Optimal two-vector predictive current control method and device for PMSM based on simplified three-level

By simplifying the three-level PMSM optimal two-vector predictive current control method, it solves the problems of poor steady-state performance and large current fluctuations of traditional MPC in permanent magnet synchronous motors, achieves fast dynamic response and excellent steady-state performance, and simplifies During the calculation process, the motor output is close to a sine wave.

CN114696709BActive Publication Date: 2024-10-08CHINA UNIV OF MINING & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210478017.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-03
Publication Date
2024-10-08
Estimated Expiration
2042-05-03

AI Technical Summary

Technical Problem

Traditional model predictive control (MPC) has problems in permanent magnet synchronous motor control systems such as poor steady-state performance, large current fluctuations, sensitivity to changes in speed outer loop parameters, and poor anti-interference ability.

Method used

The optimal two-vector predictive current control method based on simplified three-level PMSM is used to obtain the reference voltage vector through a mathematical model, simplify the three-level voltage vector into a two-level voltage vector, and use the two-vector combination and duty cycle to calculate the resultant vector Set, select the optimal two-vector combination, and solve the duty cycle through deadbeat control method, eliminating the PI control module.

Benefits of technology

It reduces the weighting factor tuning work during stator current control, improves the dynamic response speed and steady-state performance of the motor, reduces the current ripple, significantly reduces the computational complexity, and the voltage output is close to a sine wave.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114696709B_ABST
    Figure CN114696709B_ABST
Patent Text Reader

Abstract

The present invention discloses a PMSM optimal two-vector predictive current control method and device based on a simplified three-level PMSM. The method comprises: obtaining a reference voltage vector #imgabs0# through a mathematical model of a permanent magnet synchronous motor to simplify a three-level voltage vector into a two-level voltage vector; obtaining a synthetic vector set through a two-vector combination and a duty cycle of the two-level voltage vector; converting the synthetic vector set into a corresponding dotted line l i , and calculate the end point of the two-level reference voltage vector to the corresponding straight line l i The distance δ i , the distance δ i The corresponding two-vector combination to be selected when the minimum is taken as the optimal two-vector combination; the l i The predictive control method of the present invention has a simple structure, small real-time calculation amount, and is easy to achieve fast motor response speed, small current ripple and distortion, low switching frequency, and excellent system dynamic and steady-state performance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of permanent magnet synchronous motor control, and in particular is a PMSM optimal two-vector predictive current control method and device based on a simplified three-level. Background Art

[0002] Permanent-Magnet Synchronous Motor (PMSM) has the advantages of small size, high efficiency, and strong overload capacity. It has received extensive attention and research in the fields of small and medium power, high precision, wide speed regulation range servo control systems and high-performance professional drives.

[0003] At present, there are many control technologies for PMSM, such as vector control, direct torque control, sliding mode control and fuzzy control. However, the above control methods all have certain shortcomings. For example, vector control has good steady-state operation capability, but its dynamic performance is easily affected by the current inner loop. Torque control has good robustness and dynamic response speed, but usually has large torque pulsation. Model predictive control (MPC) was born in the 1960s. With the rapid development of microcontrollers, its application in power electronics has become a research hotspot in recent years. MPC technology is applied to permanent magnet synchronous motor control systems, which can provide high-speed dynamic response and excellent steady-state performance. The application of MPC in PMSM control systems has important application value.

[0004] Traditional MPC usually uses a single vector to act on the entire control cycle, but the system's steady-state performance is poor and the current still fluctuates greatly. At the same time, the speed outer loop uses a PI controller, which has problems such as sensitive parameter changes, poor anti-interference ability, and the integral link is prone to oscillation. Summary of the invention

[0005] The purpose of the embodiments of the present invention is to provide a simplified three-level PMSM optimal two-vector predictive current control method and device to solve the above technical problems.

