A power distribution control test platform for more electric aircraft
By designing a multi-electric aircraft power distribution control test platform, using the cooperation of five modules and the model-based system engineering method, the complexity of the multi-electric aircraft power system and simulation test problems were solved, and the rapid, effective simulation and safety of the aircraft power system were achieved. sexual verification, improving test efficiency and system stability.
Patent Information
- Application Number
- CN202111672972.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-31
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2041-12-31
AI Technical Summary
Existing electrical simulation tests of multi-electric aircraft are difficult to effectively conduct, resulting in transient changes in the aircraft power system affecting the cancellation of aircraft missions or dangerous maneuvers, and existing technology cannot effectively manage complex aircraft power systems.
A power distribution control test platform for multi-electric aircraft is designed, including a power management device, a starting control management system, an integrated control device, a power supply network system, a primary power distribution device and a secondary power distribution device. It is implemented through the cooperation of five modules. The reconstruction and functional verification of the power supply and distribution system are designed using model-based systems engineering methods to achieve comprehensive testing and real-time control of the aircraft power system.
It achieves fast and effective simulation of the aircraft power system, shortens the system test verification cycle, improves the efficiency of testers in developing new power distribution systems, provides flexible power distribution system reconstruction and performance verification capabilities, and ensures the reliability of the aircraft power system. security and functional stability.
Smart Images

Figure CN114465353B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of electrical technology, and in particular to a power distribution control test platform for a more-electric aircraft. Background Art
[0002] A more-electric aircraft refers to an aircraft that integrates the aircraft's power generation, distribution and power consumption into a unified system, and implements unified planning, unified management and centralized control of the power generation, distribution and power consumption systems.
[0003] With the development of more-electric aircraft and all-electric aircraft represented by Airbus A380 and Boeing B787, the structure and control of aircraft power systems are becoming more and more complex, the power is getting larger and the voltage is getting higher. Transient changes such as surges and spikes in electrical systems can cause malfunctions in aircraft onboard electronic systems or even dangerous operations, or have an adverse effect on the performance of aircraft mission equipment, leading to the cancellation of aircraft missions. Therefore, how to conduct electrical simulation tests on existing more-electric aircraft is an urgent problem to be solved. Summary of the invention
[0004] Based on this, it is necessary to provide a power distribution control test platform for multi-electric aircraft that can assess the impact of factors such as the multi-channel fault-tolerant reconstruction configuration of the power supply network and load changes on the power supply quality of the starting power generation system in response to the above technical problems.
[0005] A power distribution control test platform for a more electric aircraft, comprising:
[0006] Power management device, start control management system, integrated control device, power supply network system, primary power distribution device and secondary power distribution device; among them,
[0007] The integrated control device is respectively connected to the power management device, the start control management system, the power supply network system, the primary power distribution device and the secondary power distribution device; the integrated control device is used to collect the status information of the equipment, send control instructions to the equipment according to the control strategy, and complete the corresponding operation;
[0008] The power management device is connected to the startup control management system, and the power management device is used to receive status information of an external control device, and send corresponding aircraft status information to the device according to the control strategy to realize a comprehensive test of the aircraft power system;
[0009] The startup control management system is used to receive control instructions from the integrated control device, receive status information of the equipment in real time, start the power supply feeding network, and send the status information to the power management device;
[0010] The power supply network system, the primary power distribution device, and the secondary power distribution device receive control instructions from the startup control management system and the integrated control management device to perform real-time control on the operating topology of the aircraft power system.
