Fault recovery method for distribution network based on coordination between power output and switch action

By coordinating the output of distributed power sources and switching actions during distribution network fault recovery, a two-layer fault recovery model is constructed to optimize fault recovery decisions, solve the problem of correlation characteristics not being considered in the existing technology, and achieve distribution network fault recovery. Fast, safe and economical.

CN114825327BActive Publication Date: 2024-10-11CHONGQING XINBEIDI ELECTRIC CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210390399.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-14
Publication Date
2024-10-11
Estimated Expiration
2042-04-14

AI Technical Summary

Technical Problem

The existing technology does not fully consider the correlation characteristics between distributed power output adjustment and switching actions in distribution network fault recovery, which affects the safety and economy of fault recovery, and it is time-consuming to verify the feasibility of the recovery operation sequence through transient simulation. Long and lacks practicality.

Method used

Adopt a distribution network fault recovery method based on the coordination of power output and switching actions, collect operating parameters in real time, build a two-layer fault recovery model, optimize the output and switching actions of distributed power sources, and calculate the optimal decision through a fault recovery plan generation algorithm to achieve rapid , safe fault recovery.

Benefits of technology

It improves the power supply reliability and economy of the fault recovery process, reduces the recovery time, and provides a recovery solution that is both safe and economical.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114825327B_ABST
    Figure CN114825327B_ABST
Patent Text Reader

Abstract

The present invention provides a distribution network fault recovery method based on the coordination of power output and switch action, comprising the following steps: first, using terminal equipment to collect the operating parameters of each node in real time; when the distribution network fails and the fault section is isolated, using the distribution network fault recovery upper model to calculate the optimal switch state combination and the optimal output of each distributed power source; using the optimization result of the upper model as the parameter of the lower model, solving the fault recovery step-by-step decision through the fault recovery scheme generation algorithm; issuing the obtained fault recovery decision to each terminal device and distributed power source as a control instruction, adjusting the power reference value of the power source and performing switch opening and closing operations. The present invention is easy to implement, can guarantee the economy and safety of the fault recovery process to the greatest extent, and effectively improve the reliability of the distribution network containing distributed power sources.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of renewable energy power generation control technology, and in particular to a distribution network fault recovery method based on coordination of power supply output and switch action. Background Art

[0002] In recent years, a series of problems such as environmental pollution, depletion of conventional energy and global warming have become increasingly prominent. Promoting energy substitution strategies and accelerating the transformation of energy consumption from traditional energy to renewable energy is the only way for the world to achieve sustainable development of energy and economy. Distributed power sources including wind power and photovoltaics have developed rapidly. Distributed power sources have also been gradually applied in distribution network dispatching, voltage control, fault recovery and other scenarios, and related technologies are becoming more mature. Especially in fault recovery scenarios, relying on distributed power sources to provide support for the power grid has become an important means.

[0003] For the fault recovery of distribution networks containing distributed generation, existing research mainly determines the recovery plan by solving the fault recovery optimization model. Based on the different ways of power utilization, the recovery ideas have roughly gone through three stages, namely, the single-source-single-island recovery idea, the recovery idea based on island division, and the recovery idea of ​​multi-source coordination. The "single-source-single-island" recovery idea means that during the recovery, the load is restored outward from the power source as the starting point. After the recovery, multiple electrical islands will be formed, and each electrical island contains only one distributed generation or microgrid with black start capability; the recovery idea based on island division aims to divide the power outage area of ​​the target distribution network into several islands according to the type, capacity, location of the local power source in the distribution network, the importance of the load, the load demand and location, etc., and each island contains one or more power sources; the multi-source coordination recovery idea aims to connect all sources and loads in the target distribution network as much as possible, forming as large an island as possible, and realizing multi-source coordinated recovery. However, most of them do not consider the mutual influence between the output of distributed generation and the switch action during the fault recovery process.