[0006] In a first aspect, the present invention provides a PMSM optimal two-vector predictive current control method based on a simplified three-level system, the method comprising:

[0007] The reference voltage vector is obtained by the mathematical model of the permanent magnet synchronous motor ;

[0008] Simplify the three-level voltage vector into a two-level voltage vector;

[0009] A synthetic vector set is obtained by combining two vectors of two-level voltage vectors and a duty cycle;

[0010] Convert the resultant vector set into the corresponding dashed line , and calculate the end point of the two-level reference voltage vector to the corresponding straight line Distance , the distance The corresponding two-vector combination to be selected when the minimum is obtained is taken as the optimal two-vector combination; It is the straight line formed by connecting the end points of the two vector combinations;

[0011] After obtaining the optimal two-vector combination, the duty cycle is solved. Preferably, the reference voltage vector is obtained by the mathematical model of the permanent magnet synchronous motor. , including:

[0012] The state equation of the stator current of the permanent magnet synchronous motor is obtained through the mathematical model of the permanent magnet synchronous motor;

[0013] The state equation of the stator current is combined with the three-level inverter to calculate the current vector and the voltage vector in combination with the switch state of the three-level inverter;

[0014] The current vector and voltage vector are passed through Clark and Park The coordinate transformation is transformed into the dq rotating coordinate system, and the mathematical model of the permanent magnet synchronous motor is used to predict the current vector at the next moment. , ;

[0015] The current vector at the next moment Equivalent conversion to reference voltage vector , ;

[0016] The reference voltage vector , After inverse Park transformation, we get Reference voltage vector in coordinate system .

[0017] Preferably, simplifying the three-level voltage vector into a two-level voltage vector includes:

[0018] The reference voltage vector is obtained by the mathematical model of the permanent magnet synchronous motor ;

[0019] The 27 voltage vector large sectors of the three-level inverter are divided into 6 identical quadrilateral vector small sectors;

[0020] Determine the reference voltage vector The quadrilateral vector small sector where it is located, and the reference voltage vector of the non-first quadrilateral vector small sector N1 , all converted into the first quadrilateral vector small sector N1;

[0021] The converted reference voltage vector Subtract the center vector to simplify the three-level voltage vector into a two-level voltage vector. .

[0022] Preferably, the small quadrilateral vector sector is a sector plane ranging from -30° to 30° within the large sector plane, and the included angle of each small quadrilateral vector sector is 60°.

[0023] Preferably, the reference voltage vector of the non-first sector Transform to the first sector, specifically:

[0024] , ,

[0025] In the formula, , is the reference voltage vector, is the reference voltage vector converted to the N1 sector, Respectively The weight on the axis, for The phase angle, is the bus voltage, for As a function of the sector, is the vector modulus value.

[0026] Preferably, a synthetic vector set is obtained by combining two vectors of two-level voltage vectors, including:

[0027] Divide the quadrilateral vector into small sectors and Six small sectors; OK The small sector where it is located;

[0028] exist The small sector where the first voltage vector and the second voltage vector are selected . The resultant vector is ,in ;

[0029] Different combinations of two candidate vectors are selected according to different small sectors to obtain their synthetic vectors and form a synthetic vector set.

[0030] Preferably, the synthetic vector set is converted into a corresponding straight line , the straight line ,in, is the duty cycle, are two vectors that can be selected in their respective small sectors; for:

[0031] .

[0032] Preferably, the end point of the reference voltage vector of the two levels is calculated to the corresponding straight line Distance , It varies according to the small sectors, specifically:

[0033] When the reference voltage vector is Sector for: ,

[0034] When the reference voltage vector is Sector for: ,

[0035] When the reference voltage vector is Sector for: .

[0036] Preferably, the method for solving the duty cycle is a deadbeat control method.

