Construction site connection system, method and storage medium

By designing a separable and dockable mobile chassis and robotic arm platform in the construction factory, and using SLAM mobile positioning and visual recognition technology to achieve precise docking and separation, the low operating efficiency caused by the inseparability of the robotic arm and mobile chassis in the existing technology is solved. and high cost problems, improving production efficiency and reducing costs.

CN114179124BActive Publication Date: 2024-10-18ROBOTICPLUS AI
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202010956844.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-09-12
Publication Date
2024-10-18
Estimated Expiration
2040-09-12

AI Technical Summary

Technical Problem

The inseparable design of robotic arms and mobile chassis in existing construction plants results in low operating efficiency, and multiple robotic arms require multiple mobile chassis, which increases production costs.

Method used

Design a detachable and dockable mobile chassis and robotic arm platform that can achieve precise docking and separation through SLAM mobile positioning, visual recognition of QR codes and PGV sensors, and can operate independently and schedule other tasks.

Benefits of technology

It improves processing production efficiency, saves costs, realizes multiple docking and separation, and reduces factory production costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114179124B_ABST
    Figure CN114179124B_ABST
Patent Text Reader

Abstract

The present invention provides a construction site docking method, including: S100 global mobile positioning: moving the mobile chassis to the target work platform in the task through SLAM; S200 docking: the mobile chassis adjusts its own posture to the ideal docking entry position through the two-dimensional code of the visual recognition work platform at this point; according to the PGV sensor on the mobile chassis, the PG code on the bottom of the work platform is recognized, and the position of the mobile chassis is adjusted until the set precision positioning position threshold; the work platform descends and matches the mobile chassis, and is connected and fixed to each other; S300 mobile separation: the mobile chassis of the load work platform is globally mobile positioned, and SLAM is navigated to the task working position, and the mobile chassis is disconnected from the work platform. The mobile chassis is recorded according to the current position and the current position coordinates of this work platform are reported to the server, and a removal path is generated, and the mobile chassis is separated and removed. The present invention can perform multiple docking and separation using an independent mobile chassis and multiple work platforms, saving costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of construction robot mounting and docking methods in complex scenarios. Background Art

[0002] At present, the processing in the construction factory is basically a robot arm fixed on a mobile chassis, and the two are inseparable. When the robot arm is working, the mobile chassis is stationary and no mobile tasks are performed until the robot arm completes the operation, which causes the operation efficiency of the mobile chassis to be low. Secondly, if there are multiple robot arms that need to work, multiple mobile chassis are required to cooperate with the robot arms; and the cost of a mobile chassis is often much higher than that of an operating robot arm, which makes the production cost of the factory very high.

[0003] The present invention focuses on the above problems and proposes a design concept that the mobile chassis and the robotic arm platform are detachable and dockable. After the robotic arm platform is transported to the designated processing point by the mobile chassis, the mobile chassis and the platform are separated, the robotic arm operates independently, and the mobile chassis performs other scheduling tasks; when the robotic arm needs to be moved to other working points, the mobile chassis is scheduled to achieve precise docking with the robotic arm platform, and then the robotic arm platform is transported to the next target position, and the mobile chassis is separated again to perform other transportation tasks. Summary of the invention

[0004] The purpose of the present invention is to provide a construction site connection system, method and storage medium to at least solve one or more problems in the prior art.

[0005] In a first aspect, an embodiment of the present invention provides a construction site connection method, comprising:

[0006] S100 global mobile positioning: The mobile chassis gets a new work task, moves to the target work platform in the task through SLAM, reads a calibrated offset vector V1 of the work platform coordinates, that is, the task midpoint of the work platform, and starts the docking process;

[0007] S200 docking: S210, the mobile chassis adjusts its posture at this point by visually identifying the QR code on the side of the work platform until the master tag QR code information is confirmed and recognized, and the chassis posture is fine-tuned to the ideal docking entry position according to the master tag data, and the mobile chassis is navigated to the calibrated rough positioning position; S220, the pg code on the bottom of the work platform is identified by the pgv sensor on the mobile chassis, and the position of the mobile chassis is adjusted until the set fine positioning position threshold; S230, the work platform descends to match the mobile chassis, and they are connected and fixed to each other;

[0008] S300 mobile separation: The mobile chassis of the load working platform is positioned through global mobile positioning and SLAM navigation to the task working position; the mobile chassis is disconnected from the working platform, and the working platform is raised to a predetermined height; the mobile chassis reports the current position coordinates of the working platform to the server based on the current position record, and generates a removal path, and the mobile chassis is separated and moved out.

[0009] In the first implementation of the first aspect of the embodiment of the present invention, the coordinates of the working platform refer to the absolute position of the working platform area in the world coordinate system. When the device is initialized and calibrated, the mobile chassis is manually controlled to enter the rectangular area of ​​the working platform, and the relative position between the mobile chassis and the working platform is adjusted to an allowable range, that is, with the positive direction of the mobile chassis as a reference, the left and right sides of the mobile chassis should be basically aligned with the two sides of the working platform, and the distance between the front and rear sides and the distance between the front and rear sides of the rectangle should also be basically equal. In addition, the center position of the mobile chassis is aligned with the center position of the working platform. At this time, the position of the mobile chassis in the world coordinate system is read and uploaded, and the relative position obtained by comparing with the position of the working platform recorded in the system is defined as the rough positioning position. The rough positioning position is offset according to the offset vector V1, and this relative position is defined as the task midpoint. The mobile chassis to be moved reads the pg code laid on the bottom of the working platform according to its uploaded PGV sensor, and the pg code coordinate system is solved to adjust the chassis posture so that it can complete the final positioning position of docking with the working platform, which is defined as the precise positioning position.

