Power cable damage event early warning method, device, equipment and storage medium
By obtaining cable parameters, environmental information and real-time images, calculating cable usage rate and weather impact, identifying personnel behavior, and generating maintenance reminders, the problem of low monitoring efficiency of power cable external force damage is solved, and the efficiency and accuracy of power cable maintenance is improved.
Patent Information
- Application Number
- CN202210313038.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-28
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2042-03-28
AI Technical Summary
The existing technology cannot effectively monitor and early warning of external force damage of power cables, resulting in low fault handling efficiency and the inability to detect the cause of power cable failure in time.
By obtaining cable parameter information, environmental information and real-time image information, calculate cable usage, weather impact and personnel behavior, generate maintenance reminders, and realize early warning and preliminary fault judgment of power cable damage incidents.
It improves the efficiency of power cable maintenance work, reduces the workload of regular inspections, allows targeted inspections of key areas, and promptly prevents power cable failures.
Smart Images

Figure CN114707674B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power cable monitoring, and in particular to a power cable damage event early warning method, device, equipment and storage medium. Background Art
[0002] Power cables play a very important role in the operation of power systems. Power cables are buried in cable trenches under road surfaces, usually without any monitoring or protection measures. With the rapid expansion of urban construction, the situation of protecting underground power cables from external force damage is becoming increasingly severe, and safety accidents caused by damaged power cables are emerging one after another.
[0003] During the operation of the power system, it is necessary to regularly inspect the power cables to ensure that the situations that the system cannot directly monitor are discovered in time and handled accordingly to ensure the stable operation of the power system. At present, power system companies can monitor the fault problems of the power cable system. When external force damage occurs, it is necessary to go to the power cable system site to investigate the accident problem in order to determine the cause of the accident and then solve the fault problem.
[0004] The existing fault detection and processing method is that after a fault occurs in the power cable system, the staff can only go to the fault site for a comprehensive investigation to understand the cause of the fault, and the fault processing efficiency is low. In addition, the current power cable protection technology can only monitor the power cable system, but cannot judge the fault problem. Summary of the invention
[0005] The present invention provides a power cable damage event early warning method, device, equipment and storage medium to achieve timely prediction and discovery of power cable damage events and make preliminary fault judgments.
[0006] According to one aspect of the present invention, there is provided a method for early warning of power cable damage events, comprising:
[0007] Obtain cable parameter information, environmental information, and real-time environmental image information of the power cable that needs to be monitored;
[0008] Calculate the usage rate of the power cable based on the cable parameter information and generate service life information;
[0009] Calculate the probability of weather affecting the power cable based on the cable parameter information and the environmental information, and generate environmental impact information;
[0010] Identify the behavior of people around the power cable based on the real-time image information of the environment, and generate activity impact information;
[0011] A maintenance reminder is generated based on the usage period information, the environmental impact information, and the activity impact information.
[0012] Optionally, the cable parameter information includes the cable installation date and service life; the environmental information includes the current average rainfall, average wind speed and average snowfall; and the environmental real-time image information includes video information around the power cable.
[0013] Optionally, the calculating the usage rate of the power cable based on the cable parameter information to generate the service life information includes:
[0014] Calculate the usage date of the power cable based on the cable installation date and current time in the cable parameter information;
[0015] Calculating the ratio of the used date to the service life to obtain the utilization rate of the power cable;
[0016] Use period information is generated based on the use rate.
[0017] Optionally, the generating the usage period information based on the usage rate includes:
[0018] When the ratio is less than 1, generating first information that the service life of the power cable is normal;
[0019] When the ratio is greater than or equal to 1, generating second information that the service life of the power cable has expired;
[0020] The first information and the second information are integrated as the usage period information.
[0021] Optionally, the calculating the probability of weather impact on the power cable based on the cable parameter information and the environmental information to generate environmental impact information includes:
[0022] Calculate the estimated remaining life based on the cable installation date, service life and current time in the cable parameter information;
[0023] Calculating the weather impact amount based on the average rainfall, average wind speed, average snowfall and a preset coefficient in the environmental information;
[0024] The probability of weather affecting the power cable is calculated based on the remaining life and the weather impact amount, and environmental impact information is generated.
