Short-term dispatch and response incentive method for EV aggregators considering road traffic model
By building a road traffic model of electric vehicles short-term demand response model and optimizing incentive prices, the problem that the power system cannot effectively utilize electric vehicle resources during emergency demand is solved, and more efficient short-term scheduling and user participation are achieved to ensure grid resources. flexibility and stability.
Patent Information
- Application Number
- CN202111479915.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-06
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2041-12-06
AI Technical Summary
The existing electric vehicle scheduling and user response incentive methods fail to fully consider the road traffic model, resulting in the power system being unable to quickly and efficiently utilize the short-term charging and discharging resources of electric vehicles in the event of emergency peak cutting and valley filling demand or power outages.
A short-term scheduling and response incentive method for EV aggregators considering the road traffic model is proposed. By constructing a short-term demand response model for a single EV, rating charging station selection, optimizing the basic incentive price of users, and simulating user response uncertainty, Formulate the optimal short-term scheduling decision-making plan.
This method comprehensively considers road conditions, distance, costs and benefits during the scheduling process, improves users' enthusiasm for participation, ensures that the power grid obtains abundant and flexible short-term demand response resources, and achieves win-win returns for aggregators and users.
Smart Images

Figure CN114372606B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of electric vehicle optimization scheduling, and in particular to a short-term scheduling and response incentive method for EV aggregators considering a road traffic model. Background Art
[0002] In recent years, the number of electric vehicle users in my country has grown rapidly. Electric vehicles have the characteristics of adjustable load and energy storage. Their orderly charging and discharging can provide flexible demand response resources for the power system. Most of the existing electric vehicle scheduling and user response incentive methods are aimed at electric vehicle scheduling under normal circumstances before and during the day, and mainly focus on slow charging and discharging of vehicles. When the power system faces more urgent peak-shaving and valley-filling needs or even power outages caused by faults, dispatching electric vehicles to charging stations for orderly high-power charging and discharging can provide the power system with fast, efficient, flexible and relatively stable short-term demand response resources.
[0003] The amount of electricity and time constraints of EVs participating in short-term dispatch at charging stations are closely related to real-time road traffic information and the EV driving process. The various costs incurred by EVs during driving and charging and discharging affect the revenue of aggregators and the willingness of users to respond. The existing models fail to comprehensively consider the impact of factors such as road conditions, distance, cost and benefit on user psychology. Therefore, it is necessary to propose a short-term dispatch strategy for EV aggregators considering the road traffic model and a two-step pricing response incentive method to fully mobilize the enthusiasm of users to participate and provide the power grid with relatively abundant and flexible short-term demand response resources. Summary of the invention
[0004] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and provide a short-term scheduling and response incentive method for EV aggregators taking into account the road traffic model.
[0005] The purpose of the present invention can be achieved through the following technical solutions:
[0006] A short-term dispatch and response incentive method for EV aggregators considering a road traffic model includes the following steps:
[0007] 1) Construct a short-term demand response model for a single EV;
[0008] 2) Considering various costs during the driving process and the charging and discharging process, a short-term demand response cost function for a single EV is constructed;
[0009] 3) Construct an EV target charging station selection model based on entropy weight method scoring to determine the selected target charging station;
[0010] 4) Determine the optimization constraints of the basic incentive price for EV users based on the EV score and the improved user participation rate model, and use this to build and solve the optimization model for the basic incentive price for EV users;
[0011] 5) Considering the uncertainty of user response caused by distance, a model of the user's actual response quantity is constructed;
[0012] 6) Determine the short-term scheduling constraints of EV aggregators, and use them to build and solve the short-term scheduling decision model of EV aggregators to obtain the optimal short-term scheduling decision plan.
[0013] In the step 1), the short-term demand response model of a single EV includes a dispatchable period model and a maximum dispatchable capacity model. The dispatchable period model is specifically:
[0014]
[0015] Among them, T max,m,n is the scheduling period flexibility, T arrive,m,n and T leave,n are the earliest time when the nth EV can start charging and discharging at charging station m and the latest time when it can leave, T is the total number of scheduling periods, Δt is the length of each scheduling period, t A,m,n is the time when the nth EV arrives at the mth charging station, t0 and t e are the start time of the first scheduling period and the end time of the last scheduling period, respectively, t E,n The response end time declared by the user, symbol Indicates rounding up;
[0016] The maximum dispatchable capacity model is specifically:
[0017]
[0018] Among them, Q max,m,n is the maximum dispatchable capacity of the nth EV at charging station m, Q max1,m,n , Q max2,m,n are the maximum dispatchable capacity of the nth EV at charging station m considering power constraints and time constraints, SOC E,n , SOC S,n are the response end state of charge reported by the nth EV user and the initial state of charge of the EV, W n is the battery capacity of vehicle n, P cmax,n , P dcmax,n are the maximum charging and discharging power of vehicle n, respectively, c , η d are the charging and discharging efficiency of EV, Q D,m,n is the total power consumption of vehicle n when driving to charging station m, qD,ij is the unit mileage energy consumption of road section ij, d ij is the length of the road section ij, l ij represents the road segment between nodes i and j, L mn is the shortest path for the nth EV to reach charging station m.
