Construction method of real-time flood forecasting measurement device
By compacting the installation point of the flood forecasting measurement device and pouring the cement platform, combined with the fixation of the support frame and the electric control box, the setting of wind and solar hybrid power generation and the extension mechanism, the stability and accuracy of the device in harsh environments are solved. solve the problem and realize real-time and accurate flood monitoring and early warning functions.
Patent Information
- Application Number
- CN202210281694.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-21
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2042-03-21
AI Technical Summary
Existing flood forecast measurement devices have low installation stability in harsh shore environments, resulting in poor measurement accuracy, which in turn affects the accuracy of flood control warnings.
By compacting and leveling the installation point and pouring the cement installation platform, fixing the support frame and electric control box, setting expansion bolts and extension mechanisms, installing wind turbines and solar panels, using positioning seats and protective tubes to ensure that the installation The stability and power supply stability are improved, and the positioning base is fixed underwater to improve the installation stability.
It improves the installation stability and measurement accuracy of the flood forecast measurement device, ensures the reliability of real-time monitoring and early warning functions, avoids equipment tipping and submersion of electrical control boxes, and enhances resistance to wind, waves and silt.
Smart Images

Figure CN114550418B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of flood control equipment, and in particular relates to a construction method of a real-time flood forecasting and measuring device. Background Art
[0002] In order to prevent and mitigate flood disasters, relevant work is carried out in flood forecasting, flood control dispatching, and flood control project application. The main contents of flood control include: long-term, medium-term, and short-term weather situation forecasts, flood water situation forecasts, dispatching and application of flood control projects such as embankments, reservoirs, sluices, and flood storage areas, emergency rescue after dangerous situations and disasters occur, and emergency measures in extraordinary situations.
[0003] Flood forecasting and measuring devices are generally installed on the shore to measure and warn of the water level of the river. Therefore, the installation environment of the flood forecasting and measuring devices is relatively harsh. The soil on the shore has a high water content, which makes the soil loose and causes low installation stability. At the same time, strong winds and heavy rains in the natural environment will affect the flood forecasting and measuring devices. The flood forecasting and measuring devices in the prior art have low stability and poor measurement accuracy, resulting in inaccurate forecast results, which in turn causes delays in flood prevention and warning. Summary of the invention
[0004] The purpose of the present invention is to solve the above-mentioned technical problems existing in the prior art and provide a construction method for a real-time flood forecasting and measuring device. The method comprises selecting an installation point on the shore, compacting and leveling the installation point, thereby ensuring the stability of the soil structure, and then pouring a cement installation platform on the installation point, so that the flood forecasting and measuring device can be stably installed. At the same time, the flood forecasting and measuring device is prevented from tipping over during use, thereby increasing the stability of the installation of the flood forecasting and measuring device and improving the measurement accuracy of the flood forecasting and measuring device. The support frame is then fixed to the installation platform by expansion bolts. The setting of the expansion bolts improves the stability of the connection between the installation platform and the support frame. The expansion bolts can be set according to the size of the base. The position of the punching hole can be adjusted at any time according to the size of the base, so as to facilitate the fixation between the base and the mounting platform. Then the electric control box is installed on the support frame. The height of the electric control box is 150cm-180cm higher than the height of the base to prevent the electric control box from being submerged due to water overflow, which plays a protective role for the electrical components in the electric control box. Then the extension rod is fixed on the top of the support frame, and the wind turbine is fixed on the extension rod. The extension mechanism is then installed on both sides of the electric control box, and the solar panel is installed on the extension mechanism. The setting of the wind turbine and the solar panel realizes the complementary power generation of wind and light, thereby realizing sufficient power supply to the electric control box, so that the flood forecasting measurement device can be carried out in real time. The setting of the extension mechanism can be adjusted according to the weather. The air controls the solar panel to extend and retract, thereby protecting the solar panel. The monitor and the alarm are then installed on the cross-link, which is then installed on the support frame. The monitor is used to monitor the water surface and the rising water level, and the alarm can give timely alarm reminders. According to the installation position of the support frame, the positioning seat is lowered into the water. During the sinking process of the positioning seat, the silt discharge assembly at the bottom of the positioning seat clears the silt on the bottom of the water. The positioning seat is then placed on the bottom of the water, and then fixed piles are driven into the bottom of the water to fix the positioning seat on the bottom of the water. The setting of the silt discharge assembly enables the bottom of the positioning seat to directly contact the bottom of the water, avoiding the inability to drive the fixed piles, thereby ensuring the stability of the installation of the positioning seat. According to the installation position of the positioning seat, the bottom of the protective tube is screwed into the positioning seat to fix the protective tube; a connecting rod is installed at the end of the electric control box close to the water surface, and then a diagonal brace is welded between the bottom of the connecting rod and the support frame. The setting of the diagonal brace plays a supporting role for the connecting rod, thereby improving the bearing capacity of the connecting rod, and then the top of the fixed component is fixed to the connecting rod, and then the water level monitoring component is placed in the protective tube, and the top of the water level monitoring component is fixed to the bottom of the fixed component, thereby completing the installation of the flood forecasting measurement device. The setting of the protective tube plays a protective role for the water level monitoring component to prevent excessive wind and waves from affecting the monitoring of the water level monitoring component, thereby ensuring the accurate monitoring of the water level monitoring component.
