Horizontal well dense cutting volume fracturing design method, device, electronic equipment and medium

By optimizing perforation parameters and construction scale, combined with cyclic variable displacement and sand addition methods, the design of dense-cut volumetric fracturing for horizontal wells was realized, which solved the problems of uniform fracture expansion and high conductivity, and improved fracture-controlled reserves and single wells. Yield.

CN114429014BActive Publication Date: 2024-10-29CHINA PETROLEUM & CHEMICAL CORP +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202011004605.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-09-22
Publication Date
2024-10-29
Estimated Expiration
2040-09-22

AI Technical Summary

Technical Problem

The existing technology cannot effectively realize the close-cut volumetric fracturing design of horizontal wells, resulting in insufficient uniform fracture expansion and high conductivity, and cannot maximize the fracture stimulation area and fracture-controlled reserves.

Method used

By simulating the length and height changes of a single fracture under different parameter changes, the perforation parameters and construction scale parameters are optimized, and a combination of reducing/increasing cyclic variable displacement and intermittent/continuous sand addition is used to optimize perforation friction and cluster spacing. , ensuring uniform crack extension and high conductivity.

Benefits of technology

It achieves uniform fracture expansion, increases stimulation volume and fracture-controlled reserves, increases single well production, reduces driving pressure difference, and optimizes seepage distance and reserve utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114429014B_ABST
    Figure CN114429014B_ABST
Patent Text Reader

Abstract

The present application discloses a method, device, electronic device and medium for designing horizontal well dense cutting volume fracturing. The method may include: simulating the changes in the length and height of a single fracture under the change of fracture parameters, optimizing the perforation parameters; determining the number of dense cutting fractures and the spacing between dense cutting fractures with the maximum reformed fracture area as the goal; determining the scale parameters of dense cutting construction; in the sand-carrying fluid stage, using a combination of lowering / increasing cyclic variable displacement and intermittent / continuous sand addition to achieve uniform extension and high conductivity of each cluster. The present invention increases the reformed volume and fracture-controlled reserves, and increases the production of a single well.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of oil and gas field development, and more specifically, to a horizontal well dense cutting volume fracturing design method, device, electronic equipment and medium. Background Art

[0002] When conventional horizontal well fracturing is carried out in tight oil and gas reservoirs where natural fractures are not well developed, the matrix fluid has a long seepage distance to the fractures and the driving pressure difference required to achieve fluid flow is large. Therefore, it is necessary to implement dense cutting fracturing to minimize the matrix unit, convert the well-controlled reserves into fracture-controlled recoverable reserves, and increase the effective seepage swept volume.

[0003] Existing technologies include: by shortening the main fracture interval and increasing the amount of proppant, the degree of transformation of artificial fractures on shale reservoirs is improved, ensuring that the propped fractures have sufficient long-term conductivity, but it is impossible to ensure uniform expansion of the fractures, and a set of systematic horizontal well dense cutting volume fracturing optimization design methods that can achieve the maximum fracture transformation area have not been provided; for deep shale gas wells, dense cutting segmented fracturing is carried out to increase the stress interference between clusters, increase the complexity of fractures and the transformation volume of single well reservoirs, and improve the resource utilization efficiency of deep shale gas wells, but a set of horizontal well dense cutting volume fracturing that can achieve uniform expansion of fractures and long-term high conductivity has not been provided. Optimization design method; by performing multi-cluster perforation on the same well section, reasonably optimizing the dosage of temporary plugging agent and fracturing construction parameters, increasing the complexity of fracturing fractures, and realizing multi-segment dense cutting volume fracturing transformation of horizontal wells, but failed to give a systematic and comprehensive horizontal well dense cutting volume fracturing design method; by shortening the segment cluster spacing, increasing the fracture density, and improving the sand addition intensity, long-term temporary plugging is used to achieve non-stop pumping and layer transfer, strengthen the synchronization of fracture control, energy replenishment, and imbibition displacement, reduce the driving pressure difference required for oil and gas in the matrix, and increase the available reserves, but failed to give a horizontal well dense cutting volume fracturing design method that can achieve uniform fracture expansion.

[0004] In summary, the existing close-cut fracturing stimulation technology mainly achieves the initial improvement of reserve utilization by shortening the fracture spacing, increasing the number of fracturing clusters within the segment, and increasing the amount of sand added. A systematic and comprehensive close-cut volume fracturing design method for horizontal wells that can achieve uniform fracture expansion with the goal of achieving the maximum fracture stimulation area and the highest fracture-controlled reserves has not yet been formed.

[0005] Therefore, it is necessary to develop a horizontal well dense cutting volume fracturing design method, device, electronic equipment and medium.

