A method and device for coupling and clearing inter-provincial and intra-provincial power markets under complex power grids

By adopting the inter-provincial transaction resource optimization allocation model and the internal balanced market optimization and clearing model in complex power grids, the coupling clearing problem of inter-provincial and internal power markets has been solved, and the optimal allocation of energy resources and safe operation of the power grid has been achieved, thus improving the improvement of the power supply and improving the Energy utilization and reduce electricity purchase costs.

CN114022182BActive Publication Date: 2024-11-01NARI NANJING CONTROL SYSTEM CO LTD +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111161237.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-30
Publication Date
2024-11-01
Estimated Expiration
2041-09-30

AI Technical Summary

Technical Problem

In a complex power grid environment, the coupling and clearing mechanism of the power market between provinces and provinces has not yet been improved, making it difficult to achieve efficient application of energy and optimized resource allocation across provinces, and the safe operation of the power grid is threatened.

Method used

A method of coupling clearing of inter-provincial and intra-provincial power markets under complex power grids is adopted. By obtaining the electricity price declaration data of market members, the pre-constructed inter-provincial transaction resource optimization allocation model and the internal balanced market optimization clearing model are used, respectively. With the goal of maximizing new energy consumption and social welfare, and the minimum total electricity purchase cost within the province, we will solve the clearance of electricity and electricity prices at the inter-provincial contact line checkpoints to ensure the balance of supply and demand within the province and the safe operation of the power grid.

Benefits of technology

The coordinated coupling of inter-provincial transactions has been realized, the national allocation of energy resources has been optimized, the problem of reverse distribution of power and load resources has been solved, the energy utilization rate has been improved, and the cost of purchasing power in the province has been reduced, and the power grid has been ensured. Run safely.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114022182B_ABST
    Figure CN114022182B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and device for coupling and clearing inter-provincial and intra-provincial power markets under complex power grids, and belongs to the technical field of power market dispatching and clearing. The method includes: obtaining the electricity price declaration data of market members participating in inter-provincial power market transactions; using a pre-constructed inter-provincial transaction resource optimization allocation model, taking the maximization of the sum of new energy consumption and social welfare as the optimization goal, solving the clearing quantity and electricity price of the inter-provincial tie line gateway; for each province participating in the inter-provincial power market transaction: based on the clearing quantity and electricity price of the inter-provincial tie line gateway, using a pre-constructed intra-provincial balancing market optimization and clearing model, taking the minimum total power purchase cost in the province as the optimization goal, solving the clearing price and transaction quantity of each market member in the province so that the supply and demand in the province are balanced and the power grid operates safely. The present invention can reduce the power purchase cost in the province and ensure the safe operation of the power grid while improving energy utilization.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric power dispatching, and in particular to a method and device for coupling and clearing electric power markets between provinces and within provinces under a complex electric power grid. Background Art

[0002] At present, the scale of cross-regional and cross-provincial power channels in my country is constantly expanding, and ultra-high voltage AC and DC channels coexist, resulting in an increasingly complex cross-provincial power transmission network environment; on the other hand, the volume of inter-provincial power transactions in my country is accelerating, and the market models of various provinces are quite different, while the corresponding inter-provincial and intra-provincial market coupling mechanisms are not yet sound. The "Report on Deepening the Construction of the National Unified Power Market" proposes that one of the key links that needs to be focused on in building a national unified power market is to coordinate inter-provincial and intra-provincial transactions, determine the positioning of inter-provincial and intra-provincial markets, and handle the connection issues between power generation enterprises, power grid companies and other market entities in the two markets within and between provinces. The functional positioning of intra-provincial and inter-provincial transactions promotes energy consumption and large-scale optimization of energy resources; intra-provincial transactions are positioned to optimize the allocation of resources within the province, ensure the balance of power supply and demand and the safe operation of the power grid. Therefore, in order to achieve efficient application of energy, optimal allocation of resources and ensure the safe operation of the power grid at the same time, how to achieve the coupling and clearing of inter-provincial and intra-provincial markets is an urgent problem to be solved. Summary of the invention

[0003] The purpose of the present invention is to provide a method and device for coupling and clearing inter-provincial and intra-provincial power markets under complex power grids, which can improve energy utilization while reducing the cost of purchasing power within the province and ensure safe operation of the power grid. The technical solution adopted by the present invention is as follows.

