A method, device, equipment and storage medium for predicting dynamic reserves of water-invaded gas reservoirs
By obtaining the collected data of the gas reservoir development unit, the static material balance method and the flowing material balance method are used to determine the dynamic reserves in different time periods, and the relationship function between the cumulative collected gas volume and the dynamic reserves is fitted, which solves the problem that cannot be effectively evaluated in the existing technology. The problem of the impact of water invasion on gas reservoir development has enabled accurate prediction of gas reservoir dynamic reserves and optimization of gas reservoir development.
Patent Information
- Application Number
- CN202011383423.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-12-01
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2040-12-01
AI Technical Summary
Existing technology cannot effectively and quantitatively evaluate the impact of water invasion on gas reservoir development, resulting in loss of dynamic reserves and reduced recovery rate of gas reservoirs.
By obtaining the collected data of the gas reservoir development unit, the static material balance method and the flowing material balance method are used to determine the dynamic reserves in different time periods, and the relationship function between the cumulative collected gas volume and the dynamic reserves is fitted to achieve the prediction of dynamic reserves.
It achieves quantitative prediction of dynamic reserves of gas reservoirs, breaks through the traditional method of treating reserves as fixed values, and improves the accuracy and efficiency of gas reservoir development.
Smart Images

Figure CN114575833B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of gas reservoir development, and in particular to a method, device, equipment and storage medium for predicting dynamic reserves of a water-invaded gas reservoir. Background Art
[0002] Most of the developed gas reservoirs in my country are affected by water invasion, of which 40%-50% are gas reservoirs with relatively active edge and bottom water. After water invasion of gas reservoirs, macroscopic water lock phenomenon and microscopic water-sealed gas effect will occur, resulting in loss of production capacity and dynamic reserves of gas reservoirs / gas wells, thus affecting gas reservoir recovery rate and final development effect.
[0003] At present, domestic and foreign scholars have conducted a lot of research on the mechanism of water invasion in gas reservoirs, water invasion identification methods, and water invasion volume calculation, but there are few studies on the methods of evaluating and predicting the dynamic reserves of water-invaded gas reservoirs throughout their development life cycle. When researchers use the material balance principle to evaluate the dynamic reserves of water-invaded gas reservoirs, they all assume that the dynamic reserves of gas reservoirs are a constant value. In fact, the dynamic reserves of gas reservoirs change during development. After the gas reservoir is put into production, the pressure sweep range gradually expands during the production process, and the gas well gradually transitions from an unstable seepage state to a quasi-stable seepage state. The transition time is closely related to the reservoir physical properties and heterogeneity. The worse the reservoir physical properties and the stronger the heterogeneity, the longer the unstable seepage time, even up to several years. Therefore, during the development of the gas reservoir, its dynamic reserves change with the production time (cumulative gas volume). When not affected by water invasion, the dynamic reserves of a gas reservoir increase with the increase of production time (cumulative gas collection volume) until it reaches a quasi-stable seepage state and no longer changes. When formation water invades the interior of the gas reservoir and causes water lock or water-sealed gas effect, the dynamic reserves of the gas reservoir will be lost. The loss amount increases with the degree of water invasion. Therefore, it is urgent to solve the problem that it is currently impossible to achieve quantitative evaluation of the impact of water invasion on gas reservoir development. Summary of the invention
[0004] In view of the above problems in the prior art, the purpose of this article is to provide a method, device, equipment and storage medium for predicting dynamic reserves of water-invaded gas reservoirs, so as to solve the problem that the prior art cannot achieve quantitative evaluation of the impact of water invasion on gas reservoir development.
[0005] In order to solve the above technical problems, the specific technical solutions of this article are as follows:
[0006] In one aspect, the present invention provides a method for predicting dynamic reserves of a water-invaded gas reservoir, the method comprising the following steps:
[0007] Acquire the collected data of the gas reservoir development unit, wherein the collected data includes daily production data, shut-in static pressure at different time points and accumulated collected gas volume;
[0008] Determine the dynamic reserves of the first gas reservoir in different time periods using a static material balance method based on the collected data;
[0009] According to the daily production data, the dynamic reserves of the second gas reservoir are determined by using the flowing material balance method;
[0010] Determine the relationship between the cumulative collected gas volume and the dynamic reserves of the gas reservoir at different time points according to the dynamic reserves of the first gas reservoir, the dynamic reserves of the second gas reservoir and the cumulative collected gas volume in the different time periods;
[0011] According to the relationship between the cumulative collected gas volume and the dynamic reserves of the gas reservoir, fitting a relationship function between the cumulative collected gas volume and the dynamic reserves;
[0012] The dynamic reserves are predicted based on the relationship function between the cumulative gas volume and the dynamic reserves.
[0013] In a second aspect, the present invention also provides a device for predicting dynamic reserves of water-invaded gas reservoirs, the device being adapted to the method provided above, and the device comprising:
[0014] The data acquisition module is used to obtain the acquisition data of the gas reservoir development unit, wherein the acquisition data includes daily production data, shut-in static pressure at different time points and accumulated gas volume;
[0015] A first gas reservoir dynamic reserve determination module, configured to determine the first gas reservoir dynamic reserves in different time periods using a static material balance method based on the collected data;
[0016] The dynamic reserves of the second gas reservoir are used to determine the dynamic reserves of the second gas reservoir by using the flowing material balance method according to the daily production data;
[0017] A gas production and reserves relationship determination module, used to determine the relationship between the cumulative gas production and the dynamic reserves of the gas reservoir at different time points according to the dynamic reserves of the first gas reservoir, the dynamic reserves of the second gas reservoir and the cumulative gas production in different time periods;
[0018] A relationship function fitting module, used for fitting a relationship function between the cumulative collected gas volume and the dynamic reserves according to the relationship between the cumulative collected gas volume and the dynamic reserves of the gas reservoir;
[0019] The dynamic reserve prediction module is used to predict the dynamic reserves based on the relationship function between the cumulative gas volume and the dynamic reserves.
