Method and system for online dynamic optimization and adjustment of control objects of each round of low-frequency load shedding

Through online dynamic optimization and adjustment of control objects in each round of low-frequency load shedding, the problem of insufficient or over-controlled control in large power shortage events in the power grid is solved, the adaptability and accuracy of the control strategy are improved, and better security for the power grid is provided. support.

CN113690897BActive Publication Date: 2024-10-18NARI TECH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202110892324.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-08-04
Publication Date
2024-10-18
Estimated Expiration
2041-08-04

AI Technical Summary

Technical Problem

Based on the fixed mode of low-frequency load shedding control objects, when a large power shortage event occurs in the power grid, there is a hidden danger of insufficient or over-control of the total amount of low-frequency load shedding control.

Method used

Through online dynamic optimization, the control objects of each round of low-frequency load shedding are adjusted, statistics of the actual total controllable load are calculated, the upper limit and lower limit of the total load to be controlled are calculated, the adaptability of each round is evaluated, and adjustment strategies are formulated to adjust Control objects to achieve optimal adjustment of load.

Benefits of technology

It improves the adaptability and accuracy of the low-frequency load shedding control strategy, solves the problem of insufficient or over-controlled total control, and provides better technical support for the third line of defense for power grid security.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113690897B_ABST
    Figure CN113690897B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and system for online dynamic optimization and adjustment of control objects of each round of low-frequency load shedding. The present invention conducts adaptability evaluation on the actual total amount of controllable load of each round, formulates a strategy for adjusting the control objects of each round based on the fact that the actual total amount of controllable load is not adapted to the controllable load amount that needs to be adjusted in the round, and realizes optimization adjustment of the control objects, thereby improving the adaptability and accuracy of the low-frequency load shedding control strategy, solving the hidden danger of insufficient or over-control of the total amount of low-frequency load shedding control based on the fixed mode of low-frequency load shedding control objects, and providing better technical support for the third line of defense of power grid safety to fully play its due role.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method and a system for online dynamic optimization and adjustment of each round of control objects of low-frequency load shedding, belonging to the technical field of power systems. Background Art

[0002] During operation, the power system often has to withstand the impact of disturbances such as sudden loss of components and short-circuit faults. In order to ensure the safe and stable operation of the power system, the power system's ability to withstand disturbances is divided into three levels of safety and stability standards: the first level standard is to maintain stable operation and normal power supply of the power grid; the second level standard is to maintain stable operation, but allow partial load loss; the third level standard is that when the system cannot maintain stable operation, it must try to prevent system collapse and reduce load loss. Corresponding to the three-level safety and stability standards, there are three lines of defense for power system safety and stability control. The third line of defense consists of out-of-step decoupling, frequency and voltage emergency control devices. When the power system has out-of-step oscillation, frequency abnormality, voltage abnormality and other accidents, control measures such as decoupling, load shedding and machine shedding are taken to prevent system collapse. The third line of defense is usually not targeted at specific power grid operation modes, component failures and forms, and adopts a decentralized on-site layout mode.

[0003] During the operation of the power system, a large amount of power loss may suddenly occur. The reason may be the tripping of large-capacity units and the blocking of large-capacity DC feed-in, which leads to a sharp drop in frequency. In order to avoid the occurrence of abnormal low-frequency accidents in the power grid and then prevent the system from collapsing, a low-frequency load reduction device is configured in the substation. The low-frequency load reduction device is a safety and stability control equipment belonging to the third line of defense. After detecting that the local frequency has dropped to a certain degree and time, it automatically cuts off part of the load, so that the system frequency can be maintained or restored to the allowable range.

[0004] Generally, low-frequency load shedding control is divided into basic rounds and special rounds. According to the action conditions (low-frequency frequency and duration), the low-frequency load shedding device can realize the action control requirements of multiple basic rounds and multiple special rounds. The device has several groups (for example, 32 groups) of tripping outlets, which can be flexibly set to the corresponding rounds through software. At present, the grid operation planning engineers determine the action conditions and total control requirements of each round of low-frequency load shedding control of the grid through offline analysis and calculation based on the safety and stability characteristics of the grid. The engineering community calls it the low-frequency load shedding fixed value. The total control amount of each round is mostly given in the form of the percentage of the control load of each round to the total grid load, which is generally updated regularly (for example, once a year). Based on the principle of meeting the total control requirements of each round, combined with the load and characteristics of the outgoing and offline main transformers of the substations with installed low-frequency load shedding devices, the control objects (outgoing and offline main transformers) and corresponding action rounds of each group of tripping outlets are set; when the fixed value changes, according to the needs, select some tripping outlets of the low-frequency load shedding devices of several substations to adjust their control objects or corresponding action rounds.