[0037] In a second aspect, an embodiment of the present application provides a PMSM optimal two-vector predictive current control device based on a simplified three-level, the device comprising:

[0038] Reference value module for deriving a reference voltage vector from a mathematical model of a permanent magnet synchronous motor ;

[0039] A simplification module, used for simplifying a three-level voltage vector into a two-level voltage vector;

[0040] A synthetic vector set module, used for obtaining a synthetic vector set through a two-vector combination and a duty cycle of a two-level voltage vector;

[0041] Optimal two-vector module, used to convert the synthetic vector set into the corresponding dotted line , and calculate the end point of the two-level reference voltage vector to the corresponding straight line Distance , the distance The corresponding two-vector combination to be selected when the minimum is obtained is taken as the optimal two-vector combination; It is the straight line formed by connecting the end points of the two vector combinations;

[0042] The calculation module is used to combine the optimal two vectors obtained by the optimal two vector module and solve the duty cycle d according to the deadbeat control method.

[0043] The technical solution provided by the embodiments of the present application may have the following beneficial effects:

[0044] (1) The stator current is used as the control object, which reduces the tuning work of the weighting factor when the torque is used as the control coefficient;

[0045] (2) Model predictive control is adopted without using PI control module, which saves the complex parameter setting of PI module; the selected dual vector can be an effective vector and a zero vector, the synthetic vector is the optimal one, and the direction and size of the synthetic vector can be adjusted;

[0046] (3) Using a three-level inverter, there are more voltage vectors, making the inverter output voltage closer to a sine wave;

[0047] (4) The current vector is equivalently converted into a voltage vector, and the three-level voltage vector is further simplified twice, which significantly reduces the complexity of the calculation;

[0048] (5) The method has a simple structure, small amount of calculation, and is easy to implement. The motor has a fast dynamic response speed, small stator current ripple, and excellent steady-state performance. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.

[0050] Figure 1 A flow chart of a PMSM optimal two-vector predictive current control method based on a simplified three-level system provided in one embodiment of the present invention;

[0051] Figure 2 It is the input voltage vector diagram of the three-level voltage inverter;

[0052] Figure 3 It is the sector division diagram of three-level voltage vector;

[0053] Figure 4 A simplified three-level N1 sector voltage vector diagram provided by an embodiment of the present disclosure;

[0054] Figure 5 A voltage vector division diagram of a small sector in the N1 sector provided in an embodiment of the present disclosure;

[0055] Figure 6 The embodiments of the present disclosure provide Schematic diagram of optimal sector combination;

[0056] Figure 7 The embodiments of the present disclosure provide Schematic diagram of optimal sector combination;

[0057] Figure 8 The embodiments of the present disclosure provide Schematic diagram of optimal sector combination;

[0058] Fig. 9 A schematic diagram of the structure of a simplified three-level PMSM optimal two-vector predictive current control device provided in one embodiment of the present invention;

[0059] Fig.10 It is a schematic diagram of the speed change curve after adopting the present invention;

[0060] Fig.11 It is a schematic diagram of the electromagnetic torque change curve after adopting the present invention. DETAILED DESCRIPTION

[0061] The following description and the drawings sufficiently illustrate specific embodiments of the invention to enable those skilled in the art to practice them.

[0062] It should be clear that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0063] The optional embodiments of the present disclosure are described in detail below with reference to the accompanying drawings.

[0064] like Figure 1 As shown in FIG. 1 , a PMSM optimal two-vector predictive current control method based on a simplified three-level PMSM is shown in FIG.

[0065] The specific steps include the following:

[0066] S100: Derivation of reference voltage vector from mathematical model of permanent magnet synchronous motor ; This step specifically includes:

[0067] S101: obtaining a state equation of a stator current of the permanent magnet synchronous motor through a mathematical model of the permanent magnet synchronous motor;

[0068] S102: Calculate a current vector and a voltage vector by combining a state equation of a stator current with a three-level inverter and a switch state of the three-level inverter;

[0069] S103: The current vector and the voltage vector are connected through Clark and Park The coordinate transformation is transformed into the dq rotating coordinate system, and the mathematical model of the permanent magnet synchronous motor is used to predict the current vector at the next moment. , ;

[0070] Specifically, the current vector at the next moment is:

[0071]

[0072]

[0073] is the current vector at time k, is the predicted current vector at time k+1, , , are the stator resistance and the stator winding dq axis inductance respectively, The present invention takes the stator current as the control object, which reduces the tuning work of the weighted factor when the torque is used as the control coefficient.