[0006] The information disclosed in the background technology section of the present invention is only intended to deepen the understanding of the general background technology of the present invention, and should not be regarded as acknowledging or suggesting in any form that the information constitutes the prior art already known to those skilled in the art. Summary of the invention

[0007] The present invention proposes a horizontal well dense cutting volume fracturing design method, device, electronic equipment and medium, which can improve the transformation volume and fracture-controlled reserves and increase the single well production.

[0008] In a first aspect, an embodiment of the present disclosure provides a method for designing a horizontal well dense-cut volume fracturing, comprising:

[0009] Simulate the changes in length and height of a single fracture under the change of fracture parameters and optimize the perforation parameters;

[0010] Taking the maximum reformed crack area as the goal, determine the number of close-cut cracks and the distance between close-cut cracks;

[0011] Determine the scale parameters of close cutting construction;

[0012] In the sand-carrying fluid stage, a combination of lowering / increasing cyclic variable displacement and intermittent / continuous sand addition is adopted to achieve uniform extension and high conductivity of each cluster.

[0013] Preferably, the perforation parameters include the number of perforation holes, the hole diameter, and the number of perforation clusters.

[0014] Preferably, optimizing the perforation parameters includes:

[0015] The perforation friction corresponding to different perforation hole numbers, hole diameters and perforation cluster numbers is calculated, and the perforation parameters are optimized according to the perforation friction.

[0016] Preferably, the perforation friction is calculated by formula (1):

[0017]

[0018] Among them, Q i is the fracture cluster flow, p fi is the friction resistance of cluster perforation holes, N p is the number of holes, ρ f is the density of the sand-carrying fluid, d f is the hole diameter, C d is the flow coefficient.

[0019] Preferably, the perforation parameters also include perforation cluster spacing.

[0020] Preferably, the perforation cluster spacing is calculated by formula (2):

[0021]

[0022] Where q is the gas flow rate, P i is the initial pressure of the gas reservoir, P wf is the bottom hole flowing pressure, B g is the gas compressibility coefficient, μ gis the gas viscosity, A is the hydraulic fracture area, K is the reservoir permeability, t is the production time, and b' is the correction coefficient.

[0023] Preferably, the close cutting construction scale parameters include construction displacement, fracturing viscosity, and volume of pumped fracturing fluid.

[0024] As a specific implementation method of the embodiment of the present disclosure,

[0025] In a second aspect, the embodiment of the present disclosure further provides a horizontal well dense cutting volume fracturing design device, comprising:

[0026] The perforation parameter optimization module simulates the changes in the length and height of a single fracture under the change of fracture parameters and optimizes the perforation parameters;

[0027] Determine the module, take the maximum transformed crack area as the goal, and determine the number of close-cut cracks and the distance between close-cut cracks;

[0028] The scale parameter determination module determines the scale parameters of the close cutting construction;

[0029] The mode determination module adopts the combination of lowering / increasing cyclic variable displacement and intermittent / continuous sand addition in the sand-carrying liquid stage to achieve uniform extension and high conductivity of each cluster.

[0030] Preferably, the perforation parameters include the number of perforation holes, the hole diameter, and the number of perforation clusters.

[0031] Preferably, optimizing the perforation parameters includes:

[0032] The perforation friction corresponding to different perforation hole numbers, hole diameters and perforation cluster numbers is calculated, and the perforation parameters are optimized according to the perforation friction.

[0033] Preferably, the perforation friction is calculated by formula (1):

[0034]

[0035] Among them, Q i is the fracture cluster flow, p fi is the friction resistance of cluster perforation holes, N p is the number of holes, ρ f is the density of the sand-carrying fluid, d f is the hole diameter, C d is the flow coefficient.

[0036] Preferably, the perforation parameters also include perforation cluster spacing.

[0037] Preferably, the perforation cluster spacing is calculated by formula (2):

[0038]

[0039] Where q is the gas flow rate, P i is the initial pressure of the gas reservoir, P wf is the bottom hole flowing pressure, B g is the gas compressibility coefficient, μ g is the gas viscosity, A is the hydraulic fracture area, K is the reservoir permeability, t is the production time, and b' is the correction coefficient.

[0040] Preferably, the close cutting construction scale parameters include construction displacement, fracturing viscosity, and volume of pumped fracturing fluid.

[0041] In a third aspect, an embodiment of the present disclosure further provides an electronic device, the electronic device comprising:

[0042] A memory storing executable instructions;

[0043] A processor runs the executable instructions in the memory to implement the horizontal well dense cutting volume fracturing design method.

[0044] In a fourth aspect, an embodiment of the present disclosure further provides a computer-readable storage medium, which stores a computer program, and when the computer program is executed by a processor, the horizontal well dense cutting volume fracturing design method is implemented.

[0045] The methods and apparatus of the present invention have other features and advantages that will be apparent from, or will be described in detail in, the accompanying drawings and subsequent detailed descriptions incorporated herein, which together serve to explain the specific principles of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] The above and other objects, features and advantages of the present invention will become more apparent through a more detailed description of exemplary embodiments of the present invention in conjunction with the accompanying drawings, wherein like reference numerals generally represent like components throughout the exemplary embodiments of the present invention.

