A safe and fast lifting tool and removal method for the top pivot A and B rods of a large ship lock miter gate
Through the top pivot hole lifting bracket and clamping lifting bracket structure, combined with the main hook and hand chain hoist, the quick and safe lifting and dismantling of the top pivot A and B rods of the herringbone door are realized, which solves the problem of disassembly and assembly efficiency in the existing technology. Low and safety risk issues, improving construction efficiency and safety.
Patent Information
- Application Number
- CN202111477442.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-06
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2041-12-06
AI Technical Summary
In the existing technology, the disassembly and assembly efficiency of the top pivots A and B of the herringbone door is low and there are safety risks, especially when working at high altitudes, which threatens the safety of construction workers.
The structure of the top pivot hole lifting bracket and the clamping lifting bracket is adopted. Through the cooperation of the main hook and the hand chain hoist, the wire rope and jack are used to quickly lift and dismantle the A and B poles, which avoids the wire rope passing through the top pivot hole and reduces the cost. Artificial working at heights.
It improves the disassembly and assembly efficiency of poles A and B, reduces safety risks for construction workers, avoids wear and tear on the copper sleeves of poles A and B, simplifies the construction process, and enhances construction safety.
Smart Images

Figure CN114348848B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a safe and fast lifting tool and a dismantling method for top pivots A and B of a large ship lock miter gate, belonging to the field of maintenance of top pivots of large ship lock miter gates. Background Art
[0002] The top pivot of the miter door plays the role of fixing the upper door, and mainly bears the horizontal force generated by its own weight, opening and closing, and the friction generated by rotation. Due to the high frequency of operation of the miter door, the bottom pivot ball and mushroom head may be worn, the sealing ring may be damaged, and the ball and shoe oil channel may be blocked, which may affect the safe and stable operation of the miter door. The door body needs to be lifted regularly to inspect and repair the bottom pivot. Generally, before the top door construction of the miter door, the top pivot AB pull rod needs to be removed. At present, the removal process of the top pivot A and B rods of the miter door mainly includes the removal of the anchor frame wedge cover, the removal of the lifting screw, the removal of the top pivot and the B rod shaft, the loosening of the front and rear wedges, and the hoisting of the A and B rods. Among them, the maintenance methods and processes of the removal of the anchor frame wedge cover, the removal of the lifting screw, the removal of the top pivot and the B rod shaft have been well solved, but the hoisting of the A and B rods still restricts the disassembly and assembly efficiency of the A and B rods of the miter door, thereby affecting the construction period of the entire miter door maintenance project. Therefore, how to quickly and safely hoist the A and B poles has become a key issue in the disassembly, assembly and maintenance of the A and B poles of the miter door.
[0003] The space at the top pivot is relatively narrow. In the past, the A and B poles were moved and hoisted by screw jacks, wire ropes, hand winches, and cranes. During hoisting, it was necessary to manually lay out the wire ropes, adjust the level of the A and B poles by hand winches, control the gap between them and the door body ear plates and anchor frames, and gradually move out the A and B poles using screw jacks. This method is not efficient and relies on manual experience and proficiency. There is a risk of falling objects from high altitude during the demolition process, and there are safety risks for construction workers. Summary of the invention
[0004] The purpose of the present invention is to provide a tool for safe and rapid lifting and removal of the top pivots A and B rods of a large ship lock miter gate and a method for removing the tool. The tool can be used for rapid lifting and removal of the top pivots A and B rods of a large ship lock miter gate, thereby improving the efficiency of assembly and removal and ensuring the safety of the removal construction.
[0005] In order to realize the above-mentioned technical features, the purpose of the present invention is achieved as follows: a safe and fast lifting tool for the top pivots A and B rods of a large-scale ship lock miter gate, which includes a top pivot hole lifting bracket, and the top pivot hole lifting bracket is fixedly installed on the top pivot hole of the A rod through a locking screw assembly; the A rod second axis hole of the A rod cooperates with the A rod lifting ear; a clamping lifting bracket structure for clamping the A rod is installed on the end of the A rod away from the top pivot hole.
[0006] The top pivot hole lifting bracket includes symmetrically arranged side plates, which are fixedly connected by an intermediate connecting plate, a first ear plate is fixed on the top of the intermediate connecting plate, and arc plates are symmetrically fixed on the upper and lower inner walls of the side plates; the arc plates are supported on the upper and lower sides of the A rod.
[0007] A B-rod lifting ear is installed in cooperation with the position where the first axial hole of the B-rod matches with the second axial hole of the A-rod.
