A method, system, electronic device and storage medium for optimizing dispatching of power generation vehicles
By constructing a mapping relationship between generator vehicles and equipment fault locations, the dispatch plan of generator vehicles is optimized, which solves the problem of low dispatch and utilization efficiency of generator vehicles in the existing technology, and achieves more efficient resource utilization and user demand satisfaction.
Patent Information
- Application Number
- CN202111473149.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-02
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2041-12-02
AI Technical Summary
The dispatching and utilization efficiency of existing power generation vehicles is low, it is difficult to meet user needs, and resources are not utilized rationally.
By obtaining the user's generator car dispatching instructions, based on the ledger information of the generator car and the probability of equipment failure, a pre-scheduling plan is constructed to optimize the mapping relationship between the generator car and the equipment failure location, calculate the dispatch priority of each generator car, and generate Optimal generator vehicle dispatching plan.
It improves the utilization efficiency of power generation vehicle dispatching, meets user needs, and optimizes the allocation and use of power generation vehicle resources.
Smart Images

Figure CN114037355B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric power resource allocation, and in particular to a method, system, electronic equipment and storage medium for optimizing the dispatching of power generation vehicles. Background Art
[0002] With the rapid development of my country's economy, the residential electricity load has reached new highs every year, and the public's demand for stable power supply has continued to increase. Power supply reliability has been placed in an increasingly important position and has even become an important condition for regional investment attraction. Therefore, in recent years, power grid companies have increasingly stringently assessed power supply reliability.
[0003] At present, the distribution network structure in most areas is weak, the equipment in the distribution room is old, and the degree of automation is low. When the equipment is repaired and maintained, part of the load needs to be shut down. At the same time, in the process of urban development, the number of infrastructure projects is increasing, and there is a risk that the construction units will damage the transmission and distribution lines, thereby causing power outages. These factors will greatly affect the power supply reliability indicators.
[0004] In response to the above problems, the use of generator trucks for temporary power supply has become a solution. When planned maintenance or emergency repairs are required, the generator truck is connected to the AC bus of the distribution network equipment as a temporary power source to provide power supply for the affected loads.
[0005] However, in the process of using generator trucks, the generator trucks have not yet achieved centralized optimal allocation. When a power supply branch needs to use a generator truck, it is generally necessary to contact and coordinate the generator truck managers of other power supply branches in turn for related matters of borrowing vehicles. This not only increases human resources and time costs, but also fails to meet user needs, and the generator truck resources are not reasonably utilized. Summary of the invention
[0006] The present invention provides a method, system, electronic equipment and storage medium for optimizing the dispatching of power generation vehicles, which solve the technical problems that the utilization efficiency of the existing dispatching of power generation vehicles is low and it is difficult to meet the needs of users.
[0007] In view of this, a first aspect of the present invention provides a method for optimizing the dispatching of power generation vehicles, comprising the following steps:
[0008] Acquire a number of power generation vehicle dispatching instructions sent in advance by a user, wherein the power generation vehicle dispatching instructions include a location of a device failure;
[0009] In response to each generator car dispatch instruction, a pre-dispatch plan is formed based on the ledger information of each generator car, the pre-dispatch plan includes a mapping relationship between each generator car and each equipment fault location, the ledger information includes rated capacity, maximum usage time, generator car status and generator car geographical location;
[0010] Calculate the equipment failure probability of each generating vehicle in the substation area;
[0011] Based on the equipment failure location, the ledger information of each power car and the equipment failure probability of the substation to which it belongs, the scheduling priority between each power car and each power car scheduling instruction in the pre-scheduling plan is evaluated to obtain the optimal power car scheduling plan.
[0012] Preferably, the step of calculating the equipment failure probability of each power generation vehicle in the assigned substation specifically includes:
[0013] Obtain the real-time geographical distribution location of each generator vehicle and its affiliated station area;
[0014] Obtain equipment risk assessment information, equipment status assessment information, load information and construction risk information of all power equipment in the substation area;
[0015] The equipment failure probability generated based on the equipment risk assessment information, equipment status assessment information, load information and construction risk information of all power equipment is:
[0016]
[0017] In the formula, p i-n is the failure probability of the nth power equipment in the ith assigned substation, P i is the equipment failure probability of the ith assigned area, i is the ith assigned area, n is the nth power equipment, im is the total number of power equipment in the ith assigned area, R i-n is the equipment risk assessment information of the nth power equipment in the ith substation, H i-n is the equipment status evaluation information of the nth power equipment in the ith assigned substation, V i-n is the load information of the nth power equipment in the ith assigned substation, that is, the ratio of the current load of the power equipment to the historical maximum load of the equipment, G i-n is the construction risk information of the nth power equipment in the ith substation, a, b, c, d are all weight coefficients, a+b+c+d=1, e i-n is the equipment criticality coefficient of the nth power equipment in the ith substation.