[0011] The power distribution control test platform of the above-mentioned more-electric aircraft realizes the reconstruction of the entire power supply and distribution system through the cooperation of five modules. The test platform has strong versatility and can flexibly realize the reconstruction of the power distribution system. It can realize the function and performance verification of various power distribution systems. The power supply logic has fast real-time calculation and completely simulates the actual power supply and distribution system. The semi-physical simulation system shortens the system test and verification cycle, allowing testers to quickly and effectively develop new power distribution systems and logic, develop once and reuse them multiple times, which is reliable and efficient. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 The present invention is a schematic diagram of a power distribution control test platform for a more-electric aircraft;
[0013] Figure 2 The present invention is a schematic diagram of a power distribution control test platform for a more electric aircraft;
[0014] Figure 3 A real-time simulation control principle diagram in the present invention;
[0015] Figure 4 is a structural diagram of a comprehensive control device in the present invention;
[0016] Figure 5 This is a topological diagram of a primary power distribution device in the present invention. DETAILED DESCRIPTION
[0017] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0018] In one embodiment, Figure 1 As shown, an architecture diagram of a power distribution control test platform for a more electric aircraft is provided, including the following parts:
[0019] Power management device, start control management system, integrated control device, power supply network system, primary power distribution device and secondary power distribution device; among them,
[0020] The integrated control device is respectively connected to the power management device, the start control management system, the power supply network system, the primary power distribution device and the secondary power distribution device; the integrated control device is used to collect the status information of the equipment, send control instructions to the equipment according to the control strategy, and complete the corresponding operation;
[0021] Further, the power management device is connected to the startup control management system, and the power management device is used to receive status information of an external control device, and send corresponding aircraft status information to the device according to the control strategy, so as to realize a comprehensive test of the aircraft power system;
[0022] In one embodiment, the startup control management system is used to receive control instructions from the integrated control device, receive status information of the device in real time, start the power supply feeding network, and send the status information to the power management device;
[0023] Regarding the functions of the power equipment, the power supply network system, the primary power distribution device, and the secondary power distribution device receive control instructions from the start-up control management system and the integrated control management device to perform real-time control of the operating topology of the aircraft power system.
[0024] In this embodiment, the reconstruction of the entire power supply and distribution system is achieved through the cooperation of five modules. The test platform has strong versatility and can flexibly realize the reconstruction of the distribution system. It can realize the function and performance verification of various distribution systems. The power supply logic has fast real-time calculation and completely simulates the actual power supply and distribution system. The semi-physical simulation system shortens the system test and verification cycle, allowing testers to quickly and effectively develop new distribution systems and logics, develop them once and reuse them multiple times, which is reliable and efficient.
[0025] Reference Figure 2 , showing an architecture diagram of a power distribution control test platform of the present invention; the power distribution control test platform includes a rapid control prototype platform; the rapid control prototype platform is connected to the power management device and the integrated control device respectively, and the rapid control prototype platform is used to send control strategies to the power management device and the integrated control device; the aircraft power system runs on the rapid control prototype platform.
[0026] The power distribution control test platform is designed using the Model-Based Systems Engineering (MBSE) method. In a preferred embodiment, the power distribution control test platform can add a rapid control prototyping platform to the modules of the power management device, the starting control management system, the integrated control device, the power supply network system, the primary distribution device and the secondary distribution device.
[0027] The entire aircraft power system runs on a rapid control prototyping platform, receiving information from the main power generation controller, auxiliary power generation controller and aircraft status information in real time through the power management device, receiving the status of the aircraft power system through the integrated control management device, and realizing integrated control of the aircraft power system according to the control strategy.
[0028] The power management system receives the status information of the external control device in real time, sends the status information to the rapid control prototyping platform, and sends the corresponding aircraft status information to the main power generation controller and the auxiliary power generation controller according to the control strategy of the rapid control prototyping platform to realize the comprehensive test of the aircraft power system;
[0029] The integrated control device collects information such as voltage, current and other electrical quantities of the power supply and distribution system as well as the status of each switch in real time, and receives control instructions from the rapid control prototyping platform to realize comprehensive control of the operation mode of the power system;
[0030] The start management system receives control instructions from the integrated control device, receives status information of the main power generation controller, the auxiliary power generation controller and each start converter (main start converter MES, auxiliary start converter AES) in real time, starts the power supply feed network, and sends each status information to the power management device;
[0031] The power supply network system, primary distribution device and secondary distribution device receive control instructions from the starting control management system and the integrated control management device, and perform real-time control of the operating topology of the power system. Each power system is equipped with voltage and current sensors, which transmit the collected power parameters to the integrated control device for processing and display.
