Train departure method, device and electronic equipment used in railway stations

By setting up virtual signals in the railway station and calculating the driving permission and speed limit value of the train to be departed, the problem of low train departure efficiency is solved, the departure sequence can be determined in advance without affecting safety, and the railway station efficiency is improved. field transportation efficiency.

CN113895488BActive Publication Date: 2024-10-22TRAFFIC CONTROL TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111202585.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-10-15
Publication Date
2024-10-22
Estimated Expiration
2041-10-15

AI Technical Summary

Technical Problem

In the existing technology, the train departure efficiency in railway stations is low, which affects the transportation efficiency. This is mainly because the train to be departed needs to wait for the rear of the departed train to completely cross the exit signal before it can depart, resulting in a waste of departure time.

Method used

Set up a virtual signal in the railway station, combine the status information of the outgoing signal and the virtual signal, calculate the first driving permission and the first speed limit value of the train to be departed, and determine whether the train that has already departed can be on the train that is waiting to depart. Cross the outbound signal within the required time, thereby identifying candidate trains in advance and optimizing the departure sequence.

Benefits of technology

By calculating the driving permission and speed limit value of the train to be departed in advance, it avoids waiting for the departed train to cross the exit signal before departure, saving departure time and improving the departure efficiency of the entire railway station.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113895488B_ABST
    Figure CN113895488B_ABST
Patent Text Reader

Abstract

In the embodiment of the present application, a train departure method, device and electronic equipment applied to a railway station are provided, aiming to save train departure time and improve departure efficiency. The train departure method includes: calculating the first driving permit of each train to be departed according to the status information of multiple signal machines in the railway station, the multiple signal machines include an exit signal machine and a virtual signal machine, and the virtual signal machine is located in the railway station; calculating the first speed limit value of each train to be departed according to the driving permit of each train to be departed; calculating the time t required for each train to be departed from starting to accelerating to the first speed limit value, and for each train to be departed, judging whether the departed train can pass the signal machine within the required time t of the train to be departed, if so, the train to be departed is used as the first candidate train; according to the required time t of each first candidate train, arranging the next train to depart after the departed train from a number of first candidate trains.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of rail transit technology, and in particular, to a train dispatching method, device and electronic equipment applied to a railway station. Background Art

[0002] In the field of rail transit technology, railway stations serve as distribution centers for trains, with many trains entering and leaving every day. Since trains are densely distributed in railway stations, it is an important task to control multiple trains to leave the railway stations in an orderly manner. In related technologies, the main control method is that the current train to be dispatched can only depart after the tail of the departing train has completely passed the exit signal. However, since the station interval is usually relatively long, controlling the departure of trains in the above manner will waste departure time, resulting in low departure efficiency, which in turn affects the transportation efficiency of the railway system. Summary of the invention

[0003] The embodiments of the present application provide a train departure method, device and electronic equipment applied to a railway station, aiming to save train departure time and improve departure efficiency.

[0004] According to a first aspect of an embodiment of the present application, a train departure method applied to a railway station is provided, the method comprising: calculating a first driving permit for each train to be departed according to status information of a plurality of signal machines in the railway station, the plurality of signal machines comprising an exit signal machine and a virtual signal machine, the virtual signal machine being located in the railway station, and the exit signal machine being located at the exit of the railway station; calculating a first speed limit value for each train to be departed according to the first driving permit for each train to be departed; calculating a required time t for each train to be departed from starting to accelerating to the first speed limit value, and for each train to be departed, determining whether a departed train can pass the exit signal machine within the required time t of the train to be departed, and if so, taking the train to be departed as a first candidate train; determining a first target train from a plurality of first candidate trains according to the required time t of each first candidate train, the first target train being the next train to depart after the departed train.

[0005] According to a second aspect of an embodiment of the present application, a train departure device applied to a railway station is provided, the device comprising: a first driving permission calculation module, a first speed limit value calculation module, a first candidate train determination module and a first target train determination module.

[0006] Among them, the first driving permission calculation module is used to calculate the first driving permission of each train to be dispatched according to the status information of multiple signal machines in the railway station, and the multiple signal machines include an exit signal machine and a virtual signal machine, the virtual signal machine is located in the railway station, and the exit signal machine is located at the exit of the railway station. The first speed limit value calculation module is used to calculate the first speed limit value of each train to be dispatched according to the first driving permission of each train to be dispatched. The first candidate train determination module is used to calculate the required time t for each train to be dispatched from starting to accelerating to the first speed limit value, and for each train to be dispatched, determine whether the dispatched train can pass the signal machine within the required time t of the train to be dispatched, and if so, the train to be dispatched is used as the first candidate train. The first target train determination module is used to determine the first target train from a number of first candidate trains according to the required time t of each first candidate train, and the first target train is used as the next train to be dispatched after the dispatched train.

[0007] According to the third aspect of an embodiment of the present application, an electronic device is provided, comprising: a processor, a memory and a bus, wherein the memory stores machine-readable instructions executable by the processor, and when the electronic device is running, the processor and the memory communicate via the bus, and when the machine-readable instructions are executed by the processor, the above-mentioned train departure method is executed.