[0018] Preferably, the method further comprises:
[0019] Determine the equipment failure probability P of the i-th assigned substation i Is it greater than a preset fault probability threshold? If the above judgment is greater than, the power generation vehicle in the corresponding assigned substation will take the dispatch of the power equipment in the assigned substation as the highest priority.
[0020] Preferably, the method further comprises:
[0021] Generate a distribution map of the power generation vehicle area according to the real-time geographical distribution position of each power generation vehicle and its affiliated area;
[0022] According to the preset fault probability threshold, the fault probability p of the nth power equipment in the ith assigned substation is set to i-n and the equipment failure probability P of the ith assigned substation i Segmentation into different levels of failure probability;
[0023] Different fault probability levels are rendered in different colors at the locations of the corresponding assigned substations in the power generation vehicle substation location distribution map, thereby forming a fault probability distribution heat map.
[0024] Preferably, the step of evaluating the dispatching priority between each power generation vehicle and each power generation vehicle dispatching instruction in the pre-dispatching plan based on the equipment failure location, the ledger information of each power generation vehicle and the equipment failure probability of the belonging substation to which it belongs, so as to obtain the optimal power generation vehicle dispatching plan specifically includes:
[0025] The scheduling objective function is constructed based on the equipment failure location, the ledger information of each power generation vehicle, and the equipment failure probability of the power generation area to which it belongs:
[0026] f k-l =αC l +βL k-l +γS l +ε(1-P i )
[0027] In the formula, f k-l is the dispatch score of the lth generator car in the kth plan, k is the kth plan in the pre-dispatching plan, l is the lth generator car, α, β, γ, ε are all weight coefficients, α+β+γ+ε=1, C l is the capacity of the first generator car,
[0028]
[0029] L k-l is the converted distance between the geographical location of the lth generator car in the kth plan and the equipment failure location in the kth plan, L k-l The calculation formula is,
[0030] L k-lmin =MIN{l k-1 , l k-2 …l k-n}
[0031] S lis the status information of the lth generator car, l k-l represents the actual geographical distance between the lth generator car and the equipment failure location in the kth plan, L k-lmin It represents the minimum actual geographical distance between the lth generator car and the equipment failure location in the kth plan;
[0032] According to the dispatch score of the lth generator car in the kth plan, the dispatch score array of each generator car is constructed, denoted as F k-l =[f k-1 , f k-2 ...f k-n ], construct the dispatch score array of all planned power generation vehicles according to the dispatch score array of each planned power generation vehicle, denoted as F k =[F 1-l ,F 2-l ...F n-l ];
[0033] The objective function for calculating the score values of all planned power generation vehicles based on the dispatch score array of each planned power generation vehicle and the dispatch score array of all planned power generation vehicles is:
[0034]
[0035] In the formula, Q max To meet the cumulative maximum value of the planned power generation vehicle score, choose(F k ) is the array of power generation vehicles that meets the plan, choose(F k-l ) is the array of power generation vehicles that meet each plan;
[0036] Obtain the scheduling combination between each power car and each power car scheduling instruction corresponding to the cumulative maximum value of the power car score values that meet the plan to determine the optimal power car scheduling plan.
[0037] Preferably, the method further comprises:
[0038] issuing a unique plan number to the generator vehicle dispatch instruction;
[0039] The plan number and its corresponding optimal power generation vehicle dispatching plan are sent to a designated terminal.
[0040] Preferably, the method further comprises:
[0041] According to the optimal generator car dispatching plan, in the generator car area location distribution map, the mapping relationship between the generator cars in the optimal generator car dispatching plan and the equipment failure locations is bound and displayed.
[0042] In a second aspect, the present invention provides a power generation vehicle optimization dispatching system, comprising:
[0043] An instruction acquisition module, used to acquire a number of power generation vehicle dispatching instructions sent in advance by a user, wherein the power generation vehicle dispatching instructions include a device fault location;
[0044] An instruction response module, used to respond to each power car dispatch instruction, and form a pre-dispatch plan based on the ledger information of each power car, the pre-dispatch plan includes a mapping relationship between each power car and each equipment fault location, the ledger information includes the power car capacity, the maximum use time, the power car maintenance time, the power car status and the power car geographical location;
[0045] A calculation module is used to calculate the equipment failure probability of each generating vehicle in the substation area;
[0046] The scheduling evaluation module is used to evaluate the scheduling priority between each power generation vehicle and each power generation vehicle scheduling instruction in the pre-scheduling plan based on the equipment failure location, the ledger information of each power generation vehicle and the equipment failure probability of the power generation vehicle to which it belongs, so as to obtain the optimal power generation vehicle scheduling plan.