[0020] In a third aspect, this document also provides a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the method steps described above when executing the computer program.
[0021] In a fourth aspect, the present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium stores an executable computer program, and when the computer program is executed by a processor, the method steps described above are implemented.
[0022] By adopting the above technical scheme, a method, device, equipment and storage medium for predicting dynamic reserves of water-invaded gas reservoirs described in this article are used to obtain the dynamic reserves of gas reservoirs in different time periods through static material balance method and dynamic material balance method, and fit the relationship function between the cumulative collected gas volume and the dynamic reserves that can predict the dynamic reserves. This article can break through the idea of treating reserves as a constant in traditional methods, realize quantitative prediction of dynamic reserves, and facilitate the later development of gas reservoirs.
[0023] In order to make the above and other purposes, features and advantages of this article more obvious and easy to understand, the following specifically cites preferred embodiments and describes them in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the technical solutions in the embodiments of this article or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of this article. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0025] Figure 1 A schematic diagram showing the steps of a method for predicting dynamic reserves of a water-invaded gas reservoir described in an embodiment of this invention is shown;
[0026] Figure 2 A schematic diagram of the steps for determining a gas reservoir development unit in an embodiment of this invention is shown;
[0027] Figure 3 A schematic diagram of the steps of determining the dynamic reserves of the first gas reservoir in the embodiment of this article is shown;
[0028] Figure 4 Shows Figure 3 A schematic diagram of the steps for further determining the dynamic reserves of the first gas reservoir in the step;
[0029] Figure 5 A schematic diagram of the steps of determining the dynamic reserves of the second gas reservoir in the embodiment of this article is shown;
[0030] Figure 6 Shows Figure 5 A schematic diagram of the steps for further determining the dynamic reserves of the second gas reservoir in the step;
[0031] Figure 7 A schematic diagram of the steps for determining the relationship function between the cumulative gas volume collected and the dynamic reserves at different development stages is shown;
[0032] Figure 8 A schematic diagram showing the steps for determining the current dynamic reserve loss of natural gas is shown;
[0033] Fig. 9 A schematic diagram showing the determination of the gas reservoir development unit in the embodiment of this article is shown;
[0034] Fig.10 A schematic diagram of a static material balance curve in the embodiments of this article is shown;
[0035] Fig.11 A schematic diagram of a flow material balance curve in the embodiments of this article is shown;
[0036] Fig.12 The schematic diagram of the division of different development stages of gas reservoirs is shown;
[0037] Fig.13 The figure shows the fitting relationship function diagram of the cumulative gas volume and dynamic reserves at different development stages of the gas reservoir;
[0038] Fig.14 A schematic diagram of the structure of a dynamic reserve prediction device for a water-invaded gas reservoir described in an embodiment of this invention is shown;
[0039] Fig.15 A schematic diagram of the structure of a dynamic reserve prediction device for a water-invaded gas reservoir described in an embodiment of this invention is shown;
[0040] Fig.16 A schematic diagram of the structure of a computer device provided in an embodiment of this invention is shown.
[0041] Description of the accompanying symbols:
[0042] 100. Data acquisition module;
[0043] 200. A first gas reservoir dynamic reserve determination module;
[0044] 300. A second gas reservoir dynamic reserve determination module;
[0045] 400. A module for determining the relationship between gas production and reserves;
[0046] 500. Relationship function fitting module;
[0047] 600. Dynamic reserve prediction module;
[0048] 700. Gas reservoir development unit determination module;
[0049] 800. Dynamic reserve loss prediction module;
[0050] 1602. Computer equipment;
[0051] 1604, processor;
[0052] 1606. Memory;
[0053] 1608, driving mechanism;
[0054] 1610, input / output module;
[0055] 1612. Input devices;
[0056] 1614. Output device;
[0057] 1616. Presentation equipment;
[0058] 1618. Graphical user interface;
[0059] 1620, network interface;
[0060] 1622, communication link;
[0061] 1624. Communication bus. DETAILED DESCRIPTION
[0062] The following will be combined with the drawings in the embodiments of this article to clearly and completely describe the technical solutions in the embodiments of this article. Obviously, the described embodiments are only part of the embodiments of this article, not all of the embodiments. Based on the embodiments of this article, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this article.
[0063] It should be noted that the terms "first", "second", etc. in the specification and claims of this article and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of this article described here can be implemented in an order other than those illustrated or described here. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, device, product or equipment that includes a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or equipment.
[0064] In the prior art, in the study of dynamic reserves of water-invaded gas reservoirs, the dynamic reserves of gas reservoirs are usually taken as a constant value. However, in fact, during the development of a gas reservoir, as the degree of water invasion deepens, its dynamic reserves change. Therefore, there has been no specific solution to the impact of water invasion on the dynamic reserves of a gas reservoir.