[0004] On the one hand, the present invention provides a method for coupling and clearing inter-provincial and intra-provincial power markets under a complex power grid, comprising:

[0005] Obtain electricity price declaration data of market members participating in inter-provincial electricity market transactions;

[0006] Based on the acquired electricity price declaration data, the pre-built inter-provincial transaction resource optimization allocation model is used to maximize the sum of new energy consumption and social welfare, and the cleared electricity volume and electricity price at the inter-provincial interconnection line checkpoint are solved;

[0007] For provinces participating in inter-provincial power market transactions: Based on the cleared electricity volume and electricity price at the inter-provincial tie-line checkpoints, the pre-built provincial balancing market optimization clearing model is used to minimize the total power purchase cost within the province. The clearing price and transaction volume of each market member within the province are solved to balance the supply and demand within the province and ensure the safe operation of the power grid.

[0008] The inter-provincial electricity market is cleared according to the clearing prices and transaction volumes of market members in each province.

[0009] Optionally, the market members participating in the transaction include electricity purchasing members and electricity selling members, the electricity price declaration data of the electricity purchasing members include hourly electricity prices and electricity consumption, and the electricity price declaration data of the electricity selling members include segmented electricity consumption and corresponding segmented prices.

[0010] Optionally, in the electricity price declaration data of the members on the power sales side participating in the inter-provincial transaction, the segmented quantity-price curve is a non-decreasing quantity-price curve within the normal output range and covering 24 hours a day, and the number of segments in the curve is at most 10. That is, the inter-provincial clearing method of the present invention can be applied to: the members on the power purchase side use hourly quotations, and the members on the power sales side use segmented quotations, which is a combined quotation method.

[0011] Optionally, the objective function of the inter-provincial transaction resource optimization allocation model is:

[0012] Optionally, the objective function of the inter-provincial transaction resource optimization allocation model is:

[0013]

[0014] in: , They are , The weight coefficient of The amount of new energy consumption; for social welfare;

[0015] The expression is:

[0016]

[0017] in: For the inter-provincial trading channels; is the total number of inter-provincial trading channels; For the The new energy consumption of inter-provincial trading channels.

[0018] Social welfare refers to the income generated by the total cost of electricity purchased by all buyers (including transmission loss costs) minus the total cost of electricity sold by sellers and transmission costs. The expression is:

[0019] F 2 = ∑ d ∈ D ∑ t ∈ T [ ∑ m ∈ M ( P m , d , t buy + P d , t los s − P d , t s ) × Q m , d , t buy − ∑ n ∈ N P n, d , t sal Q n, d , t sal ]

[0020] in: is the number of trading sessions; For the The number of electricity buyers in the inter-provincial trading channel; For the The number of electricity sellers in the inter-provincial trading channel; For electricity buyers In the Inter-provincial trading channels The electricity purchase price during the period; For the Inter-provincial trading channels Transmission loss during the period; For the Inter-provincial trading channels Time-of-day transmission prices; For electricity buyers In the Inter-provincial trading channels The amount of electricity purchased during the time period; For electricity sellers In the Inter-provincial trading channels Electricity selling price during time period; For electricity sellers In the Inter-provincial trading channels The amount of electricity sold during a period.

[0021] Optionally, the objective function solution constraints of the inter-provincial transaction resource optimization allocation model include:

[0022] (1) Power generation balance constraints:

[0023]

[0024] in: It is a collection of inter-provincial communication lines. is the line loss;

[0025] (2) Constraints on renewable energy power generation:

[0026]

[0027] in: For the new energy participating in the transaction The predicted total volume of inter-provincial trading channels.

[0028] (3) Maximum available capacity constraints of transmission channels

[0029]

[0030] in: and They are Time transmission channel The minimum and maximum transmission power; for Time transmission channel The initial transmission power plan value of for Time transmission channel Transaction power.

[0031] (4) Transmission channel climbing constraints

[0032]

[0033]

[0034] in: and They are Time transmission channel Minimum and maximum climbing power.

[0035] Optionally, the objective function of the intra-provincial equilibrium market optimization clearing model is:

[0036] min ∑ i = 1 N ∑ t = 1 T [ C i , t ( P i , t ) + C i , t U + C i , t N ] + ∑ s = 1 NS ∑ t = 1 T M [ SL s + + SL s − ]

[0037] in, represents the total number of time periods considered; Indicates the total number of units; Indicates the unit exist Output during the time period; , , For each unit In the period Operating costs, start-up costs, and no-load costs; is the penalty factor for network power flow constraint relaxation used for market clearing optimization; , are the positive and negative flow relaxation variables of section s respectively; The total number of sections.