[0074] S104: The current vector at the next moment Equivalent conversion to reference voltage vector , ;

[0075] Specifically, the reference voltage vector is:

[0076] ,

[0077]

[0078] S105: Set the reference voltage vector , After inverse Park transformation, we get Reference voltage vector in coordinate system .

[0079] S200: Simplify the three-level voltage vector into a two-level voltage vector.

[0080] In the embodiment of the present application, the three-level voltage vector is simplified to a two-level voltage vector, specifically including:

[0081] S201: Divide 27 voltage vector large sectors of the three-level inverter into 6 identical quadrilateral vector small sectors;

[0082] S202: Determine a reference voltage vector The quadrilateral vector small sector where it is located, and the reference voltage vector of the non-first quadrilateral vector small sector N1 , all converted into the first quadrilateral vector small sector N1;

[0083] S203: Convert the converted reference voltage vector Subtract the center vector to simplify the three-level voltage vector into a two-level voltage vector. .

[0084] Specifically, Figure 2As shown, it is a voltage vector diagram of the input quantity of the three-level voltage inverter, wherein the voltage vector and the name correspondence table is shown in Table 1;

[0085] Table 1 Correspondence between voltage vector and name

[0086]

[0087] Step S201 : dividing 27 voltage vector large sectors of the three-level inverter into 6 identical quadrilateral vector small sectors.

[0088] Specifically, the small sector of the quadrilateral vector is a sector plane ranging from -30° to 30° in the large sector plane, and the included angle of each small sector of the quadrilateral vector is 60°.

[0089] Step S202, determine the reference voltage vector The quadrilateral vector small sector where it is located, and the reference voltage vector of the non-first quadrilateral vector small sector N1 , all converted into the first quadrilateral vector small sector N1.

[0090] Specifically: According to the reference voltage vector , determine the sector N where the reference voltage vector is located, Figure 3 The three-level voltage vector sector division diagram is shown in Figure 1. The voltage vector of the non-first sector Transformed to sector N1, we get:

[0091] , ,in is the reference voltage vector converted to the N1 sector, for The phase angle, is the bus voltage. for The function of the sector is given in Table 2.

[0092] Table 2 Relationship between initial angle and angle after conversion

[0093]

[0094] Step S203: convert the converted reference voltage vector Subtract the center vector to simplify the three-level voltage vector into a two-level voltage vector. .

[0095] Specifically, the converted reference voltage vector Subtract the center vector to get the two-level voltage vector , normalized, Figure 4To simplify the three-level N1 sector voltage vector diagram, the solid line represents the original voltage vector, and the dotted line represents the voltage vector after subtracting the center vector. Decompose into a center vector and a two-level voltage vector, that is, convert the three-level voltage vector into a two-level voltage vector, so as to achieve the purpose of simplification. Adopt model predictive control, do not use PI control module, save the complex parameter setting of PI module; the selected dual vector can be effective vector and zero vector, the synthetic vector is optimal, and the direction and size of the synthetic vector can be adjusted.

[0096] S300: Obtaining a synthetic vector set by combining two vectors of two-level voltage vectors and a duty cycle.

[0097] Includes: Divide the quadrilateral vector into small sectors and six small sectors;

[0098] Figure 5 This is the voltage vector division diagram of the small sector in the N1 sector, which is divided into and Six small sectors will The basic voltage vector of the inverter is normalized in the coordinate system to obtain a normalized basic voltage vector.