[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions:
[0006] The construction method of the real-time flood forecasting measurement device is characterized by comprising the following steps:
[0007] a. Preparation before construction
[0008] First, the installation point of the flood forecasting measurement device is selected. The installation point is located on the shore of the water surface, and the installation point is preliminarily cleaned, and then the installation point is leveled and compacted. After the treatment is completed, a cement installation platform is poured at the installation point;
[0009] b. Installation of support frame
[0010] 1) Fixing of the support frame: After the installation platform is set up, open bolt holes on the installation platform according to the support frame base, and then fix the support frame base on the installation platform by screwing in expansion bolts;
[0011] 2) Installation of electric control box
[0012] After the support frame is fixed, the electric control box is fixedly installed in the middle of the support frame. At the same time, the height of the electric control box is 150cm-180cm higher than the height of the base;
[0013] 3) Installation of wind turbines
[0014] After the electric control box is fixed, the extension rod is fixed on the top of the support frame, and then the wind turbine is set on the top of the extension rod;
[0015] 4) Installation of solar generator
[0016] Install extension mechanisms on both sides of the electric control box, and then install the solar panel on the extension mechanisms and fix them;
[0017] 5) Installation of monitors and alarms
[0018] First, install the monitor and alarm on the cross connecting rod respectively, and then fix the cross connecting rod on the support frame so that the cross connecting rod is above the electric control box;
[0019] c. Installation of protective devices
[0020] 1) Fixing of the positioning seat
[0021] The positioning seat is placed on the bottom of the water according to the installation point of the support frame, the silt removal assembly at the bottom of the positioning seat removes the silt on the bottom of the water, and then the fixing piles are driven into the positioning seat to fix it on the bottom of the water;
[0022] 2) Fixing of protective tube
[0023] According to the fixed position of the positioning seat, the bottom of the protective tube is screwed into the top surface of the positioning seat, so that the protective tube is fixed on the base;
[0024] d. Installation of water level monitoring components
[0025] 1) Installation of connecting rod
[0026] A connecting rod is fixed on one side of the electric control box close to the protective tube, and then an oblique support rod is welded between the bottom of the connecting rod and the support frame, so that the oblique support rod supports the connecting rod;
[0027] 2) Fixing of water level monitoring components
[0028] After the connecting rod is installed, fix the top of the fixed component on the connecting rod according to the installation position of the protective tube, then place the water level monitoring component in the protective tube, and then fix the top of the water level monitoring component to the bottom of the fixed component to complete the installation of the flood forecasting measurement device.
[0029] Furthermore, the support includes a base, a support rod and a pedestal, the base is fixedly connected to the mounting platform, the bottom of the support rod is fixedly connected to the base, the pedestal is fixedly connected to the top of the support rod, the cross connecting rod is fixedly connected to the support rod, the extension rod is fixedly connected to the pedestal, and the wind turbine is fixedly connected to the top of the extension rod. The setting of the extension rod increases the installation height of the wind turbine, and one is to ensure that the wind turbine is exposed to more wind, and at the same time, the operation of the wind turbine will not affect the shooting of the monitor.
[0030] Furthermore, the monitor and the alarm are arranged at the four corners of the cross link at intervals, and the monitor faces the water surface, which ensures that the monitor can monitor the water surface in real time and the alarm has a certain range of influence.
[0031] Further, in step b, the specific structure of the extension mechanism includes a fixed bar, a fixed rod, a first telescopic push rod, a hinge and an extension, the fixed bar is fixedly connected to both sides of the electric control box, one end of the fixed rod is fixedly connected to the electric control box, the fixed rod is against the top of the fixed bar, the top of one end of the extension is rotatably connected to the other end of the fixed rod, one end of the hinge is rotatably connected to the bottom of the fixed bar, the other end of the hinge is rotatably connected to the middle of one end of the extension, the top of the first telescopic push rod is rotatably connected to the top of the fixed bar, and the bottom of the first telescopic push rod is rotatably connected to the hinge. The hinge is controlled by the first telescopic push rod to drive the extension to swing, so as to control the solar panel installed on the extension to flip, when it is dark and the wind and rain are strong, the first telescopic push rod controls the hinge to drive the extension to control the solar panel to retract, so as to avoid damage to the solar panel, thereby protecting the solar panel; when the sunlight is good, the first telescopic push rod controls the hinge to drive the extension to control the extension of the solar panel, so that the solar panel can receive sunlight in a wider range.
[0032] Furthermore, the hinged member includes a first hinged rod and a second hinged rod, one end of the first hinged rod is rotatably connected to the bottom of the fixed bar, the other end of the first hinged rod is hinged to one end of the second hinged rod, the other end of the second hinged rod is rotatably connected to the middle of one end of the extension member, and the other end of the first telescopic push rod is rotatably connected to the first hinged rod. When the sunlight is good, the first telescopic push rod extends, thereby controlling the first hinged rod to drive the second hinged rod to swing upward, so that the extension member swings upward, thereby causing the solar panel on the extension member to swing upward, ensuring that the solar panel receives sunlight in a wider range; when it is dark and the wind and rain are strong, the first telescopic push rod retracts, thereby controlling the solar panel to retract, thereby playing a protective role for the solar panel.