[0019] In the step 2), the short-term demand response cost function of a single EV includes a fixed cost function generated during the driving process and a variable cost function generated during the charging and discharging process. The fixed cost function is specifically:
[0020]
[0021] Among them, C 1,m,n is the fixed cost of the nth EV to participate in the dispatch to charging station m, C Q,m,n is the electricity consumption cost of EV driving, C T,m,n is the travel time cost, C wait,m,n is the waiting time cost of the vehicle arriving before the dispatch starts, α is the time value coefficient, and p p With T p are the annual income and annual working hours of the workers, t D,m,n is the travel time from vehicle n to charging station m, t wait,m,n is the waiting time when vehicle n arrives at charging station m in advance, and p0 is the daily average electricity price;
[0022] The variable cost function is specifically:
[0023]
[0024] Among them, C 2,m,n is the variable cost of EV participating in dispatch, is the charging electricity cost of EV users participating in charging response, C DOD,m,n To participate in the discharge response, the loss cost of the battery life of the EV is calculated. The electricity cost for users to recharge the EV participating in the discharge response after the EV is discharged, T start,n With T end,n are the start and end time periods of the actual dispatch of vehicle n by the aggregator, Q m,n (t) is the actual dispatch capacity of the nth EV at the charging station m in the tth period when the aggregator dispatches it.
[0025] In the step 3), the EV target charging station selection model based on the entropy weight method scoring is specifically:
[0026]
[0027]
[0028] in, and are the standardized value, initial value and normalized result of the wth indicator of the vehicle n to the charging station m. The EV scoring indicators include the flexibility of the scheduling period, the maximum dispatchable capacity and the user's fixed cost. is the weight of each indicator, e m,n is the score of vehicle n participating in the dispatch to charging station m, W is the total number of evaluation indicators, M is the number of charging stations managed by the aggregator, ξ m,n is a 0-1 variable indicating that vehicle n selects charging station m as the target charging station.
[0029] In the step 4), the objective function expression of the EV user basic incentive price optimization model is:
[0030]
[0031] The constraints include:
[0032]
[0033] in, are the upper and lower limits of user participation rate, respectively. Parameters r1, h1, r2, and h2 are the values obtained through the aggregator's preliminary research and historical data for charging and discharging, respectively. 1,n1 、c 1,n2 are the basic incentive prices of vehicles n1 and n2, respectively, n is the probability of vehicle n participating in the response, the membership degree σ is a parameter describing the impact of road conditions on different dates and time periods on user participation rate, c0 is the minimum difference between the basic incentive prices of two adjacent EV users set by the aggregator, and f av The average user participation rate set by the aggregator, k m is the number of EVs that use the mth charging station as the target charging station, are the scores of two adjacent electric cars n1 and n2 after sorting the electric cars in ascending order.
[0034] In the step 5), considering the uncertainty of user response caused by distance, the expression of the user's actual response model is:
[0035]
[0036] in, is the actual response amount obtained by the aggregator considering the uncertainty of its response when vehicle n is actually selected to participate in the dispatch, Q is the ratio of the actual under-response of the nth EV due to the distance to its dispatch capacity by the aggregator, obtained through Monte Carlo sampling,Lmax,n is its upper limit, U[] represents uniform distribution, Q n (t) is the actual dispatch quantity of the aggregator for the nth EV in period t, D n is the shortest path distance for vehicle n to reach its target charging station, D max Q is the maximum value of the shortest path distance for all EVs that agree to participate in the dispatch to reach their target charging station. MR The maximum proportion of insufficient user responses.
[0037] In step 6), the objective function of the short-term scheduling decision model of the EV aggregator is:
[0038]
[0039]
[0040] in, and are the expected revenue of aggregator k, the expected expenditure of compensating users, and the expected compensation due to insufficient response capacity exceeding the specified margin, and They represent the revenue of aggregator k, the expenditure on compensating users and the compensation caused by insufficient response capacity exceeding the specified margin in the sth simulation, ω is the penalty imposed by the power company on the aggregator for insufficient response, and x l ∈{x 1 ,x 2 ,...,x L} is the l-th price among the L-level additional incentive prices set by the aggregator, β is the penalty coefficient for insufficient user response, and F 1,n is the basic incentive for user n, and They represent the additional response incentive and insufficient response penalty of the nth EV when the price l is selected, The probability that user n chooses price l is The probability of users choosing the l-th tier additional incentive price obtained by the aggregator simulation is the largest, and its value is p max , at this time, the probability of users choosing the remaining incentive prices is set to be equal, and its value is (1-p max ) / (L-1).
[0041] In step 6), the constraints of the short-term scheduling decision model of the EV aggregator are:
[0042]
[0043] Among them, Q 0,n is the maximum responsive capacity of the nth EV in a single period Δt, SOC n (tE,n ) and SOC E,n are the actual EV charge state when the user leaves after responding and the charge state requirement reported by the user at the end of the response, SOC(t) is the charge state of the user during time period t, and SOC min , SOC max are the lower and upper limits of the vehicle's state of charge during charging and discharging, respectively. select N is the number of users that the aggregator actually chooses to call. a is the number of users who finally agree to participate in the scheduling, μ k Quote for the kth aggregator, are the highest and lowest bids of the aggregator, respectively, and their values are related to the demand response level Φ, ε n Q is a 0-1 variable indicating whether vehicle n is actually selected for call. SCmin In order to avoid a user's actual dispatch capacity being too low, resulting in the user's revenue being far lower than expected, the minimum actual dispatch capacity of the called EV is stipulated. is the response reliability of aggregator k, P remin Minimum requirements for the reliability of responses from aggregators;
[0044] The response reliability of the aggregator k The expression is:
[0045]
[0046]
[0047] in, is the actual total response capacity simulated by aggregator k, is the winning bid capacity of aggregator k, δ is the margin allowed by the power company to allow aggregators to have insufficient response, N sim Indicates the number of simulations, N z For Monte Carlo simulation The number of times.