[0099] Sure The small sector where it is located;

[0100] exist The small sector where the first voltage vector and the second voltage vector are selected . The resultant vector is ,in ;

[0101] Different combinations of two candidate vectors are selected according to different small sectors to obtain their synthetic vectors and form a synthetic vector set.

[0102] S400: Convert the composite vector set into the corresponding dotted line , and calculate the reference voltage vector The end point to the corresponding straight line Distance , the distance The corresponding two-vector combination to be selected when the minimum is the most optimal two-vector combination; A straight line formed by connecting the end points of two vector combinations.

[0103] Convert the resultant vector set into the corresponding dashed line , specifically: the straight line ,in, is the duty cycle, are two vectors that can be selected in their respective small sectors; for:

[0104] .

[0105] Different fixed two-vector combinations are selected according to the small sectors S. Figure 6 , Figure 7 and Figure 8 They are Schematic diagram of optimal sector combination, Schematic diagram of optimal sector combination and Schematic diagram of the optimal sector combination.

[0106] It should be noted that after the above method is used, the optimization principle has been transformed into calculating the distance from the reference voltage vector of the small sector S to the dotted line. .

[0107] Calculate the reference voltage vector The end point to the corresponding straight line Distance , according to the different small sectors, select the corresponding two-vector combination when the distance is the smallest ,in It varies according to the small sectors, specifically:

[0108] When the reference voltage vector is Sector for: ,

[0109] When the reference voltage vector is Sector for: ,

[0110] When the reference voltage vector is Sector for: .

[0111] Table 3 The optimal voltage vector combination corresponding to the N1 sector after mapping to the original sector

[0112]

[0113] S400: After obtaining the optimal two-vector combination, the duty cycle is solved.

[0114] Specifically, the method for solving the duty cycle is a deadbeat control method.

[0115] The method provided by the present invention has a simple structure, a small amount of calculation, and is easy to implement. The dynamic response speed of the motor is fast, the stator current ripple is small, and the steady-state performance is excellent.

[0116] See also Fig. 9 , which shows a schematic diagram of the structure of a simplified three-level PMSM optimal two-vector predictive current control device provided by an exemplary embodiment of the present invention. The device includes:

[0117] Reference value module for deriving a reference voltage vector from a mathematical model of a permanent magnet synchronous motor ;

[0118] A simplification module, used for simplifying a three-level voltage vector into a two-level voltage vector;

[0119] A synthetic vector set module, used for obtaining a synthetic vector set through a two-vector combination and a duty cycle of a two-level voltage vector;

[0120] Optimal two-vector module, used to convert the synthetic vector set into the corresponding dotted line , and calculate the reference voltage vector The end point to the corresponding straight line Distance , the distance The corresponding two-vector combination to be selected when the minimum is obtained is taken as the optimal two-vector combination; It is the straight line formed by connecting the end points of the two vector combinations;

[0121] The calculation module is used to combine the optimal two vectors obtained by the optimal two vector module and solve the duty cycle d according to the deadbeat control method.

[0122] In the embodiment of the present application, the simplification module is used to simplify the three-level voltage vector into a two-level voltage vector. Simplifying into a two-level voltage vector specifically includes:

[0123] The 27 voltage vector large sectors of the three-level inverter are divided into 6 identical quadrilateral vector small sectors;

[0124] Determine the reference voltage vector The quadrilateral vector small sector where it is located, and the reference voltage vector of the non-first quadrilateral vector small sector N1 , all converted into the first quadrilateral vector small sector N1; the converted reference voltage vector Subtract the center vector to simplify the three-level voltage vector into a two-level voltage vector. .

[0125] Furthermore, the voltage vector of the non-first sector is Transformed to sector N1, we get:

[0126] , ,in is the reference voltage vector converted to the N1 sector, for The phase angle, is the bus voltage. for The function of the sector is given in Table 2.