[0047] Figure 1 A flow chart showing the steps of a method for designing a horizontal well dense cutting volume fracturing according to an embodiment of the present invention.

[0048] Figure 2 A schematic diagram showing the seepage distance of fluid in 3 years under different permeabilities and different driving pressure differences according to an embodiment of the present invention is shown.

[0049] Figure 3 A schematic diagram showing the relationship between the seepage distance and the driving pressure difference of reservoirs with different permeabilities according to an embodiment of the present invention.

[0050] Figure 4 A schematic diagram showing the conversion of well-controlled reserves to fracture-controlled reserves by dense cutting according to an embodiment of the present invention is shown.

[0051] Figure 5 A schematic diagram showing the relationship between the fracture spacing and the fracture-controlled reserves according to an embodiment of the present invention is shown.

[0052] Figure 6 A schematic diagram showing the effect of perforation hole friction on inter-cluster flow according to an embodiment of the present invention.

[0053] Figure 7 A schematic diagram of the fracture propagation morphology of four clusters of perforations at intervals of 100 meters according to an embodiment of the present invention is shown.

[0054] Figure 8 A schematic diagram showing the distribution of sand bodies and fracture pressure along a horizontal well according to an embodiment of the present invention is shown.

[0055] Fig. 9 A block diagram of a device for designing horizontal well dense-cut volume fracturing according to an embodiment of the present invention is shown.

[0056] Description of reference numerals:

[0057] 201, perforation parameter optimization module; 202, determination module; 203, scale parameter determination module; 204, mode determination module. DETAILED DESCRIPTION

[0058] The preferred embodiments of the present invention will be described in more detail below. Although the preferred embodiments of the present invention are described below, it should be understood that the present invention can be implemented in various forms and should not be limited to the embodiments set forth herein.

[0059] The present invention provides a horizontal well dense cutting volume fracturing design method, comprising:

[0060] Simulate the changes in length and height of a single fracture under the change of fracture parameters and optimize the perforation parameters;

[0061] Taking the maximum reformed crack area as the goal, determine the number of close-cut cracks and the distance between close-cut cracks;

[0062] Determine the scale parameters of close cutting construction;

[0063] In the sand-carrying fluid stage, a combination of lowering / increasing cyclic variable displacement and intermittent / continuous sand addition is adopted to achieve uniform extension and high conductivity of each cluster.

[0064] In one example, the perforation parameters include the number of perforation holes, hole diameter, and the number of perforation clusters.

[0065] In one example, optimizing perforation parameters includes:

[0066] The perforation friction corresponding to different perforation hole numbers, hole diameters and perforation cluster numbers is calculated, and the perforation parameters are optimized through the perforation friction.

[0067] In one example, perforation friction is calculated by formula (1):

[0068]

[0069] Among them, Q i is the fracture cluster flow, p fi is the friction resistance of cluster perforation holes, N p is the number of holes, ρ f is the density of the sand-carrying fluid, d f is the hole diameter, C d is the flow coefficient.

[0070] In one example, the perforation parameters also include perforation cluster spacing.

[0071] In one example, the perforation cluster spacing is calculated by formula (2):

[0072]

[0073] Where q is the gas flow rate, P i is the initial pressure of the gas reservoir, P wf is the bottom hole flowing pressure, B g is the gas compressibility coefficient, μ g is the gas viscosity, A is the hydraulic fracture area, K is the reservoir permeability, t is the production time, and b' is the correction coefficient.

[0074] In one example, the close-cutting construction scale parameters include construction displacement, fracturing viscosity, and volume of pumped fracturing fluid.

[0075] Specifically, at present, for tight oil and gas reservoirs where natural fractures are not developed, after conventional fracturing transformation, the matrix fluid seeps into the fractures over a "long distance", even exceeding one hundred meters. The main factor for the low recovery rate is that the flow distance of the matrix fluid is too long and the driving pressure difference required to achieve flow is too large.

