ACK retransmission processing and MAC-CE activation
By performing timing actions based on the successful transmission or resend request of the ACK signal in the wireless communication system, the problem of timing uncertainty caused by the failure to send the ACK signal after the UE receives the MAC-CE instruction in the NR-U environment is solved, and data transmission is improved. reliability and system efficiency.
Patent Information
- Application Number
- CN202080057277.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-08-14
- Publication Date
- 2024-10-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In wireless communication systems, especially in NR-U environments, after the UE receives the MAC-CE instruction, the failure to send the ACK signal may lead to uncertainty in the MAC-CE execution timing, affecting data decoding performance and system efficiency.
Ensures deterministic execution of MAC-CE instructions by receiving instructions from the base station (gNB) in the User Equipment (UE) and performing timing actions based on successful transmission or resend request of ACK, including receipt of timing information and ACK/ NAK signal processing adopts the listen-before-talk (LBT) process to avoid conflicts, and a retransmission request is made when ACK fails to ensure the execution of instructions.
It realizes the deterministic execution of MAC-CE instructions in UE in NR-U environment, improves the reliability of data transmission and system efficiency, and reduces the timing uncertainty problem caused by ACK failure.
Smart Images

Figure CN114270753B_ABST
Abstract
Description
[0001] CROSS-REFERENCE TO RELATED APPLICATIONS
[0002] This patent application claims priority to and the benefit of U.S. non-provisional patent application No. 16 / 993,103, filed on August 14, 2020, entitled “ACK RETRANSMISSION PROCESSING AND MAC-CE ACTIVATION,” which claims priority to and the benefit of U.S. non-provisional patent application No. 62 / 888,111, filed on August 16, 2019, entitled “ACK RETRANSMISSION PROCESSING AND MAC-CE ACTIVATION,” which is hereby assigned to the assignee of this application. Technical Field
[0003] The present application relates to wireless communication systems, and more particularly, to ACK retransmission processing and MAC-CE activation timing. Background Art
[0004] Wireless communication systems are widely deployed to provide various types of communication content, such as voice, video, data packet, messaging, broadcast, etc. These systems may be able to support communication with multiple users by sharing available system resources (e.g., time, frequency, and power). A wireless multiple-access communication system may include multiple base stations (BSs), each of which simultaneously supports communication for multiple communication devices, which may be otherwise referred to as user equipment (UE).
[0005] In order to meet the growing demand for extended mobile broadband connections, wireless communication technology is evolving from long-term evolution (LTE) technology to next-generation new radio (NR) technology, which may be referred to as the fifth generation (5G). For example, NR is designed to provide lower latency, higher bandwidth or higher throughput, and higher reliability than LTE. NR is designed to operate over a wide range of spectrum bandwidths, for example, from low-frequency bandwidths below about 1 GHz and medium-frequency bandwidths from about 1 GHz to about 6 GHz, to high-frequency bandwidths, such as millimeter wave (mmWave) bandwidths. NR is also designed to operate across different spectrum types from licensed spectrum to unlicensed and shared spectrum. Spectrum sharing enables operators to opportunistically aggregate spectrum to dynamically support high-bandwidth services. Spectrum sharing can extend the benefits of NR technology to operating entities that may not have access to licensed spectrum.
[0006] One way to avoid conflicts when communicating in a shared spectrum or an unlicensed spectrum is to use a listen-before-talk (LBT) process to ensure that the shared channel is clear before sending a signal in the shared channel. The operation or deployment of NR in an unlicensed spectrum is called NR-U. In NR-U, the BS can schedule the UE for uplink (UL) transmission in an unlicensed band. The UE can perform the LBT process before the scheduled time. When the LBT is successful, the UE can continue to send UL data according to the schedule. When the LBT fails, the UE can suppress the transmission. In some cases, the LBT may pass at a later time within the scheduled time period. When the LBT success is delayed to the scheduled time period, the UE can send it within the remaining time of the scheduled time period by puncturing part of the UL data. Therefore, depending on the LBT result, the UE may or may not send UL data as scheduled. In addition, puncturing reduces the decoding performance of the UL data at the BS.
[0007] However, when a UE receives a physical downlink shared channel (PDSCH) containing a medium access control (MAC) control element (CE) executed by the UE, the timing of the execution of the MAC-CE may be unclear. Therefore, it is necessary to clarify the timing of the execution of the MAC-CE under various operating conditions. Summary of the invention
[0008] The following summarizes some aspects of the present disclosure to provide a basic understanding of the technology discussed. This summary is not an extensive overview of all expected features of the present disclosure, and is neither intended to identify important or key elements of all aspects of the present disclosure, nor is it intended to delineate the scope of any or all aspects of the present disclosure. Its sole purpose is to present some concepts of one or more aspects of the present disclosure in a summary form as a preface to a more detailed description presented later.
[0009] A method of operating a user equipment (UE) device according to some embodiments includes: receiving a transmission from a base station (gNB), the transmission including an instruction for performing an action; attempting an ACK based on the transmission; performing a timed action based on the transmission of the ACK, the reception of the transmission, or the reception of a retransmission request; and performing the action according to the timing.
[0010] In some embodiments, a method of operating a user equipment (UE) device includes: receiving a transmission from a base station (gNB) including an instruction for performing an action; attempting an ACK based on the transmission; timing the performance of the action depending on whether the ACK is successfully sent; and performing the action according to the timing.
[0011] In some embodiments, a user equipment device includes a transceiver; a communication module coupled to the transceiver to receive and send communications to a base station, the communication module executing instructions to receive a transmission from a base station (gNB), the transmission including instructions for performing an action; attempting an ACK based on the transmission; timing the execution of an action depending on whether the ACK is successfully sent; and performing the action according to the timing.
[0012] Other aspects, features, and embodiments of the present invention will become apparent to those of ordinary skill in the art upon reviewing the following description of specific exemplary embodiments of the present invention in conjunction with the accompanying drawings. Although features of the present invention may be discussed with respect to certain embodiments and drawings below, all embodiments of the present invention may include one or more of the advantageous features discussed herein. In other words, although one or more embodiments may be discussed as having certain advantageous features, one or more of these features may also be used in accordance with the various embodiments of the present invention discussed herein. In a similar manner, although exemplary embodiments may be discussed below as device, system, or method embodiments, it should be understood that such exemplary embodiments may be implemented in various devices, systems, and methods. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 A wireless communication network according to some embodiments of the present disclosure is illustrated.
[0014] Figure 2 is a block diagram of an example user equipment (UE) according to an embodiment of the present disclosure.
[0015] Figure 3 is a block diagram of an example base station (BS) according to an embodiment of the present disclosure.
[0016] Figure 4A and 4B The timing of execution of MAC-CE commands in a user equipment (UE) device is illustrated.
[0017] Figure 5 An embodiment of the timing of execution of MAC-CE commands in a UE device is illustrated.
[0018] Figure 6 Another embodiment for the timing of execution of MAC-CE commands in a UE device is illustrated.
[0019] Figure 7 Another embodiment for the timing of execution of MAC-CE commands in a UE device is illustrated.