[0047] In a third aspect, the present invention provides a computer device, comprising a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the above method when executing the computer program.
[0048] In a fourth aspect, the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein the computer program implements the steps of the above method when executed by a processor.
[0049] It can be seen from the above technical solutions that the present invention has the following advantages:
[0050] The present invention obtains several power car dispatching instructions sent in advance by the user, responds to the power car dispatching instructions, and constructs a mapping relationship between each power car dispatching instruction and each power car to form a pre-dispatching plan. By calculating the equipment failure probability of the belonging substation where each power car is located, the dispatching priority between each power car and each power car dispatching instruction in the pre-dispatching plan is evaluated based on the equipment failure location, the ledger information of each power car and the equipment failure probability of the belonging substation where it is located, and the optimal power car dispatching plan is obtained, thereby improving the utilization efficiency of power car dispatching and meeting user needs. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] Figure 1 A flow chart of a method for optimizing the dispatching of power generation vehicles provided by an embodiment of the present invention;
[0052] Figure 2 A schematic structural diagram of a power generation vehicle optimization scheduling system provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0053] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0054] For easier understanding, see Figure 1 The present invention provides a method for optimizing the dispatching of power generation vehicles, comprising the following steps:
[0055] Step 1: Obtain several power generation vehicle dispatching instructions sent in advance by the user, where the power generation vehicle dispatching instructions include the location of equipment failure.
[0056] In actual applications, users send generator dispatch instructions to the generator dispatch platform, and there can be multiple generator dispatch instructions. In addition to the location of the equipment failure, the generator dispatch instruction also includes the applicant, the applicant unit, the application time, the reason for the application, the application type (plan, emergency repair), the generator grade, the generator capacity and other matters.
[0057] Step 2: Respond to each generator dispatch instruction and form a pre-dispatch plan based on the ledger information of each generator. The pre-dispatch plan includes a mapping relationship between each generator and each equipment fault location. The ledger information includes rated capacity, maximum usage time, generator status and generator geographic location.
[0058] In a practical application, multiple dispatching instructions for power generation vehicles are obtained. If there are multiple power generation vehicles, a mapping relationship can be formed between each power generation vehicle and each dispatching instruction for the power generation vehicle, and a mapping matrix can be constructed, and the mapping matrix can be used as a pre-dispatching plan.
[0059] Step 3: Calculate the equipment failure probability of each power generation vehicle in the substation.
[0060] It should be noted that the equipment failure probability is the probability of failure of the power equipment in this substation. In general examples, the higher the equipment failure probability, the higher the priority of the power generation vehicle in the substation for maintaining the power equipment in the substation, thereby ensuring the maintenance of the power equipment in the substation nearby.
[0061] Step 4: Based on the equipment failure location, the ledger information of each power car and the equipment failure probability of its affiliated substation, the dispatch priority between each power car and each power car dispatch instruction in the pre-dispatch plan is evaluated to obtain the optimal power car dispatch plan.
[0062] It can be understood that the ledger information of the generator car includes rated capacity, maximum usage time, generator car status and generator car geographical location. Among them, since the faulty equipment has power requirements, usage time requirements, and generator car status requirements (maintenance or normal), it is necessary to consider whether the generator car meets the above requirements in the pre-dispatch plan. At the same time, in order to save distance and time, it is necessary to consider the distance between the equipment failure location and the generator car's geographical location. At the same time, it is also necessary to consider the equipment failure probability of the substation where each generator car is located. The higher the equipment failure probability of the substation other than the substation where the faulty equipment is located, the lower the probability of dispatching to the faulty equipment. Therefore, the dispatch priority between each generator car and each generator car dispatch instruction in the pre-dispatch plan is evaluated to obtain the optimal generator car dispatch plan that meets the above conditions.
[0063] It should be noted that this embodiment provides a method for optimizing the dispatching of power vehicles, by obtaining several power vehicle dispatching instructions sent in advance by users, responding to the power vehicle dispatching instructions, and constructing a mapping relationship between each power vehicle dispatching instruction and each power vehicle to form a pre-dispatching plan. By calculating the equipment failure probability of the substation where each power vehicle is located, the dispatching priority between each power vehicle and each power vehicle dispatching instruction in the pre-dispatching plan is evaluated based on the equipment failure location, the ledger information of each power vehicle, and the equipment failure probability of the substation where it is located, and the optimal power vehicle dispatching plan is obtained, thereby improving the utilization efficiency of power vehicle dispatching and meeting user needs.
