5G base station site selection method and device
By calculating the base station load utilization rate and core network load reduction rate in the user distribution data, constructing an objective function and using a greedy algorithm to determine the location of 5G base stations, the problem of high 5G base station deployment costs is solved, and the cost is limited. optimal deployment and efficiency improvement.
Patent Information
- Application Number
- CN202210544615.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-19
- Publication Date
- 2024-10-25
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing 3G and 4G base station site selection methods are not effectively applicable to 5G base stations, making it difficult to select the optimal deployment location under cost constraints, and the high cost problem of 5G base stations has not been effectively solved.
By obtaining the user distribution data of the area to be deployed, the base station load utilization rate and the core network load reduction rate are calculated, an objective function is constructed to maximize these indicators, and a greedy algorithm is used to solve the problem to determine the optimal base station location location.
When operators' costs are limited, it improves the efficiency and investment returns of 5G base station deployment, reduces operating costs, and is suitable for the characteristics and application scenarios of 5G base stations.
Smart Images

Figure CN114793340B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of big data technology, and in particular to a 5G base station site selection method and device. Background Art
[0002] This section is intended to provide a background or context to the embodiments of the invention recited in the claims. No admission is made that the description herein is prior art by inclusion in this section.
[0003] When investing in building new base stations, the first factor that operators consider is investment and return. Under previous communication protocols, base stations are built in areas with high population density and large numbers, while improving coverage and reducing blind spots.
[0004] The coverage range of 5G base stations is small, and achieving full coverage will greatly increase the investment in base station construction; 5G communication introduces the mobile edge computing model, and equips 5G base stations with edge servers that support computing and storage, so the cost of 5G base stations is higher.
[0005] The existing base station site selection methods are mostly 3G and 4G base station site selection plans, which do not take into account the characteristics and application scenarios of 5G communications and are not suitable for 5G base station site selection. Summary of the invention
[0006] An embodiment of the present invention provides a 5G base station site selection method, which is used to select an optimal location for 5G base station deployment when the operator's cost is limited. The method includes:
[0007] Obtaining user distribution data of the area to be deployed, wherein the user distribution data includes the number of users and the amount of user data;
[0008] Determine the base station load utilization rate at each candidate point in the to-be-deployed area according to the user distribution data, where the base station load utilization rate is the proportion of time during which the base station load exceeds a threshold within a first set time period;
[0009] Determine, according to the user distribution data, a core network load reduction rate corresponding to each candidate point location base station in the to-be-deployed area, wherein the core network load reduction rate is a ratio of a user data volume of a single candidate point location base station in the to-be-deployed area to a user data volume of all candidate point location base stations within a second set time period;
[0010] Constructing an objective function, wherein the objective function is to maximize the base station load utilization rate and the core network load reduction rate in the area to be deployed;
[0011] By solving the objective function, the site selection of the base station in the area to be deployed is determined.
[0012] An embodiment of the present invention provides a 5G base station site selection device, which is used to select an optimal location for 5G base station deployment when the operator's cost is limited. The device includes:
[0013] A data acquisition module, used to acquire user distribution data of the area to be deployed, wherein the user distribution data includes the number of users and the amount of user data;
[0014] A base station load utilization module, used to determine the base station load utilization of each candidate point in the deployment area according to the user distribution data, wherein the base station load utilization is the proportion of the time period during which the base station load exceeds the threshold within the first set time period;
[0015] A core network load reduction rate module, used to determine the core network load reduction rate corresponding to each candidate point location base station in the to-be-deployed area according to the user distribution data, wherein the core network load reduction rate is the ratio of the user data volume of a single candidate point location base station in the to-be-deployed area to the user data volume of all candidate point location base stations within a second set time period;
[0016] An objective function construction module, used to construct an objective function, wherein the objective function is to maximize the base station load utilization rate and the core network load reduction rate in the area to be deployed;
[0017] The base station site selection module determines the base station site selection in the area to be deployed by solving the objective function.
[0018] An embodiment of the present invention also provides a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the above-mentioned 5G base station site selection method when executing the computer program.
[0019] An embodiment of the present invention also provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the above-mentioned 5G base station site selection method is implemented.
[0020] An embodiment of the present invention also provides a computer program product, which includes a computer program, and when the computer program is executed by a processor, the above-mentioned 5G base station site selection method is implemented.
