An assembly tool for a rubber part and a washing pipe
By designing an automated assembly tool for rubber parts and washing pipes, the movement of perforated inflatables and perforated parts is driven by cylinders, the problems of low manual connection efficiency and poor sealing performance in the prior art are solved, and efficient and reliable sealing assembly is achieved.
Patent Information
- Application Number
- CN202111053411.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-09
- Publication Date
- 2025-06-27
- Estimated Expiration
- 2041-09-09
AI Technical Summary
In the prior art, the seal between the rubber parts and the washing pipe is manually connected, which has high labor intensity and low efficiency. Manual operation leads to uneven connection position and length, affecting product quality and sealing performance.
Design a assembly tool for rubber parts and washing pipes, drive the movement of perforated inflatables and perforated parts through horizontal cylinders and vertical cylinders, and use the air path of perforated inflatables to support the rubber parts to realize an automated assembly process.
Through the automated assembly process, the labor intensity of labor is reduced, the assembly efficiency is improved, the sealing performance and product quality are guaranteed, and the failure rate and cost are reduced.
Smart Images

Figure CN113910626B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of experimental instruments, and particularly to an assembly tool for a rubber part and a washing pipe. Background Art
[0002] With the continuous changes in the vehicle market and the diversified development direction of vehicle washing systems, a rubber part is required for sealing after the vehicle washing pipe passes through the vehicle sheet metal hole. In the prior art, the sealing of the rubber part and the washing pipe is manually connected, resulting in high labor intensity and low efficiency. At the same time, the connection positions, connection lengths, etc. of the manual operations are uneven, and the product quality and sealing performance cannot be guaranteed. Summary of the Invention
[0003] In view of the above technical problems, the present invention provides an assembly tool for a rubber part and a washing pipe.
[0004] To achieve the above object, the present invention provides the following technical solutions:
[0005] An assembly tool for a rubber part and a washing pipe, comprising a frame body. A first perforated inflator and a second perforated inflator are horizontally movably arranged on the front side of the frame body. The first perforated inflator and the second perforated inflator have the same shape and are arranged opposite to each other. Washing pipe placement grooves are formed on the adjacent sides of the first perforated inflator and the second perforated inflator. After the first perforated inflator and the second perforated inflator are brought closer together, the two washing pipe placement grooves are combined into a placement hole for the washing pipe to pass through. The placement hole is arranged in the horizontal direction. Blowing passages are respectively formed inside the first perforated inflator and the second perforated inflator. The outlet ends of the blowing passages point to the inner side of the placement hole, and the inlet ends of the blowing passages are located on the upper sides of the two perforated inflators. A perforated part is vertically movably arranged on the rear side of the frame body. A rubber part placement groove is formed in the center of the perforated part, and a ventilation hole in the horizontal direction is formed in the rubber part placement groove.
[0006] Further, the first perforated inflator is driven to move left and right by a first horizontal cylinder. The cylinder body of the first horizontal cylinder is fixed on a first vertical plate on one side of the frame body, and the cylinder rod of the first horizontal cylinder is fixedly connected to the side of the first perforated inflator away from the washing pipe placement groove.
[0007] Further, a horizontally sliding guide rail and a first slider are arranged at the bottom of the first perforated inflator. The horizontal guide rail is fixed on the frame body, and the first slider is fixed at the bottom of the first perforated inflator.
[0008] Further, the second perforated inflator is driven to move left and right by a second horizontal cylinder. The cylinder body of the second horizontal cylinder is fixed on a second vertical plate on one side of the frame body, and the cylinder rod of the second horizontal cylinder is fixedly connected to the side of the second perforated inflator away from the washing pipe placement groove.
[0009] Further, a horizontal guide rail and a second slider which are slidably connected are provided at the bottom of the second perforated inflating member. The horizontal guide rail is fixed on the frame body, and the second slider is fixed at the bottom of the second perforated inflating member.