[0076] By adopting the dense cutting technology, by reducing the interval between the horizontal well fracturing sections or increasing the length of the clustered artificial fractures in each section, multiple hydraulic fractures perpendicular to the wellbore are formed along the horizontal well section, cutting the reservoir around the horizontal wellbore, minimizing the matrix unit, and achieving short-distance seepage of the matrix fluid, reducing the driving pressure difference, and converting the well-controlled reserves into fracture-controlled recoverable reserves, increasing the effective seepage swept volume, and realizing "subdivided cutting exhaustion development". The concept of fracture-controlled reserves further highlights the role of fractures in controlling reservoirs, and is an important change to the inherent concept that "complex fractures" must be created for volume transformation.For the fracturing design of horizontal wells in tight oil and gas reservoirs, it is first necessary to judge the necessity of close-cut fracturing based on the flow of matrix fluid. Then, combined with the geological characteristics of the reservoir, including the rock mechanics of the reservoir and its surrounding formations, the parameters of the geostress field, pore pressure, permeability, porosity, etc., according to the changes in the thickness of the reservoir and interlayer along the horizontal trajectory, a full three-dimensional fluid-solid coupling hydraulic fracturing simulation model is used to simulate the changes in the length and height of a single fracture under different displacement, viscosity and other parameters. By simulating the changes in the fracture morphology of a single fracture under different construction parameters, we can better understand the expansion laws of multiple fractures and lay the foundation for close-cut fracturing of multiple fractures. Using water The multi-cluster dense cutting and transformation method in the flat well section optimizes the parameters such as the number of perforations, aperture, and number of perforation clusters. According to the difference in fracture stress between clusters, the stress interference between clusters is considered to give play to the throttling friction effect of the perforations. Under the conditions of certain perforation length, aperture density and perforation phase angle, the corresponding perforation friction under different perforation numbers, apertures and perforation clusters is calculated by formula (1). The parameters such as the number of perforations, aperture, and number of perforation clusters are optimized to ensure uniform extension of the fractures in the section. The perforation parameters also include the perforation cluster spacing, which is calculated by formula (2). In combination with different construction parameters, including construction displacement, fracturing viscosity, pumped fracturing fluid volume and other construction parameters, According to the difference of fracture stress between clusters, considering the stress interference between clusters, giving play to the throttling effect of holes, promoting the uniform extension of cracks in the section, taking the maximum transformation crack area as the goal, under the same construction parameters, when the hydraulic fracture area is the largest, the corresponding number of cracks and crack spacing are optimal, determine the optimal number of cracks and crack spacing, increase the number and length of cracks in the section, and shorten the seepage distance of gas to the cracks; refer to the relationship between the construction parameters of a single crack and the crack morphology, apply the proportional relationship, determine the parameters such as the displacement, viscosity and volume of pumped fracturing fluid for multiple cracks, and adopt the reduction / increase of cyclic displacement, intermittent / continuous fracturing fluid volume in the sand-carrying fluid stage. The sand adding combination method, the lowering / increasing cyclic displacement method is: reduce the displacement from 12-10-8-6-4 every minute, and then increase the displacement by 4-6-8-10-12 every minute; the intermittent / continuous sand adding combination method is: the plug-type sand adding method is adopted in the early stage, that is, the sand adding method is an intermittent and discontinuous method, which can prevent the sand from accumulating in the horizontal section or at the entrance of the fracture to form sand plugging. In the later stage, the continuous sand adding method is adopted to improve the fracture conductivity, further alleviate the insufficient liquid inflow clusters, and realize high conductivity of each cluster, and finally form a targeted horizontal well dense cutting fracturing design method, increase the transformation volume and fracture-controlled reserves, and increase the single well production.

[0077] The present invention also provides a horizontal well dense cutting volume fracturing design device, comprising:

[0078] The perforation parameter optimization module simulates the changes in the length and height of a single fracture under the change of fracture parameters and optimizes the perforation parameters;

[0079] Determine the module, take the maximum transformed crack area as the goal, and determine the number of close-cut cracks and the distance between close-cut cracks;

[0080] The scale parameter determination module determines the scale parameters of the close cutting construction;

[0081] The mode determination module adopts the combination of lowering / increasing cyclic variable displacement and intermittent / continuous sand addition in the sand-carrying liquid stage to achieve uniform extension and high conductivity of each cluster.

[0082] In one example, the perforation parameters include the number of perforation holes, hole diameter, and the number of perforation clusters.

[0083] In one example, optimizing perforation parameters includes:

[0084] The perforation friction corresponding to different perforation hole numbers, hole diameters and perforation cluster numbers is calculated, and the perforation parameters are optimized through the perforation friction.

[0085] In one example, perforation friction is calculated by formula (1):

[0086]

[0087] Among them, Q i is the fracture cluster flow, p fi is the friction resistance of cluster perforation holes, N p is the number of holes, ρ f is the density of the sand-carrying fluid, d f is the hole diameter, C d is the flow coefficient.

[0088] In one example, the perforation parameters also include perforation cluster spacing.

[0089] In one example, the perforation cluster spacing is calculated by formula (2):

[0090]

[0091] Where q is the gas flow rate, P i is the initial pressure of the gas reservoir, P wf is the bottom hole flowing pressure, B g is the gas compressibility coefficient, μ g is the gas viscosity, A is the hydraulic fracture area, K is the reservoir permeability, t is the production time, and b' is the correction coefficient.

[0092] In one example, the close-cutting construction scale parameters include construction displacement, fracturing viscosity, and volume of pumped fracturing fluid.