[0025] Optionally, the identifying the behavior of people around the power cable based on the real-time image information of the environment and generating the activity impact information includes:
[0026] Using a pre-trained image recognition model to recognize the real-time image information of the environment, determine whether there are large-scale equipment operating around the power cable, or whether there are people contacting the power cable;
[0027] Activity impact information is generated based on whether there is any large equipment operating around the power cable, or whether there are people contacting the power cable.
[0028] Optionally, after generating the maintenance reminder based on the service life information, the environmental impact information and the activity impact information, the method further includes:
[0029] Visualize maintenance reminders;
[0030] The available material information within a preset range of the corresponding position of the power cable is visually displayed.
[0031] According to another aspect of the present invention, there is provided a power cable damage event warning device, comprising:
[0032] An acquisition module is used to acquire cable parameter information, environmental information, and real-time environmental image information of the power cable to be monitored;
[0033] A period calculation module, used to calculate the usage rate of the power cable based on the cable parameter information and generate usage period information;
[0034] An environment calculation module, used to calculate the probability of weather affecting the power cable based on the cable parameter information and the environment information, and generate environment impact information;
[0035] An image calculation module, used to identify the behavior of people around the power cable based on the real-time image information of the environment and generate activity impact information;
[0036] A reminder module is used to generate a maintenance reminder based on the service life information, the environmental impact information and the activity impact information.
[0037] According to another aspect of the present invention, a power cable damage event warning device is provided, characterized in that the power cable damage event warning device comprises:
[0038] at least one processor; and
[0039] a memory communicatively connected to the at least one processor; wherein,
[0040] The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the power cable damage event warning method described in any embodiment.
[0041] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the power cable damage event warning method described in any embodiment when executed.
[0042] The technical solution of the embodiment of the present invention obtains cable parameter information, environmental information, and real-time environmental image information of the power cable that needs to be monitored, and then performs calculations and analysis based on the collected data to determine the current situation of the power cable. When a situation that may affect the normal operation of the power cable occurs, a reminder signal is promptly issued to remind maintenance personnel to perform maintenance on the power cable in a timely manner, thereby effectively avoiding the workload required for staff to conduct regular inspections and investigations. Staff can conduct targeted inspections on key areas, effectively improving the efficiency of power cable maintenance work.
[0043] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0045] Figure 1 A flowchart of a method for early warning of power cable damage events is provided in accordance with a first embodiment of the present invention;
[0046] Figure 2 Embodiment 2 of the present invention provides a structure of a power cable damage event warning device;
[0047] Figure 3 The present invention is a schematic diagram of the structure of a power cable damage event warning device for realizing a power cable damage event warning method according to an embodiment of the present invention. DETAILED DESCRIPTION
[0048] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0049] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0050] Embodiment 1
[0051] Figure 1 A flowchart of a power cable damage event warning method is provided for the first embodiment of the present invention. This embodiment is applicable to the situation of monitoring and warning the damage of power cables. The method can be executed by a power cable damage event warning device. The power cable damage event warning device can be implemented in the form of hardware and / or software. The power cable damage event warning device can be configured in a computer device, such as a server, a workstation, a personal computer, etc. Figure 1 As shown, the method comprises the following steps:
[0052] S110, obtaining cable parameter information, environmental information, and real-time environmental image information of the power cable to be monitored.
[0053] Power cables are used to transmit and distribute electric energy. They are commonly used in urban underground power grids, power station lead-out lines, internal power supply for industrial and mining enterprises, and underwater transmission lines across rivers and seas. In power lines, the proportion of cables is gradually increasing. Cables may be damaged by external forces during storage, transportation, laying, and operation. In particular, directly buried cables that have been in operation are easily damaged during ground construction of other projects. Such accidents often account for 50% of cable accidents. In order to avoid such accidents, in addition to strengthening the work quality of cable storage, transportation, laying, etc., it is more important to strictly implement the groundbreaking system.
[0054] The cable parameter information of the power cable may include the name of the cable, nameplate information, cable installation location, overall length, overhead length, buried length, installation time, service life, etc. The environmental information of the power cable may include the historical environmental information and current environmental information of the power cable installation location, which may include the average rainfall, average wind speed, average snowfall, etc. The real-time image information of the power cable environment may include image information or video information obtained regularly near the power cable installation location, etc. The video information or image information may be obtained from surveillance cameras installed by the municipality, etc.
