An assembled operating platform for a compound fertilizer granulation high tower and a construction method thereof

By processing lightweight prefabricated base slabs and truss side beams on the ground and combining them with tower crane hoisting, a prefabricated operating platform for compound fertilizer granulation towers was constructed. This solved the problems of heavy structure, high construction difficulty, and low safety in existing technologies, and achieved rapid and safe construction and a stable operating platform.

CN114135090BActive Publication Date: 2026-07-28WUHAN UNIV OF TECH
View PDF 2 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
WUHAN UNIV OF TECH
Filing Date
2021-12-18
Publication Date
2026-07-28

AI Technical Summary

Technical Problem

The existing high-tower operation platform for compound fertilizer granulation is heavy, difficult to construct, costly, and has low safety. The existing construction methods are carried out at high altitudes, which poses a significant risk.

Method used

The prefabricated operating platform, consisting of a lightweight prefabricated base plate and truss side beams, is processed on the ground and hoisted into a high tower by a tower crane for fixation. It is combined with inclined horizontal bracing rods to improve stability, and the surface is covered with anti-corrosion lightweight flame-retardant material to improve corrosion resistance and durability.

Benefits of technology

It has achieved a lightweight and easy-to-construct operating platform, which shortens construction time, reduces costs, and improves construction safety and platform stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114135090B_ABST
    Figure CN114135090B_ABST
Patent Text Reader

Abstract

The application discloses a kind of composite fertilizer granulation high tower's assembly type operating platform and its construction method, its operating platform includes: truss side beam, the truss side beam is two parallel spaced arrangements, and two ends of two truss side beam are fixed on the inner tower wall of high tower;Light prefabricated floor, the light prefabricated floor is fixedly installed between the bottom end of two truss side beam;Cross bracing top rod, the cross bracing top rod is multiple, and multiple cross bracing top rod two ends are fixedly installed between the top end of two truss side beam respectively.The operating platform in the application not only simple structure, light in quality, but also adopt tower under processing truss side beam and light prefabricated floor, then again the truss side beam and light prefabricated floor of well processing are hoisted to tower installation, with short construction time, low construction cost, high safety, easily construction installation advantage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of compound fertilizer granulation tower technology, and more specifically to a prefabricated operating platform for a compound fertilizer granulation tower and its construction method. Background Technology

[0002] Compound fertilizer granulation tower is a new type of high tower with a concrete (or steel) structure. The pressure difference between the top and bottom of the tower creates a ventilation effect similar to a chimney (or cooling tower). Molten slurry is sprayed on the tower and exchanged with cold air to form solid granules. Compound fertilizer granulation tower is a special chemical structure, usually more than 100m high, and the tower wall is usually constructed using a sliding membrane method.

[0003] The characteristic of compound fertilizer granulation towers is that an operating platform is built at a height of 70-90m inside the tower to house related equipment. However, existing operating platform structures generally involve erecting a dedicated construction platform on a high tower, and then installing formwork and cast-in-place concrete beams, walls, and slabs on the platform. This is heavy, involves high-altitude construction, is highly dangerous, and is difficult to construct. Furthermore, the construction method for the operating platform involves sliding the concrete of the tower to the top and waiting for the concrete to reach 100% strength before constructing the inner sleeve operating platform of the upper part of the granulation tower using the radial beam method or a stiffening beam structure. Both of these construction methods require the erection of a construction platform at a height of 70-90m inside the tower for the construction of the upper operating platform, resulting in long construction time, high construction costs, high platform erection difficulty, and high risks associated with the platform structure.

[0004] Therefore, how to provide a prefabricated operating platform for compound fertilizer granulation towers that is lightweight and easy to assemble, and its construction method, is a problem that urgently needs to be solved by those skilled in the art. Summary of the Invention

[0005] In view of this, the present invention provides a prefabricated operating platform for a compound fertilizer granulation tower that is lightweight and easy to assemble, and its construction method.

[0006] To achieve the above objectives, the present invention adopts the following technical solution:

[0007] A prefabricated operating platform for a compound fertilizer granulation tower includes:

[0008] Truss side beams, wherein two truss side beams are arranged in parallel and spaced apart, and the two ends of the two truss side beams are respectively fixed to the inner tower wall of the tower;

[0009] A lightweight precast base slab is fixedly installed between the bottom ends of the two truss side beams;

[0010] The cross bracing is a plurality of cross bracing members arranged at intervals, and the two ends of the plurality of cross bracing members are respectively fixedly installed between the top ends of the two truss side beams.