[0005] Low-frequency load shedding control deals with global frequency problems, and its appropriate control amount is closely related to the total active power of the power grid before the large power shortage occurs. The load in the power grid has significant time-varying characteristics. Based on the fixed low-frequency load shedding control object mode, the actual controllable load amount of low-frequency load shedding may deviate greatly from the expected control load amount. It can be seen that due to the interaction of the above two factors, the current low-frequency load shedding control object-fixed mode has the hidden danger of insufficient or over-control of the low-frequency load shedding control amount when a large power shortage occurs in the power grid. Summary of the invention

[0006] The present invention provides a method and system for online dynamic optimization and adjustment of the control objects of each round of low-frequency load shedding, which solves the problem of insufficient total amount of low-frequency load shedding control or hidden danger of over-control when a large power shortage event occurs in the power grid based on a fixed mode of low-frequency load shedding control objects.

[0007] In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0008] The method for online dynamic optimization and adjustment of each round of control objects of low-frequency load shedding includes:

[0009] Count the total actual controllable load in each round of low-frequency load shedding;

[0010] Calculate the upper and lower limits of the total load that needs to be controlled in each round, conduct adaptability evaluation on the actual total load that can be controlled in each round, and obtain the inappropriate rounds;

[0011] Calculate the controllable load that needs to be adjusted for the unsuitable rounds;

[0012] According to the controllable load that needs to be adjusted in the unsuitable rounds and the preset rules, formulate strategies for adjusting the control objects in each round;

[0013] Adjust the control object according to the strategy of adjusting the control object in each round.

[0014] The formula used to calculate the total actual controllable load is:

[0015]

[0016] Among them, Prc i is the total actual controllable load of round i, Pr i,k,l is the real-time active power of the controllable object l by the low-frequency load shedding device k round i, KT is the total number of low-frequency load shedding devices, LT i,k is the total number of objects that can actually be controlled by the low-frequency load shedding device in round i of low-frequency load shedding k.

[0017] Calculate the upper and lower limits of the total load that needs to be controlled in each round, and conduct adaptability evaluation on the actual total load that can be controlled in each round. The specific process is as follows:

[0018] Calculate the upper and lower limits of the total load that needs to be controlled in each round;

[0019] Traversing all rounds, if the actual total controllable load of the round is within the corresponding upper and lower limits, the actual total controllable load of the round meets the current grid operation requirements; otherwise, the actual total controllable load of the round does not meet the current grid operation requirements.

[0020] Calculate the upper and lower limits of the total load that needs to be controlled in each round. The specific formula is:

[0021] Plo i =PTO*PC i *Perlo i

[0022] Pup i =PTO*PC i *Perup i

[0023] Among them, Plo i is the lower limit of the total load that needs to be controlled in round i, Pup i is the upper limit of the total load that needs to be controlled in round i, PTO is the real-time total active load of the power grid, PC i is the setting value of the total controllable load in round i, Perlo i is the lower limit coefficient, Perup i is the upper limit coefficient.

[0024] The unsuitable rounds include insufficient rounds and excessive rounds. The actual total amount of controllable load is calculated to adjust the controllable load of the unsuitable rounds. The specific process is as follows:

[0025] If the actual total controllable load is less than the corresponding lower limit, then the round is an insufficient round, and the controllable load that needs to be increased is the lower limit minus the actual total controllable load;

[0026] If the actual total amount of controllable load is greater than the corresponding upper limit value, then this round is an excess round, and the controllable load that needs to be reduced is the actual total amount of controllable load minus the upper limit value.

