A method for testing overload of stern anchor bracket
Through the manual hoist and tension meter test device, combined with the angle installation of the support frame, the problem of low reliability and safety in the overload test of the stern anchor frame of small ships has been solved, and the accurate judgment and safety of the force deformation of the stern anchor frame have been achieved. operate.
Patent Information
- Application Number
- CN202111634660.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-29
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2041-12-29
AI Technical Summary
The reliability and safety of the overload test of the stern anchor rack of small ships are low. The existing method of suspending heavy objects can easily cause damage to the side wall of the hull, and it is difficult to meet the test conditions.
Using a test device consisting of a manual hoist and a tension meter, the test rope is passed through the stern anchor frame rotating guide, the target tension value is set for the tension test, and the shape changes of the stern anchor frame are recorded to simulate the vertical and horizontal movements of the stern anchor frame. In order to avoid the force deformation in the direction, use support frames to install them at angles to reduce the impact on the hull.
It improves the reliability and safety of the stern anchor rack test, avoids damage to the hull side wall by suspended heavy objects, provides a convenient operation method, and can accurately judge the stress deformation of the stern anchor rack in the vertical and horizontal directions. Improved the pertinence and accuracy of the test.
Smart Images

Figure CN114354355B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of stern anchor frame testing, and in particular relates to a stern anchor frame overload testing method. Background Art
[0002] The stern of a small ship is equipped with a reversible stern anchor frame. Due to the limitation of the width, the stern anchor frame is set near the deck edge line close to the side. When conducting an overload test on the side stern anchor frame, the stern anchor frame needs to be tilted to one side of the side, and a constant load is set at a specified angle to the rear. After unloading the load, check that the stern anchor frame should have no permanent deformation. The stern anchor frames of large ships are mostly fixed at the stern end of the ship. The stern anchor frames are mostly tested by suspending heavy objects. When this method is directly applied to small ships, the load action line is close to the side, and the heavy objects used as loads are prone to collide with the hull and side piers, beams and other slipway equipment. The test conditions are difficult to meet, and the reliability and safety of the test are difficult to guarantee. Summary of the invention
[0003] The present application aims to at least to some extent solve the technical problems of low reliability and safety of the existing stern anchor frame testing method when applied to small hulls. To this end, the present application provides a stern anchor frame overload testing method.
[0004] The technical solution of this application is as follows:
[0005] A stern anchor frame overload test method comprises the following steps:
[0006] A testing device is provided, the testing device comprising a manual hoist and a dynamometer, the hook of the manual hoist is connected to the hull, and the hook of the manual hoist is connected to one end of the dynamometer;
[0007] Provide a test rope, pass one end of the test rope through the rotating fairlead of the stern anchor frame and then connect it to the stern anchor machine, connect the other end of the test rope to the other end of the dynamometer, and the straightened test rope has an angle with the horizontal plane and the mid-longitudinal section of the hull;
[0008] Performing a tension test, setting a target tension value, driving the manual hoist until the tension value indicated by the tension meter reaches the target tension value, and maintaining it for a period of time;
[0009] The test rope is disassembled, and after a period of time, the stern anchor bracket is inspected for deformation.
[0010] In some embodiments, the tension test step is repeated multiple times, and the target tension value in each tension test step is different.
[0011] In some embodiments, the target tension value increases with the number of times the tension test is repeated.
[0012] In some embodiments, the target tension value of the multiple tension tests is in the range of 0.8-1.1 times of the predicted tension value, and the predicted tension value is the maximum tension value when the stern anchor bracket is designed.
[0013] In some embodiments, the step of detecting whether the stern anchor bracket is deformed comprises:
[0014] Before the tension test, recording the shape of the stern anchor bracket;
[0015] The shape of the stern anchor bracket after a period of time of disassembly of the test rope is compared with the shape of the stern anchor bracket before the tension test.
[0016] In some embodiments, the specific step of detecting whether the stern anchor frame is deformed includes:
[0017] marking the orthographic projection of the end of the rotating fairlead on the deck of the hull;
[0018] After a period of time of disassembling the test rope, the orthographic projection of the end of the rotary rope guide on the deck of the hull is marked again, and the deformation of the stern anchor bracket can be determined by comparing the two marks.