[0048] The method further comprises the following steps:
[0049] 7) Determine the constraints for the clearing of the power company's dispatching organization, build and solve the power company's dispatching optimization model, and obtain the power company's dispatching optimization plan.
[0050] In the step 7), the objective function of the power company dispatch optimization model is:
[0051]
[0052]
[0053] The constraints for the power company dispatching agency to clear are:
[0054]
[0055] Among them, μ MP The highest bid among the successful bidders. is the bid capacity of aggregator k, Q EC is the total demand capacity of the power company, and K is the total number of aggregators participating in the bidding.
[0056] Compared with the prior art, the present invention has the following advantages:
[0057] This method comprehensively considers the impact of factors such as road conditions, distance, cost and benefit on users in the design of the dispatch process and response incentives. It is more in line with the actual situation and fully respects the user's wishes. It is conducive to mobilizing the enthusiasm of EV users to participate and selecting and guiding better users to participate in dispatch. It can provide the power grid with relatively abundant and flexible short-term demand response resources while realizing the benefits of aggregators and users. BRIEF DESCRIPTION OF THE DRAWINGS
[0058] Figure 1 A dispatch framework for short-term demand response.
[0059] Figure 2 This is the road network structure diagram of aggregator C.
[0060] Figure 3 The expected net profit and reliability of aggregator C change with the bid capacity.
[0061] Figure 4 It is the trend of dispatching amount, response amount and number of called EVs with the change of bid capacity.
[0062] Figure 5 Comparison of the number of EVs that can be dispatched in each period under the three schemes.
[0063] Figure 6 Provide users with incentives for income expectations and changing trends in charging electricity expenses.
[0064] Figure 7 Schematic diagram of the EV scheduling process numbered 27. DETAILED DESCRIPTION
[0065] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.
[0066] Example
[0067] The present invention proposes a short-term dispatch and response incentive method for EV aggregators considering a road traffic model. The present invention establishes an electric vehicle short-term demand response model considering a road traffic model; takes into account the user's driving process and the cost of the charging and discharging process, comprehensively considers the electric vehicle score, the user participation rate model and the response uncertainty caused by the distance, proposes a short-term dispatch strategy for electric vehicle aggregators and designs a corresponding two-step pricing response incentive method, which specifically includes the following steps:
[0068] 1) Obtain road traffic information and EV location information, obtain the initial response intention and vehicle information reported by EV users, and establish a short-term demand response model for a single EV;
[0069] 2) Considering various costs during the driving process and the charging and discharging process, a short-term demand response cost function for a single EV is established;
[0070] 3) The entropy weight method is used to score the process of EVs participating in the dispatch of each charging station and select the target charging station for the vehicle;
[0071] 4) Establish constraints for optimizing the user basic incentive price based on EV scores and improved user participation rate model;
[0072] 5) Establish an optimization model for the basic incentive price of EV users and solve it using Matlab+Cplex software, send the optimized basic incentive price to users, and guide users to re-declare their response willingness;
[0073] 6) Considering the uncertainty of user response caused by distance, a model of the user's actual response quantity is established;
[0074] 7) Establish short-term dispatch constraints for EV aggregators;
[0075] 8) Simulate the user's additional incentive price selection, establish the EV aggregator's short-term scheduling decision model and solve it using MATLAB+CPLEX software to obtain the aggregator's specific scheduling plan and bidding decision plan;
[0076] 9) Establish constraints on the clearing of power company dispatching agencies;
[0077] 10) Establish a dispatch optimization model for power companies and solve the bidding results of multiple aggregators based on the information of each aggregator.
[0078] The present invention considers the impact of the road traffic model on user costs and aggregator benefits during the optimization scheduling process, obtains real-time road traffic information, EV location information, and vehicle information reported by users who are willing to participate in scheduling, and establishes a road resistance model for EV driving, using driving time as the road resistance; on this basis, a single EV short-term demand response model is established. In step (1), the EV driving speed v in road section ij isij The calculation is shown in formula (1):
[0079]
[0080] Among them, v0 is the zero flow velocity of the road section corresponding to the road grade. my country's urban roads are mainly divided into four grades: expressway, trunk road, secondary trunk road and branch road; k ij is the traffic density of the road section, N ij The number of vehicles traveling on this road section at that moment.
[0081] The road resistance model of EV driving is shown in formula (2):
[0082]
[0083] Among them, t A,m,n is the time when the nth EV arrives at the mth charging station, t S,m,n is the time when the nth EV completes the contract signing and starts driving to charging station m, t D,m,n is the travel time of the nth EV to charging station m, l ij represents the road segment between nodes i and j, t ij d ij With v ij are the average travel time, length and average EV travel speed of road section ij, respectively. mn is the shortest path for the nth EV to reach charging station m, which can be obtained by the Dijkstra algorithm.
[0084] According to the initial response intention declared by EV users and vehicle information, an EV short-term demand response model is established to calculate the dispatchable time period and maximum dispatchable capacity of each EV to each charging station.