[0021] Compared with the technical solution of 5G base station site selection in the prior art, the embodiment of the present invention obtains user distribution data of the area to be deployed; according to the user distribution data, the base station load utilization rate of each candidate point position in the area to be deployed and the core network load reduction rate corresponding to the base station at each candidate point position in the area to be deployed are determined, so that the user distribution in the area to be deployed is analyzed and the relevant indicators of base station deployment are defined, and at the same time, considering that 5G communication introduces a mobile edge computing mode, the most reasonable deployment position is selected according to the characteristics of the edge computing mode and the usage of the edge server, so as to improve efficiency and reduce cost; construct an objective function, and determine the base station site selection in the area to be deployed by solving the objective function, and describe the base station site selection problem as a mathematical problem, which is more intuitive, direct and accurate, and convenient for calculating and solving to determine the base station site selection in the area to be deployed, thereby improving investment returns. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the prior art descriptions. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. In the drawings:
[0023] Figure 1 Schematic diagram of the process of 5G base station site selection method in an embodiment of the present invention;
[0024] Figure 2 This is a specific example diagram of the 5G base station site selection method in an embodiment of the present invention;
[0025] Figure 3 This is a structural example diagram of a 5G base station site selection device in an embodiment of the present invention;
[0026] Figure 4 This is a specific example diagram of a 5G base station site selection device in an embodiment of the present invention;
[0027] Figure 5 A schematic diagram of a computer device provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0028] To make the purpose, technical solution and advantages of the embodiments of the present invention more clear, the embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings. Here, the exemplary embodiments of the present invention and their descriptions are used to explain the present invention, but are not intended to limit the present invention.
[0029] After analysis, the inventors found that since 5G base stations integrate edge computing servers with computing and storage characteristics, when deploying 5G base stations, it is not enough to only consider coverage issues, but also comprehensive factors such as user distribution and characteristics of the area to be deployed. Traditional location analysis results cannot provide a guiding basis for the site selection of 5G base stations. For this scenario, the inventors proposed a new 5G base station site selection method based on the spatiotemporal distribution characteristics of group users. This site selection method takes into account the 5G base station site selection scenario of the region. When the operator's cost is limited, that is, when the number of base stations deployed by the operator is limited, it is necessary to select the optimal location for deployment. On the premise that the user distribution in the region has been analyzed, the final deployment location is obtained through indicator analysis. Based on this, a 5G base station site selection method is provided in an embodiment of the present invention.
[0030] Figure 1 The following is a flow chart of a 5G base station site selection method according to an embodiment of the present invention. The method comprises the following steps:
[0031] Step 101: Obtain user distribution data of the area to be deployed, where the user distribution data includes the number of users and the amount of user data;
[0032] Step 102: Determine the base station load utilization rate at each candidate point in the deployment area according to the user distribution data, where the base station load utilization rate is the proportion of the time period during which the base station load exceeds the threshold within the first set time period;
[0033] Step 103: Determine the core network load reduction rate corresponding to each candidate point location base station in the to-be-deployed area according to the user distribution data, wherein the core network load reduction rate is the ratio of the user data volume of a single candidate point location base station in the to-be-deployed area to the user data volume of all candidate point location base stations within the second set time period;
[0034] Step 104: construct an objective function, where the objective function is to maximize the base station load utilization and the core network load reduction rate in the area to be deployed;
[0035] Step 105: Solve the objective function to determine the site selection of the base station in the area to be deployed.
[0036] Depend on Figure 1It can be seen from the shown process that in an embodiment of the present invention, a 5G base station site selection method based on the spatiotemporal distribution characteristics of group users is implemented to obtain user distribution data of the area to be deployed; based on the user distribution data, the base station load utilization rate of each candidate point in the area to be deployed is determined, and the core network load reduction rate corresponding to the base station at each candidate point in the area to be deployed is determined. In this way, the user distribution in the area to be deployed is analyzed, and the relevant indicators for base station deployment are defined. At the same time, considering that 5G communication introduces a mobile edge computing mode, the most reasonable deployment location is selected according to the characteristics of the edge computing mode and the usage of the edge server to improve efficiency and reduce costs; an objective function is constructed, and the base station site selection in the area to be deployed is determined by solving the objective function. The base station site selection problem is described as a mathematical problem, which is more intuitive, direct and accurate, and is convenient for calculating and solving the base station site selection in the area to be deployed, thereby improving investment returns.
