A method and device for efficiently constructing velocity field

Through well-seismic data matching and velocity-time curve fitting methods, the long matching time and misjudgment problems in the construction of velocity fields in complex high-steep structural areas are solved, and the efficient and accurate construction of the velocity field is achieved, which is suitable for the velocity of large-angle wells. Build a field.

CN114578428BActive Publication Date: 2024-10-29CHINA NAT PETROLEUM CORP +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202011380280.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-12-01
Publication Date
2024-10-29
Estimated Expiration
2040-12-01

AI Technical Summary

Technical Problem

In complex high-steep structural areas, during the construction of seismic velocity fields, it takes a long time to match seismic interpretation data and well logging data, there is a high possibility of misreading and misjudgment, and the velocity analysis methods are insufficient, making it difficult to improve the accuracy of the velocity field, especially at large angles. With more and more wells, how to efficiently utilize inclined well data for rapid field construction is a challenge.

Method used

By matching well-seismic data based on well logging data and seismic interpretation layer data, the velocity of the control point is calculated, the velocity-time curve and layer velocity data are generated, and finally the velocity field is constructed, using the velocity-time curve fitting method or the layer-controlled interpolation method. , improve the accuracy of the velocity field.

Benefits of technology

It achieves efficient construction of the velocity field, improves accuracy, reduces the possibility of manual judgment, improves the accuracy of well location design, and provides more accurate basic data for structural mapping.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114578428B_ABST
    Figure CN114578428B_ABST
Patent Text Reader

Abstract

The present application provides a method and device for efficiently constructing a velocity field, the method comprising: matching well-seismic data in a work area where a velocity field is to be constructed based on well logging data and seismic interpretation layer data; calculating the average velocity and layer velocity of seismic waves in each layer at each control point based on the well-seismic data matching results, and generating a velocity-time scatter plot; fitting the velocity-time scatter plot to obtain a velocity-time curve, generating layer velocity data or generating layer velocity data using a plane interpolation method; and constructing a velocity field based on the layer velocity data. The present application can calculate the velocity of a control point in a work area where a velocity field is to be constructed based on well logging data and seismic interpretation layer data, and then generate layer velocity data using a velocity-time curve fitting method or a layer-controlled interpolation method, and finally construct a velocity field.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of petroleum exploration, and specifically to a method and device for efficiently constructing a velocity field. Background Art

[0002] In the process of constructing the seismic velocity field, the acquisition of the velocity field and its effective quality control are very important links, which directly affect the accuracy of velocity calculation, and further affect the accuracy of structural mapping and the depth of well location design.

[0003] At present, in complex and steep structural areas, the velocity of underground formations varies dramatically. In the conventional velocity field acquisition method, there is a problem of long matching time between seismic interpretation data and logging data in the well-seismic matching process. Especially in areas with a relatively mature development level, the drilling and logging data are relatively abundant, and the well-seismic matching is more time-consuming and labor-intensive, requiring manual judgment by interpreters, and there is a possibility of misreading and misjudgment. At the same time, in the process of constructing the velocity field, there are fewer means of velocity analysis, and the lack of effective quality control in the process of constructing the velocity field leads to the inability to further improve the accuracy of the constructed velocity field. At present, there are more and more large-angle wells. How to efficiently use the inclined well data for velocity field construction, fully explore the inclined well data information, formulate a more accurate velocity acquisition method, and further improve the accuracy of velocity field construction is a problem worthy of study. Summary of the invention

[0004] In response to the problems in the prior art, the present application provides a method and device for efficiently constructing a velocity field, which can calculate the velocity of the control points in the work area where the velocity field is to be constructed based on well logging data and seismic interpretation layer data, and then use a velocity-time curve fitting method or a layer-controlled interpolation method to generate layer velocity data, and finally construct a velocity field.

[0005] In order to solve the above technical problems, this application provides the following technical solutions:

[0006] In a first aspect, the present application provides a method for efficiently constructing a velocity field, comprising:

[0007] According to the well logging data and seismic interpretation layer data, the well-seismic data matching is carried out in the work area where the velocity field is to be constructed;

[0008] According to the matching results of well-seismic data, the average velocity and layer velocity of seismic waves in each layer at each control point are calculated to generate a velocity-time scatter plot;

[0009] Fitting the velocity-time scatter plot to obtain a velocity-time curve, and generating layer velocity data according to the velocity-time curve;

[0010] A velocity field is constructed according to the layer velocity data.

[0011] Furthermore, the work area includes a three-dimensional work area, and the well-seismic data matching is performed in the work area where the velocity field is to be constructed according to the well logging data and the seismic interpretation layer data, including:

[0012] Determine the time value corresponding to the interpretation layer data point closest to the layer point position layer by layer in each control point according to the distance parameters of the seismic interpretation layer data and each interpretation layer data point in the three-dimensional work area; wherein the distance parameters include the line distance of the interpretation layer data points, the track distance of the interpretation layer data points and the maximum distance between the layer point position and the corresponding interpretation layer data point;

[0013] Match the depth value corresponding to the mid-layer point position of each control point with the time value.

[0014] Further, according to the seismic interpretation horizon data and the distance parameters of each interpretation horizon data point in the three-dimensional work area, the time value corresponding to the interpretation horizon data point closest to the horizon point is determined layer by layer in each control point, including:

[0015] Within the maximum distance, the line numbers of the interpreted layer data points closest to the layer point are determined according to the line distances of the interpreted layer data points;

[0016] Within the maximum distance, according to the track distance of the interpreted layer data points, the track numbers of the interpreted layer data points closest to the layer points are respectively determined on the line numbers;

[0017] Determine the interpretation horizon data point closest to the horizon point according to the line number of the interpretation horizon data point and the track number of the interpretation horizon data point;

[0018] The time value corresponding to the nearest interpretation layer data point is searched in the seismic interpretation layer data to determine the time value corresponding to the seismic interpretation layer data point closest to the layer point.

[0019] Furthermore, the work area includes a two-dimensional work area, and the well-seismic data matching is performed in the work area where the velocity field is to be constructed according to the well logging data and the seismic interpretation layer data, including:

[0020] Determine the time value corresponding to the interpretation layer data point closest to the layer point position layer by layer in each control point according to the distance parameters of the seismic interpretation layer data and each interpretation layer data point in the two-dimensional work area; wherein the distance parameters include the line distance and the maximum distance between the layer point position and the corresponding interpretation layer data point;

[0021] Match the depth value corresponding to the mid-layer point position of each control point with the time value.

[0022] Further, the method of determining the time value corresponding to the interpretation horizon data point closest to the horizon point in each control point layer by layer according to the distance parameters of the seismic interpretation horizon data and each interpretation horizon data point in the two-dimensional work area includes:

[0023] Within the maximum distance, for the layer point, the distance between each interpreted layer data line and the layer point is calculated according to the track distance of the interpreted layer data point;

[0024] Within the maximum distance, determining the interpretation layer data line closest to the layer point, and determining the interpretation layer data point closest to the layer point on the interpretation layer data line;

[0025] The time value corresponding to the nearest interpretation layer data point is searched in the seismic interpretation layer data to determine the time value corresponding to the interpretation layer data point nearest to the layer point.

[0026] Furthermore, when the control point corresponds to a vertical well, the average velocity and layer velocity of the seismic wave in each layer at each control point are calculated according to the well-seismic data matching result to generate a velocity-time scatter plot, including:

[0027] Calculate the average velocity and layer velocity of the seismic wave in each layer at each control point according to the acquired depth value of each layer of the vertical well and the time value in the seismic interpretation layer data matched therewith;

[0028] The average velocity and layer velocity of each layer of the seismic wave at each control point are matched with the time value in the seismic interpretation layer data to generate a velocity-time scatter plot.

[0029] Furthermore, when the control point corresponds to a deviated well, the average velocity and layer velocity of the seismic wave in each layer at each control point are calculated according to the well-seismic data matching result to generate a velocity-time scatter plot, including:

[0030] Calculate the layer velocity of the layer in each control point according to the obtained time value of the intersection point of the real well and the layer and the depth value of the intersection point of the real well and the layer;

[0031] Calculate the depth value of the corresponding layer in the virtual well at each control point according to the layer velocity and the time value of the intersection point between the virtual well and the layer;

[0032] Calculating the average velocity of the seismic wave in each layer at each control point according to the depth value of the layer in the virtual well and the time value of the intersection of the virtual well and the corresponding layer;

[0033] The average velocity and layer velocity of each layer of the seismic wave at each control point are matched with the time value in the seismic interpretation layer data to generate a velocity-time scatter plot.