[0085] The schedulable period model is shown in formula (3):
[0086]
[0087] Among them, T max,m,n is the scheduling period flexibility, T arrive,m,n and T leave,n are the earliest time when the nth EV can start charging and discharging at charging station m and the latest time when it can leave, T is the total number of scheduling periods, Δt is the length of each scheduling period, t0 and t e are the start time of the first scheduling period and the end time of the last scheduling period, respectively, t E,n The response end time declared by the user, symbol Indicates rounding up. If the EV arrives before t0, it can start charging and discharging at the beginning of the first scheduling period; if the EV arrives after t0, it can start charging and discharging at the beginning of the next period after arrival. Similarly, if the response end time reported by the user is t E,n In t e Previously, it was considered that the user could leave at the beginning of the period; if the user reported the response end time t E,n In t e After that, it is considered that the user can leave at the beginning of the next period after the scheduling ends, that is, at the end of the last scheduling period.
[0088] The maximum dispatchable capacity model is shown in formula (4):
[0089]
[0090] Among them, Q max,m,n is the maximum dispatchable capacity of the nth EV at charging station m, Q max1,m,n , Q max2,m,n The maximum dispatchable capacity of the nth EV at charging station m is calculated considering the power constraint and the time constraint, respectively. E,n , SOC S,n are the response end state of charge reported by the nth EV user and the initial state of charge of the EV, W n is the battery capacity of vehicle n, P cmax,n , P dcmax,n are the maximum charging and discharging power of vehicle n, respectively, c , η d are the charging and discharging efficiency of EV, Q D,m,n is the total power consumption of vehicle n when driving to charging station m, q D,ij is the energy consumption per unit mileage of road section ij.
[0091] In step (2), a cost function model for each EV to participate in short-term demand response at each charging station is established, including a fixed cost function generated during the driving process and a variable cost function generated during the charging and discharging process.
[0092] The fixed cost function of a single EV is shown in formula (5):
[0093]
[0094] Among them, C 1,m,n is the fixed cost of EV participating in the dispatch, C Q,m,n is the electricity consumption cost of EV driving, C T,m,n is the travel time cost, C wait,m,n is the waiting time cost of the vehicle arriving before the dispatch starts, α is the time value coefficient, and p p With Tp are the annual income and annual working hours of the workers, t wait,m,n is the waiting time when vehicle n arrives at charging station m in advance, and p0 is the daily average electricity price.
[0095] The variable cost function of a single EV is shown in formula (6):
[0096]
[0097] Among them, C 2,m,n is the variable cost of EV participating in dispatch, is the charging electricity cost of EV users participating in charging response, C DOD,m,n To participate in the discharge response, the loss cost of the battery life of the EV is calculated. The electricity cost for users to recharge the EV participating in the discharge response after the EV is discharged, T start,n With T end,n are the start and end time periods of the actual dispatch of vehicle n by the aggregator, Q m,n (t) is the actual dispatch capacity of the nth EV at the charging station m in the tth period when the aggregator dispatches it.
[0098] In step (3), the process of EVs participating in the scheduling of each charging station is scored by entropy weight method using scheduling period flexibility, maximum dispatchable capacity and user fixed cost as scoring indicators, and the target charging station is selected for the vehicle based on the scoring results. The EV scoring model based on entropy weight method is shown in formula (7):
[0099]
[0100] in, and are the standardized value, initial value and normalized result of the wth indicator of the vehicle n to the charging station m, respectively. is the weight of each indicator, e m,n is the score of vehicle n participating in the dispatch to charging station m, W is the total number of evaluation indicators, and M is the number of charging stations managed by the aggregator.
[0101] The largest non-zero value among the scores of each EV at each charging station is selected as the final score of the EV, and the corresponding charging station is its target charging station. The EV target charging station selection model is shown in formula (8):
[0102]
[0103] Among them, ξ m,n is a 0-1 variable indicating that vehicle n selects charging station m as the target charging station.
[0104] In step (4), an improved user participation rate model is established. According to the EV score, the improved user participation rate model and the average user participation rate, the optimization constraints of the user basic incentive price are listed as shown in formula (9):
[0105]
[0106] in, are the upper and lower limits of user participation rate, respectively. Parameters r1, h1, r2, and h2 take different values for charging and discharging, respectively, which are obtained through the preliminary research and historical data of the aggregator; c 1,n is the basic incentive price of vehicle n, f n is the probability of vehicle n participating in the response, the membership degree σ is a parameter describing the impact of road conditions on different dates and time periods on user participation rate, c0 is the minimum difference between the basic incentive prices of two adjacent EV users set by the aggregator, and f av The average user participation rate set by the aggregator, k m is the number of EVs whose target charging station is the mth charging station, are the scores of two adjacent electric cars n1 and n2 after sorting the electric cars in ascending order.
[0107] In step (5), the objective function expression of the EV user basic incentive price optimization model is solved as shown in formula (10). The basic incentive price of each user obtained is sent to the EV user to guide the user to finally declare whether to participate in the scheduling.
[0108]
[0109] In step (6), considering the uncertainty of user response caused by distance, the user actual response model is established as shown in formula (11):
[0110]
[0111] in, is the actual response amount obtained by the aggregator considering the uncertainty of its response when vehicle n is actually selected to participate in the dispatch; Q is the ratio of the actual under-response of the nth EV due to the distance to its dispatch capacity by the aggregator, obtained through Monte Carlo sampling, Lmax,n is its upper limit; "U" indicates uniform distribution, Q n (t) is the final actual dispatch quantity of the aggregator for the nth EV in period t, D n is the shortest path distance for vehicle n to reach its target charging station, D max Q is the maximum value of the shortest path distance for all EVs that agree to participate in the dispatch to reach their target charging station. MR The maximum proportion of insufficient user responses.