[0064] In a specific embodiment, step three specifically includes:
[0065] 3-1 Obtain the real-time geographical location of each power generation vehicle and its affiliated substation.
[0066] In this embodiment, the data in the Baidu map background database is accessed through an interface to automatically obtain the location information of the Baidu map. After the power generation vehicle location information is connected, the real-time geographical distribution location of the power generation vehicle can be displayed. At the same time, the area to which each power generation vehicle belongs can be obtained through the area division.
[0067] 3-2 Obtain equipment risk assessment information, equipment status assessment information, load information and construction risk information of all power equipment within the substation.
[0068] Among them, equipment risk assessment information and equipment status assessment information can both be obtained from the 4A production system. The load information is the ratio of the current load of the power equipment to the historical maximum load of the equipment. The ratio of the current load of the power equipment to the historical maximum load of the equipment is obtained by the dispatching automation web subsystem that integrates the real-time four remote control (remote control, telemetry, telesignaling and teleadjustment) information of the equipment. Construction risk information can be obtained from the construction information disclosed in the municipal government's government affairs system.
[0069] 3-3 Based on the equipment risk assessment information, equipment status assessment information, load information and construction risk information of all power equipment, the equipment failure probability is generated as follows:
[0070]
[0071] In the formula, p i-n is the failure probability of the nth power equipment in the ith assigned substation, P i is the equipment failure probability of the ith assigned area, i is the ith assigned area, n is the nth power equipment, im is the total number of power equipment in the ith assigned area, R i-n is the equipment risk assessment information of the nth power equipment in the ith substation, H i-n is the equipment status evaluation information of the nth power equipment in the ith assigned substation, V i-n is the load information of the nth power equipment in the ith assigned substation, that is, the ratio of the current load of the power equipment to the historical maximum load of the equipment, G i-n is the construction risk information of the nth power equipment in the ith substation, a, b, c, d are all weight coefficients, a+b+c+d=1, e i-n is the equipment criticality coefficient of the nth power equipment in the ith substation.
[0072] Among them, the equipment criticality coefficient can be obtained from the 4A production system, and the weight coefficient is determined by the expert database.
[0073] In a specific embodiment, the method further comprises:
[0074] Determine the equipment failure probability P of the i-th assigned substation i Is it greater than a preset fault probability threshold? If the above judgment is greater than, the power generation vehicle in the corresponding assigned substation will take the dispatch of the power equipment in the assigned substation as the highest priority.
[0075] It is understandable that when the probability of equipment failure in the substation to which a certain generator vehicle belongs reaches a certain threshold, the generator vehicle should be reserved for emergency repairs in the substation to which it belongs.
[0076] In a specific embodiment, the method further comprises:
[0077] 5-1 Generate a distribution map of the power generation vehicle area location based on the real-time geographical distribution location of each power generation vehicle and its affiliated area.
[0078] It should be noted that by mapping the real-time geographical distribution position of each power generation vehicle and its affiliated substation into a geographic map, a power generation vehicle substation location distribution map can be obtained, which includes the affiliation relationship between the real-time geographical distribution position of each power generation vehicle and its affiliated substation.
[0079] 5-2 According to the preset fault probability threshold, the fault probability p of the nth power equipment in the ith assigned substation is set to i-n and the equipment failure probability P of the ith assigned substation i Segmented into different levels of failure probability.
[0080] 5-3 Different fault probability levels are rendered in different colors at the corresponding locations of the generating station area location distribution map, thereby forming a fault probability distribution heat map.
[0081] In a general example, the standard grid defect level classification can be used as a reference to divide the fault probability into four levels: high, medium, low, and general. At the same time, each level corresponds to a different color and is rendered in a different color at the corresponding location of the power station area distribution map, thereby intuitively displaying the fault probability distribution of the power equipment.
[0082] In a specific embodiment, step 4 specifically includes:
[0083] 4-1 Based on the equipment failure location, the ledger information of each power generation vehicle and the equipment failure probability of the power generation area to which it belongs, the scheduling objective function is constructed as follows:
[0084] f k-l =αC l +βL k-l +γS l +ε(1-P i )
[0085] In the formula, f k-l is the dispatch score of the lth generator car in the kth plan, k is the kth plan in the pre-dispatching plan, l is the lth generator car, α, β, γ, ε are all weight coefficients, α+β+γ+ε=1, C l is the capacity of the first generator car,
[0086]
[0087] L k-l is the converted distance between the geographical location of the lth generator car in the kth plan and the equipment failure location in the kth plan, L k-l The calculation formula is,
[0088] L k-lmin =MIN{l k-1 , l k-2 …l k-n}
[0089] S l is the status information of the lth generator car, l k-l represents the actual geographical distance between the lth generator car and the equipment failure location in the kth plan, L k-lmin It represents the minimum actual geographical distance between the lth generator car and the equipment failure location in the kth plan;
[0090] Among them, the weight coefficient is determined by the expert database.