[0008] According to a fourth aspect of an embodiment of the present application, a storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the above-mentioned train departure method is executed.

[0009] The train dispatching method provided in the embodiment of the present application is adopted, by setting at least one virtual signal in the railway station, the virtual signal is located inside the exit signal, and the virtual signal is farther away from the exit of the railway station than the exit signal. During the period of controlling the orderly dispatch of trains, the first driving permit of each train to be dispatched is calculated based on the status information of the virtual signal and the exit signal in the railway station, instead of only considering the status information of the exit signal, so that the driving permit for the train to be dispatched can be calculated in advance when the dispatched train has not passed the exit signal, which is conducive to improving the dispatching efficiency.

[0010] After calculating the first driving permit for each train to be departed, the first speed limit value of each train to be departed is calculated according to the first driving permit of each train to be departed, and the time t required for each train to be departed from starting to accelerating to the first speed limit value is calculated. Then, for each train to be departed, it is determined whether the departed train can pass the exit signal within the required time t of the train to be departed. If it can, the train to be departed is used as the first candidate train. In this application, if the departed train can pass the exit signal within the required time t of the train to be departed, the train to be departed will not collide with the departed train within the required time t. Therefore, the required time t of the train to be departed is equivalent to the early departure time of the train to be departed, and is also equivalent to the departure time saved for the train to be departed. Finally, according to the required time t of each first candidate train, which is equivalent to the departure time saved for the first candidate train, the next train to depart after the departed train is arranged from a number of first candidate trains, so that the departure of the train to be departed is controlled at the entire railway station level to improve the departure efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0012] Figure 1 It is a flow chart of a train departure method proposed in one embodiment of the present application;

[0013] Figure 2 is a distribution diagram of a virtual traffic light proposed in an embodiment of the present application;

[0014] Figure 3 is a flow chart of a train departure method proposed in another embodiment of the present invention;

[0015] Figure 4 is a schematic diagram of a train dispatching device 400 proposed in one embodiment of the present application;

[0016] Figure 5 It is a structural block diagram of an electronic device provided in one embodiment of the present application. DETAILED DESCRIPTION

[0017] In the process of implementing this application, the inventor found that in the related art, the means of controlling the orderly departure of multiple trains in a railway station is: the current train to be departed needs to completely pass the departure signal after the rear of the departing train has completely passed the departure signal. However, since the station interval is usually long, controlling the departure of trains in this way will waste departure time, resulting in low departure efficiency, which in turn affects the transportation efficiency of the railway system.

[0018] In view of the above problems, a train departure method, device, equipment and readable storage medium applied to a railway station are provided in an embodiment of the present application. At least one virtual signal is set in the railway station, and the virtual signal is located inside the exit signal. The virtual signal is farther away from the exit of the railway station than the exit signal. During the control of orderly departure of trains, the first driving permit for each train to be departed is calculated based on the status information of the virtual signal and the exit signal in the railway station, rather than only considering the status information of the exit signal. In this way, the driving permit for the train to be departed can be calculated in advance when the departing train has not yet passed the exit signal, which is conducive to improving the departure efficiency.

[0019] After calculating the first driving permit for each train to be departed, the first speed limit value of each train to be departed is calculated according to the first driving permit of each train to be departed, and the time t required for each train to be departed from starting to accelerating to the first speed limit value is calculated. Then, for each train to be departed, it is determined whether the departed train can pass the exit signal within the required time t of the train to be departed. If it can, the train to be departed is used as the first candidate train. In this application, if the departed train can pass the exit signal within the required time t of the train to be departed, the train to be departed will not collide with the departed train within the required time t. Therefore, the required time t of the train to be departed is equivalent to the early departure time of the train to be departed, and is also equivalent to the departure time saved for the train to be departed. Finally, according to the required time t of each first candidate train, which is equivalent to the departure time saved for the first candidate train, the next train to depart after the departed train is arranged from a number of first candidate trains, so that the departure of the train to be departed is controlled at the entire railway station level to improve the departure efficiency.

[0020] In order to make the technical solutions and advantages in the embodiments of the present application clearer, the exemplary embodiments of the present application are further described in detail in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, rather than an exhaustive list of all the embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other in the absence of conflict. To simplify the description, the train departure method applied to the railway station will be referred to as the train departure method, and the train departure device applied to the railway station will be referred to as the train departure device.

[0021] refer to Figure 1 , Figure 1 FIG. 1 is a flow chart of a train departure method proposed in an embodiment of the present application. Figure 1 As shown, the train departure method includes the following steps:

[0022] S110: Calculate the first driving permit for each train to be dispatched based on status information of multiple signal machines in the railway station.

[0023] The multiple signal machines include an exit signal machine and a virtual signal machine. The virtual signal machine is located in the railway station, and the exit signal machine is located at the exit of the railway station.