[0010] In the second implementation of the first aspect of the embodiment of the present invention, the SLAM mobile positioning refers to autonomous learning to establish a map of the environment and an environmental coordinate system through the fusion of laser radar, odometer and gyroscope data uploaded by the mobile chassis (other positioning methods such as ground QR code, reflector laser locator, automatic tracker, GPS, RTK, UWB, etc. can be used), so as to know the real-time position of the mobile chassis. At the same time, based on the knowledge of the position of the mobile chassis, the position coordinates of the carried working platform can be recorded through the aforementioned mapping logic.

[0011] In the third implementation of the first aspect of the embodiment of the present invention, the step S210 includes: S211, the mobile chassis searches for the master tag at the point by visually identifying the QR code group on the side of the working platform; S212, further adjusting the position of the mobile chassis to a set adjustment threshold according to the master tag QR code information; S213, the mobile chassis moves to the coarse positioning position under the working platform according to the calibrated offset vector V1.

[0012] In the fourth implementation of the first aspect of the embodiment of the present invention, the identification of the two-dimensional code information refers to the identification of the two-dimensional code until the master tag information is confirmed to be identified, and the posture of the chassis is fine-tuned to the ideal docking entry position according to the master tag data, and the mobile chassis is navigated to the calibrated coarse positioning position. In the fourth implementation of the first aspect of the embodiment of the present invention, the posture of the fine-tuning chassis is fine-tuned to the ideal docking entry position. One of the achievable methods is: the calculated angle deviation is sent to the mobile chassis for angular velocity adjustment, and the speed deviation in the X direction is calculated and sent to the mobile chassis after the angle difference threshold is reached, and the adjustment is completed after the speed difference in the X direction reaches the threshold.

[0013] In the embodiment of the present invention, in a fifth implementation manner of the first aspect, the precise positioning position of the mobile chassis is determined by identifying the two-dimensional code on the working platform according to the pgv sensor on the mobile chassis, which means: sending an angular velocity W to the mobile chassis, and adjusting the X-direction error after reaching a threshold; sending a Y-direction velocity vy to the mobile chassis, and adjusting the Y-direction error after reaching a threshold; sending a linear velocity vx in the X direction to the mobile chassis, and completing the adjustment after reaching the threshold.

[0014] In the sixth implementation of the first aspect of the embodiment of the present invention, the descent of the working platform is consistent with the mobile chassis, which is achieved by controlling four independent lifting electric cylinders of the working platform, that is, the lifting and leveling of the working platform are adjusted by controlling the movement of four independent electric cylinders.

[0015] The working platform control method of the embodiment of the present invention includes: 1) ground control of the feet, 2) horizontal leveling, and 3) lifting control. The ground control of the feet refers to detecting whether the extended feet touch the ground through the constant torque of the servo motor; the horizontal leveling refers to: when the inclination angle X>0.1, calculating the additional moving distance of the electric cylinder until it is adjusted to the set position.

[0016] The calculation method of the electric cylinder's additional moving distance is as follows: ABC is set as the three points of a vertical triangle, B is the point where the right angle is located, AC is the distance between the front and rear legs of the work platform, ∠A is the inclination angle on a certain axis of the current platform, and the height of the compensation displacement BC is calculated, BC = fabs(tan(A) * AC); According to whether the inclination angle is greater than 0 or less than 0, the electric cylinder distance at point A or point C is determined to be compensated. Generally, the two coaxial ones move together, and the platform is leveled when both axes are adjusted to the horizontal range.

[0017] The lifting control includes an ascending control method and a descending control method, and the ascending control method includes:

[0018] 1) According to the current positions of the four electric cylinders, find the maximum extension of the electric cylinders;

[0019] 2) The translation distance from the highest point to the highest point = electric cylinder stroke - the current maximum cylinder extension distance;

[0020] 3) Electric cylinder moving setting position = electric cylinder current position + translation distance from rising to the highest point;

[0021] The described descent control method:

[0022] 1) Find the minimum extension value of the electric cylinder according to the current positions of the four electric cylinders;

[0023] 2) The distance of translation when descending to the lowest point = the distance of the cylinder that is currently extended to the minimum;

[0024] 3) The electric cylinder movement setting position = the electric cylinder current position - the translation distance from the highest point.