[0004] During the fault recovery process, network reconstruction and distributed power output regulation are not completed instantaneously, but need to be implemented step by step in a certain order. The distributed power output regulation and switch action will have different degrees of impact on the safety and economic indicators of fault recovery, so there is a correlation between the two control methods. In order to maximize the reliability of the fault recovery process, the switch action and distributed power output regulation should be coordinated on the basis of taking into account the correlation characteristics of the two. However, there is currently a lack of research on the correlation between switch action and distributed power output regulation, and there are few reports on the coordination between the two. Some studies have determined the recovery operation sequence and intelligent soft switch control mode for different operating state transitions based on the recovery operation rules, but its recovery operation is power self-starting and load recovery under large-scale power outages, and does not involve network reconstruction under conventional faults. In addition, the feasibility of its operation sequence is mainly verified by transient simulation, which is time-consuming and lacks practicality.

[0005] In summary, how to fully consider the correlation characteristics of distributed power output regulation and switch action during distribution network fault recovery to maximize the economy and safety of the fault recovery process has become an urgent problem that technicians in this field need to solve. Summary of the invention

[0006] In view of the deficiencies of the above-mentioned prior art, the present invention provides a distribution network fault recovery method based on the coordination of power supply output and switch action, which is used for performing distribution network fault recovery control after a fault occurs in the distribution network and the adjacent switches of the fault section are disconnected, so as to take into account the influence of the correlation characteristics of the output regulation of distributed power sources and the switch action during the distribution network fault recovery process, and improve the power supply safety and economy of the fault recovery process of the new energy power system.

[0007] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0008] S101, collecting operating parameters of each node of the distribution network in real time; the operating parameters include voltage amplitude, voltage phase angle, active load, reactive load, initial active output, initial reactive output and initial switch state of the node;

[0009] S102, when a fault occurs in the distribution network, disconnect the adjacent switches of the fault section to isolate the fault, and upload the collected operating parameters to the control center to perform fault recovery optimization calculation;

[0010] S103, with the goal of maximizing the load recovery amount and minimizing the voltage deviation, constructing a distribution network fault recovery upper-level model, and using the distribution network fault recovery upper-level model to calculate the optimal branch set of open switches and the branch set of closed switches as well as the optimal active output and optimal reactive output of each distributed power source;

[0011] S104, with the goal of minimizing the deviation between the output of distributed power sources and the output of distributed power sources in the optimization result of the upper model, and minimizing the expected real-time adjustment amount of the output of distributed power sources, construct a lower-level model for distribution network fault recovery, and use the lower-level recovery model of the distribution network to solve the fault recovery plan generation algorithm and calculate the fault recovery decision;

[0012] S105, issuing the fault recovery decision of S104 to each terminal device and distributed power source as a control instruction, adjusting the power reference value of the distributed power source and performing switch opening and closing operations;

[0013] Among them, the fault recovery decision includes corresponding the number of branches in the optimal closed switch branch set calculated in step 103 to the total number of basic steps. In basic step t, the distributed power supply power adjustment decision and the branch switch closing decision are executed in the branch of the tth closed switch, and then the branch switch disconnection decision is executed in the branch of the tth disconnected branch.

[0014] Compared with the prior art, the present invention has the following beneficial effects:

[0015] 1. The prior art mainly determines the output and switch state combination of distributed power sources by solving the fault recovery optimization model under a single time scale, without considering the mutual influence between the output regulation of distributed power sources and the switch action during the fault recovery process, which may not only affect the recovery rate of the power-off load, but also threaten the safety of the distributed power sources. Compared with the prior art, the present invention fully considers the influence of the correlation characteristics of the output regulation of distributed power sources and the switch action during the distribution network fault recovery process, and establishes a two-layer fault recovery optimization model for the distribution network containing distributed power sources, which can take into account the requirements of maximum load recovery and voltage fluctuation suppression during the fault recovery process, and ensure the power supply reliability and economy of the system fault recovery process.