[0032] Through semi-physical simulation, taking into account both real-time and stability, the safety and functional stability of the power system are verified safely and cost-effectively; the real-time calculation of the starting and power supply logic is realized through the rapid control prototyping platform, and each contactor is controlled through the integrated control device to realize the control and switching of different logics, and the power supply and distribution priority and power supply conversion logic can be customized.
[0033] In one embodiment, the power supply network system may include a main circuit and a transmission cable; the main circuit receives control signals from an integrated control device or a main generator controller and an auxiliary generator controller to implement a planned control logic and protection function.
[0034] Specifically, the types of main circuits include 230V variable frequency AC main circuit, 270V DC main circuit, 115V AC main circuit and 28V DC main circuit; the equipment corresponding to each main circuit includes bus bars, contactors, voltage sensors, current sensors and bus bar accessories.
[0035] That is, the power supply network system can include 230V variable frequency AC main circuit, 270V DC main circuit, 115V AC main circuit, 28V DC main circuit and transmission cables, etc. The main equipment of each main circuit includes busbars, contactors, voltage sensors, current sensors, busbar accessories, transmission cables, etc.
[0036] 4 sets of variable frequency AC starting and generating subsystems, 2 sets of auxiliary AC generating subsystems and 1 ground external power supply provide power for the power supply network system. They cooperate with the integrated control device to realize the connection and disconnection functions of each channel, multi-channel redundant power supply function, and multi-channel fault tolerance, reconstruction, conversion and protection functions in the event of a fault. Through bus cross-linking, information such as starting control instructions, starting control status, channel electrical parameters, channel fault protection, etc. are transmitted, and the power management device displays the status screen.
[0037] Among them, the main performance indicators of the power supply network are as follows: a. The rated output power of the 230V variable frequency AC main circuit is: 4×250kVA+2×225kVA, one APU (225kVA) is simulated by the power supply; b. The rated output power of the 270V DC main circuit is: 4×75kW; c. The rated output power of the 115V AC main circuit is: 2×50kVA; d. The rated output power of the 28V DC main circuit is: 2×9kW;
[0038] The main circuit receives the control signal of the integrated control device or the main generator controller and the auxiliary generator controller on the 230V variable frequency AC main circuit to realize the planned control logic and protection functions. At the same time, the integrated control device realizes the data collection of the electrical parameters of each channel, the system conversion control logic solution, the contactor conversion control, etc., and monitors and displays the status of the variable frequency AC main circuit.
[0039] In one embodiment, when there is no real controller such as a generator control unit (GCU), the Figure 3 As shown in the real-time simulation control schematic diagram, the control algorithm or logic of L1GCU, L2GCU, LAGCU, RAGCU, R1GCU, and R2GCU is simulated by the real-time simulator in the integrated management system to realize the control of the main circuit contactor. And by collecting the voltage, current, auxiliary contacts and other status information on the 230VAC main circuit feeder, fault monitoring and diagnosis are carried out. When a channel of the system fails, the main circuit control logic is flexibly reconstructed to realize ring power distribution.
[0040] The industrial computer is equipped with a variety of communication interfaces, such as serial port, CAN, 1553B, etc., which facilitates communication with other physical controllers. In this solution, the industrial computer communicates with the industrial computer and the industrial computer with the host computer software through the TCP / IP (Transmission Control Protocol / Internet Protocol) protocol to complete the control command issuance, information upload, status monitoring and display.
[0041] In another embodiment, the starting control management system sends self-detection fault information, generator status information, contactor status information or auxiliary generator device information to the integrated control device, and accepts start-up, shutdown and contactor disconnection or connection control instructions transmitted by the integrated control device.
[0042] Specifically, the starting control management system controls and manages the variable frequency AC starter / generator and its control device, and the starting converter; the starting control management system monitors the starting power supply feeding network in real time, and displays the status of each variable frequency AC starter / generator and its control device, and the starting converter in real time.
[0043] The main functions of the starting control management system include: during the starting process, the integrated control device controls and manages the variable frequency AC starter / generator, starting controller, and starting contactor.
[0044] The integrated control device receives the start-up control instruction provided to the start-up controller, and the start-up controller executes its start-up program.