[0034] Furthermore, fitting the velocity-time scatter plot to obtain a velocity-time curve and generate layer velocity data includes:

[0035] Fitting the velocity-time scatter diagram according to the time value corresponding to each layer point in each control point, the average velocity of each layer in each control point and the layer velocity to obtain a velocity-time curve;

[0036] The velocities of all interpreted horizon data points in the entire work area are obtained according to the velocity time curve and the time values ​​in the seismic interpreted horizon data to form horizon velocity data.

[0037] Further, constructing a velocity field according to the layer velocity data includes:

[0038] The constructed velocity field is obtained by matching the layer velocity data of each layer with the seismic interpretation layer data of the corresponding layer.

[0039] In a second aspect, the present application provides a device for efficiently constructing a velocity field, comprising:

[0040] A matching unit is used to match well-seismic data in the work area where the velocity field is to be constructed according to the well logging data and the seismic interpretation layer data;

[0041] A scatter plot generation unit is used to calculate the average velocity and layer velocity of seismic waves in each layer at each control point according to the well-seismic data matching results, and generate a velocity-time scatter plot;

[0042] A layer velocity data generating unit, used for fitting the velocity time scatter plot to obtain a velocity time curve, and generating layer velocity data according to the velocity time curve;

[0043] The field building unit is used to build a velocity field according to the layer velocity data.

[0044] Furthermore, the matching unit comprises:

[0045] A three-dimensional time determination module is used to determine the time value corresponding to the interpretation layer data point closest to the layer point position layer by layer in each control point according to the distance parameters of the seismic interpretation layer data and each interpretation layer data point in the three-dimensional work area; wherein the distance parameters include the line distance of the interpretation layer data point, the track distance of the interpretation layer data point and the maximum distance between the layer point position and the corresponding interpretation layer data point;

[0046] The speed time matching module is used to match the depth value corresponding to the mid-layer point position of each control point with the time value.

[0047] Furthermore, the three-dimensional time determination module includes:

[0048] A line number determination module, used to determine the line numbers of the interpretation layer data points closest to the layer point within the maximum distance according to the line distances of the interpretation layer data points;

[0049] A track number determination module, used to determine the track number of the interpretation layer data point closest to the layer point on the line number within the maximum distance according to the track distance of the interpretation layer data point;

[0050] A near point determination module, used for determining the interpretation layer data point closest to the layer point according to the line number of the interpretation layer data point and the track number of the interpretation layer data point;

[0051] The near point time determination module is used to find the time value corresponding to the nearest interpretation layer data point in the seismic interpretation layer data, and determine the time value corresponding to the seismic interpretation layer data point closest to the layer point.

[0052] Furthermore, the matching unit comprises:

[0053] A two-dimensional time determination module is used to determine the time value corresponding to the interpretation layer data point closest to the layer point position layer by layer in each control point according to the distance parameters of the seismic interpretation layer data and each interpretation layer data point in the two-dimensional work area; wherein the distance parameters include the line distance and the maximum distance between the layer point position and the corresponding interpretation layer data point;

[0054] The speed time matching module is used to match the depth value corresponding to the mid-layer point position of each control point with the time value.

[0055] Furthermore, the two-dimensional time determination module includes:

[0056] The distance calculation module is used to calculate the distance between each interpreted layer data line and the layer point within the maximum distance according to the track distance of the interpreted layer data point;

[0057] A near point determination module is used to determine the interpretation layer data line closest to the layer point within the maximum distance, and determine the interpretation layer data point closest to the layer point on the interpretation layer data line;

[0058] The near point time determination module is used to find the time value corresponding to the nearest interpretation layer data point in the seismic interpretation layer data, and determine the time value corresponding to the interpretation layer data point closest to the layer point.

[0059] Further, when the control point corresponds to a vertical well, the scatter plot generating unit includes:

[0060] A velocity calculation module, used to calculate the average velocity and layer velocity of the seismic wave in each layer at each control point according to the acquired depth value of each layer of the vertical well and the time value in the seismic interpretation layer data matched therewith;

[0061] The velocity-time scatter plot generation module is used to match the average velocity and layer velocity of each layer of the seismic wave at each control point with the time value in the seismic interpretation layer data to generate a velocity-time scatter plot.

[0062] Further, when the control point corresponds to a deviated well, the scatter plot generating unit includes:

[0063] The layer velocity calculation module is used to calculate the layer velocity of the layer in each control point according to the obtained time value of the intersection point of the real well and the layer and the depth value of the intersection point of the real well and the layer;

[0064] A depth value calculation module, used for calculating the depth value of the corresponding layer in the virtual well at each control point according to the layer velocity and the time value of the intersection point between the virtual well and the layer;

[0065] An average velocity calculation module, used to calculate the average velocity of the seismic wave in each layer in each control point according to the depth value of the layer in the virtual well and the time value of the intersection point between the virtual well and the corresponding layer;

[0066] The velocity-time scatter plot generation module is used to match the average velocity and layer velocity of each layer of the seismic wave at each control point with the time value in the seismic interpretation layer data to generate a velocity-time scatter plot.

[0067] Furthermore, the layer velocity data generating unit comprises:

[0068] A fitting curve generation module is used to fit the velocity-time scatter diagram according to the time value corresponding to each layer point in each control point, the average velocity and layer velocity of each layer in each control point, so as to obtain a velocity-time curve;

[0069] The layer velocity data generating module is used to obtain the velocity of all the interpreted layer data points in the entire work area according to the velocity time curve and the time value in the seismic interpreted layer data to form the layer velocity data.

[0070] Furthermore, the field building unit is specifically used for:

[0071] The constructed velocity field is obtained by matching the layer velocity data of each layer with the seismic interpretation layer data of the corresponding layer.

[0072] In a third aspect, the present application provides an electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the method for efficiently constructing a velocity field when executing the program.

[0073] In a fourth aspect, the present application provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the method for efficiently constructing a velocity field.

[0074] In view of the problems in the prior art, the present application provides a method and device for efficiently constructing a velocity field, which can generate a velocity time curve in a work area to be constructed based on well logging data and seismic interpretation layer data, and then generate layer velocity data, and finally construct a velocity field. The method for efficiently constructing a velocity field provided by the present application is highly efficient and accurate, and can provide more accurate basic data for the next step of mapping. BRIEF DESCRIPTION OF THE DRAWINGS

[0075] Figure 1 This is a general flow chart of the method for efficiently constructing a velocity field in an embodiment of the present application;

[0076] Figure 2 This is one of the flow charts for performing well-seismic data matching in an embodiment of the present application;

[0077] Figure 3 One of the flow charts for determining the time value corresponding to the interpretation layer data point closest to the layer point in the embodiment of the present application;

[0078] Figure 4 This is the second flow chart of well seismic data matching in the embodiment of the present application;

[0079] Figure 5 This is the second flow chart for determining the time value corresponding to the interpretation layer data point closest to the layer point in the embodiment of the present application;

[0080] Figure 6 This is one of the flow charts for generating a speed-time curve in an embodiment of the present application;

[0081] Figure 7 This is the second flow chart of generating a speed-time curve in an embodiment of the present application;

[0082] Figure 8 A flow chart for generating layer velocity data in an embodiment of the present application;

[0083] Fig. 9 This is a general structural diagram of the device for efficiently constructing a velocity field in an embodiment of the present application;

[0084] Fig.10 This is one of the structural diagrams of the matching unit in the embodiment of the present application;

[0085] Fig.11 This is a structural diagram of a three-dimensional time determination module in an embodiment of the present application;

[0086] Fig.12 This is the second structural diagram of the matching unit in the embodiment of the present application;

[0087] Fig.13 This is a structural diagram of a two-dimensional time determination module in an embodiment of the present application;

[0088] Fig.14 This is one of the structural diagrams of the scatter plot generation unit in the embodiment of the present application;

[0089] Fig.15 This is the second structural diagram of the scatter plot generation unit in the embodiment of the present application;

[0090] Fig.16 This is a structural diagram of a layer velocity data generating unit in an embodiment of the present application;

[0091] Fig.17 It is a schematic diagram of the structure of an electronic device in an embodiment of the present application;

[0092] Fig.18 It is a schematic diagram of calculating the average velocity and layer velocity of seismic waves propagating in a deviated well in an embodiment of the present application. DETAILED DESCRIPTION

[0093] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0094] See also Figure 1 In order to construct a velocity field by matching well-seismic data, the present application provides a method for efficiently constructing a velocity field, including:

[0095] S101: Perform well-seismic data matching in the work area where the velocity field is to be constructed based on the well logging data and the seismic interpretation layer data.

