A low calorific value sludge pyrolysis tail gas combustion torch
By using PLC control module and torch igniter in the sludge cracking exhaust gas combustion torch, the working status of the burner is automatically adjusted, which solves the problems of insufficient combustion and difficult to burn low-calorie exhaust gas, and achieves complete combustion and safe and efficient treatment of exhaust gas.
Patent Information
- Application Number
- CN202110864503.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-07-29
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2041-07-29
AI Technical Summary
In the existing sludge cracking exhaust gas combustion technology, the problems of insufficient combustion and difficulty in burning low-calorie value exhaust gases lead to air pollution and high purification costs.
A low-calorie value sludge cracking exhaust gas combustion torch was designed, using a PLC control module combined with a combustion mechanism and a torch igniter. By detecting the exhaust gas flow and pressure parameters, the working status of the burner is automatically adjusted to ensure that the exhaust gas is completely burned and in the incineration tower. Perform efficient combustion.
Complete combustion of exhaust gas is achieved, air pollution is avoided, the risk of insufficient combustion is reduced, and the safety and practicality of the treatment process is improved.
Smart Images

Figure CN113776072B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of sludge cracking, and in particular relates to a low calorific value sludge cracking tail gas combustion torch. Background Art
[0002] When the sludge is treated in an environmentally friendly manner, the sludge with a moisture content of 80% or 60% is formed by a forming machine and then enters a mesh belt dryer for drying. The sludge is dried to a moisture content of less than 15%. The dried sludge enters a first-stage silo and granulates before entering a gasifier for further treatment.
[0003] During the sludge treatment process, the sludge produces cracking tail gas, which contains harmful gases. Direct discharge causes air pollution. The cracking tail gas is mostly flammable gas. The heat energy generated by burning the cracking tail gas can be used for the dryer, while avoiding the problem of air pollution caused by direct discharge.
[0004] At present, pyrolysis tail gas is mostly treated by burning with a torch or by purification. For example, the patent document with publication number CN109233909A recycles the pyrolysis tail gas, wherein the purification cost is too high. Ordinary pyrolysis tail gas has some problems during combustion, such as the mismatch between the pyrolysis tail gas discharge volume and the burning speed of the pyrolysis tail gas, resulting in incomplete combustion, and some low calorific value pyrolysis tail gas is difficult to burn in the pyrolysis tail gas, which will cause the pyrolysis tail gas to be discharged into the atmosphere and cause air pollution. Summary of the invention
[0005] In order to solve the above problems, the present invention provides a low calorific value sludge cracking tail gas combustion torch, which is provided with a combustion mechanism, a gas supply pipeline, a torch igniter and an incineration tower. The combustion mechanism is automatically adjusted according to the tail gas intake of the gas supply pipeline in combination with a PLC control module, so as to realize complete combustion of the sludge cracking tail gas. The low calorific value cracking tail gas is burned by using a torch igniter, so as to prevent the cracking tail gas from entering the atmosphere and polluting the environment.
[0006] In order to achieve the above object, the technical solution of the present invention is:
[0007] A low calorific value sludge pyrolysis tail gas combustion torch, comprising a tail smoke emission pipeline, the tail gas emission pipeline is connected to a combustion mechanism, the combustion mechanism comprises a gas supply pipeline and a plurality of burners, the gas supply pipeline is connected to the tail gas emission pipeline, the burner is provided with a torch igniter, and an incineration tower is arranged around the burner;
[0008] The gas supply pipeline and the burner and the torch igniter are connected with a PLC control module, and the PLC control module includes a PLC controller, a detection unit and an execution unit. The detection unit is used to detect the flow and pressure parameters of the gas supply pipeline, the combustion condition of the torch igniter and the combustion condition of the burner. The PLC controller receives the detection parameters of the detection unit and controls the working state of the combustion mechanism and the torch igniter through the execution unit according to the detection parameters of the detection unit.