[0025] In a second aspect, an embodiment of the present invention provides a construction site connection system, including:

[0026] Independent mobile chassis, independent working platform

[0027] The global mobile positioning unit is used to: move the mobile chassis to the target work platform in the task through SLAM, and read a calibrated offset vector V1 of the work platform coordinates;

[0028] The docking unit is used to dock and fix the mobile chassis with the working platform, and it includes

[0029] The first subunit is used to: the mobile chassis adjusts its posture at this point by visually identifying the QR code on the side of the work platform until the master tag QR code information is confirmed and recognized, and fine-tunes the posture of the chassis to the ideal docking entry position according to the master tag data, and navigates the mobile chassis to the calibrated coarse positioning position;

[0030] The second subunit is used to identify the pg code on the bottom surface of the working platform according to the pgv sensor on the mobile chassis, and adjust the position of the mobile chassis until the set precise positioning position threshold;

[0031] The third subunit is used for lowering the working platform to match with the mobile chassis and to be connected and fixed to each other;

[0032] The mobile separation unit is used to: the mobile chassis of the load working platform is positioned by global mobile positioning and SLAM navigation to the task working position; the working platform is disconnected from the mobile chassis and the working platform is raised to a predetermined height; the mobile chassis reports the current position coordinates of the working platform to the server according to the current position record, and generates a removal path, and the mobile chassis is separated and moved out.

[0033] In the first implementation of the second aspect of the embodiment of the present invention, the coordinates of the work platform refer to the absolute position of the work platform area in the world coordinate system. When the device is initialized and calibrated, the mobile chassis is manually controlled to enter the rectangular area of ​​the work platform, and the relative position between the mobile chassis and the work platform is adjusted to an allowable range, that is, with the positive direction of the mobile chassis as a reference, the left and right sides of the mobile chassis should be basically aligned with the two sides of the work platform, and the distance between the front and rear sides and the distance between the front and rear sides of the rectangle should also be basically equal. In addition, the center position of the mobile chassis is aligned with the center position of the work platform. At this time, the position of the mobile chassis in the world coordinate system is read and uploaded, and the relative position obtained by comparing with the position of the work platform recorded in the system is defined as the rough positioning position. The rough positioning position is offset according to the offset vector V1, and this relative position is defined as the task midpoint. The mobile chassis to be moved reads the pg code laid on the bottom of the work platform according to its uploaded PGV sensor, and the pg code coordinate system is solved to adjust the chassis posture so that it can complete the final positioning position of docking with the work platform, which is defined as the precise positioning position.

[0034] In the second implementation of the second aspect of the present invention, the SLAM mobile positioning refers to autonomous learning to establish a map of the environment and an environmental coordinate system through the fusion of laser radar, odometer and gyroscope data uploaded by the mobile chassis (other positioning methods such as ground QR code, reflector laser locator, automatic tracker, GPS, RTK, UWB, etc. can be used), so as to know the real-time position of the mobile chassis. At the same time, based on the knowledge of the position of the mobile chassis, the position coordinates of the carried work platform can be recorded through the aforementioned mapping logic.

[0035] In the third implementation of the first aspect of the embodiment of the present invention, the first subunit includes: a first module, used for the mobile chassis to find the master tag at the point by visually identifying the QR code group on the side of the working platform; a second module, used for further adjusting the position of the mobile chassis to a set adjustment threshold according to the master tag QR code information; and a third module, used for: the mobile chassis moves into the coarse positioning position under the working platform according to the calibrated offset vector V1.

[0036] In the embodiment of the present invention, in the third and fourth implementations of the second aspect, the first subunit is used to identify the QR code information, which refers to identifying the QR code until a group of multiple QR codes with master tag information are confirmed to be identified, and the posture of the chassis is fine-tuned to the ideal docking entry position according to the mastertag data, and the mobile chassis is navigated to the calibrated coarse positioning position. In the embodiment of the present invention, in the third implementation of the second aspect, the first subunit fine-tunes the posture of the fine-tuning chassis to the ideal docking entry position, and one of the achievable methods is: the calculated angle deviation is sent to the mobile chassis for angular velocity adjustment, and the speed deviation in the X direction is calculated and sent to the mobile chassis after the angle difference threshold is reached, and the adjustment is completed after the speed difference in the X direction reaches the threshold.

[0037] In the embodiment of the present invention, in a fifth implementation manner of the second aspect, the second subunit determines the precise positioning position of the mobile chassis by identifying the QR code on the working platform according to the pgv sensor on the mobile chassis, which means: sending the angular velocity W to the mobile chassis, and adjusting the X-direction error after reaching the threshold; sending the Y-direction velocity vy to the mobile chassis, and adjusting the Y-direction error after reaching the threshold; sending the X-direction linear velocity vx to the mobile chassis, and the adjustment is completed after reaching the threshold.

[0038] In the fifth implementation of the second aspect of the embodiment of the present invention, the third subunit is used to adjust the position of the working platform to match the mobile chassis, which is specifically achieved by controlling four independent lifting electric cylinders of the working platform, that is, by controlling the movement of four independent electric cylinders to adjust the lifting and leveling of the working platform.

[0039] The third subunit of the embodiment of the present invention includes: 1) a foot landing control module, 2) a horizontal leveling module and 3) a lifting control module. The foot landing control module is used to detect whether the extended foot is touching the ground through the constant torque of the servo motor; the horizontal leveling module is used to: when the inclination angle X>0.1, calculate the additional moving distance of the electric cylinder until it is adjusted to the set position.