[0038] In the objective function of the above provincial equilibrium market optimization clearing model, the unit operating cost It is a multi-segment linear function related to the output ranges declared by the unit and the corresponding energy prices; the unit startup cost It is a function related to the downtime of the unit, indicating the startup cost of the unit in different states (cold / warm / hot); the no-load cost of the unit It indicates the no-load cost of the unit when it is in operation (including the start-up and shutdown processes).

[0039] Optionally, the constraints for solving the objective function of the intra-provincial equilibrium market optimization clearing model include:

[0040] (1) System load balance constraints:

[0041]

[0042] in, represents the output of unit i in period t, It represents the planned power of tie line j in time period t, input is positive and output is negative. is the total number of contact lines, is the system load during time period t;

[0043] (2) System positive reserve capacity constraints:

[0044]

[0045] in, represents the start and stop status of unit i in time period t, Indicates that the unit is shut down. Indicates that the unit is turned on; is the maximum output of unit i in period t; is the system positive reserve capacity requirement for time period t;

[0046] (3) System negative reserve capacity constraints:

[0047]

[0048] in, is the minimum output of unit i in period t; is the system negative reserve capacity requirement for time period t;

[0049] (4) System spinning reserve constraints:

[0050]

[0051]

[0052] in, is the maximum ramp rate of unit i, is the maximum down-slope rate of unit i; , are the maximum and minimum outputs of unit i in period t respectively; , They are the upward and downward spinning reserve requirements of the units in period t respectively;

[0053] (5) Special unit status constraints:

[0054]

[0055]

[0056] in, Refers to the complete set of the must-start unit, Refers to the complete set of must-stop groups;

[0057] (6) Upper and lower limits of unit output

[0058]

[0059] , are the minimum and maximum output of the unit respectively;

[0060] (7) Unit climbing constraints:

[0061]

[0062]

[0063] in, is the maximum ramp rate of unit i, is the maximum down-slope rate of unit i;

[0064] (8) Minimum continuous start and stop time constraints for units:

[0065]

[0066]

[0067] in, , The minimum continuous start time and minimum continuous shutdown time of the unit; , is the continuous start-up time and continuous shutdown time of unit i in time period t, expressed as:

[0068]

[0069]

[0070] (9) Section flow constraints:

[0071]

[0072] in, , are the power flow transmission limits of section s respectively; is the generator output power transfer distribution factor of the node where unit i is located to section s; is the generator output power transfer distribution factor for section s at the node where the tie line j is located; is the generator output power transfer distribution factor of node k to section s; , are the positive and negative flow relaxation variables of section s respectively;

[0073] (10) Unit output expression constraints:

[0074]

[0075]

[0076] in, The total number of sections quoted for the unit, is the unit i in period t The winning bid quantity in the output range is , The first The upper and lower bounds of the output range;

[0077] (11) Unit operating cost expression constraints:

[0078]

[0079] in, The total number of sections quoted for the unit, For the crew The report The energy price corresponding to each output range.

[0080] In a second aspect, the present invention provides a device for coupling and clearing inter-provincial and intra-provincial power markets under a complex power grid, comprising:

[0081] An electricity price declaration data acquisition module is configured to acquire electricity price declaration data of market members participating in inter-provincial electricity market transactions;

[0082] The inter-provincial dispatching and clearing module is configured to solve the clearing power and power price of the inter-provincial interconnection line checkpoint based on the acquired power price declaration data and the pre-built inter-provincial transaction resource optimization allocation model, with the maximization of the sum of new energy consumption and social welfare as the optimization goal;

[0083] The provincial dispatching and clearing module is configured to be used for the provinces participating in the inter-provincial power market transactions: based on the cleared electricity volume and electricity price at the inter-provincial tie-line gateway, using the pre-built provincial balancing market optimization clearing model, with the minimum total power purchase cost in the province as the optimization goal, to solve the clearing price and transaction volume of each market member in the province so that the supply and demand in the province are balanced and the power grid operates safely;

[0084] The clearing result output module is configured to output the inter-provincial power market clearing result according to the obtained clearing prices and transaction volumes of market members in each province.