[0024] In the related art, usually only an exit signal is installed near the exit of the railway station. However, the present application also sets up a virtual signal, and the number of virtual signals can be one or more. When the present application is implemented, the railway station may not have a physical virtual signal installed. Figure 2 , Figure 2 It is a distribution diagram of the virtual traffic light proposed in one embodiment of the present application. Figure 2 There are three signals in the figure. The signal XN located near the exit of the railway station is the exit signal. The signals XN1 and XN2 located in the railway station and farther away from the exit than the exit signal are two virtual signals.

[0025] In some possible implementations, the status information of the signal includes a red light state and a green light state. When the departing train has not passed the signal, the status information of the signal is a red light state, and when the departing train has passed the signal, the status information of the signal is a green light state. When calculating the first driving permit of the train to be departed, according to the status information of each signal among the multiple signals, the position of the signal whose status information is a green light state and which is closest to the exit of the railway station is used as the end point of the first driving permit of each train to be departed.

[0026] In this application, if the signal is in red, it means that the departing train has not completely passed the signal, that is, the rear of the departing train has not passed the signal, so the first driving permission of the waiting train cannot reach the signal. In other words, in order to avoid the conflict between the waiting train and the departing train, the waiting train cannot drive to the position of the signal for the time being.

[0027] For ease of understanding, Figure 2 As shown in the figure, the departing train has passed the virtual signal XN1 and the virtual signal XN2, but has not passed the exit signal XN. Therefore, the virtual signal XN1 and the virtual signal XN2 are both in the green light state, while the exit signal XN is in the red light state. Based on the status information of each signal, the first driving permission MA can be calculated for the train 1 to be dispatched. Figure 2 As shown, since virtual signal XN2 is the closest signal to the exit of the railway yard among all green signal machines, virtual signal XN2 is used as the end point of the first driving permission. In other words, the first driving permission MA can pass the virtual signal XN1 and reach the virtual signal XN2.

[0028] It should be noted that the dispatched train refers to the train that has already departed from the railway station, and the waiting train refers to the train that is waiting to depart from the railway station.

[0029] In the present application, the first driving permit for each train to be dispatched is calculated based on the status information of the virtual signal and the exit signal in the railway station, rather than only considering the status information of the exit signal. This allows the driving permit to be calculated in advance for the train to be dispatched before the dispatched train has passed the exit signal, which is beneficial to improving departure efficiency.

[0030] S120: Calculate a first speed limit value for each train to be dispatched according to the first driving permit for each train to be dispatched.

[0031] In some possible implementations, the speed limit curve of each train to be dispatched may be calculated based on the first driving permit of each train to be dispatched and the slope of the road section between each train to be dispatched and the dispatched trains, and the calculated speed limit curve includes speed limit value information.

[0032] Among them, in order to predetermine the slope of the road section between the train to be dispatched and the train that has been dispatched, the preset axle counting section table can be queried according to the position of the train to be dispatched and the position of the dispatched train, so as to determine the axle counting section sequence between the train to be dispatched and the train that has been dispatched. Since each axle counting section in the axle counting section sequence is accompanied by a corresponding slope value, the slope value accompanied by each axle counting section in the axle counting section sequence is the slope of the road section between the train to be dispatched and the train that has been dispatched.

[0033] S130: Calculate the time t required for each train to be dispatched from starting to accelerating to the first speed limit value, and for each train to be dispatched, determine whether the dispatched train can pass the exit signal within the time t required for the train to be dispatched. If so, the train to be dispatched is selected as the first candidate train.

[0034] In some possible implementations, the time t required from starting to accelerating to the first speed limit value may be calculated according to the following formula:

[0035] vi=vi-1+a×t0

[0036] Si=vi×t0

[0037]

[0038]

[0039] t=I×t0

[0040] Wherein, t0 represents the preset unit time; a represents the acceleration of the train to be dispatched; vi-1 represents the speed at the i-1th t0 time; vi represents the speed at the next i-th t0 time; Si represents the displacement within the i-th t0 time; S represents the length of the road section of the first driving permission; ' represents the total displacement within I t0; S represents the remaining section length, also known as the braking distance; A and B are constants in the speed limit curve calculation, and their specific values ​​can be found in the train traction calculation regulations. By solving the above equations, the I value can be calculated, and then I can be multiplied by the preset unit time t0 to calculate the required time t.

[0041] After calculating the required time t for each train to be dispatched, for each train to be dispatched, first calculate the displacement s of the dispatched train within the required time t according to the formula s=v1×t+a×t2, where v1 represents the current initial speed of the dispatched train and a represents the acceleration of the dispatched train. Since the dispatched train is considered to have crossed the signal only when the rear of the dispatched train has completely passed the signal. Therefore, it is necessary to determine whether the displacement s is greater than the length of the section between the rear of the dispatched train and the exit signal. If it is greater, it means that the dispatched train can cross the exit signal within the required time t of the train to be dispatched. If it is not greater, it means that the dispatched train cannot cross the exit signal within the required time t of the train to be dispatched.

