A beam automatic verification method based on BIM

By adopting automated verification methods in BIM management and using the combination of CAD and Revit programs, the problem of low efficiency in checking the consistency of drawings and model information is solved, efficient beam information checking is achieved, and management costs are reduced.

CN114117618BActive Publication Date: 2024-10-18CHENGDU HENGYIDA INFORMATION TECHNOLOGY CONSULTING CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202111508550.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-10
Publication Date
2024-10-18
Estimated Expiration
2041-12-10

AI Technical Summary

Technical Problem

In BIM management, the information consistency check of drawings and models needs to be done manually, resulting in low efficiency and high cost. In particular, the check of beam information is arduous and repeated, affecting management efficiency.

Method used

The BIM-based automated beam calibration method is adopted. The beam information is obtained and stored through the CAD program, and the Revit program is used for calibration. Regular expression filtering and collision checking are used to ensure the accuracy of the section and elevation, and realize automated calibration.

Benefits of technology

It greatly improves the efficiency and accuracy of beam information verification, reduces BIM management costs, and shortens manual verification time from 1 day/1 floor to 5 minutes on computer/1 building.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114117618B_ABST
    Figure CN114117618B_ABST
Patent Text Reader

Abstract

The present invention discloses a BIM-based beam automatic verification method, comprising: in any CAD beam template drawing, obtaining the drawing name of the layer, and respectively specifying the project origin and the project rotation point in the axis grid intersection of the layer, and making corresponding data marking templates on each layer; obtaining the text information of the beam through the CAD program and storing the information; opening Revit, and verifying the beam information through the Revit program. The present invention greatly improves the efficiency and accuracy of beam information verification and reduces BIM management costs through an automated verification method. Specifically, the verification speed is improved from manual "1 day / 1 layer" to computer "5 minutes / 1 building".
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of engineering design management tools, and in particular to a beam automatic verification method based on BIM. Background Art

[0002] BIM (Building Information Modeling) technology is a digital tool used in engineering design, construction, and management. By integrating digital and information models of buildings, it is shared and transmitted throughout the entire life cycle of project planning, operation, and maintenance. It enables engineering and technical personnel to correctly understand and efficiently respond to various building information, provides a basis for collaborative work for design teams and all construction entities including construction and operation units, and plays an important role in improving production efficiency, saving costs, and shortening construction periods.

[0003] With the continuous deepening of information reform in the construction industry and the introduction of BIM delivery standards in various regions of the country, almost all new construction projects require the application of BIM models to varying degrees for management, delivery, operation and maintenance, etc.

[0004] However, due to various objective reasons, the forward design based on BIM has not been promoted well in China, resulting in the fact that most projects cannot achieve the same data source for drawings and models. Instead, the management of BIM projects is mainly achieved through traditional CAD design + BIM remodeling. Drawings and models are created on multiple platform software, which makes it difficult to ensure the consistency of output results, thus affecting BIM management.

[0005] Therefore, the BIM management entity needs to manually check the consistency of the information on the drawings and models, which takes a lot of time and money. However, the drawings are constantly updated, and the models also need to be rechecked as the drawings are updated.

[0006] Among them, the verification of beam information (cross-sectional dimensions, elevation) is a heavy and repetitive task in the verification process.

[0007] Therefore, it is necessary to design an automated verification method based on programming development to significantly improve efficiency and accuracy and reduce BIM management costs. Summary of the invention

[0008] The present invention provides a BIM-based beam automatic verification method to solve the problem that in the prior art, the BIM management subject needs to manually verify the consistency of the information on the drawings and the model, which takes a lot of time and cost. However, the drawings are constantly updated, and the model also needs to be re-verified with the update of the drawings, resulting in low efficiency.

[0009] The technical solution adopted by the present invention is to provide a beam automatic verification method based on BIM, comprising:

[0010] S1. In any CAD beam-template drawing, obtain the drawing name of the layer, and specify the project origin and project rotation point in the axis grid intersection of the layer, and make corresponding data marking templates on each layer;

[0011] S2, obtaining text information of the beam through a CAD program and storing the information;

[0012] S3. Open Revit and check the beam information through the Revit program.