[0008] The clamping and hoisting bracket structure comprises a lower clamping plate and an upper clamping plate, and the lower clamping plate and the upper clamping plate are fixedly connected at two sides by a tightening screw assembly.
[0009] A second hanging ear plate is fixed to the middle part of the top of the upper clamping plate, and the second hanging ear plate is fixed by the first reinforcing plate.
[0010] The B-rod lifting ear and the A-rod lifting ear have the same structure. The A-rod lifting ear comprises a circular bottom plate, a third lifting ear plate is fixed on the top of the circular bottom plate, and a second reinforcing plate is fixed between the third lifting ear plate and the circular bottom plate.
[0011] During hoisting, it includes a main hook, the main hook and the top pivot hole hoisting bracket are connected by a main hoisting wire rope; the main hook and the clamping hoisting bracket structure are connected by a first adjustment hand chain hoist; the main hook and the A-rod lifting ear are connected by a second adjustment hand chain hoist.
[0012] A method for removing the AB rod of the top pivot of a large ship lock miter gate by safely and quickly lifting tooling, comprising the following steps:
[0013] Step 1: Disassemble the A rod, B rod, anchor frame, studs, nuts, remove the wedge plate, and loosen the A rod wedge and B rod wedge;
[0014] Step 2: The main hook is equipped with the first adjustment hand chain hoist, the second adjustment hand chain hoist and the main hoisting wire rope. The main hoisting wire rope hooks up the top pivot hole hoisting bracket, the first adjustment hand chain hoist hooks up the clamping hoisting bracket structure, and the second adjustment hand chain hoist hooks up the A-rod lifting ear;
[0015] Step 3: Install the lower clamping plate and the upper clamping plate at the fixed position of the A-bar wedge, connect them through multiple tensioning screw assemblies, lock the nuts, and use the first adjustment hand chain hoist to pre-hook the clamping hoisting bracket structure;
[0016] Step 4: Arrange a short-stroke jack at the connection between rod A and rod B, and lift the short-stroke jack to separate the joint surface of rod A and rod B to create a gap;
[0017] Step 5: Place a screw jack between the upper clamping plate and the anchor frame, and slowly push the A rod out with force using the screw jack;
[0018] Step 6: Install the top pivot hole lifting bracket at the top pivot hole, and hook the top pivot hole lifting bracket with the main lifting wire rope;
[0019] Step 7: Install the A-rod lifting lug at the second axial hole of the A-rod, and use the main lifting hook with the first adjustment chain hoist to hook up the A-rod lifting lug;
[0020] Step 8: Adjust the center of gravity of rod A by the first adjustment hand chain hoist and the second adjustment hand chain hoist, and slowly lift rod A out of the anchor frame and door body;
[0021] Step 9: The main hook is equipped with the first adjustment chain hoist and the main hoisting wire rope. The main hoisting wire rope hooks up the B-bar lifting lug, and the first adjustment chain hoist hooks up the clamping hoisting bracket structure;
[0022] Step 10: Install the lower and upper clamping plates at the fixed position of the wedge block of the B rod, connect them through multiple tensioning screw assemblies, lock the nuts, and use the first adjustment hand chain hoist to pre-hook the clamping hoisting bracket structure;
[0023] Step 11: Install the B-rod lifting lug at the first axis hole of the B-rod, and hook up the B-rod lifting lug with the main lifting wire rope;
[0024] Step 12: Arrange a screw jack between the upper clamping plate and the anchor frame, and slowly push out the B rod with the screw jack;
[0025] Step 13: Adjust the center of gravity of rod B by adjusting the hand hoist, and slowly lift rod B out of the anchor frame.
[0026] The present invention has the following beneficial effects:
[0027] 1. The present invention adopts a safe and fast lifting tool for the top pivot A and B rods of a large ship lock miter gate. The lifting wire rope does not need to pass through the top pivot hole, thereby avoiding the wear of the inner wall of the copper sleeve of the A and B rods.
[0028] 2. The present invention adopts a large-scale ship lock miter gate top pivot A and B rod safe and fast lifting tooling, which makes the installation and lifting of the tooling more convenient and quick, greatly improving the construction efficiency.
[0029] 3. The present invention adopts a safe and fast lifting tool for the top pivot A and B rods of a large-scale ship lock miter gate, which reduces the input of construction human resources, avoids the construction personnel from working at high altitude for a long time, and enhances the construction safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0031] Figure 1 It is a top view of the lifting tool of the present invention arranged and installed on the A pole.
[0032] Figure 2 For the present invention Figure 1 Medium AA view.