[0091] 4-2 According to the dispatch score of the lth generator car in the kth plan, construct the dispatch score array of the generator car in each plan, denoted as F k-l =[f k-1 ,f k-2 ...f k-n ], construct the dispatch score array of all planned power generation vehicles according to the dispatch score array of each planned power generation vehicle, denoted as F k =[F 1-l ,F 2-l ...F n-l ];
[0092] 4-3 The objective function for calculating the score values of all planned power generation vehicles based on the dispatch score array of each planned power generation vehicle and the dispatch score array of all planned power generation vehicles is:
[0093]
[0094] In the formula, Q max To meet the cumulative maximum value of the planned power generation vehicle score, choose(F k ) is the array of power generation vehicles that meets the plan, choose(F k-l ) is the array of power generation vehicles that meet each plan;
[0095] 4-4 Obtain the scheduling combination between each power car and each power car scheduling instruction corresponding to the cumulative maximum value of the power car score values that meet the plan, so as to determine the optimal power car scheduling plan.
[0096] It can be understood that when the cumulative maximum value of the score values of the power cars that meet the plan is obtained, there is a corresponding dispatch score array for the power cars in each plan, and the dispatch score array for the power cars in each plan contains the dispatch score of the lth power car in the kth plan, and the dispatch score corresponds to the lth power car in the kth plan in the pre-dispatching plan, thereby obtaining a dispatch combination between each power car and each power car dispatch instruction to determine the optimal power car dispatch plan.
[0097] In a specific embodiment, the method further comprises:
[0098] 6-1 Issue a unique plan number to the generator vehicle dispatch instruction.
[0099] 6-2 Send the plan number and its corresponding optimal power car dispatching plan to the designated terminal.
[0100] In a specific embodiment, the method further comprises:
[0101] According to the optimal generator car dispatching plan, in the generator car area location distribution map, the mapping relationship between the generator cars in the optimal generator car dispatching plan and the equipment failure location is bound and displayed.
[0102] It can be understood that the pre-dispatching plan includes the mapping relationship between each power car and each equipment fault location, and the optimal power car dispatching plan is to optimize and determine the mapping relationship between each power car in the pre-dispatching plan and each equipment fault location. At the same time, the power car location and the equipment fault location exist in the power car area location distribution map, so that the mapping relationship between the power car and the equipment fault location in the optimal power car dispatching plan can be connected and displayed.
[0103] The above is a detailed description of an embodiment of a power generation vehicle optimization scheduling method provided by the present invention. The following is a detailed description of an embodiment of a power generation vehicle optimization scheduling system provided by the present invention.
[0104] For easier understanding, see Figure 2 The present invention provides a power generation vehicle optimization dispatching system, comprising:
[0105] The instruction acquisition module 100 is used to acquire a number of power generation vehicle dispatching instructions sent in advance by the user, and the power generation vehicle dispatching instructions include the location of equipment failure;
[0106] The instruction response module 200 is used to respond to each power car dispatch instruction and form a pre-dispatch plan based on the ledger information of each power car. The pre-dispatch plan includes a mapping relationship between each power car and each equipment fault location. The ledger information includes the capacity of the power car, the maximum usage time, the maintenance time of the power car, the status of the power car and the geographical location of the power car.
[0107] The calculation module 300 is used to calculate the equipment failure probability of each power generation vehicle in the assigned substation;
[0108] The dispatch evaluation module 400 is used to evaluate the dispatch priority between each generator car and each generator car dispatch instruction in the pre-dispatching plan based on the equipment failure location, the ledger information of each generator car and the equipment failure probability of its affiliated substation, so as to obtain the optimal generator car dispatch plan.
[0109] In this embodiment, the calculation module specifically includes:
[0110] The attribution acquisition module is used to obtain the real-time geographical distribution location of each power generation vehicle and its attribution area;
[0111] The equipment information acquisition module is used to obtain equipment risk assessment information, equipment status assessment information, load information and construction risk information of all power equipment in the substation area;
[0112] The failure probability calculation module is used to generate the equipment failure probability based on the equipment risk evaluation information, equipment status evaluation information, load information and construction risk information of all power equipment:
[0113]
[0114] In the formula, p i-n is the failure probability of the nth power equipment in the ith assigned substation, P i is the equipment failure probability of the ith assigned area, i is the ith assigned area, n is the nth power equipment, im is the total number of power equipment in the ith assigned area, R i-n is the equipment risk assessment information of the nth power equipment in the ith substation, S i-n is the equipment status evaluation information of the nth power equipment in the ith assigned substation, L i-n is the load information of the nth power equipment in the ith assigned substation, that is, the ratio of the current load of the power equipment to the historical maximum load of the equipment, C i-n is the construction risk information of the nth power equipment in the ith substation, a, b, c, d are all weight coefficients, a+b+c+d=1, e i-n is the equipment criticality coefficient of the nth power equipment in the ith substation.
