Cooler, air separation system and related methods

By using absorption cooling systems and direct contact coolers in the gasification facility, and using waste heat and low-pressure steam to drive multi-stage cooling, the problems of CO2 and impurity emissions and pre-purification units in the gasification facility are solved, and the complexity of CO2 and impurity emissions and pre-purification units are achieved. Efficient, low-cost air purification and environmental friendliness.

CN114322452BActive Publication Date: 2024-11-19AIR PROD & CHEM INC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111149247.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2020-09-29
Filing Date
2021-09-29
Publication Date
2024-11-19
Estimated Expiration
2041-09-29

AI Technical Summary

Technical Problem

There are high temperature and high pressure operation in the gasification facilities that lead to CO2 and other impurities emissions, affecting the efficiency and environmental friendliness of the air separation system. The existing pre-purification units are of high size and complexity, making it difficult to cope with impurity spikes and insufficient regenerated gases.

Method used

Adoption cooling system, using low-level waste heat and low-pressure steam to drive the absorption cooler, optimize feed air temperature and impurity removal through multi-stage cooling and automatic control circuits, reduce adsorber size and improve efficiency, combined with direct contact cooler and cooling tower improve cooling effect.

Benefits of technology

It realizes low-cost, low-ground occupation and high-efficiency air purification, reduces power consumption and environmental impact, adapts to temperature and concentration changes in gasification systems, and reduces the impact of impurity spikes on the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114322452B_ABST
    Figure CN114322452B_ABST
Patent Text Reader

Abstract

A chiller may be configured as a chiller for a gasification system or other type of system or equipment. In some embodiments, the chiller may be configured to utilize a single heat source, such as low-grade waste heat in the form of hot water, and / or low-pressure steam, to drive one or more absorption chillers to cool the intake air entering one or more adsorbers of a pre-purification unit (PPU). If an undesirable impurity spike (e.g., a carbon dioxide spike, etc.) is detected, an additional amount of heat source may be withdrawn from the gasification system to increase the cooling level that the absorption chiller may provide to increase impurity removal capabilities. In some embodiments, an automatic control loop may be utilized. The control loop may be configured to check the impurity concentration and adjust operation accordingly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present innovation relates to chillers, absorption chillers, air separation equipment, air separation systems, systems utilizing chillers and / or absorption chillers, and methods of making and using the same. Background Art

[0002] Gasification is a process that converts carbonaceous feedstocks such as coal, petroleum, biofuels, biomass, etc. into combustible gases such as synthesis gas. Examples of gasification processes can be understood from U.S. Patent No. 8,980,204 and U.S. Patent Application Publication No. 2014 / 0077133.

[0003] Synthesis gas, commonly referred to as syngas, is a mixture of varying amounts of carbon monoxide (CO) and hydrogen (H2) and has a variety of applications. Synthesis gas can be used to generate electricity by burning directly in a gas turbine, boiler or reciprocating engine, by feeding a fuel cell, and / or the waste heat can be used to generate steam, which can provide additional electricity via a steam turbine. Synthesis gas can also be used to produce hydrogen or liquid fuels or chemicals, gaseous fuels, synthetic natural gas and / or carbon monoxide, some of which can be used as raw materials in the manufacture of other chemicals such as ammonia, plastics, etc.

[0004] Depending on the feedstock used, the synthesis gas produced may include CO, H2, steam (H2O), hydrocyanic acid (HCN), carbon dioxide (CO2), nitrogen (N2), oxygen (O2), methane (CH4), hydrogen sulfide (H2S), carbon oxysulfide (COS), ammonia (NH3), hydrochloric acid (HCl), argon (Ar), mercury (Hg), hydrocarbons, heavy hydrocarbons such as tar, particles containing carbonized, ash and / or unchanged fuels.

[0005] Synthesis gas can be produced at high temperature and can first be cooled using dry quenching and wet quenching with water. This step can also reduce the particle content in the synthesis gas. Synthesis gas is cooled, and waste heat streams (e.g., flue gas streams generated via combustion, etc.) of hot water, steam, or fluid are generally produced. The cooled synthesis gas can therefore generally be cooled in multiple steps, including acid gas (CO2, SO2) removal, mercury guard bed, COS / H2S removal, HCl, ammonia removal and other steps. Then the product synthesis gas is generally sent for downstream processing or for power generation. A variety of heat streams may be present in the gasification zone, such as turbine waste heat, hot water, steam under various pressures (e.g., low pressure (LP) steam under 5-12 bar, which is 500kPa to 1,200kPa; medium pressure (MP) steam under 10-20 bar, which is 1,000kPa to 2,000kPa; and high pressure (HP) steam under 15-50 bar, which is 1,500kPa to 5,000kPa).

[0006] Chillers have been used in conjunction with gasification systems. Examples of chillers can be seen in U.S. Pat. No. 4,907,405, U.S. Patent Application Publication No. 2010 / 0275648, International Application Publication No. WO 2004 / 065869, and Chinese Utility Model No. CN 210346385 U. Such chillers can have large power requirements and are generally not environmentally friendly or sustainable. Summary of the invention

[0007] Gasification can be a high temperature, high pressure process that can produce small amounts of CO2 and other gases that can be vented to the atmosphere outside the facility. In some cases, acid gases such as CO2 and SO2 may be vented or sent to storage, sold as a byproduct, or converted to acid and sold as a byproduct. However, during maintenance, improper operation, purge, off-design operation, etc., small amounts of CO2, NO2, hydrocarbons, and other impurities can be emitted to the atmosphere for short periods of time. We have determined that a solution is needed to address the problems created by such emissions.

[0008] For example, we have determined that the location of an air separation unit (ASU) for a gasification plant can be selected to be sufficiently far away from the vent duct or upstream of the typical wind direction. However, when the wind speed or wind direction changes, we have determined that the vent duct exhaust may affect the diffusion of CO2 in the air surrounding the ASU feed inlet, which may affect the CO2 concentration in the feed air introduced into the ASU. Due to the increased CO2 concentration, the feed air supplied to the ASU may have a significantly higher CO2 concentration and / or hydrocarbon load. We have determined that these impurities can be effectively removed from the feed air before being sent to one or more coolers (e.g., cold boxes) while still producing a desired amount of O2 product from the ASU.

[0009] Sometimes, the amount of CO2 in the feed air can range from 400 ppm (normal) to about 800 ppm, or to about 1500 ppm, or to about 2000 ppm, or greater than 2000 ppm for a short period of time. In rare cases, the time period can vary from less than an hour to several days. We have also determined that there may be other types of impurity concentration spikes besides CO2 spikes that may adversely affect operations (e.g., CO content in the feed air above a preselected threshold, hydrocarbon content in the feed air, a combination of CO2 content and CO content in the feed air, a combination of CO2 content, CO content and hydrocarbon content in the feed air above a preselected threshold, etc.). We have determined that the ASU can be better designed to effectively handle these impurity "spikes" for the gasification system.

[0010] We believe that one solution to this problem could be to adjust the height of the duct or to orient the duct in the opposite direction to the ASU. However, such solutions are only effective for short spikes. In addition, practical issues such as wind direction can lead to contamination of the incoming air to the ASU.

[0011] Most gasification facilities tend to be large and may have high oxygen demands. Such facilities may require large pre-purification units (PPUs). Sometimes, multiple trains of PPUs may be required. Multiple trains and vessels may increase capital costs, operating costs, and the footprint, layout, and complexity of the equipment. At high capacities, the temperature swing adsorbers of the PPUs that can be utilized must also be significantly larger. As they get larger, capital costs, manufacturing complexity, freight costs, and restrictions also increase. Another challenge we identified for improving gasification facilities is allowing the temperature swing adsorption (TSA) vessels of the PPU to be smaller, while also taking into account the increased impurity levels that may occur in the ASU feed.

[0012] A third challenge we identified in some gasification facilities is that regeneration gas (also referred to as "regeneration gas") that can be passed through the adsorber to regenerate the adsorbent material (e.g., typically waste N2) in the adsorber may not be readily available. For example, we determined that waste N2 is typically in equilibrium between the feed air and the product O2 and product N2. When most of the N2 is produced as a product, or is used to produce a product such as in ammonia production, for example, the waste N2 available for use as regeneration gas may not be sufficient. The amount of regeneration gas required may be severely affected by the amount of water that needs to be removed from the adsorbent material in one or more adsorbers of the ASU. For example, the water content in the feed air may increase with increasing atmospheric temperature. The amount of available waste N2 may be insufficient to regenerate the PPU under hot ambient conditions.

[0013] We believe there is an improved gasification system that can solve at least one of the problems we have identified. Most preferably, embodiments are designed to provide a solution that addresses all three challenges with low capital cost, low operating cost, high efficiency, flexibility with atmospheric temperature and concentration changes, low footprint, and ease of operation, and desirably, solves the problems we believe exist in conventional systems. Embodiments may also preferably provide a sustainable and environmentally friendly solution.

[0014] Embodiments of our chillers, absorption cooling systems, apparatus, and air separation units may be configured to address one or more of the problems we have identified in gasification facilities using a heat source, such as low-grade waste heat in the form of hot water and / or low-pressure steam, which may be used in the gasification zone of the apparatus to help drive one or more absorption chillers to cool the incoming air entering the adsorbers of the PPU, which may allow one or more adsorbers to be sized smaller and reduce the need for regeneration gas because less absorbent may need to be desorbed. If there is a spike in CO2 or other types of impurity concentration spikes (e.g., NO x Peaks, CO peaks, light hydrocarbon peaks (e.g., methane (CH4) peaks), etc.), additional heat sources can be removed from the gasification system to increase the cooling stage of the absorption chiller system (and / or one or more chillers) to increase the impurity removal capacity, thereby addressing impurity spikes that may occur during equipment operation.

[0015] In some embodiments, an automatic control loop may be included that can be configured to check the CO2 in the feed and adjust the feed temperature accordingly. If some embodiments desire higher heat transfer efficiency, multiple cooling steps (multiple effect coolers vs. single effect coolers) may be used. This is particularly helpful when the cooling effect required is relatively high, such as over 10°C.

[0016] We determined that at colder temperatures, the adsorbers of the PPU can be sized smaller due to lower water content and increased adsorption capacity for other impurities. For example, we determined that for some embodiments, a water load reduction of approximately 10% can be obtained for every 1°C drop in feed temperature. Adsorption isotherms can also be improved at lower temperatures. This can allow heavy hydrocarbons to be separated from water before air is supplied to the PPU so that other impurities can be efficiently removed in the adsorbers of the PPU. This can allow one or more of the adsorbers of the PPU to be smaller, more efficient, occupy less space, and be simpler in design (e.g., using fewer layers of adsorbent material).