[0009] Further, the gas supply pipeline includes a main pipeline and a primary DN40 exhaust combustion pipeline and multiple secondary DN150 exhaust combustion pipelines connected to the main pipeline, and the primary DN40 exhaust combustion pipeline and the multiple secondary DN150 exhaust combustion pipelines are connected in parallel;
[0010] The first level DN40 exhaust combustion pipeline connection N Burners, N The burners are connected in parallel. N A flame arrester is arranged between one side of the burners connected in parallel and the first-level DN40 discharge combustion pipeline, and a normally open gate valve is arranged between the first-level DN40 discharge combustion pipeline and the main pipeline.
[0011] Furthermore, one side of the secondary DN150 discharge combustion pipeline is connected to the main pipeline through a normally open gate valve, and the other side is connected to the burner. The corresponding multiple burners are connected in parallel. The number of burners connected to the secondary DN150 discharge combustion pipeline is shown in formula (1):
[0012] A=N+C (1);
[0013] in, C The sequence number for the secondary DN150 discharge combustion pipeline, N The number of burners connected to the primary DN40 exhaust combustion pipeline;
[0014] A normally open gate valve is provided between the secondary DN150 exhaust combustion pipeline and the main pipeline.
[0015] Furthermore, the torch igniter includes an active igniter and a passive igniter, the active igniter is connected to a gas supply pipeline, a second flame arrester is arranged between the gas supply pipeline and the active igniter, the torch igniter is provided with a high-voltage generator, and a permanent lamp is arranged in a bypass of the torch igniter.
[0016] Furthermore, the incineration tower is a cylindrical chimney-shaped structure welded from carbon steel plates. The outer surface of the incineration tower is provided with a coating made of silicone high-temperature paint, and the inner side of the incineration tower is provided with a ceramic fiber coating. The temperature resistance of the ceramic fiber coating is greater than 1200°C. The bottom of the incineration tower is backfilled with a pebble pad, and a plurality of support piers are provided on the bottom surface of the incineration tower. The other end of the support pier is fixed to the ground. There is a gap L between the incineration tower and the bottom surface through the support pier, and the range of the gap L is 1.2~1.5m.
[0017] Furthermore, a windbreak wall is provided outside the incineration tower. The windbreak wall is in a U-shaped structure and is arranged outside the incineration tower. The diameter of the circumscribed circle of the windbreak wall is larger than the diameter of the incineration tower. The height of the windbreak wall is 2-3m.
[0018] Furthermore, the detection unit includes a flame detector, a pressure transmitter, a flow transmitter and a combustible gas alarm;
[0019] The pressure transmitter is arranged on the main pipeline, and is used to detect the exhaust gas pressure parameter;
[0020] The flow transmitter is arranged on the first-level DN40 exhaust combustion pipeline, and the flow transmitter is used to detect the exhaust gas flow in the first-level DN40 exhaust combustion pipeline;
[0021] The flame detector is arranged at the position of the torch igniter, and is used to detect the operating state of the torch igniter;
[0022] The combustible gas alarm is arranged outside the incineration tower and is used to detect the combustion status of the incineration tower.
[0023] Furthermore, the execution unit includes a plurality of electrically controlled pneumatic butterfly valves and electric valves, and the plurality of electrically controlled pneumatic butterfly valves are separately arranged on the secondary DN150 exhaust combustion pipeline;
[0024] The electric valve is arranged on the air supply pipeline.
[0025] Further, the flame detector, pressure transmitter, flow transmitter and combustible gas alarm are all connected to the analog input terminal of the PLC controller, and the coils of the plurality of electrically controlled pneumatic butterfly valves and electric valves are all connected to the digital output port of the PLC controller;
[0026] The digital input terminal of the PLC controller is provided with a manual button.
[0027] Furthermore, the secondary DN150 exhaust combustion pipeline is provided with an anti-backfire pipeline, the anti-backfire pipeline is arranged at the front end of the flame arrester, and the anti-backfire pipeline is connected to the nitrogen delivery equipment through a normally open gate valve;
[0028] A bursting disc is arranged on one of the secondary DN150 exhaust combustion pipelines, and the bursting disc is used for safe pressure relief.