[0019] In some embodiments, the angle between the straightened test rope and the horizontal plane is 10°, and the angle between the straightened test rope and the mid-longitudinal section of the hull is 14°.
[0020] In some embodiments, the testing device further comprises a support frame, the support frame is detachably mounted on the hull, and a line between a top end of the support frame and the rotating fairlead has an angle with both a horizontal plane and a vertical plane;
[0021] The hook of the manual hoist is connected to the top of the support frame.
[0022] In some embodiments, the support frame includes a bottom bracket, a hanging ring and three support rods, the lines connecting the bottom ends of the three support rods and the connection points of the bottom bracket are in a triangle, and the top ends of the three support rods are fixedly connected to the hanging ring.
[0023] In some embodiments, a through hole is provided in the middle of the hanging ring, and the axis of the through hole is perpendicular to a line connecting the top end of the support frame and the rotating rope guide.
[0024] The embodiments of the present application have at least the following beneficial effects:
[0025] It can be seen from the above technical scheme that the stern anchor overload test method disclosed in the present invention provides a test device and a test rope, so that the stress generated by the manual hoist in the test device is offset inside the hull, and the test of the stern anchor is no longer limited to the existing direction of adding weights, thereby avoiding the risk of damage to the side wall of the hull caused by the suspended weights. At the same time, after the test device is installed, a single operator can operate the manual hoist and record the tension data, which is convenient to operate and has high safety performance; and the force direction of the stern anchor during use is simulated, which is targeted, and provides a way to judge the force deformation of the stern anchor in the vertical and horizontal directions, thereby improving the reliability of the test. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0027] Figure 1 A schematic flow chart of an overload test method for a stern anchor frame in an embodiment of the present application is shown;
[0028] Figure 2 A schematic diagram of the structure of a test device in an embodiment of the present application is shown;
[0029] Figure 3 Shows Figure 2 A schematic diagram of the structure of the test device from another perspective;
[0030] Figure 4 Shows Figure 2 A schematic diagram of the three-dimensional structure of the support frame;
[0031] Markings in the figure: 1-hull, 101-deck, 102-stern anchor bracket, 2-manual hoist, 3-tension gauge, 4-test rope, 5-support frame, 501-bottom bracket, 502-support rod, 503-hanging ring, 504-first support plate, 505-second support plate. DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0033] In addition, the present application may repeat reference numbers and / or reference letters in different examples, and such repetition is for the purpose of simplicity and clarity, and does not in itself indicate the relationship between the various embodiments and / or settings discussed. In addition, the present application provides various specific examples of processes and materials, but those of ordinary skill in the art may recognize the application of other processes and / or the use of other materials.
[0034] The stern anchor frame is the force point of the stern anchor cable, and the strength of the stern anchor frame needs to be strong enough. The stern anchor frame of a general large ship is high from the ground and far from the side wall of the hull. The strength of the stern anchor frame can be obtained by directly suspending heavy objects through the stern anchor cable. However, due to the size of small ships, when suspending heavy objects, the heavy objects are easy to hit the outer shell of the hull.
[0035] The present application is described below with reference to the accompanying drawings and specific embodiments:
[0036] like Figure 1 , Figure 2 and Figure 3 As shown, this embodiment provides a stern anchor bracket overload test method, comprising the following steps:
[0037] Step 1: Provide a testing device, which includes a manual hoist 2 and a dynamometer 3 , wherein a hook of the manual hoist 2 is connected to the hull 1 , and a hook of the manual hoist 2 is connected to one end of the dynamometer 3 .
[0038] Step 2: Provide a test rope 4, pass one end of the test rope 4 through the rotating rope guide of the stern anchor frame 102 and connect it to the stern anchor machine, connect the other end of the test rope 4 to the other end of the dynamometer 3, and the straightened test rope 4 has an angle with the horizontal plane and the mid-longitudinal section of the hull 1.
[0039] Step 3: Perform a tension test, set a target tension value, drive the manual hoist 2 until the tension value shown by the tension meter 3 reaches the target tension value, and maintain it for a period of time.
[0040] Step 4: Remove the test rope 4 and after a period of time, check whether the stern anchor bracket 102 is deformed.
