Material consumption method, system and electronic equipment

By analyzing and optimizing the materials to be consumed in the material list, the appropriate target finished product is selected for consumption, which solves the problem of unable to recycle the cost caused by the large amount of accumulation of materials in the inventory management, and improves the efficiency of material consumption.

CN114612043BActive Publication Date: 2025-01-24LENOVO (BEIJING) LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210317907.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-25
Publication Date
2025-01-24
Estimated Expiration
2042-03-25

AI Technical Summary

Technical Problem

During the inventory management process, there is a problem that a large amount of materials leads to the inability to recover costs, and the materials need to be effectively consumed.

Method used

By obtaining the bill of materials, determine the materials to be consumed, and calculate the material proportion, additional procurement cost and/or procurement cycle based on the first type of material and the second type of material in the raw material bill of finished product, thereby selecting the target finished product for material consumption .

Benefits of technology

Select the target finished products for material consumption in multiple dimensions such as material ratio, additional procurement costs and/or procurement cycles, improve the efficiency of material consumption, and avoid the problem of timely waste and cost recovery caused by the stagnation of materials.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114612043B_ABST
    Figure CN114612043B_ABST
Patent Text Reader

Abstract

The present application discloses a material consumption method, system and electronic device, which obtain a bill of materials, determine the materials to be consumed in the bill of materials, determine the raw material bill of materials required for the finished products corresponding to the materials to be consumed, the raw material bill of materials at least includes the materials to be consumed, determine the first type of materials and the second type of materials in the raw material bill of materials of the finished product, the first type of materials are the materials in the bill of materials other than the materials to be consumed, and the second type of materials are the materials that are not included in the bill of materials and need to be purchased additionally, based on the first type of materials and the second type of materials, at least determine the material proportion, additional procurement cost and / or procurement cycle in the raw material bill of materials of the finished product, and at least based on the material proportion, additional procurement cost and / or procurement cycle, determine the target finished product that consumes the materials to be consumed from the finished product.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of material consumption, and in particular to a material consumption method, system and electronic equipment. Background Art

[0002] In the process of inventory management, a large amount of materials will appear. In order to avoid the problem of unrecoverable costs caused by a large amount of materials, the materials need to be consumed. Summary of the invention

[0003] In view of this, the present application provides a material consumption method, system and electronic equipment, and the specific scheme thereof is as follows:

[0004] A material consumption method, comprising:

[0005] Obtain a bill of materials and determine the materials to be consumed in the bill of materials;

[0006] Determine a bill of materials of raw materials required for finished products corresponding to the materials to be consumed, wherein the bill of materials of raw materials at least includes the materials to be consumed;

[0007] Determine the first type of materials and the second type of materials in the raw material bill of materials of the finished product, wherein the first type of materials are materials in the bill of materials other than the materials to be consumed, and the second type of materials are materials that are not included in the bill of materials and need to be purchased additionally;

[0008] Based on the first type of materials and the second type of materials, at least determine the material proportion, additional procurement cost and / or procurement cycle in the raw material bill of materials of the finished product;

[0009] Based at least on the material proportion, the additional procurement cost and / or the procurement cycle, a target finished product that consumes the material to be consumed is determined from the finished products.

[0010] Further, the determining of the materials to be consumed in the bill of materials includes:

[0011] Obtain the idle time and idle amount of each material in the bill of materials;

[0012] The priority consumption order of each material in the material list is determined based on the idle time and idle amount, and the material with a higher priority in consumption order than other materials is determined as the material to be consumed.

[0013] Furthermore, it also includes:

[0014] Determine the quantity of the target finished product based on the ratio of the quantity of the to-be-consumed materials in the bill of materials to the quantity of the to-be-consumed materials in the raw material bill of materials of the target finished product;

[0015] Based on the quantity of the target finished product and the quantity of the first type of material in the raw material bill of materials in the target finished product, the remaining materials in the bill of materials and the quantity of the remaining materials are determined to update the bill of materials.

[0016] Furthermore, it also includes:

[0017] Determine the proportion of materials in the raw material bill of materials based on the amount of the first type of materials and the materials to be consumed in the raw material bill of materials of the finished product and the total amount of materials in the raw material bill of materials; and / or,

[0018] Determine the additional purchase cost in the raw material bill of materials based on the quantity of the second type of material in the raw material bill of materials of the finished product and the unit price of each of the second type of material; and / or,

[0019] Based on the procurement cycle of each second type of material in the raw material bill of materials of the finished product, the procurement cycle in the raw material bill of materials is determined.

[0020] Further, the determining of the proportion of materials in the raw material bill based on the amount of the first type of materials and the materials to be consumed in the raw material bill of materials of the finished product and the total amount of materials in the raw material bill of materials includes:

[0021] Determine the proportion of materials in the raw material list based on the quantity of the first type of materials, the quantity of the materials to be consumed, and the total quantity of materials in the raw material list;

[0022] or,

[0023] Determine the proportion of materials in the raw material list based on the usage of the first type of materials, the usage of the materials to be consumed, and the total usage of materials in the raw material list;

[0024] or,

[0025] The proportion of materials in the raw material bill is determined based on the price of the usage of the first type of materials in the raw material bill of materials of the finished product, the price of the usage of the material to be consumed and the price of the total usage of the materials in the raw material bill of materials.

[0026] Further, the determining of the proportion of materials in the raw material bill based on the amount of the first type of materials and the materials to be consumed in the raw material bill of materials of the finished product and the total amount of materials in the raw material bill of materials includes:

[0027] Determine the ratio of the sum of the quantity of the first type of material and the quantity of the to-be-consumed material to the total quantity of materials in the raw material bill of materials as the material proportion in the raw material bill of materials;

[0028] or,

[0029] Determine the ratio of the sum of the usage of the first type of material and the usage of the to-be-consumed material to the total usage of the materials in the raw material bill of materials as the material proportion in the raw material bill of materials;

[0030] or,

[0031] The ratio of the sum of the price of the first type of material used in the raw material bill of materials of the finished product and the price of the material to be consumed to the price of the total material usage in the raw material bill of materials is determined as the material proportion in the raw material bill of materials.

[0032] Further, determining a target finished product that consumes the to-be-consumed material from the finished products based at least on the material proportion, the additional procurement cost and / or the procurement cycle includes:

[0033] Determine the weights of material proportion, additional procurement cost and procurement cycle respectively;

[0034] Determine the recommended consumption value of each finished product based on the values ​​and weights of the material proportion, additional procurement cost and procurement cycle;

[0035] A target finished product for consuming the material to be consumed is determined from all finished products based on the consumption recommendation value of each finished product.