[0029] Through the above technical solution, the beneficial effects of the present invention are:
[0030] 1. The present invention is provided with a combustion mechanism, which includes an air supply pipeline and multiple burners. The air supply pipeline is connected to the exhaust gas emission pipeline. The exhaust gas from sludge cracking enters the air supply pipeline. The inlet and outlet air pressure and airflow of the air supply pipeline are detected by the detection unit. When the exhaust gas discharge amount increases and the air supply pipeline operates at full load, the exhaust gas discharge speed is matched with the combustion speed by combining multiple burners to avoid the problem of insufficient combustion.
[0031] 2. The burner of the present invention is provided with a torch igniter, which ignites the burner to avoid the problem that the low calorific value cracking tail gas is difficult to burn in the torch.
[0032] 3. The burner of the present invention is provided with an incineration tower on the periphery, which plays the role of sealing the flame, blocking radiant heat, heat conduction and combustion noise during operation. At the same time, the incineration tower discharges the combustion products to a height of more than 15 meters to avoid the influence of combustion exhaust gas on the ground air quality. The natural air distribution method is adopted during the combustion operation of the incineration tower, which can generate sufficient negative pressure at its bottom and improve the burnout rate. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 This is a system principle diagram of a low calorific value sludge cracking tail gas combustion torch of the present invention;
[0034] Figure 2 This is an electrical connection diagram of a low calorific value sludge pyrolysis tail gas combustion torch of the present invention;
[0035] Figure 3 The present invention is a schematic diagram of the structure of an incineration tower for burning a low calorific value sludge cracking tail gas torch.
[0036] Figure numbers: 1 is the primary DN40 emission and combustion pipeline, 2 is the secondary DN150 emission and combustion pipeline, 3 is the flame arrester, 4 is the normally open gate valve, 5 is the burner, 6 is the torch igniter, 7 is the gas supply pipeline, 8 is the second flame arrester, 9 is the high-voltage generator, 10 is the windbreak wall, 11 is the flame detector, 12 is the pressure transmitter, 13 is the flow transmitter, 14 is the combustible gas alarm, 15 is the electric-controlled pneumatic butterfly valve, 16 is the electric valve, 17 is the ever-burning lamp, 18 is the manual button, 19 is the bursting disc, and 20 is the incineration tower. DETAILED DESCRIPTION
[0037] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments:
[0038] Example 1
[0039] The present invention provides a low calorific value sludge pyrolysis tail gas combustion torch, such as Figures 1 to 3 As shown, it includes a tail gas emission pipeline, the tail gas emission pipeline is connected to a combustion mechanism, the combustion mechanism includes a gas supply pipeline and a plurality of burners 5, the gas supply pipeline is connected to the tail gas emission pipeline, the burner 5 is provided with a torch igniter 6, and an incineration tower 20 is provided around the burner 5;
[0040] The gas supply pipeline and the burner 5 are connected to the torch igniter 6 with a PLC control module, which includes a PLC controller, a detection unit and an execution unit. The detection unit is used to detect the flow and pressure parameters of the gas supply pipeline, the combustion condition of the igniter 6 and the combustion condition of the burner 5. The PLC controller receives the detection parameters of the detection unit and controls the working state of the combustion mechanism and the torch igniter 6 through the execution unit according to the detection parameters of the detection unit.
[0041] The present invention adopts PID control on the gas supply pipeline, burner and torch igniter through the PLC control module, so that the emission speed of sludge pyrolysis tail gas is automatically matched with the combustion speed, thereby avoiding the problem of insufficient combustion to the greatest extent and providing heat energy for the upper-level sludge drying operation; at the same time, the torch igniter avoids the problem of combustion inconvenience caused by damp weather or low concentration of combustible gas in the sludge pyrolysis tail gas, and finally the combustion operation is completed in the incineration tower, reducing the impact of combustion on the surrounding environment, and improving the safety and practicality of the sludge pyrolysis tail gas treatment process.