[0033] Further, the extension member includes a second telescopic push rod, a first extension rod, a second extension rod and a third extension rod, first rotating seats protrude forward on both sides of the top of the solar panel, rotating shafts are provided on both sides of the middle of the solar panel, and second rotating seats protrude backward on both sides of the bottom of the solar panel, one end of the first extension rod is rotatably connected to the rotating shaft of the first solar panel, the other end of the first extension rod is rotatably connected to the first rotating seat of the second solar panel, the bottom of the second extension rod is rotatably connected to the second rotating seat of the first solar panel, the middle part of the second extension rod is rotatably connected to the rotating shaft of the second solar panel, the top of the second extension rod is rotatably connected to the first rotating seat of the third solar panel, the bottom of the third extension rod is rotatably connected to the second rotating seat of the second solar panel, the top of the third extension rod is rotatably connected to the rotating shaft of the third solar panel, the top of the second telescopic push rod is rotatably connected to the first rotating seat of the first solar panel, and the bottom of the second telescopic push rod is rotatably connected to the second extension rod. The second extension rod is driven to swing by the second telescopic push rod, thereby controlling the first extension rod and the third extension rod to swing along with the second extension rod, so that the first solar panel, the second solar panel and the third solar panel swing, thereby realizing the retraction and expansion of the solar panel.
[0034] Further, in step c, the specific structure of the positioning seat includes a positioning plate, a fixed pile and a fixed block, the fixed block is circumferentially distributed on the outer side of the positioning plate, the fixed block is provided with a step hole corresponding to the fixed pile, the fixed pile is arranged in the step hole, the bottom of the positioning plate is provided with a mounting cavity, the sludge discharge assembly adopts an impeller, the impeller is rotatably connected in the mounting cavity, the impeller rotates to discharge the bottom sludge, and the outer wall of the positioning plate is circumferentially distributed with drainage holes. When the positioning plate sinks in the water, the impeller rotates to impact the sludge on the bottom of the water, so that the sludge on the positioning plate is discharged outwardly, and when the positioning plate is located at the bottom of the water, the sludge in the mounting cavity is discharged through the drainage hole, so that the positioning plate can be stably installed at the bottom of the water.
[0035] Further, in step c, the bottom of the protective tube is provided with a first external thread section, the top of the positioning plate is provided with a thread groove corresponding to the protective tube, the first external thread section matches the thread groove, the outer wall of the protective tube is circumferentially distributed with reinforcing ribs, the reinforcing ribs are provided on the first external thread section, after the protective tube is screwed into the positioning seat, the bottom of the reinforcing ribs abuts against the positioning seat, and the outer circumference of the protective tube is distributed with through holes. The provision of the first external thread section enables the protective tube to be fixed on the positioning seat by screwing, thereby facilitating the disassembly and replacement of the protective tube. When the protective tube is fixed on the positioning seat, the reinforcing ribs increase the contact area between the protective tube and the positioning seat, thereby greatly improving the contact area between the protective tube and the positioning seat, thereby improving the stability of the installation of the protective tube. The provision of the through hole facilitates water to flow into the protective tube, while preventing water waves from impacting the monitoring head in the protective tube, thereby increasing the monitoring accuracy of the water level monitoring assembly.
[0036] Further, in step d, the water level monitoring assembly includes a monitoring rod and a monitoring head, the monitoring head is arranged at the bottom of the monitoring rod, the monitoring rod is arranged in the protective tube, the fixing assembly includes two U-shaped ferrules arranged in a mirror image, the corresponding end of the U-shaped ferrule is provided with a slot, the slot is clamped on the connecting rod, a first threaded connecting rod is connected between the two U-shaped ferrules, both ends of the first threaded connecting rod are provided with a first fastening nut, the first fastening nut is tightened on the U-shaped ferrule, the bottom of the U-shaped ferrule is slidably connected to the clamp, the clamp is fixedly connected with an L-shaped connecting rod, a slider is provided at the top of the L-shaped connecting rod, a slide groove is provided at the bottom of the U-shaped ferrule, the slider is slidably connected in the slide groove, a fastening screw is provided on the slider, the fastening screw is tightened in the slide groove, the clamp is clamped at the top of the monitoring rod, a second threaded connecting rod is connected between the two clips, both ends of the second threaded connecting rod are provided with a second fastening nut, the second fastening nut is tightened on the clamp. According to the installation position of the protective tube, fix the fixing component and the connecting rod through a U-shaped sleeve. After the fixation is completed, place the water level monitoring component in the protective tube, and then fix the top of the monitoring rod in the clip at the bottom of the U-shaped sleeve. The clip is clamped on the top of the monitoring rod to fix it.
[0037] Furthermore, a limit block is provided at the top of the monitoring rod, a second external thread section is provided at the top of the monitoring rod, a limit ring is provided on the outside of the second external thread section, a locking nut is threadedly connected to the second external thread section, the locking nut is provided below the limit ring, the top of the clamp is against the bottom of the limit block, and the locking nut is tightened to the limit block below the clamp. The setting of the limit block and the limit ring plays a limiting role on the clamp, increases the contact area between the fixed component and the monitoring rod, thereby improving the stability of the connection between the fixed component and the monitoring rod, and the setting of the locking nut facilitates the adjustment of the position of the limit ring, so that it can be adjusted according to the size of the clamp.