[0065] In order to solve the above problems, the embodiment of this article provides a method for predicting the dynamic reserves of a water-invaded gas reservoir, which can realize the prediction of the dynamic reserves of a water-invaded gas reservoir. Figure 1 This is a schematic diagram of the steps of a method for predicting dynamic reserves of a water-invaded gas reservoir provided in the embodiments of this article. This specification provides the method operation steps described in the embodiments or flow charts, but more or fewer operation steps may be included based on conventional or non-creative labor. The order of steps listed in the embodiments is only one way of executing the steps among many orders, and does not represent the only order of execution. When the actual system or device product is executed, it can be executed in the order of the methods shown in the embodiments or drawings or in parallel. Specifically, Figure 1 As shown, the method may include:
[0066] S101: Acquire acquisition data of a gas reservoir development unit, wherein the acquisition data includes daily production data, shut-in static pressure at different time points, and accumulated acquired gas volume;
[0067] S102: Determine the dynamic reserves of the first gas reservoir in different time periods using a static material balance method based on the collected data;
[0068] S103: Determine the dynamic reserves of the second gas reservoir using a flowing material balance method according to the daily production data;
[0069] S104: determining the relationship between the cumulative collected gas volume and the dynamic reserves of the gas reservoir at different time points according to the dynamic reserves of the first gas reservoir, the dynamic reserves of the second gas reservoir and the cumulative collected gas volume in the different time periods;
[0070] S105: fitting a relationship function between the cumulative collected gas volume and the dynamic reserves according to the relationship between the cumulative collected gas volume and the dynamic reserves of the gas reservoir;
[0071] S106: predicting the dynamic reserves according to the relationship function between the cumulative gas volume collected and the dynamic reserves.
[0072] The embodiment of this invention obtains the daily production data of the gas reservoir, that is, the daily production data, as well as the shut-in static pressure and the cumulative collected gas volume at different time points, and obtains the dynamic reserves of the first gas reservoir and the second gas reservoir in different time periods through the static material balance method and the flowing material balance method. Then, the relationship between the cumulative collected gas volume and the dynamic reserves of the gas reservoir at different time points is determined, and the relationship function is fitted, so that the dynamic reserves of the gas reservoir can be predicted quickly and accurately. The calculation parameters of this invention are easy to obtain and process, and do not require a lot of testing time. At the same time, the dynamic reserves of the gas reservoir can be predicted quickly and efficiently, which is convenient for the subsequent development of the gas reservoir.
[0073] In the embodiments of this article, the daily production data includes daily bottom hole flow pressure, daily bottom hole temperature and daily gas collection volume, wherein the gas well can be the production data of a gas well, or the daily production data of all gas wells in the same gas reservoir area. Preferably, it can be the daily production data of all gas wells in the same gas reservoir area, which can accurately reflect the dynamic reserve changes of a single gas reservoir. By counting the daily gas collection volume, the cumulative gas collection volume at different time points can be obtained.
[0074] In actual work, the daily bottom hole flow pressure is difficult to measure directly, and is generally determined by the wellhead pressure or the casing pressure. Optionally, the bottom hole flow pressure can be obtained by converting the wellhead pressure to the bottom hole according to the pressure gradient. In a few cases, when there is a throttle downhole, the wellhead pressure cannot reflect the flow conditions. When the casing annulus is connected, the casing pressure can be converted to the bottom hole according to the pressure gradient as the bottom hole flow pressure.
[0075] It should be noted that in the actual exploitation process, in the early stage of gas reservoir exploitation, due to the stable internal pressure at the bottom of the well and the relatively good geological environment of the formation, more shut-in tests are generally carried out, that is, the shut-in static pressure at multiple different time points can be obtained. In the middle and late stages of gas reservoir exploitation, as the degree of exploitation deepens, the pressure at the bottom of the exploitation well is unstable, affected by internal water invasion or other factors, and the geological environment of the formation is relatively unstable. Therefore, shut-in tests are basically not chosen to avoid certain risks. Therefore, in the text embodiment, the shut-in static pressure is generally in the early stage of gas reservoir exploitation, and more often reflects the dynamic reserves of the gas reservoir when there is no water invasion. Therefore, it can be calculated by the static material balance method. In the middle and late stages of gas reservoir exploitation, the gas reservoir affected by water invasion will suffer losses in dynamic reserves due to water lock or water-sealed gas. As the water invasion deepens, the loss of dynamic reserves will gradually increase. Therefore, in this case, a relatively accurate dynamic reserve value can be obtained by the flowing material balance method.
[0076] In the examples of this paper, when the well connectivity is good, the gas wells are in the same flow unit, and the static pressure drop of each well in the same period is basically the same, they can be classified as one development unit. As the gas reservoir is exploited more, due to the differences in exploitation location and speed, there may be differences in pressure between different gas wells, resulting in the formation of multiple flow units inside the same gas reservoir, that is, divided into multiple development units. Figure 2 As shown, it is a schematic diagram of the steps for determining the gas reservoir development unit. Specifically, the steps may be:
[0077] S1011: Obtain shut-in static pressure of the gas well at multiple time points;
[0078] S1012: determining a gas reservoir pressure profile according to the shut-in static pressure;
[0079] S1013: Determine the gas reservoir development unit according to the gas reservoir pressure profile.
[0080] It can be understood that the dynamic reserves of the gas reservoir in the embodiment of this article are the dynamic reserves of the entire gas reservoir, that is, when the gas reservoir is divided into multiple development units, the dynamic reserves of each development unit should be calculated separately, and the dynamic reserves of each development unit should be added together as the dynamic reserves of the entire gas reservoir. It should be noted that this is the sum of the dynamic reserves at the same time point.
[0081] In actual work, a gas reservoir can be divided into one development unit or several development units according to the difference in inter-well connectivity. Fig. 9 As shown, it is a pressure profile diagram of the Zhangjiachang Carboniferous gas reservoir drawn according to the shut-in static pressures of multiple gas wells at multiple time points measured in a specific embodiment. It can be seen from the figure that the internal connectivity of the Zhangjiachang Carboniferous gas reservoir is good, and the gas reservoir as a whole is a development unit. Because there is edge water in the south, the pressure of the gas wells in the south is relatively high.