[0042] Example 2
[0043] In order to fully burn the sludge pyrolysis tail gas and facilitate its treatment, the combustion mechanism, flare ignition and incineration tower are optimized respectively. Specifically:
[0044] The gas supply pipeline includes a main pipeline and a primary DN40 exhaust combustion pipeline 1 and multiple secondary DN150 exhaust combustion pipelines 2 connected to the main pipeline, wherein the primary DN40 exhaust combustion pipeline 1 and the multiple secondary DN150 exhaust combustion pipelines 2 are connected in parallel;
[0045] The first-level DN40 exhaust combustion pipeline 1 is connected N Burners 5, N The burners 5 are connected in parallel. N A flame arrester 3 is arranged between one side of the burners 5 connected in parallel and the first-level DN40 discharge combustion pipeline 1, and a normally open gate valve 4 is arranged between the first-level DN40 discharge combustion pipeline 1 and the main pipeline.
[0046] As an implementable method, one side of the secondary DN150 discharge combustion pipeline 2 is connected to the main pipeline through a normally open gate valve 4, and the other side is connected to the burner 5, and the corresponding multiple burners 5 are connected in parallel. The number of burners 5 connected to the secondary DN150 discharge combustion pipeline 2 is shown in Formula 1:
[0047] A=N+C (1);
[0048] in, C The sequence number for the secondary DN150 discharge combustion pipeline 2, C∈N+ , N The number of burners 5 connected to the primary DN40 discharge combustion pipeline 1;
[0049] A normally open gate valve 4 is provided between the secondary DN150 exhaust combustion pipeline 2 and the main pipeline.
[0050] In this embodiment, two secondary DN150 emission combustion pipelines 2 are set, and the tail smoke emission pipeline is divided into three routes through the main pipeline. The three routes operate separately under different air pressures. Compared with setting one route to match the burner by adjusting the valve opening, the switching frequency of the automatic valve is reduced, the service life is extended, and the system stability is improved. The burner 5 is in the shape of a cyclone, which is convenient for mixing air and sludge cracking tail gas. The burner 5 is provided with a flame stabilizing plate to ensure that there is no backfire at low flow and no flameout at maximum flow.
[0051] There is a spacing between each row of burners 5, and the entire combustion space is fully utilized to enhance the application of air. The grading and spacing of the burners 5 are sufficient to ensure the air required for low-smoke combustion.
[0052] As an implementable embodiment, the torch igniter 6 includes an active igniter and a passive igniter, the active igniter is connected to a gas supply pipeline 7, a second flame arrester 8 is arranged between the gas supply pipeline 7 and the active igniter, the torch igniter 6 is provided with a high-voltage generator 9, and a permanent lamp 17 is arranged in a bypass of the torch igniter 6.
[0053] In this embodiment, the torch igniter 6 uses the discharge principle of the Jacob elevator to ignite, and a circularly moving planar electrode is provided, which has strong self-cleaning ability and no electro-corrosion phenomenon. The high-temperature working parts are made of high-temperature resistant alloy steel 310ss, which is resistant to corrosion by corrosive gases such as acid and sulfur. The electrical insulation parts of the torch igniter 6 are made of quartz glass, so that it can operate at a temperature of 1200°C for a long time. The torch igniter 6 is provided with a heat-resistant shield, and the electrical parts are not exposed, which effectively avoids the failure of the ignition power supply to leak due to heavy rain, snow, ice and pollution.
[0054] The high voltage generator 9 is used to output two paths of high voltage electricity with opposite phases and isolated from each other, which can ignite the ground with a single path, and has an ignition insurance function. If the torch igniter 6 has a local ice and snow short circuit, its output current will automatically increase, and the ice and snow that causes the short circuit will melt, so that the torch igniter 6 will automatically return to normal. The circuit is provided with output short circuit and circuit breaker protection functions.
[0055] As an implementable embodiment, the incineration tower 20 is a cylindrical chimney-shaped structure welded from carbon steel plates. The outer surface of the incineration tower 20 is provided with a coating made of silicone high-temperature paint, and the inner side of the incineration tower 20 is provided with a ceramic fiber coating. The temperature resistance of the ceramic fiber coating is greater than 1200°C. The bottom of the incineration tower 20 is backfilled with a pebble pad. The bottom surface of the incineration tower 20 is provided with multiple support piers, and the other end of the support pier is fixed to the ground. There is a gap L between the incineration tower 20 and the bottom surface through the support pier, and the range of the gap L is 1.2~1.5m.