[0011] As can be seen from the above technical solution, compared with the prior art, the present invention discloses a prefabricated operating platform for a compound fertilizer granulation tower. The operating platform is composed of truss side beams, lightweight prefabricated base plates and cross bracing top rods. It has a simple structure, light weight, and adopts prefabricated installation, which makes the construction of the operating platform easy.

[0012] Furthermore, there are multiple lightweight precast base plates, which are spliced ​​together between the bottom ends of the two truss side beams.

[0013] The beneficial effect of adopting the above technical solution is that there are multiple lightweight prefabricated base plates, which facilitates the later stage of segmented hoisting and installation.

[0014] Furthermore, the surface of the truss side beams is covered with a layer of corrosion-resistant, lightweight, and flame-retardant material.

[0015] The beneficial effect of adopting the above technical solution is to improve the corrosion resistance and durability of the truss side beams.

[0016] Furthermore, the surface of the lightweight precast base plate is covered with a layer of corrosion-resistant, lightweight, and flame-retardant material.

[0017] The beneficial effect of adopting the above technical solution is to improve the corrosion resistance and durability of lightweight precast foundation slabs.

[0018] Furthermore, the cross brace is inclinedly arranged between the tops of the two truss side beams.

[0019] The beneficial effect of adopting the above technical solution is that the inclined arrangement of the cross bracing top rod can provide better support for the two truss side beams, making the two truss side beams more stable and improving the stability of the operating platform.

[0020] Furthermore, the truss side beams are made of steel.

[0021] The beneficial effects of adopting the above technical solution are that it is easy to process and manufacture, and has a lightweight structure and strong vertical load-bearing capacity.

[0022] This invention provides a construction method for a prefabricated operating platform for a compound fertilizer granulation tower, comprising the following steps:

[0023] Step S1: Fabricate the truss side beams and the lightweight precast base plate on the ground;

[0024] Step S2: Use the tower crane erected at the top of the tower to hoist the truss side beam. Specifically, during hoisting, the truss side beam is hoisted from the outside of the tower through the opening at the top of the tower to the inside of the tower. Then, the two ends of the truss side beam are fixed to the inner tower wall of the tower. Repeat step S2 to hoist another truss side beam to the inner tower wall of the tower and fix it, so that the two truss side beams are arranged in parallel and spaced apart.

[0025] Step S3: Use the tower crane to lift the lightweight precast base plate. Specifically, during the lifting process, the lightweight precast base plate is lifted from the outside of the tower through the opening at the top of the tower to the inside of the tower, and then the lightweight precast base plate is fixedly installed between the bottom ends of the two truss side beams.

[0026] Step S4: Use the tower crane to hoist the horizontal support top rod. Specifically, during hoisting, the horizontal support top rod is hoisted from the outside of the tower through the opening at the top of the tower to the inside of the tower. Then, the two ends of the horizontal support top rod are fixedly installed between the tops of the two truss side beams.

[0027] As can be seen from the above technical solution, compared with the prior art, the present invention discloses a construction method for a prefabricated operating platform for a compound fertilizer granulation tower. This construction method involves processing truss side beams and lightweight prefabricated base plates under the tower, and then hoisting the processed truss side beams and lightweight prefabricated base plates onto the tower for installation. It has the advantages of short construction time, low construction cost, high safety, and easy construction and installation.

[0028] Furthermore, step S1 also includes wrapping the surfaces of the truss side beams and the lightweight precast base plate with a layer of corrosion-resistant, lightweight, and flame-retardant material.

[0029] The beneficial effects of adopting the above technical solution are that the complete anti-corrosion lightweight flame-retardant material wrapping at the bottom of the tower eliminates the need for operations on the tower, which can greatly shorten the construction time, improve safety, and save the high cost of high-altitude anti-corrosion operations.

[0030] Furthermore, in step S3, there are multiple lightweight prefabricated base plates, which are sequentially hoisted into the tower by the tower crane, and the multiple lightweight prefabricated base plates are spliced ​​together between the bottom ends of the two truss side beams.