[0093] Specifically, by using dense cutting technology, by reducing the spacing between horizontal well fracturing sections or increasing the length of clustered artificial fractures in each section, multiple hydraulic fractures perpendicular to the wellbore are formed along the horizontal well section, cutting the reservoir around the horizontal wellbore, minimizing the matrix unit, allowing the matrix fluid to seep over a short distance, reducing the driving pressure difference, and converting the well-controlled reserves into fracture-controlled recoverable reserves, increasing the effective seepage swept volume, and realizing "subdivided cutting depletion development". The concept of fracture-controlled reserves further highlights the role of fractures in controlling reservoirs, and is an important change to the inherent concept that "complex fractures" must be created for volume transformation.For the horizontal well fracturing design of tight oil and gas reservoirs, it is necessary to first determine the necessity of close-cut fracturing based on the flow of matrix fluid. Then, combined with the reservoir geological characteristics, including the rock mechanics of the reservoir and its surrounding formations, the parameters of the geostress field, pore pressure, permeability, porosity, etc., according to the changes in the thickness of the reservoir and interlayer along the horizontal trajectory, a full three-dimensional fluid-solid coupling hydraulic fracturing simulation model is used to simulate the changes in the length and height of a single fracture under different displacement, viscosity and other parameters. By simulating the changes in the fracture morphology of a single fracture under different construction parameters, we can better understand the expansion laws of multiple fractures and lay the foundation for close-cut fracturing of multiple fractures. Using multiple clusters of dense fracturing in the horizontal well section, the length and height of the fracture can be simulated. Cutting transformation mode, optimize the parameters such as the number of perforations, aperture, number of perforation clusters, etc., according to the difference of fracture stress between clusters, consider the stress interference between clusters, give play to the throttling friction effect of the hole, including under certain perforation length, hole density and perforation phase angle, calculate the corresponding perforation friction under different perforation number, aperture and number of perforation clusters by formula (1), in order to ensure the uniform extension of the fracture in the section, optimize the parameters such as the number of perforations, aperture, number of perforation clusters, etc. The perforation parameters also include the perforation cluster spacing, which is calculated by formula (2). Reasonable perforation cluster spacing can form the largest hydraulic fracture area, thereby maximizing the production, combined with different construction parameters, including construction displacement , fracturing viscosity, construction scale and other construction parameters, according to the difference in inter-cluster rupture stress, considering the inter-cluster stress interference, giving play to the throttling effect of the holes, promoting the uniform extension of the cracks in the section, with the maximum transformed crack area as the goal, under the same construction parameters, when the hydraulic fracture area is the largest, the corresponding number of cracks and crack spacing are optimal, determine the optimal number of cracks and crack spacing, increase the number and length of cracks in the section, and shorten the seepage distance of gas to the cracks; refer to the relationship between the construction parameters of a single crack and the crack morphology, apply the proportional relationship, determine the parameters such as the fracturing displacement, viscosity and construction scale for multiple cracks to be cut densely, and in the sand-carrying fluid stage, adopt the reduction / increase cycle variable displacement. , the intermittent / continuous sand adding combination method, the method of reducing / increasing the cyclic displacement is: reducing the displacement from 12-10-8-6-4 every minute, and then increasing the displacement by 4-6-8-10-12 every minute; the intermittent / continuous sand adding combination method is not: the plug-type sand adding method is adopted in the early stage, that is, the sand adding method is an intermittent and discontinuous method, which can prevent the accumulation of sand in the horizontal section or the entrance of the fracture to form sand blockage. In the later stage, the continuous sand adding method is adopted to improve the fracture conductivity, further alleviate the clusters of insufficient liquid inflow, and realize high conductivity of each cluster, and finally form a targeted horizontal well dense cutting fracturing design method, increase the transformation volume and fracture-controlled reserves, and increase the single well production.

[0094] The present invention also provides an electronic device, which includes: a memory storing executable instructions; and a processor, which runs the executable instructions in the memory to implement the above-mentioned horizontal well dense cutting volume fracturing design method.

[0095] The present invention also provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the above-mentioned horizontal well dense cutting volume fracturing design method is implemented.

[0096] To facilitate understanding of the solutions and effects of the embodiments of the present invention, four specific application examples are given below. Those skilled in the art should understand that the examples are only for facilitating understanding of the present invention, and any specific details thereof are not intended to limit the present invention in any way.

[0097] Example 1

[0098] Figure 1 A flow chart showing the steps of a method for designing a horizontal well dense cutting volume fracturing according to an embodiment of the present invention.

[0099] like Figure 1 As shown, the horizontal well dense cutting volume fracturing design method includes: step 101, simulating the changes in the length and height of a single fracture under the change of fracture parameters, and optimizing the perforation parameters; step 102, determining the number of dense cutting fractures and the spacing between dense cutting fractures with the maximum transformed fracture area as the goal; step 103, determining the dense cutting construction scale parameters; step 104, in the sand-carrying fluid stage, adopting a combination of reducing / increasing cyclic variable displacement and intermittent / continuous sand addition to achieve uniform extension and high conductivity of each cluster.