[0037] In the specific implementation, the user distribution data of the area to be deployed is first obtained, wherein the user distribution data includes the number of users and the amount of user data.
[0038] After obtaining the user distribution data of the area to be deployed, first define the relevant indicators of the base station. In the embodiment of the present invention, two indicators, namely, base station load utilization rate and core network load reduction rate, are defined. That is, the base station load utilization rate of each candidate point in the area to be deployed and the core network load reduction rate corresponding to each candidate point in the area to be deployed are determined according to the user distribution data, and then the objective function is constructed.
[0039] The base station load utilization rate is the proportion of time that the base station load exceeds the threshold within the first set time period. For example, it can be the proportion of base station i in a high-load operation state in a day, which is considered to be the proportion of time that the area becomes a hot spot area.
[0040] There may be a variety of specific calculation methods for calculating the base station load utilization. For example, in one embodiment, determining the base station load utilization of each candidate point in the to-be-deployed area based on user distribution data may include: determining the base station load utilization of each candidate point in the to-be-deployed area based on user distribution data according to the following formula (1):
[0041]
[0042] Where U(i) is the base station load utilization rate at candidate location i; is the duration during which the base station load at candidate point position i exceeds the threshold within the first set duration; T is the first set duration.
[0043] Furthermore, in the embodiment, in order to convert the total base station load utilization in the area to be deployed to between 0 and 1, the load utilization of each base station may be normalized, as shown in the following formula (2):
[0044]
[0045] Where U′(i) is the normalized base station load utilization rate of candidate point i; M is the number of all candidate points in the area to be deployed;
[0046] After the reduction process, the formula (3) is as follows:
[0047]
[0048] In the embodiment, the cumulative sum of the time duration that the base station load at the candidate point position i exceeds the threshold within the first set time duration can be expressed as T′, as shown in the following formula (4):
[0049]
[0050] Those skilled in the art will appreciate that the above formulas (1), (2), (3), and (4) may be transformed, reduced, simplified, or have coefficients added to them according to actual needs.
[0051] The core network load reduction rate is the ratio of the user data volume of a single candidate point location base station in the to-be-deployed area to the user data volume of all candidate point location base stations within the second set time period. The second set time period may be the same as the aforementioned first set time period. The core network load reduction rate is considered when selecting a site, because after the base station is deployed, the data traffic generated in the area will be processed by the edge server and will not occupy the core network bandwidth.
[0052] There may be a variety of specific calculation methods for calculating the core network load reduction rate. For example, in one embodiment, determining the core network load reduction rate corresponding to each candidate point location base station in the to-be-deployed area according to user distribution data may include: determining the core network load reduction rate corresponding to each candidate point location base station in the to-be-deployed area according to the following formula (5):
[0053]
[0054] Among them, R(i) is the core network load reduction rate corresponding to the base station at candidate point i; is the number of users of the base station at the candidate point location i within the second set time length; d is the amount of data generated by each user within the second set time length; and D is the amount of user data of all base stations at the candidate point locations in the area to be deployed within the second set time length.
[0055] One calculation formula for D is:
[0056]
[0057] Of course, those skilled in the art can transform, reduce, simplify or add coefficients to the above formulas (4) and (5) according to actual needs.
[0058] After determining the base station load utilization and the core network load reduction rate, the objective function is constructed. At this point, the base station site selection problem can now be described as a mathematical problem, that is, selecting multiple locations from the M locations in the area to be deployed to deploy base stations to maximize the base station load utilization and core network load reduction rate of the entire communication system in the area to be deployed. This problem can be formalized as an integer linear programming problem.
[0059] In this embodiment, a decision variable s can be used i To indicate whether to place a base station at the candidate point i, s i The definition of is shown in formula (6):
[0060]
[0061] The goal of the base station site selection method is to maximize the base station load utilization rate and core network load reduction rate of the system. As mentioned above, the base station load utilization rate of the system can be expressed as The core network load reduction rate can be expressed as Assuming that all users are homogeneous and the amount of data generated in a unit time slice is d, the problem can be formalized as an integer linear programming problem. It can be understood that in the embodiment, if the users are not homogeneous, the amount of data d generated by each user in a unit time slice has different values.