[0045] The integrated control device monitors parameters such as AC and DC power supply (voltage, current, frequency, phase sequence), starter generator (speed, etc.), starter controller (starting instruction, output voltage, current and frequency, temperature, flow, fault information), starter contactor (contactor status), busbar (voltage, current, frequency, phase sequence) during the starting process. If the monitored operating parameters are abnormal, the integrated control device will power off and alarm. The operating parameters should be sampled, graphically displayed, stored, and replayed, and can be interconnected with the TDM test data management system. The specific connection method and protocol will be determined in the detailed plan.
[0046] The start control management system transmits the start information to the integrated control device via Ethernet. The start control management system sends self-detection fault information, generator status information, contactor status information, auxiliary generator and other device information to the integrated control device, and receives the control instructions of start, shutdown, disconnection / connection of contactors transmitted by the integrated control device.
[0047] Practical application to this embodiment, refer to Figure 4 , showing an architecture diagram of an integrated control device of the present invention; the integrated control device collects status information of the main generator controller, the auxiliary generator controller, and the secondary power supply through the data bus, and sends control instructions to the generator controller and each contactor in the power supply network system according to the control strategy to complete the power supply mode switching operation, fault isolation function operation, fault protection operation and network reconstruction operation.
[0048] The integrated control device collects the status information of the main and auxiliary generator controllers, secondary power supplies and other equipment through the data bus, and summarizes various types of data in the computer of the integrated control device. The computer analyzes the collected data and sends control instructions to the generator controller and each contactor in the power supply network according to the power supply logic to complete the power supply mode switching, fault isolation, protection and network reconstruction functions. At the same time, the data is collected and displayed in the software interface, and the data is saved for data playback after the test; it can be interconnected with the TDM test data management system.
[0049] The specific functions are as follows: According to the working status of the variable frequency AC starting subsystem and the auxiliary AC generating subsystem, as well as the power supply priority, the 230V variable frequency AC main circuit is controlled to ensure the normal operation of the power supply system; the information of each channel is solved, and the connecting power relays between channels are controlled according to the power supply priority of each channel to achieve the normal operation and fault-tolerant reconstruction of the AC power generation system.
[0050] Real-time monitoring, control and management of the power supply network, and graphical display of the status of each control device; control, management and real-time monitoring of the primary power distribution device; control, management and real-time monitoring of the secondary power distribution device; control, management and monitoring of the secondary power supply through communication; data communication function;
[0051] Graphically display the status and parameters of each busbar; Graphically display the status and parameters of each power supply branch; Have data recording, storage and output functions; Communicate with TDM test data management system through Ethernet to achieve data cross-linking, complete data recording, storage, and complete storage and analysis of output function data:
[0052] The integrated control device monitors the AC and DC power supply for starting. It monitors the voltage, frequency, phase sequence and other parameters of the power supply. If it is normal, the AC and DC power supply is allowed to be supplied to the starting controller; if there is a fault, it is not allowed to be put into use, and an alarm indication is given.
[0053] In a preferred embodiment, the power management device simulates the power management computer on the aircraft, and the main functions of the power management device are as follows:
[0054] The power management device receives the status information of each GCU and secondary power supply of the power generation subsystem through communication, monitors the information, and can display the working status information, fault status information and self-test result information;
[0055] The aircraft status information is sent to the main and auxiliary generator controllers and the auxiliary generator controllers through RS-232 / 422 / 485, 1553B, CAN and other communication methods. The status information is sent to the power management device through the rapid control prototyping platform using Ethernet.
[0056] Receive and display information from the starting control management system through Ethernet communication; receive status information of the secondary power supply and external power supply through RS-232 / 422 / 485, 1553B, CAN and other communication methods, monitor and display the secondary power supply and external power supply (including status information, fault information, self-test result display); interconnect with the TDM test data management system through Ethernet.
[0057] Reference Figure 5 , showing a topological structure diagram of a primary power distribution device of the present invention; the primary power distribution device is a special equipment in the power distribution control test platform, which is composed of 230V AC contactors of various specifications, overcurrent protection devices, current sampling devices, electrical connection components, bus bars, cables and other components, wherein the cables meet the layout requirements of the corresponding site.