[0096] It is understandable that there is a matching relationship between the well logging data and the seismic interpretation layer data. This application adopts an efficient matching method to identify the time information corresponding to each control point in the well logging data and the seismic interpretation layer data in each interpretation layer, and performs efficient well-seismic matching, laying the foundation for the next step of velocity field construction.

[0097] Among them, the logging data includes: well name, well coordinates, core elevation, logging layer information and well inclination information. The exploration wells in the work area may include vertical wells and inclined wells. Each control point corresponds to a well in the work area. This well can be a real well, that is, an exploration well that actually exists in the work area, or a virtual well, that is, a control point added by researchers according to actual conditions for the construction of the velocity field. Each control point contains several seismic interpretation layers, and each seismic interpretation layer corresponds to a layer point, which is used to control each seismic interpretation layer. The seismic interpretation layer data includes line number, channel number, coordinate value and time value.

[0098] S102: Calculate the average velocity and layer velocity of the seismic wave in each layer at each control point according to the well-seismic data matching result, and generate a velocity-time scatter plot.

[0099] It is understandable that in this step, the present application can calculate the average velocity and layer velocity of seismic waves propagating in each layer in the real well and the virtual well, and then generate a velocity-time scatter plot in combination with the well-seismic data matching results obtained in the previous step. This velocity-time scatter plot includes an average velocity-time scatter plot and a layer velocity-time scatter plot. Subsequently, the velocity-time scatter plot can be fitted to obtain a velocity-time curve, and then the velocity-time fitting formula can be obtained based on the velocity-time curve.

[0100] S103: Fitting the velocity-time scatter plot to obtain a velocity-time curve, and generating layer velocity data according to the velocity-time curve.

[0101] It can be understood that by fitting the velocity-time scatter plot, a velocity-time curve can be obtained, and then a velocity-time fitting formula can be obtained according to the velocity-time curve, and finally the average velocity and layer velocity of the entire seismic wave propagating in each layer at each control point in the work area are calculated according to the velocity-time fitting formula to generate layer velocity data. The specific fitting method can be found in the following description.

[0102] S104: constructing a velocity field according to the layer velocity data.

[0103] It can be understood that the present application matches the layer velocity data obtained in the previous step with the seismic interpretation layer data to obtain a velocity field model in a three-dimensional space. Assume that there are layers h1, h2 and h3 in a work area; the seismic interpretation layer data of the three layers are R1, R2 and R3 respectively; the average velocity data of the three layers are calculated by S101 to S103 as V1, V2 and V3 respectively; when constructing the velocity field, it is necessary to combine V1 and R1, V2 and R2, and V3 and R3 to jointly generate a velocity model file. The velocity model file includes multiple lines, and the format of each line is as follows: identification number, X coordinate of the interpretation layer data point in the seismic interpretation layer data, Y coordinate of the interpretation layer data point in the seismic interpretation layer data, time value of the seismic interpretation layer data and seismic interpretation layer velocity. The so-called interpretation layer data point refers to the intersection of each line number and each channel number in the seismic interpretation layer data, and these intersections can find their corresponding time values ​​in the seismic interpretation layer data.

[0104] From the above description, it can be seen that the method for efficiently constructing a velocity field provided by the present application can generate a velocity time curve in the work area where the velocity field is to be constructed based on well logging data and seismic interpretation layer data, and then generate layer velocity data, and finally construct the velocity field. The method for efficiently constructing a velocity field provided by the present application is highly efficient and accurate, and can provide more accurate basic data for the next step of mapping.

[0105] See also Figure 2 The work area includes a three-dimensional work area, and the well-seismic data matching is performed in the work area where the velocity field is to be constructed according to the well logging data and the seismic interpretation layer data, including:

[0106] S201: Determine the time value corresponding to the interpretation layer data point closest to the layer point in each control point layer by layer according to the distance parameters of the seismic interpretation layer data and each interpretation layer data point in the three-dimensional work area; wherein the distance parameters include the line distance of the interpretation layer data points, the track distance of the interpretation layer data points and the maximum distance between the layer point and the corresponding interpretation layer data point.

[0107] It can be understood that, for a three-dimensional work area, the method for matching well and seismic data in the work area where the velocity field is to be constructed is as follows:

[0108] Based on the logging data including well name, well coordinates, core filling altitude, logging layer information and well deviation information, the depth position of each layer of each control point in the three-dimensional work area is located.

[0109] In the three-dimensional work area, there are two directions on the plane, namely the inline direction and the crossline direction, which are perpendicular to each other. Assume that the work area acquisition surface element is sd (meters) × td (meters), the track distance is td (meters), and the maximum threshold distance is set to Y (meters). Among them, the maximum threshold distance refers to the distance between the artificially set layer point and the corresponding interpretation layer data point. Once this range is exceeded, even if the interpretation layer data point closest to the layer point is found, it loses its engineering significance. Therefore, when looking for the interpretation layer data point closest to the layer point, it should be searched within the maximum threshold distance.

[0110] (1) For the interpreted layer h, calculate the i-th line L in the inline direction i To the pth layer point K p The distance D ip ; Where i is the inline line number, and its value range is 1-L m , in actual calculation, i starts from 1; D ip Divide by sd and round the result to an integer Z ip If Z ip is zero, then the line L i Denoted as L min , proceed to step (3); if Z ip ≥1, then L i The line increases in the direction of increasing line number. ip Line, denoted as L r Line. Contrast L r With the maximum line number L m :

[0111] 1) If L r <L m , proceed to step (2);

[0112] 2) If L r ≥L m , calculate L m To K p The distance D mp , D mp Compare with the set maximum threshold distance Y; if D mp >Y, then the point in this layer has no valid matching information in this layer, and proceed to step (6); if D mp ≤Y, then record L m For L min , proceed to step (3);

[0113] (2) Calculate L r Line to layer point K p The distance D rp , D rp Divide by sd and round the result to an integer Zrp If Z rp is zero, then the line L r Denoted as L min , proceed to step (3); if Z rp ≥1, then the distance D in step (1) is ip Compare with the set maximum threshold distance Y; if D ip >Y, then the point in this layer has no valid matching information in this layer, and proceed to step (6); if D ip ≤Y, then record L in step (1) i Line L min .

[0114] (3) Obtain the minimum line number L min Then, calculate the jth C in the crossline direction j ; where j is the track number, and its value range is 1-C n , in actual calculation, j starts from 1; calculate C j Go to the pth layer point K p The distance between the coordinates is denoted by E jp ; E jp Divide by td and round the result to an integer Q jp If Q jp If it is zero, then the channel is recorded as C min , proceed to step (5); if Q jp ≥1, then C j Increase Q in the direction of increasing lane number jp Road, get C s Road. Compare C s Channel and maximum channel number C n :

[0115] 1) If C s <C n , proceed to step (4);

[0116] 2) If C s ≥C n , calculate C n To K p The distance D np , D np Compare with the maximum threshold distance Y; if D np >Y, then the point in this layer has no valid matching information in this layer, and proceed to step (6); if D np ≤Y, then record C n C min , proceed to step (5);

[0117] (4) Calculate C s K from the track to the layer point p The distance Dsp , D sp Divide by td and round the result to an integer Q sp If Q sp If it is zero, then the channel is recorded as C min , proceed to step (5); if Q sp ≥1, then the distance E in step (3) is jp Compare with the set maximum threshold distance Y; if E jp >Y, then the point in this layer has no valid matching information in this layer, and proceed to step (6); if E jp ≤Y, then record step (3) C j Tao is C min .

[0118] (5) According to L min and C min The nearest interpretation layer data point to the layer point can be determined, and the time value T in the interpretation layer h can be obtained as the layer point K p The time value at this layer.

[0119] (6) For the next layer point K p+1 Carry out the calculations in steps (1) to (5) above.

[0120] (7) Perform the calculations of steps (1) to (6) above for the next interpretation layer h+1, and finally determine the time value corresponding to the interpretation layer data point closest to each layer point layer by layer in each control point. The time value corresponding to the interpretation layer data point closest to the layer point is also used as the time value of the corresponding layer point.

[0121] S202: Matching the depth value corresponding to the mid-layer point position of each control point with the time value.

[0122] It is understandable that the depth value corresponding to the mid-layer point of each control point can be obtained by collecting data through on-site measurement, so that the depth value corresponding to the mid-layer point of each control point can be matched with the time value corresponding to each layer point calculated in step S201.