[0040] The calculation method of the electric cylinder supplementary moving distance in the horizontal leveling module is as follows: ABC is set as the three points of the vertical triangle, B is the point where the right angle is located, AC is the distance between the front and rear legs of the work platform, ∠A is the inclination angle on a certain axis of the current platform, and the height of the compensation displacement BC is calculated, BC = fabs(tan(A) * AC); According to whether the inclination angle is greater than 0 or less than 0, the electric cylinder distance at point A or point C is determined to be compensated. Generally, the two coaxial ones act together, and the platform completes the leveling when both axes are adjusted to the horizontal range.

[0041] The lifting control module includes an ascending control module and a descending control module, wherein the ascending control module is used to:

[0042] 1) According to the current positions of the four electric cylinders, find the maximum extension of the electric cylinders;

[0043] 2) The translation distance from the highest point to the highest point = electric cylinder stroke - the current maximum cylinder extension distance;

[0044] 3) Electric cylinder moving setting position = electric cylinder current position + translation distance from rising to the highest point;

[0045] The descent control module is used for:

[0046] 1) Find the minimum extension value of the electric cylinder according to the current positions of the four electric cylinders;

[0047] 2) The distance of translation when descending to the lowest point = the distance of the cylinder that is currently extended to the minimum;

[0048] 3) The electric cylinder movement setting position = the electric cylinder current position - the translation distance from the highest point.

[0049] In the third aspect, a construction site docking method provided by an embodiment of the present invention also includes driving and slam navigation of a mobile chassis. The driving, slam navigation, calibration, docking and separation of the mobile chassis and the control of the working platform are carried out through the TCP / IP protocol via wired or wireless communication, and the interface provided by the open source ROS development environment middleware is used for data transmission.

[0050] In a fourth aspect, an embodiment of the present invention provides a device or terminal for implementing construction site docking, comprising one or more processors and a storage device; the storage device is used to store one or more programs; when the one or more programs are executed by the one or more processors, the one or more processors implement a construction site docking method as described in any one of the first aspects above.

[0051] In a fifth aspect, an embodiment of the present invention provides a computer-readable storage medium storing a computer program, which, when executed by a processor, implements a construction site connection method as described in any one of the first aspects above.

[0052] Beneficial effects of the present invention:

[0053] The construction connection method and system provided by the present invention can perform multiple connection and separation by using an independent mobile chassis, multiple working platforms or one working platform, thereby improving processing and production efficiency and saving costs.

[0054] The specific embodiments of the present invention are described below with reference to the accompanying drawings: BRIEF DESCRIPTION OF THE DRAWINGS

[0055] Figure 1-3A schematic diagram of the docking process between an independent mobile chassis and a work platform provided in an embodiment.

[0056] Figure 4 A flow chart of a construction connection method provided in an embodiment.

[0057] Figure 5 A flow chart of the calibration steps of the construction connection method provided in the embodiment.

[0058] Figure 6 A flowchart of the docking steps of the construction docking method provided in the embodiment.

[0059] Figure 7 A flowchart of the QR code recognition steps of the construction connection method provided in the embodiment.

[0060] Figure 8 A flow chart of the PGV identification and adjustment steps of the construction connection method provided in an embodiment.

[0061] Fig. 9 A flow chart of the separation steps of the construction connection method provided in the embodiment.

[0062] Fig.10 A hardware communication diagram of a docking system provided in an embodiment.

[0063] Fig.11 A flow chart of a leveling algorithm for a work platform provided in an embodiment.

[0064] Fig.12 A block diagram of a construction connection system provided for an embodiment. DETAILED DESCRIPTION

[0065] The specific embodiments described herein are only used to explain the technical solution of this patent, rather than to limit the disclosed technical solution. It should also be noted that, for ease of description, only the parts related to the disclosed technical solution are shown in the drawings, rather than all structures.

[0066] Before discussing the exemplary embodiments in more detail, it should be mentioned that the structures of the device components and / or modules themselves mentioned in the embodiments, if not described in detail, are understandable to those skilled in the art based on the existing public technology or commercially available products.

[0067] See also Figure 1-3 The construction connection method and system provided by the embodiment of the present invention utilizes an independent mobile chassis, multiple working platforms or one working platform to perform multiple connection and separation. 1 is a working platform, 101 is a platform table, 102 is an electric cylinder, and 103 is a foot.

[0068] See also Fig.10The embodiment of this patent also provides a communication mode for the method and system for connecting an independent mobile chassis and an operating platform.

[0069] See also Figures 4 to 6 , Fig. 9 , the construction site connection method provided by the embodiment of the present invention includes:

[0070] S100 global mobile positioning: The mobile chassis receives a new work task, moves to the target platform in the task through SLAM, reads a calibrated offset value V1 of the coordinates, that is, the task midpoint of the work platform, and starts the docking process.

[0071] S200 docking: S210, the mobile chassis adjusts its posture at this point by visually identifying the QR code on the side of the working platform until the master tag QR code information is confirmed and recognized, and the chassis posture is fine-tuned to the ideal docking entry position according to the master tag data, and the mobile chassis is navigated to the calibrated coarse positioning position; S220, the pg code on the bottom of the working platform is identified according to the pgv sensor on the mobile chassis, and the position of the mobile chassis is adjusted until the set fine positioning position threshold; S230, the working platform descends to match the mobile chassis, and they are connected and fixed to each other.