[0041] Through the test device and test rope 4 provided in step 1 and step 2, the stress generated by the manual hoist 2 in the test device is offset inside the hull, and the test of the stern anchor frame 102 is no longer limited to the existing direction of adding weights, avoiding the risk of damage to the side wall of the hull caused by the suspended weights. At the same time, after the test device is installed, a single operator can operate the manual hoist 2 and record the tension data, which is convenient and safe to operate. Compared with the test method of suspending heavy objects, which can only obtain the deformation of the stern anchor frame 102 in the vertical direction, this embodiment simulates the force direction of the stern anchor frame 102 during use through step 3, which is targeted and provides a method for judging the force deformation of the stern anchor frame 102 in the vertical and horizontal directions. The target tension value in step 3 can be a predicted tension value, which is the tension value that the hull 1 requires the stern anchor frame 102 to withstand when designing.
[0042] The mid-longitudinal section is a section formed by cutting the hull 1 with the midline plane. The test rope 4 can directly adopt the stern anchor cable, but in order to reduce the wear of the test on the stern anchor cable, the test rope 4 in this embodiment can adopt a steel cable.
[0043] In order to further reduce the test error, in this embodiment, steps 3 and 4 are repeated multiple times, and the stern anchor bracket 102 is tested by target tension values of different values, so as to relatively accurately measure the maximum tension value that the stern anchor bracket 102 can withstand. If the tension value that the stern anchor bracket 102 can withstand does not meet the design requirements of the hull 1, multiple sets of measured tension data can show the difference between the distance of the stern anchor bracket 102 and the design requirements, which is convenient for improving the strength of the stern anchor bracket 102.
[0044] Specifically, the size of the target tension value increases with the number of repeated tension tests, and the target tension value of multiple tension tests ranges from 0.8 to 1.1 times the predicted tension value. The target tension value of the tension test may be greater than the predicted tension value to ensure that the stern anchor bracket 102 can cope with the extreme overload situation. It can be understood that if the predicted tension value of the hull 1 is relatively large during design, the maximum value of the target tension value may only be the predicted tension value.
[0045] In step 4, the step of detecting whether the stern anchor bracket 102 is deformed includes:
[0046] Step 401: Before the tension test, the shape of the stern anchor bracket 102 is recorded.
[0047] Step 402: Compare the shape of the stern anchor bracket 102 after a period of time of disassembly of the test rope 4 with the shape of the stern anchor bracket 102 before the tension test.
[0048] There are many ways to record the stern anchor bracket 102, such as using a camera to continuously shoot and record the stern anchor bracket 102. However, considering the test cost, the specific steps of detecting whether the stern anchor bracket 102 is deformed in this embodiment include:
[0049] Mark the orthographic projection of the end of the rotating fairlead on the deck 101 of the hull 1. After a period of time of disassembling the test rope 4, mark the orthographic projection of the end of the rotating fairlead on the deck 101 of the hull 1 again, and compare the two marks to determine whether the stern anchor bracket 102 is deformed. The orthographic projection can be obtained by hanging a line. Furthermore, the orthographic projection of the end of the rotating fairlead on the longitudinal section of the hull 1 can also be used to determine whether the stern anchor bracket 102 is deformed.
[0050] In step 3, the angle between the straightened test rope 4 and the horizontal plane is 10°, and the angle between the straightened test rope 4 and the mid-longitudinal section of the hull 1 is 14°, thereby simulating the force angle of the stern anchor frame 102 in use and meeting the test standards of the stern anchor frame 102.
[0051] In order to enable the test rope 4 to reach the above angle during testing, the testing device also includes a support frame 5, which is detachably mounted on the hull 1, and the line between the top of the support frame 5 and the rotating rope guide has an angle with the horizontal plane and the vertical plane; the hook of the manual hoist 2 is connected to the top of the support frame 5.
[0052] Reference Figure 4 Specifically, the support frame 5 includes a bottom bracket 501, a hanging ring 503 and three support rods 502. The lines connecting the bottom ends of the three support rods 502 and the connection points of the bottom bracket 501 are in the shape of a triangle. The top ends of the three support rods 502 are fixedly connected to the hanging ring 503. The three support rods 502 utilize the stability of the triangle to improve the strength of the support frame 5. Furthermore, the bottom bracket 501 also includes a first support plate 504, a second support plate 505 and a third support plate connected to the support rods 502. The first support plate 504, the second support plate 505 and the third support plate are fixedly installed on the side wall of the hull 1. The first support plate 504, the second support plate 505 and the third support plate are enclosed in a triangle to further enhance the strength of the support frame 5. Generally speaking, the strength of the support frame 5 is greater than the strength of the stern anchor frame 102 to ensure that the test angle of the test rope 4 remains unchanged.
