A wind power full power converter dual-branch low energy consumption temperature control test platform
By designing a dual-branch low-energy-consumption temperature-controlled test platform for wind power full-power converters, and using precharge circuits and water-cooling equipment to simulate different ambient temperatures, the problem of test result deviation in the existing technology is solved and more accurate changes are achieved. flow converter performance evaluation.
Patent Information
- Application Number
- CN202111210586.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-10-18
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-10-18
Smart Images

Figure CN113848411B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of converter monitoring, and in particular to a dual-branch low-energy consumption temperature-controlled test platform for a wind power full-power converter. Background Art
[0002] In the existing technology, some tests on ultra-large capacity converters are conducted using non-rated voltage, i.e. rated current at lower voltage. This method can only roughly understand the performance under some test conditions, and there is a risk of failing to find some problems in converter prototype tests. Therefore, dual circuits are used to meet the test requirements of converters with different voltage levels and capacities.
[0003] In existing solutions, only temperature rise is often calculated during high current testing. For high ambient temperature and high water temperature that may be encountered in actual applications, if the heat dissipated from the cabinet surface and the different heat generation of the same device at different water temperatures are directly converted without considering the problem, the test results will be seriously inconsistent with the facts. Therefore, a platform that can stably control the operating environment temperature and water inlet temperature of the inverter is needed. Summary of the invention
[0004] In view of this, the purpose of the present invention is to provide a low-energy temperature-controlled test platform for a dual-branch full-power converter of a wind power plant. The platform provided by the present invention can perform corresponding testing work according to different ambient temperatures and water inlet temperatures, thereby alleviating the problem in the prior art that the actual working conditions cannot be achieved, resulting in deviations in test results.
[0005] The present invention provides a wind power full-power converter dual-branch low-energy consumption temperature control test platform, comprising:
[0006] Pre-charging circuit, small and medium megawatt unit test branch, large megawatt unit test branch;
[0007] The pre-charging circuit includes a first circuit breaker, a first contactor, a pre-charging transformer, and a first isolation transformer;
[0008] One end of the first circuit breaker is connected to an external power supply, and the other end of the first circuit breaker is connected to one end of the first isolation transformer;
[0009] One end of the first contactor is connected to one end of the pre-charging transformer, and the other end of the pre-charging transformer is connected to one end of the first isolation transformer;
[0010] The other end of the first isolation transformer is connected to the test branch of the small and medium megawatt units;
[0011] The small and medium megawatt unit test branch includes a second isolation transformer, a second circuit breaker, a second contactor, a second pre-charging transformer, a third circuit breaker and a first machine-side autotransformer;
[0012] One end of the second isolation transformer is connected to the other end of the first isolation transformer through the second circuit breaker;
[0013] The other end of the second isolation transformer is connected to one end of the third circuit breaker, and the other end of the third circuit breaker is connected to the converter to be tested through the first machine-side autotransformer after passing through the filter circuit;
[0014] One end of the second contactor is connected to the third circuit breaker, and the other end of the third circuit breaker is connected to one end of the second pre-charging transformer;
[0015] The fourth circuit breaker is connected in series between the first isolation transformer and the grid-test autotransformer, and the transformer is connected to the grid side of the converter to be tested;
[0016] The large megawatt unit test branch includes a third isolation transformer, a fifth circuit breaker, a third contactor, a third pre-charging transformer, a sixth circuit breaker, a seventh circuit breaker and a second machine-side autotransformer;
[0017] The seventh circuit breaker is connected in series between the network test of the converter to be tested and one end of the fifth circuit breaker, the other end of the fifth circuit breaker is connected to one end of the third pre-charging transformer, the other end of the third pre-charging transformer is connected to one end of the sixth circuit breaker, and the other end of the sixth circuit breaker is connected to the machine side of the converter to be tested through a filter circuit;
[0018] The sixth circuit breaker is connected to the third circuit breaker through the third contactor.
[0019] Preferably, it further comprises a water cooling device, wherein a water inlet pipe and a water outlet pipe of the water cooling device are both connected to the converter to be tested.
[0020] Preferably, the converter to be tested is located in a heat-insulating room, and the heat-insulating room is used to simulate changes in the external environment.