[0017] If there is a CO2 spike or other type of undesirable impurity concentration spike in the feed composition, embodiments of the system may be designed to increase the heat source sent to the absorption chiller as one or more streams of heated fluids (e.g., steam, flue gas, etc.) to allow the heat from the stream to drive the absorption chiller to operate to cool the feed gas (directly via the evaporator of the absorption chiller or indirectly by cooling the cooling medium of the direct contact chiller or the cooling medium supplied to different types of heat exchangers). In some embodiments, the chiller and absorption cooling system may be used to provide improvements until the feed temperature approaches freezing temperatures (e.g., at about 5°C). The cooling system may also be used to address other types of undesirable content concentration spikes (e.g., spikes of impurities other than CO2 or impurities instead of CO2) or other types of fluid property spikes (e.g., undesirable spikes in temperature, etc.). In some embodiments, the absorption chiller system and / or chiller may be designed for the coldest possible feed temperature and the highest heat source flow rate. This configuration generally allows for increased operational flexibility at minimal cost.

[0018] The degree of cooling that can be provided can also be adjusted according to the feed temperature. For example, in the summer, a greater amount of cooling can be used, while in the winter, a lesser amount of cooling may be used.

[0019] The cold feed temperature of the PPU not only allows the adsorber of the PPU to be smaller, but also reduces the machine power of the ASU. The presence of a pump and a heat exchanger of one or more absorption chillers, instead of a compressor (rotating equipment) of one or more mechanical chillers, can improve the reliability and availability of the absorption chiller.

[0020] We have determined that unexpected benefits can be obtained by using embodiments of our chillers, chiller absorption systems, absorption cooling systems, and methods of making and using the same, because these embodiments can be configured to solve multiple problems by balancing the heat sources available in the gasification equipment and converting them into cold air to provide improved efficiency, while also solving feed impurity problems that may arise during operation. In addition, embodiments can be configured so that the adsorber of the PPU can be designed as a single layer (e.g., only molecular sieves), which in some embodiments can completely eliminate the need for an alumina adsorption layer because water can be removed from upstream of the PPU via at least one separatory cylinder or other water removal mechanism, which can be located downstream of at least one absorption chiller and / or absorption cooling system. Hydrocarbons or other impurities can also be removed from upstream of the PPU (e.g., also via a separatory cylinder). We have determined that these can be provided in some embodiments because water and hydrocarbons can be significantly removed by partial condensation upstream of the PPU and downstream of one or more absorption chillers or absorption cooling systems.

[0021] Since the power source is free, embodiments of our chillers, absorption chillers, and absorption cooling systems and apparatus can have extremely low electricity costs, thus significantly reducing operating costs and improving sustainability. For example, embodiments can be configured to use water as a coolant and thus can be more environmentally friendly than mechanical chillers that use chlorofluorocarbons (CFCs) as a coolant.

[0022] Some embodiments of our cooling system may be configured as an absorption cooling system for an air separation unit (ASU) of a plant. The absorption cooling system may include at least one absorption chiller positioned to receive at least one process stream from a gasification zone of the plant, so that heat from at least one process steam is supplied to at least one generator of the at least one absorption chiller. The at least one absorption chiller may be positioned to perform the following steps: (i) cooling air at a first pressure from a compression system of the ASU for supplying the cooled air to a pre-purification unit (PPU) for purifying air to form a purified air stream, thereby supplying the purified air stream to a cold box of the ASU, (ii) cooling the purified air stream before supplying the purified air stream from the PPU to the cold box, and / or (iii) cooling air at a second pressure from a compression system of the ASU for supplying the cooled air at the second pressure to a compression system for further compressing it to a first pressure (the first pressure being higher than the second pressure).

[0023] It should be understood that the absorption cooling system can be arranged and configured such that at least one absorption chiller can be positioned to perform only one of options (i)-(iii), only two of options (i)-(iii) (e.g., options (i) and (ii), options (ii) and (iii), or options (i) and (iii), etc.), or all three (i)-(iii). At least one absorption chiller can also be positioned to provide additional cooling of other equipment process streams in some embodiments.

[0024] In some embodiments, at least one evaporator of at least one absorption chiller may cool air at a first pressure originating from a compression system of the ASU for supplying the cooled air to the PPU, cooling a purified air stream from the PPU before supplying the purified air stream to a cold box, and / or cooling air at a second pressure from the compression system.

[0025] Some embodiments of the absorption cooling system may also include a direct contact cooler. The direct contact cooler may be integrated into the aftercooler, or in an embodiment utilizing an aftercooler, may be separated from the aftercooler and located downstream thereof. The direct contact cooler may be positioned to receive air at a first pressure from the compression system of the ASU for cooling the air via a cooling medium and supplying the cooled air to the PPU. The direct contact cooler may be connected to at least one absorption cooler to receive a cooling medium from the absorption cooler for cooling the air at a first pressure. In some embodiments, the cooling medium may be water or ethylene glycol. In some embodiments, the PPU may include at least one radial adsorber or at least two radial adsorbers. In some embodiments, the direct contact cooler cooling medium may include water, and the absorption cooling system may further include a cooling tower disposed between a cold box and at least one absorption cooler to cool the cooling medium before supplying the cooling medium to at least one absorption cooler. The cooling tower may be positioned to receive a cooling liquid flow from the cold box to cool the cooling medium before supplying the cooling medium to at least one absorption cooler.

[0026] The absorption cooling system can be configured to detect the impurity concentration of the air. The impurity concentration can be, for example, the concentration of CO2, the concentration of CO, the concentration of NO x The concentration of one or more light hydrocarbons (e.g., CH4, etc.) or a combination of these impurities at different concentration thresholds. Embodiments of the system may also be configured such that at least one absorption chiller includes a primary absorption chiller and a secondary absorption chiller. In such embodiments, the system may be arranged and configured such that one of the following:

[0027] (i) the absorption cooling system is configured such that in response to the impurity concentration reaching or exceeding a preselected threshold, a first portion of the air at a first pressure from the compression system is supplied to a primary absorption chiller for cooling, and a second portion of the air at the first pressure from the compression system is supplied to a secondary absorption chiller for cooling, and

[0028] (ii) the absorption cooling system is configured such that, in response to the impurity concentration reaching or exceeding a preselected threshold: a first portion of the cooling medium is supplied to the primary absorption chiller to cool the first portion of the cooling medium to a preselected direct contact chiller cooling medium inlet temperature, wherein the first portion of the cooling medium will be supplied to the direct contact chiller for cooling air at a first pressure from the compression system; and a second portion of the cooling medium is supplied to the secondary absorption chiller to cool the second portion of the cooling medium to the preselected direct contact chiller cooling medium inlet temperature, wherein the second portion of the cooling medium will be supplied to the direct contact chiller for cooling the air at the first pressure.

[0029] In other embodiments, the absorption cooling system may be configured such that the absorption cooling system is configured to supply air from the compression system at a first pressure to the primary absorption chiller for cooling. In other embodiments, the absorption cooling system may be configured such that cooling medium is supplied to the primary absorption chiller to cool the cooling medium to a preselected direct contact chiller cooling medium inlet temperature, wherein the cooling medium is supplied to the direct contact chiller for cooling the air from the compression system at the first pressure. In some embodiments, the direct contact chiller may be integrated into or located downstream of the aftercooler.

[0030] An apparatus is also provided. The apparatus may include an ASU having an embodiment of our absorption cooling system and a gasification zone. In some embodiments of the apparatus, the ASU may have a compression system, a cold box, and a PPU, and at least one separator cylinder is located between the absorption cooling system and the cold box. In some embodiments of the apparatus, at least one process stream from the gasification zone of the apparatus may also heat a heater for heating a regeneration fluid that may be supplied to at least one adsorber that is in a closed position of the PPU during operation of the apparatus, thereby heating the regeneration fluid passing through the at least one adsorber, thereby regenerating adsorbent material in the at least one adsorber. For example, steam from another relatively hot process stream from the gasification zone may be used to heat the regeneration fluid.

[0031] A method of cooling air in an air separation unit (ASU) of a plant having a gasification zone is also provided. Embodiments of the method may include the steps of positioning at least one absorption chiller in the ASU to receive at least one process stream from the gasification zone so that heat from at least one process steam from the gasification zone can be supplied to at least one generator of the at least one absorption chiller. The at least one absorption chiller can provide cooling to facilitate:

[0032] (i) cooling air at a first pressure from a compression system of the ASU for supplying the cooled air to a pre-purification unit (PPU) for purifying air to form a purified air stream, for supplying the purified air stream to a cold box of the ASU,

[0033] (ii) cooling the purified air stream from the PPU before supplying it to the cold box, and / or

[0034] (iii) cooling air at a second pressure from the compression system of the ASU for supplying the cooled air at the second pressure to the compression system for further compression thereof to a first pressure, the first pressure being higher than the second pressure.

[0035] It should be understood that the cooling facilitated by the at least one absorption chiller may include only one of options (i)-(iii), all three of options (i)-(iii), or only two of these options (e.g., only options (i)-(ii), only options (ii)-(iii), or only options (i) and (iii), etc.). In yet other embodiments, the at least one absorption chiller may also provide cooling for other process streams.

[0036] In some embodiments of the method, at least one evaporator of at least one absorption chiller may cool air at a first pressure received from a compression system of the ASU for supplying the cooled air to the PPU, cooling the purified air flow from the PPU before supplying it to a cold box, and / or cooling air at a second pressure from the compression system.

[0037] It should be understood that the direct contact cooler may be positioned to receive air at a first pressure from the compression system of the ASU for cooling the air via a cooling medium in an embodiment of the method and supplying the cooled air to the PPU. The direct contact cooler may be connected to at least one absorption cooler to receive a cooling medium from at least one absorption cooler for cooling the air at a first pressure. Cooling is provided via at least one absorption cooler to facilitate cooling of the air at a first pressure from the compression system of the ASU for supplying the cooled air to the PPU for purifying the air to form a purified air stream for supplying the purified air stream to the cold box of the ASU, which may include the following steps: at least one absorption cooler cools the cooling medium to a preselected direct contact cooler cooling medium inlet temperature for supplying the cooling medium at the preselected direct contact cooler cooling medium inlet temperature to the direct contact cooler. In some embodiments of the method, the direct contact cooler may be located downstream of an aftercooler disposed between the compression system and the direct contact cooler or may be integrated into the aftercooler.