[0010] Further, the perforated member is driven to move up and down by a vertical air cylinder. The cylinder body of the vertical air cylinder is fixed on a third vertical plate located on one side of the frame body, and the cylinder rod of the vertical air cylinder is fixedly connected downward to the top of the perforated member.
[0011] Further, a vertical guide rail and a third slider which are slidably connected are provided on the side of the perforated member. The vertical guide rail is fixed on the third vertical plate, and the third slider is fixed on the side of the perforated member.
[0012] Further, the air inlet end of the air blowing passage is connected to an air source through a pipeline.
[0013] Further, an infrared sensor is provided at one end of the front side of the frame body.
[0014] Further, multiple air blowing passages are arranged inside the perforated inflating member.
[0015] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0016] The assembly tool for the rubber part and the washing pipe provided by the present invention drives the perforated inflating member and the perforated member to move horizontally and vertically through a horizontal air cylinder and a vertical air cylinder. At the same time, the rubber part is perforated and propped up by the air path of the perforated inflating member to complete the assembly process of the washing pipe and the rubber part, avoiding the problems of large labor intensity and low efficiency caused by manual connection. At the same time, it reduces the non-uniformity of the connection position, connection length, etc. caused by manual operation, ensures the product quality and the sealing performance of the washing pipe passing through the vehicle sheet metal hole, effectively improves the work efficiency, reduces the cost, and has low failure rate, safety and reliability. Description of the Drawings
[0017] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the prior art, the following will briefly introduce the drawings required to be used in the embodiments. Obviously, the drawings described below are only some embodiments recorded in the present invention. For those of ordinary skill in the art, other drawings can also be obtained according to these drawings.
[0018] Figure 1 It is a perspective view of the assembly tool for the rubber part and the washing pipe provided by the embodiment of the present invention.
[0019] Figure 2 It is a structural diagram of the perforated member provided by the embodiment of the present invention.
[0020] Description of the reference numerals:
[0021] 1 - Frame body, 2 - First perforated inflatable part, 3 - Second perforated inflatable part, 4 - Perforated part, 5 - Washing pipe placement groove, 6 - Blowing passage, 7 - Pipeline, 8 - Rubber part placement groove, 9 - Vent hole, 10 - First horizontal cylinder, 11 - First vertical plate, 12 - Second horizontal cylinder, 13 - Second vertical plate, 14 - Horizontal guide rail, 15 - First slider, 16 - Vertical cylinder, 17 - Third vertical plate, 18 - Vertical guide rail, 19 - Third slider, 20 - Infrared sensor, 21 - Second slider. Detailed implementation mode
[0022] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further introduced in detail below in conjunction with the drawings and embodiments.
[0023] As Figure 1-2 shown, the assembly tooling for rubber parts and washing pipes provided by the present invention includes a frame body 1. The first perforated inflatable part 2 and the second perforated inflatable part 3 are horizontally movable on the front side of the frame body 1, and the perforated part 4 is vertically movable on the rear side of the frame body 1. Among them:
[0024] The first perforated inflatable part 2 and the second perforated inflatable part 3 have the same shape and are arranged opposite to each other. Washing pipe placement grooves 5 are formed on the adjacent sides of the first perforated inflatable part 2 and the second perforated inflatable part 3. After the first perforated inflatable part 2 and the second perforated inflatable part 3 are brought closer, the two washing pipe placement grooves are combined into a placement hole for the washing pipe to pass through, and the placement hole is arranged in the horizontal direction.
[0025] Blowing passages 6 are respectively formed inside the first perforated inflatable part 2 and the second perforated inflatable part 3. Specifically, multiple blowing passages 6 are arranged inside the perforated inflatable part. The outlet end of the blowing passage 6 points to the inner side of the placement hole, and the inlet end of the blowing passage 6 is located on the upper side of the two perforated inflatable parts. The inlet end of the blowing passage 6 is connected to a gas source through a pipeline 7.