[0013] As a preferred method of the BIM-based beam automatic verification method, in S2, the CAD program includes:

[0014] S2.1, select all text primitives in this layer;

[0015] S2.2, according to the regular expression rules on the CAD side, filter out the text belonging to the beam information;

[0016] S2.3. After filtering out the text belonging to the beam information, extract the text information belonging to the beam section and beam elevation one by one; the text information includes the text content, the coordinates of the text content relative to the project origin, and the text rotation angle; store the text information of this layer;

[0017] S2.4. Obtain the beam information of other layers in sequence according to S2.1 and S2.2. The project origin and project rotation point should be consistent with the intersection of the axis grid of the previous layer;

[0018] S2.5. After obtaining the beam data of the building, export it and save it as a CAD beam database.

[0019] As a preferred method of the BIM-based beam automatic verification method, in S3, the Revit program includes:

[0020] S3.1, read the CAD beam database;

[0021] S3.2. Manually map the floor information in the CAD beam database with the Revit floor information;

[0022] S3.3. In Revit, click to obtain the grid intersection points where the project origin and rotation point are located to ensure that the model text to be generated later in Revit is consistent with the horizontal relative position of CAD;

[0023] S3.4, set 4 different color marks for the detection status of each component for easy viewing: a. undetected state; b. error state; c. warning state; d. correct state;

[0024] S3.5. Carry out beam section verification and beam standard verification.

[0025] As a preferred method of the BIM-based beam automatic verification method, in S3.5, the beam section verification method includes:

[0026] S3.5.11. Read the text information, coordinates, and rotation angles of the beam section in the CAD beam database so that it can be created using model text in Revit;

[0027] S3.5.12, traverse each beam: based on the baseline of the beam, automatically generate a collision block, and use collision check to check whether the collision block collides with the model text;

[0028] S3.5.13, if there is no collision, the beam is marked as undetected;

[0029] S3.5.14. If there is a collision, obtain all model texts that collide with the collision block and traverse them one by one:

[0030] a. Determine whether the angle of the model text and the parallelism of the beam exceed the preset value;

[0031] b. If the parallelism does not exceed the preset degree, skip the next model text detection. If the text content is detected in parallel, use the set regular expression rules to obtain whether the values ​​of "width" and "height" in the model text are consistent with the size of the beam;

[0032] c. If they are consistent, traverse to the next model text;

[0033] d. During the traversal process, if the "width" and "height" values ​​in any model text are inconsistent with the beam size, the traversal of the model text will be interrupted and the beam will be marked as an error state; if the traversal is completed and all model texts are not parallel to the beam, the beam will be marked as an undetected state; if the traversal is completed and the "width" and "height" values ​​in all model texts are consistent with the beam size, the beam will be marked as a correct state.

[0034] As a preferred method of the BIM-based beam automatic verification method, in S3.5, the beam standard verification method includes:

[0035] S3.5.21. Read the text information, coordinates, and rotation angles of beam elevations in the CAD beam database and create them using model text in Revit;

[0036] S3.5.22, traverse each beam: obtain the elevation of the beam, automatically generate a collision block based on the baseline of the beam, and use collision check to check whether the collision block collides with the model text;

[0037] S3.5.23. If there is no collision with the model text, use collision check to check whether the collision block collides with the floor slab; if there is no collision with the floor slab, the beam is marked as unchecked; if there is a collision, traverse the floors one by one: if all floors are the same height as the beam, it is marked as correct; if at least one is not the same height as the beam, it is marked as warning; if all floors are not the same height as the beam, it is marked as error;

[0038] S3.5.24. If there is a collision with the model text, obtain all the model texts that collide with the collision block and traverse them one by one:

[0039] a. Determine whether the angle of the model text and the parallelism of the beam exceed the preset value;

[0040] b. If the parallelism does not exceed the preset degree, skip it. If it is parallel, check its text content and use the set regular expression rules to obtain whether the value of "elevation" in the model text is consistent with the beam elevation. If there is no value in the model text, skip it.