[0038] In some embodiments of the method, the at least one absorption chiller may include a primary absorption chiller and a secondary absorption chiller. The method may also include the step of detecting an impurity concentration level at or above a preselected threshold. The impurity concentration may be, for example, a concentration of CO2, a concentration of CO, a concentration of NO x The concentration of one or more light hydrocarbons (e.g., CH4, etc.) or a combination of impurity concentrations at different concentration thresholds. The embodiment of the method may also include one of the following steps:

[0039] (a) in response to determining that the impurity concentration level is at or above a preselected threshold, adjusting operation to supply a first portion of the air at a first pressure from the compression system to the primary absorption chiller and a second portion of the air at the first pressure from the compression system to the secondary absorption chiller, and

[0040] (b) in response to determining that the impurity concentration level is at or above a preselected threshold, adjusting operation to: supply a first portion of the cooling medium to the primary absorption chiller to cool the first portion of the cooling medium to a preselected direct contact chiller cooling medium inlet temperature, wherein the first portion of the cooling medium will be supplied to the direct contact chiller for cooling air at the first pressure from the compression system; and supply a second portion of the cooling medium to the secondary absorption chiller to cool the second portion of the cooling medium to the preselected direct contact chiller cooling medium inlet temperature, wherein the second portion of the cooling medium will be supplied to the direct contact chiller for cooling air at the first pressure from the compression system.

[0041] Embodiments of the method may further include other steps. For example, the method may further include the following steps: using at least one process stream from the gasification zone to heat the regeneration fluid to supply the heated regeneration fluid to the adsorber of the PPU in the closed state position, thereby regenerating the adsorbent material in the adsorber of the PPU in the closed state position. In some embodiments, the closed state adsorber of the PPU may be a radial adsorber. In some embodiments, the PPU may include at least one radial adsorber or at least two radial adsorbers (for example, one radial adsorber may be in an on state for purification, and a second radial adsorber may be in an off state position, while another adsorber is in an on state position for regenerating the adsorbent material of the closed state adsorber).

[0042] We also provide an embodiment of a cooling system for an air separation unit (ASU) of an apparatus. The cooling system may include a first cooler and a second cooler. The first cooler and the second cooler may be absorption coolers, or may be other types of coolers (e.g., mechanical coolers). The first cooler may be positioned to facilitate the following steps: (i) cooling air at a first pressure from a compression system of the ASU for supplying the cooled air to a pre-purification unit (PPU) for purifying air to form a purified air stream, thereby supplying the purified air stream to a cold box of the ASU, (ii) cooling the purified air stream before supplying the purified air stream from the PPU to the cold box, and / or (iii) cooling air at a second pressure from a compression system of the ASU for supplying the cooled air at the second pressure to a compression system for further compressing it to a first pressure (the first pressure being higher than the second pressure). The cooling system may include a computer device configured to detect an impurity concentration of the air. In some embodiments, the impurity concentration may be, for example, a concentration of CO2, a concentration of CO, a concentration of NO x The concentration of one or more light hydrocarbons (e.g., CH4, etc.) or a combination of these impurities at different concentration thresholds.

[0043] In some embodiments, the cooling system may be configured such that, in response to the impurity concentration reaching or exceeding a preselected threshold, a first portion of the air at a first pressure from the compression system is supplied to the first cooler for cooling, and a second portion of the air at the first pressure from the compression system is supplied to the second cooler for cooling. In other embodiments, the cooling system may be configured such that, in response to the impurity concentration reaching or exceeding a preselected threshold: a first portion of the cooling medium is supplied to the first cooler to cool the first portion of the cooling medium to a preselected direct contact cooler cooling medium inlet temperature, wherein the first portion of the cooling medium is to be supplied to the direct contact cooler for cooling the air at the first pressure from the compression system; and a second portion of the cooling medium is supplied to the second cooler to cool the second portion of the cooling medium to a preselected direct contact cooler cooling medium inlet temperature, wherein the second portion of the cooling medium is to be supplied to the direct contact cooler for cooling the air at the first pressure.

[0044] Other details, objects, and advantages of our chillers, absorption chillers, absorption cooling systems, systems utilizing one or more chillers, apparatus utilizing one or more chillers, and methods of making and using the same will become apparent as the following description of certain exemplary embodiments thereof is given. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] Exemplary embodiments of chillers, absorption chillers, absorption chiller systems, systems utilizing one or more chillers, apparatus utilizing one or more chillers, and methods of making and using the same will be shown in the accompanying drawings. It should be understood that reference numerals used in the drawings may identify the same components.

[0046] Figure 1 FIG. 1 is a schematic block diagram of a first exemplary embodiment of an apparatus utilizing a first exemplary embodiment of an absorption cooling system. The arrangement of the intermediate compressor air cooling conduit 105ic, the separator cylinder 108, and the conduit for purifying the cooling flow 107v that can be utilized in this embodiment is shown in FIG. Figure 1 Indicated by dotted lines.

[0047] Figure 2 FIG. 1 is a schematic block diagram of a second exemplary embodiment of an apparatus utilizing a second exemplary embodiment of an absorption cooling system. The arrangement of the intermediate compressor air cooling conduit 105ic, the separator cylinder 108, and the conduit for purifying the cooling flow 107v that can be utilized in this embodiment is shown in FIG. Figure 2 Indicated by dotted lines.

[0048] Figure 3 is a partial schematic block diagram of a second exemplary embodiment of an apparatus providing a more detailed illustration of exemplary fluid flows for flow into and out of an exemplary absorption cooling system.

[0049] Figure 4 is a partial schematic block diagram of a first exemplary embodiment of an apparatus providing a more detailed illustration of exemplary fluid flows for fluid flow into and out of an exemplary absorption cooling system.

[0050] Figure 5 Schematic block diagram of an exemplary PPU arrangement for a first exemplary embodiment and a second exemplary embodiment of an apparatus.

[0051] Figure 6 is a schematic block diagram of an exemplary embodiment of an absorption chiller 105b that may be used in an embodiment of an exemplary absorption cooling system 105 that may be included in the first exemplary embodiment and the second exemplary embodiment of the apparatus.

[0052] Figure 7 is a block diagram of an exemplary controller that may be used in exemplary embodiments of an exemplary absorption cooling system that may be included in the first exemplary embodiment and the second exemplary embodiment of an apparatus. DETAILED DESCRIPTION

[0053] Reference Figures 1 to 7, the device 100 may be configured to include a cryogenic air distillation system for generating one or more output streams to provide one or more desired products (e.g., oxygen, nitrogen, argon, etc.). In other embodiments, the device may be configured to process other fluids to generate one or more other desired product streams. The device 100 may include an air separation unit (ASU) 102 and a gasification zone 111. The ASU may include: a compression system 103 having at least one compressor to compress a feed air stream (AIR) so as to compress the compressed air output from the compression system 103 to a compression system output pressure (COMPR.AIR); a pre-purification unit 107 for purifying the compressed air output from the compressor; and a cold box 109 for cooling the purified compressed air and separating oxygen (O2) and nitrogen (N2) from the compressed air and outputting the oxygen stream and the nitrogen stream as first and second output streams 109a and 109b. The cold box 109 may also liquefy and / or otherwise separate other components of the purified air it receives from the PPU 107 to form an output stream to other gases (such as argon). These output streams may be supplied to the gasification zone 111 of the apparatus 100. In some embodiments, at least a portion of these output streams from the cold box 109 may also be used to form products (e.g., oxygen, nitrogen, ammonia, argon, or other gaseous products). At least a portion of the nitrogen output from the cold box may also be supplied to the offline adsorber of the PPU 107 as the PPU regeneration stream R1 of the regeneration gas stream R output from the cold box 109 for regenerating the adsorbent material while the online adsorber of the PPU is purifying the compressed air. A cooling system such as an absorption cooling system 105 and other types of cooling systems 105 may be located between the compression system 103 and the PPU 107 to help facilitate cooling of the compressed air (COMPR.AIR) from the compression system 103 so that the cooled compressed air (COMPR.COOLED AIR) may be supplied to the PPU 107.

[0054] The PPU 107 may be configured to purify the compressed air to remove carbon dioxide (CO2), water, nitrous oxide (N2O), heavy hydrocarbons, and / or other impurities that may freeze in downstream processes or cause safety issues. If impurities are not adequately removed from the compressed air, they may interrupt normal operation, cause damage to cold box equipment, require downtime and expensive maintenance, affect equipment life, and / or affect the safety of the ASU. For efficient operation of the gasification zone 111, the ASU 102 may be designed to minimize maintenance and downtime so that the PPU can operate efficiently over the life of the facility.

[0055] The gasification zone 111 can utilize one or more feedstocks (e.g., coal, oil, natural gas, bio-oil, etc.) to gasify the feedstock in the gasifier. The syngas generated by the gasification of the feedstock can be cooled in at least one syngas cooling unit and purified in at least one syngas purification unit. The purified syngas can then be used in a power plant to generate electricity to power one or more components of the equipment, for chemical synthesis and / or for some other equipment processes. In the gasification process of the syngas and the subsequent cooling and purification, the gasification zone 111 can generate at least one heating process stream 111a, such as steam, hot water, or waste heat from at least one fluid stream generated by the gasification zone unit (e.g., heat from flue gas generated by combustion in the gasifier, etc.). At least one heating process stream 111a from the gasification zone can be transferred to the absorption cooling system 105 to cool the compressed air output from the compressor 103, so that the heat from one or more gasification zone process streams 111a can be used in one or more absorption coolers 105b of the absorption cooling system 105. The gasification zone to the cooling system conduit arrangement may be located between the gasification zone and the absorption cooling system 105 for routing the heated process stream 111a to at least one absorption chiller 105b of the absorption cooling system 105 (which may also be referred to as an absorption cooling system). The absorption cooling system 105 may also be located in the facility for cooling the purified air output from the PPU 107 for cooling the purified air stream before supplying the purified air to the cold box 109. The positioning of the absorption cooling system 105 for cooling the output of the PPU 107 may be in addition to or in lieu of cooling the compressed air (e.g., COMPR. AIR and / or INTERMEDIATE COMPR. AIR) from the compression system 103 via a purified cooling stream 107v that connects at least one absorption chiller 105b of the absorption cooling system 105 between the PPU 107 and the cold box 109.

[0056] The absorption cooling system 105 may also be connected to at least one intermediate stage of the compression system 103 for cooling air (INTERMEDIATE COMPR. AIR) compressed to at least one intermediate pressure (e.g., a first intermediate pressure, a second intermediate pressure, a low compressed air pressure, etc.) before the cooled compressed air is returned to the compression system 103 as an intermediate compressed cooling air flow (INTERMEDIATE COMPR. COOLED AIR) for further compression via the compression system 103 to a compression system output pressure (e.g., a pressure higher than one or more intermediate pressures, which may reach or be within a preselected compressed air pressure range for outputting the compression system 103).