[0058] The secondary power distribution device is also a special equipment in the power distribution control test platform. The secondary power distribution device includes a distribution panel box, which includes a 270V DC secondary distribution panel box, a 115V AC secondary distribution panel box, and a 28V DC secondary distribution panel box; the distribution panel box includes a contactor, a circuit breaker, a solid-state power controller, a relay, an overcurrent protection device, a current sampling device, a voltage sampling device, a communication board, a control board, electrical connection components, bus bars, and cables; the contactor includes a 270V DC contactor, a 115V AC contactor, and a 28V DC contactor.
[0059] Specifically, the secondary power distribution device may include three distribution panels, namely, a 270V DC secondary distribution panel, a 115V AC secondary distribution panel, and a 28V DC secondary distribution panel. Each distribution panel is composed of various specifications of 270V DC contactors, 115V AC contactors, 28V DC contactors, circuit breakers, solid-state power controllers (SSPC) (voltage systems are not less than 3), relays, overcurrent protection devices, current sampling devices, voltage sampling devices, communication boards, control boards, electrical connection components, bus bars, cables (the length meets the layout requirements of the corresponding site), etc.
[0060] The main branch functions of the secondary power distribution device are as follows:
[0061] There are 10 DC power supply branches for 270V DC loads, and the power supply capacity of each 270V DC power supply branch is within the range of (10A to 100A). There are 4 key load power supply branches, and the power supply capacity of each branch is 50A. There are 2 important load power supply branches, and the power supply capacity of each branch is 20A. There are 4 general load power supply branches, and the power supply capacity of each branch is 100A.
[0062] Two three-phase AC power supply branches for 115V three-phase AC loads, each with a power supply capacity of (5A-30A) / phase, including one key three-phase load power supply branch with a single power supply capacity of 10A / phase; one important load power supply branch with a single power supply capacity of 20A / phase;
[0063] There are 6 single-phase AC power supply branches for 115V single-phase AC loads, and the power supply capacity of each single-phase AC power supply branch is within the range of (5A to 20A). There are 2 key load power supply branches, and the single-channel power supply capacity is 10A. There are 2 important load power supply branches, and the single-channel power supply capacity is 5A. There are 2 general load power supply branches, and the single-channel power supply capacity is 20A;
[0064] There are 10 DC power supply branches for 28V DC loads, and the power supply capacity of each 28V DC power supply branch is in the range of 5A to 25A. There are 4 key load power supply branches, and the power supply capacity of each branch is 10A. There are 3 important load power supply branches, and the power supply capacity of each branch is 15A. There are 3 general load power supply branches, and the power supply capacity of each branch is 25A.
[0065] In this embodiment, a distribution control test platform is built that integrates the power supply network, primary distribution, secondary distribution, and management and protection functions of the entire power system. Combined with high-power high-voltage DC and high-power variable-frequency AC power systems and performance analysis and simulation verification conditions of various products, a control test platform that meets the key technologies of more-electric aircraft is finally established.
[0066] The power distribution control test platform is mainly used to assess the impact of multi-channel fault-tolerant reconstruction configuration of the power supply network and load changes on the power supply quality of the starting power generation system, and to distribute electric energy, distributing 230VAC, 115VAC AC, 270VDC and 28VDC DC to power equipment. Distributable node configuration and distributed computing are used to meet the needs of distributed power supply and distribution systems; physical interfaces, software and control strategies are all flexibly constructed with good openness and easy expansion; it facilitates the flexible reconstruction of the power supply and distribution system, and the system controls each contactor through an integrated control device to perform fault-tolerant reconstruction tests according to the set requirements.
[0067] In this embodiment, the power distribution control test platform of the multi-electric aircraft may include a variety of computer devices, which include a processor, a memory, a communication interface, a display screen and an input device connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be achieved through WIFI, a mobile cellular network, NFC (near field communication) or other technologies. When the computer program is executed by the processor, a data processing step of a power distribution control test platform of a multi-electric aircraft is implemented. The display screen of the computer device can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covered on the display screen, or a key, trackball or touchpad set on the housing of the computer device, or an external keyboard, touchpad or mouse.