[0115] In this embodiment, the system further includes:
[0116] The judgment module is used to judge the equipment failure probability P of the i-th assigned substation. iIs it greater than a preset fault probability threshold? If the above judgment is greater than, the power generation vehicle in the corresponding assigned substation will take the dispatch of the power equipment in the assigned substation as the highest priority.
[0117] In this embodiment, the system further includes:
[0118] The distribution map module is used to generate a distribution map of the power generation vehicle area according to the real-time geographical distribution location of each power generation vehicle and its affiliated area;
[0119] The level segmentation module is used to divide the fault probability p of the nth power equipment in the ith belonging area into i-n and the equipment failure probability P of the ith assigned substation i Segmentation into different levels of failure probability;
[0120] The rendering module is used to render different fault probability levels in different colors at the corresponding locations of the generating station area location distribution map, thereby forming a fault probability distribution heat map.
[0121] In this embodiment, the scheduling evaluation module specifically includes:
[0122] The objective function module is used to construct the scheduling objective function based on the equipment failure location, the ledger information of each power generation vehicle, and the equipment failure probability of the power generation area to which it belongs.
[0123] f k-l =αC l +βL k-l +γS l +ε(1-P i )
[0124] In the formula, f k-l is the dispatch score of the lth generator car in the kth plan, k is the kth plan in the pre-dispatching plan, l is the lth generator car, α, β, γ, ε are all weight coefficients, α+β+γ+ε=1, C l is the capacity of the first generator car,
[0125]
[0126] L k-l is the converted distance between the geographical location of the lth generator car in the kth plan and the equipment failure location in the kth plan, L k-l The calculation formula is,
[0127] L k-lmin =MIN{l k-1 , l k-2 …l k-n}
[0128] S l is the status information of the lth generator car, l k-l represents the actual geographical distance between the lth generator car and the equipment failure location in the kth plan, L k-lmin It represents the minimum actual geographical distance between the lth generator car and the equipment failure location in the kth plan;
[0129] The numerical module is used to construct the dispatch score array of the generator car in each plan according to the dispatch score of the lth generator car in the kth plan, denoted as F k-l =[f k-1 ,f k-2 ...f k-n ], construct the dispatch score array of all planned power generation vehicles according to the dispatch score array of each planned power generation vehicle, denoted as F k =[F 1-l ,F 2-l ...F n-l ];
[0130] The scoring function module is used to calculate the target function of the scoring values of all planned power generation vehicles according to the scheduling score array of each planned power generation vehicle and the scheduling score array of all planned power generation vehicles.
[0131]
[0132] In the formula, Q max To meet the cumulative maximum value of the planned power generation vehicle score, choose(F k ) is the array of power generation vehicles that meets the plan, choose(F k-l ) is the array of power generation vehicles that meet each plan;
[0133] The scheduling plan module is used to obtain the scheduling combination between each power car and each power car scheduling instruction corresponding to the cumulative maximum value of the power car score values that meet the plan, so as to determine the optimal power car scheduling plan.
[0134] In this embodiment, the system further includes:
[0135] The number issuing module is used to issue a unique plan number to the dispatching instructions of the power generation vehicle;
[0136] The sending module is used to send the plan number and its corresponding optimal power generation vehicle dispatching plan to the designated terminal.
[0137] In a specific embodiment, the system further includes:
[0138] The display module is used to bind and display the mapping relationship between the power generation vehicle in the optimal power generation vehicle scheduling plan and the equipment failure location in the power generation vehicle area location distribution map according to the optimal power generation vehicle scheduling plan.
[0139] The present invention also provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the above method when executing the computer program.
[0140] The present invention also provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the steps of the above method are implemented.
[0141] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0142] In the several embodiments provided by the present invention, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of units is only a logical function division, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0143] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0144] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0145] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for executing all or part of the steps of the method described in each embodiment of the present invention through a computer device (which can be a personal computer, a server, or a network device, etc.). The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (full name in English: Read-Only Memory, English abbreviation: ROM), random access memory (full name in English: Random Access Memory, English abbreviation: RAM), disk or optical disk and other media that can store program codes.