[0082] like Figure 3 As shown in FIG. 1 , the specific steps of calculating the dynamic reserves by shut-in static pressure according to the static material balance method may include:
[0083] S1021: Calculate a first natural gas deviation factor according to the shut-in static pressure and the daily bottom hole temperature;
[0084] S1022: Calculate the shut-in gas reservoir pressure of the development unit according to the shut-in static pressure and the first natural gas deviation factor;
[0085] S1023: establishing a static material balance curve according to the shut-in gas reservoir pressure and the accumulated collected gas volume;
[0086] S1024: Determine the dynamic reserves of the first gas reservoir in different time periods according to the static material balance curve
[0087] Among them, the natural gas deviation factor reflects the degree to which the actual gas deviates from the ideal gas state. On the one hand, the actual gas molecules have size and volume, and on the other hand, there is attraction (or repulsion) between molecules. The gas state equation is:
[0088] pV=ZRT (1)
[0089] Where p is gas pressure, MPa;
[0090] T--absolute temperature of gas, K;
[0091] V--gas molar volume, m 3 / kmol;
[0092] Z--gas deviation factor;
[0093] R--molar constant.
[0094] in,
[0095] The methods for determining the natural gas deviation coefficient can be divided into three categories, namely, direct laboratory measurement method, plate method and calculation method. The direct laboratory measurement method has a long cycle and high cost, so it is impossible to do it frequently anytime and anywhere; the plate method is relatively simple and can meet most engineering requirements and is widely used; and the calculation method is suitable for programming calculation, so it has also been widely used.
[0096] Z=f(p r ,T r ) (2)
[0097] In the formula
[0098] p r --Comparative pressure refers to the absolute working pressure p and critical pressure p of the gas c The ratio of p r =p / p c ;
[0099] T r --Comparative pressure, refers to the absolute working temperature T and critical temperature T of the gas c The ratio of T r =T / T c
[0100] For natural gas mixtures, the pseudo-comparative pressure p is often used in engineering. pr and the simulated comparison temperature T pr It means that if the mixed gas is regarded as a "pure" gas and the correspondence principle is used, the Z value can be obtained.
[0101] The parameters to be compared are defined as follows:
[0102] Quasi-comparative pressure: absolute working pressure p and quasi-critical pressure p of gas pc The ratio of
[0103] p pr =p / p pc =p / ∑y i p ci (3)
[0104] Quasi-comparison temperature: the absolute working temperature of the gas and T and the quasi-critical temperature T c The ratio of
[0105] T pr =T / T pc =T / ∑y i T ci (4)
[0106] In the formula, when the natural gas measured is a mixed gas, y i Indicates the volume percentage of each gas in the mixed gas, P ci is the pseudo-critical pressure of each gas, T ci is the pseudo-critical temperature of each gas.
[0107] In actual work, the shut-in static pressure can be regarded as the absolute working pressure P, and the daily bottom hole temperature in the daily production data can be regarded as the absolute working temperature T. The pseudo-critical pressure p can be obtained by the composition of the gas in the well in actual work. pc and pseudo-critical temperature T c , so the quasi-comparative pressure p can be calculated pr and the simulated comparison temperature T pr , the corresponding natural gas deviation factor can be obtained by the obtained pseudo-comparison pressure and pseudo-comparison temperature according to the Standing-Katz deviation coefficient plate method. When the natural gas mixture includes H2S and CO2, it can be corrected by the following formula:
[0108] Correction: ε=66.67[A 0.9 -A 1.6 +8.33(B 0.5 -B 4 )] (5)
[0109]
[0110] T' pc =T pc -ε (7)
[0111] Where: A—H2S and CO2 content; B—H2S content.
[0112] In the embodiment of this article, the first natural gas deviation factor (Z) can be obtained through the above calculation process, and the shut-in gas reservoir pressure (P / Z) is obtained by dividing the shut-in static pressure and the first natural gas deviation factor. Then, the corresponding static material balance curve can be obtained by the static material balance method (P / Z method), and then the dynamic reserves of the first gas reservoir in different time periods can be obtained, that is, a coordinate system is established with the cumulative gas volume as the horizontal coordinate and the shut-in gas reservoir pressure (P / Z) as the vertical coordinate, so as to establish a change curve graph of the cumulative gas volume-shut-in gas reservoir pressure.
[0113] In actual work, in the early stage of exploitation, the dynamic reserves will increase as the gas reservoir is exploited more deeply. However, when water invasion occurs or the impact of water invasion becomes more and more serious, the predicted value of dynamic reserves will become smaller and smaller. Specifically, Figure 4As shown, the specific steps for calculating the dynamic reserves of the first gas reservoir may include:
[0114] S0241: Determine at least one linear variation curve of the shut-in gas reservoir pressure and the cumulative collected gas volume according to the static material balance curve;
[0115] S0242: Determine the maximum cumulative collected gas volume corresponding to each linear change curve, where the maximum cumulative collected gas volume is the dynamic reserves of the first gas reservoir.
[0116] In actual work, within a certain time period, the change in dynamic reserves can change linearly with the mining process (cumulative collected gas volume). Therefore, through the static material balance curve, the cumulative collected gas volume-gas reservoir pressure change curve that changes linearly in different time periods can be determined, so that the dynamic reserves of the gas reservoir in the corresponding time period for the entire life cycle can be determined, which is equivalent to the cumulative collected gas volume of the gas reservoir when the gas reservoir pressure is zero. Specifically, at least one linear change curve of the shut-in gas reservoir pressure and the cumulative collected gas volume can be determined according to the linear change characteristics, and for each linear change curve, the corresponding maximum cumulative collected gas volume is determined. The maximum cumulative collected gas volume is the dynamic reserves of the first gas reservoir, that is, the dynamic reserves of the gas reservoir in the entire life cycle within the time period.