[0042] It should be noted that in the present application, if the departing train can pass the exit signal within the required time t of the waiting train, the waiting train will not collide with the departing train within the required time t. Therefore, the required time t of the waiting train is equivalent to the advance departure time of the waiting train, and is also equivalent to the departure time saved of the waiting train.

[0043] S140: Determine a first target train from a number of first candidate trains according to the required time t of each first candidate train, and the first target train serves as the next train to depart after the departing train.

[0044] The first candidate trains refer to all the candidate trains determined in step S130. In other words, the present application determines the first target train from all the first candidate trains according to the required time t of each first candidate train.

[0045] By implementing the above method including steps S110 to S140, after calculating the first driving permit of each train to be dispatched, the first speed limit value of each train to be dispatched is calculated according to the first driving permit of each train to be dispatched, and the required time t for each train to be dispatched from starting to accelerating to the first speed limit value is calculated. Then, for each train to be dispatched, it is determined whether the dispatched train can pass the exit signal within the required time t of the train to be dispatched. If it can, the train to be dispatched is used as the first candidate train. In the present application, if the dispatched train can pass the exit signal within the required time t of the train to be dispatched, the train to be dispatched will not collide with the dispatched train within the required time t, so the required time t of the train to be dispatched is equivalent to the early departure time of the train to be dispatched, and is also equivalent to the departure time saved by the train to be dispatched. Finally, according to the required time t of each first candidate train, which is equivalent to the departure time saved by the first candidate train, the next train to be dispatched after the dispatched train is arranged from a number of first candidate trains, so that the departure of the train to be dispatched is controlled at the level of the entire railway station, and the departure efficiency is improved.

[0046] In some possible implementations, when determining the first target train, the first candidate train with the longest required time t can be determined from a number of first candidate trains according to the required time t of each first candidate train, and the determined first candidate train is used as the first target train. In the present application, since the required time t of the first candidate train is equivalent to the departure time saved by the first candidate train, by using the first candidate train with the longest departure time saved as the first target train, the departure efficiency can be maximized at the entire railway yard level.

[0047] refer to Figure 3 , Figure 3 It is a flow chart of a train departure method proposed in another embodiment of the present invention.

[0048] like Figure 3 As shown, the train departure method comprises the following steps:

[0049] S310: Calculate the first driving permit for each train to be dispatched based on the status information of multiple signal machines in the railway station.

[0050] S320: Calculate a first speed limit value for each train to be dispatched according to the first driving permit for each train to be dispatched.

[0051] S330: Calculate the time t required for each train to be dispatched from starting to accelerating to the first speed limit value, and for each train to be dispatched, determine whether the dispatched train can pass the exit signal within the time t required for the train to be dispatched. If so, the train to be dispatched is selected as the first candidate train.

[0052] S340: Determine a first target train from among a number of first candidate trains according to the required time t of each first candidate train, and the first target train serves as the next train to depart after the departing train.

[0053] For the specific implementation of steps S310 to S340, reference may be made to the above description of steps S110 to S140, which will not be described here to avoid repetition.

[0054] S350: Add the first target train to the end of the departure sequence.

[0055] In this application, the departure sequence includes zero, one or more trains, and the trains included in the departure sequence are arranged in order, and these trains arranged in order will depart one by one according to the order. Among them, the later the train is arranged, the later it will depart. For the sake of simplicity, the train at the end of the departure sequence is referred to as the terminal train below.

[0056] In some possible real-time methods, when the front train in the departure sequence starts to depart, the departure sequence can remove the train. Before the first target train is added to the departure sequence, the departure sequence may be empty. When the first target train is added to the departure sequence, the first target train is the front train in the departure sequence and the end train.

[0057] S360: Calculate the second driving permit for each remaining train to be dispatched based on the status information of the plurality of signals.

[0058] Among them, the remaining trains to be dispatched refer to the trains to be dispatched that have not been added to the departure sequence. When calculating the second driving permit for the trains to be dispatched, the specific implementation method of step S110 can be referred to. Specifically, according to the position of the dispatched train (at this time, the end train in the departure sequence is regarded as the dispatched train), the traffic light status of each signal is determined, and the second driving permit is calculated for each train to be dispatched according to the traffic light status of each signal. Among them, in order to simplify the calculation, the position of the end train can be preset as a fixed position, for example, a position between the virtual signal XN1 and the virtual signal XN2 is preset as the position of the end train. Therefore, when calculating the second driving permit, the preset position is used as the position of the end train, so as to calculate the second driving permit for each train to be dispatched.

[0059] Alternatively, the position information of the terminal train after departure can be predicted based on the pre-departure position information and the exit time prediction information of the terminal train. Therefore, when calculating the second driving permit, the traffic light status of each signal can be determined based on the predicted position of the terminal train, and then the second driving permit for each train to be dispatched can be calculated. In some optional embodiments, when the second train in front of the terminal train passes the exit signal, the terminal train starts to depart. When the first train in front of the terminal train passes the exit signal, the train to be dispatched is selected from the remaining trains to be dispatched to be added to the end of the departure sequence. During the selection of the train to be dispatched, the position of the terminal train is predicted based on the time when the first train in front of the terminal train passes the exit signal, thereby predicting the status information of each signal based on the position of the terminal train, and then calculating the second driving permit for each remaining train to be dispatched based on the status information of each signal.