[0027] The default rules are:

[0028] Rule 1: If there are only insufficient rounds, the controllable load is adjusted between rounds with the rounds where the controllable load can be reduced; if the actual total controllable load is greater than the corresponding lower limit and not greater than the corresponding upper limit, then this round is a round where the controllable load can be reduced;

[0029] Rule 2: If there is only one excess round, make a controllable load adjustment within the round;

[0030] Rule 3: If there are both insufficient rounds and excessive rounds, first adjust the controllable load between the insufficient rounds and the excessive rounds; if only the excessive rounds remain after the adjustment, adjust according to Rule 2; if only the insufficient rounds remain after the adjustment, adjust according to Rule 1.

[0031] The controllable load adjustment within the round includes:

[0032] Based on the principle of minimizing the number of low-frequency load shedding devices and the number of controlled objects to be adjusted, the control objects at the outlet of the low-frequency load shedding device in the excessive round shall be locked according to the controllable load amount to be reduced as required;

[0033] Controllable load adjustments between excess and insufficient rounds include:

[0034] If the total amount of controllable load that needs to be reduced is not greater than the total amount of controllable load that needs to be increased, the excess round control object is changed to the insufficient round control object;

[0035] If the total amount of controllable load that needs to be reduced is greater than the total amount of controllable load that needs to be increased, based on the principle of adjusting the minimum number of low-frequency load reduction devices and the minimum number of control objects, some of the excess round control objects are changed to insufficient round control objects;

[0036] Adjustments to the controllable load between rounds that can reduce the controllable load and insufficient rounds include:

[0037] If the total amount of controllable load that can be reduced is not greater than the total amount of controllable load that needs to be increased, the control object of the round in which the controllable load can be reduced is changed to the control object of the insufficient round;

[0038] If the total amount of controllable load that can be reduced is greater than the total amount of controllable load that needs to be increased, based on the principle of minimizing the number of low-frequency load reduction devices and minimizing the number of control objects, some of the control objects that can reduce the controllable load will be changed to insufficient control objects.

[0039] The system for online dynamic optimization and adjustment of the control objects of each round of low-frequency load shedding includes:

[0040] Total quantity statistics module: counts the total actual controllable load in each round of low-frequency load shedding;

[0041] Evaluation module: calculates the upper and lower limits of the total load that needs to be controlled in each round, conducts adaptability evaluation on the actual total load that can be controlled in each round, and obtains the inappropriate rounds;

[0042] Load calculation module: calculates the controllable load that needs to be adjusted for the inappropriate rounds;

[0043] Strategy formulation module: formulates strategies for adjusting the control objects of each round according to the controllable load that needs to be adjusted in the unsuitable round and the preset rules;

[0044] Adjustment module: adjust the control object according to the strategy of adjusting the control object in each round.

[0045] A computer-readable storage medium storing one or more programs, wherein the one or more programs include instructions, and when the instructions are executed by a computing device, the computing device executes a method for online dynamic optimization and adjustment of control objects of each round of underfrequency load shedding.

[0046] A computing device includes one or more processors, one or more memories, and one or more programs, wherein the one or more programs are stored in the one or more memories and are configured to be executed by the one or more processors, and the one or more programs include instructions for executing a method for online dynamic optimization adjustment of each round of control objects of underfrequency load shedding.

[0047] The beneficial effects achieved by the present invention are as follows: the present invention conducts an adaptability evaluation on the actual total amount of controllable load in each round, formulates a strategy for adjusting the control object of each round based on the fact that the actual total amount of controllable load is not suitable for the controllable load amount of the round, and realizes the optimization adjustment of the control object, thereby improving the adaptability and accuracy of the low-frequency load reduction control strategy, solving the hidden danger of insufficient or over-control of the total amount of low-frequency load reduction control based on the fixed mode of low-frequency load reduction control object, and providing better technical support for the third line of defense for power grid safety to fully play its due role. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Figure 1 Flow chart of the method of the present invention. DETAILED DESCRIPTION

[0049] The present invention will be further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.

[0050] like Figure 1 As shown, the method for online dynamic optimization and adjustment of the control objects of each round of low-frequency load reduction includes the following steps:

[0051] Step 1: Count the total actual controllable load in each round of low-frequency load shedding;

[0052] Step 2: Calculate the upper and lower limits of the total load that needs to be controlled in each round, conduct adaptability evaluation on the actual total load that can be controlled in each round, and obtain the inadaptable rounds;

[0053] Step 3, calculating the controllable load amount that needs to be adjusted for the unsuitable rounds; wherein the unsuitable rounds include rounds with insufficient and excessive total actual controllable load;

[0054] Step 4, formulate a strategy for adjusting the control object of each round according to the controllable load that needs to be adjusted in the unsuitable round and the preset rules;

[0055] Step 5: Adjust the control object according to the strategy for adjusting the control object in each round.