[0020] Figure 8 Another embodiment for the timing of execution of MAC-CE commands in a UE device is illustrated. DETAILED DESCRIPTION
[0021] The detailed description described below in conjunction with the accompanying drawings is intended as a description of various configurations and is not intended to represent the only configuration in which the concepts described herein can be practiced. The detailed description includes specific details for the purpose of providing a thorough understanding of the various concepts. However, it is apparent to those skilled in the art that these concepts can be practiced without these specific details. In some cases, in order to avoid confusing these concepts, well-known structures and components are shown in block diagram form.
[0022] The present disclosure relates to the timing of executing a MAC control element (MAC-CE) or other action in a UE after receiving a physical downlink shared channel (PDSCH) transmission with a MAC-CE instruction or an instruction for other actions. In many cases, the timing is indicated for the UE to provide an ACK / NACK for a PDSCH transmission (which thereby indicates whether the MAC-CE has been received). The timing information may be part of a downlink (DL) downlink control indicator (DCI) (sent in a PDSCH transmission) that carries a scheduling grant for a physical downlink control channel (PDCCH) that carries a scheduling grant for a PDSCH transmission. Alternatively, if the PDSCH transmission is performed on an RRC-configured grant (such as a semi-persistent scheduling grant), the timing information may be pre-configured by a radio resource controller (RRC). The execution of a MAC-CE may occur in a set time period after an ACK signal. However, embodiments of the present invention solve the problem that occurs when a UE cannot send an ACK signal and solve the timing of the execution of a MAC-CE in a UE.
[0023] As described above, the present disclosure generally relates to wireless communication systems, also referred to as wireless communication networks. In various embodiments, these techniques and devices can be used for wireless communication networks, such as code division multiple access (CDMA) networks, time division multiple access (TDMA) networks, frequency division multiple access (FDMA) networks, orthogonal FDMA (OFDMA) networks, single carrier FDMA (SC-FDMA) networks, LTE networks, global mobile communication systems (GSM) networks, fifth generation (5G) or new radio (NR) networks, and other communication networks. As described herein, the terms "network" and "system" can be used interchangeably.
[0024] OFDMA networks can implement radio technologies such as Evolved UTRA (E-UTRA), Institute of Electrical and Electronics Engineers (IEEE) 802.11, IEEE 802.16, IEEE 802.20, flash-OFDM, etc. UTRA, E-UTRA, and GSM are part of Universal Mobile Telecommunications System (UMTS). In particular, Long Term Evolution (LTE) is a version of UMTS that uses E-UTRA. UTRA, E-UTRA, GSM, UMTS, and LTE are described in documents provided by an organization named "3rd Generation Partnership Project" (3GPP), and cdma2000 is described in documents provided by an organization named "3rd Generation Partnership Project 2" (3GPP2). These various radio technologies and standards are known or are being developed. For example, the 3rd Generation Partnership Project (3GPP) is a collaboration between telecommunications association groups that aims to define globally applicable third generation (3G) mobile phone specifications. 3GPP Long Term Evolution (LTE) is a 3GPP project whose purpose is to improve the UMTS mobile phone standard. 3GPP may define specifications for next generation mobile networks, mobile systems, and mobile devices. The present disclosure focuses on the evolution of wireless technology from LTE, 4G, 5G, NR and beyond, where access to the wireless spectrum is shared between networks using a new and different set of radio access technologies or radio air interfaces.
[0025] In particular, 5G networks take into account diverse deployments, diverse spectrum, and diverse services and devices that can be implemented using a unified air interface based on OFDM. To achieve these goals, in addition to developing new radio technologies for 5G NR networks, further enhancements to LTE and LTE-A are also considered. 5G NR will be able to expand to provide coverage: (1) for networks with ultra-high density (e.g., ~1M nodes / km) 2 ), ultra-low complexity (e.g., ~10s of bit / sec), ultra-low energy (e.g., ~10 years+ battery life), and deep coverage to reach challenging locations; (2) including mission-critical controls with strong security to protect sensitive personal, financial, or confidential information, ultra-high reliability (e.g., ~99.9999% reliability), ultra-low latency (e.g., ~1ms), and a wide range of mobile or immobile users; and (3) with enhanced mobile broadband, including very high capacity (e.g., ~10Tbps / km 2 ), extremely high data rates (e.g., multi-Gbps rates, 100+Mbps user experience rates), and deep perception with advanced discovery and optimization.
[0026] 5GNR can be implemented to use an optimized OFDM-based waveform with scalable parameters and transmission time intervals (TTI); a general, flexible framework to effectively multiplex services and features using dynamic, low-latency time division duplex (TDD) / frequency division duplex (FDD) designs; and advanced wireless technologies such as massive multiple-input multiple-output (MIMO), robust millimeter wave (mmWave) transmission, advanced channel coding, and device-centric mobility. The scalability of parameters in 5G NR, with the extension of subcarrier spacing, can effectively address the operation of different services across different spectrums and different deployments. For example, in various outdoor and macro coverage deployments of less than 3GHz FDD / TDD implementations, the subcarrier spacing may appear at 15kHz on bandwidths (BW) such as 5, 10, 20MHz, etc. For other various outdoor and small cell coverage deployments of TDD greater than 3GHz, the subcarrier spacing may appear at 30kHz on a BW of 80 / 100MHz. For various other indoor broadband implementations, using TDD on the unlicensed portion of the 5GHz band, subcarrier spacing may occur at 60kHz on 160MHz BW. Finally, for various deployments transmitting with mmWave components on TDD at 28GHz, subcarrier spacing may occur at 120kHz on 500MHz BW.
[0027] 5G NR's scalable parameter set facilitates scalable TTI for different latency and quality of service (QoS) requirements. For example, shorter TTIs can be used for low latency and high reliability, while longer TTIs can be used for higher spectral efficiency. Efficient multiplexing of long TTIs and short TTIs to allow transmission to be started on symbol boundaries. 5G NR also considers a self-contained integrated subframe design that contains uplink / downlink scheduling information, data, and acknowledgment in the same subframe. The self-contained integrated subframe supports communications in unlicensed or contention-based shared spectrum, and the adapted uplink / downlink can be flexibly configured on a per-cell basis to dynamically switch between uplink and downlink to meet current business needs.
[0028] Various other aspects and features of the present disclosure are further described below. Obviously, the teachings herein can be embodied in various forms, and any specific structure, function, or both disclosed herein are only representative and non-restrictive. Based on the teachings herein, it should be understood by those of ordinary skill in the art that an aspect disclosed herein can be implemented independently of any other aspect, and two or more of these aspects can be combined in various ways. For example, any number of aspects set forth herein can be used to implement a device or practice a method. In addition, in addition to one or more of the aspects set forth herein, or in addition to one or more of the aspects set forth herein, other structures, functions, or structures and functions can be used to implement such a device or practice such a method. For example, a method can be implemented as a system, a device, an equipment, and / or as a part of an instruction stored on a computer-readable medium for execution on a processor or a computer. In addition, an aspect can include at least one element of a claim.