[0085] Beneficial Effects

[0086] The power market coupling clearing method of the present invention performs double-layer optimization for both inter-provincial and intra-provincial transactions, and incorporates the inter-provincial transaction clearing electricity volume and electricity price results into the intra-provincial optimization clearing model, thereby obtaining the final cross-provincial clearing result, thereby realizing the coordinated coupling of inter-provincial and intra-provincial transactions, and also realizing the wide-area spatiotemporal optimization allocation of energy resources across the country, which can effectively solve the problem of reverse distribution of power and load resources and realize the complementary advantages among regions.

[0087] In addition, the clearing optimization model and algorithm of the present invention take into account the ultra-high voltage AC and DC hybrid power grid structure, and can provide a technical basis for new technology verification and pilot application for inter-provincial and intra-provincial market coupling clearing under future ultra-high voltage AC and DC hybrid power grids. BRIEF DESCRIPTION OF THE DRAWINGS

[0088] Figure 1 Shown is a schematic diagram of the principle and process of the method of the present invention. DETAILED DESCRIPTION

[0089] The inter-provincial and intra-provincial transaction coupling clearing method under complex power grids proposed in the present invention is aimed at promoting energy consumption and large-scale optimal allocation of energy resources under the background of the development of a national unified power market; intra-provincial transactions are positioned to optimize the allocation of resources within the province, ensure the balance of power supply and demand and the safe operation of the power grid.

[0090] To achieve the above objectives, the technical concept of the present invention is as follows: the inter-provincial power market takes the maximization of the sum of new energy consumption and social welfare as its trading goal, and the intra-provincial power market establishes an optimized clearing model with the goal of minimizing the power purchase cost, and optimizes at the inter-provincial and intra-provincial levels.

[0091] In solving the two-layer optimization problem of inter-provincial and intra-provincial transaction coupling, the first layer of the present invention is to construct an inter-provincial transaction resource optimization configuration model, and the second layer is to construct an intra-provincial balancing market optimization clearing model. In order to better reflect the network characteristics of the power grid, the power grid security constraints must be fully considered in market transactions. Inter-provincial transactions will be centralized and optimized on the basis of considering the maximum consumption of new energy and the available transmission capacity of the AC / DC hybrid power grid. Intra-provincial transactions will achieve power balance in the control area on the basis of satisfying the safety constraints of the key section flow. This transaction optimization clearing model is applicable to power market transactions under the national unified market system. The purpose of inter-provincial optimization is to maximize the sum of new energy consumption and social welfare. The transmission and distribution fees generated by cross-provincial transactions shall be borne by the electricity purchaser according to the current transmission and distribution price system. Intra-provincial optimization aims to minimize the total power purchase cost.

[0092] The invention is further described below with reference to the accompanying drawings and specific embodiments.

[0093] Example 1

[0094] This embodiment introduces a method for coupling and clearing inter-provincial and intra-provincial power markets under complex power grids. Figure 1 As shown, the method includes:

[0095] Obtain electricity price declaration data of market members participating in inter-provincial electricity market transactions;

[0096] Based on the electricity price declaration data obtained, the pre-built inter-provincial transaction resource optimization allocation model is used to maximize the sum of new energy consumption and social welfare, and solve the clearing power and electricity price at the inter-provincial interconnection line checkpoint;

[0097] For provinces participating in inter-provincial power market transactions: Based on the cleared electricity volume and electricity price at the inter-provincial tie-line checkpoints, the pre-built provincial balancing market optimization clearing model is used to minimize the total power purchase cost within the province. The clearing price and transaction volume of each market member within the province are solved to balance the supply and demand within the province and ensure the safe operation of the power grid.

[0098] The inter-provincial electricity market is cleared according to the clearing prices and transaction volumes of market members in each province.

[0099] The method of this embodiment specifically involves the following contents.