[0112] In step (7), the short-term dispatch constraints of EV aggregators are established by considering the dispatchable power and dispatchable time constraints, user power demand constraints, battery state of charge constraints, user quantity constraints, aggregator price constraints, dispatch capacity constraints considering user benefits, and response reliability constraints, as shown in formula (12):
[0113]
[0114] Among them, Q 0,n is the maximum responsive capacity of the nth EV in a single period Δt, SOC n (t E,n ) and SOC E,n are the actual EV charge state when the user leaves after responding and the charge state requirement reported by the user at the end of the response, SOC(t) is the charge state of the user during time period t, and SOC min , SOC max are the lower and upper limits of the vehicle's state of charge during charging and discharging, respectively. select N is the number of users that the aggregator actually chooses to call. a is the number of users who finally agree to participate in the scheduling; μ k Quote for the kth aggregator (the clearing price when updating the actual decision); are the highest and lowest bids of the aggregator, respectively, and their values are related to the demand response level Φ, which is determined by the power company; ε n is a 0-1 variable indicating whether vehicle n is actually selected for call, Q SCmin In order to avoid a user's actual dispatch capacity being too low, resulting in the user's revenue being far lower than expected, the minimum actual dispatch capacity of the called EV is stipulated. is the response reliability of aggregator k, P remin The minimum requirement for the aggregator's response reliability.
[0115] In formula (12), the maximum responsive capacity Q of EV in a single period Δt is 0n The calculation is shown in formula (13):
[0116]
[0117] In formula (12), the aggregator finally chooses to call the number of users N select The calculation of is shown in formula (14):
[0118]
[0119] Where N is the total number of EV users with initial reporting information.
[0120] The response reliability of aggregator k in formula (12) is The definition is shown in formula (15):
[0121]
[0122] in is the total response capacity simulated by aggregator k, is the winning bid capacity of aggregator k, δ is the margin allowed by the power company to allow aggregators to have insufficient response, N sim Indicates the number of simulations, N z For Monte Carlo simulation The number of times.
[0123] The total response capacity obtained by simulating the aggregation quotient k in formula (15) is The specific calculation of is shown in formula (16):
[0124]
[0125] In step (8), the probability of users choosing each additional incentive price is simulated and calculated, and the short-term scheduling decision model of EV aggregators is established with the goal of maximizing the expected net profit of aggregators. Its objective function is shown in formula (17):
[0126]
[0127] in, and They are the expected revenue of aggregator k, the expected expenditure for compensating users, and the expected compensation due to insufficient response capacity exceeding the specified margin.
[0128] The costs and benefits in the objective function are shown in formula (18):
[0129]
[0130] and They represent the revenue of aggregator k, the expenditure on compensating users and the compensation caused by insufficient response capacity exceeding the specified margin in the sth simulation, ω is the penalty imposed by the power company on the aggregator for insufficient response, and x l ∈{x 1 ,x 2 ,...,x L} is the l-th price among the L-level additional incentive prices set by the aggregator, β is the penalty coefficient for insufficient user response, and F 1,n is the basic incentive for user n, and They represent the additional response incentive and insufficient response penalty of the nth EV when the price l is selected. The probability that user n chooses price l is The probability of users choosing the l-th tier additional incentive price obtained by the aggregator simulation is the largest, and its value is p max ; At this time, the probability of users choosing the remaining incentive prices is set to be equal, which is (1-p max ) / (L-1).
[0131] In step (9), the constraints for clearing by the power company dispatching agency are shown in formula (19):
[0132]
[0133] in, is the bid capacity of aggregator k, Q EC is the total demand capacity of the power company, and K is the total number of aggregators participating in the bidding.
[0134] In step (10), a dispatch optimization model for power companies is established to solve the bidding results of multiple aggregators. Its objective function is shown in formula (20):
[0135]
[0136] Application Examples
[0137] The short-term demand response scheduling framework of the present invention is as follows: Figure 1 Assume that there are 5 EV aggregators A, B, C, D, and E participating in the bidding in the area under the jurisdiction of the power company. The number of road nodes in their areas are 36, 30, 34, 30, and 27 respectively, the number of charging stations are 5, 4, 4, 4, and 3 respectively, and the number of EVs that have declared their initial response intentions are 260, 240, 230, 215, and 200 respectively. The road network structure of aggregator C is as follows: Figure 2 As shown. Taking charging response as an example for analysis, the EV parameter setting refers to BYD E6, the total scheduling time is 1h, and Δt=5min is a scheduling period. The initial SOC of EV, the expected SOC value when leaving, and the response end time are all obtained by user declaration. For the calculation of time cost, α is taken as 50%, the annual income of workers is taken as the national per capita disposable income of urban residents in 2020 of 43,834 yuan, and the annual working hours of workers are calculated based on 22 days a month and 8 hours a day. The three-level additional incentive price is set as shown in Table 1. The probability of users choosing the price with the highest probability is set to p max =0.5. The other main parameters required for the example are shown in Table 2.
[0138] Table 1 Additional incentive price settings
[0139]
[0140] Table 2 Main parameter description
[0141]
[0142] The average user participation rate of each aggregator is 0.8, and the membership degree σ = 0.8. The bidding schemes of each aggregator are shown in Table 3. According to the scale effect, the bid price of EV aggregators gradually decreases as their maximum dispatchable capacity increases, and the proportion of their bid capacity to the maximum dispatchable capacity also gradually decreases.