[0029] Figure 1 A wireless communication network 100 according to some embodiments of the present disclosure is illustrated. The network 100 may be a 5G network. The network 100 includes a plurality of base stations (BSs) 105 and other network entities. The BSs 105 may be stations that communicate with the UEs 115 and may also be referred to as evolved Node Bs (eNBs), next generation eNBs (gNBs), access points, etc. Each BS 105 may provide communication coverage for a particular geographic area. In 3GPP, the term "cell" may refer to this particular geographic coverage area of the BS 105 and / or a BS subsystem that serves the coverage area, depending on the context in which the term is used.
[0030] The BS 105 may provide communication coverage for macro cells or small cells (such as pico cells or femto cells) and / or other types of cells. A macro cell generally covers a relatively large geographic area (e.g., a radius of several kilometers) and may allow unrestricted access by UEs that have a service subscription with a network provider. Small cells such as pico cells will generally cover a relatively small geographic area and may allow unrestricted access by UEs that have a service subscription with a network provider. Small cells such as femto cells will generally also cover a relatively small geographic area (e.g., a home) and, in addition to unrestricted access, may also provide restricted access for UEs associated with the femto cells (e.g., UEs in a closed subscriber group (CSG) , UEs of users in a home, etc.). A BS for a macro cell may be referred to as a macro BS. A BS for a small cell may be referred to as a small cell BS, a pico BS, a femto BS, or a home BS. In Figure 1In the example shown, BS 105d and BS 105e may be conventional macro BSs, while BS 105a-105c may be macro BSs enabled with one of three-dimensional (3D), full-dimensional (FD), or massive MIMO. BS 105a-105c may utilize its higher-dimensional MIMO performance to utilize 3D beamforming in elevation and azimuth beamforming to increase coverage and capacity. BS 105f may be a small cell BS, which may be a home node or a portable access point. BS 105 may support one or more (e.g., two, three, four, etc.) cells.
[0031] The network 100 may support synchronous or asynchronous operation. For synchronous operation, the BSs may have similar frame timing, and transmissions from different BSs may be approximately aligned in time. For asynchronous operation, the BSs may have different frame timing, and transmissions from different BSs may not be aligned in time.
[0032] UE 115 is dispersed throughout the wireless network 100, and each UE 115 may be fixed or mobile. UE 115 may also be referred to as a terminal, a mobile station, a subscriber unit, a station, etc. UE 115 may be a cellular phone, a personal digital assistant (PDA), a wireless modem, a wireless communication device, a handheld device, a tablet computer, a laptop, a cordless phone, a wireless local loop (WLL) station, etc. In one aspect, UE 115 may be a device including a universal integrated circuit card (UICC). In another aspect, UE may be a device not including a UICC. In some aspects, UE 115 not including a UICC may also be referred to as an IoT device or an Internet of Everything (IoE) device. UE 115a-115d is an example of a mobile smart phone type device accessing the network 100. UE 115 may also be a machine specifically configured for connecting communications, including machine type communications (MTC), enhanced MTC (eMTC), narrowband IoT (NB-IoT), etc. UE 115e-115k are examples of various machines configured for communication to access network 100. UE 115 is capable of communicating with any type of BS, whether macro BS, small cell, etc. Figure 1 , the lightning ball (eg, communication link) indicates wireless transmissions between UE 115 and serving BS 105, which is a BS designated to serve UE 115 on DL and / or UL, or desired transmissions between BSs, and backhaul transmissions between BSs.
[0033] In operation, BS 105a-105c may use 3D beamforming and cooperative spatial techniques such as coordinated multipoint (CoMP) or multi-connectivity to serve UEs 115a and 115b. Macro BS 105d may perform backhaul communications with BS 105a-105c and with small cell BS 105f. Macro BS 105d may also send multicast services subscribed to and received by UEs 115c and 115d. Such multicast services may include mobile TV or streaming video, or may include other services for providing community information, such as weather emergencies or alerts, such as Amber alerts or gray alerts.
[0034] The network 100 may also support mission-critical communications through ultra-reliable and redundant links for mission-critical devices, such as UE 115e, which may be a drone. The redundant communication links with UE 115e may include links from macro BSs 105d and 105e, and links from small cell BS 105f. Other machine-type devices, such as UE 115f (e.g., a thermometer), UE 115g (e.g., a smart meter), and UE 115h (e.g., a wearable device) may communicate directly with a BS (such as small cell BS 105f and macro BS 105e) through the network 100, or in a multi-hop configuration by communicating with another user device to relay its information to the network, such as UE 115f transmitting temperature measurement information to smart meter UE 115g, which then reports to the network through small cell BS 105f. The network 100 may also provide additional network efficiency through dynamic, low-latency TDD / FDD communications, such as in vehicle-to-vehicle (V2V).
[0035] In some implementations, the network 100 communicates using an OFDM-based waveform. An OFDM-based system can divide the system BW into multiple (K) orthogonal subcarriers, which are also generally referred to as subcarriers, tones, bins, etc. Each subcarrier can be modulated with data. In some instances, the subcarrier spacing between adjacent subcarriers can be fixed, and the total number of subcarriers (K) can depend on the system BW. The system BW can also be divided into subbands. In other cases, the subcarrier spacing and / or the duration of the TTI can be scalable.
[0036] Figure 2 2 is a block diagram of an exemplary UE 200 according to an embodiment of the present disclosure. As discussed above, the UE 200 may be a Figure 11. As shown, UE 200 may include a processor 202, a memory 204, a communication module 208, a transceiver 210 including a modem subsystem 212 and a radio frequency (RF) unit 214, and one or more antennas 216. These elements may communicate with each other directly or indirectly, for example via one or more buses.
[0037] The processor 202 may include a central processing unit (CPU), a digital signal processor (DSP), an application specific integrated circuit (ASIC), a controller, a field programmable gate array (FPGA) device, another hardware device, a firmware device, or any combination configured to perform the operations described herein. The processor 202 may also be implemented as a combination of computing devices, for example, a combination of a DSP and a microprocessor, multiple microprocessors, one or more microprocessors in combination with a DSP core, or any other such configuration.
[0038] The memory 204 may include a cache memory (e.g., a cache memory of the processor 202), a random access memory (RAM), a magnetoresistive RAM (MRAM), a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), flash memory, a solid-state storage device, a hard disk drive, other forms of volatile and non-volatile memory, or a combination of different types of memory. In one embodiment, the memory 204 includes a non-transitory computer-readable medium. The memory 204 may store instructions 206. The instructions 206 may include instructions that, when executed by the processor 202, cause the processor 202 to perform the operations described in conjunction with the embodiments of the present disclosure with reference to the UE 115. The terms "instructions" and "code" should be interpreted broadly to include any type of (multiple) computer-readable statements. For example, the terms "instructions" and "code" may refer to one or more programs, routines, subroutines, functions, procedures, etc. "Instructions" and "code" may include a single computer-readable statement or multiple computer-readable statements.