[0123] From the above description, it can be seen that the efficient velocity field construction method provided in the present application can match well-seismic data in the work area where the velocity field is to be constructed based on the well logging data and the seismic interpretation layer data.

[0124] See also Figure 3 , according to the seismic interpretation layer data and the distance parameters of each interpretation layer data point in the three-dimensional work area, the time value corresponding to the interpretation layer data point closest to the layer point is determined layer by layer in each control point, including:

[0125] S301: within the maximum distance, determine the line numbers of the interpreted layer data points closest to the layer point according to the line distances of the interpreted layer data points;

[0126] S302: within the maximum distance, determine the track number of the interpreted layer data point closest to the layer point on the line number according to the track distance of the interpreted layer data point;

[0127] S303: determining the interpreted layer data point closest to the layer point according to the line number of the interpreted layer data point and the track number of the interpreted layer data point;

[0128] S304: searching for the time value corresponding to the nearest interpretation horizon data point in the seismic interpretation horizon data, and determining the time value corresponding to the seismic interpretation horizon data point closest to the horizon point.

[0129] S301 to S304 may correspond to the description in the above S201.

[0130] From the above description, it can be seen that the efficient velocity field construction method provided by the present application can determine the time value corresponding to the interpretation layer data point closest to the layer point in each control point layer by layer according to the distance parameters of each interpretation layer data point in the seismic interpretation layer data and the interpretation layer data in the three-dimensional work area.

[0131] See also Figure 4 The work area includes a two-dimensional work area, and the well-seismic data matching is performed in the work area where the velocity field is to be constructed according to the well logging data and the seismic interpretation layer data, including:

[0132] S401: determining the time value corresponding to the interpretation layer data point closest to the layer point position layer by layer in each control point according to the distance parameters of the seismic interpretation layer data and each interpretation layer data point in the interpretation layer data in the two-dimensional work area; wherein the distance parameters include the line distance and the maximum distance between the layer point position and the corresponding interpretation layer data point;

[0133] S402: Match the depth value corresponding to the mid-layer point position of each control point with the time value.

[0134] It can be understood that, for a two-dimensional work area, the method for matching well-seismic data in the work area where the velocity field is to be constructed is as follows:

[0135] Based on the logging data including well name, well coordinates, core filling altitude, logging layer information and well inclination information, the depth position of each layer of each control point in the two-dimensional work area is located.

[0136] In the two-dimensional work area, the matching process is carried out on the plane, but unlike the three-dimensional work area, the data points of each interpretation layer are not evenly distributed in a grid, and the arrangement of each survey line is irregular. Set the maximum threshold distance to Y (meters). Among them, the maximum threshold distance refers to the distance between the artificially set layer point and the corresponding interpretation layer data point. Once this range is exceeded, even if the interpretation layer data point closest to the layer point is found, it loses its engineering significance. Therefore, when looking for the interpretation layer data point closest to the layer point, it should be searched within the maximum threshold distance.

[0137] (1) For each layer h, calculate C i To layer point K p The shortest distance is recorded as C min Among them, C i is the measuring line i, the value range of i is 1-C n .

[0138] (2) On measuring line C min On the top, calculate the layer point K p The distances to the maximum CDP point number, the minimum CDP point number, and the middle CDP point number are sorted from small to large and recorded as D min , D mid , D max . Select D min and D mid The corresponding CDP points are denoted as P mim and P mid .

[0139] (3) If P mim and P mid is an adjacent CDP point, then proceed to step (5); if P mim and P mid If there is a CDP point in the middle, select P mim and P mid The middle CDP point number is denoted by P mm , calculate K p To P mm The distance D mm .

[0140] (4) Judge D mm With D min The size of D mm <D min , then D min Assign to D mid , D mm Assign to D min , and at the same time min Denoted as P mid , original P mmDenoted as P min If D mm ≥D min , then D mm Assign to D mid , and at the same time mm Denoted as P mid . Continue with step (3).

[0141] (5) Read the seismic interpretation layer data and convert P min The time T of the point in layer h is taken as the layer point K p The time value of this layer. When performing this step, it should be noted that if P min If the distance between the point and the layer point exceeds the maximum threshold distance Y, then the layer point has no valid matching information in this layer, and proceed to step (6).

[0142] (6) For the next layer point K p+1 Carry out the calculations in steps (1) to (5) above.

[0143] (7) Perform the calculations of steps (1) to (6) above for the next interpretation layer h+1.

[0144] S402: Match the depth value corresponding to the mid-layer point position of each control point with the time value.

[0145] It is understandable that the depth value corresponding to the mid-layer point of each control point can be obtained by collecting data through on-site measurement, so that the depth value corresponding to the mid-layer point of each control point can be matched with the time value corresponding to each layer point calculated in step S201.

[0146] From the above description, it can be seen that the efficient velocity field construction method provided in the present application can match well-seismic data in the work area where the velocity field is to be constructed based on the well logging data and the seismic interpretation layer data.

[0147] See also Figure 5 , according to the seismic interpretation layer data and the distance parameters of each interpretation layer data point in the two-dimensional work area, the time value corresponding to the interpretation layer data point closest to the layer point is determined layer by layer in each control point, including:

[0148] S501: within the maximum distance, for the layer point, the distance between each interpreted layer data line and the layer point is calculated according to the track distance of the interpreted layer data point;

[0149] S502: determining an interpretation layer data line closest to the layer point within the maximum distance, and determining an interpretation layer data point closest to the layer point on the interpretation layer data line;

[0150] S503: searching for the time value corresponding to the nearest interpretation horizon data point in the seismic interpretation horizon data, and determining the time value corresponding to the interpretation horizon data point nearest to the horizon point.

[0151] S501 to S504 may correspond to the description in the above S301.

[0152] From the above description, it can be seen that the efficient velocity field construction method provided by the present application can determine the time value corresponding to the interpretation layer data point closest to the layer point in each control point layer by layer according to the distance parameters of each interpretation layer data point in the seismic interpretation layer data and the interpretation layer data in the two-dimensional work area.

[0153] See also Figure 6 When the control point corresponds to a vertical well, the average velocity and layer velocity of the seismic wave in each layer at each control point are calculated according to the well-seismic data matching result to generate a velocity-time scatter plot, including:

[0154] S601: Calculating the average velocity and layer velocity of seismic waves in each layer at each control point according to the acquired depth value of each layer of the vertical well and the time value in the seismic interpretation layer data matched therewith;

[0155] It is understandable that when the control point corresponds to a vertical well, technicians often do not need to consider the virtual well, but directly perform calculations based on the actual data of the real well, taking each real well as a control point.

[0156] For each control point, the method for calculating the average velocity and layer velocity of the seismic wave propagating therein is as follows:

[0157] The average velocity V of seismic waves propagating in each layer of the control point ave The calculation formula is

[0158] Among them, h i is the height from the i-th layer to the i-1th layer, t i is the one-way travel time from the i-th layer to the i-1th layer, n represents the number of layers of the control point; if i = 1, then h i is the height from the first layer to the reference surface (the location of the wellhead on the surface), t i is the one-way travel time from layer 1 to the datum (surface wellhead location).

[0159] The layer velocity V of the seismic wave propagating in each layer of the control point int The calculation formula is

[0160] Where Δh is the layer thickness and Δt is the one-way travel time of a seismic wave through the layer.

[0161] S602: Match the average velocity and layer velocity of each layer of the seismic wave at each control point with the time value in the seismic interpretation layer data to generate a velocity-time scatter plot.

[0162] It is understandable that technicians can correspond the average velocity and layer velocity of the seismic wave in each layer at each control point with the time value recorded in the seismic interpretation layer data in the actual test, thereby generating a velocity-time scatter plot.

[0163] From the above description, it can be seen that when the control point corresponds to a vertical well, the efficient velocity field construction method provided in the present application can calculate the average velocity and layer velocity of the seismic wave in each layer at each control point according to the well-seismic data matching results, and generate a velocity-time scatter plot.

[0164] See also Figure 7 When the control point corresponds to a deviated well, the average velocity and layer velocity of the seismic wave in each layer at each control point are calculated according to the well-seismic data matching result, and a velocity-time scatter plot is generated, including:

[0165] S701: Calculating the layer velocity of the layer in each control point according to the acquired time value of the intersection point of the real well and the layer and the depth value of the intersection point of the real well and the layer;

[0166] S702: Calculate the depth value of the corresponding layer in the virtual well at each control point according to the layer velocity and the time value of the intersection point between the virtual well and the layer;

[0167] S703: Calculating the average velocity of the seismic wave in each layer at each control point according to the depth value of the layer in the virtual well and the time value of the intersection point between the virtual well and the corresponding layer;

[0168] S704: Match the average velocity and layer velocity of each layer of the seismic wave in each control point with the time value in the seismic interpretation layer data to generate a velocity-time scatter plot.