[0036] A material consumption system, comprising:

[0037] A first determining unit, used to obtain a bill of materials and determine the materials to be consumed in the bill of materials;

[0038] A second determining unit is used to determine a raw material bill of materials required for each of the finished products corresponding to the materials to be consumed, wherein the raw material bill of materials at least includes the materials to be consumed;

[0039] A third determining unit is used to determine the first type of materials and the second type of materials in the raw material bill of materials of the finished product, wherein the first type of materials are materials in the bill of materials other than the to-be-consumed materials, and the second type of materials are materials that are not included in the bill of materials and need to be purchased additionally;

[0040] a fourth determining unit, configured to determine at least a material proportion, an additional procurement cost and / or a procurement cycle in a raw material bill of materials of the finished product based on the first type of materials and the second type of materials;

[0041] The fifth determination unit is used to determine a target finished product that consumes the material to be consumed from the finished products based at least on the material proportion, the additional procurement cost and / or the procurement cycle.

[0042] An electronic device, comprising:

[0043] A processor is used to obtain a bill of materials, determine the materials to be consumed in the bill of materials; determine a raw material bill of materials required for the finished products corresponding to the materials to be consumed, the raw material bill of materials at least including the materials to be consumed; determine a first type of material and a second type of material in the raw material bill of materials of the finished product, the first type of material being the material in the bill of materials other than the materials to be consumed, and the second type of material being the material that is not included in the bill of materials and needs to be purchased additionally; based on the first type of material and the second type of material, at least determine the material proportion, additional purchase cost and / or purchase cycle in the raw material bill of materials of the finished product; at least based on the material proportion, additional purchase cost and / or purchase cycle, determine a target finished product that consumes the materials to be consumed from the finished product;

[0044] The memory is used to store the program for the processor to execute the above processing process.

[0045] A readable storage medium for storing at least one set of instructions;

[0046] The instruction set is used to be called and at least execute the material consumption method as described in any one of the above items.

[0047] It can be seen from the above technical scheme that the material consumption method, system and electronic device disclosed in the present application obtain a bill of materials, determine the materials to be consumed in the bill of materials, determine the raw material bill of materials required for the finished products corresponding to the materials to be consumed, the raw material bill of materials at least includes the materials to be consumed, determine the first type of materials and the second type of materials in the raw material bill of materials of the finished product, the first type of materials are materials other than the materials to be consumed in the bill of materials, and the second type of materials are materials that are not included in the bill of materials and need to be purchased additionally, based on the first type of materials and the second type of materials, at least determine the material proportion, additional purchase cost and / or purchase cycle in the raw material bill of materials of the finished product, and at least based on the material proportion, additional purchase cost and / or purchase cycle, determine the target finished product that consumes the materials to be consumed from the finished product. In this scheme, when consuming materials, a target finished product is selected from multiple finished products based on parameters such as material proportion, additional purchase cost and / or purchase cycle to consume the materials to be consumed in the bill of materials, so as to realize the selection of target finished products for material consumption in multiple dimensions such as material proportion, additional purchase cost and / or purchase cycle, thereby improving the material consumption efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0049] Figure 1 A flow chart of a material consumption method disclosed in an embodiment of the present application;

[0050] Figure 2 A flow chart of a material consumption method disclosed in an embodiment of the present application;

[0051] Figure 3 A flow chart of a material consumption method disclosed in an embodiment of the present application;

[0052] Figure 4 A flow chart of a material consumption method disclosed in an embodiment of the present application;

[0053] Figure 5 A structural schematic diagram of a material consumption system disclosed in an embodiment of the present application;

[0054] Figure 6 A schematic diagram of the structure of an electronic device disclosed in an embodiment of the present application. DETAILED DESCRIPTION

[0055] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0056] The present application discloses a processing method, the flow chart of which is as follows: Figure 1 As shown, including:

[0057] Step S11, obtaining a bill of materials, and determining the materials to be consumed in the bill of materials;

[0058] Step S12, determining a bill of materials of raw materials required for the finished products corresponding to the materials to be consumed, wherein the bill of materials of raw materials at least includes the materials to be consumed;

[0059] Step S13, determining the first type of materials and the second type of materials in the bill of materials of raw materials for the finished product, the first type of materials being materials in the bill of materials other than the materials to be consumed, and the second type of materials being materials that are not included in the bill of materials and need to be purchased additionally;

[0060] Step S14: Based on the first type of materials and the second type of materials, at least determine the material proportion, additional procurement cost and / or procurement cycle in the raw material bill of materials of the finished product;

[0061] Step S15: determining a target finished product that consumes the to-be-consumed material from the finished products based at least on the material proportion, the additional procurement cost and / or the procurement cycle.

[0062] In inventory management, there may be stagnant materials. If the materials remain stagnant for a long time, it will lead to waste of resources and untimely cost recovery.

[0063] In order to avoid this problem, it is necessary to consume the materials. In this solution, the first step is to obtain the list of materials in the inventory, that is, to determine which materials are left in the inventory and the remaining quantity of each material.

[0064] Select the materials to be consumed from the bill of materials. The selected materials to be consumed can be multiple or one. If multiple materials to be consumed are selected, the multiple materials to be consumed can be consumed sequentially or simultaneously. When multiple materials to be consumed are consumed simultaneously, the multiple materials to be consumed can be used as raw materials for the same finished product.

[0065] When determining the material to be consumed, it is necessary to first determine the finished product that can use the material to be consumed as the raw material. The finished product that uses the material to be consumed as the raw material may be one or more. When there is one finished product that uses the material to be consumed as the raw material, this finished product is directly determined as the target finished product; when there are multiple finished products that use the material to be consumed as the raw material, it is necessary to select one from the multiple finished products as the target finished product, so as to realize the consumption of the material to be consumed through the completion of the target finished product.

[0066] When it is determined that there are multiple finished products that use the to-be-consumed material as raw material, it is necessary to further determine which raw materials are needed to realize each finished product. Each finished product usually has multiple raw materials, and the raw materials of each finished product must contain the to-be-consumed material in the bill of materials. Determine the raw material bill of each finished product to facilitate subsequent calculations.