[0055] S120: Calculate the usage rate of the power cable based on the cable parameter information and generate service life information.
[0056] In an embodiment of the present invention, the cable parameter information may include the name of the cable, nameplate information, cable installation location, overall length, overhead length, buried length, installation time, service life and other information. Based on the cable parameter information of the power cable and the time it has been in operation, the usage of the power cable can be calculated, for example, the remaining life of the power cable can be calculated as the service life information.
[0057] In a specific implementation, the environmental influencing factors of the location where the power cable is installed can also be collected, and the service life of the power cable can be further calibrated by using the environmental influencing factors to calculate the actual service life of the power cable at the location where it is installed, and then calculate the utilization rate of the power cable.
[0058] Exemplarily, S120 may include the following steps:
[0059] S121. Calculate the usage date of the power cable based on the cable installation date and the current time in the cable parameter information.
[0060] In a specific implementation, the cable installation date is subtracted from the current time to calculate the time length from the cable installation date to the current time, which is the used date in the embodiment of the present invention. In the embodiment of the present invention, the used date is calculated using "day" as the time length unit.
[0061] S122. Calculate the ratio of the used date to the used years to obtain the utilization rate of the power cable.
[0062] In the embodiment of the present invention, the ratio of the used date to the used age is obtained by dividing the used age by the used date, and the ratio is used as the usage rate of the power cable.
[0063] Optionally, in a specific example, a certain number of days may be added to the used date, and then the ratio of the used date to the service life may be calculated to obtain the use rate of the power cable. For example, 60 days may be added to the used date. By adding a certain number of days to the used date obtained by the original calculation, the used date may be appropriately amplified so that the predicted service life arrives earlier than the actual service life, and prompt information may be issued in subsequent steps to enable maintenance personnel to perform maintenance and repair operations on the power cable in advance, so as to avoid performing maintenance and repair operations on the power cable only after the service life of the power cable expires. This may provide a certain response and operation time for maintenance and repair behaviors, and reduce the impact on the normal operation of the power cable.
[0064] S123. Generate usage period information based on the usage rate.
[0065] In the embodiment of the present invention, the above-mentioned calculation of the usage rate of the power cable represents the usage of the power cable and whether the power cable has reached the expected service life. In this step, the corresponding service life information is generated based on the usage rate to assist maintenance personnel in judging the operation of the power cable.
[0066] Furthermore, the size of the calculated ratio (usage rate) is determined, and then preset information is generated.
[0067] Optionally, when the ratio is less than 1, first information indicating that the service life of the power cable is normal is generated; when the ratio is greater than or equal to 1, second information indicating that the service life of the power cable has expired is generated. Finally, the first information and the second information are integrated as the service life information.
[0068] When the ratio is equal to 1, it indicates that the used date is equal to the service life, that is, the service life of the power cable has reached the set service life, and the possibility of failure of the power cable during operation has increased significantly. In an embodiment of the present invention, when the ratio is less than 1, it indicates that the power cable has not yet reached the end of its service life and can still be used normally. The first information generated may be that the power cable has not yet reached the end of its service life. When the ratio is greater than or equal to 1, it indicates that the service life of the power cable has reached the end of its service life. The corresponding second information may be that the power cable has reached the end of its service life and maintenance should be arranged in time.
[0069] In actual implementation, the content of the first information and the second information can be customized. The above examples are only for demonstration purposes, and specific settings can be made based on actual needs.
[0070] S130: Calculate the probability of weather affecting the power cable based on the cable parameter information and environmental information, and generate environmental impact information.
[0071] In actual implementation, the operation of power cables is affected by environmental factors, such as typhoons, rain, snow and other weather conditions. When the wind force reaches a certain level, the outdoor overhead power cables will be greatly affected and may be broken. When the rainfall reaches a certain level, it may also affect the safe operation of the power cables. In snowy weather, when the rainfall reaches a certain amount, it may also affect the safe operation of the power cables.