[0056] The incineration tower 20 can withstand the erosion of rain and smoke, and has the function of sound absorption and noise reduction; it adopts the diffusion combustion principle, and the chimney-like structure makes the bottom of the incineration tower 20 produce sufficient negative pressure. The upward burning method and the height of the combustion tower are conducive to enhancing the heat flow suction generated during combustion, and the natural air distribution method improves the burnout rate.
[0057] As an implementable embodiment, a windbreak wall 10 is additionally provided on the periphery of the incineration tower 20. The windbreak wall 10 is in a U-shaped structure and is arranged outside the incineration tower 20. The diameter of the circumscribed circle of the windbreak wall 10 is larger than the diameter of the incineration tower 20, and the height of the windbreak wall 10 is 2 to 3 meters.
[0058] The windbreak wall 10 can further reduce the heat radiation generated by the combustion operation, making the external heat radiation lower than 1.58kW / m2. At the same time, the windbreak wall 10 will serve as a channel for natural air injection, and the air enters from above the windbreak wall to prevent strong wind from blowing directly into the interior from the bottom of the incineration tower 20 and affecting the stable combustion of the burner.
[0059] As an implementable method, the secondary DN150 exhaust combustion pipeline 2 is provided with an anti-flashback pipeline, the anti-flashback pipeline is arranged at the front end of the flame arrester 3, and the anti-flashback pipeline is connected to the nitrogen delivery equipment through the normally open gate valve 4;
[0060] A bursting disc 19 is provided on one of the secondary DN150 exhaust combustion pipelines 2, and the bursting disc is used for safe pressure relief.
[0061] Example 3
[0062] In order to realize the automatic combustion of sludge cracking gas, the PLC control module is optimized.
[0063] The detection unit includes a flame detector 11, a pressure transmitter 12, a flow transmitter 13 and a combustible gas alarm 14;
[0064] The pressure transmitter 12 is arranged on the main pipeline, and the pressure transmitter 12 is used to detect the exhaust gas pressure parameter;
[0065] The flow transmitter 13 is arranged on the first-level DN40 exhaust combustion pipeline 1, and the flow transmitter 13 is used to detect the exhaust gas flow in the first-level DN40 exhaust combustion pipeline 1;
[0066] The flame detector 11 is disposed at the position of the torch igniter 6, and the flame detector 11 is used to detect the operating state of the torch igniter 6;
[0067] The combustible gas alarm 14 is arranged outside the incineration tower 20 and is used to detect the combustion status of the incineration tower 20.
[0068] As an implementable embodiment, the execution unit includes a plurality of electrically controlled pneumatic butterfly valves 15 and electric valves 16, and the plurality of electrically controlled pneumatic butterfly valves 15 are separately arranged on the secondary DN150 exhaust combustion pipeline 2;
[0069] The electric valve 16 is arranged on the air supply pipeline 7 .
[0070] As an implementable embodiment, the flame detector 11, the pressure transmitter 12, the flow transmitter 13 and the combustible gas alarm 14 are all connected to the analog input terminal of the PLC controller, and the coils of the multiple electrically controlled pneumatic butterfly valves 15 and the electric valve 16 are all connected to the digital output port of the PLC controller;
[0071] The digital input terminal of the PLC controller is provided with a manual button 18 .
[0072] In this embodiment, the PLC controller is connected to a host computer via RS232 serial port communication.