[0146] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for optimizing the dispatching of power generation vehicles, characterized in that: The following steps are involved: Acquire a number of power generation vehicle dispatching instructions sent in advance by a user, wherein the power generation vehicle dispatching instructions include a device fault location; In response to each generator car dispatch instruction, a pre-dispatch plan is formed based on the ledger information of each generator car, the pre-dispatch plan includes a mapping relationship between each generator car and each equipment fault location, the ledger information includes rated capacity, maximum usage time, generator car status and generator car geographical location; Calculate the equipment failure probability of each power generation vehicle in the substation, including: Obtain the real-time geographical distribution location of each generator vehicle and its affiliated station area; Obtain equipment risk assessment information, equipment status assessment information, load information and construction risk information of all power equipment in the substation area; The equipment failure probability generated based on the equipment risk assessment information, equipment status assessment information, load information and construction risk information of all power equipment is: In the formula, p i-n is the failure probability of the nth power equipment in the ith assigned substation, P i is the equipment failure probability of the ith assigned area, i is the ith assigned area, n is the nth power equipment, im is the total number of power equipment in the ith assigned area, R i-n is the equipment risk assessment information of the nth power equipment in the ith substation, H i-n is the equipment status evaluation information of the nth power equipment in the ith assigned substation, V i-n is the load information of the nth power equipment in the ith assigned substation, that is, the ratio of the current load of the power equipment to the historical maximum load of the equipment, G i-n is the construction risk information of the nth power equipment in the ith substation, a, b, c, d are all weight coefficients, a+b+c+d=1, e i-n is the equipment criticality coefficient of the nth power equipment in the ith assigned substation; Based on the equipment failure location, the ledger information of each power car and the equipment failure probability of the substation to which it belongs, the dispatch priority between each power car and each power car dispatch instruction in the pre-dispatching plan is evaluated to obtain the optimal power car dispatching plan, which specifically includes: The scheduling objective function is constructed based on the equipment failure location, the ledger information of each power generation vehicle, and the equipment failure probability of the power generation area to which it belongs: f k-l =αC l +βL k-l +γS l +ε(1-P i ) In the formula, f k-l is the dispatch score of the lth generator car in the kth plan, k is the kth plan in the pre-dispatching plan, l is the lth generator car, α, β, γ, ε are all weight coefficients, α+β+γ+ε=1, C l is the capacity of the first generator car, L k-l is the converted distance between the geographical location of the lth generator car in the kth plan and the equipment failure location in the kth plan, L k-l The calculation formula is, S l is the status information of the lth generator car, l k-l represents the actual geographical distance between the lth generator car and the equipment failure location in the kth plan, L k-lmin It represents the minimum actual geographical distance between the lth generator car and the equipment failure location in the kth plan; According to the dispatch score of the lth generator car in the kth plan, the dispatch score array of each generator car is constructed, denoted as F k-l =[f k-1 ,f k-2 ...f k-n ], construct the dispatch score array of all planned power generation vehicles according to the dispatch score array of each planned power generation vehicle, denoted as F k =[f 1-l ,f 2-l ...f n-l ]; The objective function for calculating the score values of all planned power generation vehicles based on the dispatch score array of each planned power generation vehicle and the dispatch score array of all planned power generation vehicles is: In the formula, Q max To meet the cumulative maximum value of the planned power generation vehicle score, choose(F k ) is the array of power generation vehicles that meets the plan, choose(F k-l ) is the array of power generation vehicles that meet each plan; Obtain the scheduling combination between each power car and each power car scheduling instruction corresponding to the cumulative maximum value of the power car score values that meet the plan to determine the optimal power car scheduling plan.
2. The power generation vehicle optimization scheduling method according to claim 1 is characterized in that: Also includes: Determine the equipment failure probability P of the i-th assigned substation i Is it greater than a preset fault probability threshold? If the above judgment is greater than, the power generation vehicle in the corresponding assigned substation will take the dispatch of the power equipment in the assigned substation as the highest priority.
3. The power generation vehicle optimization scheduling method according to claim 1 is characterized in that: Also includes: Generate a distribution map of the power generation vehicle area according to the real-time geographical distribution position of each power generation vehicle and its affiliated area; According to the preset fault probability threshold, the fault probability p of the nth power equipment in the ith assigned substation is set to i-n and the equipment failure probability P of the ith assigned substation i Segmentation into different levels of failure probability; Different fault probability levels are rendered in different colors at the locations of the corresponding assigned areas of the power generation vehicle area location distribution map, thereby forming a fault probability distribution heat map.
4. The power generation vehicle optimization scheduling method according to claim 1 is characterized in that: Also includes: issuing a unique plan number to the generator vehicle dispatch instruction; The plan number and its corresponding optimal power generation vehicle dispatching plan are sent to a designated terminal.