[0143] Table 3 EV aggregator bidding proposal
[0144]
[0145] Assuming that the power company's demand capacity for this period is 11.8MW·h, the actual bidding results of each aggregator are shown in Table 4. It can be seen that aggregators D and E face the risk of partial winning and non-winning, respectively. When all aggregators win the bid, the expected net profit of their actual decision is greatly improved compared with the bidding decision, and the total dispatch capacity and number of EVs of the aggregator in the actual decision are also slightly higher than those in the bidding decision. This is because for all the winning aggregators A, B, and C, since the clearing price is higher than the bid, the profit brought by calling each kW·h of electricity is increased, and the incentive expenditure per kW·h for each EV user remains unchanged, so the aggregator tends to add some EV users who were not selected in the bidding decision but can increase their own profits in the actual decision. For aggregator D, which partially won the bid, the expected net profit in the actual decision is lower than the value in the bidding decision, and the capacity and number of EVs called in the actual decision are also significantly reduced. Therefore, it is necessary for the aggregator to adjust the dispatch plan according to the clearing results to obtain higher profits.
[0146] Table 4 Actual decision-making plan of EV aggregators
[0147]
[0148] Taking aggregator C as an example, we analyze the bidding decision of a single aggregator. When the bidding capacity of the aggregator increases from 2800kW·h to 3800kW·h, its expected net profit and response reliability are as follows: Figure 3 As shown in the figure, it can be seen that as the bidding capacity increases, the response reliability of the aggregator shows a trend of first remaining constant and then rapidly decreasing, while the expected value of net profit first increases and then decreases. When the bidding capacity reaches 3300kW·h, the expected net profit of aggregator C is the largest and the response reliability is 1, which can be used as a reference value for the bidding decision of aggregator C.
[0149] from Figure 4It can be seen from the figure that as the bid capacity increases, the number of EVs called by aggregators gradually increases slowly. When the bid capacity of the aggregator is lower than 3300kW·h, as the bid capacity increases, the difference between the total dispatch capacity of the aggregator and the expected value of the actual response capacity of the user and the bid capacity remains basically unchanged. When the bid capacity exceeds 3300kW·h, the difference between the total dispatch capacity of the aggregator and the bid capacity decreases significantly until it drops to a negative value; and the expected value of the actual response capacity of the user also increases more slowly compared with the bid capacity. This is because as the bid capacity increases, the aggregator has to choose some EVs with higher unit capacity dispatch costs and lower dispatchable capacity to participate in the dispatch to avoid the penalty of insufficient response exceeding the specified margin; and when the bid capacity of the aggregator unit capacity quotation and penalty price remain unchanged, when the bid capacity increases, the newly selected EVs increase the revenue of the aggregator less and less than the increased expenditure cost, so the aggregator tends to add less call capacity and number of EVs to pursue higher benefits.
[0150] In order to analyze the impact of charging station division and basic incentive price setting on the aggregator's scheduling results, taking aggregator C as an example, three schemes were designed for comparative analysis.
[0151] Option 1: Select the target charging station for each EV based on the principle of closest distance. The basic incentive price for each user is the same and the average basic incentive price of all EV users in Option 3 is used.
[0152] Option 2: Select the target charging station for each EV based on the principle of closest distance, and formulate the basic incentive price based on the vehicle-station distance and the improved user participation rate model.
[0153] Option 3: Use the method mentioned in Section 3.1, that is, use the entropy weight method to score and select the target charging station for each EV, and formulate the basic incentive price according to the scoring results of each EV and the improved user participation rate model.
[0154] It can be seen from Table 5 that after the basic incentive price is used to guide users to declare their final response intentions, the total fixed cost spent by users in Scheme 3 is higher than that in Scheme 2. However, in Scheme 3, the users who agree to participate in the dispatch can provide the largest dispatchable capacity, and under the same quotation, the expected value of the net profit obtained by the aggregator and its corresponding bidding capacity are also the largest. Figure 5 It can be seen that Scheme 3 has more dispatchable EVs in each period than Schemes 1 and 2, and the distribution is more balanced during the entire dispatch time. This is because the use of entropy weight scoring to divide charging stations and guide the basic incentive price makes EVs with larger dispatchable capacity and more flexible dispatchable periods have a greater probability of participation. In summary, Scheme 3 can provide aggregators with better capacity and time flexibility for subsequent optimization and dispatch, ultimately enabling aggregators to obtain greater profits, and is also conducive to providing the power grid with greater response capacity.
[0155] Table 5 Scheduling results under three schemes
[0156]
[0157] Taking the case of aggregator C dispatching EVs to participate in charging demand response as an example, the response results of 171 EV users under the optimal dispatch plan are shown in Table 6. It can be seen that the average incentive income expectation of each user is 105.34 yuan, which is much higher than the average charging cost expenditure of 11.98 yuan; and the average charging dispatch volume of each user under the aggregator dispatch plan is 19.96kW·h, while the average user driving energy consumption is only 1.06kW·h. Therefore, the incentive mechanism and optimized dispatch strategy adopted in this paper can better guarantee user benefits, enhance user participation enthusiasm, and can also make full use of the EV battery response potential.
[0158] Table 6 Response results from the perspective of EV users
[0159]
[0160] The 171 EVs are rearranged in order of dispatch capacity from small to large, and the charging electricity expenditure and incentive income expectations of each EV user are sorted in the same EV order, and their changing trends and relationships are analyzed. Figure 6 It can be seen that the maximum and minimum values of the user's expected incentive income are 183.19 yuan and 52.71 yuan respectively, while the maximum and minimum values of the user's charging electricity expenditure are 20.7 yuan and 6.05 yuan respectively; and at this time, the charging electricity expenditure of each EV user increases with the increase of the dispatch capacity, and the overall trend of each user's expected incentive income also increases accordingly, but there are local ups and downs. This is because the charging electricity price is fixed in the calculation example, and the user's charging electricity expenditure is only proportional to the dispatch capacity, while the user's incentive income expectation is not only affected by the dispatch capacity, but also by the different unit capacity incentive prices of each user, including different basic incentive prices and additional incentive prices. Therefore, the expected value of the incentive income obtained by the user participating in the dispatch shows the characteristics of increasing as a whole with the increase of the dispatch capacity, and fluctuating locally due to different incentive unit prices.