[0073] Combined with the above-mentioned embodiment, the automatic combustion of sludge pyrolysis gas is described. Figure 1 As shown in the present embodiment, two secondary DN150 emission combustion pipelines 2 are provided, and the tail smoke emission pipeline is divided into three routes through the main pipeline, wherein the flame detector 11 is labeled A and B in the figure, the pressure transmitter 12 is labeled C in the figure, the flow transmitter 13 is labeled D in the figure, and the combustible gas alarm 14 is labeled E in the figure, and the electric-controlled pneumatic butterfly valves 15 corresponding to the two secondary DN150 emission combustion pipelines 2 are labeled F2 and F3 respectively in the figure, and the electric valve 16 is labeled F1 in the figure, and the natural gas transmission end is labeled R in the figure, the tail smoke emission pipeline is labeled WQ in the figure, and the nitrogen delivery equipment is labeled N2 in the figure;
[0074] During automatic operation, C detects that sludge pyrolysis tail gas enters the main pipeline. In the normal preparation state, the normally open gate valve on the main pipeline is in the normally open state. The sludge pyrolysis tail gas enters the first-level DN40 discharge combustion pipeline 1 and flows toward the burner 5 through D. In this embodiment, N Take 1, a first-level DN40 emission combustion pipeline 1 is connected to a burner 5, D detects that there is sludge cracking tail gas in the first-level DN40 emission combustion pipeline 1, and transmits it to the PLC controller, the PLC controller energizes the F1 coil, and the natural gas is delivered to the position of the torch igniter 6, the PLC controller controls the electrode ignition of the torch igniter 6, the torch igniter 6 generates a flame, and ignites the burner 5 to output the sludge cracking tail gas. At this time, the PLC controller controls the torch igniter 6 to stop working, and the pilot lamp 17 is ignited while igniting the burner 5, and continues to work with the burner 5 to avoid the burner 5 from extinguishing;
[0075] C detects that the pressure of the sludge pyrolysis tail gas increases, and the PLC controller opens the F2 and F3 valves according to the detection value, and adjusts the valve opening to match the burner. In this embodiment, the number of burners 5 connected to the two secondary DN150 emission combustion pipelines 2 are 2 and 3 respectively, and E detects the exhaust gas at the outlet of the incineration tower 20. When the PLC controller detects that the exhaust gas at the outlet of the incineration tower 20 contains combustible gas, the PID control method is used to adjust the valve opening of F2 and F3 in combination with the C detection parameters, so that the sludge pyrolysis tail gas intake volume and the combustion speed are automatically matched.
[0076] The manual button 18 is used to detect the working state of the torch igniter 6. The torch igniter 6 is ignited by pressing the manual button 18. A or B detects whether the torch igniter 6 is ignited successfully. If the ignition fails, the PLC controller alarms the staff through the host computer.
[0077] The embodiments described above are only preferred embodiments of the present invention and are not intended to limit the scope of implementation of the present invention. Therefore, any equivalent changes or modifications made according to the structures, features and principles described in the patent scope of the present invention should be included in the scope of the patent application of the present invention.
Claims
1. A low calorific value sludge pyrolysis tail gas combustion torch, comprising a tail gas discharge pipeline, characterized in that: The tail gas discharge pipeline is connected to a combustion mechanism, the combustion mechanism comprises a gas supply pipeline and a plurality of burners (5), the gas supply pipeline is in communication with the tail gas discharge pipeline, the burner (5) is provided with a torch igniter (6), and an incineration tower (20) is provided on the periphery of the burner (5); The gas supply pipeline and the burner (5) and the torch igniter (6) are connected to a PLC control module, the PLC control module comprising a PLC controller, a detection unit and an execution unit, the detection unit being used to detect flow and pressure parameters of the gas supply pipeline, the combustion status of the torch igniter (6) and the combustion status of the burner (5), the PLC controller receiving detection parameters of the detection unit and controlling the working status of the combustion mechanism and the torch igniter (6) through the execution unit according to the detection parameters of the detection unit; The gas supply pipeline comprises a main pipeline and a primary DN40 exhaust combustion pipeline (1) and multiple secondary DN150 exhaust combustion pipelines (2) connected to the main pipeline, wherein the primary DN40 exhaust combustion pipeline (1) and the multiple secondary DN150 exhaust combustion pipelines (2) are connected in parallel; The first level DN40 exhaust combustion pipeline (1) is connected N burners (5), N The burners (5) are connected in parallel, N