[0033] Figure 3 For the present invention Figure 1 Medium BB view.
[0034] Figure 4 It is a three-dimensional diagram of the arrangement of the lifting tooling of the present invention.
[0035] Figure 5 It is a three-dimensional diagram of the tooling arrangement when the B pole is hoisted according to the present invention.
[0036] Figure 6 It is a top view of the tooling arrangement when the B pole is hoisted according to the present invention.
[0037] Figure 7 This is the CC view of the tooling arrangement when hoisting the B pole in 6 of the present invention.
[0038] Figure 8 It is a top view of the hook arrangement when A of the present invention is hoisted.
[0039] Fig. 9 This is the front view of the B rod of the present invention when it is hoisted.
[0040] Fig.10 The present invention is a flowchart of the hoisting process of the top pivot A rod of the miter door.
[0041] Fig.11 The present invention is a flowchart of the hoisting process of the top pivot B rod of the miter door.
[0042] In the figure: top pivot hole lifting bracket 1, locking screw assembly 2, upper clamping plate 3, lower clamping plate 4, A rod lifting lug 5, tensioning screw assembly 6, B rod lifting lug 7, A rod 8, B rod 9, top pivot hole 10, B rod first axial hole 11, A rod second axial hole 12, first adjustment hand chain hoist 13, main lifting wire rope 14, second adjustment hand chain hoist 15, main hook 16;
[0043] Side plate 101, first hanging ear plate 102, middle connecting plate 103, arc plate 104;
[0044] A second hanging ear plate 301 and a first reinforcing plate 302;
[0045] Circular bottom plate 501 , second reinforcing plate 502 , and third hanging ear plate 503 . DETAILED DESCRIPTION
[0046] The embodiments of the present invention are further described below in conjunction with the accompanying drawings.
[0047] Embodiment 1:
[0048] See also Figure 1-11A safe and fast lifting tool for the top pivot A and B rods of a large ship lock miter gate, comprising a top pivot hole lifting bracket 1, which is fixedly mounted on the top pivot hole 10 of the A rod 8 through a locking screw assembly 2; the A rod second axis hole 12 of the A rod 8 matches with the A rod lifting ear 5; a clamping lifting bracket structure for clamping the A rod 8 is installed on one end of the A rod 8 away from the top pivot hole 10. The above-mentioned fast lifting tool can be used for the auxiliary lifting of the top pivot AB rod of the ship lock miter gate.
[0049] Furthermore, the top pivot hole hanging bracket 1 includes symmetrically arranged side plates 101, the side plates 101 are fixedly connected via an intermediate connecting plate 103, a first hanging ear plate 102 is fixed to the top of the intermediate connecting plate 103, and arc plates 104 are symmetrically fixed to the upper and lower inner side walls of the side plates 101; the arc plates 104 are supported on the upper and lower sides of the A rod 8. The top pivot hole hanging bracket 1 can be used to hang and connect the pivot connection parts of the A rod 8 and the B rod 9.
[0050] Furthermore, a B-rod lifting lug 7 is installed in cooperation with the B-rod first axial hole 11 of the B-rod that matches the top pivot hole 10. The B-rod lifting lug 7 can be used to assist in lifting the B-rod 9.
[0051] Furthermore, the clamping and hoisting bracket structure includes a lower clamping plate 4 and an upper clamping plate 3 arranged at the upper and lower ends of the B rod 9, and the lower clamping plate 4 and the upper clamping plate 3 are fixedly connected at both sides by a tightening screw assembly 6. The above-mentioned clamping and hoisting bracket structure can be used to assist in hoisting the B rod 9.
[0052] Furthermore, a second lug plate 301 is fixed to the middle part of the top of the upper clamping plate 3, and the second lug plate 301 is fixed by a first reinforcing plate 302. The structural strength is enhanced by the above structure.
[0053] Furthermore, the B-bar lifting lug 7 and the A-bar lifting lug 5 have the same structure, and the A-bar lifting lug 5 comprises a circular bottom plate 501, a third lifting lug plate 503 is fixed on the top of the circular bottom plate 501, and a second reinforcing plate 502 is fixed between the third lifting lug plate 503 and the circular bottom plate 501. The lifting lug of the above structure ensures structural strength.