[0117] like Fig.10 As shown in the figure, the P / Z curves of the Zhangjiachang Carboniferous gas reservoir in three different periods are determined by the linear change law, and then the dynamic reserves corresponding to the three different periods are determined (the horizontal axis corresponds to the cumulative collected gas volume). The dynamic reserves of the first gas reservoir in different time periods can be determined by directly obtaining the shut-in static pressure. The data acquisition is simple and the processing process is fast. At the same time, it can improve the accuracy and speed of dynamic reserve prediction of gas reservoirs.
[0118] The above-mentioned static material balance method can accurately obtain the dynamic reserves of the first gas reservoir. In the actual gas reservoir exploitation process, the speed and range of water invasion are uncontrollable and difficult to predict, especially in the later stage of exploitation, due to the lack of key data such as shut-in static pressure, it is difficult to obtain accurate dynamic reserves of the gas reservoir through the static material balance method. Therefore, the dynamic reserves of the gas reservoir in the later stage of exploitation can be judged through daily collection data and its changing rules.
[0119] Specifically, Figure 5 FIG. 1 is a schematic diagram of steps for obtaining the dynamic reserves of a gas reservoir by the flowing material balance method (FMB curve), and the steps may include:
[0120] S1031: Calculate a second natural gas deviation factor according to the daily bottom hole flow pressure and the daily bottom hole temperature;
[0121] S1032: Calculate the daily gas reservoir pressure of the development unit according to the daily bottom hole flowing pressure and the second natural gas deviation factor;
[0122] S1033: establishing a flow material balance curve according to the daily gas reservoir pressure and the daily gas collection volume;
[0123] S1034: Determine the dynamic reserves of the second gas reservoir according to the flow material balance curve.
[0124] The calculation of the second natural gas deviation factor may be similar to the calculation of the first natural gas deviation factor. The second natural gas deviation factor may be obtained by using the daily bottom hole flow pressure and daily bottom hole temperature obtained by the above calculation according to the above calculation process, which will not be described in detail in the embodiments of this article.
[0125] Specifically, the second natural gas deviation factor (Z ** ) can be obtained through the above calculation process, the daily gas reservoir pressure (P / Z ** ) is the daily gas reservoir pressure and the second natural gas deviation factor, and then the corresponding flow material balance curve can be obtained by the flow material balance method (FMB method), and then the dynamic reserves of the second gas reservoir can be obtained, that is, the accumulated gas volume is used as the horizontal axis and the daily gas reservoir pressure (P / Z ** ) is used as the vertical coordinate to establish a coordinate system, thereby establishing a curve diagram of the cumulative gas volume collected-gas reservoir pressure change.
[0126] In actual work, due to the large amount of daily production data and the uncontrollable and unpredictable water invasion process, the impact on the gas reservoir exploitation process is also uncertain. When the dynamic reserves are predicted through the flow material balance curve, the curve deviation will be large due to the influence of individual data points. Therefore, when calculating the dynamic reserves in the past mining time period, the curve determination deviation will be large due to human factors, resulting in a large error in the dynamic reserve calculation, which is not conducive to the prediction of the dynamic reserves of the gas reservoir in the later period. Therefore, the dynamic reserves of the current mining time period can be determined as the basis for the subsequent dynamic reserves prediction of the gas reservoir.
[0127] In some other embodiments, in order to reduce the amount of data processing, daily production data can be collected at preset time intervals, which can reduce the amount of data processing and improve efficiency. Optionally, data collection can be selected every week or half a month, which is not limited in this specification.
[0128] In some other embodiments, in order to reduce the amount of data processing and reduce the difficulty of curve determination, the average value of data collected within the same time interval can be obtained as the collected data. This can improve the efficiency of data use and reduce the impact of individual anomalies on the entire curve. Optionally, the average value of data collected for a week or half a month can be used as the collected data, which is not limited in this specification.
[0129] like Figure 6 As shown, it is a schematic diagram of the steps of determining the dynamic reserves of the second gas reservoir. Specifically, the steps may include:
[0130] S0341: Determine the linear variation curve of the daily gas reservoir pressure and the daily gas production volume according to the flow material balance curve;
[0131] S0342: Determine the maximum cumulative collected gas volume corresponding to the linear change curve, and the maximum cumulative collected gas volume is the dynamic reserves of the second gas reservoir.
[0132] It can be understood that by determining the linear change curve corresponding to the flow material balance curve through the current daily mining data, it can ensure the improvement of the calculation accuracy of the current gas reservoir dynamic reserves, and at the same time can further limit the change trend of the dynamic reserves of the gas reservoir throughout its life cycle.
[0133] like Fig.11 As shown in the figure, it is the FMB curve of the Zhangjiachang Carboniferous gas reservoir. The solid line is the maximum dynamic reserves of the Zhangjiachang Carboniferous gas reservoir when it is not affected by water invasion, and the dotted line is the dynamic reserves of the current gas reservoir after being affected by water invasion. With the deepening of mining, the impact of water invasion on the dynamic reserves of the gas reservoir will become greater and greater.
[0134] Through the above steps, the dynamic reserves of the first gas reservoir and the dynamic reserves of the second gas reservoir in different time periods can be obtained, and then according to the cumulative collected gas volume, a relationship diagram between the cumulative collected gas volume and the dynamic reserves can be obtained.
[0135] In a specific embodiment, as shown in Table 1 below, the dynamic reserves of the Zhangjiachang gas reservoir at different periods are shown.
[0136] Table 1 Dynamic reserves of Zhangjiachang gas reservoir in different periods
[0137]
[0138] By obtaining the relationship diagram between the cumulative gas volume and the dynamic reserves, the relationship function between the cumulative gas volume and the dynamic reserves can be fitted. In actual work, the impact of water invasion on gas reservoirs will become increasingly greater, and the change of dynamic reserves is also irregular. Therefore, different development stages can be divided, and the development stage can represent different water invasion stages, such as a water invasion stage and a non-water invasion stage.