[0062] In one embodiment, constructing the objective function may include: constructing the objective function according to one or any combination of the following constraints, wherein the objective function is to maximize the base station load utilization and the core network load reduction rate in the area to be deployed:
[0063] The number of base stations deployed in the area to be deployed shall not exceed the maximum number of base stations that the operator can provide;
[0064] The sum of the weights of the base station load utilization rate and the core network load reduction rate is 1;
[0065] The decision variable used to indicate whether a base station is placed at the candidate point takes a value of 0 or 1.
[0066] For example, an objective function may be constructed according to the following formula, wherein the objective function is to maximize the base station load utilization rate and the core network load reduction rate in the area to be deployed:
[0067]
[0068] The constraints are one or any combination of the following:
[0069] C1:
[0070] C2:α+β=1,α,β∈(0,1),
[0071] C3:s i ∈{0,1},
[0072] Wherein, maximize() is the constructed objective function; M is the number of all candidate locations in the area to be deployed; N is the maximum number of base stations that the operator can provide; α is the weight of the load utilization rate; β is the weight of the core network load reduction rate; C1, C2, and C3 are all constraints; s i is a decision variable, indicating whether to place a base station at the candidate point i; The duration during which the base station load at the candidate point position i exceeds the threshold within the first set duration; is the number of users of the base station at the candidate point position i within the second set time length; d is the amount of data generated by each user within the second set time length; T′ is the cumulative sum of the time lengths during which the base station loads at all candidate point positions exceed the threshold within the first set time length. Of course, those skilled in the art can transform, reduce, simplify, or add coefficients to the above formulas (6) and (7) according to actual needs.
[0073] The objective function is to maximize the operator's return on investment by deploying base stations in hot spots with high demand and high data volume. It can be seen that the problem is finally formalized as a 0-1 integer linear programming problem.
[0074] After constructing the objective function, the objective function is solved to determine the site selection of the base station in the area to be deployed. Figure 2 FIG. 5 is a specific example diagram of the 5G base station site selection method in an embodiment of the present invention, such as Figure 2 As shown, Figure 1 Step 105 may specifically include:
[0075] Step 201: Use a greedy algorithm to solve the objective function and determine the site selection of the base station in the area to be deployed.
[0076] In the embodiment, by analyzing the above objective function formula, it can be found that T′ and D are the cumulative values of regional features and are both constants. Therefore, if only variables are considered, formula (7) can be transformed into the selection The greedy algorithm always makes the best choice at the moment when solving a problem. In the current problem, it does not take the best solution from all the selection results, but selects a candidate point with the largest benefit each time, and obtains the optimal solution after N times. This problem is similar to a 0-1 knapsack problem. The knapsack capacity can be regarded as the number of deployable base stations N, and the items to be loaded can be regarded as the candidate locations of the base stations. Each candidate location has two situations: being selected and not being selected, and has a corresponding benefit value. The difference is that the weight of each item in the knapsack problem is different, while the candidate positions are the same, and each selection occupies one of N, so the problem can be solved by performing a greedy algorithm each time.
[0077] In the embodiment, the greedy algorithm selects the benefit value each time The principle is to first examine a global optimal solution and then modify it to use a greedy algorithm. This choice turns the original problem into a similar but smaller problem. For example, we can assume that the candidate point set S = {P1, P2, ..., P m} have been arranged in order of return value from small to large, where P1, P2, ..., P m is the deployment point in the set. Then assume that a global optimal solution to this problem is S(i) = {P i1 ,P i2 ,…,P im}, also arranged in ascending order, where P i1 ,P i2 ,…,P im For each deployment point in the optimal solution. For the greedy algorithm, each time, it will always select a limited number of candidate points P with the highest benefit value. m When it is selected, the candidate point P with the second highest benefit value is selected. m-1 , and so on. If the point P with the highest benefit value in the optimal solution im =P m , the problem is proved. Because the optimal solution S(i) already contains the greedy algorithm, we only need to summarize the point P with the second highest benefit value in the optimal solution. im-1 =P m-1 , until N choices are completed. If P im ! =P m , using the method of exchanging parameters, P im Replace with P m , because P m is the position with the highest profit value, so the greedy algorithm should choose this position, but this position is not in the optimal solution. By exchanging parameters, a better solution can be obtained, because P m >P im, so S(i) is not an optimal solution, and the assumption does not hold. Therefore, the optimal solution can be obtained by selecting through the greedy algorithm.