[0054] Furthermore, during hoisting, a main hook 16 is included, and the main hook 16 and the top pivot hole hoisting bracket 1 are connected by hooking through a main hoisting wire rope 14; the main hook 16 and the clamping hoisting bracket structure are connected by a first adjustment hand chain hoist 13; the main hook 16 and the A rod lifting ear 5 are connected by a second adjustment hand chain hoist 15. Through the cooperation between the above-mentioned main hook 16, the first adjustment hand chain hoist 13 and the second adjustment hand chain hoist 15, the center of gravity of the AB rod during the hoisting process can be adjusted.
[0055] Embodiment 2:
[0056] A method for removing the AB rod of the top pivot of a large ship lock miter gate by safely and quickly lifting tooling, comprising the following steps:
[0057] Step 1: Disassemble the A rod, B rod, anchor frame, studs, nuts, remove the wedge plate, and loosen the A rod wedge and B rod wedge;
[0058] Step 2: The main hook 16 is equipped with the first adjustment hand chain hoist 13, the second adjustment hand chain hoist 15 and the main hoisting wire rope 14, the main hoisting wire rope 14 hooks up the top pivot hole hoisting bracket 1, the first adjustment hand chain hoist 13 hooks up the clamping hoisting bracket structure, and the second adjustment hand chain hoist 15 hooks up the A-rod lifting ear 5;
[0059] Step 3: Install the lower clamping plate 4 and the upper clamping plate 3 at the fixed position of the wedge block of the A rod, connect them through multiple tensioning screw rod assemblies 6, lock the nuts, and use the main hook 16 with the first adjustment hand chain hoist 13 to pre-hook the clamping and lifting bracket structure;
[0060] Step 4: Arrange a short-stroke jack at the connection between the A rod 8 and the B rod 9, and lift the short-stroke jack to separate the joint surface of the A rod 8 and the B rod 9 to generate a gap;
[0061] Step 5: Arrange a screw jack between the upper clamping plate 3 and the anchor frame, and slowly push the A rod 8 out with force using the screw jack;
[0062] Step 6: Install the top pivot hole lifting bracket 1 at the top pivot hole 10, and hook the top pivot hole lifting bracket 1 with the main lifting wire rope 14;
[0063] Step 7: Install the A-rod lifting lug 5 at the second axial hole 12 of the A-rod, and use the main lifting hook 16 with the first adjusting hand chain hoist 13 to hook up the A-rod lifting lug 5;
[0064] Step 8: Adjust the center of gravity of the A-rod 8 by the first adjustment hand chain hoist 13 and the second adjustment hand chain hoist 15, and slowly lift the A-rod 8 out of the anchor frame and the door body;
[0065] Step 9: The main hook 16 is equipped with the first adjustment hand chain hoist 13 and the main hoisting wire rope 14, the main hoisting wire rope 14 hooks up the B-bar lifting lug 7, and the first adjustment hand chain hoist 13 hooks up the clamping hoisting bracket structure;
[0066] Step 10: Install the lower clamping plate 4 and the upper clamping plate 3 at the fixed position of the wedge block of the B rod, connect them through multiple tensioning screw rod assemblies 6, lock the nuts, and use the main hook 16 with the first adjustment hand chain hoist 13 to pre-hook the clamping and lifting bracket structure;
[0067] Step 11: Install the B-rod lifting lug 7 at the first axial hole 11 of the B-rod, and hook up the B-rod lifting lug 7 with the main lifting wire rope 14;
[0068] Step 12: a screw jack is arranged between the upper clamping plate 3 and the anchor frame, and the screw jack is used to slowly push out the B rod;
[0069] Step 13: Adjust the center of gravity of rod B by first adjusting the hand winch 13, and slowly lift rod B out of the anchor frame.