[0067] The raw material bills of materials for different finished products will be different. The first type of materials and the second type of materials in the raw material bill of materials for each finished product are determined based on the raw material bill of materials for each finished product. The first type of materials are the materials in the bill of materials except the materials to be consumed, and the second type of materials are the materials that are not included in the bill of materials and need to be purchased separately.

[0068] Among them, the first type of material is a material in the bill of materials of the raw materials of the finished product and a material in the bill of materials, and the first type of material is a non-consumable material, that is, it is a material in the bill of materials other than the consumable materials. In other words, the first type of material is not only the consumable materials in the bill of materials, but also other materials in the bill of materials that need to be consumed to complete the finished product.

[0069] The second type of materials are materials in the bill of materials of raw materials of the finished product, but are not materials in the bill of materials. When completing the finished product, in addition to consuming the materials in the bill of materials, additional materials need to be purchased. The materials that need to be purchased additionally are the second type of materials.

[0070] The raw material bill of materials of each finished product includes at least the first type of materials and / or the second type of materials in addition to the materials to be consumed, or the raw material bill of materials of a finished product only includes the materials to be consumed and no other materials, that is, the finished product can be completed only with the materials to be consumed.

[0071] If the raw material bill of materials of a finished product only includes materials to be consumed and materials of the first type, then the materials in the raw material bill of materials of the finished product all belong to the bill of materials, and to complete the finished product, only the materials in the bill of materials need to be consumed; if the raw material bill of materials of a finished product only includes materials to be consumed and materials of the second type, then only the materials to be consumed belong to the bill of materials in the raw material bill of materials of the finished product, and the other materials in the raw material bill of materials need to be purchased separately; if the raw material bill of materials of a finished product includes both materials to be consumed and materials of the first type and materials of the second type, that is, the raw material bill of materials of the finished product includes other materials in the bill of materials in addition to the materials to be consumed, and to complete the finished product, other materials need to be purchased separately.

[0072] After determining the first type of materials and the second type of materials in the raw material bill of materials required for each finished product, it is necessary to further determine the material proportion, additional procurement cost and / or procurement cycle in the raw material bill of materials for each finished product, so as to select a finished product from multiple finished products based on these parameters such as material proportion, additional procurement cost and / or procurement cycle to consume the material to be consumed.

[0073] Among them, the material ratio is the ratio of the first type of materials and the materials to be consumed in the raw materials of a finished product, that is, the ratio of the first type of materials and the materials to be consumed in the raw materials of a finished product to the total materials of the raw materials. Based on the material ratio, the total amount of materials in the bill of materials that can be consumed by each of the multiple finished products can be determined. Using the material ratio as one of the comparison parameters can determine which finished product consumes more materials in the bill of materials and which finished product consumes less materials in the bill of materials.

[0074] The additional purchase cost is the cost of the additional materials needed to complete a finished product. If the additional materials needed to complete a finished product are the second type of materials, then the additional purchase cost is the cost required to purchase the second type of materials. Using the additional purchase cost as one of the comparison parameters can determine which finished product requires a higher additional purchase cost and which finished product requires a lower additional purchase cost.

[0075] The procurement cycle is the time required to purchase additional materials to complete a finished product, that is, the time required to purchase the second type of materials. Using the procurement cycle as one of the comparison parameters can determine which finished products require additional procurement, and if additional procurement is required, which finished product requires additional procurement for a longer time and which finished product requires additional procurement for a shorter time.

[0076] The material proportion, additional procurement cost and procurement cycle are used as comparison parameters to compare the advantages and disadvantages of multiple determined finished products, so as to determine which finished product has greater advantages as the target finished product for consuming the materials to be consumed. The greater advantage means: a larger material proportion, or a smaller additional procurement cost, or a shorter procurement cycle, or multiple comparison parameters are comprehensively considered to determine a finished product as the target finished product. Under comprehensive consideration, a certain comparison parameter is not necessarily the best.

[0077] Among them, the comparison parameters used to compare the advantages and disadvantages of multiple finished products may include not only material proportion, additional procurement cost and procurement cycle, but also other parameters, which are not specifically limited here.

[0078] The material consumption method disclosed in this embodiment obtains a bill of materials, determines the materials to be consumed in the bill of materials, determines the raw material bills required for the finished products corresponding to the materials to be consumed, the raw material bills at least include the materials to be consumed, determines the first type of materials and the second type of materials in the raw material bill of materials of the finished product, the first type of materials are the materials in the bill of materials other than the materials to be consumed, and the second type of materials are the materials that are not included in the bill of materials and need to be purchased additionally, based on the first type of materials and the second type of materials, at least the material proportion, additional purchase cost and / or purchase cycle in the raw material bill of materials of the finished product are determined, and at least based on the material proportion, additional purchase cost and / or purchase cycle, the target finished product that consumes the materials to be consumed is determined from the finished products. In this solution, when consuming materials, a target finished product is selected from multiple finished products based on parameters such as material proportion, additional purchase cost and / or purchase cycle to consume the materials to be consumed in the bill of materials, so that the target finished product is selected for material consumption in multiple dimensions such as material proportion, additional purchase cost and / or purchase cycle, thereby improving the material consumption efficiency.

[0079] This embodiment discloses a material consumption method, and its flow chart is as follows: Figure 2 As shown, including:

[0080] Step S21, obtain the bill of materials, and obtain the idle time and idle amount of each material in the bill of materials;

[0081] Step S22: determine the priority consumption order of each material in the material list based on the idle time and idle amount, and determine the material with a higher priority than other materials as the material to be consumed;

[0082] Step S23, determining a bill of materials of raw materials required for the finished products corresponding to the materials to be consumed, wherein the bill of materials of raw materials at least includes the materials to be consumed;

[0083] Step S24, determining the first type of materials and the second type of materials in the bill of materials of raw materials of the finished product, the first type of materials are materials in the bill of materials except the materials to be consumed, and the second type of materials are materials that are not included in the bill of materials and need to be purchased additionally;

[0084] Step S25: Based on the first type of materials and the second type of materials, at least determine the material proportion, additional procurement cost and / or procurement cycle in the raw material bill of materials of the finished product;

[0085] Step S26: Determine a target finished product that consumes the to-be-consumed material from the finished products based at least on the material proportion, the additional procurement cost and / or the procurement cycle.

[0086] There are multiple materials in stock. The materials in stock are statistically managed through the bill of materials. If there are multiple materials in the bill of materials, the materials to be consumed are selected from the multiple materials in turn until all the materials in the bill of materials are consumed.