[0039] The communication module 208 may be implemented via hardware, software, or a combination thereof. For example, the communication module 208 may be implemented as a processor, circuit, and / or instruction 206 stored in the memory 204 and executed by the processor 202 .
[0040] The communication module 208 may be configured to package upload (UL) data in a predetermined frame structure or receive download (DL) data. The predetermined frame structure is set to send and receive data through the network 100. The communication module 208 may be configured to send and receive data between the UE 200 and the BS according to the predetermined frame structure. The predetermined frame structure may be a time division duplex (TDD) or frequency division duplex (FDD) structure and include time slots for uploading and downloading data. In addition, a listen-before-talk (LBT) protocol may be implemented so that the communication module 208 monitors the physical channel before sending data.
[0041] As shown, the transceiver 210 may include a modem subsystem 212 and an RF unit 214. The transceiver 210 may be configured to communicate bidirectionally with other devices such as the BS 105 and / or another core network element. The modem subsystem 212 may be configured to modulate and / or encode data from the memory 204 and / or the communication module 208 according to a modulation and coding scheme (MCS) (e.g., a low-density parity check (LDPC) coding scheme, a turbo coding scheme, a convolutional coding scheme, a digital beamforming scheme, etc.) and in accordance with a predetermined frame structure. The RF unit 214 may be configured to process (e.g., perform analog-to-digital conversion or digital-to-analog conversion, etc.) modulated / encoded data from the modem subsystem 212 (on outbound transmissions) or from another source such as a UE or BS 105. The RF unit 214 may also be configured to perform analog beamforming in combination with digital beamforming. Although shown as being integrated together in the transceiver 210, the modem subsystem 212 and the RF unit 214 may be separate devices that are coupled together at the UE 200 to enable the UE 200 to communicate with other devices.
[0042] The RF unit 214 can provide modulated and / or processed data, such as a data packet (or more generally, a data message that can contain one or more data packets and other information) to the antenna 216 for transmission to one or more other devices. The antenna 216 can also receive data messages sent from other devices. The antenna 216 can provide received data messages for processing and / or demodulation at the transceiver 210. The antenna 216 can include multiple antennas of similar or different designs in order to maintain multiple transmission links. The RF unit 214 can configure the antenna 216.
[0043] Figure 3 3 is a block diagram of an example BS (gNB) 300 according to an embodiment of the present disclosure. As discussed above, the gNB 300 may be a Figure 1BS 105 is shown in FIG. As shown, gNB 300 may include a processor 302, a memory 304, a communication module 308, a transceiver 310 including a modem subsystem 312 and an RF unit 314, and one or more antennas 316. These elements may communicate with each other directly or indirectly, for example via one or more buses.
[0044] The processor 302 may have various characteristics as a particular type of processor. For example, these may include a CPU, a DSP, an ASIC, a controller, an FPGA device, another hardware device, a firmware device, or any combination configured to perform the operations described herein. The processor 302 may also be implemented as a combination of computing devices, for example, a combination of a DSP and a microprocessor, multiple microprocessors, one or more microprocessors in combination with a DSP core, or any other such configuration.
[0045] Memory 304 may include cache memory (e.g., cache memory of processor 302), RAM, MRAM, ROM, PROM, EPROM, EEPROM, flash memory, solid-state memory devices, one or more hard disk drives, memristor-based arrays, other forms of volatile and non-volatile memory, or a combination of different types of memory. In some embodiments, memory 304 may include non-transitory computer-readable media. Memory 304 may store instructions 306. Instructions 306 may include instructions that, when executed by processor 302, cause processor 302 to perform the operations described herein. Instructions 306 may also be referred to as code, which may be broadly interpreted as including the above-mentioned instructions. Figure 2 Any type of computer-readable statement(s) in question.
[0046] The communication module 308 may be implemented via hardware, software, or a combination thereof. For example, the communication module 308 may be implemented as a processor, circuit, and / or instruction 306 stored in the memory 304 and executed by the processor 302 .
[0047] The communication module 308 may be configured to prepare or receive data into a predetermined frame structure, or retrieve data according to a predetermined frame structure in order to send and receive data. The predetermined frame structure may be a time division duplex (TDD) or frequency division duplex (FDD) structure, and include time slots for uploading and downloading data. In addition, a listen before talk (LBT) protocol may be implemented so that the communication module 308 monitors the physical channel before sending data.
[0048] As shown, the transceiver 310 may include a modem subsystem 312 and an RF unit 314. The transceiver 310 may be configured to communicate bidirectionally with other devices such as the UE 200 (or any UE 115) and / or another core network element. The modem subsystem 312 may be configured to modulate and / or encode data according to an MCS (e.g., an LDPC coding scheme, a turbo coding scheme, a convolutional coding scheme, a digital beamforming scheme, etc.). The RF unit 314 may be configured to process (e.g., perform analog-to-digital conversion or digital-to-analog conversion, etc.) data from the modem subsystem 312 (on outbound transmissions) or from devices such as the UE 200 or inbound. Figure 1 105. The RF unit 314 may also be configured to perform analog beamforming in combination with digital beamforming. Although shown as being integrated together in the transceiver 310, the modem subsystem 312 and the RF unit 314 may be separate devices that are coupled together at the gNB 300 to enable the gNB 300 to communicate with other devices.
[0049] The RF unit 314 may provide modulated and / or processed data, such as data packets, or more generally, data messages that may contain one or more data packets and other information, to the antenna 316 for transmission to one or more other devices. For example, according to an embodiment of the present disclosure, this may include the transmission of information for completing attachment to a network and communication with a resident UE 115 (UE 200). The antenna 316 may also receive data messages sent from other devices and provide received data messages for processing and / or demodulation at the transceiver 310. The antenna 316 may include multiple antennas of similar or different designs in order to maintain multiple transmission links.
[0050] Reference again Figure 1In some embodiments, BS 105 may allocate or schedule transmission resources (e.g., in the form of time-frequency resource blocks (RBs)) for DL and UL transmissions in network 100. DL refers to the transmission direction from BS 105 to UE 115, and UL refers to the transmission direction from UE 115 to BS 105. Communication may be in the form of radio frames. A radio frame may be divided into a plurality of subframes or time slots, such as 10 time slots per frame. Each time slot may be further divided into micro time slots. In FDD mode, synchronized UL and DL transmissions may occur in different frequency bands. For example, each subframe includes a UL subframe in a UL frequency band and a DL subframe in a DL frequency band. In TDD mode, UL and DL transmissions occur in different time periods using the same frequency band. For example, a subset of time slots in a radio frame (e.g., DL time slots) may be used for DL transmission, and another subset of time slots in a radio frame (e.g., UL time slots) may be used for UL transmission.
[0051] After the connection is established, the UE 115 and the BS 105 may enter a normal operation phase, in which operational data may be exchanged. For example, the BS 105 may schedule the UE 115 for UL and / or DL communications. The BS 105 may send an UL and / or DL scheduling grant to the UE 115 via a physical DL control channel (PDCCH). The BS 105 may send a DL communication signal to the UE 115 via a physical DL shared channel (PDSCH) according to the DL scheduling grant. The UE 115 may send an UL communication signal to the BS 105 via a physical UL shared channel (PUSCH) and / or a physical UL control channel (PUCCH) according to the UL scheduling grant.