Claims
1. A safe and fast lifting tool for the top pivot A and B rods of a large ship lock miter gate, characterized in that: The invention comprises a top pivot hole hanging bracket (1), wherein the top pivot hole hanging bracket (1) is fixedly mounted on the top pivot hole (10) of the A rod (8) via a locking screw assembly (2); the A rod second axis hole (12) of the A rod (8) cooperates with the A rod hanging ear (5); and a clamping hanging bracket structure for clamping the A rod (8) is mounted on one end of the A rod (8) away from the top pivot hole (10); The top pivot hole hanging bracket (1) comprises symmetrically arranged side plates (101), the side plates (101) being fixedly connected via an intermediate connecting plate (103), a first hanging ear plate (102) being fixed on the top of the intermediate connecting plate (103), and arc plates (104) being symmetrically fixed on the upper and lower inner side walls of the side plates (101); the arc plates (104) are supported on the upper and lower sides of the A rod (8); A B-rod lifting lug (7) is installed in cooperation with the B-rod first axial hole (11) where the B-rod (9) cooperates with the A-rod second axial hole (12); The clamping and hoisting bracket structure comprises a lower clamping plate (4) and an upper clamping plate (3), and the lower clamping plate (4) and the upper clamping plate (3) are fixedly connected at both sides via a tensioning screw assembly (6); A second hanging ear plate (301) is fixed to the middle part of the top of the upper clamping plate (3), and the second hanging ear plate (301) is fixed by a first reinforcing plate (302); The B-rod lifting eye (7) and the A-rod lifting eye (5) have the same structure, and the A-rod lifting eye (5) comprises a circular bottom plate (501), a third lifting eye plate (503) is fixed on the top of the circular bottom plate (501), and a second reinforcing plate (502) is fixed between the third lifting eye plate (503) and the circular bottom plate (501); During hoisting, the main hoisting hook (16) is included. The main hoisting hook (16) and the top pivot hole hoisting bracket (1) are connected by hooking via a main hoisting wire rope (14); the main hoisting hook (16) and the clamping hoisting bracket structure are connected via a first adjustment hand chain hoist (13); and the main hoisting hook (16) and the A-rod lifting ear (5) are connected via a second adjustment hand chain hoist (15).
2. A method for removing the top pivots A and B of a large ship lock miter gate using the safe and fast lifting tooling of claim 1, comprising the following steps: Step 1: Disassemble the A rod, B rod, anchor frame, studs, nuts, remove the wedge plate, and loosen the A rod wedge and B rod wedge; Step 2: The main lifting hook (16) is equipped with a first adjustment hand chain hoist (13), a second adjustment hand chain hoist (15) and a main lifting wire rope (14); the main lifting wire rope (14) hooks up the top pivot hole lifting bracket (1); the first adjustment hand chain hoist (13) hooks up the clamping lifting bracket structure; and the second adjustment hand chain hoist (15) hooks up the A-rod lifting lug (5); Step 3: Install the lower clamping plate (4) and the upper clamping plate (3) at the fixed position of the wedge block of the A rod, connect them through multiple tensioning screw rod assemblies (6), lock the nuts, and use the main hook (16) with the first adjustment hand chain hoist (13) to pre-hook the clamping and lifting bracket structure; Step 4: Arrange a short-stroke jack at the connection between the A rod (8) and the B rod (9), and lift the short-stroke jack to separate the joint surfaces of the A rod (8) and the B rod (9) to generate a gap; Step 5: Arrange a screw jack between the upper clamping plate (3) and the anchor frame, and slowly push the A rod (8) out with force using the screw jack; Step 6: Install the top pivot hole lifting bracket (1) at the top pivot hole (10), and hook the top pivot hole lifting bracket (1) with the main lifting wire rope (14); Step 7: Install the A-rod lifting lug (5) at the second axial hole (12) of the A-rod, and use the main lifting hook (16) with the first adjustment hand chain hoist (13) to hook up the A-rod lifting lug (5); Step 8: Adjust the center of gravity of the A rod (8) by using the first adjustment hand chain hoist (13) and the second adjustment hand chain hoist (15), and slowly lift the A rod (8) out of the anchor frame and the door body; Step 9: The main lifting hook (16) is equipped with the first adjustment hand chain hoist (13) and the main lifting wire rope (14), the main lifting wire rope (14) hooks up the B-bar lifting lug (7), and the first adjustment hand chain hoist (13) hooks up the clamping lifting bracket structure; Step 10: Install the lower clamping plate (4) and the upper clamping plate (3) at the fixed position of the wedge block of the B rod, connect them through multiple tensioning screw rod assemblies (6), lock the nuts, and use the main hook (16) with the first adjustment hand chain hoist (13) to pre-hook the clamping and lifting bracket structure; Step 11: Install the B-rod lifting lug (7) at the first axial hole (11) of the B-rod, and hook the B-rod lifting lug (7) with the main lifting wire rope (14); Step 12: a screw jack is arranged between the upper clamping plate (3) and the anchor frame, and the screw jack is used to slowly push out the B rod with force; Step 13: Use the first adjustment chain hoist (13) to adjust the center of gravity of rod B and slowly lift rod B out of the anchor frame.
Citation Information
Patent Citations
Device for efficiently demounting miter gate top pintle A / B pull rod adjusting wedge block
CN203594002U
Safe and rapid loosening tool for top pivot wedge block of miter gate of large ship lock
CN214560505U
Safe and rapid hoisting tool for A rod and B rod of miter gate top pivot of large ship lock
CN216764030U
Swivel
GB201613230D0
Falling protect system
KR101459236B1