[0041] c. If they are consistent, traverse to the next model text;

[0042] d. During the traversal process, if the "elevation" value in any model text is inconsistent with the beam size, the traversal of the model text will be interrupted and the beam will be marked as an error state; if the traversal is completed and all model texts are not parallel to the beam, the beam will be marked as an undetected state; if the traversal is completed and the "elevation" values ​​in all model texts are consistent with the beam size, the beam will be marked as a correct state.

[0043] The beneficial effect of the present invention is that the present invention greatly improves the efficiency and accuracy of beam information verification through an automated verification method, and reduces BIM management costs. Specifically, the verification speed is improved from manual "1 day / 1 floor" to computer "5 minutes / 1 building". BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 It is a flow chart of the BIM-based beam automatic verification method disclosed in the present invention.

[0045] Figure 2 It is a data marking template for pre-processing of CAD data extraction disclosed by the present invention.

[0046] Figure 3 It is a regular expression standard formulated during the development of the CAD-side and Revit-side programs disclosed in the present invention.

[0047] Figure 4 This is an example of floor mapping disclosed in the present invention.

[0048] Figure 5This is a rendering of the effect after the BIM-based beam automatic verification method disclosed in the present invention is executed. DETAILED DESCRIPTION

[0049] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be further described in detail below with reference to the accompanying drawings, but the embodiments of the present invention are not limited thereto.

[0050] Embodiment 1:

[0051] The present invention provides a BIM-based beam automatic verification method, which can efficiently verify the consistency between the beam information (section size, elevation) drawings and models. Through the relevant program on the CAD side, under the condition that the classification of the original drawing layers is not high, the data related to the beam in the drawing is picked up and exported, and then loaded into the verification program on the Revit side to realize automatic verification and identify the problematic beam components.

[0052] See also Figure 1 , the method specifically comprises the following steps:

[0053] S1. In any CAD beam-template drawing, obtain the drawing name of the layer, and specify the project origin and project rotation point in the axis grid intersection of the layer, and make corresponding data marking templates on each layer. Figure 2 , Figure 2 It is a data marking template for pre-processing of CAD data extraction.

[0054] S2. Obtain text information of the beam through a CAD program and store the information.

[0055] CAD programs include:

[0056] S2.1. Select all text primitives in this layer.

[0057] S2.2. Filter out the text belonging to the beam information according to the regular expression rules on the CAD side. Figure 3 , Figure 3 It is a regular expression standard established during the development of CAD and Revit programs.

[0058] S2.3. After filtering out the text belonging to the beam information, extract the text information belonging to the beam section and beam elevation one by one; the text information includes the text content, the coordinates of the text content relative to the project origin, and the text rotation angle; store the text information of this layer.

[0059] S2.4. Obtain beam information of other layers in sequence according to steps S2.1 and S2.2. The project origin and project rotation point should be consistent with the intersection of the axis grid of the previous layer.

[0060] S2.5. After obtaining the beam data of the building, export it and save it as a CAD beam database.

[0061] S3. Open Revit and check the beam information through the Revit program.

[0062] The Revit program includes:

[0063] S3.1. Read the CAD beam database.

[0064] S3.2. Manually map the floor information in the CAD beam database with the Revit floor information. Let the program find the corresponding floor in the CAD beam database in Revit, so as to find the correct height coordinates (such as the Z-axis value) of each floor. Figure 4 , Figure 4 This is an example of a floor map.

[0065] S3.3. In Revit, click to obtain the intersection of the axis grid where the project origin and the project rotation point are located to ensure that the model text to be generated later in Revit is consistent with the horizontal relative position (X and Y axis values) of CAD.

[0066] S3.4. Set 4 different color marks for the detection status of each component for easy viewing: a. undetected status; b. error status; c. warning status; d. correct status.

[0067] S3.5. Check the beam section and beam mark. The beam section check methods include:

[0068] S3.5.11. Read the text information, coordinates, and rotation angles of the beam section in the CAD beam database and create them using model text in Revit.