[0021] The embodiments of the present invention bring the following beneficial effects: The present invention provides a dual-branch low-energy consumption temperature-controlled test platform for a full-power wind power converter, comprising: a pre-charging circuit, a small and medium-sized megawatt unit test branch, and a large megawatt unit test branch; the pre-charging circuit comprises a first circuit breaker, a first contactor, a pre-charging transformer, and a first isolation transformer; one end of the first circuit breaker is connected to an external power supply, and the other end of the first circuit breaker is connected to one end of the first isolation transformer; one end of the first contactor is connected to one end of the pre-charging transformer, and the other end of the pre-charging transformer is connected to one end of the first isolation transformer; the other end of the first isolation transformer is connected to the small and medium-sized megawatt unit test branch; the small and medium-sized megawatt unit test branch comprises a second isolation transformer, a second circuit breaker, a second contactor, a second pre-charging transformer, a third circuit breaker, and a first machine-side autotransformer; one end of the second isolation transformer is connected to the other end of the first isolation transformer through a second circuit breaker; the second isolation transformer The other end of the second contactor is connected to one end of the third circuit breaker, and the other end of the third circuit breaker is connected to the converter to be tested through the first machine-side autotransformer after passing through the filtering circuit; one end of the second contactor is connected to the third circuit breaker, and the other end of the third circuit breaker is connected to one end of the second pre-charging transformer; the fourth circuit breaker is connected in series between the first isolation transformer and the network test autotransformer, and the transformer is connected to the network side of the converter to be tested; the large megawatt unit test branch includes the third isolation transformer, the fifth circuit breaker, the third contactor, the third pre-charging transformer, the sixth circuit breaker, the seventh circuit breaker and the second machine-side autotransformer; the seventh circuit breaker is connected in series between the network test of the converter to be tested and one end of the fifth circuit breaker, the other end of the fifth circuit breaker is connected to one end of the third pre-charging transformer, the other end of the third pre-charging transformer is connected to one end of the sixth circuit breaker, and the other end of the sixth circuit breaker is connected to the machine side of the converter to be tested through the filtering circuit; the sixth circuit breaker is connected to the third circuit breaker through the third contactor. The present invention can perform corresponding testing work according to different ambient temperatures and water inlet temperatures, thereby alleviating the problem in the prior art that the actual working conditions cannot be achieved and thus cause deviations in the test results.
[0022] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention are realized and obtained by the structures particularly pointed out in the description, claims and drawings.
[0023] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0025] Figure 1 A structural diagram of a dual-branch low-energy consumption temperature-controlled test platform for a wind power full-power converter provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0026] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] At present, some tests on ultra-large capacity converters are performed using non-rated voltage, that is, rated current under lower voltage. This method can only roughly understand the performance under some test conditions, and there is a risk of failing to discover some problems in the converter prototype test. Based on this, an embodiment of the present invention provides a dual-branch low-energy temperature-controlled test platform for a full-power wind power converter, which can perform corresponding tests according to different ambient temperatures and water inlet temperatures, thereby alleviating the problem of test result deviation caused by the inability to achieve actual working conditions in the prior art.
[0028] To facilitate understanding of this embodiment, a wind power full-power converter dual-branch low-energy consumption temperature-controlled test platform disclosed in an embodiment of the present invention is first introduced in detail.
[0029] The present invention provides a wind power full-power converter dual-branch low-energy consumption temperature control test platform, comprising:
[0030] Pre-charging circuit, small and medium megawatt unit test branch, large megawatt unit test branch;
[0031] The pre-charging circuit includes a first circuit breaker, a first contactor, a pre-charging transformer, and a first isolation transformer;
[0032] One end of the first circuit breaker is connected to an external power supply, and the other end of the first circuit breaker is connected to one end of the first isolation transformer;
[0033] One end of the first contactor is connected to one end of the pre-charging transformer, and the other end of the pre-charging transformer is connected to one end of the first isolation transformer;
[0034] The other end of the first isolation transformer is connected to the test branch of the small and medium megawatt units;
[0035] The small and medium megawatt unit test branch includes a second isolation transformer, a second circuit breaker, a second contactor, a second pre-charging transformer, a third circuit breaker and a first machine-side autotransformer;
[0036] One end of the second isolation transformer is connected to the other end of the first isolation transformer through the second circuit breaker;
[0037] The other end of the second isolation transformer is connected to one end of the third circuit breaker, and the other end of the third circuit breaker is connected to the converter to be tested through the first machine-side autotransformer after passing through the filter circuit;
[0038] One end of the second contactor is connected to the third circuit breaker, and the other end of the third circuit breaker is connected to one end of the second pre-charging transformer;
[0039] The fourth circuit breaker is connected in series between the first isolation transformer and the grid-test autotransformer, and the transformer is connected to the grid side of the converter to be tested;
[0040] The large megawatt unit test branch includes a third isolation transformer, a fifth circuit breaker, a third contactor, a third pre-charging transformer, a sixth circuit breaker, a seventh circuit breaker and a second machine-side autotransformer;
[0041] The seventh circuit breaker is connected in series between the network test of the converter to be tested and one end of the fifth circuit breaker, the other end of the fifth circuit breaker is connected to one end of the third pre-charging transformer, the other end of the third pre-charging transformer is connected to one end of the sixth circuit breaker, and the other end of the sixth circuit breaker is connected to the machine side of the converter to be tested through a filter circuit;
[0042] The sixth circuit breaker is connected to the third circuit breaker through the third contactor.
[0043] Preferably, it further comprises a water cooling device, wherein a water inlet pipe and a water outlet pipe of the water cooling device are both connected to the converter to be tested.