[0052] refer to Figure 2 and Figure 3 UE 200 and gNB 300 communicate with each other as follows Figure 1The network 100 shown communicates with each other. The communication module 208 of the UE 200 and the communication module 308 of the BS 300 exchange data with each other by exchanging MAC packets. The MAC packet includes a MAC header and a MAC payload. The MAC packet may also include control elements (CEs) that control various aspects of the communication and / or provide requests for actions to be performed by the recipient of the MAC-CE (e.g., UE 200). The current list of MAC-CEs is applicable to the 5G standard, for example, it can be found in Section 6.1.3 of the standard 3GPP 38.321. The present disclosure is directed to those MAC-CEs that will be sent from the BS 300 to the UE 200 and the actions directed by the MAC-CE performed by the UE 200. In general, when the BS 300 sends a MAC-CE to the UE 200, it is important that the BS 300 receives a notification of the receipt of the MAC-CE, which typically occurs in the ACK / NAK transmission from the UE 200 to the BS 300.
[0053] Embodiments of the present invention provide BS 300 with certainty of execution of an action in UE 200. A method of operating a user equipment (UE) device receives from a base station (gNB) instructions for executing an action (e.g., in a PDSCH MAC-CE communication from the base station). Even if an ACK based on an attempted transmission fails, the execution of the timing action is determined at the base station. The action is then executed according to the timing. According to some embodiments, the timing may be based on the successful transmission of an ACK, the reception of a transmission, or the reception of a retransmission request.
[0054] As described above, UE 200 may be Figure 1 Any UE 115 shown in FIG. 10A . Additionally, BS 300 may be Figure 1 Any of BS 105 shown in.
[0055] Figure 4A The diagram illustrates the intended communication 400 between a base station (gNB) 300 and a UE 200. In particular, Figure 4A FIG2 illustrates the operation of UE 200 after receiving a MAC-CE command from base station gNB 300. Figure 4A As shown, UE 200 receives a PDSCH with a MAC-CE command 402 at time t1. The PDSCH MAC-CE generally includes parameters for processing the MAC-CE in UE 200, including a delay time for providing an ACK / NAK signal and timing of execution of the command in the MAC-CE. In particular, gNB 300 provides a timing schedule for scheduling of an ACK on the PUCCH in a download control indicator (DCI) in the PDSCH MAC-CE command.
[0056] like Figure 4AAs shown, starting from time t1, UE 200 performs ACK delay 404. ACK delay 404 may indicate a time slot in which UE 200 may provide ACK in response to reception of a PDSCH MAC-CE, such as Figure 1 As shown in the time slot n at time t2. Figure 4A As further illustrated in , during the transmission of the PUCCH ACK / NAK, the UE 200 performs a listen-before-talk (LBT) procedure. If the PUCCH is available, the UE 200 transmits an ACK / NAK signal 408 at a time slot n identified as time t2.
[0057] As in Figure 4A As further illustrated in FIG. 1 , UE 200 then executes the received MAC-CE instruction at time t3, which Figure 4A 4 is shown as N time slots after the ACK is sent at time t2. Thus, the UE 200 performs an activation delay 410 from time t2 when the ACK / NAK 408 is sent, where the ACK / NAK 408 is a positive ACK. The activation delay 410 may also be determined by the PDSCH MAC-CE 402 as a specific number of time slots (N time slots) after the ACK is sent in the ACK / NAK 408. Thus, starting from time slot n+N, the MAC-CE command is activated in MAC-CE activation 412, and in time slot n+N, the PDSCH is listed in the UE 104. If a NAK signal is sent in the ACK / NAK 408, then the MAC-CE command is not activated.
[0058] Figure 4B The problem that occurs if the ACK sent in the nth time slot at time t2 fails to be sent is illustrated. This failure may occur due to a listen before talk (LBT) failure preventing the ACK from being sent in ACK / NAK failure 422, or there may be other reasons why the ACK / NAK transmission 424 fails to be sent. It should be noted that for ACK transmission in an M-slot aggregation, the LBT process may be completed once every p time slots, where 1≤p≤M, and therefore may not be re-performed for a period of time when an opportunity to send an ACK is missed.
[0059] In this case where the ACK / NAK transmission has failed in step 422, an ACK / NAK retransmission (reTX) request 426 may be received from gNB 300 at some time t4 later than time t2. reTX request 426 provides another ACK / NAK slot at time t5, which again may be n1 slots after receiving reTX request 426. As shown, UE 200 then performs an ACK delay 428 from time t4 slot t5. In addition, UE 200 provides another ACK / NAK transmission 430 generated by performing an ACK / NAK 432, which does not fail in this example.
[0060] Execution of the MAC-CE command may then occur. However, in the event of a failure to send an ACK at time t2, the time at which the MAC-CE command is activated by the UE 200 is uncertain. In many cases, it is important for the gNB 300 to know when the UE 200 activates the MAC-CE command received in the PDSCH MAC-CE command 402. Therefore, embodiments of the present invention provide clarity as to when the UE 200 executes the MAC-CE command 402.
[0061] Figure 5 A timing process 500 is illustrated that addresses uncertainty in the execution of MAC-CE commands sent by the gNB 300 in accordance with some embodiments. Figure 5 In the illustrated embodiment, UE 200 activates MAC-CE in MAC-CE activation 508 a set delay time N slots after activation delay 506 after receiving a PDSCH with MAC-CE instruction 402 communication from gNB 300, regardless of any ACK transmission or retransmission time. Thus, MAC-CE activation 508 occurs after the set activation delay 506 from receiving PDSCH MAC-CE communication 402. The value of the delay time N in activation delay 506 may be preset for such communication or may be sent in PDSCH MAC-CE communication 402.
[0062] As in Figure 5 As further illustrated in , after an ACK delay 404 of n time slots from receiving the PDSCH MAC-CE communication 402, an ACK / NAK communication 504 is attempted in the ACK 502 at time t2. Figure 5 In the illustrated example, the attempt fails resulting in no ACK / NAK communication 504 being sent. However, this does not affect the actual execution of the MAC-CE instruction in MAC-CE activation 508. The value of the delay time n in ACK delay 404 may be preset for such communication or may be sent in PDSCH MAC-CE communication 402.
[0063] exist Figure 5 In the embodiment illustrated in , time t3 may be set, for example, by the delay time N included in the PDSCH MAC-CE communication 402 received at time t1, regardless of whether the scheduled ACK transmission 504 at time t2 is successful. In another example, t3 may be set by a DLDCI carrying a grant for the PDSCH, or if there is no such DCI (e.g., because the PDSCH is RRC configured), then based on a "virtual DCI grant" defined as a fixed time offset before the PDSCH.