[0069] S3.5.12. Traverse each beam: Based on the baseline of the beam, automatically generate a collision block (solid) of (beam width + 500) x (beam height + 1000), and use collision check to check whether the collision block collides with the model text.

[0070] S3.5.13 If there is no collision, the beam is marked as undetected.

[0071] S3.5.14. If there is a collision, obtain all model texts that collide with the collision block and traverse them one by one:

[0072] a. Determine whether the angle of the model text and the parallelism of the beam exceed the preset value (a 5% error is allowed).

[0073] b. If the preset parallelism is not exceeded, the next model text will be skipped. If the text content is detected in parallel, the regular expression rules set (see Figure 3) Check whether the values ​​of "width" and "height" in the model text are consistent with the size of the beam.

[0074] c. If they are consistent, traverse the next model text.

[0075] d. During the traversal process, if the "width" and "height" values ​​in any model text are inconsistent with the beam size, the traversal of the model text will be interrupted and the beam will be marked as an error state; if the traversal is completed and all model texts are not parallel to the beam, the beam will be marked as an undetected state; if the traversal is completed and the "width" and "height" values ​​in all model texts are consistent with the beam size, the beam will be marked as a correct state.

[0076] S3.5 The methods for evaluating the beam bid include:

[0077] S3.5.21. Read the text information, coordinates, and rotation angles of beam elevations from the CAD beam database and create them using model text in Revit.

[0078] S3.5.22. Traverse each beam: obtain the elevation of the beam (the value of the Z axis), and based on the baseline of the beam, automatically generate a collision block (solid) of (beam width + 500) x (beam height + 1000), and use collision check to check whether the collision block collides with the model text.

[0079] S3.5.23. If there is no collision with the model text, use collision check to check whether the collision block collides with the floor slab; if there is no collision with the floor slab, the beam is marked as undetected; if there is a collision, traverse the floors one by one: if all floors are the same height as the beam, it is marked as correct; if at least one is not the same height as the beam, it is marked as warning; if all floors are not the same height as the beam, it is marked as error.

[0080] S3.5.24. If there is a collision with the model text, obtain all the model texts that collide with the collision block and traverse them one by one:

[0081] a. Determine whether the angle of the model text and the parallelism of the beam exceed the preset value (a 5% error is allowed).

[0082] b. If the parallelism does not exceed the preset level, it will be skipped. If the text content is detected in parallel, the regular expression rules set will be used (see Figure 3), get the value of "elevation" in the model text to see if it is consistent with the beam elevation. If there is no value in the model text, skip it. It should be noted here that if there is "H" or "h" in the [model text], the program will judge that the text is "elevation offset", and the program will judge whether the offset value of the beam elevation is consistent with the layer elevation of the layer; if there is no "H" or "h" in the [model text], the program will default to "project elevation", and the program will judge whether the beam elevation is consistent with the elevation marked in the [model text].

[0083] c. If they are consistent, traverse the next model text.

[0084] d. During the traversal process, if the "elevation" value in any model text is inconsistent with the beam size, the traversal of the model text will be interrupted and the beam will be marked as an error state; if the traversal is completed and all model texts are not parallel to the beam, the beam will be marked as an undetected state; if the traversal is completed and the "elevation" values ​​in all model texts are consistent with the beam size, the beam will be marked as a correct state.

[0085] The present invention greatly improves the efficiency and accuracy of beam information verification through automated verification, and reduces BIM management costs. Specifically, the verification speed is improved from manual "1 day / 1 floor" to computer "5 minutes / 1 building". Figure 5 .

[0086] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A beam automatic verification method based on BIM, characterized in that: include: S1. In any CAD beam-template drawing, obtain the drawing name of the layer, and specify the project origin and project rotation point in the axis grid intersection of the layer, and make corresponding data marking templates on each layer; S2, obtaining text information of the beam through a CAD program and storing the information; S3. Open Revit and check the beam information through the Revit program; In said S2, the CAD program comprises: S2.1, select all text primitives in this layer; S2.2, according to the regular expression rules on the CAD side, filter out the text belonging to the beam information; S2.