[0060] For example, the departure sequence includes train 1, train 2, and train 3. When train 1 passes the departure signal, train 3 starts to depart. When train 2 passes the departure signal, according to the position of train 3 at this time, by executing the above steps S360 to the following steps S390, a second candidate train is selected from the remaining trains to be departed and added to the end of the departure sequence, and the second candidate train is controlled to start departure. In this cycle, dynamic departure control in the railway station is realized.

[0061] S370: Calculate the second speed limit value of each train to be dispatched according to the second driving permit of each train to be dispatched.

[0062] When calculating the second speed limit value of each train to be dispatched, reference may be made to the specific implementation of step S120, which will not be described here to avoid repetition.

[0063] S380: Calculate the time t' required for each train to be dispatched from starting to accelerating to the second speed limit value, and for each train to be dispatched, determine whether the terminal train can pass the exit signal within the time t' required for the train to be dispatched. If so, the train to be dispatched is used as the second candidate train.

[0064] In some optional embodiments, as described above, when the first train in front of the terminal train passes the exit signal, the train to be dispatched is selected from the remaining trains to be dispatched to be added to the end of the departure sequence. At this time, the current position and speed of the terminal train are predicted based on the time (i.e., the current time) when the first train in front of the terminal train passes the exit signal, the departure time and departure location of the terminal train, and the acceleration of the terminal train. Then, based on the current position and speed of the terminal train, the required time t' of the train to be dispatched, and the acceleration of the terminal train, the position of the terminal train at the required time t' is predicted, and it is determined whether the position has passed the exit signal.

[0065] S390: Determine a second target train from a number of second candidate trains according to the required time t' of each second candidate train, and add the second target train to the end of the departure sequence.

[0066] In the present application, the departure sequence of the second target train is determined by adding the second target train to the end of the departure sequence.

[0067] In some possible real-time methods, considering that turnouts are an important part of the railway route, the state of the turnouts will affect the passage of trains. If the state of some turnouts on the railway route from the location of a second candidate train to the exit of the railway station causes the railway route to be disconnected, hindering the passage of the train, these turnouts need to be moved in advance so that the second candidate train can only depart after these turnouts change their state. However, moving the turnouts takes a certain amount of time, so moving the turnouts will shorten the departure time of the second candidate train, that is, the required time t' is shortened.

[0068] The turnout state refers to the connection state of the turnout to the road section. For example, when a turnout is in the first state, the turnout is used to connect road section a and road section c, and disconnects road section b from road section c. At this time, the train on road section a can enter road section c through the turnout, while the train on road section b cannot enter road section c through the turnout. When the turnout is in the second state, the turnout is used to connect road section b and road section c, and disconnects road section a from road section c. At this time, the train on road section b can enter road section c through the turnout, while the train on road section a cannot enter road section c through the turnout.

[0069] Based on the above considerations, when executing step S390, the present application may specifically include the following sub-steps:

[0070] S390-1: Predict the status of turnouts in railway yards based on the position of the terminal train.

[0071] In some possible real-time methods, the railway route from the terminal train to the railway yard exit can be first determined according to the actual position of the terminal train in the departure sequence, and the railway route includes zero, one or more turnouts. Then, for each turnout on the railway route, the following judgment and operation are performed: if the current state of the turnout allows the terminal train to pass through and drive to the railway yard exit, the state of the turnout is not changed; if the current state of the turnout does not allow the terminal train to pass through and drive to the railway yard exit, the state of the turnout is switched so that the switched turnout state allows the terminal train to pass through and drive to the railway yard exit. In this way, after executing the above process, the states of some turnouts in the railway yard need to be switched, while the states of other turnouts do not need to be switched, thereby predicting the turnout state in the railway yard.

[0072] S390-2: According to the turnout status, the required time t' of each second candidate train is adjusted.

[0073] In some possible real-time modes, if the second candidate train cannot pass through the turnout to exit the station under the predicted turnout state, the adjusted required time t' of the second candidate train is equal to the required time t' before adjustment minus the time used to move the turnout. If the second candidate train can pass through the turnout to exit the station under the predicted turnout state, the adjusted required time t' of the second candidate train is equal to the required time t' before adjustment.

[0074] For ease of understanding, illustratively, Figure 2 As shown, it is assumed that train 1 is determined as the first target train in the above step S340, and is added to the end of the departure sequence in step S350 to become the end train.

[0075] During the time t' required to adjust train 2, the status of each turnout in each station is first predicted. The prediction process includes: according to the position of train 1, it can be known that the railway route from train 1 to the exit of the railway station includes section a and section c, and the railway route includes turnout X. Figure 2 As shown, at this time, turnout X just connects section a and section c. In the current state, turnout X can allow train 1 to pass through and drive to the railway station exit, so the state of turnout X does not need to be switched. Therefore, the state prediction result of turnout X is: connecting section a and section c.