[0087] Select the materials to be consumed from the bill of materials. In the process of consuming the selected materials to be consumed, other materials in the bill of materials may be consumed. Therefore, the bill of materials is updated in real time as the materials are consumed.

[0088] The selection of materials to be consumed from the BOM can be based on the priority consumption order of the materials, that is, first set the priority consumption order for each material in the BOM, and then consume the materials in the BOM according to the priority consumption order. The priority consumption order can be determined based on the parameters of each material in the BOM. The parameters of each material can include the idle time, idle amount, idle quantity, etc.

[0089] Specifically, the sluggish time and sluggish amount of each material in the bill of materials are obtained. The sluggish time is the length of time the material is stored in the inventory. If the storage time is long, it needs to be consumed first to ensure the recovery of funds; the sluggish amount is the value of a certain material stored in the inventory to determine the amount of funds to be recovered. If the sluggish amount is large, it is necessary to consume the material first to avoid a large amount of funds being stagnant and unable to be recovered.

[0090] Based on the obsolete time and obsolete amount of each material as parameters, all materials in the bill of materials are prioritized. The priority order refers to both the length of the obsolete time and the amount of the obsolete amount to ensure that the consumption order of the obsolete materials is better. Select one material from all the materials in the bill of materials as the material to be consumed according to the priority order.

[0091] After determining the materials to be consumed from the bill of materials, the target finished product is determined based on the material proportion, additional procurement cost and procurement cycle, so as to determine the remaining materials in the bill of materials after the materials to be consumed are consumed, and then the next material to be consumed is selected in order of priority, and the target finished product for the next material to be consumed is determined based on the remaining materials in the bill of materials and the material proportion, additional procurement cost and procurement cycle, and so on, until all materials in the bill of materials have determined the target finished products, that is, the consumption recommendations for all materials in the bill of materials are completed, so as to improve the consumption efficiency when consuming materials based on the consumption recommendations.

[0092] The material consumption method disclosed in this embodiment obtains a bill of materials, determines the materials to be consumed in the bill of materials, determines the raw material bills required for the finished products corresponding to the materials to be consumed, the raw material bills at least include the materials to be consumed, determines the first type of materials and the second type of materials in the raw material bill of materials of the finished product, the first type of materials are the materials in the bill of materials other than the materials to be consumed, and the second type of materials are the materials that are not included in the bill of materials and need to be purchased additionally, based on the first type of materials and the second type of materials, at least the material proportion, additional purchase cost and / or purchase cycle in the raw material bill of materials of the finished product are determined, and at least based on the material proportion, additional purchase cost and / or purchase cycle, the target finished product that consumes the materials to be consumed is determined from the finished products. In this solution, when consuming materials, a target finished product is selected from multiple finished products based on parameters such as material proportion, additional purchase cost and / or purchase cycle to consume the materials to be consumed in the bill of materials, so that the target finished product is selected for material consumption in multiple dimensions such as material proportion, additional purchase cost and / or purchase cycle, thereby improving the material consumption efficiency.

[0093] This embodiment discloses a material consumption method, and its flow chart is as follows: Figure 3 As shown, including:

[0094] Step S31, obtaining a bill of materials, and determining the materials to be consumed in the bill of materials;

[0095] Step S32, determining a bill of materials of raw materials required for the finished products corresponding to the materials to be consumed, wherein the bill of materials of raw materials at least includes the materials to be consumed;

[0096] Step S33, determining the first type of materials and the second type of materials in the bill of materials of raw materials of the finished product, the first type of materials are materials in the bill of materials except the materials to be consumed, and the second type of materials are materials that are not included in the bill of materials and need to be purchased additionally;

[0097] Step S34: Based on the first type of materials and the second type of materials, at least determine the material proportion, additional procurement cost and / or procurement cycle in the raw material bill of materials of the finished product;

[0098] Step S35, determining a target finished product that consumes the to-be-consumed material from the finished products based at least on the material proportion, the additional procurement cost and / or the procurement cycle;

[0099] Step S36, determining the quantity of the target finished product based on the ratio of the quantity of the to-be-consumed materials in the bill of materials to the quantity of the to-be-consumed materials in the raw material bill of materials of the target finished product;

[0100] Step S37: Based on the quantity of the target finished product and the quantity of the first type of material in the bill of materials of the raw materials in the target finished product, determine the remaining materials and the quantity of the remaining materials in the bill of materials to update the bill of materials.

[0101] After selecting the best target finished product for consuming the materials to be consumed from multiple finished products based at least on material proportion, additional procurement cost and / or procurement cycle, the quantity of the target finished product needs to be determined in order to update the bill of materials.

[0102] The quantity of target finished products can be determined based on the quantity of materials to be consumed. Specifically, the quantity of target finished products can be determined based on the ratio of the quantity of materials to be consumed in the bill of materials to the quantity of materials to be consumed in the bill of materials of the raw materials of the target finished products.

[0103] That is, determine how much of the unconsumable material is in the bill of materials, and determine how much of the unconsumable material is needed to complete the target finished product for each target finished product. Based on this ratio, it can be determined how many target finished products can be completed with the unconsumable material in the bill of materials.

[0104] For example: there are 10 pieces of material A to be consumed in the bill of materials, and 2 pieces of A are needed to produce a target finished product B, then 10 / 2=5, and the material A to be consumed in the bill of materials can produce 5 target finished products B, so the quantity of target finished product B is 5.

[0105] After determining the target quantity of finished products, it is necessary to further determine the amount of remaining materials in the bill of materials after the target quantity of finished products is completed, that is, after all the consumable materials are consumed.

[0106] The raw material bill of materials of the target finished product includes: materials to be consumed, first type materials and second type materials.

[0107] If the first type of material is 0, then to complete the target finished product, only the to-be-consumed materials and the second type of materials that need to be purchased additionally are needed. Then, after the to-be-consumed materials are consumed, the remaining materials in the bill of materials are only the materials after the to-be-consumed materials are consumed, and other materials in the bill of materials are not consumed;

[0108] If the first type of material is greater than 0, to complete the target finished product, not only the to-be-consumed material is needed, but also the first type of material in the bill of materials and the second type of material that needs to be purchased additionally. When the to-be-consumed material is consumed, the first type of material will also be consumed. After the to-be-consumed material is consumed, the remaining material in the bill of materials may be the material after the to-be-consumed material and the first type of material are consumed, or it may be the material after the to-be-consumed material and part of the first type of material are consumed. Therefore, to determine the remaining material, it is necessary to determine how much of the first type of material will be consumed at the same time when the to-be-consumed material is consumed.