[0078] The embodiment of the present invention also provides a 5G base station site selection device, as described in the following embodiment. Since the principle of solving the problem by the device is similar to that of the 5G base station site selection method, the implementation of the device can refer to the implementation of the 5G base station site selection method, and the repeated parts will not be repeated.
[0079] Figure 3 FIG. 5 is a structural example diagram of a 5G base station site selection device in an embodiment of the present invention. Figure 3 As shown, the 5G base station site selection device includes:
[0080] The data acquisition module 301 is used to acquire user distribution data of the area to be deployed, wherein the user distribution data includes the number of users and the amount of user data;
[0081] The base station load utilization rate determination module 302 is used to determine the base station load utilization rate of each candidate point position in the to-be-deployed area according to the user distribution data, wherein the base station load utilization rate is the proportion of the time period during which the base station load exceeds the threshold value within the first set time period;
[0082] The core network load reduction rate determination module 303 is used to determine the core network load reduction rate corresponding to each candidate point location base station in the to-be-deployed area according to the user distribution data, wherein the core network load reduction rate is the ratio of the user data volume of a single candidate point location base station in the to-be-deployed area to the user data volume of all candidate point location base stations within the second set time period;
[0083] An objective function construction module 304 is used to construct an objective function, wherein the objective function is to maximize the base station load utilization rate and the core network load reduction rate in the area to be deployed;
[0084] The base station site selection module 305 is used to determine the base station site selection in the area to be deployed by solving the objective function.
[0085] In one embodiment, the data acquisition module 301 may be specifically used to acquire user distribution data of the area to be deployed, where the user distribution data includes the number of users and the amount of user data.
[0086] In one embodiment, the base station load utilization module 302 may be specifically used to determine the base station load utilization of each candidate point in the to-be-deployed area according to the user distribution data according to the following formula:
[0087]
[0088] Where U(i) is the base station load utilization rate at candidate location i; is the duration during which the base station load at candidate point position i exceeds the threshold within the first set duration; T is the first set duration.
[0089] In one embodiment, the core network load reduction rate module 303 may be specifically used to determine the core network load reduction rate corresponding to each candidate point location base station in the to-be-deployed area according to the following formula based on user distribution data:
[0090]
[0091] Where R(i) is the core network load reduction rate corresponding to the base station at candidate location i; is the number of users of the base station at the candidate point location i within the second set time length; d is the amount of data generated by each user within the second set time length; and D is the amount of user data of all base stations at the candidate point locations in the area to be deployed within the second set time length.
[0092] In one embodiment, the objective function construction module 304 may be specifically used to:
[0093] According to one or any combination of the following constraints, an objective function is constructed, wherein the objective function is to maximize the base station load utilization and the core network load reduction rate in the area to be deployed:
[0094] The number of base stations deployed in the area to be deployed shall not exceed the maximum number of base stations that the operator can provide;
[0095] The sum of the weights of the base station load utilization rate and the core network load reduction rate is 1;
[0096] The decision variable used to indicate whether a base station is placed at the candidate point takes a value of 0 or 1.
[0097] In one embodiment, the objective function construction module 304 may be specifically used to construct an objective function according to the following formula, wherein the objective function is to maximize the base station load utilization rate and the core network load reduction rate in the area to be deployed:
[0098]
[0099] The constraints are one or any combination of the following:
[0100] C1:
[0101] C2:α+β=1,α,β∈(0,1),
[0102] C3:s i ∈{0,1},
[0103] Wherein, maximize() is the constructed objective function; M is the number of all candidate locations in the area to be deployed; N is the maximum number of base stations that the operator can provide; α is the weight of the load utilization rate; β is the weight of the core network load reduction rate; C1, C2, and C3 are all constraints; s i is a decision variable, indicating whether to place a base station at the candidate point i; The duration during which the base station load at the candidate point position i exceeds the threshold within the first set duration; is the number of users of the base station at candidate point location i within the second set time length; d is the amount of data generated by each user within the second set time length; T′ is the cumulative sum of the time that the base station load at all candidate point locations exceeds the threshold within the first set time length.