[0161] Taking the EV with the original number 27 in the jurisdiction of aggregator C as an example, the EV participation dispatch process is analyzed. Figure 7 As shown in the figure, the first dispatch period is set to start at 8:00 am. The power company needs to send the dispatch notice to the EV aggregator before 7:35, and the aggregator will notify the EV users in the jurisdiction.
[0162] During the period of 7:35-7:45, users report EV information and choose whether to confirm participation in the dispatch according to the basic incentive price given by the aggregator after optimization. The aggregator simulates the user's additional incentive price selection and the actual response uncertainty to optimize the dispatch strategy and send the specific dispatch plan to the EV user. The user selects the additional incentive price and completes the contract signing with the aggregator. The initial position of EV No. 27 is at node No. 1, the initial state of charge is 0.35, the user response end time is 8:43 (that is, the user requires to leave before 8:43), the basic incentive price given by the aggregator is 2.78 yuan / kW·h, the dispatch capacity is 26.07kW·h, and the target charging station is located at node No. 7. The EV set off at 7:45 and drove to the target charging station. The driving route is 1-2-7, the total distance is 4.95km, the driving energy consumption is 1.05kW·h, and the driving time is 8.36min. Because the user arrived early, he had to wait for 7 minutes.
[0163] The user starts charging at 8:00 am. If the charging is carried out according to the aggregator's scheduling plan, the user can complete the charging and leave at 8:40. The charging electricity fee expenditure is 15.64 yuan, and the expected incentive income is 135.36 yuan. If the user does not charge according to the scheduling plan time and response capacity, the income obtained will be lower than the expected value.
Claims
1. A short-term scheduling and response incentive method for EV aggregators considering road traffic models, characterized in that: The following steps are involved: 1) Construct a short-term demand response model for a single EV; 2) Considering various costs during the driving process and the charging and discharging process, a short-term demand response cost function for a single EV is constructed; 3) Construct an EV target charging station selection model based on entropy weight method scoring to determine the selected target charging station; 4) Determine the optimization constraints of the basic incentive price for EV users based on the EV score and the improved user participation rate model, and use this to build and solve the optimization model for the basic incentive price for EV users; 5) Considering the uncertainty of user response caused by distance, a model of the user's actual response quantity is constructed; 6) Determine the short-term dispatch constraints of EV aggregators, and use them to build and solve the short-term dispatch decision model of EV aggregators to obtain the optimal short-term dispatch decision plan; In the step 1), the short-term demand response model of a single EV includes a dispatchable period model and a maximum dispatchable capacity model. The dispatchable period model is specifically: Among them, T max,m,n is the scheduling period flexibility, T arrive,m,n and T leave,n are the earliest time when the nth EV can start charging and discharging at charging station m and the latest time when it can leave, T is the total number of scheduling periods, Δt is the length of each scheduling period, t A,m,n is the time when the nth EV arrives at the mth charging station, t0 and t e are the start time of the first scheduling period and the end time of the last scheduling period, respectively, t E,n The response end time declared by the user, symbol Indicates rounding up; The maximum dispatchable capacity model is specifically: Among them, Q max,m,n is the maximum dispatchable capacity of the nth EV at charging station m, Q max1,m,n , Q max2,m,n are the maximum dispatchable capacity of the nth EV at charging station m considering power constraints and time constraints, SOC E,n , SOC S,n are the response end state of charge reported by the nth EV user and the initial state of charge of the EV, W n is the battery capacity of vehicle n, P cmax,n , P dcmax,n are the maximum charging and discharging power of vehicle n, respectively, c , η d are the charging and discharging efficiency of EV, Q D,m,n is the total power consumption of vehicle n when driving to charging station m, q D,ij is the unit mileage energy consumption of road section ij, d ij is the length of the road section ij, l ij represents the road segment between nodes i and j, L mn is the shortest path for the nth EV to reach charging station m; In the step 2), the short-term demand response cost function of a single EV includes a fixed cost function generated during the driving process and a variable cost function generated during the charging and discharging process. The fixed cost function is specifically: Among them, C 1,m,n is the fixed cost of the nth EV to participate in the dispatch to charging station m, C Q,m,n is the electricity consumption cost of EV driving, C T,m,n is the travel time cost, C wait,m,n is the waiting time cost of the vehicle arriving before the dispatch starts, α is the time value coefficient, and p p With T p are the annual income and annual working hours of the workers, t D,m,n is the travel time from vehicle n to charging station m, t wait,m,n is the waiting time when vehicle n arrives at charging station m in advance, and p0 is the daily average electricity price; The variable cost function is specifically: Among them, C 2,m,n is the variable cost of EV participating in dispatch, is the charging electricity cost of EV users participating in charging response, C DOD,m,n To participate in the discharge response, the loss cost of the battery life of the EV is calculated. The electricity cost for users to recharge the EV after it has finished discharging. start,n With T end,n are the start and end time periods of the actual dispatch of vehicle n by the aggregator, Q m,n (t) is the actual dispatch capacity of the nth EV at charging station m in the tth time period when the aggregator dispatches it; In the step 3), the EV target charging station selection model based on the entropy weight method scoring is specifically: in, and are the standardized value, initial value and normalized result of the wth indicator of the vehicle n to the charging station m. The EV scoring indicators include the flexibility of the scheduling period, the maximum dispatchable capacity and the user's fixed cost. is the weight of each indicator, e m,n is the score of vehicle n participating in the dispatch to charging station m, W is the total number of evaluation indicators, M is the number of charging stations managed by the aggregator, ξ m,n is a 0-1 variable indicating that vehicle n selects charging station m as the target charging station; In the step 4), the objective function expression of the EV user basic incentive price optimization model is: The constraints include: in, are the upper and lower limits of user participation rate, respectively. Parameters r1, h1, r2, and h2 are the values obtained through the aggregator's preliminary research and historical data for charging and discharging, respectively. 