[0053] A through hole is provided in the middle of the hanging ring 503, and the axis of the through hole is perpendicular to the connection line between the top of the support frame 5 and the rotating rope guide, so as to prevent the axial direction of the hanging ring 503 from affecting the direction of the test rope 4, so that the angle of the test rope 4 meets the test requirements. In the process of specifically designing and manufacturing the support frame 5, a standard eye plate can be directly selected as the hanging ring 503. As a universal material, the standard eye plate has many specifications and does not require additional processing. The operator can select a matching standard eye plate according to the specifications of the hook of different manual hoists 2, thereby reducing the production cost of the support frame 5 and shortening the manufacturing time of the support frame 5.
[0054] In the present application, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0055] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise" and "counterclockwise" indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0056] It should be noted that all directional indications in the embodiments of the present application are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indication will also change accordingly.
[0057] In this application, unless otherwise clearly specified and limited, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "fixation" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0058] In addition, the descriptions of "first", "second", etc. in this application are only for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0059] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine different embodiments or examples described in this specification.
[0060] In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the fact that they can be implemented by ordinary technicians in this field. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by this application.
[0061] Although the embodiments of the present application have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the claims and their equivalents.
Claims
1. A stern anchor frame overload test method, characterized in that: The following steps are involved: A testing device is provided, the testing device comprising a manual hoist, a dynamometer and a support frame, the support frame is detachably mounted on the hull, a line between the top end of the support frame and the rotating fairlead of the stern anchor frame has an angle with both the horizontal plane and the vertical plane; a hook of the manual hoist is connected to the top end of the support frame, and a hook of the manual hoist is connected to one end of the dynamometer; Providing a test rope, passing one end of the test rope through the rotating fairlead and then connected to the stern windlass, connecting the other end of the test rope to the other end of the dynamometer, and the straightened test rope has an angle with the horizontal plane and the mid-longitudinal section of the hull; Performing a tension test, setting a target tension value, and driving the manual hoist until the tension value indicated by the tension meter reaches the target tension value; The test rope is disassembled to check whether the stern anchor bracket is deformed.
2. The stern anchor overload test method according to claim 1, characterized in that: The tension test step is repeated multiple times, and the target tension value in each tension test step is different.
3. The stern anchor overload test method according to claim 2, characterized in that: The target tension value increases with the number of times the tension test is repeated.
4. The stern anchor overload test method according to claim 3, characterized in that: The target tension value of the multiple tension tests is in the range of 0.8-1.1 times of the predicted tension value, and the predicted tension value is the maximum tension value when the stern anchor bracket is designed.
5. The stern anchor overload test method according to claim 1, characterized in that: The step of detecting whether the stern anchor frame is deformed comprises: Before the tension test, recording the shape of the stern anchor bracket; The shape of the stern anchor bracket after a period of time of disassembly of the test rope is compared with the shape of the stern anchor bracket before the tension test.
6. The stern anchor overload test method according to claim 5, characterized in that: The specific steps of detecting whether the stern anchor frame is deformed include: marking the orthographic projection of the end of the rotating fairlead on the deck of the hull; After a period of time of disassembling the test rope, the orthographic projection of the end of the rotary rope guide on the deck of the hull is marked again, and the deformation of the stern anchor bracket can be determined by comparing the two marks.
7. The stern anchor overload test method according to claim 1, characterized in that: The angle between the straightened test rope and the horizontal plane is 10°, and the angle between the straightened test rope and the mid-longitudinal section of the hull is 14°.
8. The stern anchor overload test method according to claim 1, characterized in that: The support frame includes a bottom bracket, a hanging ring and three support rods. The lines connecting the bottom ends of the three support rods and the connection points of the bottom bracket are in a triangle shape, and the top ends of the three support rods are fixedly connected to the hanging ring.
9. The stern anchor overload test method according to claim 8, characterized in that: A through hole is provided in the middle of the hanging ring, and the axis of the through hole is perpendicular to the connection line between the top end of the supporting frame and the rotating rope guide.