[0127] The synthetic vector set module is used to obtain a synthetic vector set through the two-vector combination and duty cycle of the two-level voltage vector. Specifically includes:

[0128] Divide the quadrilateral vector into small sectors and six small sectors;

[0129] Sure The small sector where it is located;

[0130] exist The small sector where the first voltage vector and the second voltage vector are selected . The resultant vector is ,in ;

[0131] Different combinations of two candidate vectors are selected according to different small sectors to obtain their synthetic vectors and form a synthetic vector set.

[0132] Further, the synthetic vector set is converted into the corresponding straight line , the straight line ,in, is the duty cycle, are two vectors that can be selected in their respective small sectors;

[0133] .

[0134] Calculate the reference voltage vector The end point to the corresponding straight line Distance , according to the different small sectors, select the corresponding two-vector combination when the distance is the smallest ,in It varies according to the small sectors, specifically:

[0135] When the reference voltage vector is Sector for: ,

[0136] When the reference voltage vector is Sector for: ,

[0137] When the reference voltage vector is Sector for: .

[0138] Fig.10 It is a schematic diagram of the speed change curve of the present invention. It can be seen from the effect diagram that when the motor increases from 0 to the reference speed, there is no overshoot and the response speed is fast. When the load torque is suddenly increased, the motor quickly recovers to the given reference speed and has good dynamic performance. Fig.11 Schematic diagram of the electromagnetic torque variation curve of the present invention. It can be seen from the schematic diagram that the electromagnetic torque has good steady-state performance.

[0139] It should be noted that the PMSM optimal two-vector prediction current control device based on simplified three-level provided in the above embodiment only uses the division of the above functional modules as an example when executing the PMSM optimal two-vector prediction current control method based on simplified three-level. In practical applications, the above functional allocation can be completed by different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. In addition, the PMSM optimal two-vector prediction current control device based on simplified three-level provided in the above embodiment and the PMSM optimal two-vector prediction current control method based on simplified three-level belong to the same concept. The implementation process thereof is detailed in the PMSM optimal two-vector prediction current control method embodiment based on simplified three-level, which will not be repeated here.

[0140] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0141] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

Claims

1. An optimal two-vector predictive current control method for PMSM based on a simplified three-level system, characterized in that: The method comprises: The reference voltage vector is obtained by the mathematical model of the permanent magnet synchronous motor ; Simplify the three-level voltage vector into a two-level voltage vector; The method of simplifying the three-level voltage vector into a two-level voltage vector includes: The 27 voltage vector large sectors of the three-level inverter are divided into 6 identical quadrilateral vector small sectors; Determine the reference voltage vector Determine the reference voltage vector The quadrilateral vector small sector where it is located, and the reference voltage vector of the non-first quadrilateral vector small sector N1 , all converted into the first quadrilateral vector small sector N1; The converted reference voltage vector Subtract the center vector to simplify the three-level voltage vector into a two-level voltage vector ; A synthetic vector set is obtained by combining two vectors of two-level voltage vectors and a duty cycle; The synthetic vector set is obtained by combining two vectors of the two-level voltage vectors, including: Divide the quadrilateral vector into small sectors and six sub-sectors; Sure The sub-sector in which it is located; exist The sub-sector where the first voltage vector and the second voltage vector are selected . The resultant vector is ,in ; Select different combinations of two candidate vectors according to different sub-sectors, obtain their synthetic vectors, and form a synthetic vector set; Convert the resultant vector set into the corresponding straight line , and calculate the end point of the two-level reference voltage vector to the corresponding straight line Distance , the distance The corresponding two-vector combination to be selected when the minimum is the optimal two-vector combination; the straight line It is the straight line formed by connecting the end points of the two vector combinations; Calculate the endpoint of the two-level reference voltage vector to the corresponding straight line Distance , It varies according to the sub-sectors, specifically: When the reference voltage vector is Sector for: , When the reference voltage vector is Sector for: , When the reference voltage vector is Sector for: , After obtaining the optimal two-vector combination, solve the duty cycle.