[0057] In some embodiments, the compression system 103 may include a compressor having multiple compression stages (e.g., two stages, three stages, four stages, more than two stages, etc.). For many embodiments, the output pressure of the compressed air (COMPR.AIR) output from the final stage of the compression system 103 may be a pressure in the range of 5-50 bar (e.g., 50 bar, in the range of 5-20 bar, in the range of 5-10 bar, 5 bar, etc.). One or more intermediate pressures at one or more different intermediate stages (INTERMEDIATE COMPR.AIR) of the compressed air may be lower than this output pressure. The compressed air output stream (COMPR.AIR) at the output pressure may be routed from the compression system 103 to the absorption cooling system 105 for cooling the compressed air before supplying it to the PPU 107.

[0058] In some embodiments, there may be multiple intermediate stage compressed air streams that are supplied for cooling to the absorption cooling system 105. For example, compressed air output from a particular intermediate stage may be routed to the absorption cooling system 105 before the cooled compressed air is returned to the compression system 103 for further compression in a subsequent stage of the compression system.

[0059] For example, for a compression system 103 having three stages (e.g., a first stage, a second stage, and a third stage), compressed air output from the first stage compressed at a first intermediate pressure may be supplied to the absorption cooling system 105 as a first intermediate compressed air stream (INTERMEDIATE COMPR. AIR) for cooling. The cooled first intermediate compressed air stream may then be output from the absorption cooling system 105 to the second stage of the compression system 103 for further compression. After the compressed air is further compressed to a second pressure higher than the first pressure via the second stage of the compression system, the compressed air may be output from the second stage of the compression system and routed to the absorption cooling system 105 for cooling as a second intermediate compressed air stream (INTERMEDIATE COMPR. AIR). The cooled second intermediate compressed air stream may then be routed back to the compression system 103 for being supplied to the third stage of the compression system for further compression to an output pressure that is higher than the first intermediate pressure and also higher than the second intermediate pressure of the intermediate compressed air stream output from the earlier compression system stage. The compressed air output from the third stage may be an output compressed air stream (COMPR. AIR) at an output pressure in the above-mentioned range of 5-50 bar.

[0060] It should be understood that the intermediate pressure of the compressed air output from the intermediate stage of the compressor is less than the final output pressure of the final stage of the compression system. These intermediate output pressures may range from greater than 1 bar to less than 50 bar (e.g., a pressure in the range of greater than 1 bar to less than 5 bar, a pressure in the range of greater than 1 bar to less than 10 bar, a pressure in the range of greater than 1 bar to less than 20 bar, etc.).

[0061] like Figures 1 to 4 As indicated by the dashed line and understood from the above, there may be at least one intermediate compressed air conduit arrangement 105ic connected between the compression system 103 and the absorption cooling system 105, for connecting the compression system 103 to the absorption cooling system 105, so that the intermediate pressure air from the compression system can be cooled via at least one absorption chiller 105b and have the cooled compressed gas routed back to the compression system 103 for further compression. For example, compressed air from an intermediate stage of the compressor can be supplied to the absorption cooling system 105 for cooling, and the cooled gas can then be returned to another stage of the compressor for further compression. As another example, compressed air from a first stage of the compressor of the compression system 103 can be supplied to the absorption cooling system 105, and then the cooled compressed air can be supplied to a second stage of the compressor of the compression system 103 via at least one intermediate compressed air conduit 105ic for further compression, so air compressed to a preselected air supply pressure can be output from the compression system as a compressed air stream.

[0062] For example, there may be a first intermediate compressed air conduit arrangement 105ic1 for supplying compressed air at an intermediate pressure to the first absorption chiller 105b for cooling, and returning the cooled air to the compression system 103 to undergo additional compression. In embodiments in which a second absorption chiller 105b may be provided (e.g., embodiments in which two or more absorption chillers may be operated in parallel or in series or embodiments in which a second chiller may be operated as a slave chiller for selective use in response to satisfying one or more slave chiller actuation conditions), there may also be a second intermediate compressed air conduit arrangement 105ic2 for supplying compressed air at an intermediate pressure from the compression system 103 to the second absorption chiller 105b for cooling, and returning the cooled air to the compression system to undergo additional compression.

[0063] As can be understood above, embodiments utilizing a multi-stage compressor may include a conduit arrangement so that compressed air at one or more intermediate pressures can be output from a non-final stage of the compressor so that each intermediate compressed air pressure flow can be supplied to an absorption chiller 105b for cooling via at least one intermediate compressed air conduit arrangement 105ic1 and / or 105ic2, and the intermediate compressed air flow can be cooled before being supplied to the next compression stage for further compression.

[0064] The absorption cooling system 105 may include at least one absorption chiller 105b. Each absorption chiller 105b may be a single-stage chiller or a multi-stage chiller. In some embodiments, the absorption cooling system 105 may include at least two absorption chillers 105b, which may include a primary absorption chiller 105c and a secondary absorption chiller 105d. The secondary absorption chiller 105d may be configured to operate in parallel or in series with the primary absorption chiller 105b when it is used. In yet other embodiments, there may be more than two chillers (e.g., three chillers, four chillers, etc.) in parallel or in series.

[0065] The absorption cooling system 105 may be positioned and configured such that the compressed air (COMPR. AIR) output from the compression system is supplied to an optional aftercooler 106ac (at the PPU 107) using cooling water before the compressed air is sent to at least one absorption chiller 105b to cool the compressed air before supplying the cooled compressed air (COMPR. COOLED AIR) to the PPU 107. Figure 1 and Figure 2 denoted by dashed lines). Figure 1 and Figure 4 Such an arrangement may be best illustrated by way of example embodiments.

[0066] The absorption cooling system 105 can also be positioned and configured to cool the compressed air (COMPR.AIR) from the compression system 103 by cooling a cooling medium, which will be supplied to the direct contact cooler 105a or other type of heat exchanger of the absorption cooling system 105 to cool the compressed air (COMPR.COOLED AIR) before supplying the cooled compressed air (COMPR.COOLED AIR) to the PPU 107. Figures 2 to 3 Such an arrangement may be best illustrated by way of example embodiments.

[0067] For embodiments utilizing direct contact cooler 105a, direct contact cooler 105a may be a heat exchanger in which a cooling medium (e.g., liquid water) supplied to the body of the cooler to directly contact the compressed air passes through the body of the heat exchanger to cool the compressed air. The heated cooling medium (heated via direct contact with the hotter compressed air) may be output from direct contact cooler 105a after being used to cool the compressed air being output to another equipment unit for storage and / or reuse (e.g., the hot cooling medium output from direct contact cooler 105a may be sent back to cooling tower 113 and / or absorption cooler 105 as part of a circulation loop for re-cooling to be circulated back to the direct contact cooler at the cooling medium inlet).

[0068] In some embodiments, the direct contact cooler 105a may be incorporated into a compression system aftercooler unit such that the bottom zone of this cooling unit cools the compressed air (COMP.AIR) output from the compression system via a shell and tube heat exchanger arrangement or other type of heat exchanger arrangement (e.g., direct contact heat exchanger arrangement, etc.) via a first cooling medium (e.g., cooling water that may be at atmospheric temperature or other temperature), and the upper zone of the unit is a contact cooler 105a configured to further cool the compressed air via a second cooling medium such as cooling water (e.g., water cooled to a temperature below atmospheric temperature). The second cooling medium supplied to the direct contact cooler may be cooled to the direct contact cooler cooling medium inlet temperature by one or more absorption coolers 105b of the cooling system 105.

[0069] Reference Figure 1 and Figures 4 to 7 In an exemplary arrangement of FIG. 1 , compressed air from the compression system 103 may be supplied directly to the primary absorption chiller 105c via a primary chiller conduit. The absorption chiller 105b may cool the compressed air to a preselected compressed air feed temperature before directing the compressed air to the PPU 107 for purification via an absorption chiller connecting conduit connecting the output of the absorption chiller 105b to the PPU 107.

[0070] For the embodiment utilizing the secondary absorption chiller 105d ( Figure 4 The secondary absorption chiller 105b may be positioned and arranged to receive the cooled compressed air from the primary chiller 105c in a series arrangement. The secondary cooler 105d may then further cool the air from the primary chiller 105c to a preselected compressed air feed temperature. The secondary cooler 105s may then be arranged via at least one secondary cooler conduit 105s ( Figure 4 The cooled compressed air from the secondary cooler 105d is supplied to the PPU 107 (shown by dotted lines in FIG. 1 ).

[0071] Alternatively, the secondary absorption chiller 105b may be positioned and arranged to receive a portion of the compressed air (COMPR. AIR) directly from the compression system via a secondary chiller conduit arrangement 105p, which may provide a second portion of the compressed air as an input stream of compressed air to the secondary absorption chiller 105d, while supplying a first portion of this compressed air (COMPR. AIR) to the primary absorption chiller 105c via a main compressed air inlet conduit connecting the primary absorption chiller 105c to the compression system 103. The cooled compressed air (COMPR. COOLED AIR) from the primary chiller 105c may be output from the primary absorption chiller 105c via the outlet conduit of the primary absorption chiller 105c with the cooled first portion of the compressed air being at a preselected compressed air feed temperature (or within a preselected compressed air feed temperature range). Cooled compressed air (COMPR. COOLED AIR) from the secondary absorption chiller 105d may be output from the secondary absorption chiller 105d via an outlet conduit in the secondary chiller conduit arrangement 105p connecting the output of the secondary absorption chiller with the output of the primary absorption chiller 105c. The output of the secondary absorption chiller 105d may provide a cooled second portion of compressed air at a preselected compressed air feed temperature (or within a preselected compressed air feed temperature range) that is output from the secondary absorption chiller 105d to be mixed or combined with the output stream from the primary absorption chiller 105c before supplying the cooled compressed air stream to the PPU 107 for purification.