[0016] 2. Some existing technologies use transient simulation to verify the feasibility of switch operation and distributed power output adjustment sequence, which is time-consuming and lacks practicality. Compared with the existing technology, the present invention adopts a distributed power optimal control point search method that takes into account the ring voltage fluctuation, and integrates it into the fault recovery plan generation algorithm to obtain a fault recovery action plan with "adjusting distributed power supply power-closing branch switch-opening branch switch" as the basic sequence, that is, the basic steps, which can calculate a recovery plan that is both safe and economical at a faster speed. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to make the purpose, technical solution and advantages of the invention more clear, the present invention will be further described in detail below with reference to the accompanying drawings, in which:

[0018] Figure 1It is a flow chart of a distribution network fault recovery method based on active control of distributed power sources of the present invention.

[0019] Figure 2 It is a calculation flow chart of a fault recovery scheme generation algorithm in the distribution network fault recovery method of the present invention.

[0020] Figure 3 This is an example diagram of a distribution network topology structure containing distributed power sources used in an embodiment of the present invention.

[0021] Figure 4 Yes Figure 3 The example system shown is a voltage waveform diagram of the closing node when the prior art method is used to perform distribution network fault recovery. Figure 4 (a) is the closed branch L in the prior art 8-12 , disconnect branch circuit L 6-8 The corresponding voltage waveform is: Figure 4 (b) is the closed branch L in the prior art 5-14 , disconnect branch circuit L 4-5 The corresponding voltage waveform diagram;

[0022] Figure 5 Yes Figure 3 The voltage waveform diagram of the closing node when the exemplary system shown adopts the present invention to perform distribution network fault recovery is shown in FIG. Figure 5 (a) is the closed branch L of the present invention 5-14 , disconnect branch circuit L 4-5 The corresponding voltage waveform is: Figure 5 (b) is the closed branch L 8-12 , disconnect branch circuit L 6-8 The voltage waveform diagram corresponding to the present invention. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0024] In view of the deficiencies of the above-mentioned technologies, the present invention provides a distribution network fault recovery method based on the coordination of power output and switch action, which comprehensively considers the requirements of maximum load recovery and voltage fluctuation suppression during the fault recovery process, and adopts a distributed power supply optimal control point search method considering the ring voltage fluctuation, and determines the reference value of the distributed power supply output by searching for the distributed power supply optimal control point that minimizes the non-periodic component of the ring voltage when a certain switch is closed, and finally determines the optimal switch action plan and distributed power supply output adjustment plan through optimization, so as to maximize the economic and safety of the fault recovery process and improve the reliability of the distribution network containing distributed power supplies. At the same time, the fault recovery plan generation algorithm proposed in the present invention can calculate a recovery plan that is both safe and economical at a relatively fast speed.

[0025] The present invention is based on the distribution network fault recovery method of the coordinated cooperation between power output and switch action, and its flow chart is as follows: Figure 1 As shown, the specific steps include:

[0026] S1, real-time collection of operating parameters of each node in the distribution network;

[0027] In specific implementation, the terminal equipment can be used to collect the node's voltage amplitude, voltage phase angle, active load, reactive load, initial active output of distributed power source, initial reactive output and initial switch state in real time as node operation parameters.

[0028] S2. When a fault occurs in the distribution network, disconnect the adjacent switches in the fault section to isolate the fault, and upload the collected operating parameters to the control center for fault recovery optimization calculation;

[0029] In an embodiment of the present invention, when a fault occurs in the distribution network, adjacent switches in the faulty section can be disconnected to isolate the fault. At the same time, the collected operating parameters need to be uploaded to the control center, and the control center is used to calculate a fault recovery plan to achieve the purpose of fault recovery.