[0064] Figure 5 The embodiment illustrated in 504 represents a simple solution that is independent of the Ack LBT result in ACK 502 or any other factors that may cause UE 200 to fail to send ACK 504. Figure 5 In the embodiment illustrated in , if the ACK / NAK is scheduled / decodable at gNB 300 only N time slots later ending at time t3, gNB 300 may not know whether UE 200 actually received PDSCH MAC-CE order 402. This effect can be mitigated with a large N, so that ACK / NAK communication 504 typically arrives after the failure of ACK failure 502 (this is still not guaranteed due to LBT failure in later attempts). Therefore, Figure 5 The embodiment illustrated in the figure may be used for certain "non-critical" MAC-CEs, where any resulting misalignment in the precise activation time between the gNB 300 and the UE 200 may not lead to serious consequences. In addition, this approach may not adhere to the timing of the ACK signal consistent with the evolving Release 15 of the standard for 5G organized by the "3rd Generation Partnership Project" (3GPP).
[0065] Figure 6 Another embodiment of the timing process 600 is illustrated, where the activation of the MAC-CE occurs a set time, such as N time slots, after a successful ACK transmission, which also eliminates uncertainty about the activation. Figure 6 As illustrated in FIG. 6 , UE 200 receives a PDSCH with a MAC-CE command 402 from gNB 300 at time t1. After ACK delay 404, UE 200 attempts to send an ACK / NAK communication 600 in ACK 602 at time t2 (e.g., n time slots after receiving the command 402). Figure 6As illustrated in , UE 200 fails to send an ACK at a specified time t2 in ACK step 602. As described above, the LBT processing in ACK step 602 may have failed or some other failure may have occurred. After another delay 606, at a later time t3, gNB 300 submits a retransmission (ReTX) instruction 608. After another ACK delay 610, UE 200 may attempt ACK / NAK communication 614 in ACK step 612. In this example, ACK step 612 is successful and ACK / NAK communication 614 is successfully sent by UE 200 to gNB 300 at time t4. Again, ACK delay 610 may be n time slots after receiving ReTX 608, where n is a setting predetermined in ReTX 608. Successful transmission of ACK / NAK communication delay 614 results in MAC-CE activation 618 after activation delay 616. Therefore, at time t5 (which may be N time slots after the successful ACK transmission in communication 614 ) UE 200 activates MAC-CE according to MAC-CE instruction 402 .
[0066] In some embodiments, if an unsuccessful ACK / NAK communication 604 is discarded due to LBT failure, it is not counted as a successful ACK communication. For M-slot aggregate ACK, if the number or percentage of discarded ACK slots is greater than a certain threshold, it can be counted as a discard. The threshold can be set between the extremes of if any slot is discarded to if all slots are discarded. The setting of the threshold can be an operational parameter for the UE 200 to determine the ACK communication failure in the ACK step 602.
[0067] For multi-slot ACK (PUCCH or PUSCH slot aggregation), the value of n in ACK Delay 404 or ACK Delay 610 refers to the last slot in the aggregation used for ACK. It should be noted that the aggregated slots used for ACK do not have to be consecutive - only the slot positions need to be known in advance. If this threshold rule passes, the activation time t5 can still be based on N slots after the last scheduled slot for Ack, regardless of which slots are dropped (because the gNB 300 may not know which slots are dropped).
[0068] Figure 7 An embodiment is illustrated in which UE 200 apparently successfully provides ACK communication at time t2, but receives ReTX instruction 708 at time t3 before MAC-CE activation in MAC-CE activation 710. In these cases, UE 200 may have already started activating MAC-CE and cannot stop the activation. Embodiments of the present invention may have several options for solving this problem, such as Figure 7The timing sequence 700 illustrated in FIG.
[0069] like Figure 7 , UE 200 receives PDSCH MAC-CE 402 at time t1. Reception of PDSCH MAC-CE 402 initiates ACK delay 404. As discussed above, ACK delay 404 initiates a slot delay of n, where for multi-slot ACK processing (e.g., PUCCH or PUSCH slot aggregation), n represents the last slot used to send ACK / NAK communication 704. In ACK step 702, UE 200 successfully sends ACK communication 704. After successfully sending ACK communication 704, UE 200 performs activation delay 706 before activating MAC-CE 710 in MAC-CE activation at time t4. Figure 7 In the illustrated example, the ReTX instruction 708 is received at time t3 prior to time t4.
[0070] exist Figure 7 In the embodiment shown in , the activation of the MAC-CE in MAC-CE activation 710 is based on the first apparently successful ACK communication 704 ("first transmission") in the ACK step 702, regardless of whether the reTx instruction 708 is triggered. Figure 7 , the apparently successful transmission of the ACK communication 704 occurs at time t2, however, the ReTX instruction 708 is received at an earlier time t3. However, the activation of the MAC-CE ends at time t4 in MAC-CE activation 710 regardless of the receipt of the ReTX instruction 708. In some embodiments, the UE 200 may respond to the ReTX instruction 708 by providing another ACK, but this does not affect the timing of the activation of the MAC-CE instruction in MAC-CE activation 710. In this way, the UE 200 does not change its activation plan once the plan is started.
[0071] When there is no LBT failure and / or the threshold conditions discussed above are met, an apparently successful ACK transmission may occur in ACK / NAK communication 704. As previously noted, what constitutes a "first transmission" for this purpose may depend on what portion (if any) of the transmission opportunities were discarded due to LBT failures.
[0072] Since the ReTX instruction 708 is to help the gNB 300 to read the ACK / NAK communication 704, Figure 7In embodiments of the timing process 700, the gNB 300 may not be able to obtain confirmation of the actual MAC-CE activation. Again, as discussed above, the large N used in the activation delay 706 can alleviate this problem, but will not completely eliminate it. From the perspective of the UE 200, this approach is simpler because the UE 200 does not have to change its activation plan based on the Ack retransmission. However, in some more critical MAC-CE instructions, a more complex approach may be required.
[0073] Figure 8 Another embodiment with a timing diagram 800 is illustrated, where the timing of MAC-CE activation in UE 200 is reset upon arrival of a new ReTX, provided that the ReTX arrives within certain timing criteria. Thus, activation of the MAC-CE is based on the mth Ack (re)send ReTX instruction, e.g., the most recent one.
[0074] like Figure 8 As illustrated in FIG. 4 , a PDSCH MAC-CE communication 402 is received in UE 200 at time t1. After ack delay 404, UE 200 sends an ACK / NAK communication 804 in ACK 802 at time t2. UE 200 will then activate MAC-CE in MAC-CE activation 810 after activation delay 806. However, as Figure 8 , ReTX communication 808 is received during activation delay 806. As discussed below, ReTX communication 808 is either ignored or causes a reset of the timing sequence, depending on when ReTX 808 is received. If ReTX 808 is ignored, then UE 200 activates the MAC-CE instructions in MAC-CE activation 810, which is executed at time t5. If the timing is reset, then a new ACK delay 812 is performed, and at time t6, an ACK / NAK communication 816 is sent by ACK 814. In addition, after activation delay 818, UE 200 activates MAC-CE in MAC-CE activation 820 at time t7.