[0169] It is understandable that in actual work areas, in addition to vertical wells, there are usually inclined wells. When the control point corresponds to an inclined well, the technician often needs to consider the virtual well, and regard each real well or each virtual well set by the technician as a control point.

[0170] In fact, both real wells and virtual wells are in the logging data of the embodiment of the present application. When performing calculations, they all need to provide information such as well name, well coordinates, and core elevation. The difference is that real wells are real exploration data obtained by logging after real drilling, while virtual wells are control points added by technicians based on actual conditions in order to build a velocity field. The addition of these control points makes the result of establishing the velocity field more reasonable and accurate.

[0171] For example, see Fig.18, the line passing through the points (x1, y1), (x2, y2) and (x3, y3) represents a real well, and this real well is an inclined well. The three approximately parallel arcs where hor1, hor2 and hor3 are located represent three strata. This inclined well intersects with these three strata at three points, namely the real point (x1, y1), the real point (x2, y2) and the real point (x3, y3). However, since this well is an inclined well, each intersection point intersects with the strata at six virtual points vertically, so there are a total of nine points where the dotted line intersects with the strata. Excluding the three real intersection points of the inclined well, the other six intersection points are virtual points. When calculating the average velocity and layer velocity for the inclined well, the embodiment of the present application not only needs to calculate the average velocity and layer velocity of the seismic waves propagating at these three real points, but also needs to calculate the average velocity and layer velocity of the seismic waves propagating at the six virtual points.

[0172] Based on the above example, when calculating the velocity of a deviated well, the embodiment of the present application needs to calculate the velocity values ​​of all points. Assume that the deviated well passes through N layers H1, H2...H from shallow to deep. n , and each layer has a real point P1, P2…P n According to the above, there are also n×(n-1) virtual points that intersect with other layers vertically, and all intersection points can be represented by the matrix P.

[0173]

[0174] In the above matrix, the subscript i represents the intersection of the inclined well and layer i, and the value of i is [1, n]. The superscript j represents the intersection of the virtual well corresponding to the inclined well and layer j, and the value of j is [1, n]. The intersection without a superscript is the real intersection, and the point with a superscript is the virtual intersection.

[0175] In the embodiment of the present application, when calculating the velocity of an inclined well, the velocities corresponding to all intersections need to be calculated. When calculating the velocity corresponding to a real intersection, the calculation method is the same as that for a vertical well, and will not be repeated here. The following is a detailed description of the calculation method for the average velocity and layer velocity of a virtual intersection:

[0176] (1) Search all point time values.

[0177] First, the time values ​​of the n×n intersections in the above matrix are obtained from the seismic interpretation layer data, which are expressed as matrix T as follows. The order of the matrix is ​​consistent with that of the matrix P, and the elements at corresponding positions in the two matrices correspond one to one.

[0178] Among them, t1, t2…t n is the time value of the real intersection, and the others are the time values ​​of the virtual intersection.

[0179]

[0180] (2) Read the actual intersection depth value of the inclined well in each layer. Assume P1, P2…P n The corresponding depth values ​​are Tvd1, Tvd2…Tvd n .

[0181] (3) The depth and time values ​​of the real intersection points are used to solve the layer velocity of each layer.

[0182] The layer velocity solution method still uses Formula, the specific parameters are consistent with those described in S601. Among them, the layer velocity of the top layer, i.e. the first layer, is the same as its average velocity, obtained by dividing Tvd1 by t1, and the Δh of the remaining layers is obtained by subtracting the depth of the real intersection of the next layer from the depth of the real intersection of the previous layer, such as the Δh of the second layer is Tvd2-Tvd1, and so on; Δt is the one-way travel time of the seismic wave through the layer, such as the Δt of the second layer is t2-t1, and so on. Assuming that the layer velocity is unchanged laterally, the layer velocity of other virtual points in the layer is the same as the layer velocity of the real point, and the layer velocity of layer i is recorded as

[0183] (4) Calculate the depth value of the virtual intersection.

[0184] The solution of the virtual point depth value needs to start from the shallow layer, calculate layer by layer, and recursively go to the deep layer. Suppose the matrix D composed of the depth values ​​is as follows, where the depth values ​​of the real intersection points shown by the diagonal are Tvd1, Tvd2…Tvd n It is a known quantity obtained from the real logging data, and the depth values ​​of other virtual points need to be calculated.

[0185]

[0186] The depth value Tvd1 of the virtual point in the first layer i The calculation is as follows: Where i is 2, 3, ... n, and the depth value of the virtual point in the jth layer is the superposition of the depth values ​​of the points on the virtual well. These points may include real points or virtual points. The calculation formula is as follows:

[0187]

[0188] The meanings of i and j are the same as those mentioned above.

[0189] (5) Calculate the average speed at the virtual intersection.

[0190] The average velocity of the virtual intersection point is calculated by the ratio of the depth value to the time value of the point.

[0191] It can be seen that the above method can improve the efficiency of velocity field construction. Compared with the traditional method, this method reduces the possibility of interpretation errors in the process of manual data reading, and is fully automatic and programmed, without manual intervention, faster and more accurate.

[0192] From the above description, it can be seen that when the control point corresponds to an inclined well, the efficient velocity field construction method provided in this application can calculate the average velocity and layer velocity of the seismic wave in each layer at each control point according to the well-seismic data matching results, and generate a velocity-time scatter plot.

[0193] See also Figure 8 , the fitting of the velocity-time scatter plot to obtain a velocity-time curve and generate layer velocity data includes:

[0194] S801: fitting the velocity-time scatter diagram according to the time value corresponding to each layer point in each control point, the average velocity of each layer in each control point, and the layer velocity to obtain a velocity-time curve;

[0195] S802: Obtain the velocities of all interpreted horizon data points in the entire work area according to the velocity time curve and the time values ​​in the seismic interpreted horizon data to form horizon velocity data.

[0196] It can be understood that the horizon velocity data is a necessary file for constructing the velocity field. This step includes velocity time curve fitting, quality control of the fitting relationship, and output of the horizon velocity data.

[0197] First, when fitting the velocity-time scatter plot, it is necessary to select a certain layer for fitting. When fitting the inclined well, it is also necessary to fit the virtual well as a control point. After fitting the velocity-time scatter plot, a velocity-time curve can be obtained, and then a velocity-time fitting formula can be generated according to the velocity-time curve. Subsequently, the velocity of all interpreted layer data points in the entire work area can be calculated according to the velocity-time curve and / or its corresponding velocity-time fitting formula to form the layer velocity data.

[0198] The embodiment of the present application can adopt a variety of methods to automatically fit the speed time scatter plot, and these methods include: straight line fitting, binomial fitting and exponential fitting, etc. If there is no obvious trend in the speed distribution or it is desired to add the rich experience of the interpreter in the fitting process, the fitting curve can be manually input, that is, at different depth values ​​or time points, the above-mentioned different fitting methods are used for fitting according to the different changing trends of the speed. In addition, for the abnormal values ​​of the speed, since they affect the fitting effect, the abnormal values ​​need to be queried and eliminated. After eliminating the abnormal values, fitting again will be more in line with reality. In order to make the fitted speed time scatter plot more reasonable, the embodiment of the present application sets the maximum and minimum threshold ranges of the speed. When the speed value calculated by the fitting curve exceeds the threshold range, the maximum or minimum speed threshold is taken as the speed value of the point. The above process can also be called quality control.

[0199] The velocity-time formula can be generated according to the velocity-time fitting relationship after quality control. Using the velocity-time formula, the velocity can be calculated for each time value in the layer interpretation data to obtain layer velocity data that is consistent with the size format of the layer interpretation data. The layer velocity data can show the plane distribution of the velocity of a certain layer.

[0200] In addition, the method for generating layer velocity data may also include a plane difference method. This method refers to using the Kriging interpolation method or the inverse distance weighted method to interpolate the velocity data of the calculated control points into a two-dimensional data body of the same order as the interpreted layer data. This two-dimensional data body is a two-dimensional array, and has different orders depending on the number of interpreted layer data. This two-dimensional data body is the layer velocity data.

[0201] It can be seen from the above description that the efficient velocity field construction method provided in the present application can fit the velocity-time scatter plot, obtain the velocity-time curve, and generate layer velocity data.