[0072] Other embodiments of the apparatus may utilize different configurations of the absorption cooling system 105. For example, referring to Figure 2 and Figure 3In an exemplary arrangement, compressed air from the compression system 103 may be supplied directly to the direct contact cooler 105a of the absorption cooling system 105. The cooling fluid of the direct contact cooler 105a may be liquid water, water vapor, ethylene glycol, or other types of cooling fluids, which may be in direct contact with the compressed air (COMPR.AIR) within the shell or other types of housings of the direct contact cooler 105a, for cooling the compressed air to provide the compressed cooling air (COMPR.COOLED AIR) to the PPU 107 for purification. In such an arrangement, at least one absorption cooler 105b of the absorption cooling system may cool the cooling medium used by the direct contact cooler 105a to cool the compressed air. For example, at least one absorption cooler 105b may include a main absorption cooler 105c, which has a cooling medium conduit connection between the main cooler 105c and the direct contact cooler for supplying the cooled cooling medium (e.g., liquid water) to the direct contact cooler 105a. The main absorption cooler 105b can cool the cooling medium of the direct contact cooler to a preselected cooling medium inlet temperature (which can also be referred to as a preselected cooling medium inlet temperature) before the cooling medium of the direct contact cooler contacts the compressed air to cool the air. The main absorption cooler 105c can receive the cooling medium to be cooled via a cooling medium conduit CM connecting the absorption cooler 105b to the cooling medium feed. The cooling medium feed can be cooling water output from the components of the cold box 109, ethylene glycol output from the components of the cold box 109, or other types of cooling medium feed elements (e.g., water or other fluid streams that are further cooled via at least one absorption cooler 105b, which the cooler receives from the gasification zone 111 or the cold box 109 via a cooling medium conduit arrangement).

[0073] For the embodiment utilizing the secondary absorption chiller 105d ( Figure 3 The secondary absorption chiller 105b may be positioned and arranged to receive cooling medium from the primary chiller 105c in a series arrangement (shown in dashed lines in FIG. 1 ). The secondary chiller 105d may then further cool the cooling medium from the primary chiller 105c to a preselected cooling medium inlet temperature. The secondary chiller 105d may then be connected to the direct contact chiller 105a via at least one secondary chiller conduit arrangement 105s ( Figure 3 The cooled cooling medium from the secondary cooler 105d is supplied to the direct contact cooler 105a.

[0074] Alternatively, the secondary absorption chiller 105b may be positioned and arranged to cool the medium via the chiller feed conduit ( Figure 3The cooling medium feed conduit (shown in dotted lines) receives a portion of the cooling medium CM, which cooler cooling medium feed conduit can provide a second portion of the cooling medium to be cooled to the secondary cooler 105d, while supplying a first portion of the cooling medium to be cooled to the primary cooler 105c. The first portion of the cooling medium can be output from the primary absorption cooler 105c via the primary absorption cooler with the cooled first portion of the cooling medium at a preselected cooling medium inlet temperature (or within a preselected cooling medium inlet temperature range). The cooled cooling medium from the secondary absorption cooler 105d can be output from the secondary absorption cooler 105d via an outlet conduit in a secondary cooler conduit arrangement 105p, which connects the output of the secondary absorption cooler with the output of the primary absorption cooler 105c for supplying the cooled cooling medium to the direct contact cooler 105a. The output of the secondary absorption chiller 105d may provide a cooled second portion of cooling medium at a preselected cooling medium inlet temperature (or within a preselected cooling medium inlet temperature range) that is output from the secondary absorption chiller 105d to be mixed or combined with the output stream from the primary absorption chiller 105c prior to supplying the cooled cooling medium stream to the direct contact chiller 105a. In yet other embodiments, at least a portion of the cooling medium output from the secondary chiller 105d may be supplied to the direct contact chiller as a second cooling medium supplied to the direct contact chiller 105a, rather than the portion that is combined with the cooling medium from the primary chiller 105c prior to supplying the cooling medium to the direct contact chiller 105c.

[0075] In yet other embodiments, there may not be any merging of the cooling media from the primary and secondary coolers. Instead, each cooler may be operated in parallel and the cooling media output from that cooler is supplied to the direct contact cooler 105a via respective cooling media feed conduits connecting the different coolers to the direct contact cooler 105a. For such embodiments, the temperature of the cooling media output from each cooler may be the same or different (e.g., the cooling media inlet temperature supplied to the direct contact cooler may be different for different portions of the cooling media supplied to the direct contact cooler via different absorption coolers 105b, or may be at the same temperature or within the same temperature range).

[0076] It should be understood that embodiments of the absorption cooling system 105 may utilize multiple chillers 105b so that a secondary chiller 105d may be utilized in the event that an expected impurity spike may be occasionally anticipated in connection with the operation of the plant 100. For example, a CO2 spike or other type of impurity spike may be significantly greater than the spike designed for normal operation of the plant 100. In some preferred embodiments, the absorption cooling system 105 may be arranged such that, during normal operation (e.g., no CO2 spike or other impurity spike), only the primary chiller 105c is used, and the secondary chiller 105d is offline and reserved for backup. In response to detecting an impurity spike in the feed (e.g., a CO2 spike where the CO2 concentration of the air is above a preselected feed threshold, etc.), the secondary chiller 105(d) may be started in addition to the primary chiller 105c. Furthermore, under normal operation (no impurity spike), if the primary chiller 105c fails or requires maintenance, the secondary chiller 105d may be immediately started to operate in place of the primary chiller 105c. As discussed herein, a controller may be used in conjunction with sensors and other control components of the apparatus (eg, conduits, valves, etc.) to facilitate operation of the absorption cooling system in response to detection of such concentration changes or other types of process parameters.

[0077] In some embodiments, the cooling medium of the absorption cooler 105b (e.g., compressed air or the cooling medium used by the direct contact cooler 105a) used to cool at least one process stream can be cooling water or air. For embodiments in which the cooling medium to be supplied to the direct contact cooler 105a is water, a portion of the cold nitrogen gas stream from the cold box 109 can be used to cool water in a cooling tower 113 before further cooling the portion of the cold nitrogen gas stream by one or more absorption coolers 105b. In some embodiments, the cooling tower 113 can be considered a waste tower.

[0078] For such embodiments, each absorption cooler 105b may be located between the cooling tower 113 and the direct contact cooler 105a for cooling the cooled water to a desired direct contact cooler cooling medium inlet temperature within a preselected inlet temperature range before supplying the cooled water to the direct contact cooler 105a. The cooled water then cools the compressed air in the direct contact cooler before supplying the compressed air to the PPU 107. The direct contact cooler 105a and cooling tower 113 may therefore be sized to handle the cooler temperature of the cooled water. A separation layer may also be added between the air and the absorption cooler coolant used to cool the compressed air. This arrangement may also allow the absorption cooler 105b to be sized smaller since in this arrangement it is cooling water rather than air. Contact and distribution issues may also be well addressed in this arrangement and efficiently addressed by using packaging or trays. One potential drawback of such an arrangement is that it may add additional approach temperature (eg, 2-3° C.) and, in some installations, may also increase the capital costs associated with implementing the absorption cooling system 105 .

[0079] The absorption cooling system 105 may also be positioned and arranged to provide cooling of the purified compressed air output from the PPU 107 before the purified air stream is supplied to the cold box 109. For example, at least one pre-purification cooling duct arrangement may be positioned and arranged to connect the PPU 107 to the absorption cooling system 105 for cooling the purified air after it is output from the PPU 107 and before it is supplied to the cold box 109. The purified cooling stream 107v provided via the pre-purification cooling duct arrangement may provide the cooled purified stream to the cold box 109 to help provide more efficient cold box operation of the purified air output from the PPU 107.

[0080] Embodiments of the absorption cooling system 105 used in embodiments of the apparatus 100 may be configured to utilize a cooling medium (which may also be referred to as a cooling medium) output from the cold box 109. The cooling medium may be used as a cooling liquid in a cooling tower 113 or other type of heat exchanger. For example, a nitrogen stream output from the cold box 109 may be output as a regeneration fluid stream R. Figure 5As best shown, a first portion R1 of the regeneration fluid stream R may be supplied to a regeneration fluid heater 107htr for heating the regeneration fluid before the regeneration fluid passes through the PPU 107, the regeneration fluid passing through a first adsorber 107a in the PPU in a closed position for regenerating the adsorbent material within the first adsorber 107a, while a second adsorber 107b of the PPU 107 is in an online position for receiving and purifying the cooled compressed air supplied to the PPU 107. A heat exchanger (not shown) may be used to heat the regeneration gas stream to a desired temperature before supplying it to the offline adsorbers of the PPU 107, also for regenerating the adsorbent material. After passing the regeneration fluid through one or more offline adsorbers of the PPU 107, the regeneration gas may be routed to another process unit 115 (e.g., heat exchanger, row, etc.) of the apparatus for further processing via a regeneration gas output conduit arrangement extending between the adsorbers of the PPU 107 and the process unit 115.

[0081] It should be understood that the PPU 107 can be configured such that the online adsorber and the offline adsorber can be switched from the first adsorber 107a to the second adsorber 107b and vice versa. The first portion R1 of the regeneration fluid R can be supplied via the regeneration fluid conduit so that the first portion R1 of the regeneration fluid is supplied to the adsorber in the offline position while the other adsorber is in the online position for purifying the cooling compressed air. Some embodiments of the PPU 107 can utilize multiple pairs of offline and online switchable adsorbers that work in parallel or in series to purify the cooling compressed air after the air is cooled by the absorption cooling system 105.

[0082] In some embodiments, the adsorber 107a of the PPU 107 may be a radial adsorber. In other embodiments, the adsorber may be an axial-flow adsorber.

[0083] The cooling medium is used to produce a product or is otherwise processed, or is exhausted to the environment as an exhaust gas within a preselected waste temperature range (e.g., see the diagram illustrating an exemplary flow path of the second portion R2 of the regeneration fluid). Figure 3 and Figure 4 Before the regeneration fluid stream R is cooled (in the dashed area), a second portion R2 of the regeneration fluid stream R may be supplied to a cooling tower 113 or other type of heat exchanger for cooling the cooling medium supplied to at least one absorption chiller 105b. The cooling medium output from the cold box 109 may be supplied to the cooling tower 113 so that the cooling medium is passed through the tower to be cooled via the cooling medium conduit arrangement CM. After passing the cooling medium through the cooling tower 113 or another type of heat exchanger, the cooling medium may be supplied to one or more absorption chillers 105b as a process gas cooled by the chiller (e.g., Figures 2 to 3In the embodiment of the present invention, the cooling medium is supplied to the direct contact cooler 105a, or the cooling medium is supplied to one or more condensers 201 of one or more absorption coolers 105b, and the cooling medium is used as the cooling medium for cooling the compressed air (COMPR.AIR) as the process stream cooled by the cooler, such as Figure 1 and Figure 4 In the embodiment.