A flame arrester (3) is provided between one side of the burners (5) connected in parallel and the first-level DN40 discharge combustion pipeline (1), and a normally open gate valve (4) is provided between the first-level DN40 discharge combustion pipeline (1) and the main pipeline; One side of the secondary DN150 discharge combustion pipeline (2) is connected to the main pipeline via a normally open gate valve (4), and the other side is connected to the burner (5). The corresponding plurality of burners (5) are connected in parallel. The number of burners (5) connected to the secondary DN150 discharge combustion pipeline (2) is as shown in Formula 1: A=N+C (1); in, C is the sequence number of the secondary DN150 discharge combustion pipeline (2), N The number of burners (5) connected to the primary DN40 discharge combustion pipeline (1); A normally open gate valve (4) is provided between the secondary DN150 exhaust combustion pipeline (2) and the main pipeline; The torch igniter (6) comprises an active igniter and a passive igniter, the active igniter is connected to a gas supply pipeline (7), a second flame arrester (8) is arranged between the gas supply pipeline (7) and the active igniter, the torch igniter (6) is provided with a high-voltage generator (9), and a permanent lamp (17) is arranged in a bypass of the torch igniter (6); The incineration tower (20) is a cylindrical chimney-shaped structure welded from carbon steel plates. The outer surface of the incineration tower (20) is provided with a coating made of organic silicon high-temperature paint material. The inner side surface of the incineration tower (20) is provided with a ceramic fiber coating. The temperature resistance of the ceramic fiber coating is greater than 1200° C. The bottom of the incineration tower (20) is backfilled with a pebble pad. The bottom surface of the incineration tower (20) is provided with a plurality of support piers. The other end of the support pier is fixed to the ground. A gap L is provided between the incineration tower (20) and the bottom surface through the support pier. The range of the gap L is 1.2-1.5 m.
2. A low calorific value sludge pyrolysis tail gas combustion torch according to claim 1, characterized in that: A windbreak wall (10) is additionally provided on the periphery of the incineration tower (20). The windbreak wall (10) is in a U-shaped structure. The windbreak wall (10) is arranged outside the incineration tower (20). The diameter of the circumscribed circle of the windbreak wall (10) is larger than the diameter of the incineration tower (20). The height of the windbreak wall (10) is 2-3 m.
3. A low calorific value sludge pyrolysis tail gas combustion torch according to any one of claims 1 to 2, characterized in that: The detection unit comprises a flame detector (11), a pressure transmitter (12), a flow transmitter (13) and a combustible gas alarm (14); The pressure transmitter (12) is arranged on the main pipeline, and the pressure transmitter (12) is used to detect the exhaust gas pressure parameter; The flow transmitter (13) is arranged on the first-level DN40 exhaust combustion pipeline (1), and the flow transmitter (13) is used to detect the exhaust gas flow in the first-level DN40 exhaust combustion pipeline (1); The flame detector (11) is arranged at the position of the torch igniter (6), and the flame detector (11) is used to detect the operating state of the torch igniter (6); The combustible gas alarm (14) is arranged outside the incineration tower (20) and is used to detect the combustion status of the incineration tower (20).
4. A low calorific value sludge pyrolysis tail gas combustion torch according to claim 3, characterized in that: The execution unit comprises a plurality of electrically controlled pneumatic butterfly valves (15) and electric valves (16), wherein the plurality of electrically controlled pneumatic butterfly valves (15) are separately arranged on the secondary DN150 exhaust combustion pipeline (2); The electric valve (16) is arranged on the air supply pipeline (7).
5. A low calorific value sludge pyrolysis tail gas combustion torch according to claim 4, characterized in that: The flame detector (11), the pressure transmitter (12), the flow transmitter (13) and the combustible gas alarm (14) are all connected to the analog input terminal of the PLC controller, and the coils of the plurality of electrically controlled pneumatic butterfly valves (15) and the electric valves (16) are all connected to the digital output port of the PLC controller; The digital input terminal of the PLC controller is provided with a manual button (18).
6. The low calorific value sludge pyrolysis tail gas combustion torch according to claim 1, characterized in that: The secondary DN150 exhaust combustion pipeline (2) is provided with an anti-backfire pipeline, the anti-backfire pipeline is arranged at the front end of the flame arrester (3), and the anti-backfire pipeline is connected to the nitrogen delivery equipment through a normally open gate valve (4); A bursting disc (19) is provided on one of the secondary DN150 exhaust combustion pipelines (2), and the bursting disc is used for safe pressure relief.