[0202] In one embodiment, constructing the velocity field according to the layer velocity data includes: matching the layer velocity data of each layer with the seismic interpretation layer data of the corresponding layer to obtain the constructed velocity field. For specific methods, please refer to the description of S104.

[0203] Based on the same inventive concept, the embodiment of the present application also provides a velocity field efficient construction device, which can be used to implement the method described in the above embodiment, as described in the following embodiment. Since the principle of the velocity field efficient construction device to solve the problem is similar to the velocity field efficient construction method, the implementation of the velocity field efficient construction device can refer to the implementation of the method based on the software performance benchmark determination, and the repetitions are not repeated. As used below, the term "unit" or "module" can implement a combination of software and / or hardware of a predetermined function. Although the system described in the following embodiment is preferably implemented in software, the implementation of hardware, or a combination of software and hardware is also possible and conceived.

[0204] See also Fig. 9 In order to construct a velocity field by matching well and seismic data, the present application provides a velocity field efficient construction device, including: a matching unit 901, a scatter plot generation unit 902, a layer velocity data generation unit 903 and a field construction unit 904.

[0205] A matching unit 901 is used to match well-seismic data in the work area where the velocity field is to be constructed according to the well logging data and the seismic interpretation layer data;

[0206] A scatter plot generating unit 902 is used to calculate the average velocity and layer velocity of seismic waves in each layer at each control point according to the well-seismic data matching result, and generate a velocity-time scatter plot;

[0207] A layer velocity data generating unit 903 is used to fit the velocity-time scatter plot to obtain a velocity-time curve and generate layer velocity data;

[0208] The field building unit 904 is used to build a velocity field according to the layer velocity data.

[0209] See also Fig.10 The matching unit 901 includes: a three-dimensional time determination module 1001 and a speed time matching module 1002.

[0210] The three-dimensional time determination module 1001 is used to determine the time value corresponding to the interpretation layer data point closest to the layer point position layer by layer in each control point according to the distance parameters of the seismic interpretation layer data and each interpretation layer data point in the three-dimensional work area; wherein the distance parameters include the line distance of the interpretation layer data point, the track distance of the interpretation layer data point and the maximum distance between the layer point position and the corresponding interpretation layer data point;

[0211] The speed time matching module 1002 is used to match the depth value corresponding to the mid-layer point position of each control point with the time value.

[0212] See also Fig.11The three-dimensional time determination module 1001 includes: a line number determination module 1101, a track number determination module 1102, a near point determination module 1103 and a near point time determination module 1104.

[0213] The line number determination module 1101 is used to determine the line numbers of the interpretation layer data points closest to the layer point within the maximum distance according to the line distances of the interpretation layer data points;

[0214] A track number determination module 1102 is used to determine the track number of the interpretation layer data point closest to the layer point on the line number within the maximum distance according to the track distance of the interpretation layer data point;

[0215] A near point determination module 1103 is used to determine the interpretation layer data point closest to the layer point according to the line number of the interpretation layer data point and the track number of the interpretation layer data point;

[0216] The near point time determination module 1104 is used to find the time value corresponding to the nearest seismic interpretation layer data point in the seismic interpretation layer data, and determine the time value corresponding to the seismic interpretation layer data point closest to the layer point.

[0217] See also Fig.12 The matching unit 901 also includes: a two-dimensional time determination module 1201 and a speed time matching module 1202.

[0218] The two-dimensional time determination module 1201 is used to determine the time value corresponding to the interpretation layer data point closest to the layer point position layer by layer in each control point according to the distance parameters of the seismic interpretation layer data and each interpretation layer data point in the two-dimensional work area; wherein the distance parameters include the line distance and the maximum distance between the layer point position and the corresponding interpretation layer data point;

[0219] The speed time matching module 1202 is used to match the depth value corresponding to the mid-layer point position of each control point with the time value.

[0220] See also Fig.13 The two-dimensional time determination module 1201 includes: a distance calculation module 1301, a near point determination module 1302 and a near point time determination module 1303.

[0221] The distance calculation module 1301 is used to calculate the distance between each interpreted layer data line and the layer point within the maximum distance according to the track distance of the interpreted layer data point;

[0222] The near point determination module 1302 is used to determine the interpretation layer data line closest to the layer point within the maximum distance, and determine the interpretation layer data point closest to the layer point on the interpretation layer data line;

[0223] The near point time determination module 1303 is used to find the time value corresponding to the nearest interpretation horizon data point in the seismic interpretation horizon data, and determine the time value corresponding to the interpretation horizon data point closest to the horizon point.

[0224] See also Fig.14 When the control point corresponds to a vertical well, the scatter diagram generating unit 902 includes: a velocity calculation module 1401 and a velocity-time scatter diagram generating module 1402 .

[0225] The velocity calculation module 1401 is used to calculate the average velocity and layer velocity of the seismic wave in each layer at each control point according to the acquired depth value of each layer of the vertical well and the time value in the seismic interpretation layer data matched therewith;

[0226] The velocity-time scatter plot generation module 1402 is used to match the average velocity and layer velocity of each layer of the seismic wave at each control point with the time value in the seismic interpretation layer data to generate a velocity-time scatter plot.

[0227] See also Fig.15 When the control point corresponds to a deviated well, the scatter plot generation unit 902 includes: a layer velocity calculation module 1501, a depth value calculation module 1502, an average velocity calculation module 1503 and a velocity-time scatter plot generation module 1504.

[0228] The layer velocity calculation module 1501 is used to calculate the layer velocity of the layer in each control point according to the acquired time value of the intersection point of the real well and the layer and the depth value of the intersection point of the real well and the layer;

[0229] The depth value calculation module 1502 is used to calculate the depth value of the corresponding layer in the virtual well at each control point according to the layer velocity and the time value of the intersection point between the virtual well and the layer;

[0230] The average velocity calculation module 1503 is used to calculate the average velocity of the seismic wave in each layer in each control point according to the depth value of the layer in the virtual well and the time value of the intersection point between the virtual well and the corresponding layer;

[0231] The velocity-time scatter plot generation module 1504 is used to match the average velocity and layer velocity of each layer of the seismic wave at each control point with the time value in the seismic interpretation layer data to generate a velocity-time scatter plot.

[0232] See also Fig.16 The layer velocity data generating unit 903 includes: a fitting curve generating module 1601 and a layer velocity data generating module 1602.

[0233] The fitting curve generating module 1601 is used to fit the speed-time scatter diagram according to the time value corresponding to each layer point position in each control point, the average speed of each layer in each control point and the layer speed to obtain a speed-time curve;

[0234] The layer velocity data generating module 1602 is used to obtain the velocity of all the interpreted layer data points in the entire work area according to the velocity time curve and the time value in the seismic interpreted layer data to form layer velocity data.

[0235] The field building unit 904 is specifically used for:

[0236] The constructed velocity field is obtained by matching the layer velocity data of each layer with the seismic interpretation layer data of the corresponding layer.

[0237] From the hardware level, in order to construct a velocity field by matching well and seismic data, the present application provides an embodiment of an electronic device for implementing all or part of the contents of the method for efficiently constructing a velocity field, and the electronic device specifically includes the following contents:

[0238] Processor, memory, communication interface and bus; wherein the processor, memory and communication interface communicate with each other through the bus; the communication interface is used to realize information transmission between the velocity field efficient construction device and related devices such as core business systems, user terminals and related databases; the logic controller can be a desktop computer, a tablet computer and a mobile terminal, etc., and the present embodiment is not limited thereto. In the present embodiment, the logic controller can be implemented with reference to the embodiment of the velocity field efficient construction method and the embodiment of the velocity field efficient construction device in the embodiment, and the contents thereof are incorporated herein, and the repeated parts are not repeated.

[0239] It is understandable that the user terminal may include a smart phone, a tablet electronic device, a network set-top box, a portable computer, a desktop computer, a personal digital assistant (PDA), a vehicle-mounted device, a smart wearable device, etc. Among them, the smart wearable device may include smart glasses, a smart watch, a smart bracelet, etc.

[0240] In practical applications, part of the method for efficiently constructing a velocity field can be executed on the electronic device side as described above, or all operations can be completed in the client device. The selection can be made based on the processing capability of the client device and the limitations of the user's usage scenario. This application does not limit this. If all operations are completed in the client device, the client device may also include a processor.

[0241] The client device may have a communication module (i.e., a communication unit) that can communicate with a remote server to achieve data transmission with the server. The server may include a server on the task scheduling center side, and other implementation scenarios may also include a server on an intermediate platform, such as a server on a third-party server platform that has a communication link with the task scheduling center server. The server may include a single computer device, or a server cluster consisting of multiple servers, or a server structure of a distributed device.