[0084] from Figure 6 The exemplary embodiment shown can best be understood as an exemplary design of an absorption chiller 105b that can be used as a primary chiller 105c and a secondary chiller 105d. It should be understood that other types of absorption chillers (e.g., multi-stage absorption chillers, other types of single-stage absorption chillers, etc.) can also be used. Figure 6 , the absorption chiller 105b may include a condenser 201, a generator 203, a first pump 205, a first pressure reducing device 207 (e.g., a pressure reducing valve), an adsorber 209, an evaporator 211, and a second pressure reducing device 213 (e.g., a pressure reducing valve). Figure 6 ), which may be operated in parallel with the first pump, or may be provided as a secondary pump that may be turned on-line when the first pump is offline due to failure, error or maintenance.

[0085] If available from Figure 6 According to the exemplary embodiment of the absorption chiller 105b, the absorption chiller 105b can be configured so that at least one gasification stream 111a can be supplied from the gasification zone to the generator 203 of the chiller. The gasification stream can be, for example, low-pressure steam (e.g., steam at a pressure of 8-10 bar, or steam at or below 10 bar, steam between 800 kPa and 1000 kPa, or steam at or below 1000 kPa, etc.), or can be hot liquid water (e.g., water that is heated but in liquid state), or can be another fluid stream from the gasification zone, which can be a waste fluid stream from the gasification zone (e.g., heated gas from a gasifier, etc.). In still other embodiments, the gasification steam 111a supplied to the generator 203 of the absorption chiller 105b can be medium-pressure steam or high-pressure steam from the gasification zone 111.

[0086] The absorption chiller 105 may be positioned so that the generator 203 outputs the high pressure refrigerant vapor (HP REFRIGERANT VAPOR) to the condenser to condense the condenser medium inlet fluid (CMIN) supplied to the condenser 201 for condensing the refrigerant. The refrigerant may be water, ethylene glycol or other suitable refrigerant. The condenser medium may be water, atmosphere or other type of fluid stream for condensing the refrigerant vapor. The condensed condenser medium may be output from the condenser (CM OUT) to be sent to another equipment unit (e.g., a washing tower or a reservoir when the cooling medium is water). The high pressure refrigerant vapor may be condensed into a liquid when passing through the condenser 201 and output as a high pressure refrigerant liquid (HP REFRIGERANT LIQUID), which may then be supplied to the second pressure reducing device 213 for reducing the pressure of the refrigerant, so that it is a low pressure refrigerant liquid (LP REFRIGERANT LIQUID) that may be supplied to the evaporator 211. The low-pressure coolant can evaporate in the evaporator because the coolant absorbs heat from the process stream to be cooled by the cooler, which process stream also passes through the evaporator 211 in parallel or countercurrent with the coolant passing through the evaporator 211. At least one process stream cooled in the evaporator 211 (process stream to be cooled) can be a cooling medium to be cooled to be supplied to the direct contact cooler 105a, or can be compressed air (COMPR.AIR), for example.

[0087] The low-pressure refrigerant vapor (LP REFRIGERANT VAPOR) output from the evaporator 211 may be supplied to the adsorber 209. The adsorber 209 may receive a low-pressure condensate solution (LP CONC SOLUTION) so that the low-pressure refrigerant vapor absorbs the solution, so that the adsorber 209 may output a low-pressure dilution solution (LP DILUTE SOLUTION) of the refrigerant for supply to the first pump 205 or the second pump 206 for forming a high-pressure dilution solution (HP DILUTE SOLUTION) for supply to the generator 203.

[0088] The generator 203 may be configured to use the heat of at least one vaporization stream 111a to form high pressure coolant vapor from the high pressure dilution solution it receives via the pump. The generator 203 may also output a high pressure condensed solution (HP CONC SOLUTION) to be supplied to the first pressure reducing device 207 so that a low pressure concentrated solution (LP CONC SOLUTION) may be supplied to the adsorber 209 as part of the coolant circuit of the cooler.

[0089] It should be understood that the evaporator 211 can be positioned and configured to cool multiple process streams if the cooler is a single-stage cooler, or the cooler can be a multi-stage cooler that can have multiple stages for cooling different process streams or cooling the same process stream in series. The one or more process streams to be cooled in the evaporator 211 can then be output from the evaporator as one or more cooling output streams (COOLED OUTPUT) output from the cooler. For example, in some embodiments, each cooler can be a multi-stage cooler, including: a first stage for cooling intermediate compressed system air; a second stage for cooling the compressed air flow or cooling the cooling medium supplied to the contact cooler for cooling the compressed air; and a third stage for cooling the purified air output from the PPU 107. As another example, each cooler can be a multi-stage cooler, including: a first stage for cooling the compressed air flow or cooling the cooling medium supplied to the contact cooler for cooling the compressed air; and a second stage for cooling the purified air output from the PPU 107. As another example, some embodiments of the absorption chiller 105 may be a multi-stage chiller, including a first stage and a second stage, for cooling a compressed air stream or for cooling a cooling medium supplied to a contact cooler for cooling the compressed air to a desired temperature for supplying the compressed cooled air to the PPU 107. As another example, embodiments of the chiller may be configured so that the evaporator 211 of a single-stage chiller receives more than one process stream to be cooled in the evaporator 211 (e.g., intermediate compression system compressed air, compressed air output from the compression system, and purified air output from the PPU 107 via the purified cooling stream 107v, or compressed air output from the compression system and purified air output from the PPU 107 via the purified cooling stream 107v, etc.).

[0090] The absorption chiller 105b may be designed so that the temperature difference across the chiller may meet a specific set of process design criteria parameters (e.g., the temperature difference between the inlet temperature of the process stream to be cooled and the outlet temperature of the process stream after being cooled by the chiller). These parameters may vary as needed depending on process conditions such as the atmospheric temperature of the feed air received at the compression system 103, the CO2 concentration of the feed, etc. In some embodiments, the temperature difference may be greater than 3°C, greater than 5°C, or greater than 5°C and 20°C. It should be understood that a temperature difference of 5°C-10°C will indicate the fact that the evaporator 211 of the chiller may cool the process stream to be cooled by 5°C-10°C (e.g., the inlet temperature of the stream may be 10°C, and the outlet temperature may be 5°C, 3°C, 1°C, or 0°C, etc.).

[0091] In many embodiments, it is believed that a temperature differential between 5°C and 20°C may result in sufficiently significant savings in operating capacity for sizing the adsorber of the PPU such that the cost savings in adsorber sizing may ensure that the inclusion of absorption cooling system components improves plant operating profitability. It is also possible to achieve such savings at lower temperature differential operating parameters. It is also believed that embodiments of the absorption chiller 105b of the absorption cooling system 105 that can utilize a temperature differential between 5°C and 50°C (e.g., an input process stream that changes from 55°C to 5°C or from 55°C to 45°C, etc.) may provide greater economic benefits for a high return on investment by utilizing the greater advantage of the absorption chiller 105b and utilizing a greater amount of heat source flow from the gasification zone stream 111a. For example, in many plants, it is believed that the compressed cooling air may be at a temperature of 5°C-20°C, 5°C-15°C, or 5°C-10°C. At these temperatures of the compressed cooling air (COMPR.COOLED AIR), the adsorber sizing of the PPU 107 can be minimized due to the use of one or more absorption chillers 105b, which utilize one or more gasification zone streams 111a. For example, the low pressure steam flow rate from the gasification zone 111 can be between 0.5 tons / hr and 5 tons / hr and used by the generator of the absorption chiller 105b to cool the compressed air or the cooling medium of the direct contact chiller 105a for cooling the compressed air.

[0092] In some embodiments, the desired temperature range for the compressed cooled air may be within 10°C-15°C. However, when an impurity spike is detected in the air feed, the desired temperature range may be further reduced to 5°C-10°C, or other appropriate impurity spike cooled compressed air temperature range. The temperature change of the cooled compressed air used to account for the impurity spike may vary depending on the size of the spike (e.g., how much CO2 or other impurities may be contained in the compressed feed air, etc.) and the equipment (e.g., the available heat of at least one process stream from the gasification zone 111, which is output as at least one gasification zone stream 111a, and its flow rate may increase by 0.2 to 2 t / h during the spike period compared to when there is no spike, etc.).

[0093] For embodiments based on an absorption chiller system 105, which is configured to cool the compressor inlet feed air and / or other intermediate compressed air streams and / or purified air output from the PPU 107, this may increase the size of the system's absorption chiller 105b. However, this may also allow for a reduction in compressor size, improved compression efficiency, and may also reduce the overall electrical cost of the ASU.

[0094] If available from Figures 1 to 5It is understood that the embodiment of the equipment and absorption cooling system 105 may include the use of a separator 108, which may be located between the PPU 107 and the absorption cooling system 105 (e.g., the direct contact cooler 105a or the absorption cooler 105b of the system). The separator 108 may be positioned to remove water and hydrocarbons from the cooling compressed air, and this cooling compressed air is exported from the absorption cooling system 105 before air is supplied to the PPU 107 for purification. The separator 108 may be positioned to remove water and / or hydrocarbons, so that the PPU 107 does not have to remove these impurities. This may allow the adsorber of the PPU 107 to become smaller and also use fewer layers (e.g., being more simply designed and also becoming smaller and smaller), for purifying this compressed air before the compressed air is supplied to the cold box 109.

[0095] In some preferred embodiments, the regeneration gas supplied to the PPU 107 can be heated by the same heat source used to supply the generator 203 of the absorption chiller. The vaporization stream 111a that can be used to heat the regeneration gas can be split, so some of this stream is used in a heat exchanger to heat the regeneration gas in the regeneration fluid heater 107htr, and another part of this stream is supplied to the absorption chiller generator, thereby reducing piping costs and complexity. In another embodiment, multiple heat sources through multiple different vaporization zone streams 111a can be used in series or parallel in one or more absorption chillers and provide heat for heating the regeneration gas supplied to the PPU 107.

[0096] In some embodiments, the absorption cooling system 105 may be arranged to allow for removal of an aluminum oxide layer within an adsorber of the PPU 107. Such embodiments may allow for removal of an intermediate mesh layer of the adsorber, which may reduce capital costs and manufacturing and operating complexity associated with the PPU 107.

[0097] The embodiments of our absorption cooling system 105 are not limited by any chiller backup method. For example, 1x100%, 2x100%, 2x50% absorption chillers can be installed or provided. In some cases, a mechanical chiller can be installed as a backup device for the absorption chiller 105 (b). As another example, any solute can be used in the absorption chiller 105b, such as lithium bromide (LiBr) or ammonia (NH3). Any additional component can be added to the solution, such as a preservative, or salt to prevent crystallization. When water is used as a cooling medium or as a cooling medium supplied to the condenser 201, the cooled water can be seawater in some embodiments close to a saltwater source (e.g., the ocean). The structural material of the heat exchanger can be carbon steel, stainless steel or tungsten and other materials required when a seawater exchanger is needed or used. Any type of heat exchanger for the absorption chiller 105b can be used, such as shell and tube, plate fin, kettle, etc. Any number of stages (e.g., single state, two stages, more than two stages, etc.) can also be used in cooling.