[0076] Then, when adjusting the required time t' of Train 2, since the switch X connects Section a and Section c, Section b and Section c are disconnected, so Train 2 cannot leave the station through Switch X. In this case, it is necessary to move Switch X in advance to switch the state of Switch X so that Switch X disconnects Section a and Section c and connects Section b and Section c. Since it takes a certain amount of time to move Switch X, the departure time of Train 2 to be dispatched is shortened, that is, the required time t' is shortened. Therefore, the required time t' of Train 2 to be dispatched after adjustment should be equal to the required time t' before adjustment minus the time used to move the switch.

[0077] S390-3: Determine a second target train from a number of second candidate trains according to the adjusted required time t' of each second candidate train.

[0078] In some possible implementations, when determining the second target train, the second candidate train with the longest adjusted required time t' can be determined from a number of second candidate trains according to the adjusted required time t' of each second candidate train, and the determined second candidate train is used as the second target train. In the present application, by using the second candidate train with the longest required time t' (i.e., the longest departure time saving) as the second target train, the departure efficiency can be maximized at the entire railway yard level.

[0079] In addition, if Figure 3 As shown, after executing step S390, the process can return to step S360, thereby looping through steps S360 to S390. In this proposal, steps S360 to S390 are looped through, and each time step S390 is executed, the second candidate train with the longest required time t' (i.e., the train with the longest departure time savings) is added to the end of the departure sequence. In this way, each train in the departure sequence is the optimal candidate train in the corresponding execution round (i.e., the candidate train with the longest departure time savings), thereby arranging an optimal departure sequence at the entire railway yard level, maximizing the overall departure efficiency of the railway yard.

[0080] refer to Figure 4 , Figure 4 is a schematic diagram of a train dispatching device 400 proposed in an embodiment of the present application, such as Figure 4 As shown, the train dispatching device 400 includes:

[0081] The first driving permission calculation module 410 is used to calculate the first driving permission of each train to be dispatched based on the status information of multiple signals in the railway station. The multiple signals include an exit signal and a virtual signal. The virtual signal is located in the railway station, and the exit signal is located at the exit of the railway station.

[0082] The first speed limit value calculation module 420 is used to calculate the first speed limit value of each train to be dispatched according to the first driving permission of each train to be dispatched.

[0083] The first candidate train determination module 430 is used to calculate the time t required for each train to be dispatched to start and accelerate to the first speed limit value, and for each train to be dispatched, determine whether the dispatched train can pass the signal within the time t required for the train to be dispatched. If so, the train to be dispatched is used as the first candidate train.

[0084] The first target train determination module 440 is used to determine a first target train from a number of first candidate trains according to the required time t of each first candidate train, and the first target train is the next train to depart after the departing train.

[0085] In some possible implementations, the first target train determination module 440 is specifically used to: determine a first candidate train with the longest required time t from a number of first candidate trains according to the required time t of each first candidate train, and use the determined first candidate train as the first target train.

[0086] In some possible implementations, the status information of the signal includes a red light state and a green light state. When the departing train has not passed the signal, the status information of the signal is a red light state, and when the departing train has passed the signal, the status information of the signal is a green light state. The first driving permission calculation module 410 is specifically used to: according to the status information of each signal among the multiple signals, the position of the signal whose status information is a green light state and which is closest to the exit of the railway station is used as the end point of the first driving permission of each train to be departed.

[0087] In some possible implementations, such as Figure 4 As shown, the train dispatching device 400 may further include:

[0088] The train adding module 450 is used to add the first target train to the end of the departure sequence.

[0089] The second driving permission calculation module 460 is used to calculate the second driving permission of each remaining train to be dispatched according to the status information of multiple signals, and the remaining trains to be dispatched refer to the trains to be dispatched that have not been added to the departure sequence.

[0090] The second speed limit value calculation module 470 is used to calculate the second speed limit value of each train to be dispatched according to the second driving permission of each train to be dispatched.

[0091] The second candidate train determination module 480 is used to calculate the time t' required for each train to be dispatched from starting to accelerating to the second speed limit value, and for each train to be dispatched, determine whether the terminal train can pass the exit signal within the time t' required for the train to be dispatched. If so, the train to be dispatched is used as the second candidate train; wherein the terminal train refers to the train at the end of the departure sequence.

[0092] The second target train determination module 490 is used to determine the second target train from a number of second candidate trains according to the required time t' of each second candidate train, and add the second target train to the end of the departure sequence.

[0093] In some possible implementations, such as Figure 4 As shown, the second target train determination module 490 includes:

[0094] The turnout state prediction unit 491 is used to predict the turnout state in the railway station according to the position of the terminal train.

[0095] The time saving adjustment unit 492 is used to adjust the required time t' of each second candidate train according to the turnout status.

[0096] The second target train determining unit 493 is configured to determine the second target train from among the plurality of second candidate trains according to the adjusted required time t' of each second candidate train.