[0242] Fig.17 FIG. 9 is a schematic block diagram of the system structure of the electronic device 9600 according to an embodiment of the present application. Fig.17 As shown, the electronic device 9600 may include a central processor 9100 and a memory 9140; the memory 9140 is coupled to the central processor 9100. It is worth noting that Fig.17 is exemplary; other types of structures may also be used to supplement or replace this structure to implement telecommunication functions or other functions.

[0243] In one embodiment, the function of the velocity field efficient construction method can be integrated into the central processing unit 9100. The central processing unit 9100 can be configured to perform the following control:

[0244] S101: performing well-seismic data matching in the work area where the velocity field is to be constructed according to the well logging data and the seismic interpretation layer data;

[0245] S102: Calculate the average velocity and layer velocity of the seismic wave in each layer at each control point according to the well-seismic data matching result, and generate a velocity-time scatter plot;

[0246] S103: fitting the velocity-time scatter plot to obtain a velocity-time curve and generate layer velocity data;

[0247] S104: constructing a velocity field according to the layer velocity data.

[0248] From the above description, it can be seen that the method and device for efficiently constructing the velocity field provided by the present application can generate a velocity time curve in the work area to be constructed of the velocity field based on the well logging data and the seismic interpretation layer data, and then generate the layer velocity data, and finally construct the velocity field. The method for efficiently constructing the velocity field provided by the present application is highly efficient and accurate, and can provide more accurate basic data for the next step of mapping.

[0249] In another embodiment, the velocity field efficient construction device can be configured separately from the central processing unit 9100. For example, the data composite transmission device velocity field efficient construction device can be configured as a chip connected to the central processing unit 9100, and the function of the velocity field efficient construction method can be realized through the control of the central processing unit.

[0250] like Fig.17 As shown, the electronic device 9600 may also include: a communication module 9110, an input unit 9120, an audio processor 9130, a display 9160, and a power supply 9170. It is worth noting that the electronic device 9600 does not necessarily have to include Fig.17 In addition, the electronic device 9600 may also include Fig.17 For components not shown, reference may be made to the prior art.

[0251] like Fig.17 As shown, the central processing unit 9100 is sometimes also referred to as a controller or an operation control, and may include a microprocessor or other processor device and / or logic device. The central processing unit 9100 receives input and controls the operation of various components of the electronic device 9600.

[0252] The memory 9140 may be, for example, one or more of a cache, a flash memory, a hard drive, a removable medium, a volatile memory, a non-volatile memory or other suitable devices. The above-mentioned information related to the failure may be stored, and a program for executing the relevant information may also be stored. The CPU 9100 may execute the program stored in the memory 9140 to implement information storage or processing, etc.

[0253] The input unit 9120 provides input to the central processing unit 9100. The input unit 9120 is, for example, a key or a touch input device. The power supply 9170 is used to provide power to the electronic device 9600. The display 9160 is used to display display objects such as images and texts. The display may be, for example, an LCD display, but is not limited thereto.

[0254] The memory 9140 may be a solid-state memory, such as a read-only memory (ROM), a random access memory (RAM), a SIM card, etc. It may also be a memory that saves information even when the power is off, can be selectively erased, and is provided with more data, examples of which are sometimes referred to as EPROMs, etc. The memory 9140 may also be some other type of device. The memory 9140 includes a buffer memory 9141 (sometimes referred to as a buffer). The memory 9140 may include an application / function storage unit 9142, which is used to store application programs and function programs or processes for executing the operation of the electronic device 9600 through the central processor 9100.

[0255] The memory 9140 may also include a data storage unit 9143 for storing data, such as contacts, digital data, pictures, sounds, and / or any other data used by the electronic device. The driver storage unit 9144 of the memory 9140 may include various drivers for communication functions of the electronic device and / or for executing other functions of the electronic device (such as messaging applications, address book applications, etc.).

[0256] The communication module 9110 is a transmitter / receiver 9110 that sends and receives signals via an antenna 9111. The communication module (transmitter / receiver) 9110 is coupled to the central processor 9100 to provide input signals and receive output signals, which may be the same as the case of a conventional mobile communication terminal.

[0257] Based on different communication technologies, multiple communication modules 9110 may be provided in the same electronic device, such as a cellular network module, a Bluetooth module and / or a wireless LAN module. The communication module (transmitter / receiver) 9110 is also coupled to a speaker 9131 and a microphone 9132 via an audio processor 9130 to provide an audio output via the speaker 9131 and receive an audio input from the microphone 9132, thereby realizing a common telecommunication function. The audio processor 9130 may include any suitable buffer, decoder, amplifier, etc. In addition, the audio processor 9130 is also coupled to the central processor 9100, so that recording can be performed on the local machine through the microphone 9132, and the sound stored on the local machine can be played through the speaker 9131.

[0258] The embodiments of the present application also provide a computer-readable storage medium capable of implementing all steps of the method for efficiently constructing a velocity field in the above embodiment, where the execution subject is a server or a client. The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, all steps of the method for efficiently constructing a velocity field in the above embodiment are implemented by the execution subject being a server or a client. For example, when the processor executes the computer program, the following steps are implemented:

[0259] S101: performing well-seismic data matching in the work area where the velocity field is to be constructed according to the well logging data and the seismic interpretation layer data;

[0260] S102: Calculate the average velocity and layer velocity of the seismic wave in each layer at each control point according to the well-seismic data matching result, and generate a velocity-time scatter plot;

[0261] S103: fitting the velocity-time scatter plot to obtain a velocity-time curve and generate layer velocity data;

[0262] S104: constructing a velocity field according to the layer velocity data.

[0263] From the above description, it can be seen that the method and device for efficiently constructing the velocity field provided by the present application can generate a velocity time curve in the work area to be constructed of the velocity field based on the well logging data and the seismic interpretation layer data, and then generate the layer velocity data, and finally construct the velocity field. The method for efficiently constructing the velocity field provided by the present application is highly efficient and accurate, and can provide more accurate basic data for the next step of mapping.

[0264] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, devices, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0265] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (apparatus), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0266] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0267] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0268] The present invention uses specific embodiments to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea. At the same time, for those skilled in the art, according to the idea of ​​the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as a limitation on the present invention.

Claims

1. An efficient method for constructing velocity field, It is characterized in that include: According to the well logging data and seismic interpretation layer data, the well-seismic data matching is carried out in the work area where the velocity field is to be constructed; According to the matching results of well-seismic data, the average velocity and layer velocity of seismic waves in each layer at each control point are calculated to generate a velocity-time scatter plot; Fitting the velocity-time scatter plot to obtain a velocity-time curve, and generating layer velocity data according to the velocity-time curve; constructing a velocity field according to the layer velocity data; Wherein, the work area includes a two-dimensional work area or a three-dimensional work area; Wherein, when the work area is a three-dimensional work area, the well-seismic data matching is performed in the work area where the velocity field is to be constructed according to the well logging data and the seismic interpretation layer data, including: determining the time value corresponding to the interpretation layer data point closest to the layer point position layer by layer in each control point according to the distance parameters of the seismic interpretation layer data and each interpretation layer data point in the three-dimensional work area; wherein the distance parameters include the line distance of the interpretation layer data point, the track distance of the interpretation layer data point and the maximum distance between the layer point position and the corresponding interpretation layer data point; matching the depth value corresponding to the layer point position in each control point with the time value; Wherein, according to the distance parameters of the seismic interpretation horizon data and each interpretation horizon data point in the three-dimensional work area, the time value corresponding to the interpretation horizon data point closest to the horizon point is determined layer by layer in each control point, including: within the maximum distance, according to the line distance of the interpretation horizon data points, the line number of the interpretation horizon data point closest to the horizon point is determined; within the maximum distance, according to the track distance of the interpretation horizon data points, the track number of the interpretation horizon data point closest to the horizon point is determined on the line number; according to the line number of the interpretation horizon data point and the track number of the interpretation horizon data point, the interpretation horizon data point closest to the horizon point is determined; the time value corresponding to the nearest interpretation horizon data point is searched in the seismic interpretation horizon data, and the time value corresponding to the seismic interpretation horizon data point closest to the horizon point is determined; Wherein, when the work area is a two-dimensional work area, the well-seismic data matching is performed in the work area where the velocity field is to be constructed according to the well logging data and the seismic interpretation layer data, including: determining the time value corresponding to the interpretation layer data point closest to the layer point position layer by layer in each control point according to the distance parameters of the seismic interpretation layer data and each interpretation layer data point in the two-dimensional work area; wherein the distance parameters include the line distance and the maximum distance between the layer point position and the corresponding interpretation layer data point; matching the depth value corresponding to the layer point position in each control point with the time value; Among them, the method of determining the time value corresponding to the interpretation layer data point closest to the layer point in each control point layer by layer according to the distance parameters of the seismic interpretation layer data and each interpretation layer data point in the two-dimensional work area includes: within the maximum distance, for the layer point, respectively calculating the distance between each interpretation layer data line and the layer point according to the track spacing of the interpretation layer data point; within the maximum distance, determining the interpretation layer data line closest to the layer point, and determining the interpretation layer data point closest to the layer point on the interpretation layer data line; searching for the time value corresponding to the nearest interpretation layer data point in the seismic interpretation layer data, and determining the time value corresponding to the interpretation layer data point closest to the layer point.