[0100] 1. Obtaining market member quotation data

[0101] During the quotation stage, market members participating in the transaction adopt the method of "segmented quotation and unified clearing". This algorithm adopts segmented quotation on the power generation side and hourly quotation on the power consumption side. The power generation side shall declare a non-decreasing quantity-price curve for 24 hours a day within the normal output range to participate in inter-provincial transactions, with a maximum of no more than 10 segments. Each segment shall declare the starting point (MW) of the output interval, the end point (MW) of the output interval and the quotation (yuan / MWh) of the interval. The starting point of the first output interval is the sum of the minimum technical output of each unit participating in the inter-provincial transaction on the power generation side, and the end point of the last output interval is the sum of the maximum technical output of each unit participating in the inter-provincial transaction on the power generation side. The length of each quotation segment shall not be less than 5% of the difference between the sum of the maximum technical output and the sum of the minimum technical output of each unit on the power generation side. Each quotation shall not exceed the lower limit of the declared price. If the power generation side fails to declare the power quotation within the deadline, it shall participate in the inter-provincial market clearing according to its default power quotation. The default electricity quotation on the power generation side refers to the default electricity quotation parameters that the power generation side participating in the inter-provincial market transactions must provide when registering in the market. In principle, the default electricity quotation parameters of each power generation side are allowed to be changed once a year, and the power generation side shall apply to the market operation agency and make changes through the prescribed procedures. On the electricity consumption side, each market member reports the basic quotation form of "price-electricity-time period". Price is the unit price declared by the participants in the inter-provincial transaction, electricity is the instantaneous amount of electricity available for clearing, and the time period is the time period when the transaction is fixed on a certain day.

[0102] 2. Construction of inter-provincial transaction resource optimization allocation model and inter-provincial optimization clearing

[0103] The objective function of the inter-provincial transaction optimization stage is to maximize the sum of new energy consumption and social welfare:

[0104]

[0105] in: , They are , The weight coefficient of The amount of new energy consumption; for social welfare;

[0106] is the amount of new energy consumption, expressed as:

[0107]

[0108] in: For the inter-provincial trading channels; is the total number of inter-provincial trading channels; For the The new energy consumption of inter-provincial trading channels.

[0109] Social welfare refers to the benefits generated by deducting the total electricity sales cost and transmission cost of all sellers from the total electricity purchase cost of all buyers (including transmission loss costs).

[0110] F 2 = ∑ d ∈ D ∑ t ∈ T [ ∑ m ∈ M ( P m , d , t buy + P d , t los s − P d , t s ) × Q m , d , t buy − ∑ n ∈ N P n, d , t sal Q n, d , t sal ]

[0111] in: is the number of trading sessions; For the The number of electricity buyers in the inter-provincial trading channel; For the The number of electricity sellers in the inter-provincial trading channel; For electricity buyers In the Inter-provincial trading channels The electricity purchase price during the period; For the Inter-provincial trading channels Transmission loss during the period; For the Inter-provincial trading channels Time-of-day transmission prices; For electricity buyers In the Inter-provincial trading channels The amount of electricity purchased during the time period; For electricity sellers In the Inter-provincial trading channels Electricity selling price during time period; For electricity sellers In the Inter-provincial trading channels The amount of electricity sold during a period.

[0112] The constraints on inter-provincial transactions include power generation and purchase balance constraints, maximum available capacity constraints of transmission channels, and transmission channel ramp constraints.

[0113] (1) Power generation balance constraints:

[0114]

[0115] in: It is a collection of inter-provincial communication lines. is the line loss;

[0116] (2) Constraints on renewable energy power generation:

[0117]

[0118] in: For the new energy participating in the transaction The predicted total volume of inter-provincial trading channels.

[0119] (3) Maximum available capacity constraints of transmission channels

[0120]

[0121] in: and They are Time transmission channel The minimum and maximum transmission power; for Time transmission channel The initial transmission power plan value of for Time transmission channel Transaction power.

[0122] (4) Transmission channel climbing constraints

[0123]

[0124]

[0125] in: and They are Time transmission channel Minimum and maximum climbing power.

[0126] 3. Construction of the optimal clearing model of the provincial equilibrium market and provincial optimization

[0127] The objective function of the mathematical model for clearing intra-provincial transactions is to minimize the total electricity purchase cost:

[0128] min ∑ i = 1 N ∑ t = 1 T [ C i , t ( P i , t ) + C i , t U + C i , t N ] + ∑ s = 1 NS ∑ t = 1 T M [ SL s + + SL s − ]

[0129] in,

[0130] represents the total number of time periods considered;

[0131] Indicates the total number of units;

[0132] Indicates the unit exist Output during the time period;

[0133] , , are the operating cost, startup cost, and no-load cost of unit i in period t, among which the operating cost of unit It is a multi-segment linear function related to the output ranges declared by the unit and the corresponding energy prices; the unit startup cost It is a function related to the downtime of the unit, which represents the startup cost of the unit in different states (cold / warm / hot); the no-load cost of the unit It indicates the no-load cost of the unit when it is in operation (including the start-up and shutdown processes).