[0100] For tight oil and gas reservoirs with few natural fractures, the main reason for low recovery after conventional fracturing is that the flow distance of matrix fluid is too long and the driving pressure difference required to achieve flow is too large:

[0101]

[0102] Figure 2 A schematic diagram showing the seepage distance of fluid in 3 years under different permeabilities and different driving pressure differences according to an embodiment of the present invention is shown.

[0103] Figure 3 A schematic diagram showing the relationship between the seepage distance and the driving pressure difference of reservoirs with different permeabilities according to an embodiment of the present invention.

[0104] 0.1md matrix permeability, flow 100m, the required driving pressure difference is 100MPa, 0.1md matrix permeability, driving pressure difference is 40MPa, flow less than 30m, such as Figure 2 , Figure 3 shown.

[0105] Figure 4 A schematic diagram showing the conversion of well-controlled reserves to fracture-controlled reserves by dense cutting according to an embodiment of the present invention is shown.

[0106] Through the close cutting technology, the matrix unit is minimized, the matrix fluid body achieves short-distance seepage, the driving pressure difference is reduced, the well-controlled reserves are converted into fracture-controlled recoverable reserves, the effective seepage sweep volume is increased, and "subdivided cutting depletion development" is realized. Figure 4 As shown in the figure, well-controlled reserves Nt: oil and gas reserves in the reservoir unit where the well is located; fracture-controlled reserves Nf: oil and gas reserves that can be effectively controlled by fractures.

[0107] Figure 5 A schematic diagram showing the relationship between the fracture spacing and the fracture-controlled reserves according to an embodiment of the present invention is shown.

[0108] Reducing the fracture spacing can effectively increase the available reserve area and change the seepage pattern in the fracture-controlled reserve area, such as Figure 5 shown.

[0109] Figure 6 A schematic diagram showing the effect of perforation hole friction on inter-cluster flow according to an embodiment of the present invention.

[0110] According to the difference of fracture stress between clusters, considering the stress interference between clusters, the throttling effect of the perforation is brought into play to promote the uniform extension of the fractures in the segment. The maximum reconstruction fracture area is taken as the goal. The friction resistance of the perforation holes is calculated by formula (1) to determine the optimal number of fractures and the fracture spacing. The number and length of fractures in the segment are increased, and the seepage distance of gas to the fractures is shortened, such as Figure 6 shown.

[0111] Figure 7 A schematic diagram of the fracture propagation morphology of four clusters of perforations at intervals of 100 meters according to an embodiment of the present invention is shown.

[0112] After multi-cluster intensive fracturing of horizontal wells in low-permeability gas reservoirs, the gas well production is positively correlated with the total hydraulic fracture area and the permeability of the reservoir transformation area. The functional relationship can be expressed as formula (2). According to formula (2), the perforation cluster spacing can be optimized, as follows: Figure 7 shown.

[0113] A dense-cut volume fracturing scheme was designed for a horizontal well in a certain basin.

[0114] Figure 8 A schematic diagram showing the distribution of sand bodies and fracture pressure along a horizontal well according to an embodiment of the present invention is shown.

[0115] The reservoir of this horizontal well has low porosity and permeability, poor physical properties, a geothermal gradient of 2.86℃ / 100m, a pressure coefficient of 0.97-0.98, a reservoir-interlayer stress difference of 3-6MPa, a maximum and minimum principal stress difference of 6-9MPa, and a mudstone Young's modulus higher than that of sandstone, with moderate to strong salt sensitivity and alkali sensitivity. The horizontal section has strong heterogeneity, which is not conducive to the uniform initiation and extension of multiple fractures in the horizontal section. Figure 8 shown.

[0116] According to the development of reservoirs and interlayers along the horizontal well section, the single fracture height penetration was first determined, as shown in Table 1. 3 / min, fracturing fluid viscosity>90cp, scale>200m 3 In this case, it is possible to achieve through-layer fracturing with a thickness of 6 m in both the upper and lower layers. However, when the lower layer is less than 2 m, it is difficult to achieve through-layer fracturing with a thickness of 6 m in the upper layer.

[0117] Table 1

[0118]

[0119] According to the difference in fracture pressure along the horizontal section and considering the interference between clusters, the 89-type perforating gun is used, with each cluster perforating 0.5m in length, 20 holes / m, and a phase angle of 60°, forming a throttling friction of 8-10MPa, which is conducive to the fracture and uniform extension of each cluster.

[0120] The optimization of perforation cluster spacing shows that when the cluster spacing within the segment is 27-35m, the total fracture area formed is the largest. The actual cluster spacing division can be appropriately adjusted according to the formation characteristics and logging display.