[0097] In some possible implementations, the time saving adjustment unit 492 is specifically used for: if the second candidate train cannot pass through the switch to exit the station in the switch state, then the adjusted required time t' of the second candidate train is equal to the required time t' before adjustment minus the time for moving the switch; if the second candidate train can pass through the switch to exit the station in the switch state, then the adjusted required time t' of the second candidate train is equal to the required time t' before adjustment.

[0098] In some possible implementations, the second target train determination unit 493 is specifically used to: determine a second candidate train with the longest adjusted required time t' from a number of second candidate trains according to the adjusted required time t' of each second candidate train, and use the determined second candidate train as the second target train.

[0099] In some possible real-time ways, such as Figure 4 As shown, the second target train determination module 490 is connected to the second driving permission calculation module 460, so as to implement the cyclic execution of the following steps:

[0100] According to the status information of multiple signals, the second driving permit of each remaining train to be dispatched is calculated, and the remaining multiple trains to be dispatched refer to the trains to be dispatched that have not been added to the departure sequence; according to the second driving permit of each train to be dispatched, the second speed limit value of each train to be dispatched is calculated; the time t' required for each train to be dispatched from starting to accelerating to the second speed limit value is calculated, and for each train to be dispatched, it is determined whether the terminal train can pass the exit signal within the required time t' of the train to be dispatched, if so, the train to be dispatched is used as the second candidate train; according to the required time t' of each second candidate train, a second target train is determined from a number of second candidate trains, and the second target train is added to the end of the departure sequence.

[0101] It should be noted that those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the above-described device can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.

[0102] See also Figure 5 , Figure 5It is a structural block diagram of an electronic device provided in one embodiment of the present application, wherein the electronic device 500 includes a processor 510, a memory 520, and one or more applications, wherein the one or more applications are stored in the memory 520 and configured to be executed by one or more processors 510, and the one or more programs are configured to execute the above-mentioned train departure method.

[0103] The electronic device 500 in the present application may include one or more of the following components: a processor 510, a memory 520, and one or more applications, wherein the one or more applications may be stored in the memory 520 and configured to be executed by one or more processors 510, and the one or more programs are configured to execute the method as described in the aforementioned method embodiment.

[0104] The processor 510 may include one or more processing cores. The processor 510 uses various interfaces and lines to connect various parts of the entire electronic device 500, and executes various functions and processes data of the electronic device 500 by running or executing instructions, programs, code sets or instruction sets stored in the memory 520, and calling data stored in the memory 520. Optionally, the processor 510 can be implemented in at least one hardware form of digital signal processing (Digital Signal Processing, DSP), field programmable gate array (Field-Programmable Gate Array, FPGA), and programmable logic array (Programmable Logic Array, PLA). The processor 510 can integrate one or a combination of a central processing unit (Central Processing Unit, CPU), a graphics processing unit (Graphics Processing Unit, GPU), and a modem. Among them, the CPU mainly processes the operating system, user interface, and application programs; the GPU is responsible for rendering and drawing display content; and the modem is used to process wireless communications. It can be understood that the above-mentioned modem may not be integrated into the processor 510, but may be implemented separately through a communication chip.

[0105] The memory 520 may include a random access memory (RAM) or a read-only memory (Read-Only Memory). The memory 520 may be used to store instructions, programs, codes, code sets or instruction sets. The memory 520 may include a program storage area and a data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for implementing at least one function (such as a touch function, a sound playback function, an image playback function, etc.), instructions for implementing the above-mentioned various method embodiments, etc. The data storage area may also store data created by the electronic device 500 during use, etc.

[0106] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0107] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0108] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0109] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0110] Although the preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.

[0111] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.

Claims

1. A train dispatching method applied to a railway station, characterized in that: The method comprises: Calculate the first driving permission of each train to be dispatched according to the status information of multiple signal machines in the railway yard, wherein the multiple signal machines include an exit signal machine and a virtual signal machine, wherein the virtual signal machine is located in the railway yard, and the exit signal machine is located at the exit of the railway yard; Calculating a first speed limit value for each train to be dispatched according to a first driving permit for each train to be dispatched; Calculate the time t required for each train to be dispatched from starting to accelerating to the first speed limit value, and for each train to be dispatched, determine whether the dispatched train can pass the exit signal within the time t required for the train to be dispatched, and if so, use the train to be dispatched as the first candidate train; According to the required time t of each first candidate train, determine a first target train from a plurality of first candidate trains, the first target train being the next train to depart after the departing train; Adding the first target train to the end of the departure sequence; Calculating the second driving permission of each remaining train to be dispatched according to the status information of the plurality of signals, wherein the remaining train to be dispatched refers to the train to be dispatched that has not been added to the dispatch sequence; Calculating a second speed limit value for each train to be dispatched according to the second driving permit for each train to be dispatched; Calculate the time t' required for each train to be dispatched from starting to accelerating to the second speed limit value, and for each train to be dispatched, determine whether the terminal train can pass the exit signal within the time t' required for the train to be dispatched, and if so, use the train to be dispatched as the second candidate train; wherein the terminal train refers to the train at the end of the departure sequence; According to the required time t' of each second candidate train, a second target train is determined from a number of second candidate trains, and the second target train is added to the end of the departure sequence.