[0109] Specifically, based on the quantity of the target finished product and the quantity of the first type of material in the bill of materials of raw materials in the target finished product, the remaining materials in the bill of materials and the quantity of the remaining materials are determined.

[0110] Determine the quantity of the first type of material in the raw material bill of materials of the target finished product, that is, how much first type of material is needed to complete the target finished product. If there is one first type of material, then the quantity of the first type of material to be consumed to complete the target finished product is the quantity of the one first type of material; if there are multiple first type of materials, then the quantity of the first type of material to be consumed to complete the target finished product is the quantity of multiple first type of materials. It is necessary to determine the quantity of each first type of material separately in order to determine how much of each first type of material will be consumed after the materials to be consumed are consumed.

[0111] After determining the quantity of each type of material in the target finished product, multiply that quantity by the quantity of the target finished product. The product is the amount of each type of material that will be consumed when the material to be consumed is consumed. Subtract the product from the quantity of each type of material in the bill of materials to get the quantity of each type of material remaining in the bill of materials, and update the bill of materials based on that quantity.

[0112] For example: the BOM includes 10 unconsumed material A, the target finished product B, the unconsumed material A in the target finished product B is 2, the first type material C is 1, the BOM also includes the first type material C, and the first type material C in the BOM is 9. If the unconsumed material A is to be consumed, the target finished product B quantity that needs to be completed is 10 / 2=5. When the target finished product B quantity is 5, the unconsumed material A in the BOM is consumed. At this time, the first type material C quantity that will be consumed is 1*5=5, and the remaining first type material C in the BOM is 9-5=4. Based on this, the BOM is updated, and the updated BOM no longer includes the unconsumed material A, and the quantity of the first type material C is changed to 4.

[0113] The material consumption method disclosed in this embodiment obtains a bill of materials, determines the materials to be consumed in the bill of materials, determines the raw material bills required for the finished products corresponding to the materials to be consumed, the raw material bills at least include the materials to be consumed, determines the first type of materials and the second type of materials in the raw material bill of materials of the finished product, the first type of materials are the materials in the bill of materials other than the materials to be consumed, and the second type of materials are the materials that are not included in the bill of materials and need to be purchased additionally, based on the first type of materials and the second type of materials, at least the material proportion, additional purchase cost and / or purchase cycle in the raw material bill of materials of the finished product are determined, and at least based on the material proportion, additional purchase cost and / or purchase cycle, the target finished product that consumes the materials to be consumed is determined from the finished products. In this solution, when consuming materials, a target finished product is selected from multiple finished products based on parameters such as material proportion, additional purchase cost and / or purchase cycle to consume the materials to be consumed in the bill of materials, so that the target finished product is selected for material consumption in multiple dimensions such as material proportion, additional purchase cost and / or purchase cycle, thereby improving the material consumption efficiency.

[0114] This embodiment discloses a material consumption method, and its flow chart is as follows: Figure 4 As shown, including:

[0115] Step S41, obtaining a bill of materials, and determining the materials to be consumed in the bill of materials;

[0116] Step S42, determining a bill of materials of raw materials required for the finished products corresponding to the materials to be consumed, wherein the bill of materials of raw materials at least includes the materials to be consumed;

[0117] Step S43, determining the first type of materials and the second type of materials in the bill of materials of raw materials of the finished product, the first type of materials are materials in the bill of materials except the materials to be consumed, and the second type of materials are materials that are not included in the bill of materials and need to be purchased additionally;

[0118] Step S44: determining the proportion of materials in the raw material bill of materials based on the amount of the first type of materials and the materials to be consumed in the raw material bill of materials of the finished product and the total amount of materials in the raw material bill of materials;

[0119] Step S45: determining the additional purchase cost in the raw material bill of materials based on the quantity of the second type of materials in the raw material bill of materials of the finished product and the unit price of each second type of materials;

[0120] Step S46: Determine the procurement cycle in the raw material bill of materials based on the procurement cycle of each second type of material in the raw material bill of materials of the finished product;

[0121] Step S47: Determine a target finished product that consumes the to-be-consumed material from the finished products based at least on the material proportion, the additional procurement cost and / or the procurement cycle.

[0122] The comparison parameters for selecting a target finished product from a plurality of finished products include at least: material proportion, additional procurement cost and procurement cycle. Different comparison parameters have different proportions, that is, different weights are set for different comparison parameters.

[0123] The weights of material proportion, additional procurement cost and procurement cycle are determined respectively; the recommended consumption value of each finished product is determined based on the values ​​and weights of material proportion, additional procurement cost and procurement cycle; the target finished product used to consume the materials to be consumed is determined from all finished products based on the recommended consumption value of each finished product.

[0124] When setting different weights for different comparison parameters, it can be determined based on historical data or user needs. For example, if the user is more concerned about the types of materials in the bill of materials that can be consumed by each finished product, a larger weight is set for the material proportion, while a smaller weight is set for the additional procurement cost and the procurement cycle; if the user is more concerned about the cost required to consume the materials in the bill of materials, a larger weight is set for the additional procurement cost, while a smaller weight is set for the material proportion and the procurement cycle; if the user is more concerned about the time required to consume the materials in the bill of materials, a larger weight is set for the procurement cycle, while a smaller weight is set for the material proportion and the additional procurement cost.

[0125] After determining the weights of the material proportion, additional procurement cost and procurement cycle, multiply the determined material proportion value by the weight value of the material proportion, multiply the determined additional procurement cost value by the weight value of the additional procurement cost, and multiply the determined procurement cycle value by the weight value of the procurement cycle. Then, divide the sum of each product by the sum of each weight value to get the recommended consumption value.

[0126] Compare the consumption recommendations of different finished products to determine the best finished product and identify it as the target finished product.

[0127] Among them, the procurement cycle and additional procurement costs can be adjusted proportionally to obtain a score between 0 and 1, which is convenient for calculation.

[0128] It should be noted that the comparison parameters are not limited to material proportion, additional procurement cost and procurement cycle. When the comparison parameters include other parameters, different weights are set for the current comparison parameters and other comparison parameters based on historical data or user needs.