5. The power generation vehicle optimization scheduling method according to claim 3 is characterized in that: Also includes: According to the optimal generator car dispatching plan, in the generator car area location distribution map, the mapping relationship between the generator cars in the optimal generator car dispatching plan and the equipment failure location is bound and displayed.
6. A power generation vehicle optimization dispatching system, characterized in that: include: An instruction acquisition module, used to acquire a number of power generation vehicle dispatching instructions sent in advance by a user, wherein the power generation vehicle dispatching instructions include a device fault location; An instruction response module, used to respond to each power car dispatch instruction, and form a pre-dispatch plan based on the ledger information of each power car, the pre-dispatch plan includes a mapping relationship between each power car and each equipment fault location, the ledger information includes the power car capacity, the maximum use time, the power car maintenance time, the power car status and the power car geographical location; The calculation module is used to calculate the equipment failure probability of each power generation vehicle in the substation, including: Obtain the real-time geographical distribution location of each generator vehicle and its affiliated station area; Obtain equipment risk assessment information, equipment status assessment information, load information and construction risk information of all power equipment in the substation area; The equipment failure probability generated based on the equipment risk assessment information, equipment status assessment information, load information and construction risk information of all power equipment is: In the formula, p i-n is the failure probability of the nth power equipment in the ith assigned substation, P i is the equipment failure probability of the ith assigned area, i is the ith assigned area, n is the nth power equipment, im is the total number of power equipment in the ith assigned area, R i-n is the equipment risk assessment information of the nth power equipment in the ith substation, H i-n is the equipment status evaluation information of the nth power equipment in the ith assigned substation, V i-n is the load information of the nth power equipment in the ith assigned substation, that is, the ratio of the current load of the power equipment to the historical maximum load of the equipment, G i-n is the construction risk information of the nth power equipment in the ith substation, a, b, c, d are all weight coefficients, a+b+c+d=1, e i-n is the equipment criticality coefficient of the nth power equipment in the ith assigned substation; The dispatch evaluation module is used to evaluate the dispatch priority between each generator car and each generator car dispatch instruction in the pre-dispatching plan based on the equipment failure location, the ledger information of each generator car and the equipment failure probability of the substation to which it belongs, so as to obtain the optimal generator car dispatch plan, specifically including: The scheduling objective function is constructed based on the equipment failure location, the ledger information of each power generation vehicle, and the equipment failure probability of the power generation area to which it belongs: f k-l =αC l +βL k-l +γS l +ε(1-P i ) In the formula, f k-l is the dispatch score of the lth generator car in the kth plan, k is the kth plan in the pre-dispatching plan, l is the lth generator car, α, β, γ, ε are all weight coefficients, α+β+γ+ε=1, C l is the capacity of the first generator car, L k-l is the converted distance between the geographical location of the lth generator car in the kth plan and the equipment failure location in the kth plan, L k-l The calculation formula is, S l is the status information of the lth generator car, l k-l represents the actual geographical distance between the lth generator car and the equipment failure location in the kth plan, L k-lmin It represents the minimum actual geographical distance between the lth generator car and the equipment failure location in the kth plan; According to the dispatch score of the lth generator car in the kth plan, the dispatch score array of each generator car is constructed, denoted as F k-l =[f k-1 ,f k-2 ...f k-n ], construct the dispatch score array of all planned power generation vehicles according to the dispatch score array of each planned power generation vehicle, denoted as F k =[f 1-l ,f 2-l ...f n-l ]; The objective function for calculating the score values of all planned power generation vehicles based on the dispatch score array of each planned power generation vehicle and the dispatch score array of all planned power generation vehicles is: In the formula, Q max To meet the cumulative maximum value of the planned power generation vehicle score, choose(F k ) is the array of power generation vehicles that meets the plan, choose(F k-l ) is the array of power generation vehicles that meet each plan; Obtain the scheduling combination between each power car and each power car scheduling instruction corresponding to the cumulative maximum value of the power car score values that meet the plan to determine the optimal power car scheduling plan.
7. A computer device comprising a memory and a processor, wherein the memory stores a computer program, characterized in that: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 5 are implemented.
8. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 5 are implemented.
Citation Information
Patent Citations
Power system recovery comprehensive evaluation method
CN111489091A
Power distribution network multi-fault first-aid repair recovery method and system considering pre-disaster pre-scheduling
CN111539566A
Power distribution network fault emergency repair scheduling-fault recovery cooperation method and device
CN113011670A
Transformer area fault first-aid repair and scheduling method and device and terminal equipment
CN113159598A
Active power distribution network fault balanced power supply recovery method considering emergency power supply vehicle scheduling
CN113452051A