[0038] The present invention has the following beneficial effects due to the adoption of the above technical solution:
[0039] In step a of the present invention, an installation point is selected on the shore and compacted and leveled to ensure the stability of the soil structure. A cement installation platform is then poured on the installation point to enable the flood forecasting measurement device to be stably installed. At the same time, the flood forecasting measurement device is prevented from tipping over during use, thereby increasing the stability of the installation of the flood forecasting measurement device and improving the measurement accuracy of the flood forecasting measurement device.
[0040] In step b of the present invention, the support frame is fixed to the mounting platform by expansion bolts. The setting of the expansion bolts improves the stability of the connection between the mounting platform and the support frame. The expansion bolts are set, and the position of the holes can be adjusted at any time according to the size of the base, so as to facilitate the fixation between the base and the mounting platform. Then, the electric control box is installed on the support frame. The height of the electric control box is 150cm-180cm higher than the height of the base to avoid water overflow and flooding of the electric control box, which plays a protective role for the electrical components in the electric control box. Then, the extension rod is fixed on the top of the support frame, and the wind turbine is fixed on the extension rod. Extension mechanisms are installed on both sides of the electric control box, and solar panels are installed on the extension mechanisms. The setting of wind turbines and solar panels realizes the complementary power generation of wind and light, thereby realizing sufficient power supply to the electric control box, so that the flood forecasting and measuring device can be carried out in real time. The setting of the extension mechanism can control the extension and retraction of the solar panels according to the weather, thereby playing a protective role for the solar panels, and then the monitor and alarm are installed on the cross connecting rod, and the cross connecting rod is installed on the support frame. The monitor is used to monitor the water surface conditions and the rising water level, and the alarm can give timely alarm reminders.
[0041] In step c of the present invention, the positioning seat is lowered into the water according to the installation position of the support frame. During the sinking of the positioning seat, the silt discharge assembly at the bottom of the positioning seat clears the silt on the bottom of the water. The positioning seat is then placed on the bottom of the water and then driven into the bottom of the water through fixed piles, thereby fixing the positioning seat to the bottom of the water. The setting of the silt discharge assembly enables the bottom of the positioning seat to directly contact the bottom of the water, avoiding the inability to drive the fixed piles firmly, thereby ensuring the stability of the installation of the positioning seat. According to the installation position of the positioning seat, the bottom of the protective tube is screwed into the positioning seat to fix the protective tube.
[0042] In step d of the present invention, a connecting rod is installed at one end of the electric control box close to the water surface, and then a diagonal brace is welded between the bottom of the connecting rod and the support frame. The setting of the diagonal brace plays a supporting role on the connecting rod, thereby improving the bearing capacity of the connecting rod. Then, the top of the fixed component is fixed on the connecting rod, and then the water level monitoring component is placed in the protective tube, and the top of the water level monitoring component is fixed to the bottom of the fixed component, thereby completing the installation of the flood forecasting measurement device. The setting of the protective tube plays a protective role on the water level monitoring component, preventing excessive wind and waves from affecting the monitoring of the water level monitoring component, thereby ensuring accurate monitoring of the water level monitoring component. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] The present invention will be further described below in conjunction with the accompanying drawings:
[0044] Figure 1 It is a structural schematic diagram of the present invention in which the support frame is fixed on the mounting platform;
[0045] Figure 2 This is a schematic diagram of the structure of the present invention when the positioning seat is installed;
[0046] Figure 3 This is a schematic diagram of the structure of the present invention when the protective tube is installed;
[0047] Figure 4 This is a schematic diagram of the structure of the present invention after the water level monitoring component is installed;
[0048] Figure 5 This is a schematic diagram of the structure of the present invention after the solar panel is opened;
[0049] Figure 6 It is a schematic diagram of the explosion of the protective device in the present invention;
[0050] Figure 7 It is a schematic diagram of the structure of the solar cell retracted in the present invention;
[0051] Figure 8 It is a schematic diagram of the structure of the solar energy deployment in the present invention;
[0052] Fig. 9 for Figure 5 Schematic diagram of the structure enlarged at point A in the middle.
[0053] In the figure, 1-support frame; 2-base; 3-expansion bolt; 4-electric control box; 5-wind turbine; 6-solar generator; 7-monitor; 8-alarm; 9-cross connecting rod; 10-positioning seat; 11-fixed pile; 12-protective tube; 13-connecting rod; 14-diagonal support rod; 15-fixing assembly; 16-extension mechanism; 17-support rod; 18-base; 19-extension rod; 20-fixing bar; 21-fixing rod; 22-first telescopic push rod; 23-hinge; 24-extension member; 25-first hinged rod; 26-second hinged rod; 27-second telescopic push rod; 28-first extension rod; 29-second extension rod; 30-third extension rod ;31-solar panel;32-first rotating seat;33-rotating shaft;34-second rotating seat;35-positioning plate;36-fixed block;37-step hole;38-impeller;39-drain hole;40-thread groove;41-first external thread segment;42-strengthening rib;43-through hole;44-monitoring rod;45-U-type ferrule;46-slot;47-first threaded connecting rod;48-first fastening nut;49-clamp;50-L-type connecting rod;51-slider;52-slide;53-fastening screw;54-second threaded connecting rod;55-second fastening nut;56-limiting block;57-second external thread segment;58-limiting ring;59-locking nut. DETAILED DESCRIPTION
[0054] like Figures 1 to 9 As shown, the construction method of the real-time flood forecasting measurement device of the present invention is characterized in that it includes the following steps:
[0055] a. Preparation before construction
[0056] First, select the installation point of the flood forecasting measurement device, which is located on the shore of the water surface, and conduct preliminary cleaning of the installation point. Then, level and compact the installation point. After the treatment is completed, pour a cement installation platform at the installation point.