[0129] The material proportion can be the proportion of material quantity, the proportion of material usage, or the proportion of material price. Different material proportions are determined in different ways.

[0130] Specifically, based on the quantity of the first type of materials, the quantity of the materials to be consumed, and the total quantity of the materials in the raw material bill of materials, the proportion of the quantity of the materials in the raw material bill of materials is determined.

[0131] The ratio of the sum of the quantity of the first type of materials and the quantity of the materials to be consumed to the total quantity of the materials in the raw material bill of materials is determined as the material proportion in the raw material bill of materials.

[0132] For example, to complete a target finished product B, 2 unconsumable materials, 1 first type material and 7 second type materials are required. A total of 10 materials are required in the raw material bill of materials for the target finished product B. The proportion of the materials in the bill of materials is: (2+1) / (2+1+7)=0.3.

[0133] In addition, the proportion of material usage is as follows: based on the usage of the first type of material, the usage of the material to be consumed and the total material usage in the raw material bill of materials, the proportion of the material in the raw material bill of materials is determined.

[0134] The ratio of the sum of the usage of the first type of material and the usage of the material to be consumed to the total usage of the material in the raw material bill of materials is determined as the material proportion in the raw material bill of materials.

[0135] For example, to complete a target finished product B, 2g of pending materials, 1g of the first type of materials and 7g of the second type of materials are required. A total of 10g of materials are required in the bill of materials for the target finished product B. The proportion of the materials in the bill of materials is: (2+1) / (2+1+7)=0.3.

[0136] In addition, the proportion of material prices can be determined by: determining the proportion of materials in the raw material list based on the price of the first type of material used in the raw material list of the finished product, the price of the material to be consumed and the price of the total material usage in the raw material list.

[0137] The ratio of the sum of the price of the first type of material usage in the raw material bill of materials of the finished product and the price of the material usage to be consumed to the price of the total material usage in the raw material bill of materials is determined as the material proportion in the raw material bill of materials.

[0138] Of course, it can also be: the ratio of the sum of the price of the quantity of the first type of material in the raw material bill of materials of the finished product and the price of the quantity of the material to be consumed to the price of the total quantity of materials in the raw material bill of materials is determined as the material proportion in the raw material bill of materials.

[0139] Take the price of material usage as an example:

[0140] To complete one target finished product B, 2g of unconsumable materials, 1g of first-type materials, and 7g of second-type materials are needed, so a total of 10g of materials are needed in the raw material bill of materials for the target finished product B. Among them, the price of each gram of unconsumable materials is 3 yuan, the price of each gram of first-type materials is 1 yuan, and the price of each gram of second-type materials is 2 yuan, so the proportion of materials in the bill of materials is: (2*3+1*1) / (2*3+1*1+7*2)=1 / 3.

[0141] The amount of the first type of material may be 0 or not. Similarly, the amount of the second type of material may be 0 or not.

[0142] The material consumption method disclosed in this embodiment obtains a bill of materials, determines the materials to be consumed in the bill of materials, determines the raw material bills required for the finished products corresponding to the materials to be consumed, the raw material bills at least include the materials to be consumed, determines the first type of materials and the second type of materials in the raw material bill of materials of the finished product, the first type of materials are the materials in the bill of materials other than the materials to be consumed, and the second type of materials are the materials that are not included in the bill of materials and need to be purchased additionally, based on the first type of materials and the second type of materials, at least the material proportion, additional purchase cost and / or purchase cycle in the raw material bill of materials of the finished product are determined, and at least based on the material proportion, additional purchase cost and / or purchase cycle, the target finished product that consumes the materials to be consumed is determined from the finished products. In this solution, when consuming materials, a target finished product is selected from multiple finished products based on parameters such as material proportion, additional purchase cost and / or purchase cycle to consume the materials to be consumed in the bill of materials, so that the target finished product is selected for material consumption in multiple dimensions such as material proportion, additional purchase cost and / or purchase cycle, thereby improving the material consumption efficiency.

[0143] This embodiment discloses a material consumption system, and its structural diagram is as follows: Figure 5 As shown, including:

[0144] A first determining unit 51 , a second determining unit 52 , a third determining unit 53 , a fourth determining unit 54 and a fifth determining unit 55 .

[0145] The first determining unit 51 is used to obtain a bill of materials and determine the materials to be consumed in the bill of materials;

[0146] The second determining unit 52 is used to determine the raw material list required for the finished products corresponding to the materials to be consumed, and the raw material list at least includes the materials to be consumed;

[0147] The third determining unit 53 is used to determine the first type of materials and the second type of materials in the raw material bill of materials of the finished product, the first type of materials are materials in the bill of materials except the materials to be consumed, and the second type of materials are materials that are not included in the bill of materials and need to be purchased additionally;

[0148] The fourth determining unit 54 is used to determine at least a material proportion, an additional procurement cost and / or a procurement cycle in a raw material bill of materials of a finished product based on the first type of material and the second type of material;

[0149] The fifth determining unit 55 is used to determine a target finished product that consumes the to-be-consumed material from the finished products based at least on the material proportion, the additional procurement cost and / or the procurement cycle.

[0150] Further, the first determining unit is used for:

[0151] Obtain the slow-moving time and slow-moving amount of each material in the bill of materials; determine the priority consumption order of each material in the bill of materials based on the slow-moving time and slow-moving amount, and determine the material with a higher consumption priority than other materials as the material to be consumed.

[0152] Furthermore, the material consumption system disclosed in this embodiment may also include:

[0153] The updating unit is used to determine the quantity of target finished products based on the ratio of the quantity of materials to be consumed in the bill of materials to the quantity of materials to be consumed in the bill of materials of the raw materials of the target finished products; based on the quantity of target finished products and the quantity of the first type of materials in the bill of materials of the raw materials of the target finished products, determine the remaining materials in the bill of materials and the quantity of the remaining materials to update the bill of materials.

[0154] Furthermore, the fourth determining unit is used for:

[0155] Determine the proportion of materials in the raw material bill of materials based on the quantity of the first type of materials and the materials to be consumed in the raw material bill of materials of the finished product and the total amount of materials in the raw material bill of materials; and / or, determine the additional procurement cost in the raw material bill of materials based on the quantity of the second type of materials in the raw material bill of materials of the finished product and the unit price of each second type of material; and / or, determine the procurement cycle in the raw material bill of materials based on the procurement cycle of each second type of material in the raw material bill of materials of the finished product.

