Method and device for measuring and positioning new anode installation of intelligent aluminum electrolysis multifunctional unit
Through the twisting mechanism and measuring device of the intelligent aluminum electrolysis multi-functional unit, the anode guide rod is accurately installed, solving the low level of intelligence and safety risks caused by manual visual inspection, and improving the intelligence and safety of aluminum electrolysis production. .
Patent Information
- Application Number
- CN202111453310.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-01
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2041-12-01
AI Technical Summary
In the aluminum electrolysis production process, when installing a new anode, it is necessary to put the anode guide rod into the small box clamp hook on the anode busbar. The existing technology relies on manual visual inspection, resulting in low intelligence level, high labor intensity and safety risks.
The new anode installation measurement and positioning method of the intelligent aluminum electrolysis multi-functional unit is adopted. The new anode is grasped through the twisting mechanism and the measuring device is used to measure the characteristic marks on the anode bus. The precise deviation is calculated and the unit is guided to perform secondary precise positioning to make the new anode more precise. The anode is installed accurately in the small box clamp hook.
It improves the intelligence level of the aluminum electrolysis multifunctional unit, ensures the precise installation of new anodes, reduces labor intensity and safety risks, and improves installation efficiency and safety.
Smart Images

Figure HDA0003385743620000011 
Figure HDA0003385743620000021
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of aluminum electrolysis, and in particular relates to a method and a device for installing, measuring and positioning a new anode of an intelligent aluminum electrolysis multifunctional unit. Background Art
[0002] The production of industrial primary aluminum requires regular replacement of anodes, and currently this operation is completed using manually operated aluminum electrolysis multifunctional units.
[0003] In the prior art, the invention patent publication document with publication number CN104032331A provides a pole-changing device for an aluminum electrolytic cell, including an anode support frame, a pole-changing protection baffle, a pole-setting and drawing work platform, universal wheels, an operating pedal, and a support frame handrail; wherein the anode support frame is vertically arranged at the bottom of the pole-changing protection baffle; the pole-setting and drawing work platform is vertically arranged at the top of the pole-changing protection baffle, and is arranged on the same side of the pole-changing protection baffle as the anode support frame; the universal wheels are arranged at the bottom of the pole-changing protection baffle, and are arranged on different sides of the pole-changing protection baffle as the anode support frame; the operating pedal is vertically arranged on the pole-changing protection baffle above the universal wheels; the support frame handrail is arranged on the pole-changing protection baffle above the operating pedal, and is arranged on the same side of the pole-changing protection baffle as the operating pedal. The pole-changing device of this scheme can set poles and draw lines on the anode, and can complete the pole-changing work of the aluminum electrolytic cell with high quality.
[0004] For another example, the invention patent publication document with publication number CN106811772A provides an automatic pole-changing system and pole-changing method for an aluminum electrolytic cell, including an automatic pole-changing mechanical arm with vertical lifting freedom and linear motion freedom at any position in the horizontal plane; the execution terminal of the automatic pole-changing mechanical arm is provided with a clamping element for fixing and clamping the anode guide rod, a socket wrench for locking or unlocking the anode clamp, and a first positioning element, the socket wrench is arranged on the automatic pole-changing mechanical arm through a telescopic mechanism, the clamping element, the telescopic mechanism and the socket wrench are all electrically controlled automatic actuators, and are connected to the control module of the aluminum electrolytic cell through a signal together with the first positioning element. Its scheme thoroughly transforms the existing pole-changing system and method of aluminum electrolytic cells, especially for aluminum electrolytic cells without upper crust, which can greatly shorten the pole-changing time through automatic pole-changing, thereby avoiding the electrolytic cell from operating in an unstable state for a long time, saving energy consumption and reducing the use of personnel.
[0005] However, the above existing technologies still do not take into account the following technical problems: when installing new anodes on aluminum electrolytic cells, the anode guide rods need to be accurately placed into the small box clamp hooks on the anode busbars. Currently, this operation is done by manual visual inspection, with a low overall intelligence level, high labor intensity, and a harsh environment. If workers make mistakes in operation, it will bring great safety risks. Summary of the invention
[0006] The purpose of the present invention is to provide a method and device for measuring and positioning the installation of a new anode for an intelligent aluminum electrolysis multifunctional unit in order to solve the problem that it is difficult to accurately place the anode guide rod into the small box fixture hook on the anode busbar during the process of replacing the anode in aluminum electrolysis production.