[0139] Specifically, Figure 7 As shown, the steps for determining the development stage may include:
[0140] S1051: Dividing the development stages of the gas reservoir according to the relationship between the cumulative gas volume collected and the dynamic reserves of the gas reservoir;
[0141] S1052: According to the relationship between the cumulative collected gas volume and the dynamic reserves of the gas reservoir corresponding to each gas reservoir development stage, the relationship function between the cumulative collected gas volume and the dynamic reserves is fitted in stages.
[0142] It can be understood that the development stage is determined by the mutation of the relationship curve between the cumulative gas volume and the dynamic reserves. In the non-water invasion stage, the dynamic reserves increase with the increase of the exploitation degree (the increase of the cumulative gas volume). With the addition and increase of water invasion, the dynamic reserves will decrease accordingly with the increase of the cumulative gas volume. Therefore, the subsequent dynamic reserves of the gas reservoir can be further predicted by the relationship curve between the cumulative gas volume and the dynamic reserves.
[0143] like Fig.12 and Fig.13 As shown in the figure, by drawing the relationship curve between cumulative gas production and dynamic reserves, the gas reservoir development / development unit can be divided into the non-water invasion stage, the early water invasion stage, and the middle and late water invasion stage according to the change characteristics of dynamic reserves. Among them, the division between the non-water invasion stage and the water invasion stage is relatively obvious. The detailed division of the water invasion stage can be divided into the early water invasion stage and the middle and late water invasion stage according to the reduction degree of dynamic reserves affected by water invasion. The stage from the beginning of water invasion to the reduction of dynamic reserves by 10% to 15% is divided into the early water invasion stage, and the subsequent stage is the middle and late water invasion stage.
[0144] like Fig.13 As shown in the figure, the relationship curve between cumulative gas production and dynamic reserves in the non-water invasion stage of the gas reservoir is fitted. The Zhangjiachang Carboniferous gas reservoir is:
[0145] G t =13.33ln G p +30.38 (8)
[0146] The curve can be extrapolated to predict the dynamic reserve change law of gas reservoirs without water invasion (such as Fig.13 upper dotted line);
[0147] Fitting the relationship curve between cumulative gas production and dynamic reserves during the water invasion stage of the gas reservoir, the Zhangjiachang Carboniferous gas reservoir is:
[0148] G t =-10.62ln G p +92.55 (9)
[0149] The curve can be extrapolated to predict the dynamic reserve change law of gas reservoir under water invasion conditions (such as Fig.13lower dotted line).
[0150] On the basis of determining the relationship function between the cumulative gas collection and dynamic reserves at different development stages, the relationship function between the corresponding cumulative gas collection and dynamic reserve loss can also be determined, specifically, Figure 8 As shown, the following steps may be included:
[0151] S107: Calculate and obtain a relationship function between the cumulative gas collection volume and the dynamic reserve loss amount according to the fitted relationship function between the cumulative gas collection volume and the dynamic reserve in each stage;
[0152] S108: Determine the current dynamic reserve loss of natural gas according to the relationship function between the cumulative collected gas volume and the dynamic reserve loss.
[0153] It can be understood that the dynamic reserve loss in the corresponding period can also be determined by the cumulative gas volume collected in different periods, so as to obtain the influence of water invasion in different stages of the gas reservoir. By determining the current dynamic reserve loss of natural gas, the development degree of the gas reservoir can be further judged.
[0154] In a specific embodiment, if Fig.13 The fitting curve shown in FIG. 1 can be used to obtain the cumulative gas volume and dynamic reserve loss by subtracting the fitting curve function of the water invasion stage from the fitting curve function of the non-water invasion stage. Specifically, the amount affected by water invasion can be obtained by subtracting formula (9) from formula (8):
[0155] ΔG t =23.95ln G p -62.17 (10)
[0156] By determining the amount of gas reservoir loss due to water invasion and determining the development stage of the gas reservoir according to the change of dynamic reserves, it is possible to formulate corresponding countermeasures for gas reservoir development. For example, when the remaining dynamic reserves are still large after excluding the impact of water invasion, it is recommended to implement potential tapping measures. When the remaining dynamic reserves are insufficient after excluding the impact of water invasion, it is not recommended to implement potential tapping measures.
[0157] The embodiment of this article uses the daily production data of the gas reservoir, shut-in static pressure and cumulative collected gas volume, without calculating the water intrusion and water body parameters of the gas reservoir. It only expresses the changing characteristics of the dynamic reserves of the gas reservoir through a continuous curve, so that the dynamic reserves in different periods can be accurately predicted, avoiding the regulation of regarding the dynamic reserves as a constant value.
[0158] Based on the above-mentioned method for predicting the dynamic reserves of a water-invaded gas reservoir, the embodiment of this invention further provides a device for predicting the dynamic reserves of a water-invaded gas reservoir, such as Fig.14 As shown, the device comprises:
[0159] The data acquisition module 100 is used to obtain the acquisition data of the gas reservoir development unit, wherein the acquisition data includes daily production data, shut-in static pressure at different time points and accumulated gas volume;
[0160] The first gas reservoir dynamic reserve determination module 200 is used to determine the first gas reservoir dynamic reserves in different time periods using a static material balance method based on the collected data;
[0161] A second gas reservoir dynamic reserve determination module 300 is used to determine the second gas reservoir dynamic reserve by using a flowing material balance method according to the daily production data;
[0162] The gas production and reserves relationship determination module 400 is used to determine the relationship between the cumulative gas production and the dynamic reserves of the gas reservoir at different time points according to the dynamic reserves of the first gas reservoir, the dynamic reserves of the second gas reservoir and the cumulative gas production in different time periods;
[0163] A relationship function fitting module 500 is used to fit the relationship function between the cumulative collected gas volume and the dynamic reserves according to the relationship between the cumulative collected gas volume and the dynamic reserves of the gas reservoir;
[0164] The dynamic reserve prediction module 600 is used to predict the dynamic reserves according to the relationship function between the cumulative gas volume and the dynamic reserves.