[0072] S300 mobile separation: The mobile chassis of the load working platform is located by global mobile positioning and SLAM navigation to the task working position; after the mobile platform and the load working platform arrive at the task working position, they are connected and disconnected from each other, and the working platform is raised to a predetermined height. The mobile chassis reports the current position coordinates of the working platform to the server according to the current position record, and generates an exit path, and the working platform is separated from the mobile chassis.

[0073] The coordinates of the working platform refer to the absolute position of the working platform area in the world coordinate system. When the equipment is initialized and calibrated, the mobile chassis is manually controlled to enter the rectangular area of ​​the working platform, and the relative position between the mobile chassis and the working platform is adjusted to an allowable range, that is, with the positive direction of the mobile chassis as a reference, the left and right sides of the mobile chassis should be basically aligned with the sides of the working platform, and the distance between the front and rear sides and the distance between the front and rear sides of the rectangle should also be basically equal. In addition, the center position of the mobile chassis is aligned with the center position of the working platform. At this time, the position of the mobile chassis in the world coordinate system is read and uploaded, and the relative position obtained by comparing with the position of the working platform recorded in the system is defined as the rough positioning position. The rough positioning position is offset by the offset vector V1 (for example, 1000mm in the direction of the short axis of the platform), and this relative position is defined as the middle point of the task. The mobile chassis reads the pg code laid on the bottom of the working platform according to its uploaded PGV sensor, and solves the pg code coordinate system to adjust the chassis posture so that it can complete the final positioning position of docking with the working platform, which is defined as the precise positioning position.

[0074] In the second implementation of the first aspect, the SLAM mobile positioning is carried out by fusion of laser radar, odometer and gyroscope data uploaded by the mobile chassis. (Other positioning methods such as ground QR code, reflector laser locator, automatic tracker, GPS, RTK, UWB, etc. can be used), autonomous learning is used to establish a map of the environment, and an environmental coordinate system is established to know the real-time position of the mobile chassis. At the same time, based on the knowledge of the position of the mobile chassis, the position coordinates of the carried working platform can be recorded through the aforementioned mapping logic.

[0075] One of the implementation methods of identifying the two-dimensional code information can be achieved by referring to Figure 7 , by identifying the QR code until a group of multiple QR codes with master tag information is confirmed to be identified, the chassis posture is fine-tuned to the ideal docking entry position according to the master tag data, and the mobile chassis is navigated to the calibrated rough positioning position. For example, step S210 includes: S211, the mobile chassis searches for the master tag at this point by visually identifying the QR code group on the side of the work platform; S212, further adjusting the position of the mobile chassis to the set adjustment threshold according to the master tag QR code information; S213, the mobile chassis moves to the rough positioning position under the work platform according to the calibrated offset vector V1.

[0076] In an embodiment of the present invention, the posture of the fine-tuning chassis is fine-tuned to an ideal docking entry position. One of the preferred methods that can be implemented is: the calculated angle deviation is sent to the mobile chassis for angular velocity adjustment. After the angle difference threshold is reached, the speed deviation in the X direction is calculated and sent to the mobile chassis. After the speed difference in the X direction reaches the threshold, the adjustment is completed.

[0077] Another achievable embodiment of the present invention is as follows: Figure 8 The pgv sensor on the mobile chassis identifies the QR code on the working platform to determine the precise position of the mobile chassis. The steps are as follows: sending the angular velocity W to the mobile chassis, and adjusting the X-direction error after reaching the threshold; sending the Y-direction velocity vy to the mobile chassis, and adjusting the Y-direction error after reaching the threshold; sending the X-direction linear velocity vx to the mobile chassis, and the adjustment is completed after reaching the threshold.

[0078] refer to Figure 1 , Fig.11 A method for matching the descent of a working platform with a mobile chassis provided in an embodiment of the present invention is achieved by controlling four independent electric cylinders of the working platform, that is, by controlling the movement of four independent electric cylinders to adjust the lifting and leveling of the working platform.

[0079] like Figure 1 , Fig.10 and Fig.11As shown, an embodiment of the present invention provides a working platform control method including: 1) foot touchdown control, 2) horizontal leveling and 3) lifting control, wherein the foot touchdown control refers to detecting whether the extended foot touches the ground by means of a constant torque of a servo motor; the horizontal leveling refers to: when the inclination angle X>0.1, calculating the supplementary moving distance of the electric cylinder until it is adjusted to the set position.

[0080] The calculation method of the electric cylinder's additional moving distance is as follows: ABC is set as the three points of a vertical triangle, B is the point where the right angle is located, AC is the distance between the front and rear legs of the work platform, ∠A is the inclination angle on a certain axis of the current platform, and the height of the compensation displacement BC is calculated, BC = fabs(tan(A) * AC); According to whether the inclination angle is greater than 0 or less than 0, the electric cylinder distance at point A or point C is determined to be compensated. Generally, the two coaxial ones move together, and the platform is leveled when both axes are adjusted to the horizontal range.