[0075] The first timing setting leading to the MAC-CE activation in MAC-CE activation 810 at time t6 is based on the ACK / NAK communication 804 at time t2 from the initial reception of the PDSCH with the MAC-CE command 402 at time t1. However, it is still a problem that the reTX request 808 may arrive when it is too late for the UE 200 to change its planned MAC-CE activation in MAC-CE activation 810. The UE 200 does not know in advance whether reTx will be requested. If it is requested, it should be treated as a non-contiguous slot aggregation (i.e., part of the previous Ack), rather than a separate Ack reTx.
[0076] Thus, as illustrated in example timing sequence 800, a deadline 822 may be set for ReTX request 808 to arrive at time t4, beyond which request 808 will not change the current MAC-CE activation timing resulting in activation at MAC-CE activation 810. Figure 8 As further illustrated in , if the ReTX request arriving at time t3 is earlier than the deadline 822 at time t4, then the previously scheduled activation at time t5 is moved to time t7 and has an ACK response at time t6. However, if the reTX arrives too late (i.e., t3>t4), then MAC-CE activation 810 is performed at time t5.
[0077] In some embodiments, if based only on a previously arrived ReTX request (or original reception of a PDSCH with a MAC-CE order), the deadline may be defined as X slots before the UE 104 would have been activated. In this case, X>0.
[0078] In some embodiments, the deadline may be defined as Y slots after the most recent Ack(re)Tx request. In that case, Y>0. The timing of the initial Ack Tx request may be based on the timing of the scheduling DL DCI or the PDSCH carrying the MAC-CE.
[0079] In some embodiments, the deadline may be defined as Z time slots after the most recent ACK transmission is completed. Figure 8 In the illustrated example, this is ACK / NAK 804 or ACK / NAK 816. In the case of a multi-slot Ack, it is possible that Z < 0 here, although this may be explicitly excluded in some embodiments, for example, using the rule that an AckreTx request must arrive only after the previous Ack has finished sending. Figure 8 As further illustrated in , Y represents the time between receiving the PDSCH MAC-CE communication 402 and a deadline (deadline 822 or deadline 824 if redefined), and X represents the time between the deadline (deadline 822 or deadline 824 if redefined) and activation of the MAC-CE (in MAC-CE activation 810 or MAC-CE activation 820).
[0080] Combinations of the above deadline definitions may also be used. It should be noted that the above deadlines and other timings expressed in slots are only illustrative examples. Other timing granularities (e.g., OFDM symbols, frames, etc.) or absolute time units (milliseconds, etc.) may be used both for "slots" (X, Y, Z) and for defining events related to defining a slot (e.g., using the exact OFDM symbol that an Ack TX ends, or only using the slot that it ends in, regardless of which symbol in the slot it ends in).
[0081] It should also be noted that a ReTX request may be allowed even if the above deadline rules are not met. In this case, the UE 300 will retransmit the Ack, but will not activate the MAC-CE based on the retransmitted Ack. There may be a separate deadline for fulfilling the ACKreTx request, for example, related to the deadline for keeping undecoded packets in a hybrid automatic repeat request (HARQ) buffer.
[0082] In About Figure 8 In another question of the example timing sequence 800 shown in , in the case of a multi-slot ACK, does the reTX request 808 actually advance rather than further delay the activation of the MAC-CE in the UE 200. The activation time is based on the end of the Ack transmission in the communication 804 (i.e., the last slot of the ACK transmission). In the middle of a multi-slot Ack over M slots, the UE 200 may receive a reTx request 808 for another multi-slot Ack over N<M slots, which may end earlier than the original ACK transmission 804. Even in the case where the block ACK is single-slot, the "k1 value" or gap between the PDSCH and ACK (or between the DCI and ACK if there is no associated PDSCH) may be smaller for the later arriving ACK reTX request, causing the later requested ACK reTX to end earlier than the previously requested ACK reTX. Therefore, switching to the activation time based solely on this reTX request will advance the MAC-CE activation (i.e., in Figure 8 In one solution to this problem, the UE 200 may simply follow the timing commanded by the new reTX request 808 as long as it meets the deadline requirements discussed above.
[0083] However, another solution is for the UE 104 to use the timing from the latest ReTX request that meets the deadline requirement but does not advance the MAC-CE activation timing. In this case, using the "Y time slots after the latest (re)tx request" definition of deadline, the UE 104 will only consider the latest ReTX request that delayed the MAC-CE activation (i.e., t7>t5 in all cases).
[0084] A separate solution to the timing problem is to completely rule out the scenario by implementing a rule that the UE 104 does not expect and may ignore or treat as a failed CRC pass for PDCCH decoding an Ack ReTX request arrives when a previous Ack ReTX request has not yet completed.
[0085] If multiple reTX requests are received "simultaneously" (e.g., same time slot) with different corresponding Ack end times, the UE 200 may follow the later ending Ack, or other "tie" criteria (e.g., earlier OFDM symbol within the time slot, or lower PRB index, etc.) may be implemented. Alternatively, this case may be excluded entirely - the UE 200 does not expect it, so it is undefined behavior, or the UE 200 is specified to ignore all requests.
[0086] exist Figure 8 Another problem with the example timing sequence 800 illustrated in is that the UE 200 may miss the ACKreTX request 808 from the gNB 300 even though it was sent before the deadline 822 as described above. In this case, the UE 200 activates the MAC-CE in the MAC CE activation 810, while the gNB 300 believes that it has deferred this activation using the reTx request 808. As a solution to this problem, in some embodiments, the gNB 300 may discover this missed request. For example, the gNB 300 may request an ACK / NAK for the DCI or MAC-CE via a DCI or MAC-CE, which would reveal the missed request. For DCI-based requests, the DAI mechanism may be used to discover the missed DCI. The gNB 300 may send the reTx request sufficiently in advance so that it can discover this before the UE 200 activates the MAC-CE, provided that sufficient time is provided.
[0087] The methods described herein apply to any situation where the UE 200 may not send some scheduled Acks. LBT failure is an example of such a failure. Other examples may include preemption by more urgent (UL or DL) traffic, or skipping of Ack transmission due to insufficient UL OFDM symbols in the scheduled timeslot. It should be noted that different behaviors may apply depending on whether the gNB 300 is aware of (e.g., caused by) the preemption. For example, the thresholds described above for determining a successful ACK may be different based on this. The gNB 300 may not be aware of the preemption if the UE 200 has to transmit to different TRPs, sidelink UEs, etc. on different SIMs (in a dual SIM UE).
[0088] AckreTx request can be configured even in licensed operation, not just in unlicensed NR-U. The same idea as described above applies. If the gNB 300 has an ACK->NAK error and schedules a HARQ retransmission accordingly, the Ack for that HARQ retransmission can be interpreted by the UE 200 as an Ack retransmission and processed using the rules described herein.