[0072] In the embodiment of the present invention, environmental information around the power cable is collected, and then the impact of weather on the power cable is calculated by conversion to obtain the impact probability, and then environmental impact information is generated based on the impact probability.
[0073] Optionally, the probability of weather affecting the power cable can be calculated based on the cable parameter information and the environmental information by the following steps:
[0074] S131. Calculate the estimated remaining life based on the cable installation date, service life and current time in the cable parameter information.
[0075] The calculation of the remaining life in this step is similar to the aforementioned step 121, which is to obtain the length of time the power cable has been in operation by subtracting the cable installation date from the current time, and then to obtain the estimated remaining life by subtracting the length of time in operation from the service life.
[0076] S132. Calculate the weather impact based on the average rainfall, average wind speed, average snowfall and preset coefficients in the environmental information.
[0077] In a specific implementation, the stress conditions of the power cable in different environments can be collected, and then the coefficients can be calculated, and the stress of the power cable in different weather conditions can be calculated through the coefficients.
[0078] Exemplarily, the impact probability is calculated using the following formula:
[0079] A=[T-(tT 1 +60)]*(L*α)*(V*β)*(S*γ)
[0080] Where A is the impact probability, T is the service life, t is the current time, T 1 is the cable installation date, L is the average rainfall, V is the average wind speed, S is the average snowfall, and α, β, and γ are preset coefficients.
[0081] When the average rainfall, average wind speed, and average snowfall are zero, they are not included in the calculation.
[0082] S133. Calculate the probability of weather affecting the power cable based on the remaining life and weather impact, and generate environmental impact information.
[0083] When the calculated result is greater than 1, it means that the force on the power cable has reached its limit and the power cable may break, requiring timely maintenance.
[0084] S140: Identify the behavior of people around the power cable based on the real-time image information of the environment, and generate activity impact information.
[0085] In the specific implementation, a pre-trained image recognition model is used to identify the real-time image information of the environment to determine whether there are large-scale equipment operating around the power cables or whether people are in contact with the power cables.
[0086] Generate activity impact information based on whether there is large equipment operating around the power cables or whether people are in contact with the power cables.
[0087] S150: Generate a maintenance reminder based on the service life information, the environmental impact information, and the activity impact information.
[0088] In the aforementioned step, a corresponding information judgment is made on the situation of the power cable. In this step, it is necessary to generate corresponding reminder information based on the aforementioned information.
[0089] The technical solution of the embodiment of the present invention obtains cable parameter information, environmental information, and real-time environmental image information of the power cable that needs to be monitored, and then performs calculations and analysis based on the collected data to determine the current situation of the power cable. When a situation that may affect the normal operation of the power cable occurs, a reminder signal is promptly issued to remind maintenance personnel to perform maintenance on the power cable in a timely manner, thereby effectively avoiding the workload required for staff to conduct regular inspections and investigations. Staff can conduct targeted inspections on key areas, effectively improving the efficiency of power cable maintenance work.
[0090] In the embodiment of the present invention, the method may further include:
[0091] Visualize maintenance reminders;
[0092] The available material information within the preset range of the corresponding position of the power cable is visualized.
[0093] In a specific implementation, the inspection reminder information can be displayed visually to the maintenance personnel, for example, on the system interface, or by generating information push and pushing it to the mobile terminal or personal device held by the staff. Based on the information calculated in the above steps, the cause of the power cable failure can be roughly determined. In this step, the information of the materials that may be used in the corresponding area of the power cable can also be displayed visually, which is convenient for the maintenance personnel to call for the materials.
[0094] Embodiment 2
[0095] Figure 2 This is a schematic diagram of the structure of a power cable damage event warning device provided in Embodiment 2 of the present invention. Figure 2 As shown, the device includes an acquisition module 21, a deadline calculation module 22, an environment calculation module 23, an image calculation module 24, and a reminder module 25. Among them:
[0096] An acquisition module 21 is used to acquire cable parameter information, environmental information, and real-time environmental image information of a power cable to be monitored;
[0097] A period calculation module 22, used to calculate the usage rate of the power cable based on the cable parameter information and generate the usage period information;
[0098] An environment calculation module 23 is used to calculate the probability of weather affecting the power cable based on the cable parameter information and the environment information, and generate environment impact information;
[0099] An image calculation module 24 is used to identify the behavior of people around the power cable based on the real-time image information of the environment and generate activity impact information;
[0100] The reminder module 25 is used to generate a maintenance reminder based on the service life information, the environmental impact information and the activity impact information.