[0165] In order to further improve the above device, Fig.15 As shown, it is a further embodiment of the device described in the embodiments of this article, and the device may also include:
[0166] The gas reservoir development unit determination module 700 is used to obtain the shut-in static pressure of the gas well at multiple time points; determine the gas reservoir pressure profile according to the shut-in static pressure; and determine the gas reservoir development unit according to the gas reservoir pressure profile.
[0167] The dynamic reserve loss prediction module 800 is used to calculate the relationship function between the cumulative gas collection volume and the dynamic reserve loss according to the fitted relationship function between the cumulative gas collection volume and the dynamic reserve in different stages; and determine the current natural gas dynamic reserve loss according to the relationship function between the cumulative gas collection volume and the dynamic reserve loss.
[0168] The device provided in the embodiment of this article obtains the dynamic reserves of the gas reservoir development unit in different periods through two dynamic reserves calculation methods, draws the relationship curve between the cumulative gas production and the dynamic reserves, divides the different development stages, and predicts the change law of the dynamic reserves of the gas reservoir in different stages. At the same time, it can also calculate the loss of dynamic reserves in different periods, and make reasonable and accurate evaluations and suggestions for the actual development of the gas reservoir.
[0169] like Fig.16As shown in the computer device provided in the embodiment of this article, the computer device 1602 may include one or more processors 1604, such as one or more central processing units (CPUs), and each processing unit may implement one or more hardware threads. The computer device 1602 may also include any memory 1606, which is used to store any kind of information such as code, settings, data, etc. Non-restrictive, for example, the memory 1606 may include any one or more combinations of the following: any type of RAM, any type of ROM, flash memory device, hard disk, optical disk, etc. More generally, any memory can use any technology to store information. Further, any memory can provide volatile or non-volatile retention of information. Further, any memory can represent a fixed or removable component of the computer device 1602. In one case, when the processor 1604 executes an associated instruction stored in any memory or a combination of memories, the computer device 1602 can perform any operation of the associated instruction. The computer device 1602 also includes one or more drive mechanisms 1608 for interacting with any memory, such as a hard disk drive mechanism, an optical disk drive mechanism, etc.
[0170] The computer device 1602 may also include an input / output module 1610 (I / O) for receiving various inputs (via input devices 1612) and for providing various outputs (via output devices 1614). A specific output mechanism may include a presentation device 1616 and an associated graphical user interface (GUI) 1618. In other embodiments, the input / output module 1610 (I / O), input device 1612, and output device 1614 may not be included, and the computer device 1602 may be used as a computer device in a network. The computer device 1602 may also include one or more network interfaces 1620 for exchanging data with other devices via one or more communication links 1622. One or more communication buses 1624 couple the components described above together.
[0171] The communication link 1622 may be implemented in any manner, for example, through a local area network, a wide area network (e.g., the Internet), a point-to-point connection, etc., or any combination thereof. The communication link 1622 may include any combination of hardwired links, wireless links, routers, gateway functions, name servers, etc. governed by any protocol or combination of protocols.
[0172] Corresponds to Figures 1 to 8 The method in this article also provides a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the steps of the above method are executed.
[0173] The embodiment of the present invention also provides a computer readable instruction, wherein when the processor executes the instruction, the program therein causes the processor to execute the following Figures 1 to 8 The method shown.
[0174] It should be understood that in the various embodiments of this document, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of this document.
[0175] It should also be understood that in the embodiments of this article, the term "and / or" is only a description of the association relationship of the associated objects, indicating that three relationships may exist. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0176] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition and steps of each example have been generally described in terms of function in the above description. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this article.
[0177] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0178] In the several embodiments provided herein, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of the units is only a logical function division, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. In addition, the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, or can be electrical, mechanical or other forms of connection.
[0179] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the embodiments of this article.
[0180] In addition, each functional unit in each embodiment of this invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above integrated unit may be implemented in the form of hardware or in the form of software functional unit.
[0181] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of this article is essentially or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of this article. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.
[0182] Specific embodiments are used in this article to illustrate the principles and implementation methods of this article. The description of the above embodiments is only used to help understand the methods and core ideas of this article. At the same time, for general technicians in this field, according to the ideas of this article, there will be changes in the specific implementation methods and application scopes. In summary, the content of this specification should not be understood as a limitation on this article.
Claims
1. A method for predicting dynamic reserves of water-invaded gas reservoirs, characterized in that: The method comprises: Acquire the collected data of the gas reservoir development unit, wherein the collected data includes daily production data, shut-in static pressure at different time points and cumulative collected gas volume, and the daily production data includes daily bottom hole flowing pressure, daily bottom hole temperature and daily collected gas volume; Determine the dynamic reserves of the first gas reservoir in different time periods using a static material balance method based on the collected data; According to the daily production data, the dynamic reserves of the second gas reservoir are determined by using the flowing material balance method; Determine the relationship between the cumulative collected gas volume and the dynamic reserves of the gas reservoir at different time points according to the dynamic reserves of the first gas reservoir, the dynamic reserves of the second gas reservoir and the cumulative collected gas volume in the different time periods; According to the relationship between the cumulative collected gas volume and the dynamic reserves of the gas reservoir, fitting a relationship function between the cumulative collected gas volume and the dynamic reserves; According to the relationship function between the cumulative gas volume and dynamic reserves, the dynamic reserves are predicted; Wherein, determining the dynamic reserves of the first gas reservoir in different time periods by using the static material balance method according to the collected data further includes: Calculating a first natural gas deviation factor according to the shut-in static pressure and the daily bottom hole temperature; The shut-in gas reservoir pressure of the development unit is calculated according to the shut-in static pressure and the first natural gas deviation factor; Establishing a static material balance curve according to the shut-in gas reservoir pressure and the accumulated gas volume; Determining the dynamic reserves of the first gas reservoir in different time periods according to the static material balance curve; Wherein, determining the dynamic reserves of the first gas reservoir in different time periods according to the static material balance curve further includes: Determining at least one linear variation curve of the shut-in gas reservoir pressure and the cumulative collected gas volume according to the static material balance curve; The maximum cumulative collected gas volume corresponding to each linear change curve is determined, and the maximum cumulative collected gas volume is the dynamic reserves of the first gas reservoir.