[0031] The beneficial effect of adopting the above technical solution is that the lightweight precast base slab is installed by segmented hoisting, which makes the hoisting and installation of the lightweight precast base slab simpler and easier to carry out construction operations.

[0032] Furthermore, when installing the cross brace top rod in step S4, the cross brace top rod needs to be arranged obliquely between the top ends of the two truss side beams.

[0033] The beneficial effect of adopting the above technical solution is to improve the stability of the two truss side beams after construction. Attached Figure Description

[0034] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on the provided drawings without creative effort.

[0035] Figure 1 The attached figure is a front view schematic diagram of the assembled operating platform of a compound fertilizer granulation tower provided by the present invention.

[0036] Figure 2 The attached image is... Figure 1 A top-view structural diagram.

[0037] Figure 3 The attached diagram is a front view of the truss side beams. Detailed Implementation

[0038] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0039] See Figures 1-3 This invention discloses a prefabricated operating platform for a compound fertilizer granulation tower, comprising:

[0040] Truss side beam 1 (as a lightweight side wall) consists of two parallel and spaced-apart truss side beams 1, with both ends of the two truss side beams 1 fixed to the inner tower wall of the tower 100.

[0041] Lightweight precast base slab 2 is fixedly installed between the bottom ends of the two truss side beams 1;

[0042] The horizontal bracing rods 3 are arranged at intervals, and the two ends of the horizontal bracing rods 3 are respectively fixedly installed between the top ends of the two truss side beams 1.

[0043] Multiple lightweight precast base slabs 2 are spliced ​​together between the bottom ends of the two truss side beams 1.

[0044] The surface of the truss side beam 1 is covered with a layer of corrosion-resistant, lightweight, and flame-retardant material.

[0045] The surface of the lightweight precast base slab 2 is covered with a layer of corrosion-resistant, lightweight, and flame-retardant material.

[0046] The horizontal bracing rod 3 is inclinedly arranged between the tops of the two truss side beams 1.

[0047] Truss side beam 1 is made of steel.

[0048] The present invention provides a construction method for a prefabricated operating platform for a compound fertilizer granulation tower, comprising the following steps:

[0049] Step S1: Fabricate the truss side beam 1 and the lightweight precast base plate 2 on the ground;

[0050] Step S2: Use the tower crane 200 erected at the top of the tower 100 to hoist the truss side beam 1. Specifically, during hoisting, the truss side beam 1 is hoisted from the outside of the tower 100 through the open top of the tower 100 to the inside of the tower 100. Then, fix both ends of the truss side beam 1 to the inner tower wall of the tower 100. Repeat step S2 to hoist another truss side beam 1 to the inner tower wall of the tower 100 and fix it, so that the two truss side beams 1 are arranged in parallel and spaced apart.

[0051] Step S3: Use tower crane 200 to lift the lightweight precast base plate 2. Specifically, during the lifting process, the lightweight precast base plate 2 is lifted from the outside of the tower 100 through the opening at the top of the tower 100 to the inside of the tower 100. Then, the lightweight precast base plate 2 is fixedly installed between the bottom ends of the two truss side beams 1.

[0052] Step S4: Use tower crane 200 to hoist the horizontal bracing rod 3. Specifically, during hoisting, the horizontal bracing rod 3 is hoisted from the outside of the tower 100 through the opening at the top of the tower 100 to the inside of the tower 100. Then, the two ends of the horizontal bracing rod 3 are fixedly installed between the tops of the two truss side beams 1.

[0053] Step S1 also includes wrapping the surfaces of the truss side beam 1 and the lightweight precast base plate 2 with a layer of anti-corrosion, lightweight, and flame-retardant material.

[0054] In step S3, there are multiple lightweight prefabricated base plates 2, which are sequentially hoisted into the tower 100 by tower crane 200. The multiple lightweight prefabricated base plates 2 are spliced ​​together between the bottom ends of the two truss side beams 1.

[0055] When installing the cross brace 3 in step S4, the cross brace 3 needs to be arranged at an angle between the tops of the two truss side beams 1.

[0056] In addition, after the side beams of the trusses on both sides are installed, the bottom formwork of the operating layer can be hoisted onto the tower and supported on the truss, and a lightweight precast base slab can be made by casting the base slab on the tower.