[0057] b. Installation of support frame
[0058] 1) Fixing of the support frame 1: After the installation platform is set up, bolt holes are opened on the installation platform according to the base 2 of the support frame 1, and then the base 2 of the support frame 1 is fixed to the installation platform by screwing in the expansion bolts 3.
[0059] 2) Installation of electric control box 4
[0060] After the support frame 1 is fixed, the electric control box 4 is fixedly installed in the middle of the support frame 1 , and the height of the electric control box 4 is 150 cm-180 cm higher than the height of the base 2 .
[0061] 3) Installation of wind turbine 5
[0062] After the electric control box 4 is fixed, an extension rod is fixed on the top of the support frame 1, and then the wind turbine 5 is set on the top of the extension rod.
[0063] 4) Installation of solar generator 6
[0064] The extension mechanism 16 is installed on both sides of the electric control box 4, and then the solar cell panel 31 is installed on the extension mechanism 16 and fixed.
[0065] 5) Installation of monitor 7 and alarm 8
[0066] First, the monitor 7 and the alarm 8 are respectively installed on the cross link 9, and then the cross link 9 is fixed on the support frame 1 so that the cross link 9 is above the electric control box 4;
[0067] c. Installation of protective devices
[0068] 1) Fixing of the positioning seat 10
[0069] The positioning seat 10 is placed on the bottom of the water according to the installation point of the support frame 1, the silt removal assembly at the bottom of the positioning seat 10 removes the silt on the bottom of the water, and then the fixing piles 11 are driven into the positioning seat 10 to fix it on the bottom of the water.
[0070] 2) Fixing of the protective tube 12
[0071] The bottom of the protective tube 12 is screwed into the top surface of the positioning seat 10 according to the fixed position of the positioning seat 10 , so that the protective tube 12 is fixed on the base 2 .
[0072] d. Installation of water level monitoring components
[0073] 1) Installation of connecting rod 13
[0074] A connecting rod 13 is fixed on one side of the electric control box 4 close to the protective tube 12 , and then an oblique support rod 14 is welded between the bottom of the connecting rod 13 and the support frame 1 , so that the oblique support rod 14 supports the connecting rod 13 .
[0075] 2) Fixing of water level monitoring components
[0076] After the connecting rod 13 is installed, the top of the fixing group 15 is fixed on the connecting rod 13 according to the installation position of the protective tube 12, and then the water level monitoring component is placed in the protective tube 12, and then the top of the water level monitoring component is fixed to the bottom of the fixing group 15, thereby completing the installation of the flood forecasting measurement device.
[0077] The support includes a base 2, a support rod 17 and a base 18, the base 2 is fixedly connected to the mounting platform, the bottom of the support rod 17 is fixedly connected to the base 2, the base 18 is fixedly connected to the top of the support rod 17, the cross link 9 is fixedly connected to the support rod 17, the extension rod 19 is fixedly connected to the base 18, and the wind turbine 5 is fixedly connected to the top of the extension rod 19. The setting of the extension rod 19 increases the installation height of the wind turbine 5, one is to ensure that the wind turbine 5 is exposed to more wind, and at the same time, the operation of the wind turbine 5 will not affect the shooting of the monitor.
[0078] The monitor 7 and the alarm 8 are arranged at the four corners of the cross link 9, and the monitor 7 faces the water surface. It is ensured that the monitor 7 can monitor the water surface in real time, and the influence range of the alarm 8 is ensured at the same time.
[0079] In step b, the specific structure of the extension mechanism 16 includes a fixed bar 20, a fixed rod 21, a first telescopic push rod 22, a hinge 23 and an extension piece 24, the fixed bar 20 is fixedly connected to both sides of the electric control box 4, one end of the fixed rod 21 is fixedly connected to the electric control box 4, the fixed rod 21 is against the top of the fixed bar 20, the top of one end of the extension piece 24 is rotatably connected to the other end of the fixed rod 21, one end of the hinge 23 is rotatably connected to the bottom of the fixed bar 20, the other end of the hinge 23 is rotatably connected to the middle of one end of the extension piece 24, the top of the first telescopic push rod 22 is rotatably connected to the top of the fixed bar 20, and the bottom of the first telescopic push rod 22 is rotatably connected to the hinge 23. The first telescopic push rod 22 controls the hinge 23 to drive the extension member 24 to swing, thereby controlling the solar panel 31 installed on the extension member 24 to flip. When it is dark and windy and rainy, the first telescopic push rod 22 controls the hinge 23 to drive the extension member 24 to control the solar panel 31 to retract, thereby avoiding damage to the solar panel 31, thereby protecting the solar panel 31; when the sunlight is good, the first telescopic push rod 22 controls the hinge 23 to drive the extension member 24 to control the solar panel 31 to extend, so that the solar panel 31 can receive sunlight in a wider range.