[0081] The lifting control includes an ascending control method and a descending control method, and the ascending control method includes:

[0082] 1) According to the current positions of the four electric cylinders, find the maximum extension of the electric cylinders;

[0083] 2) The translation distance from the highest point to the highest point = electric cylinder stroke - the current maximum cylinder extension distance;

[0084] 3) Electric cylinder moving setting position = electric cylinder current position + translation distance from rising to the highest point;

[0085] The described descent control method:

[0086] 1) Find the minimum extension value of the electric cylinder according to the current positions of the four electric cylinders;

[0087] 2) The distance of translation when descending to the lowest point = the distance of the cylinder that is currently extended to the minimum;

[0088] 3) The electric cylinder movement setting position = the electric cylinder current position - the translation distance from the highest point.

[0089] like Fig.10 , 12 As shown, an embodiment of the present invention further provides a construction site connection system, including:

[0090] Independent mobile chassis, independent working platform

[0091] The global mobile positioning unit is used to: move the mobile chassis to the target work platform in the task through SLAM, and record a calibrated offset vector V1 of the work platform coordinates;

[0092] The docking unit is used to dock and fix the mobile chassis with the working platform, and it includes

[0093] The first subunit is used to: the mobile chassis adjusts its posture at this point by visually identifying the QR code on the side of the work platform until the master tag QR code information is confirmed and recognized, and fine-tunes the posture of the chassis to the ideal docking entry position according to the master tag data, and navigates the mobile chassis to the calibrated coarse positioning position;

[0094] The second subunit is used to identify the pg code on the bottom surface of the working platform according to the pgv sensor on the mobile chassis, and adjust the position of the mobile chassis until the set precise positioning position threshold;

[0095] The third subunit is used for lowering the working platform to match with the mobile chassis and to be connected and fixed to each other;

[0096] The mobile separation unit is used for: the mobile chassis of the load working platform is positioned by global mobile positioning and SLAM navigation to the task working position; the working platform is disconnected from the mobile chassis and the working platform is raised to a predetermined height; the mobile chassis reports the current position coordinates of the working platform to the server according to the current position record, and generates a removal path, and the mobile chassis is separated and moved out.

[0097] In the construction site docking system provided by the embodiment of the present invention, the coordinates of the work platform refer to the absolute position of the work platform area in the world coordinate system. When the equipment is initialized and calibrated, the mobile chassis is manually controlled to enter the rectangular area of ​​the work platform, and the relative position between the mobile chassis and the work platform is adjusted to an allowable range, that is, with the positive direction of the mobile chassis as a reference, the left and right sides of the mobile chassis should be basically aligned with the two sides of the work platform, and the distance between the front and rear sides and the distance between the front and rear sides of the rectangle should also be basically equal. In addition, the center position of the mobile chassis is aligned with the center position of the work platform. At this time, the position of the mobile chassis in the world coordinate system is read and uploaded, and the relative position obtained by comparing with the position of the work platform recorded in the system is defined as the coarse positioning position. The coarse positioning position is offset according to the offset vector V1, and this relative position is defined as the task midpoint. The mobile chassis to be moved reads the pg code laid on the bottom of the work platform according to its uploaded PGV sensor, and the pg code coordinate system is solved to adjust the chassis posture so that it can complete the final positioning position of docking with the work platform, which is defined as the precise positioning position.

[0098] For the construction site docking system provided by the embodiment of the present invention and the SLAM mobile positioning, those skilled in the art can use existing SLAM navigation technology. It is also possible to load a laser radar, odometer and gyroscope data fusion on the mobile chassis (such as choosing to use ground QR code, reflector laser locator, automatic tracker, GPS, RTK, UWB and other positioning methods), autonomously learn to establish a local environment map, and establish an environmental coordinate system, so as to know the real-time position of the mobile chassis. At the same time, based on knowing the position of the mobile chassis, the position coordinates of the carried work platform can be recorded through the aforementioned mapping logic.

[0099] In an achievable implementation method, the first subunit for identifying the QR code information is used to identify the QR code until a group of multiple QR codes of the master tag information is confirmed to be identified, and the posture of the chassis is fine-tuned to the ideal docking entry position according to the data of the master tag, and the mobile chassis is navigated to the calibrated rough positioning position. In another achievable preferred embodiment, the first subunit fine-tunes the posture of the fine-tuning chassis to the ideal docking entry position: the calculated angle deviation is sent to the mobile chassis for angular velocity adjustment, and the speed deviation in the X direction is calculated after reaching the threshold of the angle difference and sent to the mobile chassis, and the adjustment is completed after the speed difference in the X direction reaches the threshold. The first subunit can also be implemented by the following modules: the first module is used for the mobile chassis to find the master tag at this point by visually identifying the QR code group on the side of the working platform; the second module is used to: further adjust the position of the mobile chassis to the set adjustment threshold according to the master tag QR code information; the third module is used to: the mobile chassis moves into the rough positioning position under the working platform according to the calibrated offset vector V1.