[0007] The present invention is achieved in that:
[0008] The intelligent aluminum electrolysis multifunctional unit new anode installation measurement and positioning method of the present invention comprises the following steps: the aluminum electrolysis multifunctional unit grasps the new anode through a twisting and pulling mechanism, and initially positions the new anode near the installation position according to the system setting; the measuring device works to measure the spatial position information of the characteristic mark on the anode busbar; through data processing and analysis, the precise deviation between the current new anode position and the target position is calculated, and the aluminum electrolysis multifunctional unit is guided to move and accurately position the new anode for a second time, so that the new anode is accurately placed in the small box clamp hook and is close to the surface of the anode busbar.
[0009] Based on the above method, the intelligent aluminum electrolysis multifunctional unit new anode installation measurement and positioning device of the present invention includes an aluminum electrolysis multifunctional unit, which is installed on the track of the electrolysis plant and can move horizontally on the plane of the plant; a twisting and pulling mechanism and a measuring device are installed on the aluminum electrolysis multifunctional unit; an aluminum electrolysis cell is also fixedly installed on the workshop floor, an anode busbar is installed on the aluminum electrolysis cell, and a small box clamp hook is fixedly installed on the anode busbar. The aluminum electrolysis multifunctional unit has position feedback and automatic positioning functions.
[0010] Compared with the prior art, the technical solution of the present invention can transmit the target location information to be installed to the aluminum electrolysis multifunctional unit, guide the unit to move horizontally, accurately install the new anode on the aluminum electrolysis cell, and improve the intelligence level of the aluminum electrolysis multifunctional unit. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a schematic diagram of the structure of the present invention;
[0012] Figure 2 yes Figure 1 Large-scale drawing in the middle direction A.
[0013] The markings in the attached drawings are: 1-aluminum electrolysis multifunctional unit, 2-twisting and pulling mechanism, 3-new anode, 4-small box clamp hook, 5-aluminum electrolytic cell, 6-measuring device, 7-anode busbar, 8-characteristic mark. DETAILED DESCRIPTION
[0014] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0015] like Figure 1-2As shown, the present invention is constructed as follows: it includes an aluminum electrolysis multifunctional unit 1, a twisting and pulling mechanism 2, a new anode 3, a small box clamp hook 4, an aluminum electrolysis cell 5, a measuring device 6, an anode busbar 7, and a characteristic mark 8. The aluminum electrolysis multifunctional unit 1 is installed on the track of the electrolysis plant and can move horizontally on the plane of the plant. The aluminum electrolysis cell 5 is fixedly installed on the floor plane of the workshop, the anode busbar 7 is installed on the aluminum electrolysis cell 5, and the small box clamp hook 4 is fixedly installed on the anode busbar 7. The twisting and pulling mechanism 2 and the measuring device 6 are installed on the aluminum electrolysis multifunctional unit 1. The new anode 3 is grabbed by the twisting and pulling mechanism 2 and can move with the aluminum electrolysis multifunctional unit 1 in the horizontal direction of the workshop. The characteristic marks 8 are arranged in sequence on the anode busbar 7. The aluminum electrolysis multifunctional unit 1 has position feedback and automatic positioning functions.
[0016] During implementation, the aluminum electrolysis multifunctional unit 1 grabs the new anode 3 through the twisting and pulling mechanism 2, and initially positions it near the installation position of the new anode 3 according to the system setting. The measuring device 6 works to measure the spatial position information of the characteristic mark 8 on the anode busbar 7. Through data processing and analysis, the precise deviation between the current position of the new anode 3 and the target position is calculated, and the aluminum electrolysis multifunctional unit 1 is guided to move and accurately position it for the second time, so that the new anode 3 is accurately placed in the small box fixture hook 4 and close to the surface of the anode busbar 7.
[0017] Among them, the twisting mechanism 2 belongs to the prior art, see "An intelligent twisting device for aluminum electrolysis multifunctional unit", patent publication number ZL212955378U. The measuring device 6 belongs to the prior art, see "A visual assistance system for electrolytic aluminum production workshop", patent publication number ZL 211982010U.
[0018] The setting method and identification process of the characteristic mark 8 are as follows: the characteristic mark 8 is set on the anode busbar 7. A circular or rectangular deep hole of a certain depth can be opened on the anode busbar 7, or a cylindrical platform, a cube or a prism platform can be installed on the anode busbar 7, or other regular shapes can be used. The characteristic mark 8 is set in the middle position of the two anode guide rods and is evenly arranged in a straight line.