[0134] is the penalty factor for relaxing the network power constraints used for market clearing optimization;

[0135] , are the positive and negative flow relaxation variables of section s respectively; The total number of sections.

[0136] The constraints for intra-provincial transactions include system load balance constraints, system positive and negative reserve capacity constraints, system rotating reserve constraints, special unit status constraints, unit output upper and lower limit constraints, unit climbing constraints, unit minimum continuous start and stop time constraints, and section flow constraints.

[0137] (1) System load balance constraints

[0138] For each time period t, the load balancing constraint can be described as:

[0139]

[0140] in, represents the output of unit i in period t, represents the planned power of tie line j in period t (input is positive, output is negative), is the total number of contact lines, is the system load during period t.

[0141] (2) System positive reserve capacity constraints

[0142] Under the premise of ensuring system power balance, in order to prevent system load forecast deviations and imbalance fluctuations in system supply and demand caused by various actual operation accidents, the entire system generally needs to have a certain amount of spare capacity.

[0143] It is necessary to ensure that the total daily startup capacity meets the system's minimum spare capacity. The system's positive spare capacity constraint can be described as:

[0144]

[0145] in, represents the start and stop status of unit i in time period t, Indicates that the unit is shut down. Indicates that the unit is turned on; is the maximum output of unit i in period t; is the system positive spare capacity requirement for time period t.

[0146] (3) System Negative Reserve Capacity Constraints

[0147] The system negative reserve capacity constraint can be described as:

[0148]

[0149] in, is the minimum output of unit i in period t; is the system negative reserve capacity requirement for period t.

[0150] (4) System spinning reserve constraints

[0151] The sum of the upward and downward adjustment capabilities of the unit output in each period must meet the upward and downward adjustment requirements of the spinning standby in actual operation.

[0152]

[0153]

[0154] in, is the maximum ramp rate of unit i, is the maximum down-slope rate of unit i; , are the maximum and minimum outputs of unit i in period t respectively; , Adjust the spinning reserve requirement upward or downward for time period t respectively.

[0155] (5) Special unit status constraints

[0156] 1) The units that must be started by the algorithm and manual judgment should be in the start-up state:

[0157]

[0158] in, Refers to the complete set of must-start units.

[0159] 2) The units that must be shut down as determined by the algorithm and manual judgment should be in the shutdown state:

[0160] in, Refers to the complete set of must-stop groups.

[0161] (6) Upper and lower limits of unit output

[0162] The output of the unit should be within its maximum / minimum output range, and its constraints can be described as:

[0163]

[0164] For the units that must be turned on, during their must-be-turned-on period, , if there is a minimum output requirement, then in the above formula Take it as the minimum output that must be turned on during the corresponding period.

[0165] (7) Unit climbing constraints

[0166] When the unit is climbing up or down a slope, it should meet the climbing rate requirements. The climbing constraint can be described as:

[0167]

[0168]

[0169] in, is the maximum ramp rate of unit i, is the maximum ramp down rate of unit i.

[0170] (8) Minimum continuous start and stop time constraints for units

[0171] Due to the physical properties of thermal power units and actual operation requirements, thermal power units are required to meet the minimum continuous start / stop time. The minimum continuous start / stop time constraint can be described as:

[0172]

[0173]

[0174] in, is the start and stop status of unit i in time period t; , The minimum continuous start time and minimum continuous shutdown time of the unit; , is the continuous start-up time and continuous shutdown time of unit i in period t, which can be expressed as state variables To express:

[0175]

[0176]

[0177] (9) Sectional flow constraints

[0178] Considering the flow constraint of the key section, the constraint can be described as:

[0179]

[0180] in, , are the power flow transmission limits of section s respectively; is the generator output power transfer distribution factor of the node where unit i is located to section s; is the generator output power transfer distribution factor for section s at the node where the tie line j is located; is the generator output power transfer distribution factor for node k to section s. , are the positive and reverse flow relaxation variables of section s respectively.

[0181] (10) Unit output expression:

[0182]

[0183]

[0184] in, The total number of sections quoted for the unit, is the unit i in period t The winning bid power in the output range, , The first The upper and lower bounds of the output range.