[0056] The above method conducts adaptability evaluation on the actual total controllable load of each round, formulates strategies for adjusting the control objects of each round based on the fact that the actual total controllable load is not suitable for the controllable load of the round, and realizes the optimization adjustment of the control objects, thereby improving the adaptability and accuracy of the low-frequency load reduction control strategy, and solving the hidden dangers of insufficient or over-control of the total low-frequency load reduction control amount based on the fixed mode of low-frequency load reduction control object, and providing better technical support for the third line of defense for power grid safety to fully play its due role.

[0057] Before performing statistics on the total amount of actual controllable load, basic information is first obtained, including the configuration of the low-frequency load shedding device, the real-time operation information of the low-frequency load shedding device, the control object information of the low-frequency load shedding device, the real-time operation information of the control object of the low-frequency load shedding device, and the real-time total load of the power grid;

[0058] Among them, the low-frequency load shedding device configuration includes the load shedding round information and the number of tripping outlet groups configured by the low-frequency load shedding device, and the control object information of the low-frequency load shedding device includes the control object information such as the line and main transformer controlled by the tripping outlets of each round;

[0059] The real-time operation information of the low-frequency load reduction device, including the actual status of the device's "operation", "device locked", "PT disconnection", "communication abnormality", "general function pressure plate" and "low-frequency function pressure plate" signals, is sent to the dispatching master station by the low-frequency load reduction device in real time.

[0060] The real-time operation information of the controlled object of the low-frequency load shedding device includes the status of the output pressure plate of the controlled object (line or main transformer) and the real-time active power. This information is sent to the dispatching master station in real time by the low-frequency load shedding device.

[0061] Based on the above basic information, the actual total amount of controllable load in each round of low-frequency load reduction is counted. The specific calculation formula is as follows:

[0062]

[0063] Among them, Prc i is the total actual controllable load of round i, Pr i,k,lis the real-time active power of the controllable object l by the low-frequency load shedding device k round i, KT is the total number of low-frequency load shedding devices, LT i,k is the total number of objects that can actually be controlled by the low-frequency load shedding device in round i of low-frequency load shedding k.

[0064] Actual controllable object of low-frequency load shedding: When the low-frequency load shedding action conditions are met, the low-frequency load shedding device can automatically trip the control object at the outlet, which is related to the actual operating status of the low-frequency load shedding device and the actual operating status of the control object's outlet pressure plate.

[0065] If the low-frequency load reduction device "operates" normally, and the "general function pressure plate" and "low-frequency function pressure plate" are in the engaged state, the device has the low-frequency load reduction function; further, if the control object outlet pressure plate is in the engaged state, the control object is an actual controllable object for low-frequency load reduction.

[0066] Calculate the upper and lower limits of the total load that needs to be controlled in each round, and conduct adaptability evaluation on the actual total load that can be controlled in each round. The specific process is as follows:

[0067] 21) Calculate the upper and lower limits of the total load that needs to be controlled in each round;

[0068] The details are as follows:

[0069] Plo i =PTO*PC i *Perlo i

[0070] Pup i =PTO*PC i *Perup i

[0071] Among them, Plo i is the lower limit of the total load that needs to be controlled in round i, Pup i is the upper limit of the total load that needs to be controlled in round i, PTO is the real-time total active load of the power grid, PC i is the setting value of the total controllable load in round i, which is set offline by the operation planning engineer and is expressed as a percentage of the grid load. i is the lower limit coefficient (typical value is 0.985), Perup i is the upper limit coefficient (typical value is 1.015);

[0072] The set value of the total controllable load in each round of low-frequency load shedding is calculated by the grid operation planning engineer based on the grid offline simulation analysis. It is usually expressed as the percentage of the total controllable load in each round to the grid load. The set value is usually updated once a year.

[0073] When the grid operation planning engineer conducts offline analysis and calculation of low-frequency load reduction, he / she will calculate the load reduction of Perlo according to the maximum and minimum load reduction constraints of each round. i 、Perup i Perform calibration and give recommended values.