2. The optimal two-vector predictive current control method for PMSM based on simplified three-level according to claim 1 is characterized in that: The reference voltage vector is obtained by the mathematical model of the permanent magnet synchronous motor. , including: The state equation of the stator current of the permanent magnet synchronous motor is obtained through the mathematical model of the permanent magnet synchronous motor; The state equation of the stator current is combined with the three-level inverter to calculate the current vector and the voltage vector in combination with the switch state of the three-level inverter; The current vector and voltage vector are passed through Clark and Park The coordinate transformation is transformed into the dq rotating coordinate system, and the mathematical model of the permanent magnet synchronous motor is used to predict the current vector at the next moment. , ; The current vector at the next moment Equivalent conversion to reference voltage vector 、 ; The reference voltage vector , After inverse Park transformation, we get Reference voltage vector in coordinate system .

3. The optimal two-vector predictive current control method for PMSM based on simplified three-level according to claim 2, characterized in that: The quadrilateral vector small sector is a sector plane ranging from -30° to 30° in the large sector plane, and the included angle of each quadrilateral vector small sector is 60°.

4. The optimal two-vector predictive current control method for PMSM based on simplified three-level according to claim 3, characterized in that: The reference voltage vector of the non-first sector Transform to the first sector, specifically: , , In the formula, , is the reference voltage vector, is the reference voltage vector converted to the N1 sector, Respectively The weight on the axis, for The phase angle, is the bus voltage, for As a function of the sector, is the vector modulus value.

5. The optimal two-vector predictive current control method for PMSM based on simplified three-level according to claim 4, characterized in that:Convert the resultant vector set into the corresponding straight line , the straight line ,in, is the duty cycle, are two vectors selectable in their respective sub-sectors; for: 。 6. The optimal two-vector predictive current control method for PMSM based on simplified three-level according to claim 1, characterized in that: The method for solving the duty cycle is a deadbeat control method.

7. Based on simplified three-level PMSM optimal two-vector prediction current control device, characterized in that: The device includes: Reference value module for deriving a reference voltage vector from a mathematical model of a permanent magnet synchronous motor ; A simplification module, used for simplifying a three-level voltage vector into a two-level voltage vector; The method of simplifying the three-level voltage vector into a two-level voltage vector includes: The 27 voltage vector large sectors of the three-level inverter are divided into 6 identical quadrilateral vector small sectors; Determine the reference voltage vector Determine the reference voltage vector The quadrilateral vector small sector where it is located, and the reference voltage vector of the non-first quadrilateral vector small sector N1 , all converted into the first quadrilateral vector small sector N1; The converted reference voltage vector Subtract the center vector to simplify the three-level voltage vector into a two-level voltage vector ; A synthetic vector set module, used for obtaining a synthetic vector set through a two-vector combination and a duty cycle of a two-level voltage vector; The synthetic vector set is obtained by combining two vectors of the two-level voltage vectors, including: Divide the quadrilateral vector into small sectors and six sub-sectors; Sure The sub-sector in which it is located; exist The sub-sector where the first voltage vector and the second voltage vector are selected . The resultant vector is ,in ; Select different combinations of two candidate vectors according to different sub-sectors, obtain their synthetic vectors, and form a synthetic vector set; Optimal two-vector module, used to convert a set of synthetic vectors into corresponding straight lines , and calculate the end point of the two-level reference voltage vector to the corresponding straight line Distance , the distance The corresponding two-vector combination to be selected when the minimum is the optimal two-vector combination; the straight line It is the straight line formed by connecting the end points of the two vector combinations; Calculate the endpoint of the two-level reference voltage vector to the corresponding straight line Distance , It varies according to the sub-sectors, specifically: When the reference voltage vector is Sector for: , When the reference voltage vector is Sector for: , When the reference voltage vector is Sector for: , The calculation module is used to combine the optimal two vectors obtained by the optimal two vector module and solve the duty cycle according to the deadbeat control method.