2. The method for efficiently constructing a velocity field according to claim 1, It is characterized in that When the control point corresponds to a vertical well, the average velocity and layer velocity of the seismic wave in each layer at each control point are calculated according to the well-seismic data matching result to generate a velocity-time scatter plot, including: Calculate the average velocity and layer velocity of the seismic wave in each layer at each control point according to the acquired depth value of each layer of the vertical well and the time value in the seismic interpretation layer data matched therewith; The average velocity and layer velocity of each layer of the seismic wave at each control point are matched with the time value in the seismic interpretation layer data to generate a velocity-time scatter plot.

3. The method for efficiently constructing a velocity field according to claim 1, It is characterized in that When the control point corresponds to a deviated well, the average velocity and layer velocity of the seismic wave in each layer at each control point are calculated according to the well-seismic data matching result to generate a velocity-time scatter plot, including: Calculate the layer velocity of the layer in each control point according to the obtained time value of the intersection point of the real well and the layer and the depth value of the intersection point of the real well and the layer; Calculate the depth value of the corresponding layer in the virtual well at each control point according to the layer velocity and the time value of the intersection point between the virtual well and the layer; Calculating the average velocity of the seismic wave in each layer at each control point according to the depth value of the layer in the virtual well and the time value of the intersection of the virtual well and the corresponding layer; The average velocity and layer velocity of each layer of the seismic wave at each control point are matched with the time value in the seismic interpretation layer data to generate a velocity-time scatter plot.

4. The method for efficiently constructing a velocity field according to claim 1, It is characterized in that The step of fitting the velocity-time scatter plot to obtain a velocity-time curve and generate layer velocity data includes: Fitting the velocity-time scatter diagram according to the time value corresponding to each layer point in each control point, the average velocity of each layer in each control point and the layer velocity to obtain a velocity-time curve; The velocities of all interpreted horizon data points in the entire work area are obtained according to the velocity time curve and the time values ​​in the seismic interpreted horizon data to form the horizon velocity data.

5. The method for efficiently constructing a velocity field according to claim 4, It is characterized in that The constructing of the velocity field according to the layer velocity data comprises: The constructed velocity field is obtained by matching the horizon velocity data of each horizon with the seismic interpretation horizon data of the corresponding horizon.

6. A device for efficiently constructing velocity fields, It is characterized in that include: A matching unit is used to match well-seismic data in the work area where the velocity field is to be constructed according to the well logging data and the seismic interpretation layer data; A scatter plot generation unit is used to calculate the average velocity and layer velocity of seismic waves in each layer at each control point according to the well-seismic data matching results, and generate a velocity-time scatter plot; A layer velocity data generating unit, used for fitting the velocity time scatter plot to obtain a velocity time curve, and generating layer velocity data according to the velocity time curve; A field construction unit, used for constructing a velocity field according to the layer velocity data; Wherein, the work area includes a two-dimensional work area or a three-dimensional work area; Wherein, when the work area is a three-dimensional work area, the matching unit includes: A three-dimensional time determination module is used to determine the time value corresponding to the interpretation layer data point closest to the layer point position layer by layer in each control point according to the distance parameters of the seismic interpretation layer data and each interpretation layer data point in the three-dimensional work area; wherein the distance parameters include the line distance of the interpretation layer data point, the track distance of the interpretation layer data point and the maximum distance between the layer point position and the corresponding interpretation layer data point; A speed-time matching module is used to match the depth value corresponding to the mid-layer point of each control point with the time value; Wherein, the three-dimensional time determination module includes: A line number determination module, used to determine the line numbers of the interpretation layer data points closest to the layer point within the maximum distance according to the line distances of the interpretation layer data points; A track number determination module, used to determine the track number of the interpretation layer data point closest to the layer point on the line number within the maximum distance according to the track distance of the interpretation layer data point; A near point determination module, used for determining the interpretation layer data point closest to the layer point according to the line number of the interpretation layer data point and the track number of the interpretation layer data point; A near-point time determination module is used to find the time value corresponding to the nearest interpretation layer data point in the seismic interpretation layer data, and determine the time value corresponding to the seismic interpretation layer data point closest to the layer point; Wherein, when the working area is a two-dimensional working area, the matching unit includes: A two-dimensional time determination module is used to determine the time value corresponding to the interpretation layer data point closest to the layer point position layer by layer in each control point according to the distance parameters of the seismic interpretation layer data and each interpretation layer data point in the two-dimensional work area; wherein the distance parameters include the line distance and the maximum distance between the layer point position and the corresponding interpretation layer data point; A speed-time matching module is used to match the depth value corresponding to the mid-layer point of each control point with the time value; Wherein, the two-dimensional time determination module includes: The distance calculation module is used to calculate the distance between each interpreted layer data line and the layer point within the maximum distance according to the track distance of the interpreted layer data point; A near point determination module is used to determine the interpretation layer data line closest to the layer point within the maximum distance, and determine the interpretation layer data point closest to the layer point on the interpretation layer data line; The near point time determination module is used to find the time value corresponding to the nearest interpretation layer data point in the seismic interpretation layer data, and determine the time value corresponding to the interpretation layer data point closest to the layer point.

7. The device for efficiently constructing a velocity field according to claim 6, It is characterized in that When the control point corresponds to a vertical well, the scatter plot generating unit includes: A velocity calculation module, used to calculate the average velocity and layer velocity of the seismic wave in each layer at each control point according to the acquired depth value of each layer of the vertical well and the time value in the seismic interpretation layer data matched therewith; The velocity-time scatter plot generation module is used to match the average velocity and layer velocity of each layer of the seismic wave at each control point with the time value in the seismic interpretation layer data to generate a velocity-time scatter plot.

8. The device for efficiently constructing a velocity field according to claim 6, It is characterized in that When the control point corresponds to a deviated well, the scatter plot generating unit includes: The layer velocity calculation module is used to calculate the layer velocity of the layer in each control point according to the obtained time value of the intersection point of the real well and the layer and the depth value of the intersection point of the real well and the layer; A depth value calculation module, used for calculating the depth value of the corresponding layer in the virtual well at each control point according to the layer velocity and the time value of the intersection point between the virtual well and the layer; An average velocity calculation module, used to calculate the average velocity of the seismic wave in each layer in each control point according to the depth value of the layer in the virtual well and the time value of the intersection point between the virtual well and the corresponding layer; The velocity-time scatter plot generation module is used to match the average velocity and layer velocity of each layer of the seismic wave at each control point with the time value in the seismic interpretation layer data to generate a velocity-time scatter plot.

9. The device for efficiently constructing a velocity field according to claim 6, It is characterized in that The layer velocity data generating unit comprises: A fitting curve generation module is used to fit the velocity-time scatter diagram according to the time value corresponding to each layer point in each control point, the average velocity and layer velocity of each layer in each control point, so as to obtain a velocity-time curve; The layer velocity data generating module is used to obtain the velocity of all the interpreted layer data points in the entire work area according to the velocity time curve and the time value in the seismic interpreted layer data to form the layer velocity data.

10. The device for efficiently constructing a velocity field according to claim 9, It is characterized in that The field building unit is specifically used for: The constructed velocity field is obtained by matching the horizon velocity data of each horizon with the seismic interpretation horizon data of the corresponding horizon.

11. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the program, the steps of the method for efficiently constructing a velocity field according to any one of claims 1 to 5 are implemented.

12. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the steps of the method for efficiently constructing a velocity field according to any one of claims 1 to 5 are implemented.

Citation Information

Patent Citations

  • Calculating method and system of well-to-seismic integration average speed field

    CN105353412A

  • Determination method and device of pre-stack time migration speed of earthquake

    CN107315194A