[0026] A rubber part placement groove 8 is formed at the center of the perforated part 4, and a horizontal vent hole 9 is formed inside the rubber part placement groove 8.
[0027] Specifically, the first perforated inflatable part 2 is driven to move left and right by a first horizontal cylinder 10. The cylinder body of the first horizontal cylinder 10 is fixed on the first vertical plate 11 on one side of the frame body 1, and the cylinder rod of the first horizontal cylinder 10 is fixedly connected to the side of the first perforated inflatable part 2 away from the washing pipe placement groove. The second perforated inflatable part 3 is driven to move left and right by a second horizontal cylinder 12. The cylinder body of the second horizontal cylinder 12 is fixed on the second vertical plate 13 on one side of the frame body 1, and the cylinder rod of the second horizontal cylinder 12 is fixedly connected to the side of the second perforated inflatable part 3 away from the washing pipe placement groove.
[0028] To enable the first perforated inflatable member 2 and the second perforated inflatable member 3 to move horizontally smoothly and smoothly, and improve the running stability, a horizontal guide rail 14 and a first slider 15 are slidably connected to the bottom of the first perforated inflatable member 2. The horizontal guide rail 14 is fixed on the frame 1, and the first slider 15 is fixed to the bottom of the first perforated inflatable member 2. A horizontal guide rail 14 and a second slider 21 are slidably connected to the bottom of the second perforated inflatable member 3. The horizontal guide rail 14 is fixed on the frame 1, and the second slider 21 is fixed to the bottom of the second perforated inflatable member 3. To ensure the running stability, the first perforated inflatable member 2 and the second perforated inflatable member 3 share the horizontal guide rail 14.
[0029] The perforated member 4 is driven to move up and down by a vertical cylinder 16. The cylinder body of the vertical cylinder 16 is fixed on the third vertical plate 17 on one side of the frame 1, and the cylinder rod of the vertical cylinder 16 is fixedly connected downward to the top of the perforated member 4.
[0030] To enable the perforated member 4 to move vertically smoothly and smoothly, and improve the running stability, a vertical guide rail 18 and a third slider 19 are slidably connected to the side of the perforated member 4. The vertical guide rail 16 is fixed on the third vertical plate 17, and the third slider 19 is fixed to the side of the perforated member 4.
[0031] To improve the degree of automation, an infrared sensor 20 is provided at one end of the front side of the frame 1.
[0032] When the rubber part and the washing tube assembly tooling of the present invention is in use, the rubber part with perforations is placed in the rubber part placement groove 8 of the perforated part. The perforated part 4 is driven by the vertical cylinder 16 to move downward. The first perforated inflatable member 2 and the second perforated inflatable member 3 approach and merge with each other under the drive of the first horizontal cylinder 10 and the second horizontal cylinder 12 respectively. The washing tube is placed on the front side of the frame and recognized by infrared induction. The air source is started to introduce air into the air blowing passage 6. The gas blows towards the rubber part and expands the perforation of the rubber part. The washing tube is inserted into the placement hole formed by the combination of the first perforated inflatable member 2 and the second perforated inflatable member 3. The infrared induction is disconnected, the air source stops ventilating, the perforation of the rubber part shrinks and clamps the washing tube tightly. The first horizontal cylinder 10 and the second horizontal cylinder 12 drive the first perforated inflatable member 2 and the second perforated inflatable member 3 to separate. The vertical cylinder 16 drives the perforated part 4 to move upward, and the assembled product is taken out to complete the work of installing the washing tube on the rubber part. The assembly tooling is simple and fast to operate, and effectively solves the sealing requirement for the washing tube to pass through the vehicle body sheet metal hole.