[0121] When the distance between the fractures is 80 m, the cumulative gas production of the three fracture clusters is significantly higher than that of the two fracture clusters within 2 years, and the increasing trend slows down after 4 years. When the distance between the fractures is 100 m, the cumulative gas production of the four fracture clusters is also significantly higher than that of the three fracture clusters within 2 years, and the increasing trend slows down after 4 years.

[0122] The well adopts casing injection, P110 pipe, Φ114.3, considering the casing material and construction safety pressure limit, the design construction displacement is 12-14m 3 / min(3 clusters 12m 3 / min, 4 clusters 13-14m 3 / min), the estimated construction pressure is 61-73MPa.

[0123] According to the well location of the horizontal well, the scale is appropriately reduced from target point B to target point A to avoid excessive fractures affecting adjacent wells. The fracture length and the conductivity of the fracture are used as indicators to optimize the single cluster fluid volume of each fracturing stage to 200-340m 3 , sand adding amount 24-40m 3 , half seam length is 120-205m.

[0124] Sections 1, 3, 4, and 6 (3 clusters): Fracturing scale 1,100 m 3 , sand volume 125m 3 , construction displacement 12m 3 / min, average sand ratio 22.3%, fracture half length 190-205m. The middle section of the sand-carrying fluid adopts the method of decreasing / increasing cyclic variable displacement and intermittent sand addition, which can flush the wellbore sand around the perforation cluster, release the stress between clusters, change the wellbore and perforation friction, instantly break the current flow distribution balance between clusters, and facilitate the expansion of fractures in the insufficiently transformed clusters, as shown in Table 2.

[0125] Table 2

[0126]

[0127]

[0128] Example 2

[0129] Fig. 9 A block diagram of a device for designing horizontal well dense-cut volume fracturing according to an embodiment of the present invention is shown.

[0130] like Fig. 9 As shown, the horizontal well dense cutting volume fracturing design device includes:

[0131] The perforation parameter optimization module 201 simulates the changes in the length and height of a single fracture under the change of fracture parameters and optimizes the perforation parameters;

[0132] Determination module 202, taking the maximum reformed crack area as a target, determines the number of close-cut cracks and the distance between close-cut cracks;

[0133] The scale parameter determination module 203 determines the scale parameters of the close cutting construction;

[0134] The mode determination module 204, in the sand-carrying fluid stage, adopts a combination of lowering / increasing cyclic variable displacement and intermittent / continuous sand addition to achieve uniform extension of each cluster and high flow conductivity.

[0135] As an option, the perforation parameters include the number of perforation holes, hole diameters, and the number of perforation clusters.

[0136] As an option, optimization of perforation parameters includes:

[0137] The perforation friction corresponding to different perforation hole numbers, hole diameters and perforation cluster numbers is calculated, and the perforation parameters are optimized through the perforation friction.

[0138] As an alternative, the perforation friction is calculated by formula (1):

[0139]

[0140] Among them, Q i is the fracture cluster flow, pfi is the friction resistance of cluster perforation holes, N p is the number of holes, ρ f is the density of the sand-carrying fluid, d f is the hole diameter, C d is the flow coefficient.

[0141] As an option, the perforation parameters also include perforation cluster spacing.

[0142] As an alternative, the perforation cluster spacing is calculated using formula (2):

[0143]

[0144] Where q is the gas flow rate, P i is the initial pressure of the gas reservoir, P wf is the bottom hole flowing pressure, B g is the gas compressibility coefficient, μ g is the gas viscosity, A is the hydraulic fracture area, K is the reservoir permeability, t is the production time, and b' is the correction coefficient.

[0145] As an optional option, the close-cutting construction scale parameters include construction displacement, fracturing viscosity, and volume of pumped fracturing fluid.

[0146] Example 3

[0147] The present disclosure provides an electronic device, which includes: a memory storing executable instructions; a processor running the executable instructions in the memory to implement the above-mentioned horizontal well dense cutting volume fracturing design method.

[0148] An electronic device according to an embodiment of the present disclosure includes a memory and a processor.

[0149] The memory is used to store non-temporary computer-readable instructions. Specifically, the memory may include one or more computer program products, which may include various forms of computer-readable storage media, such as volatile memory and / or non-volatile memory. The volatile memory may, for example, include random access memory (RAM) and / or cache memory (cache), etc. The non-volatile memory may, for example, include read-only memory (ROM), hard disk, flash memory, etc.

[0150] The processor may be a central processing unit (CPU) or other forms of processing units having data processing capabilities and / or instruction execution capabilities, and may control other components in the electronic device to perform desired functions. In one embodiment of the present disclosure, the processor is used to run the computer-readable instructions stored in the memory.

[0151] Those skilled in the art should be able to understand that in order to solve the technical problem of how to obtain a good user experience, the present embodiment may also include well-known structures such as a communication bus and an interface, and these well-known structures should also be included in the protection scope of the present disclosure.