[0185] (11) Expression for unit operating cost:

[0186]

[0187] in, The total number of sections quoted for the unit, For the crew The report The energy price corresponding to each output range.

[0188] By using the above intra-provincial optimization model for optimization and solution, the clearing price and transaction volume of each market member participating in the market transaction can be obtained as the result of inter-provincial electricity market clearing.

[0189] From the objective function and constraint conditions of the double-layer optimization model, it can be seen that the clearing results obtained by using the present invention can improve energy utilization while reducing the cost of purchasing electricity in the province and ensuring the safe operation of the power grid.

[0190] Example 2

[0191] Based on the same inventive concept as Example 1, this example introduces a device for coupling and clearing inter-provincial and intra-provincial power markets under a complex power grid, including:

[0192] An electricity price declaration data acquisition module is configured to acquire electricity price declaration data of market members participating in inter-provincial electricity market transactions;

[0193] The inter-provincial dispatching and clearing module is configured to solve the clearing power and power price of the inter-provincial interconnection line checkpoint based on the acquired power price declaration data and the pre-built inter-provincial transaction resource optimization allocation model, with the maximization of the sum of new energy consumption and social welfare as the optimization goal;

[0194] The provincial dispatching and clearing module is configured to be used for the provinces participating in the inter-provincial power market transactions: based on the cleared electricity volume and electricity price at the inter-provincial tie-line gateway, using the pre-built provincial balancing market optimization clearing model, with the minimum total power purchase cost in the province as the optimization goal, to solve the clearing price and transaction volume of each market member in the province so that the supply and demand in the province are balanced and the power grid operates safely;

[0195] The clearing result output module is configured to output the inter-provincial power market clearing result according to the obtained clearing prices and transaction volumes of market members in each province.

[0196] For the specific function implementation methods of the above modules, please refer to the relevant content of Example 1.

[0197] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.

[0198] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0199] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0200] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0201] The embodiments of the present invention are described above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the enlightenment of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the purpose of the present invention and the claims, which all fall within the protection of the present invention.