1,n1 、c 1,n2 are the basic incentive prices of vehicles n1 and n2, respectively, n is the probability of vehicle n participating in the response, the membership degree σ is a parameter describing the impact of road conditions on different dates and time periods on user participation rate, c0 is the minimum difference between the basic incentive prices of two adjacent EV users set by the aggregator, and f av The average user participation rate set by the aggregator, k m is the number of EVs that use the mth charging station as the target charging station, are the scores of two adjacent electric vehicles n1 and n2 after sorting the electric vehicles from small to large according to the scores; In the step 5), considering the uncertainty of user response caused by distance, the expression of the user's actual response model is: in, is the actual response amount obtained by the aggregator considering the uncertainty of its response when vehicle n is actually selected to participate in the dispatch, Q is the ratio of the actual under-response of the nth EV due to the distance to its dispatch capacity by the aggregator, obtained through Monte Carlo sampling, Lmax,n is its upper limit, U[] represents uniform distribution, Q n (t) is the actual dispatch quantity of the aggregator for the nth EV in period t, D n is the shortest path distance for vehicle n to reach its target charging station, D max Q is the maximum value of the shortest path distance for all EVs that agree to participate in the dispatch to reach their target charging station. MR is the maximum proportion of insufficient user responses; In step 6), the objective function of the short-term scheduling decision model of the EV aggregator is: in, and are the expected revenue of aggregator k, the expected expenditure of compensating users, and the expected compensation due to insufficient response capacity exceeding the specified margin, and They represent the revenue of aggregator k, the expenditure on compensating users and the compensation caused by insufficient response capacity exceeding the specified margin in the sth simulation, ω is the penalty imposed by the power company on the aggregator for insufficient response, and x l ∈{x 1 ,x 2 ,...,x L } is the l-th price among the L-level additional incentive prices set by the aggregator, β is the penalty coefficient for insufficient user response, and F 1,n is the basic incentive for user n, and They represent the additional response incentive and insufficient response penalty of the nth EV when the price l is selected, The probability that user n chooses price l is The probability of users choosing the l-th tier additional incentive price obtained by the aggregator simulation is the largest, and its value is p max , at this time, the probability of users choosing the remaining incentive prices is set to be equal, and its value is (1-p max ) / (L-1).
2. A short-term scheduling and response incentive method for EV aggregators considering a road traffic model according to claim 1, characterized in that: In step 6), the constraints of the short-term scheduling decision model of the EV aggregator are: Among them, Q 0,n is the maximum responsive capacity of the nth EV in a single period Δt, SOC n (t E,n ) and SOC E,n are the actual EV charge state when the user leaves after responding and the charge state requirement reported by the user at the end of the response, SOC(t) is the charge state of the user during time period t, and SOC min , SOC max are the lower and upper limits of the vehicle's state of charge during charging and discharging, respectively. select N is the number of users that the aggregator actually chooses to call. a is the number of users who finally agree to participate in the scheduling, μ k Quote for the kth aggregator, are the highest and lowest bids of the aggregator, respectively, and their values are related to the demand response level Φ, ε n Q is a 0-1 variable indicating whether vehicle n is actually selected for call. SCmin In order to avoid a user's actual dispatch capacity being too low, resulting in the user's revenue being far lower than expected, the minimum actual dispatch capacity of the called EV is stipulated. is the response reliability of aggregator k, P remin Minimum requirements for the reliability of responses from aggregators; The response reliability of the aggregator k The expression is: in, is the actual total response capacity simulated by aggregator k, is the winning bid capacity of aggregator k, δ is the margin allowed by the power company to allow aggregators to have insufficient response, N sim Indicates the number of simulations, N z For Monte Carlo simulation The number of times.
3. A short-term scheduling and response incentive method for EV aggregators considering road traffic models according to claim 2, characterized in that: The method further comprises the following steps: 7) Determine the constraints for the clearing of the power company's dispatching organization, build and solve the power company's dispatching optimization model, and obtain the power company's dispatching optimization plan.
4. A method for short-term scheduling and response incentives for EV aggregators considering a road traffic model according to claim 3, characterized in that: In the step 7), the objective function of the power company dispatch optimization model is: m MP =max{μ 1 ,m 2 ,...,m K } The constraints for the power company dispatching agency to clear are: Among them, μ MP The highest bid among the successful bidders. is the bid capacity of aggregator k, Q EC is the total demand capacity of the power company, and K is the total number of aggregators participating in the bidding.
Citation Information
Patent Citations
Electric vehicle economic dispatching method based on demand response
CN104966127A
Incentive demand response method considering three-party game
CN112257905A
Dispatching method and system for electric vehicle battery swapping station
US20210331601A1