2. The method according to claim 1, characterized in that The step of determining the first target train from a plurality of first candidate trains according to the required time t of each first candidate train comprises: According to the required time t of each first candidate train, a first candidate train with the longest required time t is determined from among a number of first candidate trains, and the determined first candidate train is used as the first target train.

3. The method according to claim 1, characterized in that The status information of the signal includes a red light status and a green light status. When the departing train has not passed the signal, the status information of the signal is a red light status. When the departing train has passed the signal, the status information of the signal is a green light status. The step of calculating the first driving permission for each train to be dispatched according to the status information of multiple signal machines in the railway station comprises: According to the status information of each signal among the plurality of signals, the position of the signal whose status information is green and closest to the exit of the railway yard is used as the end point of the first driving permission of each train to be dispatched.

4. The method according to claim 1, characterized in that: The step of determining the second target train from a plurality of second candidate trains according to the required time t' of each second candidate train comprises: Predicting the state of the turnout in the railway station according to the position of the terminal train; According to the turnout state, adjusting the required time t' of each second candidate train; A second target train is determined from the plurality of second candidate trains according to the adjusted required time t' of each second candidate train.

5. The method according to claim 4, characterized in that The step of adjusting the required time t' of each second candidate train according to the turnout state includes: If the second candidate train cannot pass through the switch to leave the station under the switch state, the adjusted required time t' of the second candidate train is equal to the required time t' before adjustment minus the time for moving the switch; If the second candidate train can pass through the turnout to exit the station under the turnout state, the adjusted required time t' of the second candidate train is equal to the required time t' before adjustment.

6. The method according to claim 4, characterized in that The step of determining the second target train from a plurality of second candidate trains according to the adjusted required time t' of each second candidate train comprises: According to the adjusted required time t' of each second candidate train, a second candidate train with the longest adjusted required time t' is determined from among a number of second candidate trains, and the determined second candidate train is used as the second target train.

7. The method according to claim 1, characterized in that After adding the second target train to the end of the departure sequence, the following steps are executed in a loop: Calculating the second driving permission for each remaining train to be dispatched according to the status information of the plurality of signals; Calculating a second speed limit value for each train to be dispatched according to the second driving permit for each train to be dispatched; Calculate the time t' required for each train to be dispatched from starting to accelerating to the second speed limit value, and for each train to be dispatched, determine whether the terminal train can pass the exit signal within the time t' required for the train to be dispatched, and if so, use the train to be dispatched as the second candidate train; According to the required time t' of each second candidate train, a second target train is determined from a number of second candidate trains, and the second target train is added to the end of the departure sequence.

8. A train dispatching device used in a railway station, characterized in that: The device comprises: A first driving permission calculation module, used for calculating the first driving permission of each waiting train according to the status information of multiple signal machines in the railway yard, wherein the multiple signal machines include an exit signal machine and a virtual signal machine, wherein the virtual signal machine is located in the railway yard, and the exit signal machine is located at the exit of the railway yard; A first speed limit value calculation module, used for calculating a first speed limit value of each train to be dispatched according to a first driving permit of each train to be dispatched; A first candidate train determination module is used to calculate the time t required for each train to be dispatched from starting to accelerating to the first speed limit value, and for each train to be dispatched, determine whether the dispatched train can pass the signal within the time t required for the train to be dispatched, and if so, the train to be dispatched is used as the first candidate train; A first target train determination module, used to determine a first target train from a plurality of first candidate trains according to the required time t of each first candidate train, the first target train being the next train to depart after the departing train; A train adding module, used for adding a first target train to the end of the departure sequence; A second driving permission calculation module is used to calculate the second driving permission of each remaining train to be dispatched according to the status information of the plurality of signals, wherein the remaining trains to be dispatched refer to the trains to be dispatched that have not been added to the dispatch sequence; A second speed limit value calculation module, used for calculating the second speed limit value of each train to be dispatched according to the second driving permission of each train to be dispatched; The second candidate train determination module is used to calculate the time t' required for each train to be dispatched from starting to accelerating to the second speed limit value, and for each train to be dispatched, determine whether the terminal train can pass the exit signal within the time t' required for the train to be dispatched, and if so, the train to be dispatched is used as the second candidate train; wherein the terminal train refers to the train at the end of the departure sequence; The second target train determination module is used to determine the second target train from a number of second candidate trains according to the required time t' of each second candidate train, and add the second target train to the end of the departure sequence.

9. An electronic device, characterized in that: The electronic device comprises: a processor, a memory and a bus, the memory stores machine-readable instructions executable by the processor, when the electronic device is running, the processor and the memory communicate through the bus, and when the machine-readable instructions are executed by the processor, the method according to any one of claims 1 to 7 is performed.