[0100] In an achievable embodiment, the second subunit is used to: send an angular velocity W to the mobile chassis, and adjust the X-direction error after reaching a threshold; send a velocity vy in the Y direction to the mobile chassis, and adjust the Y-direction error after reaching a threshold; send a linear velocity vx in the X direction to the mobile chassis, and complete the adjustment after reaching a threshold.

[0101] In a feasible embodiment, the third subunit is used to adjust the position of the working platform to match the mobile chassis, which is specifically achieved by controlling the four independent lifting cylinders of the working platform, that is, by controlling the movement of four independent electric cylinders to adjust the lifting and leveling of the working platform.

[0102] The third subunit provided in one embodiment of the present invention includes: 1) a foot landing control module, 2) a horizontal leveling module and 3) a lifting control module, wherein the foot landing control module is used to detect whether the extended foot has touched the ground through the constant torque of the servo motor; the horizontal leveling module is used to: when the inclination angle X>0.1, calculate the additional moving distance of the electric cylinder until it is adjusted to the set position.

[0103] In a preferred embodiment, the calculation method of the electric cylinder supplementary moving distance in the horizontal leveling module is as follows: ABC is set as the three points of a vertical triangle, B is the point where the right angle is located, AC is the distance between the front and rear legs of the working platform, ∠A is the inclination angle on a certain axis of the current platform, and the height of the compensation displacement BC is calculated, BC = fabs(tan(A) *AC); According to whether the inclination angle is greater than 0 or less than 0, it is determined whether the electric cylinder distance at point A or point C is compensated. Generally, the two coaxial ones act together, and the platform completes the leveling when both axes are adjusted to the horizontal range.

[0104] In a preferred embodiment, the lifting control module includes an ascending control module and a descending control module, and the ascending control module is used to:

[0105] 1) According to the current positions of the four electric cylinders, find the maximum extension of the electric cylinders;

[0106] 2) The translation distance from the highest point to the highest point = electric cylinder stroke - the current maximum cylinder extension distance;

[0107] 3) Electric cylinder moving setting position = electric cylinder current position + translation distance from rising to the highest point;

[0108] In a preferred embodiment, the descent control module is used to:

[0109] 1) Find the minimum extension value of the electric cylinder according to the current positions of the four electric cylinders;

[0110] 2) The distance of translation when descending to the lowest point = the distance of the cylinder that is currently extended to the minimum;

[0111] 3) The electric cylinder movement setting position = the electric cylinder current position - the translation distance from the highest point.

[0112] An embodiment of the present invention also provides another construction site docking method, including driving and slam navigation of a mobile chassis. The driving, slam navigation, calibration, docking and separation of the mobile chassis and the control of the working platform communicate via wired or wireless communication through the TCP / IP protocol, and use the interface provided by the open source ROS development environment middleware for data transmission.

[0113] In addition, an embodiment of the present invention provides a device or terminal for realizing construction site docking, including one or more processors and a storage device; the storage device is used to store one or more programs; when the one or more programs are executed by the one or more processors, the one or more processors implement a construction site docking method as described in any one of the first aspects above. It may also include a communication interface for communicating with other devices or communication networks.

[0114] At the same time, the present invention also provides an embodiment of a computer-readable storage medium, which stores a computer program, and when the program is executed by a processor, it implements a construction site connection method as described in any one of the first aspects above.

[0115] Those skilled in the art will appreciate that all or part of the steps provided in the above-mentioned embodiment method can be implemented by instructing related hardware through a program, and the program can be stored in a computer-readable storage medium, which, when executed, includes one of the steps in the method or a combination thereof.

[0116] The above is an example of the preferred implementation of the present invention, but the invention is not limited to the embodiments. Those skilled in the art can make various equivalent modifications or substitutions without violating the spirit of the utility model. These equivalent modifications or substitutions are all included in the scope defined by the claims of this application.

Claims

1. A construction site connection method, comprising: S100 global mobile positioning: Move the mobile chassis to the target work platform in the mission through SLAM, read a calibrated offset vector V1 of the work platform coordinates, and start the docking process; S200 docking: S210, the mobile chassis adjusts its posture at the point by visually identifying the QR code on the side of the working platform until the master tag QR code information is confirmed and recognized, and the chassis posture is fine-tuned to the ideal docking entry position according to the master tag data, and the mobile chassis is navigated to the calibrated rough positioning position; S220, the pg code on the bottom of the working platform is identified by the pgv sensor on the mobile chassis, and the position of the mobile chassis is adjusted until the set fine positioning position threshold; S230, the working platform descends to match the mobile chassis, and they are connected and fixed to each other; S300 mobile separation: The mobile chassis of the load working platform is located by global mobile positioning and SLAM navigation to the task working position; the mobile chassis is disconnected from the working platform, and the working platform is raised to a predetermined height; the mobile chassis reports the current position coordinates of the working platform to the server according to the current position record, and generates a removal path, and the mobile chassis is separated and removed; The S230 adjusts the lifting and leveling of the working platform by controlling the four independent lifting electric cylinders of the working platform, including: 1) ground contact control, 2) horizontal leveling and 3) lifting control. The ground contact control refers to detecting whether the extended ground feet touch the ground through the constant torque of the servo motor; the horizontal leveling refers to: when the inclination angle X>0.1, the electric cylinder's additional moving distance is calculated until it is adjusted to the set position.