[0080] The hinge 23 includes a first hinge rod 25 and a second hinge rod 26. One end of the first hinge rod 25 is rotatably connected to the bottom of the fixing bar 20. The other end of the first hinge rod 25 is hinged to one end of the second hinge rod 26. The other end of the second hinge rod 26 is rotatably connected to the middle of one end of the extension member 24. The other end of the first telescopic push rod 22 is rotatably connected to the first hinge rod 25. When the sunlight is good, the first telescopic push rod 22 extends, thereby controlling the first hinge rod 25 to drive the second hinge rod 26 to swing upward, so that the extension member 24 swings upward, thereby causing the solar panel 31 on the extension member 24 to swing upward, ensuring that the solar panel 31 receives sunlight from a wider range; when it is dark and the wind and rain are strong, the first telescopic push rod 22 retracts, thereby controlling the solar panel 31 to retract, thereby playing a protective role for the solar panel 31.
[0081] The extension member 24 includes a second telescopic push rod 27, a first extension rod 28, a second extension rod 29 and a third extension rod 30. The two sides of the top of the solar panel 31 are provided with a first rotating seat 32 protruding forward, and the two sides of the middle of the solar panel 31 are provided with a rotating shaft 33. The two sides of the bottom of the solar panel 31 are provided with a second rotating seat 34 protruding backward. One end of the first extension rod 28 is rotatably connected to the rotating shaft 33 of the first solar panel 31, and the other end of the first extension rod 28 is rotatably connected to the first rotating seat 32 of the second solar panel 31. The bottom of the second extension rod 29 is rotatably connected to the second rotating seat 34 of the first solar panel 31. The second rotating seat 34 is rotatably connected, the middle part of the second extension rod 29 is rotatably connected to the rotating shaft 33 of the second solar panel 31, the top of the second extension rod 29 is rotatably connected to the first rotating seat 32 of the third solar panel 31, the bottom of the third extension rod 30 is rotatably connected to the second rotating seat 34 of the second solar panel 31, the top of the third extension rod 30 is rotatably connected to the rotating shaft 33 of the third solar panel 31, the top of the second telescopic push rod 27 is rotatably connected to the first rotating seat 32 of the first solar panel 31, and the bottom of the second telescopic push rod 27 is rotatably connected to the second extension rod 29. The second extension rod 29 is driven to swing by the second telescopic push rod 27, so as to control the first extension rod 28 and the third extension rod 30 to swing with the second extension rod 29, so that the first solar panel 31, the second solar panel 31 and the third solar panel 31 swing, thereby realizing the retraction and expansion of the solar panel 31.
[0082] In step c, the specific structure of the positioning seat 10 includes a positioning plate 35, a fixing pile 11 and a fixing block 36. The fixing block 36 is circumferentially distributed on the outer side of the positioning plate 35. The fixing block 36 is provided with a step hole 37 corresponding to the fixing pile 11. The fixing pile 11 is arranged in the step hole 37. The bottom of the positioning plate 35 is provided with a mounting cavity. The sludge discharge assembly adopts an impeller 38. The impeller 38 is rotatably connected in the mounting cavity. The impeller 38 rotates to discharge the bottom sludge. The outer wall of the positioning plate 35 is circumferentially distributed with drainage holes 39. When the positioning plate 35 sinks in the water, the impeller 38 rotates to impact the sludge on the bottom of the water, so that the sludge on the positioning plate 35 is discharged outward. When the positioning plate 35 is located at the bottom of the water, the sludge in the mounting cavity is discharged through the drainage holes 39, so that the positioning plate 35 can be stably installed at the bottom of the water.
[0083] In step c, a first external thread section 41 is provided at the bottom of the protective tube 12, and a thread groove 40 is provided at the top of the positioning plate 35 corresponding to the protective tube 12. The first external thread section 41 matches the thread groove 40. Reinforcing ribs 42 are distributed circumferentially on the outer wall of the protective tube 12. The reinforcing ribs 42 are provided on the first external thread section 41. After the protective tube 12 is screwed into the positioning seat 10, the bottom of the reinforcing rib 42 rests on the positioning seat 10, and through holes 43 are distributed circumferentially on the outer side of the protective tube 12. The provision of the first external thread section 41 enables the protective tube 12 to be fixed to the positioning seat 10 by screwing in, thereby facilitating the disassembly, assembly and replacement of the protective tube 12. When the protective tube 12 is fixed to the positioning seat 10, the reinforcing ribs 42 increase the contact area between the protective tube 12 and the positioning seat 10, thereby greatly improving the contact area between the protective tube 12 and the positioning seat 10, thereby improving the stability of the installation of the protective tube 12. The provision of the through hole 43 facilitates water to flow into the protective tube 12, while preventing water waves from impacting the monitoring head in the protective tube 12, thereby increasing the monitoring accuracy of the water level monitoring assembly.