[0057] The operating platform in this invention is not only simple in structure and lightweight, but also uses truss side beams and lightweight prefabricated base plates processed under the tower, and then hoisted onto the tower for installation. It has the advantages of short construction time, low construction cost, high safety and easy construction and installation.

[0058] The various embodiments in this specification are described in a progressive manner, with each embodiment focusing on its differences from other embodiments. Similar or identical parts between embodiments can be referred to interchangeably. For the apparatus disclosed in the embodiments, since they correspond to the methods disclosed in the embodiments, the description is relatively simple; relevant parts can be referred to the method section.

[0059] The above description of the disclosed embodiments enables those skilled in the art to make or use the invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Therefore, the invention is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A prefabricated operating platform for a compound fertilizer granulation tower, characterized in that, include: Truss side beams (1), the truss side beams (1) are two parallel and spaced apart, and the two ends of the two truss side beams (1) are respectively fixed to the inner tower wall of the tower (100); lightweight precast base plate (2), the lightweight precast base plate (2) is fixedly installed between the bottom ends of the two truss side beams (1); cross bracing top rods (3), the cross bracing top rods (3) are multiple and spaced apart, and the two ends of the multiple cross bracing top rods (3) are respectively fixedly installed between the top ends of the two truss side beams (1); The lightweight precast base plate (2) consists of multiple pieces, which are spliced ​​together between the bottom ends of the two truss side beams (1); The surface of the truss side beam (1) is covered with a layer of corrosion-resistant, lightweight, and flame-retardant material; The surface of the lightweight precast base plate (2) is wrapped with a layer of anti-corrosion, lightweight, and flame-retardant material; The cross bracing rod (3) is inclinedly arranged between the tops of the two truss side beams (1); The truss side beam (1) is made of steel.

2. A construction method for a prefabricated operating platform for a compound fertilizer granulation tower, characterized in that, The steps include: Step S1: Process the truss side beam (1) and the lightweight precast base plate (2) on the ground; Step S2: Use the tower crane (200) erected on the top of the tower (100) to hoist the truss side beam (1). Specifically, during hoisting, the truss side beam (1) is hoisted from the outside of the tower (100) through the opening at the top of the tower (100) to the inside of the tower (100). Then, the two ends of the truss side beam (1) are fixed to the inner tower wall of the tower (100). Step S2 is repeated to hoist another truss side beam (1) to the inner tower wall of the tower (100) and fix it, so that the two truss side beams (1) are arranged in parallel and spaced apart; Step S3: Use the tower crane (200) erected on the top of the tower (100) to hoist the truss side beam (1) and the lightweight precast base plate (2) on the ground; Step S2: Use the tower crane (200) erected on the top of the tower (100) to hoist the truss side beam (1) and the lightweight precast base plate (2) on the ground; Step S2: Use the tower crane (200) erected on the top of the tower (100) to hoist the truss side beam (1) and the lightweight precast base plate (2) on the ground; Step S3 ... The tower crane (200) is used to hoist the lightweight precast base plate (2). Specifically, during hoisting, the lightweight precast base plate (2) is hoisted from the outside of the tower (100) through the opening at the top of the tower (100) to the inside of the tower (100), and then the lightweight precast base plate (2) is fixedly installed between the bottom ends of the two truss side beams (1); Step S4: The tower crane (200) is used to hoist the horizontal support rod (3). Specifically, during hoisting, the horizontal support rod (3) is hoisted from the outside of the tower (100) through the opening at the top of the tower (100) to the inside of the tower (100), and then the two ends of the horizontal support rod (3) are fixedly installed between the top ends of the two truss side beams (1); Step S1 also includes wrapping the surfaces of the truss side beam (1) and the lightweight precast base plate (2) with a layer of anti-corrosion lightweight flame retardant material; In step S3, there are multiple lightweight prefabricated base plates (2), which are sequentially hoisted into the tower (100) by the tower crane (200). The multiple lightweight prefabricated base plates (2) are spliced ​​together between the bottom ends of the two truss side beams (1). When installing the cross brace top rod (3) in step S4, the cross brace top rod (3) needs to be arranged at an angle between the top ends of the two truss side beams (1).