[0101] In an embodiment of the present invention, the cable parameter information includes the cable installation date and service life; the environmental information includes the current average rainfall, average wind speed and average snowfall; and the environmental real-time image information includes video information around the power cable.
[0102] Optionally, the deadline calculation module 22 includes:
[0103] A date calculation unit, used to calculate the usage date of the power cable based on the cable installation date and the current time in the cable parameter information;
[0104] A usage rate calculation unit, used to calculate the ratio of the used date to the service life, and obtain the usage rate of the power cable;
[0105] The deadline generating unit is used to generate the usage deadline information based on the usage rate.
[0106] The deadline information generating unit includes:
[0107] A first judgment subunit, configured to generate first information indicating that the service life of the power cable is normal when the ratio is less than 1;
[0108] A second judgment subunit is used to generate second information that the service life of the power cable has expired when the ratio is greater than or equal to 1;
[0109] The expiration information generating subunit is used to integrate the first information and the second information as expiration information.
[0110] Optionally, the environment calculation module 23 includes:
[0111] A remaining life calculation unit, used to calculate the estimated remaining life based on the cable installation date, service life and current time in the cable parameter information;
[0112] A weather impact calculation unit, used to calculate the weather impact based on the average rainfall, average wind speed, average snowfall and a preset coefficient in the environmental information;
[0113] The unit is used to calculate the probability of weather impact on the power cable based on the remaining life and the weather impact amount, and generate environmental impact information.
[0114] Optionally, the image calculation module 24 includes:
[0115] The recognition unit is used to recognize the real-time image information of the environment using a pre-trained image recognition model to determine whether there are large-scale equipment operating around the power cable or whether there are people touching the power cable;
[0116] The activity impact generation unit is used to generate activity impact information based on whether there are large-scale equipment operating around the power cables or whether people are in contact with the power cables.
[0117] Optionally, also include:
[0118] A first visualization module is used to visualize the maintenance reminder;
[0119] The second visualization module is used to visualize the available material information within a preset range corresponding to the position of the power cable.
[0120] The power cable damage event warning device provided in the embodiment of the present invention can execute the power cable damage event warning method provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.
[0121] Embodiment 3
[0122] Figure 3A schematic diagram of a power cable damage event warning device 10 that can be used to implement an embodiment of the present invention is shown. The power cable damage event warning device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The power cable damage event warning device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.
[0123] like Figure 3 As shown, the power cable damage event warning device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the power cable damage event warning device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.
[0124] Multiple components in the power cable damage event warning device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the power cable damage event warning device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0125] The processor 11 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 11 executes the various methods and processes described above, such as a power cable damage event early warning method.
[0126] In some embodiments, the power cable damage event early warning method can be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program can be loaded and / or installed on the power cable damage event early warning device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the power cable damage event early warning method described above can be performed. Alternatively, in other embodiments, the processor 11 can be configured to execute the power cable damage event early warning method in any other appropriate manner (for example, by means of firmware).
[0127] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0128] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.
[0129] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in combination with an instruction execution system, device or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0130] In order to provide interaction with the user, the systems and techniques described herein can be implemented on a power cable damage event warning device, which has: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or a trackball), through which the user can provide input to the power cable damage event warning device. Other types of devices can also be used to provide interaction with the user; for example, the feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and the input from the user can be received in any form (including acoustic input, voice input, or tactile input).
[0131] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.
[0132] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.
[0133] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.