2. The construction site connection method according to claim 1, characterized in that: The step S210 includes: S211, the mobile chassis searches for the master tag at a point by visually identifying the QR code group on the side of the work platform; S212, further adjusting the position of the mobile chassis to a set adjustment threshold according to the mastertag QR code information; S213, the mobile chassis moves to a coarse positioning position under the work platform according to the calibrated offset vector V1.

3. The construction site connection method according to claim 1, characterized in that: The method of fine-tuning the chassis's posture to an ideal docking entry position is as follows: the calculated angle deviation is sent to the mobile chassis for angular velocity adjustment, and after the angle difference threshold is reached, the speed deviation in the X direction is calculated and sent to the mobile chassis, and the adjustment is completed after the speed deviation in the X direction reaches the threshold.

4. The construction site connection method according to claim 1, characterized in that: The S220 adjusts the position of the mobile chassis until the set precise positioning position threshold, and the method adopted is: sending the angular velocity W to the mobile chassis, and adjusting the X direction error after reaching the threshold; sending the speed vy in the Y direction to the mobile chassis, and adjusting the Y direction error after reaching the threshold; sending the linear velocity vx in the X direction to the mobile chassis, and completing the adjustment after reaching the threshold.

5. A construction site connection system, comprising: Independent mobile chassis and independent working platform; The global mobile positioning unit is used to: move the mobile chassis to the target work platform in the task through SLAM, and read a calibrated offset vector V1 of the work platform coordinates; The docking unit is used to dock and fix the mobile chassis with the working platform, and it includes The first subunit is used to: the mobile chassis adjusts its posture at the point by visually recognizing the QR code on the side of the work platform until the master tag QR code information is confirmed and recognized, and fine-tunes the posture of the chassis to the ideal docking entry position according to the master tag data, and navigates the mobile chassis to the calibrated coarse positioning position; The second subunit is used to identify the pg code on the bottom surface of the working platform according to the pgv sensor on the mobile chassis, and adjust the position of the mobile chassis until the set precise positioning position threshold; The third subunit is used for lowering the working platform to match with the mobile chassis and to be connected and fixed to each other; The mobile separation unit is used to: the mobile chassis of the load working platform is positioned by global mobile positioning and SLAM navigation to the task working position; the working platform is disconnected from the mobile chassis and the working platform is raised to a predetermined height; the mobile chassis reports the current position coordinates of the working platform to the server according to the current position record, and generates a removal path, and the mobile chassis is separated and removed; The third subunit is used to control four independent lifting cylinders of the working platform to adjust the lifting and leveling of the working platform, including: 1) a foot landing control module, 2) a horizontal leveling module and 3) a lifting control module. The foot landing control module is used to detect whether the extended foot is touching the ground through the constant torque of the servo motor; the horizontal leveling module is used to: when the inclination angle X>0.1, calculate the additional moving distance of the electric cylinder until it is adjusted to the set position.

6. The construction site connection system according to claim 5, characterized in that: The first subunit includes: a first module, which is used for the mobile chassis to find the master tag at a point by visually identifying the QR code group on the side of the working platform; a second module, which is used to further adjust the position of the mobile chassis to a set adjustment threshold according to the master tag QR code information; and a third module, which is used to move the mobile chassis into a coarse positioning position under the working platform according to a calibrated offset vector V1.

7. The construction site connection system according to claim 5, characterized in that: The first subunit fine-tunes the chassis's posture to an ideal docking entry position by calculating the angle deviation and sending it to the mobile chassis for angular velocity adjustment. After the angle difference threshold is reached, the speed deviation in the X direction is calculated and sent to the mobile chassis. The adjustment is completed after the speed difference in the X direction reaches the threshold.

8. The construction site connection system according to claim 5, characterized in that: The second subunit adjusts the position of the mobile chassis to the precise positioning position by: sending an angular velocity W to the mobile chassis, and adjusting the X-direction error after reaching a threshold; sending a velocity vy in the Y direction to the mobile chassis, and adjusting the Y-direction error after reaching a threshold; sending a linear velocity vx in the X direction to the mobile chassis, and completing the adjustment after reaching a threshold.

9. A device for realizing construction site docking, comprising one or more processors and a storage device; the storage device is used to store one or more programs; when the one or more programs are executed by the one or more processors, the one or more processors realize a construction site docking method as described in any one of claims 1-4.

10. A computer-readable storage medium storing a computer program, wherein the program, when executed by a processor, implements a construction site connection method as described in any one of claims 1 to 4.

Citation Information

Patent Citations

  • Navigation method based on indoor microwave base station and AGV

    CN109814548A

  • Two-dimensional code guidance control method of autonomous mobile robot

    CN110673612A

  • Traveling carriage loading / unloading device of self-traveling lifter loadable and unloadable by itself

    JP2009120296A

  • Method for horizontally and vertically conveying equipment in automatic manner and device for horizontally and vertically conveying same in automatic manner

    JP2019028974A

  • Standalone adjustable transportation system suitable for any vehicle with a platform

    US20200239245A1