[0084] In step d, the water level monitoring assembly includes a monitoring rod 44 and a monitoring head, the monitoring head is arranged at the bottom of the monitoring rod 44, the monitoring rod 44 is arranged in the protective tube 12, the fixing assembly 15 includes two U-shaped ferrules 45 arranged in a mirror image, the corresponding end of the U-shaped ferrule 45 is provided with a card slot 46, the card slot 46 is clamped on the connecting rod 13, a first threaded connecting rod 47 is connected between the two U-shaped ferrules 45, and the two ends of the first threaded connecting rod 47 are provided with first fastening nuts 48, the first fastening nuts 48 are tightened on the U-shaped ferrule 45, and the bottom of the U-shaped ferrule 45 is provided with a first fastening nut 48. The upper part of the monitoring rod 44 is slidably connected with a clamp 49, and the clamp 49 is fixedly connected with an L-shaped connecting rod 50. A slider 51 is provided at the top of the L-shaped connecting rod 50, and a slide groove 52 is provided at the bottom of the U-shaped clamp 45. The slider 51 is slidably connected in the slide groove 52. A fastening screw 53 is provided on the slider 51, and the fastening screw 53 is tightened in the slide groove 52. The clamp 49 is clamped at the top of the monitoring rod 44. A second threaded connecting rod 54 is connected between the two clamps 49. Second fastening nuts 55 are provided at both ends of the second threaded connecting rod 54, and the second fastening nuts 55 are tightened on the clamp 49. According to the installation position of the protective tube 12, the fixing group 15 is fixed to the connecting rod 13 through the U-shaped clamp 45. After the fixing is completed, the water level monitoring assembly is placed in the protective tube 12, and then the top of the monitoring rod 44 is fixed in the clamp 49 located at the bottom of the U-shaped clamp 45, and the clamp 49 is clamped at the top of the monitoring rod 44 for fixing.
[0085] A limit block 56 is provided at the top of the monitoring rod 44, a second external thread section 57 is provided at the top of the monitoring rod 44, a limit ring 58 is provided on the outside of the second external thread section 57, a locking nut 59 is threadedly connected to the second external thread section 57, the locking nut 59 is provided below the limit ring 58, the top of the clamp 49 is against the bottom of the limit block 56, and the locking nut 59 tightens the limit block 56 below the clamp 49. The setting of the limit block 56 and the limit ring 58 plays a limiting role on the clamp 49, increases the contact area between the fixing group 15 and the monitoring rod 44, thereby improving the stability of the connection between the fixing group 15 and the monitoring rod 44, and the setting of the locking nut 59 facilitates the adjustment of the position of the limit ring 58, so that it can be adjusted according to the size of the clamp 49.
[0086] The present invention realizes wind-solar complementary power storage by arranging a wind turbine 5 and a solar turbine 6, thereby ensuring that the flood forecasting and measuring device operates uninterruptedly 24 hours a day. At the same time, an extension mechanism 16 is arranged to ensure that the solar panel 31 can receive sufficient sunlight and can be properly protected when not in use. A protective device is arranged at the bottom of the water to protect the water level monitoring component, thereby preventing the water level monitoring component from being affected by wind and waves, thereby improving the accuracy of water level monitoring.
[0087] The above are only specific embodiments of the present invention, but the technical features of the present invention are not limited thereto. Any simple changes, equivalent replacements or modifications made based on the present invention to solve basically the same technical problems and achieve basically the same technical effects are all included in the protection scope of the present invention.
Claims
1. A construction method of a real-time flood forecasting measurement device, characterized in that The steps include: a. Preparation before construction First, the installation point of the flood forecasting measurement device is selected. The installation point is located on the shore of the water surface, and the installation point is preliminarily cleaned, and then the installation point is leveled and compacted. After the treatment is completed, a cement installation platform is poured at the installation point; b. Installation of support frame 1) Fixing of the support frame: After the installation platform is set up, open bolt holes on the installation platform according to the support frame base, and then fix the support frame base on the installation platform by screwing in expansion bolts; 2) After the support frame for the electric control box is fixed, install the electric control box in the middle of the support frame. At the same time, the height of the electric control box should be 150cm-180cm higher than the height of the base. 3) After the wind turbine installation and electrical control box are fixed, fix the extension rod on the top of the support frame, and then set the wind turbine on the top of the extension rod; 4) Installation of the solar generator Install the extension mechanism on both sides of the electric control box, and then install the solar panel on the extension mechanism for fixing; 5) Installation of monitor and alarm First, install the monitor and alarm on the cross link respectively, and then fix the cross link on the support frame so that the cross link is above the electric control box; c. Installation of protective devices 1) Fixing of the positioning seat The positioning seat is placed on the bottom of the water according to the installation point of the support frame, the silt removal assembly at the bottom of the positioning seat removes the silt on the bottom of the water, and then the fixing piles are driven into the positioning seat to fix it on the bottom of the water; 2) Fixing of the protective tube: Screw the bottom of the protective tube into the top surface of the positioning seat according to the fixed position of the positioning seat, so that the protective tube is fixed on the base; d. Installation of water level monitoring components The water level monitoring component includes a monitoring rod and a monitoring head, the monitoring head is arranged at the bottom of the monitoring rod, the monitoring rod is arranged in the protective tube, the fixing component includes two U-shaped ferrules arranged in a mirror image, the corresponding end of the U-shaped ferrule is provided with a slot, the slot is clamped on the connecting rod, a first threaded connecting rod is connected between the two U-shaped ferrules, both ends of the first threaded connecting rod are provided with a first fastening nut, the first fastening nut is tightened on the U-shaped ferrule, the bottom of the U-shaped ferrule is slidably connected with a clamp, the clamp is fixedly connected with an L-shaped connecting rod, the top of the L-shaped connecting rod is provided with a slider, the bottom of the U-shaped ferrule is provided with a slide groove, the slider is slidably connected to the In the slide groove, the sliding block is provided with a fastening screw, the fastening screw is tightened in the slide groove, the clamp is clamped on the top end of the monitoring rod, a second threaded connecting rod is connected between the two clamps, and second fastening nuts are provided at both ends of the second threaded connecting rod, and the second fastening nut is tightened on the clamp; a limit block is provided at the top end of the monitoring rod, a second external thread section is provided at the top of the monitoring rod, a limit ring is provided on the outside of the second external thread section, a locking nut is threadedly connected to the second external thread section, and the locking nut is arranged below the limit ring, the top of the clamp is against the below of the limit block, and the locking nut is tightened to the limit block below the clamp; 1) Installation of connecting rod A connecting rod is fixed on one side of the electric control box close to the protective tube, and then an oblique support rod is welded between the bottom of the connecting rod and the support frame, so that the oblique support rod supports the connecting rod; 2) Fixing of water level monitoring components After the connecting rod is installed, fix the top of the fixed component on the connecting rod according to the installation position of the protective tube, then place the water level monitoring component in the protective tube, and then fix the top of the water level monitoring component to the bottom of the fixed component to complete the installation of the flood forecasting measurement device.