[0074] 22) If the actual total amount of controllable load is within the range of the upper limit and the lower limit, the actual total amount of controllable load of this round meets the requirements of the current power grid operation mode; otherwise, the actual total amount of controllable load of this round does not meet the requirements of the current power grid operation mode;

[0075] If Plo i ≤Prc i ≤Pup i , that is, the actual total controllable load is within the range of the upper limit and the lower limit, then the actual total controllable load of this round meets the requirements of the current power grid operation mode.

[0076] If Plo i >Prc i or Prc i >Pup i , that is, the actual total controllable load is not within the range of the upper and lower limits, then the actual total controllable load of this round does not meet the requirements of the current power grid operation mode.

[0077] Calculate the controllable load that needs to be adjusted when the actual total amount of controllable load is not suitable for the round, and formulate a strategy for adjusting each control object that the actual total amount of controllable load is not suitable for the round according to the preset rules, as follows:

[0078] Calculate the actual total controllable load that does not adapt to the round and needs to adjust the controllable load:

[0079] 1) If the actual controllable total load is less than the corresponding lower limit, that is, Plo i >Prc i , then this round is an insufficient round, and the controllable load that needs to be increased is the lower limit minus the actual total controllable load, that is, PInc i =Plo i -Prc i .

[0080] 2) If the actual controllable total load is greater than the corresponding upper limit, that is, Prc i >Pup i , then this round is an excess round, and the controllable load that needs to be reduced is the actual total controllable load minus the upper limit, that is, PDec i =Prc i -Pup i .

[0081] The default rules are as follows:

[0082] Rule 1: If there are only insufficient rounds, the controllable load is adjusted between rounds with other rounds where the controllable load can be reduced; if the actual total controllable load is greater than the corresponding lower limit and not greater than the corresponding upper limit, then the round is a round where the controllable load can be reduced;

[0083] Rule 2: If there is only one excess round, make a controllable load adjustment within the round;

[0084] Rule 3: If there are both insufficient rounds and excess rounds, first adjust the controllable load between the excess and insufficient rounds; if only excess rounds remain after the adjustment, adjust according to Rule 2; if only insufficient rounds remain after the adjustment, adjust according to Rule 1.

[0085] There are two types of controllable load adjustments between the above rounds, one is the controllable load adjustment between the excess round and the insufficient round, and the other is the controllable load adjustment between the controllable load reduction round and the insufficient round;

[0086] Controllable load adjustment between excess and insufficient rounds:

[0087] If the total amount of controllable load that needs to be reduced is not greater than the total amount of controllable load that needs to be increased, the excess round control object is changed to the insufficient round control object;

[0088] If the total amount of controllable load that needs to be reduced is greater than the total amount of controllable load that needs to be increased, based on the principle of adjusting the minimum number of low-frequency load reduction devices and the minimum number of control objects, some of the excess round control objects are changed to insufficient round control objects;

[0089] The controllable load adjustment between the rounds with reduced controllable load and the insufficient rounds can be:

[0090] If the total amount of controllable load that can be reduced is not greater than the total amount of controllable load that needs to be increased, the control object of the round in which the controllable load can be reduced is changed to the control object of the insufficient round;

[0091] If the total amount of controllable load that can be reduced is greater than the total amount of controllable load that needs to be increased, based on the principle of minimizing the number of low-frequency load reduction devices and minimizing the number of control objects, some of the control objects that can reduce the controllable load will be changed to insufficient control objects.

[0092] The principle of adjustment between rounds is "basic round first, then special round; basic rounds are prioritized by the round that moves first". For example, take the adjustment between excess rounds and insufficient rounds as an example: adjust the control amount of excess round j (control amount is the abbreviation of controllable load amount) to the control amount that needs to be increased for insufficient round i1, and the excess round j is changed to the adjustment amount PAj of insufficient round i1. i1,j=min{PInc i1 ,PDec j};

[0093] After adjustment, the total amount of control less than round i1 is Prc i +PA i1,j , the control amount that needs to be increased is PInc i1 -PAj i1,j ; The total amount of excess round j is Prc j -PAj i1,j , the control amount that needs to be reduced is PDec j -PAj i1,j ; If PInc i -PAj i1,j If PDec is greater than 0, it means that the control amount needs to be increased in round i1, and the control amount should be increased from other rounds where the control amount needs to be reduced; j -PAj i1,j If it is greater than 0, it means that the control amount of the excess round j needs to be reduced, and its excess control amount can be adjusted to other rounds that need to increase the control amount.