[0033] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that they can still modify the technical solutions described in the foregoing embodiments, or perform equivalent replacements for some of the technical features, but these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. An assembly tool for a rubber part and a washing pipe, characterized in that, It includes a frame body. At the front side of the frame body, there are a first perforated inflatable member and a second perforated inflatable member that are horizontally movable. The first perforated inflatable member and the second perforated inflatable member have the same shape and are arranged oppositely. On the adjacent sides of the first perforated inflatable member and the second perforated inflatable member, there are respectively formed washing tube placement grooves. After the first perforated inflatable member and the second perforated inflatable member are brought closer, the two washing tube placement grooves are combined into a placement hole for the washing tube to pass through. The placement hole is arranged in the horizontal direction. The first perforated inflatable member is driven to move left and right by a first horizontal cylinder. The cylinder body of the first horizontal cylinder is fixed on a first vertical plate on one side of the frame body, and the cylinder rod of the first horizontal cylinder is fixedly connected to the side of the first perforated inflatable member away from the washing tube placement groove. At the bottom of the first perforated inflatable member, there are a horizontally sliding connected horizontal guide rail and a first slider. The horizontal guide rail is fixed on the frame body, and the first slider is fixed at the bottom of the first perforated inflatable member. The second perforated inflatable member is driven to move left and right by a second horizontal cylinder. The cylinder body of the second horizontal cylinder is fixed on a second vertical plate on one side of the frame body, and the cylinder rod of the second horizontal cylinder is fixedly connected to the side of the second perforated inflatable member away from the washing tube placement groove. At the bottom of the second perforated inflatable member, there are a horizontally sliding connected horizontal guide rail and a second slider. The horizontal guide rail is fixed on the frame body, and the second slider is fixed at the bottom of the second perforated inflatable member. Inside the first perforated inflatable member and the second perforated inflatable member, there are respectively formed air blowing passages. The air outlet ends of the air blowing passages point to the inner side of the placement hole, and the air inlet ends of the air blowing passages are located on the upper sides of the two perforated inflatable members. The air inlet ends of the air blowing passages are connected to a gas source through pipelines, and there are multiple air blowing passages arranged inside the perforated inflatable members. At the rear side of the frame body, there is a perforated member that is vertically movable. In the center of the perforated member, there is a rubber member placement groove, and a horizontally arranged ventilation hole is formed in the rubber member placement groove. The perforated member is driven to move up and down by a vertical cylinder. The cylinder body of the vertical cylinder is fixed on a third vertical plate on one side of the frame body, and the cylinder rod of the vertical cylinder is fixedly connected downward to the top of the perforated member. On the side of the perforated member, there are a vertically sliding connected vertical guide rail and a third slider. The vertical guide rail is fixed on the third vertical plate, and the third slider is fixed on the side of the perforated member hole. At one end of the front side of the frame body, there is an infrared sensor. The control process of the assembly tool for the rubber member and the washing tube is as follows: Place the perforated rubber member into the rubber member placement groove of the perforated member. The perforated member is driven downward by the vertical cylinder. The first perforated inflatable member and the second perforated inflatable member are respectively driven to approach and merge with each other by the first horizontal cylinder and the second horizontal cylinder. Place the washing tube on the front side of the frame body. After infrared induction recognition, start the gas source to introduce air into the air blowing passages. The gas blows towards the rubber member and expands the perforation of the rubber member. Place the washing tube into the placement hole formed by the combination of the first perforated inflatable member and the second perforated inflatable member. When the infrared induction is disconnected, the gas source stops ventilating. The perforation of the rubber member shrinks and clamps the washing tube tightly. The first horizontal cylinder and the second horizontal cylinder drive the first perforated inflatable member and the second perforated inflatable member to separate. The vertical cylinder drives the perforated member to move upward, and then take out the assembled product to complete the work of installing the washing tube on the rubber member.
Citation Information
Patent Citations
Novel expansion rubber sleeve of blowing penetrates mechanism
CN208438744U
Assembling tool for rubber part and washing pipe
CN216466280U