[0068] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as devices or computer program products. Therefore, the present invention may take the form of embodiments combining software and hardware aspects. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.
[0069] Although the preferred embodiments of the present invention have been described, those skilled in the art may make additional changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.
[0070] Finally, it should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or terminal device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or terminal device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or terminal device including the elements.
[0071] The above is a detailed introduction to a power distribution control test platform for a more-electric aircraft provided by the present invention. Specific examples are used in this article to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the system of the present invention and its core idea. At the same time, for those skilled in the art, according to the idea of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.
Claims
1. A power distribution control test platform for a more electric aircraft, characterized in that: include: Power management device, start control management system, integrated control device, power supply network system, primary power distribution device and secondary power distribution device; among them, The integrated control device is respectively connected to the power management device, the start control management system, the power supply network system, the primary power distribution device and the secondary power distribution device; the integrated control device is used to collect the status information of the equipment, send control instructions to the equipment according to the control strategy, and complete the corresponding operation; The power management device is connected to the startup control management system, and the power management device is used to receive status information of an external control device, and send corresponding aircraft status information to the device according to the control strategy to realize a comprehensive test of the aircraft power system; The startup control management system is used to receive control instructions from the integrated control device, receive status information of the equipment in real time, start the power supply feeding network, and send the status information to the power management device; The power supply network system, the primary power distribution device, and the secondary power distribution device receive control instructions from the startup control management system and the integrated control management device to perform real-time control on the operating topology of the aircraft power system; The power distribution control test platform includes a rapid control prototype platform; the rapid control prototype platform is connected to the power management device and the integrated control device respectively, and the rapid control prototype platform is used to send control strategies to the power management device and the integrated control device; the aircraft power system runs on the rapid control prototype platform; The starting control management system sends self-detection fault information, generator status information, contactor status information or auxiliary generator device information to the integrated control device, and receives control instructions for starting, shutting down, disconnecting or connecting the contactor transmitted by the integrated control device; The integrated control device collects status information of the main generator controller, auxiliary generator controller, and secondary power supply through the data bus, sends control instructions to the generator controller and each contactor according to the control strategy, and completes power supply mode switching operations, fault isolation function operations, fault protection operations, and network reconstruction operations.
2. The power distribution control test platform according to claim 1, characterized in that: The power supply network system includes a main circuit and a transmission cable; the main circuit receives control signals from an integrated control device or a main generator controller and an auxiliary generator controller to implement the intended control logic and protection functions.
3. The power distribution control test platform according to claim 2, characterized in that: The types of main circuits include 230V variable frequency AC main circuit, 270V DC main circuit, 115V AC main circuit and 28V DC main circuit; the equipment corresponding to each main circuit includes busbars, contactors, voltage sensors, current sensors and busbar accessories.
4. The power distribution control test platform according to claim 1, characterized in that: The comprehensive control device is connected to the TDM test data management system to realize data cross-linking, recording, storage and output operations.
5. The power distribution control test platform according to claim 1, characterized in that: The primary power distribution device includes a 230V AC contactor, an overcurrent protection device, a current sampling device, electrical connection components, bus bars and cables.
6. The power distribution control test platform according to claim 1, characterized in that: The secondary power distribution device includes a distribution panel box, and the distribution panel box includes a 270V DC secondary power distribution panel box, a 115V AC secondary power distribution panel box and a 28V DC secondary power distribution panel box.
7. The power distribution control test platform according to claim 6, characterized in that: The distribution panel box includes contactors, circuit breakers, solid-state power controllers, relays, overcurrent protection devices, current sampling devices, voltage sampling devices, communication boards, control boards, electrical connection components, bus bars and cables; the contactors include 270V DC contactors, 115V AC contactors and 28V DC contactors.
Citation Information
Patent Citations
Large-scale civil aircraft power supply and distribution system ground test integrated verification test platform architecture
CN109683588A
Power distribution management system and method for double-engine aircraft
CN112072778A
Power Automatic Control and distribution and System Protection Method of Aircraft, and Media that can Record Program for Method the same
KR101025979B1
Control and Protection System of Converter Valve Operation Test Equipment
US20110276189A1