[0098] We have discovered that a significant difference between a mechanical chiller and an absorption chiller 105b is that, rather than using a compressor to increase the pressure of the low pressure refrigerant vapor and closing the refrigerant loop, the pressure can be increased by using multiple heat exchangers (e.g., evaporator 211 and condenser 201), a pump, and at least one pressure reducing device (e.g., a pressure reducing valve). This may involve more equipment than a mechanical chiller. However, the absence of rotating equipment may allow for lower levels of electrical power consumption during operation. This improvement in operating costs may provide a significant advantage over a mechanical chiller. The following are some illustrative examples to help make more apparent some of the important operating advantages we have determined to exist through implementation of an embodiment of our absorption chiller system 105.

[0099] For example (and by way of non-limiting example), in a design having a 500,000 nm 3In a plant with a feed air flow of 1.5 t / hr, which has a direct contact cooler 105a and a cooling tower 113 (structured as a water tower), and 2.5 tons / hr of low-pressure steam at 8 bar (800 kPa) as a gasification flow 111a, when at least one absorption cooler 105b of the absorption cooling system is used in the plant, the feed to the PPU 107 can be cooled to 7°C under summer conditions with a CO2 concentration of 800 ppm, compared to when no cooler is used. We have found that for such a plant, the use of at least one absorption cooler 105b can reduce the adsorber size requirements of the PPU 107 by 30% compared to the case without a cooler, and the amount of regeneration gas required to regenerate the offline adsorber of the PPU 107 can be halved. Due to the use of at least one absorption cooler 105b, the cooling temperature of the feed gas can be cooled to a temperature that is approximately 30% lower and the impurity spike from CO2 that the system can handle can be increased by 60%. This non-limiting example helps to illustrate the significant operational improvements that may be provided by exemplary embodiments of our absorption cooling system 105 .

[0100] As another non-limiting example, in one embodiment of the apparatus, the feed air stream is designed to have a wavelength of 500,000 nm at 17°C. 3 / hr and has a direct contact cooler 105a and a cooling tower 113 (structured as a water tower), 4 tons / hr of low-pressure steam at 8 bar (800kPa) is used as the gasification flow 111a, and under summer conditions, the feed to the PPU 107 can be cooled to 5°C and the 800ppm CO2 concentration spike is resolved through at least one absorption cooler 105b. Compared with the case without a cooler, the adsorber size of the PPU 107 can be reduced by 30%, and the regeneration gas demand can also be reduced by half. In addition, due to the use of the absorption cooler 105 (b), the air temperature supplied to the PPU can be reduced by more than 58% and adapt to 60% higher impurity concentration spikes. This non-limiting example helps to further show the significant operational improvements that can be provided by exemplary embodiments of our absorption cooling system 105.

[0101] Embodiments of the apparatus 100 and absorption cooling system 105 may utilize a controller to monitor and control the operation of the apparatus 100 and / or absorption cooling system 105. For example, temperature sensors, pressure sensors, flow sensors, and concentration sensors configured to detect the concentration of one or more compounds (e.g., oxygen, CO2, N2, CO, water, etc.) may be included to sense and / or detect the flow, concentration, temperature, or pressure of fluids flowing through different components or units of the apparatus and / or conduits between those units. For example, sensors may be positioned to detect (i) the flow, pressure, temperature, and feed concentration of air supplied to the compression system 103, (ii) the flow, pressure, temperature, and / or feed temperature of air output from the compression system 103 for supply to the absorption cooling system, (iii) the flow, pressure, temperature, and feed concentration of air output from the absorption cooling system 105 for supply to the PPU 107, (iv) the flow, pressure, temperature, and composition concentration of air output from the PPU 107 for supply to the cold box, and / or (v) the flow, pressure, temperature, and composition concentration of air supplied to and / or output from the separator 108. Other sensors may also be positioned in the compression system 103, the absorption cooling system 105, the PPU 107, the separator 108, the cold box 109, and / or the vaporization zone 111 to monitor and control the operation of these components of the apparatus 100. A controller may be provided to receive data from the sensors and adjust the operation of the various components based on the received sensor data. Examples of such controllers may be found at Figure 7, and may include a processor connected to a non-transitory computer-readable medium and at least one interface for communicating with a sensor. The processor may run at least one automatic control program stored in a computer-readable medium (e.g., non-transitory memory, flash memory, etc.) that defines a method for controlling the operation of the device and / or the operation of one or more components of the device (e.g., absorption cooling system 105). In some embodiments, the controller may be configured to monitor one or more feed impurity concentrations supplied to or output from the compression system 103. When one or more impurity concentrations exceed a preselected threshold (e.g., meet or exceed an impurity concentration threshold), the controller may actuate one or more valves so that the primary absorption chiller 105c operates at an increased operating capacity or the secondary absorption chiller 105d is online and begins to receive one or more process streams to be cooled as discussed herein (e.g., intermediate air from a compressor, compressed air output from the compression system 103, and / or purified air output from the PPU 107, etc.). The controller may also communicate with one or more control components of the gasification zone 111 to obtain an increased flow rate of one or more gasification streams 111a that may provide a heat source to one or more absorption chillers 105b of the absorption cooling system so that the chillers may address higher impurity concentrations in their operation by cooling the compressed air to a preselected impurity spike temperature threshold, which may be lower than the temperature set point used under normal operating conditions when the impurity spike is not present. In response to detecting that the impurity concentration is below the threshold, the controller may communicate with control components of various equipment components to take the secondary chiller 105d offline and / or the primary chiller at a reduced operating capacity after the impurity spike condition is resolved. Such communication may also be performed with the gasification zone flow conduit assembly for adjusting the flow rate of one or more gasification streams 111a that supply fluid to the generator of the one or more chillers 105b. The preselected impurity concentration threshold may be an appropriate value selected to account for the equipment configuration and operational design criteria. In some embodiments, the preselected impurity concentration thresholds may be 400 ppm CO2, 500 ppm CO2, 800 ppm CO2, 1,000 ppm CO2, 1,500 ppm CO2, 2,000 ppm CO2, 2,500 ppm CO2, 3,000 ppm CO2, 400 ppm CO2, and 50 ppm CO, or some other appropriate threshold criteria.

[0102] It should be understood that embodiments of the controller may also be configured to utilize other sensor data to actuate different equipment operations and use different conduits for different flow paths of fluids into and out of different components. In some embodiments, the controller may be connected to a display, and at least one input device and / or input / output device to facilitate outputting data to a user or operator and receiving input from an operator. For example, the controller may be connected to an operator workstation or a computer of an operator of the equipment. The controller may also be connected to other equipment control components for incorporation into a larger automated process control system of the equipment.

[0103] It should be understood that the embodiments clearly shown and discussed herein can be modified to meet the design goals of a specific group or the design standards of a specific group. For example, the arrangement of valves, conduits and other conduit components (e.g., conduit connection mechanisms, pipelines, seals, etc.) for the fluid flow between different units of the interconnected device to fluidly communicate different units can meet the specific equipment layout design, which illustrates the useful area of ​​the equipment, the sizing equipment of the equipment and other design considerations. As another example, the flow, pressure and temperature of the fluid through one or more coolers and through other equipment components can be changed to consider different equipment design configurations and other design criteria. As another example, the number of coolers and their arrangement can be adjusted to meet a specific set of design criteria. As another example, the material composition of the different structural components of the cooler, the cooler absorption system and the equipment can be any type of suitable material required to meet a specific set of design criteria. As another example, in some embodiments, it is considered that the cooling system 105 can utilize one or more mechanical coolers to replace the absorption cooler 105b.

[0104] It should be understood that embodiments of the apparatus may be configured as an air separation apparatus or other type of apparatus in which at least one chiller may be utilized. The apparatus, chiller absorption system, and one or more chillers may each be configured to include process control components positioned and configured to monitor and control operations (e.g., temperature and pressure sensors, flow sensors, an automated process control system having at least one workstation including a processor, non-transitory memory, and at least one transceiver for communicating with the sensor components, valves, and controllers, for providing a user interface for the automated process control system that may be run at the workstation and / or another computer device of the apparatus, etc.).

[0105] As another example, it is contemplated that certain features described individually or as part of an embodiment may be combined with other individually described features or portions of other embodiments. Thus, components and actions of the different embodiments described herein may be combined to provide other embodiments. Thus, while certain exemplary embodiments of chillers, chiller adsorption systems, air separation units, apparatus, and methods of making and using the same have been shown and described above, it should be clearly understood that the invention is not limited thereto, but may be otherwise variously embodied and practiced within the scope of the following claims.

Claims

1. An absorption-based cooling system for an air separation unit (ASU) of a plant, the absorption-based cooling system comprising: at least one absorption cooler positioned to receive at least one process stream from the gasification zone of the apparatus, whereby heat from the at least one process stream is supplied to at least one generator of the at least one absorption cooler, the at least one absorption cooler being positionable to: (i) cooling air at a first pressure from a compression system of the ASU, for supplying the cooled air to a pre-purification unit (PPU) for purifying the air to form a purified air stream, for supplying the purified air stream to a cold box of the ASU, (ii) cooling the purified air stream from the PPU before supplying it to the cold box, and / or (iii) cooling air at a second pressure from a compression system of the ASU for supplying the cooled air at the second pressure to the compression system to undergo further compression to the first pressure, the first pressure being higher than the second pressure; wherein the absorption-based cooling system is configured to detect an impurity concentration of the air, and the at least one absorption chiller comprises a primary absorption chiller and a secondary absorption chiller, and wherein one of: The absorption-based cooling system is configured such that, in response to the impurity concentration being at or above a preselected threshold, a first portion of the air from the compression system at the first pressure is supplied to the primary absorption chiller for cooling and a second portion of the air from the compression system at the first pressure is supplied to the secondary absorption chiller for cooling, and The absorption-based cooling system is configured such that, in response to the impurity concentration being at or above a preselected threshold, a first portion of the cooling medium is supplied to the primary absorption chiller to cool the first portion of the cooling medium to a preselected direct contact cooler cooling medium inlet temperature, the first portion of the cooling medium to be supplied to the direct contact cooler for cooling the air at the first pressure from the compression system, and a second portion of the cooling medium is supplied to the secondary absorption chiller to cool the second portion of the cooling medium to the preselected direct contact cooler cooling medium inlet temperature, the second portion of the cooling medium to be supplied to the direct contact cooler for cooling the air at the first pressure.