3. After filtering out the text belonging to the beam information, extract the text information belonging to the beam section and beam elevation one by one; the text information includes the text content, the coordinates of the text content relative to the project origin, and the text rotation angle; store the text information of this layer; S2.

4. Obtain the beam information of other layers in sequence according to S2.1 and S2.

2. The project origin and project rotation point should be consistent with the intersection of the axis grid of the previous layer; S2.

5. After obtaining the building beam data, export it and save it as a CAD beam database; The S3 Revit program includes: S3.1, read the CAD beam database; S3.

2. Manually map the floor information in the CAD beam database with the Revit floor information; S3.

3. In Revit, click to obtain the grid intersection points where the project origin and rotation point are located to ensure that the model text to be generated later in Revit is consistent with the horizontal relative position of CAD; S3.4, set 4 different color marks for the detection status of each component for easy viewing: a. undetected state; b. error state; c. warning state; d. correct state; S3.

5. Check the beam cross section and beam standard; In S3.5, the method for checking the beam cross section includes: S3.5.

11. Read the text information, coordinates, and rotation angles of the beam section in the CAD beam database so that it can be created using model text in Revit; S3.5.12, traverse each beam: based on the baseline of the beam, automatically generate a collision block, and use collision check to check whether the collision block collides with the model text; S3.5.13, if there is no collision, the beam is marked as undetected; S3.5.

14. If there is a collision, obtain all model texts that collide with the collision block and traverse them one by one: a. Determine whether the angle of the model text and the parallelism of the beam exceed the preset value; b. If the preset parallelism is exceeded, the next model text will be skipped for detection. If the text content is detected in parallel, the values ​​of "width" and "height" in the model text will be obtained through the set regular expression rules to see if they are consistent with the size of the beam; c. If they are consistent, traverse to the next model text; d. During the traversal process, if the "width" and "height" values ​​in any model text are inconsistent with the beam size, the traversal of the model text will be interrupted and the beam will be marked as an error state; if the traversal is completed and all model texts are not parallel to the beam, the beam will be marked as an undetected state; if the traversal is completed and the "width" and "height" values ​​in all model texts are consistent with the beam size, the beam will be marked as a correct state.

2. The BIM-based beam automatic verification method according to claim 1 is characterized in that: In S3.5, the method of beam standard verification includes: S3.5.

21. Read the text information, coordinates, and rotation angles of beam elevations in the CAD beam database and create them using model text in Revit; S3.5.22, traverse each beam: obtain the elevation of the beam, automatically generate a collision block based on the baseline of the beam, and use collision check to check whether the collision block collides with the model text; S3.5.

23. If there is no collision with the model text, use collision check to check whether the collision block collides with the floor slab; if there is no collision with the floor slab, the beam is marked as unchecked; if there is a collision, traverse the floors one by one: if all floors are the same height as the beam, it is marked as correct; if at least one is not the same height as the beam, it is marked as warning; if all floors are not the same height as the beam, it is marked as error; S3.5.

24. If there is a collision with the model text, obtain all the model texts that collide with the collision block and traverse them one by one: a. Determine whether the angle of the model text and the parallelism of the beam exceed the preset value; b. If the parallelism exceeds the preset degree, skip it. If it is parallel, check its text content and use the set regular expression rules to obtain whether the value of "elevation" in the model text is consistent with the beam elevation. If there is no value in the model text, skip it. c. If they are consistent, traverse to the next model text; d. During the traversal process, if the "elevation" value in any model text is inconsistent with the beam size, the traversal of the model text will be interrupted and the beam will be marked as an error state; if the traversal is completed and all model texts are not parallel to the beam, the beam will be marked as an undetected state; if the traversal is completed and the "elevation" values ​​in all model texts are consistent with the beam size, the beam will be marked as a correct state.

Citation Information

Patent Citations

  • Method for capturing CAD data

    CN106599324A

  • Building model correctness verification method and system

    CN112597662A