2. The construction method of the real-time flood forecasting measurement device according to claim 1 is characterized in that: The support includes the base, a support rod and a pedestal, the base is fixedly connected to the mounting platform, the bottom of the support rod is fixedly connected to the base, the pedestal is fixedly connected to the top of the support rod, the cross connecting rod is fixedly connected to the support rod, the extension rod is fixedly connected to the pedestal, and the wind turbine is fixedly connected to the top of the extension rod.
3. The construction method of the real-time flood forecasting measurement device according to claim 2 is characterized in that: The monitor and the alarm are arranged at four corners of the cross connecting rod at intervals, and the monitor faces the water surface.
4. The construction method of the real-time flood forecasting measurement device according to claim 1 is characterized in that: In step b, the specific structure of the extension mechanism includes a fixed bar, a fixed rod, a first telescopic push rod, a hinge and an extension member, the fixed bar is fixedly connected to both sides of the electric control box, one end of the fixed rod is fixedly connected to the electric control box, the fixed rod is against the top of the fixed bar, the top of one end of the extension member is rotatably connected to the other end of the fixed rod, one end of the hinge is rotatably connected to the bottom of the fixed bar, the other end of the hinge is rotatably connected to the middle of one end of the extension member, the top of the first telescopic push rod is rotatably connected to the top of the fixed bar, and the bottom of the first telescopic push rod is rotatably connected to the hinge.
5. The construction method of the real-time flood forecasting measurement device according to claim 4 is characterized in that: The hinged member includes a first hinged rod and a second hinged rod, one end of the first hinged rod is rotatably connected to the bottom of the fixing bar, the other end of the first hinged rod is hinged to one end of the second hinged rod, the other end of the second hinged rod is rotatably connected to the middle part of one end of the extension member, and the other end of the first telescopic push rod is rotatably connected to the first hinged rod.
6. The construction method of the real-time flood forecasting measurement device according to claim 4 is characterized in that: The extension member includes a second telescopic push rod, a first extension rod, a second extension rod and a third extension rod. First rotating seats are protruded forward on both sides of the top of the solar panel, a rotating shaft is provided on both sides of the middle of the solar panel, and second rotating seats are protruded backward on both sides of the bottom of the solar panel. One end of the first extension rod is rotatably connected to the rotating shaft of the first solar panel, the other end of the first extension rod is rotatably connected to the first rotating seat of the second solar panel, the bottom of the second extension rod is rotatably connected to the second rotating seat of the first solar panel, the middle of the second extension rod is rotatably connected to the rotating shaft of the second solar panel, the top of the second extension rod is rotatably connected to the first rotating seat of the third solar panel, the bottom of the third extension rod is rotatably connected to the second rotating seat of the second solar panel, the top of the third extension rod is rotatably connected to the rotating shaft of the third solar panel, the top of the second telescopic push rod is rotatably connected to the top of the first solar panel, and the bottom of the second telescopic push rod is rotatably connected to the second extension rod.
7. The construction method of the real-time flood forecasting measurement device according to claim 1 is characterized in that: In step c, the specific structure of the positioning seat includes a positioning plate, the fixed pile and the fixed block, the fixed block is circumferentially distributed on the outer side of the positioning plate, the fixed block is provided with a step hole corresponding to the fixed pile, the fixed pile is arranged in the step hole, the bottom of the positioning plate is provided with an installation cavity, the sludge discharge component adopts an impeller, the impeller is rotatably connected in the installation cavity, the impeller rotates to discharge the bottom sludge, and the outer wall of the positioning plate is circumferentially provided with drainage holes.
8. The construction method of the real-time flood forecasting measurement device according to claim 7 is characterized in that: In step c, a first external thread section is provided at the bottom of the protective tube, a thread groove is provided at the top of the positioning plate corresponding to the protective tube, the first external thread section matches the thread groove, reinforcing ribs are distributed circumferentially on the outer wall of the protective tube, the reinforcing ribs are provided on the first external thread section, after the protective tube is screwed into the positioning seat, the bottom of the reinforcing ribs abuts against the positioning seat, and through holes are distributed circumferentially on the outer side of the protective tube.
Citation Information
Patent Citations
Self-adapted wind collection type overwater wind power station
CN104763595A
Ground water level real-time monitoring device used for water-preserved mining
CN111502660A
Water level measuring device for flood prevention of reservoir
CN113566926A
Efficient pile foundation system for blocking dike breach
CN113982487A
Portable foldable flexible or semi-flexible solar cell support system and application thereof
CN114204893A