[0089] In the above discussion, an example is given in which the first Ack transmission is triggered by the DCI that schedules the PDSCH being ACKed, and the subsequent ACKreTx communication is triggered by the subsequent DCI. However, the scheduling DCI may not trigger any ACK. The subsequent DCI may trigger the first ACKTx. The same concept applies; the timeline is based on the later DCI that is considered to be the DCI triggered by the first Ack. Then, the timeline may not be based on the reception of the PDSCH, because the later DCI may not even be associated with any PDSCH. It can also be noted that the same or different rules, or the same or different parameter values (such as thresholds) related to a specific rule can be applied to different types of MAC-CE. In addition, although the above operations are described based on the MAC-CE and ACK / NACK reTX requests sent by the base station 300 to the UE 200, similar behavior may apply even if these are sent by the side link UE to the UE 200.
[0090] In some embodiments, after receiving a packet with a HARQ-ID, the UE 200 does not expect another transmission on the same HARQ-ID until it has finished sending the ACK / NAK. Using multi-slot ACK, the gNB 300 can decode the ACK / NAK in advance, so it may not need to wait to receive the entire ACK at the gNB 300 before sending the second transmission. In extreme cases, the gNB 300 can preemptively guess the status of the ACK / NAK transmission from the UE 200 before the UE 200 has even started transmitting. The NDI field of the second transmission on the same HARQ-ID indicates whether it is a retransmission or a new packet. If the UE 200 expects a retransmission but receives a new packet, then it either (a) ignores the previous packet or (b) ignores the NDI field and handles it as a retransmission. If the UE 200 expects a new packet but receives a retransmission, then the UE 200 can ignore the retransmission because it has already decoded the packet. The ACK / NAK transmission based on the PDSCH can continue or be aborted. This may depend on whether the ACK / NAK transmission has already started.
[0091] As some skilled in the art will now appreciate, and depending on the specific application at hand, many modifications, substitutions and changes may be made in and to the materials, devices, configurations and methods of use of the apparatus of the present disclosure without departing from the spirit and scope of the present disclosure. In view of this, the scope of the present disclosure should not be limited to the scope of the specific embodiments illustrated and described herein, as they are merely examples thereof, but should correspond fully to the scope of the appended claims and their functional equivalents.
Claims
1. A method of operating a user equipment (UE) device, comprising: receiving a transmission from a base station, the transmission comprising an instruction for performing an action; Attempting an ACK based on the sending; timing the execution of the action depending on whether the ACK is successfully sent; as well as Execute the action according to the timing, Wherein a portion of a scheduled ACK transmission duration is omitted, the portion ranging from no ACK transmission to all ACK transmission, and the timing of the action is adjusted based on this ACK transmission depending on the omitted portion falling below a threshold.
2. The method of claim 1, wherein: The timing of performance of the action is based on attempting or actually sending the ACK, receipt of the transmission from the base station, or receipt of a retransmission request.
3. The method of claim 1, wherein: The action is the activation of a MAC-CE instruction.
4. The method of claim 1, wherein: Timing the action includes basing the timing on a previous ACK transmission or ACK retransmission.
5. The method of claim 1, wherein: An attempted ACK results in an ACK being sent, and the timing of the action is based on the time of the first ACK being sent.
6. The method of claim 1, wherein: The timing of the action is based on the most recent receipt of a resend request.
7. The method of claim 1, wherein: Timing the action is based on the most recent receipt of a retransmission request that complies with a timing deadline that is based on a previous timing.
8. The method of claim 7, wherein: The time limit is defined by one of: a setup time to completion of the action, a setup time from completion of an ACK request, and a setup time from receiving a send request or receiving a last resend request.
9. The method of claim 1, wherein: The omitted portions are due to one or more of LBT failure, preemption, or insufficient uplink OFDM symbols for transmission.
10. The method of claim 1, wherein: The threshold depends on whether the base station is aware of the omission.
11. The method of claim 1, wherein: The omitted portion represents a fixed number of time slots or OFDM symbols, or a fraction or percentage of the scheduled number of time slots or OFDM symbols.
12. The method of claim 1, further comprising: Receive an ACK ReTX request, which is expected only after a previous ACK transmission is completed.
13. The method of claim 1, wherein: An ACK ReTX request is not expected after a deadline related to a deadline for storing undecoded packets in the HARQ buffer.
14. A method of operating a user equipment (UE) device, comprising: receiving a transmission from a base station, the transmission comprising an instruction for performing an action; Attempting an ACK based on the sending; timing the performance of the action depending on whether the ACK was successfully sent, wherein the timing of the action is based on a recent receipt of a retransmission request that complied with a timing deadline, the timing deadline being based on a previous timing; Execute the action according to the timing; and The method further includes receiving an ACK ReTX request, and wherein the ACK ReTX request delays performing the action.
15. A method of operating a user equipment (UE) device, comprising: receiving a transmission from a base station, the transmission comprising an instruction for performing an action; Attempting an ACK based on the sending; timing the performance of the action depending on whether the ACK was successfully sent, wherein the timing of the action is based on a recent receipt of a retransmission request that complied with a timing deadline, the timing deadline being based on a previous timing; Execute the action according to the timing; and The method further includes receiving an ACK ReTX request, and wherein performing the actions is delayed or advanced.
16. A user equipment, comprising: Transceiver; A communication module is coupled to the transceiver to receive and send communications to a base station, the communication module executes instructions to receiving a transmission from a base station, the transmission comprising an instruction for performing an action; Attempting an ACK based on the sending; timing the execution of the action depending on whether the ACK is successfully sent; as well as Execute the action according to the timing, Wherein a portion of a scheduled ACK transmission duration is omitted, the portion ranging from no ACK transmission to all ACK transmission, and the timing of the action is adjusted based on this ACK transmission depending on the omitted portion falling below a threshold.
17. The user equipment according to claim 16, wherein: The performance of the actions is timed based on attempting or actually sending the ACK, receipt of the transmission from the base station, or receipt of a retransmission request.
18. The user equipment according to claim 16, wherein: The action is the activation of the MAC-CE command.
19. The user equipment according to claim 16, wherein: Timing the action is based on the most recent receipt of a retransmission request that complies with a timing deadline that is based on a previous timing.
20. The user equipment according to claim 19, wherein: The time limit is defined by one of: a setup time to completion of the action, a setup time from completion of an ACK request, and a setup time from receiving a send request or receiving a last resend request.
21. A user equipment device, comprising: means for receiving a transmission from a base station, the transmission comprising an instruction for performing an action; means for attempting an ACK based on said sending; means for timing performance of said action depending on whether said ACK is successfully sent; as well as means for executing said action according to said timing, Wherein a portion of a scheduled ACK transmission duration is omitted, the portion ranging from no ACK transmission to all ACK transmission, and the timing of the action is adjusted based on this ACK transmission depending on the omitted portion falling below a threshold.
Citation Information
Patent Citations
ACK retransmission processing and mac-ce activation
US20210050959A1
Device and Method of Handling Hybrid Automatic Repeat Request Transmission
CN107040344A
Bandwidth part activation, deactivation, and switching in wireless communications
US20190103954A1
Signaling, procedures, user equipment and base stations for uplink ultra reliable low latency communications
WO2018128970A1
User equipment in wireless communication system
WO2019143900A1