[0134] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for early warning of power cable damage events, characterized in that: include: Obtain cable parameter information, environmental information, and real-time environmental image information of the power cable that needs to be monitored; Calculate the usage rate of the power cable based on the cable parameter information and generate service life information; Calculate the probability of weather affecting the power cable based on the cable parameter information and the environmental information, and generate environmental impact information; Identify the behavior of people around the power cable based on the real-time image information of the environment, and generate activity impact information; generating a maintenance reminder based on the service life information, the environmental impact information, and the activity impact information; The step of calculating the usage rate of the power cable based on the cable parameter information and generating the usage period information includes: Calculate the usage date of the power cable based on the cable installation date and current time in the cable parameter information; Add a certain number of days to the used date, and then calculate the ratio of the used date to the service life to obtain the use rate of the power cable; generating usage period information based on the usage rate; The calculating the probability of weather affecting the power cable based on the cable parameter information and the environmental information to generate environmental impact information includes: Calculate the estimated remaining life based on the cable installation date, service life and current time in the cable parameter information; Calculating the weather impact amount based on the average rainfall, average wind speed, average snowfall and a preset coefficient in the environmental information; Calculate the probability of weather affecting the power cable based on the remaining life and the weather impact amount, and generate environmental impact information; The calculation of weather influence comprises: collecting the stress conditions of the power cable under different environments to calculate the coefficients; calculating the stress of the power cable under different weather conditions by using the obtained coefficients; Wherein, after generating the maintenance reminder based on the service life information, the environmental impact information and the activity impact information, the method further includes: Visualize maintenance reminders; The available material information within a preset range of the corresponding position of the power cable is visually displayed.
2. The power cable damage event early warning method according to claim 1, characterized in that: The cable parameter information includes the cable installation date and service life; the environmental information includes the current average rainfall, average wind speed and average snowfall; and the environmental real-time image information includes video information around the power cable.
3. The power cable damage event early warning method according to claim 1, characterized in that: The generating of the usage period information based on the usage rate includes: When the ratio is less than 1, generating first information that the service life of the power cable is normal; When the ratio is greater than or equal to 1, generating second information that the service life of the power cable has expired; The first information and the second information are integrated as the usage period information.
4. The power cable damage event early warning method according to claim 1, characterized in that: The identifying of the human behavior around the power cable based on the real-time image information of the environment and generating the activity impact information includes: Using a pre-trained image recognition model to recognize the real-time image information of the environment, determine whether there are large-scale equipment operating around the power cable, or whether there are people contacting the power cable; Activity impact information is generated based on whether there is any large equipment operating around the power cable, or whether there are people contacting the power cable.
5. A power cable damage event warning device, characterized in that: include: An acquisition module is used to acquire cable parameter information, environmental information, and real-time environmental image information of the power cable to be monitored; A period calculation module, used to calculate the usage rate of the power cable based on the cable parameter information and generate usage period information; An environment calculation module, used to calculate the probability of weather affecting the power cable based on the cable parameter information and the environment information, and generate environment impact information; An image calculation module, used to identify the behavior of people around the power cable based on the real-time image information of the environment and generate activity impact information; A reminder module, used for generating a maintenance reminder based on the service life information, the environmental impact information and the activity impact information; Wherein, the deadline calculation module includes: A date calculation unit, used to calculate the usage date of the power cable based on the cable installation date and the current time in the cable parameter information; A usage rate calculation unit, used to add a certain number of days to the used date, and then calculate the ratio of the used date to the service life to obtain the usage rate of the power cable; A deadline generating unit, used for generating usage deadline information based on the usage rate; Wherein, the environment calculation module includes: A remaining life calculation unit, used to calculate the estimated remaining life based on the cable installation date, service life and current time in the cable parameter information; A weather impact calculation unit, used to calculate the weather impact based on the average rainfall, average wind speed, average snowfall and a preset coefficient in the environmental information; An environmental impact information generating unit, used to calculate the probability of weather impact on the power cable based on the remaining life and the weather impact amount, and generate environmental impact information; The weather influence calculation unit is specifically used to collect the stress conditions of the power cable under different environments and calculate the coefficients; the stress of the power cable under different weather conditions is calculated by using the obtained coefficients; Wherein, the device further comprises: A first visualization module is used to visualize the maintenance reminder; The second visualization module is used to visualize the available material information within a preset range corresponding to the position of the power cable.
6. A power cable damage event warning device, characterized in that: The power cable damage event early warning device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the power cable damage event early warning method according to any one of claims 1 to 4.
7. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the power cable damage event warning method according to any one of claims 1 to 4 when executed.