[0019] After the aluminum electrolysis multifunctional unit has been positioned once according to the coordinates, the measuring device 6 takes a photo of the characteristic mark 8 for identification and extracts the mark information of the characteristic mark 8 .
[0020] Through data processing and analysis, the precise deviation between the current position of the new anode 3 and the target position is calculated, and the aluminum electrolysis multifunctional unit 1 is guided to move and accurately position the second time. After the aluminum electrolysis multifunctional unit grabs the new anode on the anode tray, it runs to the installation preparation position according to the coordinates of the required installation position of the new pole, and the positioning is completed in one time. Due to the coordinate error on site, secondary accurate positioning must be performed when the new pole is installed. The unit pauses at the installation preparation position, and the measuring device 6 takes a photo to identify the characteristic mark 8, extracts the mark information of the characteristic mark 8, analyzes and calculates the gap between the actual position and the ideal position of the new anode required to be installed in the spatial coordinate system, performs error correction, and guides the aluminum electrolysis multifunctional unit trolley and car to move and position according to the difference between the X-axis and the Y-axis to complete the new pole installation.
[0021] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A new anode installation measurement and positioning method for an intelligent aluminum electrolysis multifunctional unit. Features: The method adopts the following device: comprising an aluminum electrolysis multifunctional unit (1), the aluminum electrolysis multifunctional unit (1) being installed on a track of an electrolysis plant and being able to move horizontally on the plane of the plant; a twisting and pulling mechanism (2) and a measuring device (6) being installed on the aluminum electrolysis multifunctional unit (1); an aluminum electrolysis cell (5) being fixedly installed on the plane of the workshop, an anode busbar (7) being installed on the aluminum electrolysis cell (5), and a small box clamp hook (4) being fixedly installed on the anode busbar (7); The method comprises the following steps: enabling the aluminum electrolysis multifunctional unit (1) to grasp the new anode (3) through a twisting and pulling mechanism (2), and initially positioning the new anode (3) near the installation position according to the system setting; operating the measuring device (6) to measure the spatial position information of the characteristic mark (8) on the anode busbar (7); calculating the precise deviation between the current position of the new anode (3) and the target position through data processing and analysis, guiding the aluminum electrolysis multifunctional unit (1) to move and perform secondary precise positioning, so that the new anode (3) is accurately placed in the small box fixture hook (4) and closely attached to the surface of the anode busbar (7); The setting method and identification process of the characteristic mark (8) are as follows: the characteristic mark (8) is set on the anode busbar (7), and the characteristic mark (8) is set in the middle position of the two anode guide rods and is evenly arranged in a straight line; The characteristic mark (8) is a circular or rectangular deep hole opened on the anode busbar (7), or a cylindrical platform, a cube or a prism platform installed on the anode busbar (7); The measuring device (6) measures the spatial position information of the characteristic mark (8) on the anode busbar (7) in the following manner: after the aluminum electrolysis multifunctional unit is positioned once according to the coordinates, the measuring device (6) takes a photo of the characteristic mark (8) for identification, and extracts the mark information of the characteristic mark (8); The method of calculating the precise deviation between the current position of the new anode (3) and the target position through data processing and analysis, guiding the aluminum electrolysis multifunctional unit (1) to move and perform secondary precise positioning is as follows: after the aluminum electrolysis multifunctional unit (1) grabs the new anode (3) on the anode tray, it moves to the installation preparation position according to the coordinates of the required installation position of the new anode (3), and completes the positioning once; the unit is paused at the installation preparation position, and the measuring device (6) takes a photo of the characteristic mark (8) for recognition, extracts the mark information of the characteristic mark (8), analyzes and calculates the difference between the actual position and the ideal position of the new anode required for installation in the spatial coordinate system, performs error correction, and guides the aluminum electrolysis multifunctional unit trolley and carriage to move according to the difference between the X-axis and the Y-axis, so as to achieve secondary precise positioning and complete the installation of the new anode (3).
2. According to the method for measuring and positioning the new anode installation of the intelligent aluminum electrolysis multifunctional unit in claim 1, Features: The aluminum electrolysis multifunctional unit (1) has position feedback and automatic positioning functions.
Citation Information
Patent Citations
Electrode changing device for aluminium electrolysis cell
CN104032331A
Visual auxiliary system for electrolytic aluminum production workshop
CN211982010U
Intelligent twisting and pulling device of aluminum electrolysis multifunctional unit
CN212955378U
Automatic aluminum electrolytic bath electrode changing system and electrode changing method thereof
CN106811772A
Visual measurement twisting system method and device for multifunctional aluminum electrolysis unit
CN112981465A