[0044] Preferably, the converter to be tested is located in a heat-insulating room, and the heat-insulating room is used to simulate changes in the external environment.
[0045] Embodiment 2:
[0046] The second embodiment of the present invention describes the workflow of the first embodiment:
[0047] When testing small and medium-sized megawatt units, only the small and medium-sized megawatt unit test branch is needed. The specific steps are as follows: close the first contactor KM1 to pre-charge the isolation transformer outside the loop, close the second circuit breaker Q5 / Q5' after 30 seconds to charge the second isolation transformer, and close the fourth circuit breaker Q3 / Q3' after another 30 seconds to pre-charge the grid-side transformer, and then close the first circuit breaker Q1 switch to disconnect the first contactor KM1. Then close KM2 to pre-charge the machine-side filter capacitor and transformer, and close Q6 / Q6' after 30 seconds to disconnect KM2. At this time, control the water cooling equipment, the heater in the insulation room, and the cooling fan to control the ambient temperature and the water inlet temperature, and then perform converter-related tests.
[0048] When testing large megawatt units, the specific steps are as follows: close contactor KM1 to pre-charge the isolation transformer outside the loop, close Q3 / Q3', Q2 / Q2' to charge the grid-side transformer after 30s, close Q5 / Q5' to charge isolation transformer 1 after 30s, close Q4 / Q4' to charge isolation transformer 2 after 30s, then close Q1 switch and disconnect KM1. Then close KM2 to pre-charge the filter capacitor and transformer on the machine side of branch 1, close KM3 to pre-charge the filter capacitor and transformer on the machine side of branch 2 after 30s, close Q6 / Q6', Q7 / Q7' after 30s, disconnect KM2 and KM3, and complete the entire power-on process. At this time, control the water cooling equipment and the heater and heat dissipation fan in the insulation room to control the ambient temperature and water inlet temperature, and then perform converter-related tests.
[0049] Unless otherwise specifically stated, the relative steps, numerical expressions and values of the components and steps set forth in these embodiments do not limit the scope of the present invention.
[0050] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the system and device described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.
[0051] In addition, in the description of the embodiments of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0052] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0053] Finally, it should be noted that the above-described embodiments are only specific implementations of the present invention, which are used to illustrate the technical solutions of the present invention, rather than to limit them. The protection scope of the present invention is not limited thereto. Although the present invention is described in detail with reference to the above-described embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-described embodiments within the technical scope disclosed by the present invention, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
Claims
1. A wind power full power converter dual-branch low energy consumption temperature control test platform, characterized in that: include: Pre-charging circuit, small and medium megawatt unit test branch, large megawatt unit test branch; The pre-charging circuit includes a first circuit breaker, a first contactor, a pre-charging transformer, and a first isolation transformer; One end of the first circuit breaker is connected to an external power supply, and the other end of the first circuit breaker is connected to one end of the first isolation transformer; One end of the first contactor is connected to one end of the pre-charging transformer, and the other end of the pre-charging transformer is connected to one end of the first isolation transformer; The other end of the first isolation transformer is connected to the test branch of the small and medium megawatt units; The small and medium megawatt unit test branch includes a second isolation transformer, a second circuit breaker, a second contactor, a second pre-charging transformer, a third circuit breaker and a first machine-side autotransformer; One end of the second isolation transformer is connected to the other end of the first isolation transformer through the second circuit breaker; The other end of the second isolation transformer is connected to one end of the third circuit breaker, and the other end of the third circuit breaker is connected to the converter to be tested through the first machine-side autotransformer after passing through the filter circuit; One end of the second contactor is connected to the third circuit breaker, and the other end of the third circuit breaker is connected to one end of the second pre-charging transformer; A fourth circuit breaker is connected in series between the first isolation transformer and the grid-test autotransformer, and the transformer is connected to the grid side of the converter to be tested; The large megawatt unit test branch includes a third isolation transformer, a fifth circuit breaker, a third contactor, a third pre-charging transformer, a sixth circuit breaker, a seventh circuit breaker and a second machine-side autotransformer; The seventh circuit breaker is connected in series between the network test of the converter to be tested and one end of the fifth circuit breaker, the other end of the fifth circuit breaker is connected to one end of the third pre-charging transformer, the other end of the third pre-charging transformer is connected to one end of the sixth circuit breaker, and the other end of the sixth circuit breaker is connected to the machine side of the converter to be tested through a filter circuit; The sixth circuit breaker is connected to the third circuit breaker via the third contactor; It also includes a water cooling device, wherein the water inlet pipe and the water outlet pipe of the water cooling device are both connected to the converter to be tested; The converter to be tested is located in a heat preservation room, and the heat preservation room is used to simulate changes in the external environment.
Citation Information
Patent Citations
Double-branch low-energy-consumption temperature control type test platform for wind power full-power converter
CN216956192U