[0156] Furthermore, the fourth determining unit is used for:

[0157] Determine the proportion of materials in the raw materials bill based on the quantity of the first type of materials, the quantity of materials to be consumed, and the total quantity of materials in the raw materials bill; or, determine the proportion of materials in the raw materials bill based on the usage of the first type of materials, the usage of materials to be consumed, and the total usage of materials in the raw materials bill; or, determine the proportion of materials in the raw materials bill based on the price of the usage of the first type of materials in the raw materials bill of the finished product, the price of the usage of materials to be consumed, and the price of the total usage of materials in the raw materials bill.

[0158] Furthermore, the fourth determining unit is used for:

[0159] The ratio of the sum of the quantity of the first type of material and the quantity of the material to be consumed to the total quantity of the materials in the raw material bill of materials is determined as the material proportion in the raw material bill of materials; or, the ratio of the sum of the usage of the first type of material and the usage of the material to be consumed to the total usage of the materials in the raw material bill of materials is determined as the material proportion in the raw material bill of materials; or, the ratio of the sum of the price of the usage of the first type of material in the raw material bill of materials of the finished product and the price of the usage of the material to be consumed to the price of the total usage of the materials in the raw material bill of materials is determined as the material proportion in the raw material bill of materials.

[0160] Further, the fifth determining unit is used for:

[0161] Determine the weights of material proportion, additional procurement cost and procurement cycle respectively; determine the recommended consumption value of each finished product based on the values ​​and weights of material proportion, additional procurement cost and procurement cycle; determine the target finished product for consuming the materials to be consumed from all finished products based on the recommended consumption value of each finished product.

[0162] The material consumption system disclosed in this embodiment is implemented based on the material consumption method disclosed in the above embodiment, which will not be described in detail here.

[0163] The material consumption system disclosed in this embodiment obtains a bill of materials, determines the materials to be consumed in the bill of materials, determines the raw material bills required for the finished products corresponding to the materials to be consumed, the raw material bills at least include the materials to be consumed, determines the first type of materials and the second type of materials in the raw material bill of materials of the finished product, the first type of materials are the materials in the bill of materials other than the materials to be consumed, and the second type of materials are the materials that are not included in the bill of materials and need to be purchased additionally, based on the first type of materials and the second type of materials, at least the material proportion, additional purchase cost and / or purchase cycle in the raw material bill of materials of the finished product are determined, and at least based on the material proportion, additional purchase cost and / or purchase cycle, the target finished product that consumes the materials to be consumed is determined from the finished products. In this solution, when consuming materials, a target finished product is selected from multiple finished products based on parameters such as material proportion, additional purchase cost and / or purchase cycle to consume the materials to be consumed in the bill of materials, so that the target finished product is selected for material consumption in multiple dimensions such as material proportion, additional purchase cost and / or purchase cycle, thereby improving the material consumption efficiency.

[0164] This embodiment discloses an electronic device, and its structural diagram is as follows: Figure 6 As shown, including:

[0165] Processor 61 and memory 62.

[0166] The processor 61 is used to obtain a bill of materials, determine the materials to be consumed in the bill of materials; determine the raw material bills required for the finished products corresponding to the materials to be consumed, the raw material bills at least including the materials to be consumed; determine the first type of materials and the second type of materials in the raw material bill of materials of the finished product, the first type of materials are materials in the bill of materials other than the materials to be consumed, and the second type of materials are materials that are not included in the bill of materials and need to be purchased additionally; based on the first type of materials and the second type of materials, at least determine the material proportion, additional procurement cost and / or procurement cycle in the raw material bill of materials of the finished product; at least based on the material proportion, additional procurement cost and / or procurement cycle, determine the target finished product that consumes the materials to be consumed from the finished product;

[0167] The memory 62 is used to store the program for the processor to execute the above-mentioned processing process.

[0168] The electronic device disclosed in this embodiment is implemented based on the material consumption method disclosed in the above embodiments, which will not be described in detail here.

[0169] The electronic device disclosed in this embodiment obtains a bill of materials, determines the materials to be consumed in the bill of materials, determines the raw material bills required for the finished products corresponding to the materials to be consumed, the raw material bills at least include the materials to be consumed, determines the first type of materials and the second type of materials in the raw material bill of materials of the finished product, the first type of materials are materials other than the materials to be consumed in the bill of materials, and the second type of materials are materials that are not included in the bill of materials and need to be purchased additionally, based on the first type of materials and the second type of materials, at least the material proportion, additional purchase cost and / or purchase cycle in the raw material bill of materials of the finished product are determined, and at least based on the material proportion, additional purchase cost and / or purchase cycle, the target finished product that consumes the materials to be consumed is determined from the finished products. In this solution, when consuming materials, a target finished product is selected from multiple finished products based on parameters such as material proportion, additional purchase cost and / or purchase cycle to consume the materials to be consumed in the bill of materials, so that the target finished product is selected for material consumption in multiple dimensions such as material proportion, additional purchase cost and / or purchase cycle, thereby improving the material consumption efficiency.

[0170] The embodiment of the present application also provides a readable storage medium on which a computer program is stored. The computer program is loaded and executed by a processor to implement the various steps of the above-mentioned material consumption method. The specific implementation process can refer to the description of the corresponding part of the above-mentioned embodiment, which will not be repeated in this embodiment.

[0171] The present application also proposes a computer program product or a computer program, which includes a computer instruction stored in a computer-readable storage medium. The processor of the electronic device reads the computer instruction from the computer-readable storage medium, and the processor executes the computer instruction, so that the electronic device executes the method provided in various optional implementations of the material consumption method or the material consumption system. The specific implementation process can refer to the description of the corresponding embodiment above, and will not be repeated.

[0172] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.

[0173] Professionals may further appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition and steps of each example have been generally described in the above description according to function. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professionals and technicians may use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0174] The steps of the method or algorithm described in conjunction with the embodiments disclosed herein may be implemented directly using hardware, a software module executed by a processor, or a combination of the two. The software module may be placed in a random access memory (RAM), a memory, a read-only memory (ROM), an electrically programmable ROM, an electrically erasable programmable ROM, a register, a hard disk, a removable disk, a CD-ROM, or any other form of storage medium known in the art.