[0104] Figure 4 FIG. 5 is a specific example diagram of a 5G base station site selection device in an embodiment of the present invention, as shown in FIG. Figure 4 As shown, in this embodiment, Figure 3 The base station site selection module 305 may include:
[0105] The greedy algorithm execution unit 401 is used to use the greedy algorithm to solve the objective function and determine the site selection of the base station in the area to be deployed.
[0106] Based on the above invention concept, Figure 5 As shown, the present invention also proposes a computer device 500, including a memory 510, a processor 520, and a computer program 530 stored in the memory 510 and executable on the processor 520, wherein the processor 520 implements the above-mentioned 5G base station site selection method when executing the computer program 530.
[0107] An embodiment of the present invention also provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the above-mentioned 5G base station site selection method is implemented.
[0108] An embodiment of the present invention also provides a computer program product, which includes a computer program, and when the computer program is executed by a processor, the above-mentioned 5G base station site selection method is implemented.
[0109] In summary, compared with the prior art, the 5G base station site selection method in the embodiment of the present invention realizes a 5G base station site selection method based on the spatiotemporal distribution characteristics of group users, so as to maximize the load utilization of the base station and maximize the core network load reduction rate, and select a reasonable deployment location of the 5G base station in the candidate location deployed in the region. In this way, not only the user distribution situation is taken into account, but also comprehensive factors such as the characteristics of the area to be deployed are taken into account. When the operator's cost is limited, that is, when the number of base stations deployed by the operator is limited, the optimal location is selected for deployment. On the premise that the user distribution situation in the area has been analyzed, the final deployment location is obtained through indicator analysis to reduce costs.
[0110] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0111] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0112] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0113] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0114] The specific embodiments described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A 5G base station site selection method, characterized in that: include: Obtaining user distribution data of the area to be deployed, wherein the user distribution data includes the number of users and the amount of user data; Determine the base station load utilization rate at each candidate point in the to-be-deployed area according to the user distribution data, where the base station load utilization rate is the proportion of time during which the base station load exceeds a threshold within a first set time period; Determine, according to the user distribution data, a core network load reduction rate corresponding to each candidate point location base station in the to-be-deployed area, wherein the core network load reduction rate is a ratio of a user data volume of a single candidate point location base station in the to-be-deployed area to a user data volume of all candidate point location base stations within a second set time period; Constructing an objective function, wherein the objective function is to maximize the base station load utilization rate and the core network load reduction rate in the area to be deployed; By solving the objective function, the site selection of the base station in the area to be deployed is determined.
2. The method according to claim 1, characterized in that According to the following formula, the base station load utilization rate of each candidate point in the area to be deployed is determined based on the user distribution data: Where U(i) is the base station load utilization rate at candidate location i; The duration during which the base station load at the candidate point position i exceeds the threshold within the first set duration; T is the first set duration.
3. The method according to claim 1, characterized in that According to the following formula, based on the user distribution data, the core network load reduction rate corresponding to each candidate point location base station in the area to be deployed is determined: Where R(i) is the core network load reduction rate corresponding to the base station at candidate location i; is the number of users of the base station at the candidate point position i within the second set time period; d is the amount of data generated by each user during the second set time period; D is the amount of user data of all candidate point locations of the area to be deployed within the second set time period.
4. The method according to claim 1, characterized in that Constructing an objective function, wherein the objective function is to maximize the base station load utilization and the core network load reduction rate in the area to be deployed, including: According to one or any combination of the following constraints, an objective function is constructed, wherein the objective function is to maximize the base station load utilization and the core network load reduction rate in the area to be deployed: The number of base stations deployed in the area to be deployed shall not exceed the maximum number of base stations that the operator can provide; The sum of the weights of the base station load utilization rate and the core network load reduction rate is 1; The decision variable used to indicate whether a base station is placed at the candidate point takes a value of 0 or 1.