[0094] Without loss of generality, for the situation where the control amount of excess round j needs to be reduced to increase the control amount of insufficient round i1, the actual controllable amount of excess round j of low-frequency load reduction device k is calculated:

[0095]

[0096] The principle is to minimize the number of low-frequency load shedding devices that participate in the change from excess round j to insufficient round i1, according to Prc k,j From large to small, if Greater than or equal to the total amount of load shedding control that needs to be changed to less than round i1, If it is less than the total load reduction control amount that needs to be changed to less than round i1, then K j,i1 An underfrequency load reduction device is involved in the change process.

[0097] Front K j,i1 -1 low-frequency load reduction device changes all control objects in excess round j to control objects in insufficient round i1. j,i1 The control objects of the under-frequency load reduction device are based on the principle that the number of control objects that change from excess round j to insufficient round i1 is the minimum, according to Pr j,k,l Determine the change round control object in order from large to small. Greater than or equal to the total amount of load reduction control that needs to be changed to less than round i1.

[0098] The adjustment between rounds and insufficient rounds that can reduce the controllable load is similar to the adjustment between excess rounds and insufficient rounds mentioned above.

[0099] The controllable load within the round is adjusted as follows: based on the principle of minimizing the number of low-frequency load reduction devices and the number of controlled objects, the controllable load that needs to be reduced is reduced, and the outlet control object of the low-frequency load reduction device in the excessive round is locked.

[0100] The strategy adopts the form of a ternary table {j, i, l}, which means that the control object l is adjusted from the exit action control of round j to the exit action control of round i. If i=j, it means that the control object l is adjusted from the exit action of round j to the locking exit action.

[0101] According to the strategy of adjusting the control objects of each round, the control objects are adjusted. Specifically, the information of the control objects of the low-frequency load shedding export action rounds that need to be adjusted is sent to the relevant substation low-frequency load shedding devices, and the substation low-frequency load shedding devices will update the export action rounds accordingly.

[0102] In compliance with common national and industry standards such as DL / T 5003 and meeting information security requirements, the dispatching master station and the low-frequency load shedding device adopt communication standard transmission protocols such as DL / T 476, DL / T 634.5101, and DL / T 634.5104 to achieve data transmission and interaction between the two. The dispatching master station transmits the adjustment strategy ternary table to the low-frequency load shedding device. After receiving the adjustment strategy ternary table, the low-frequency load shedding device adjusts the controlled object.

[0103] The above method fully considers the characteristics that the appropriate total control amount of low-frequency load shedding of the power grid is closely related to the total active power of the entire network before the large power shortage occurs, conducts adaptability evaluation on the actual total controllable load of each round, and formulates strategies for adjusting the control objects of each round based on the fact that the actual total controllable load is not suitable for the round and needs to adjust the controllable load, so as to achieve optimal adjustment of the control objects, thereby improving the adaptability and accuracy of the low-frequency load shedding control strategy, solving the hidden dangers of insufficient or over-control of the total low-frequency load shedding control amount based on the fixed mode of low-frequency load shedding control object, and providing better technical support for the third line of defense for power grid safety to fully play its due role.

[0104] The software system corresponding to the above method, i.e., the system for online dynamic optimization and adjustment of the control objects of each round of under-frequency load shedding, comprises:

[0105] Total quantity statistics module: counts the total actual controllable load in each round of low-frequency load shedding;

[0106] Evaluation module: calculates the upper and lower limits of the total load that needs to be controlled in each round, conducts adaptability evaluation on the actual total load that can be controlled in each round, and obtains the inappropriate rounds;

[0107] Load calculation module: calculates the controllable load that needs to be adjusted for the inappropriate rounds;

[0108] Strategy formulation module: formulates strategies for adjusting the control objects of each round according to the controllable load that needs to be adjusted in the unsuitable round and the preset rules;

[0109] Adjustment module: adjust the control object according to the strategy of adjusting the control object in each round.

[0110] A computer-readable storage medium storing one or more programs, wherein the one or more programs include instructions, and when the instructions are executed by a computing device, the computing device executes a method for online dynamic optimization and adjustment of control objects of each round of underfrequency load shedding.