[0152] For detailed description of this embodiment, reference may be made to the corresponding descriptions in the aforementioned embodiments, which will not be repeated here.

[0153] Example 4

[0154] An embodiment of the present disclosure provides a computer-readable storage medium storing a computer program, which implements the horizontal well dense cutting volume fracturing design method when executed by a processor.

[0155] According to the computer-readable storage medium of the embodiment of the present disclosure, non-transitory computer-readable instructions are stored thereon. When the non-transitory computer-readable instructions are executed by a processor, all or part of the steps of the above-mentioned methods of each embodiment of the present disclosure are executed.

[0156] The above-mentioned computer-readable storage media include, but are not limited to: optical storage media (e.g., CD-ROM and DVD), magneto-optical storage media (e.g., MO), magnetic storage media (e.g., magnetic tape or mobile hard disk), media with built-in rewritable non-volatile memory (e.g., memory card) and media with built-in ROM (e.g., ROM box).

[0157] Those skilled in the art should understand that the purpose of the above description of the embodiments of the present invention is only to exemplarily illustrate the beneficial effects of the embodiments of the present invention, and is not intended to limit the embodiments of the present invention to any given examples.

[0158] The embodiments of the present invention have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and changes will be apparent to those skilled in the art without departing from the scope and spirit of the described embodiments.

Claims

1. A horizontal well dense cutting volume fracturing design method, characterized in that: include: Simulate the changes in length and height of a single fracture under the change of fracture parameters and optimize the perforation parameters; Taking the maximum reformed crack area as the goal, determine the number of close-cut cracks and the distance between close-cut cracks; Determine the scale parameters of close cutting construction; In the sand-carrying stage, a combination of lowering / increasing cyclic variable displacement and intermittent / continuous sand addition is adopted to achieve uniform extension and high flow conductance of each cluster; Among them, the perforation parameters include the number of perforation holes, hole diameter, and number of perforation clusters; Among them, the optimized perforation parameters include: Calculate the perforation friction corresponding to different perforation hole numbers, hole diameters and perforation cluster numbers, and optimize the perforation parameters according to the perforation friction; The perforation friction resistance is calculated by formula (1): Among them, Q i is the fracture cluster flow, p fi is the friction resistance of cluster perforation holes, N p is the number of holes, ρ f is the density of the sand-carrying fluid, d f is the hole diameter, C d is the flow coefficient.

2. The horizontal well dense cutting volume fracturing design method according to claim 1, wherein: Perforation parameters also include perforation cluster spacing.

3. The horizontal well dense cutting volume fracturing design method according to claim 2, wherein: The perforation cluster spacing is calculated using formula (2): Where q is the gas flow rate, P i is the initial pressure of the gas reservoir, P wf is the bottom hole flowing pressure, B g is the gas compressibility coefficient, μ g is the gas viscosity, A is the hydraulic fracture area, K is the reservoir permeability, t is the production time, and b' is the correction coefficient.

4. The horizontal well dense cutting volume fracturing design method according to claim 1, wherein: The parameters of the dense cutting construction scale include construction displacement, fracturing viscosity, and volume of pumped fracturing fluid.

5. A horizontal well dense cutting volume fracturing design device, characterized in that: include: The perforation parameter optimization module simulates the changes in the length and height of a single fracture under the change of fracture parameters and optimizes the perforation parameters; Determine the module, take the maximum transformed crack area as the goal, and determine the number of close-cut cracks and the distance between close-cut cracks; The scale parameter determination module determines the scale parameters of the close cutting construction; The mode determination module adopts the combination of lowering / increasing cyclic variable displacement and intermittent / continuous sand addition in the sand-carrying stage to achieve uniform extension and high flow conductance of each cluster; Among them, the perforation parameters include the number of perforation holes, hole diameter, and number of perforation clusters; Among them, the optimized perforation parameters include: Calculate the perforation friction corresponding to different perforation hole numbers, hole diameters and perforation cluster numbers, and optimize the perforation parameters according to the perforation friction; The perforation friction resistance is calculated by formula (1): Among them, Q i is the fracture cluster flow, p fi is the friction resistance of cluster perforation holes, N p is the number of holes, ρ f is the density of the sand-carrying fluid, d f is the hole diameter, C d is the flow coefficient.

6. An electronic device, characterized in that: The electronic device comprises: A memory storing executable instructions; A processor, wherein the processor runs the executable instructions in the memory to implement the horizontal well dense cutting volume fracturing design method according to any one of claims 1 to 4.

7. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method for designing horizontal well dense cutting volume fracturing according to any one of claims 1 to 4 is implemented.

Citation Information

Patent Citations

  • Horizontal well sectioning multi-cluster perforating and fracturing optimizing method and device

    CN106894793A

  • Shale horizontal well segment inside close cutting temporary plugging fracturing construction optimization method

    CN111322050A