[0175] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A material consumption method, comprising: Obtain a bill of materials and determine the materials to be consumed in the bill of materials; Determine a bill of materials of raw materials required for finished products corresponding to the materials to be consumed, wherein the bill of materials of raw materials at least includes the materials to be consumed; Determine the first type of materials and the second type of materials in the raw material bill of materials of the finished product, wherein the first type of materials are materials in the bill of materials other than the materials to be consumed, and the second type of materials are materials that are not included in the bill of materials and need to be purchased additionally; Based on the first type of materials and the second type of materials, at least determine the material proportion, additional procurement cost and / or procurement cycle in the raw material bill of materials of the finished product; Determine, from the finished products, a target finished product that consumes the material to be consumed based at least on the material proportion, the additional procurement cost and / or the procurement cycle; Wherein, determining the materials to be consumed in the bill of materials includes: Obtain the idle time and idle amount of each material in the bill of materials; The priority consumption order of each material in the material list is determined based on the idle time and idle amount, and the material with a higher priority in consumption order than other materials is determined as the material to be consumed.

2. The method according to claim 1, wherein: Also includes: Determine the quantity of the target finished product based on the ratio of the quantity of the to-be-consumed materials in the bill of materials to the quantity of the to-be-consumed materials in the raw material bill of materials of the target finished product; Based on the quantity of the target finished product and the quantity of the first type of material in the raw material bill of materials in the target finished product, the remaining materials in the bill of materials and the quantity of the remaining materials are determined to update the bill of materials.

3. The method according to claim 1, wherein: Also includes: Determine the proportion of materials in the raw material bill of materials based on the amount of the first type of materials and the materials to be consumed in the raw material bill of materials of the finished product and the total amount of materials in the raw material bill of materials; and / or, Determine the additional purchase cost in the raw material bill of materials based on the quantity of the second type of materials in the raw material bill of materials of the finished product and the unit price of each of the second type of materials; and / or, Based on the procurement cycle of each second type of material in the raw material bill of materials of the finished product, the procurement cycle in the raw material bill of materials is determined.

4. The method according to claim 3, wherein: The determining of the proportion of materials in the raw material list based on the amount of the first type of materials and the materials to be consumed in the raw material list of the finished product and the total amount of materials in the raw material list includes: Determine the proportion of materials in the raw material list based on the quantity of the first type of materials, the quantity of the materials to be consumed, and the total quantity of materials in the raw material list; or, Determine the proportion of materials in the raw material list based on the usage of the first type of materials, the usage of the materials to be consumed, and the total usage of materials in the raw material list; or, The proportion of materials in the raw material bill is determined based on the price of the usage of the first type of materials in the raw material bill of materials of the finished product, the price of the usage of the material to be consumed and the price of the total usage of the materials in the raw material bill of materials.

5. The method according to claim 4, wherein: The determining of the proportion of materials in the raw material list based on the amount of the first type of materials and the materials to be consumed in the raw material list of the finished product and the total amount of materials in the raw material list includes: Determine the ratio of the sum of the quantity of the first type of material and the quantity of the to-be-consumed material to the total quantity of materials in the raw material bill of materials as the material proportion in the raw material bill of materials; or, Determine the ratio of the sum of the usage of the first type of material and the usage of the to-be-consumed material to the total usage of the materials in the raw material bill of materials as the material proportion in the raw material bill of materials; or, The ratio of the sum of the price of the first type of material used in the raw material bill of materials of the finished product and the price of the material to be consumed to the price of the total material usage in the raw material bill of materials is determined as the material proportion in the raw material bill of materials.

6. The method according to claim 1, wherein: The step of determining a target finished product that consumes the to-be-consumed material from the finished products based at least on the material proportion, the additional procurement cost and / or the procurement cycle includes: Determine the weights of material proportion, additional procurement cost and procurement cycle respectively; Determine the recommended consumption value of each finished product based on the values ​​and weights of the material proportion, additional procurement cost and procurement cycle; A target finished product for consuming the material to be consumed is determined from all finished products based on the consumption recommendation value of each finished product.

7. A material consumption system, comprising: A first determining unit, used to obtain a bill of materials and determine the materials to be consumed in the bill of materials; A second determining unit is used to determine a raw material bill of materials required for each of the finished products corresponding to the materials to be consumed, wherein the raw material bill of materials at least includes the materials to be consumed; A third determining unit is used to determine the first type of materials and the second type of materials in the raw material bill of materials of the finished product, wherein the first type of materials are materials in the bill of materials other than the to-be-consumed materials, and the second type of materials are materials that are not included in the bill of materials and need to be purchased additionally; a fourth determining unit, configured to determine at least a material proportion, an additional procurement cost and / or a procurement cycle in a raw material bill of materials of the finished product based on the first type of materials and the second type of materials; A fifth determining unit, configured to determine a target finished product that consumes the material to be consumed from the finished products based at least on the material proportion, the additional procurement cost and / or the procurement cycle; Wherein, the first determining unit is specifically used for: Obtain the idle time and idle amount of each material in the bill of materials; The priority consumption order of each material in the material list is determined based on the idle time and idle amount, and the material with a higher priority in consumption order than other materials is determined as the material to be consumed.

8. An electronic device, comprising: A processor, configured to obtain a bill of materials and determine materials to be consumed in the bill of materials; Determine a raw material bill of materials required for each of the finished products corresponding to the materials to be consumed, wherein the raw material bill of materials includes at least the materials to be consumed; determine a first type of material and a second type of material in the raw material bill of materials of the finished product, wherein the first type of material is the material in the bill of materials other than the materials to be consumed, and the second type of material is the material that is not included in the bill of materials and needs to be purchased additionally; based on the first type of material and the second type of material, at least determine the material proportion, additional purchase cost and / or purchase cycle in the raw material bill of materials of the finished product; based at least on the material proportion, additional purchase cost and / or purchase cycle, determine a target finished product that consumes the materials to be consumed from the finished products; wherein, determining the materials to be consumed in the bill of materials includes: obtaining the idle time and idle amount of each material in the bill of materials; determining the priority consumption order of each material in the bill of materials based on the idle time and idle amount, and determining the material with a higher priority in consumption order than other materials as the materials to be consumed; The memory is used to store the program for the processor to execute the above processing process.

9. A readable storage medium for storing at least one set of instruction sets; The instruction set is used to be called and at least execute the material consumption method according to any one of claims 1 to 6.

Citation Information

Patent Citations

  • Method for calculating material kitting according to sales, inventory and purchase information

    CN111461590A

  • Bill of materials generation method and electronic equipment

    CN111611284A