Claims

1. A method for coupling and clearing inter-provincial and intra-provincial power markets under complex power grids, characterized in that: include: Obtain electricity price declaration data of market members participating in inter-provincial electricity market transactions; Based on the electricity price declaration data obtained, the pre-built inter-provincial transaction resource optimization allocation model is used to maximize the sum of new energy consumption and social welfare, and the clearing power and electricity price at the inter-provincial interconnection line checkpoint are solved; For provinces participating in inter-provincial power market transactions: Based on the cleared electricity volume and electricity price at the inter-provincial tie-line checkpoints, the pre-built provincial balancing market optimization clearing model is used to minimize the total power purchase cost within the province. The clearing price and transaction volume of each market member within the province are solved to balance the supply and demand within the province and ensure the safe operation of the power grid. According to the obtained clearing prices and transaction volumes of market members in each province, the inter-provincial electricity market is cleared; Among them, the objective function of the inter-provincial transaction resource optimization allocation model is: ; in: , They are , The weight coefficient of The amount of new energy consumption; for social welfare; The expression is: ; in: Indicates inter-provincial trading channels; is the total number of inter-provincial trading channels; For the The amount of new energy consumed by inter-provincial trading channels; The expression is: ; in: is the number of trading sessions; For the The number of electricity buyers in the inter-provincial trading channel; For the The number of electricity sellers in the inter-provincial trading channel; For electricity buyers In the Inter-provincial trading channels The electricity purchase price during the period; For the Inter-provincial trading channels Transmission loss during the period; For the Inter-provincial trading channels Time-of-day transmission prices; For electricity buyers In the Inter-provincial trading channels The amount of electricity purchased during the time period; For electricity sellers In the Inter-provincial trading channels Electricity selling price during time period; For electricity sellers In the Inter-provincial trading channels The amount of electricity sold during the time period; The constraint conditions for solving the objective function of the inter-provincial transaction resource optimization allocation model include: (1) Power generation balance constraints: ; in: It is a collection of inter-provincial communication lines. is the line loss; (2) Constraints on renewable energy power generation: ; in: For the new energy participating in the transaction The predicted total volume of inter-provincial trading channels; (3) Maximum available capacity constraints of transmission channels: ; in: and They are Time transmission channel The minimum and maximum transmission power; for Time transmission channel The initial transmission power plan value of for Time transmission channel Transaction power; (4) Transmission channel climbing constraints: , ; in: and They are Time transmission channel Minimum and maximum climbing power; The objective function of the provincial equilibrium market optimization clearing model is: ; in, represents the total number of time periods considered; Indicates the total number of units; Indicates the unit exist Output during the time period; , , For each unit In the period Operating costs, start-up costs, and no-load costs; is the penalty factor for relaxing the network power constraints used for market clearing optimization; , are the positive and negative flow relaxation variables of section s respectively; is the total number of sections; The solution constraints of the objective function of the provincial equilibrium market optimization clearing model include: (1) System load balance constraints: ; in, represents the output of unit i in period t, It represents the planned power of tie line j in time period t, input is positive and output is negative. is the total number of contact lines, is the system load during time period t; (2) System positive reserve capacity constraints: ; in, represents the start and stop status of unit i in time period t, Indicates that the unit is shut down. Indicates that the unit is turned on; is the maximum output of unit i in period t; is the system positive reserve capacity requirement for time period t; (3) System negative reserve capacity constraints: ; in, is the minimum output of unit i in period t; is the system negative reserve capacity requirement for time period t; (4) System spinning reserve constraints: , ; in, is the maximum ramp rate of unit i, is the maximum down-slope rate of unit i; , are the maximum and minimum outputs of unit i in period t respectively; , They are the upward and downward spinning reserve requirements of the units in period t respectively; (5) Special unit status constraints: , ; in, Refers to the complete set of the must-start unit, Refers to the complete set of must-stop groups; (6) Upper and lower limits of unit output ; , are the minimum and maximum output of the unit respectively; (7) Unit climbing constraints: , ; in, is the maximum ramp rate of unit i, is the maximum down-slope rate of unit i; (8) Minimum continuous start and stop time constraints for units: , ; in, , The minimum continuous start time and minimum continuous shutdown time of the unit; , is the continuous start-up time and continuous shutdown time of unit i in time period t, expressed as: , ; (9) Section flow constraints: ; in, , are the power flow transmission limits of section s respectively; is the generator output power transfer distribution factor of the node where unit i is located to section s; is the generator output power transfer distribution factor for section s at the node where the tie line j is located; is the generator output power transfer distribution factor of node k to section s; , are the positive and negative flow relaxation variables of section s respectively; (10) Unit output expression constraints: , ; in, The total number of sections quoted for the unit, is the unit i in period t The winning bid quantity in the output range is , The first The upper and lower bounds of the output range; (11) Unit operating cost expression constraints: ; in, The total number of sections quoted for the unit, For the crew The report The energy price corresponding to each output range.

2. The method according to claim 1, characterized in that: The market members participating in the inter-provincial electricity market transactions include power purchasing members and power selling members. The power purchasing members' electricity price declaration data include hourly electricity prices and electricity quantities, and the power selling members' electricity price declaration data include segmented electricity quantities and corresponding segmented prices.

3. The method according to claim 2, characterized in that: In the electricity price declaration data of members on the power sales side participating in inter-provincial transactions, the segmented quantity-price curve is a non-decreasing quantity-price curve within the normal output range and covering the entire 24 hours a day. The curve can be divided into a maximum of 10 segments.

4. A device for coupling and clearing inter-provincial and intra-provincial power markets under a complex power grid using the method for coupling and clearing inter-provincial and intra-provincial power markets under a complex power grid as described in any one of claims 1 to 3, characterized in that: include: An electricity price declaration data acquisition module is configured to acquire electricity price declaration data of market members participating in inter-provincial electricity market transactions; The inter-provincial dispatching and clearing module is configured to solve the clearing power and power price of the inter-provincial interconnection line checkpoint based on the acquired power price declaration data and the pre-built inter-provincial transaction resource optimization allocation model, with the optimization goal of maximizing the sum of new energy consumption and social welfare; The provincial dispatching and clearing module is configured to be used for the provinces participating in the inter-provincial power market transactions: based on the cleared electricity volume and electricity price at the inter-provincial tie-line gateway, using the pre-built provincial balancing market optimization clearing model, with the minimum total power purchase cost in the province as the optimization goal, to solve the clearing price and transaction volume of each market member in the province so that the supply and demand in the province are balanced and the power grid operates safely; And, the clearing result output module is configured to output the inter-provincial electricity market clearing results according to the obtained clearing prices and transaction volumes of market members in each province.