[0111] A computing device includes one or more processors, one or more memories, and one or more programs, wherein the one or more programs are stored in the one or more memories and are configured to be executed by the one or more processors, and the one or more programs include instructions for executing a method for online dynamic optimization adjustment of each round of control objects of underfrequency load shedding.

[0112] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0113] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0114] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0115] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0116] The above are merely embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention are included in the scope of the claims of the present invention to be approved.

Claims

1. A method for online dynamic optimization and adjustment of the control objects of each round of low-frequency load shedding, characterized in that: include: Count the total actual controllable load in each round of low-frequency load shedding; Calculate the upper and lower limits of the total load that needs to be controlled in each round, conduct adaptability evaluation on the actual total load that can be controlled in each round, and obtain the inappropriate rounds; Calculate the controllable load that needs to be adjusted for the unsuitable rounds; Formulate strategies to adjust the control objects of each round according to the controllable load that needs to be adjusted in the unsuitable rounds and the preset rules; Adjust the control object according to the strategy of adjusting the control object in each round; Among them, the upper limit and lower limit of the total load to be controlled in each round are calculated, and the adaptability of the actual controllable load in each round is evaluated. The specific process is: calculate the upper limit and lower limit of the total load to be controlled in each round; traverse all rounds, if the actual controllable load of the round is within the corresponding upper limit and lower limit range, then the actual controllable load of the round is adapted to the current power grid operation mode requirements; otherwise, the actual controllable load of the round is not adapted to the current power grid operation mode requirements; Calculate the upper and lower limits of the total load that needs to be controlled in each round. The specific formula is: Plo i =PTO*PC i *Perlo i Pup i =PTO*PC i *Perup i In the formula, Plo i is the lower limit of the total load that needs to be controlled in round i, Pup i is the upper limit of the total load that needs to be controlled in round i, PTO is the real-time total active load of the power grid, PC i is the setting value of the total controllable load in round i, Perlo i is the lower limit coefficient, Perup i is the upper limit coefficient; The unsuitable rounds include insufficient rounds and excessive rounds; the controllable load amount that needs to be adjusted for the unsuitable rounds of the actual controllable load total amount is calculated, and the specific process is: if the actual controllable load total amount is less than the corresponding lower limit value, then the round is an insufficient round, and the controllable load amount that needs to be increased is the lower limit value minus the actual controllable load total amount; if the actual controllable load total amount is greater than the corresponding upper limit value, then the round is an excessive round, and the controllable load amount that needs to be reduced is the actual controllable load total amount minus the upper limit value; The preset rules are: Rule 1: If there are only insufficient rounds, the controllable load is adjusted between rounds with the rounds where the controllable load can be reduced; among them, if the actual total controllable load is greater than the corresponding lower limit value and not greater than the corresponding upper limit value, then the round is a round where the controllable load can be reduced; Rule 2: If there are only excess rounds, the controllable load is adjusted within the round; Rule 3: If there are both insufficient rounds and excess rounds, the controllable load between rounds is adjusted for the insufficient rounds and the excess rounds first; if only excess rounds remain after the adjustment, adjust according to Rule 2; if only insufficient rounds remain after the adjustment, adjust according to Rule 1.

2. The method for online dynamic optimization and adjustment of each round of control objects of low-frequency load shedding according to claim 1 is characterized in that: The formula used to calculate the total actual controllable load is: Among them, Prc i is the total actual controllable load of round i, Pr i,k,l is the real-time active power of the controllable object l by the low-frequency load shedding device k round i, KT is the total number of low-frequency load shedding devices, LT i,k is the total number of objects that can actually be controlled by the low-frequency load shedding device in round i of low-frequency load shedding k.