2. The method for predicting dynamic reserves of water-invaded gas reservoirs according to claim 1, characterized in that: The process of determining the gas reservoir development unit includes: Obtain shut-in static pressure of gas wells at multiple time points; Determining a gas reservoir pressure profile according to the shut-in static pressure; The gas reservoir development unit is determined according to the gas reservoir pressure profile.
3. The method for predicting dynamic reserves of water-invaded gas reservoirs according to claim 1, characterized in that: Determining the dynamic reserves of the second gas reservoir using the flowing material balance method according to the daily production data further includes: calculating a second natural gas deviation factor according to the daily bottom hole flow pressure and the daily bottom hole temperature; Calculating the daily gas reservoir pressure of the development unit according to the daily bottom hole flowing pressure and the second natural gas deviation factor; Establishing a flow material balance curve according to the daily gas reservoir pressure and the daily gas production; The dynamic reserves of the second gas reservoir are determined according to the flow material balance curve.
4. A method for predicting dynamic reserves of water-invaded gas reservoirs according to claim 3, characterized in that: Determining the dynamic reserves of the second gas reservoir according to the flow material balance curve further includes: Determining the linear variation curve of the daily gas reservoir pressure and the daily gas production volume according to the flow material balance curve; The maximum cumulative collected gas volume corresponding to the linear change curve is determined, and the maximum cumulative collected gas volume is the dynamic reserves of the second gas reservoir.
5. The method for predicting dynamic reserves of water-invaded gas reservoirs according to claim 1, characterized in that: According to the relationship between the cumulative gas volume collected and the dynamic reserves of the gas reservoir, fitting the relationship function between the cumulative gas volume collected and the dynamic reserves further includes: According to the relationship between the cumulative gas volume collected and the dynamic reserves of the gas reservoir, the development stages of the gas reservoir are divided; According to the relationship between the cumulative gas volume collected and the dynamic reserves of the gas reservoir corresponding to each gas reservoir development stage, the relationship function between the cumulative gas volume collected and the dynamic reserves is fitted in stages.
6. A method for predicting dynamic reserves of water-invaded gas reservoirs according to claim 5, characterized in that: The method further comprises: According to the fitted relationship function between the cumulative gas collection volume and the dynamic reserves in different stages, the relationship function between the cumulative gas collection volume and the dynamic reserves loss volume is calculated; The current dynamic reserve loss of natural gas is determined according to the relationship function between the cumulative gas collection volume and the dynamic reserve loss.
7. A dynamic reserve prediction device for water-invaded gas reservoirs, characterized in that: The device comprises: A data acquisition module is used to obtain the acquisition data of the gas reservoir development unit, wherein the acquisition data includes daily production data, shut-in static pressure at different time points and cumulative collected gas volume, and the daily production data includes daily bottom hole flowing pressure, daily bottom hole temperature and daily collected gas volume; A first gas reservoir dynamic reserve determination module, configured to determine the first gas reservoir dynamic reserves in different time periods using a static material balance method based on the collected data; A second gas reservoir dynamic reserve determination module, used to determine the second gas reservoir dynamic reserve by using a flowing material balance method according to the daily production data; A gas production and reserves relationship determination module, used to determine the relationship between the cumulative gas production and the dynamic reserves of the gas reservoir at different time points according to the dynamic reserves of the first gas reservoir, the dynamic reserves of the second gas reservoir and the cumulative gas production in different time periods; A relationship function fitting module, used for fitting a relationship function between the cumulative collected gas volume and the dynamic reserves according to the relationship between the cumulative collected gas volume and the dynamic reserves of the gas reservoir; Dynamic reserve prediction module, used to predict dynamic reserves based on the relationship function between the cumulative gas volume and dynamic reserves; Wherein, determining the dynamic reserves of the first gas reservoir in different time periods by using the static material balance method according to the collected data further includes: Calculating a first natural gas deviation factor according to the shut-in static pressure and the daily bottom hole temperature; The shut-in gas reservoir pressure of the development unit is calculated according to the shut-in static pressure and the first natural gas deviation factor; Establishing a static material balance curve according to the shut-in gas reservoir pressure and the accumulated gas volume; Determining the dynamic reserves of the first gas reservoir in different time periods according to the static material balance curve; Wherein, determining the dynamic reserves of the first gas reservoir in different time periods according to the static material balance curve further includes: Determining at least one linear variation curve of the shut-in gas reservoir pressure and the cumulative collected gas volume according to the static material balance curve; The maximum cumulative collected gas volume corresponding to each linear change curve is determined, and the maximum cumulative collected gas volume is the dynamic reserves of the first gas reservoir.
8. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the method steps according to any one of claims 1 to 6 are implemented.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores an executable computer program, and when the computer program is executed by a processor, the method steps according to any one of claims 1 to 6 are implemented.