5. The method according to claim 4, characterized in that According to the following formula, an objective function is constructed, wherein the objective function is to maximize the total base station load utilization and the core network load reduction rate in the area to be deployed: The constraints are one or any combination of the following: C2:α+β=1,α,β∈(0,1), Among them, maximize() is the constructed objective function; M is the number of all candidate locations in the area to be deployed; N is the maximum number of base stations that the operator can provide; α is the weight of load utilization; β is the weight of the core network load reduction rate; C1, C2, and C3 are all constraints; s i is a decision variable, indicating whether to place a base station at the candidate point i; The duration during which the base station load at the candidate point position i exceeds the threshold within the first set duration; is the number of users of the base station at the candidate point position i within the second set time period; d is the amount of data generated by each user during the second set time period; T ′ It is the cumulative sum of the durations during which the base station loads at all candidate point locations exceed the threshold within the first set duration.
6. The method according to claim 1, characterized in that By solving the objective function, the base station site selection in the area to be deployed is determined, including: A greedy algorithm is used to solve the objective function and determine the site selection of base stations in the area to be deployed.
7. A 5G base station site selection device, characterized in that: include: A data acquisition module, used to acquire user distribution data of the area to be deployed, wherein the user distribution data includes the number of users and the amount of user data; A base station load utilization rate determination module, used to determine the base station load utilization rate of each candidate point position in the to-be-deployed area according to the user distribution data, wherein the base station load utilization rate is the proportion of the time period during which the base station load exceeds a threshold value within a first set time period; A core network load reduction rate determination module is used to determine the core network load reduction rate corresponding to each candidate point location base station in the to-be-deployed area according to the user distribution data, wherein the core network load reduction rate is the ratio of the user data volume of a single candidate point location base station in the to-be-deployed area to the user data volume of all candidate point location base stations within a second set time period; An objective function construction module, used to construct an objective function, wherein the objective function is to maximize the base station load utilization rate and the core network load reduction rate in the area to be deployed; The base station site selection module is used to determine the base station site selection in the area to be deployed by solving the objective function.
8. The device according to claim 7, characterized in that The base station load utilization rate determination module is specifically used to determine the base station load utilization rate of each candidate point in the to-be-deployed area according to the following formula and user distribution data: Where U(i) is the base station load utilization rate at candidate location i; The duration during which the base station load at the candidate point position i exceeds the threshold within the first set duration; T is the first set duration.
9. The device according to claim 7, characterized in that The core network load reduction rate determination module is specifically used to determine the core network load reduction rate corresponding to each candidate point location base station in the to-be-deployed area according to the following formula and user distribution data: Where R(i) is the core network load reduction rate corresponding to the base station at candidate location i; is the number of users of the base station at the candidate point position i within the second set time period; d is the amount of data generated by each user during the second set time period; D is the amount of user data of all candidate point locations of the area to be deployed within the second set time period.
10. The device according to claim 7, characterized in that The objective function building block is specifically used for: According to one or any combination of the following constraints, an objective function is constructed, wherein the objective function is to maximize the base station load utilization and the core network load reduction rate in the area to be deployed: The number of base stations deployed in the area to be deployed shall not exceed the maximum number of base stations that the operator can provide; The sum of the weights of the base station load utilization rate and the core network load reduction rate is 1; The decision variable used to indicate whether a base station is placed at the candidate point takes a value of 0 or 1.
11. The device according to claim 10, characterized in that The objective function construction module is specifically used to construct an objective function according to the following formula, wherein the objective function is to maximize the total base station load utilization and core network load reduction rate in the area to be deployed: The constraints are one or any combination of the following: C2:α+β=1,α,β∈(0,1), Among them, maximize() is the constructed objective function; M is the number of all candidate locations in the area to be deployed; N is the maximum number of base stations that the operator can provide; α is the weight of load utilization; β is the weight of the core network load reduction rate; C1, C2, and C3 are all constraints; s i is a decision variable, indicating whether to place a base station at the candidate point i; The duration during which the base station load at the candidate point position i exceeds the threshold within the first set duration; is the number of users of the base station at the candidate point position i within the second set time period; d is the amount of data generated by each user during the second set time period; T ′ It is the cumulative sum of the durations during which the base station loads at all candidate point locations exceed the threshold within the first set duration.
12. The device according to claim 7, characterized in that The base station site selection module is specifically used for: A greedy algorithm is used to solve the objective function and determine the site selection of base stations in the area to be deployed.
13. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the method according to any one of claims 1 to 6 is implemented.
14. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method according to any one of claims 1 to 6 is implemented.
15. A computer program product, characterized in that The computer program product comprises a computer program, and when the computer program is executed by a processor, the method according to any one of claims 1 to 6 is implemented.