3. The method for online dynamic optimization and adjustment of each round of control objects of low-frequency load shedding according to claim 1 is characterized in that: The controllable load adjustment within the round includes: Based on the principle of minimizing the number of low-frequency load shedding devices and the number of controlled objects to be adjusted, the control objects at the outlet of the low-frequency load shedding device in the excessive round shall be locked according to the controllable load amount to be reduced as required; Controllable load adjustments between excess and insufficient rounds include: If the total amount of controllable load that needs to be reduced is not greater than the total amount of controllable load that needs to be increased, the excess round control object is changed to the insufficient round control object; If the total amount of controllable load that needs to be reduced is greater than the total amount of controllable load that needs to be increased, based on the principle of adjusting the minimum number of low-frequency load reduction devices and the minimum number of control objects, some of the excess round control objects are changed to insufficient round control objects; Adjustments to the controllable load between rounds that can reduce the controllable load and insufficient rounds include: If the total amount of controllable load that can be reduced is not greater than the total amount of controllable load that needs to be increased, the control object of the round in which the controllable load can be reduced is changed to the control object of the insufficient round; If the total amount of controllable load that can be reduced is greater than the total amount of controllable load that needs to be increased, based on the principle of minimizing the number of low-frequency load reduction devices and minimizing the number of control objects, some of the control objects that can reduce the controllable load will be changed to insufficient control objects.

4. A system for online dynamic optimization and adjustment of the control objects of each round of low-frequency load shedding, characterized in that: include: Total quantity statistics module: counts the total actual controllable load in each round of low-frequency load shedding; Evaluation module: calculates the upper and lower limits of the total load that needs to be controlled in each round, conducts adaptability evaluation on the actual total load that can be controlled in each round, and obtains the inappropriate rounds; Load calculation module: calculates the controllable load that needs to be adjusted for the inappropriate rounds; Strategy formulation module: formulates strategies for adjusting the control objects of each round according to the controllable load that needs to be adjusted in the unsuitable round and the preset rules; Adjustment module: adjusts the control object according to the strategy of adjusting the control object in each round; Among them, the upper limit and lower limit of the total load to be controlled in each round are calculated, and the adaptability of the actual controllable load in each round is evaluated. The specific process is: calculate the upper limit and lower limit of the total load to be controlled in each round; traverse all rounds, if the actual controllable load of the round is within the corresponding upper limit and lower limit range, then the actual controllable load of the round is adapted to the current power grid operation mode requirements; otherwise, the actual controllable load of the round is not adapted to the current power grid operation mode requirements; Calculate the upper and lower limits of the total load that needs to be controlled in each round. The specific formula is: Plo i =PTO*PC i *Perlo i Pup i =PTO*PC i *Perup i In the formula, Plo i is the lower limit of the total load that needs to be controlled in round i, Pup i is the upper limit of the total load that needs to be controlled in round i, PTO is the real-time total active load of the power grid, PC i is the setting value of the total controllable load in round i, Perlo i is the lower limit coefficient, Perup i is the upper limit coefficient; The unsuitable rounds include insufficient rounds and excessive rounds; the controllable load amount that needs to be adjusted for the unsuitable rounds of the actual controllable load total amount is calculated, and the specific process is: if the actual controllable load total amount is less than the corresponding lower limit value, then the round is an insufficient round, and the controllable load amount that needs to be increased is the lower limit value minus the actual controllable load total amount; if the actual controllable load total amount is greater than the corresponding upper limit value, then the round is an excessive round, and the controllable load amount that needs to be reduced is the actual controllable load total amount minus the upper limit value; The preset rules are: Rule 1: If there are only insufficient rounds, the controllable load is adjusted between rounds with the rounds where the controllable load can be reduced; among them, if the actual total controllable load is greater than the corresponding lower limit value and not greater than the corresponding upper limit value, then the round is a round where the controllable load can be reduced; Rule 2: If there are only excess rounds, the controllable load is adjusted within the round; Rule 3: If there are both insufficient rounds and excess rounds, the controllable load between rounds is adjusted for the insufficient rounds and the excess rounds first; if only excess rounds remain after the adjustment, adjust according to Rule 2; if only insufficient rounds remain after the adjustment, adjust according to Rule 1.

5. A computer-readable storage medium storing one or more programs, characterized in that: The one or more programs include instructions which, when executed by a computing device, cause the computing device to perform any one of the methods according to claims 1 to 3.

6. A computing device, characterized in that include: One or more processors, one or more memories, and one or more programs, wherein the one or more programs are stored in the one or more memories and are configured to be executed by the one or more processors, and the one or more programs include instructions for executing any of the methods according to claims 1 to 3.

Citation Information

Patent Citations

  • Control method for combined selection and shedding of feeder loads in overload process of power line or power transformer

    CN104092217A

  • Emergency energy management strategy suitable for light-storage-type building microgrid

    CN106230014A