2. The absorption-based cooling system of claim 1, wherein the at least one absorption chiller is positionable: (i) cooling the air at a first pressure coming from a compression system of the ASU, for supplying the cooled air to a PPU for purifying the air to form a purified air stream, for supplying the purified air stream to a cold box of the ASU, (ii) cooling the purified air stream from the PPU before supplying the purified air stream to the cold box, and (iii) cooling the air at a second pressure from a compression system of the ASU for supplying the cooled air at the second pressure to the compression system to undergo further compression to the first pressure.

3. The absorption-based cooling system of claim 1, wherein the at least one absorption chiller is positionable: (i) cooling the air at a first pressure coming from a compression system of the ASU, for supplying the cooled air to a PPU for purifying the air to form a purified air stream, for supplying the purified air stream to a cold box of the ASU, and (ii) cooling the purified air stream from the PPU before supplying the purified air stream to the cold box.

4. The absorption-based cooling system of claim 1, wherein the at least one absorption chiller is positionable: (i) cooling the air at a first pressure coming from a compression system of the ASU, for supplying the cooled air to a PPU for purifying the air to form a purified air stream, for supplying the purified air stream to a cold box of the ASU, and (iii) cooling the air at a second pressure from a compression system of the ASU for supplying the cooled air at the second pressure to the compression system to undergo further compression to the first pressure.

5. The absorption-based cooling system of claim 1, wherein the at least one absorption chiller is positionable: (ii) cooling the purified air stream from the PPU before supplying the purified air stream to the cold box, and (iii) cooling the air at a second pressure from a compression system of the ASU for supplying the cooled air at the second pressure to the compression system to undergo further compression to the first pressure.

6. An absorption-based cooling system according to claim 1, wherein at least one evaporator of the at least one absorption chiller cools the air at the first pressure received from the compression system of the ASU for supplying the cooled air to the PPU, cooling the purified air flow from the PPU before supplying the purified air flow to the cold box, and / or cooling the air at the second pressure from the compression system.

7. The absorption-based cooling system of claim 1 , comprising a direct contact cooler positioned to receive the air at the first pressure from a compression system of the ASU for cooling the air via a cooling medium and supplying the cooled air to the PPU, the direct contact cooler being connected to the at least one absorption cooler to receive the cooling medium from the absorption cooler for cooling the air at the first pressure.

8. The absorption-based cooling system of claim 7, wherein the cooling medium comprises water or ethylene glycol and the PPU comprises at least one radial adsorber.

9. The absorption-based cooling system of claim 8, wherein the cooling medium comprises water, and the absorption-based cooling system further comprises a cooling tower positioned between the cold box and the at least one absorption chiller to cool the cooling medium before supplying the cooling medium to the at least one absorption chiller, the cooling tower being positioned to receive a flow of cooling liquid from the cold box to cool the cooling medium before supplying the cooling medium to the at least one absorption chiller.

10. The absorption based cooling system of claim 1, wherein: The absorption based cooling system is configured such that the air at the first pressure from the compression system is supplied to the primary absorption chiller for cooling, or The absorption based cooling system is configured such that a cooling medium is supplied to the primary absorption chiller to cool the cooling medium to a preselected direct contact chiller cooling medium inlet temperature, the cooling medium to be supplied to the direct contact chiller for cooling the air at the first pressure from the compression system.

11. The absorption based cooling system of claim 1 , wherein the PPU comprises a radial adsorber.

12. A device comprising: An air separation unit (ASU) having an absorption based cooling system according to claim 1; and The gasification zone.

13. The apparatus of claim 12, wherein the ASU has the compression system, the cold box, and the PPU, and the at least one tapping cylinder is positioned between the absorption-based cooling system and the cold box.

14. The apparatus according to claim 12, wherein the at least one process stream from the gasification zone of the apparatus also heats a heater for heating a regeneration fluid that can be supplied to at least one adsorber of the PPU that is in a closed position during operation of the apparatus, for heating a regeneration fluid passing through the at least one adsorber, for regenerating adsorbent material in the at least one adsorber.

15. A method of cooling air in an air separation unit (ASU) of an apparatus, the apparatus also having a gasification zone, the method comprising: positioning at least one absorption chiller in the ASU to receive at least one process stream from the gasification zone, whereby heat from the at least one process stream from the gasification zone can be supplied to at least one generator of the at least one absorption chiller; providing cooling via the at least one absorption chiller to: (i) cooling air at a first pressure from a compression system of the ASU, for supplying the cooled air to a pre-purification unit (PPU) for purifying the air to form a purified air stream, for supplying the purified air stream to a cold box of the ASU, (ii) cooling the purified air stream from the PPU before supplying it to the cold box, and / or (iii) cooling air at a second pressure from a compression system of the ASU for supplying the cooled air at the second pressure to the compression system to undergo further compression to the first pressure, the first pressure being higher than the second pressure; wherein the at least one absorption chiller comprises a primary absorption chiller and a secondary absorption chiller, the method further comprising one of: responsive to determining that the impurity concentration level is at or above a preselected threshold, adjusting operation such that a first portion of the air at the first pressure from the compression system is supplied to the primary absorption chiller and a second portion of the air at the first pressure from the compression system is supplied to the secondary absorption chiller, and In response to determining that the impurity concentration level is at or above a preselected threshold, operation is adjusted such that a first portion of cooling medium is supplied to the primary absorption chiller to cool the first portion of the cooling medium to a preselected direct contact chiller cooling medium inlet temperature to which the first portion of the cooling medium will be supplied for cooling the air from the compression system at the first pressure, and a second portion of the cooling medium is supplied to the secondary absorption chiller to cool the second portion of the cooling medium to the preselected direct contact chiller cooling medium inlet temperature to which the second portion of the cooling medium will be supplied for cooling the air from the compression system at the first pressure.

16. The method of claim 15, wherein providing the cooling via the at least one absorption chiller comprises: (i) cooling the air at a first pressure coming from a compression system of the ASU, for supplying the cooled air to a PPU for purifying the air to form a purified air stream, for supplying the purified air stream to a cold box of the ASU, (ii) cooling the purified air stream from the PPU before supplying the purified air stream to the cold box, and (iii) cooling the air at a second pressure from a compression system of the ASU for supplying the cooled air at the second pressure to the compression system to undergo further compression to the first pressure.

17. The method of claim 15, wherein providing the cooling via the at least one absorption chiller comprises: (i) cooling the air at a first pressure coming from a compression system of the ASU, for supplying the cooled air to a PPU for purifying the air to form a purified air stream, for supplying the purified air stream to a cold box of the ASU, and (ii) cooling the purified air stream from the PPU before supplying the purified air stream to the cold box.

18. The method of claim 15, wherein providing the cooling via the at least one absorption chiller comprises: (i) cooling the air at a first pressure coming from a compression system of the ASU, for supplying the cooled air to a PPU for purifying the air to form a purified air stream, for supplying the purified air stream to a cold box of the ASU, and (iii) cooling the air at a second pressure from a compression system of the ASU for supplying the cooled air at the second pressure to the compression system to undergo further compression to the first pressure.

19. The method of claim 15, wherein providing the cooling via the at least one absorption chiller comprises: (ii) cooling the purified air stream from the PPU before supplying the purified air stream to the cold box, and (iii) cooling the air at a second pressure from a compression system of the ASU for supplying the cooled air at the second pressure to the compression system to undergo further compression to the first pressure.

20. The method of claim 15, wherein at least one evaporator of the at least one absorption chiller cools the air at the first pressure received from the compression system of the ASU for supplying the cooled air to the PPU, cooling the purified air flow from the PPU before supplying the purified air flow to the cold box, and / or cooling the air at the second pressure from the compression system.

21. The method of claim 15, wherein a direct contact cooler is positioned to receive the air at the first pressure from a compression system of the ASU for cooling the air via a cooling medium and supplying the cooled air to the PPU, the direct contact cooler being connected to the at least one absorption cooler to receive the cooling medium from the at least one absorption cooler for cooling the air at the first pressure; providing cooling via the at least one absorption chiller in order to cool air at the first pressure coming from the compression system of the ASU, for supplying the cooled air to a PPU for purifying the air to form a purified air stream, for supplying the purified air stream to a cold box of the ASU, comprising: The at least one absorption chiller cools the cooling medium to a preselected direct contact chiller cooling medium inlet temperature for supplying the cooling medium at the preselected direct contact chiller cooling medium inlet temperature to the direct contact chiller.

22. The method of claim 15, comprising: The at least one process stream from the gasification zone is used to heat a regeneration fluid so that the heated regeneration fluid is supplied to the adsorber of the PPU in the closed state position for regenerating adsorbent material in the adsorber of the PPU in the closed state position.

23. A cooling system for an air separation unit (ASU) of an apparatus, the cooling system comprising: a first cooler and a second cooler, wherein the first cooler is positioned to facilitate: (i) cooling air at a first pressure from a compression system of the ASU, for supplying the cooled air to a pre-purification unit (PPU) for purifying the air to form a purified air stream, for supplying the purified air stream to a cold box of the ASU, (ii) cooling the purified air stream from the PPU before supplying it to the cold box, and / or (iii) cooling air at a second pressure from a compression system of the ASU for supplying the cooled air at the second pressure to the compression system to undergo further compression to the first pressure, the first pressure being higher than the second pressure; wherein the cooling system comprises a computer device configured to detect an impurity concentration of the air; and One of the following: the cooling system being configured such that, in response to the impurity concentration being at or above a preselected threshold, a first portion of the air from the compression system at the first pressure is supplied to the first cooler for cooling, and a second portion of the air from the compression system at the first pressure is supplied to the second cooler for cooling, and The cooling system is configured such that, in response to the impurity concentration being at or above a preselected threshold, a first portion of a cooling medium is supplied to the first cooler to cool the first portion of the cooling medium to a preselected direct contact cooler cooling medium inlet temperature, the first portion of the cooling medium to be supplied to the direct contact cooler for cooling the air at the first pressure from the compression system, and a second portion of the cooling medium is supplied to the second cooler to cool the second portion of the cooling medium to the preselected direct contact cooler cooling medium inlet temperature, the second portion of the cooling medium to be supplied to the direct contact cooler for cooling the air at the first pressure.

24. The cooling system of claim 23, wherein the first chiller is an absorption chiller and the second chiller is an absorption chiller.