[0030] S3. With the goal of maximizing the load recovery amount and minimizing the voltage deviation, an upper-level model of distribution network fault recovery is constructed, and the upper-level model of distribution network fault recovery is used to calculate the optimal branch set of open switches and the branch set of closed switches as well as the optimal active output and optimal reactive output of each distributed power source;

[0031] In the embodiment of the present invention, the upper model of distribution network fault recovery can be used to calculate the optimal state combination of sectional switches and interconnecting switches and the optimal active and reactive output of each distributed power source; wherein, the sectional switch refers to a switch on the main channel of a distribution line, through which the line can be divided into several sections to reduce power outage losses. Since it is on one line, when a distribution network fails, the adjacent switches of the faulty section are disconnected to isolate the fault, so the load cannot be transferred and powered by the sectional switch. In order to minimize the impact of power outages, the present invention can connect two distribution lines through a switch so as to realize the transfer of power between loads. The switch used to connect the two distribution lines is called an interconnecting switch. Therefore, by calculating the optimal state combination of sectional switches and interconnecting switches, the optimal branch set of disconnected switches and the optimal branch set of closed switches can be obtained.

[0032] S4. With the goal of minimizing the deviation between the output of distributed power sources and the output of distributed power sources in the optimization result of the upper model, and minimizing the expected real-time adjustment amount of the output of distributed power sources, a lower-level model for distribution network fault recovery is constructed, and the lower-level recovery model of the distribution network is used to solve the fault recovery plan generation algorithm, and the fault recovery decision is calculated;

[0033] In an embodiment of the present invention, the optimization results of the upper-level model can be used as parameters of the fault recovery lower-level model, and the fault recovery plan generation algorithm can be used to solve the fault recovery decision with "adjusting the power of distributed power sources - closing branch switches - opening branch switches" as the basic steps.

[0034] S5: The fault recovery decision of S4 is issued to each terminal device and distributed power source as a control instruction to adjust the power reference value of the distributed power source and perform switch opening and closing operations.

[0035] Among them, the fault recovery decision includes corresponding the number of branches in the optimal closed switch branch set calculated in step S3 to the total number of basic steps. In basic step t, the distributed power supply power adjustment decision and the branch switch closing decision are executed in the branch of the tth closed switch, and then the branch switch disconnection decision is executed in the branch of the tth disconnected branch.

[0036] It can be understood that in the embodiment of the present invention, the number of branches in the branch set of the optimal closed switch is actually equal to the number of branches in the branch set of the open switch. Since the fault recovery decision is in the order of "adjusting the power of the distributed power supply - closing the branch switch - opening the branch switch", in order to facilitate the explanation of the basic steps, the data corresponding to the number of branches in the branch set of the closed switch is processed here.

[0037] In specific implementation, in step S3, the upper-level model of distribution network fault recovery is:

[0038] The objective functions F1 and F2 are maximizing the load recovery and minimizing the voltage deviation, respectively;

[0039]

[0040] Where N bus is the total number of system nodes, i.e. the total number of distribution network nodes; i is the importance of the load at the i-th node, P L,i is the load size of the i-th node; V i is the voltage of the ith node in the system, V i,N is the rated voltage of the ith node.

[0041] In specific implementation, for the objective functions F1 and F2, the constraints include:

[0042] 1) Radial topology constraints:

[0043]

[0044]

[0045]

[0046] In the formula, u ij is the switch state of the branch between the i-th node and the j-th node, u ij =1 means the branch switch is in the closed state, u ij =0 means the branch switch is in the off state; C and P are the set of all rings in the network and the set of all paths between root nodes respectively; C k , P k They represent any path between any ring and the root node in the network; E is the set of all branches in the network; N rt The total number of root nodes in the system.

[0047] 2) Distribution network flow constraints:

[0048]

[0049]

[0050] Where V i is the voltage amplitude of the i-th node in the system; P i , Q i are respectively the active and reactive power injected into the upper grid of the i-th node, P g,i , Q g,i are the active and reactive powers injected by the distributed generation at the i-th node respectively; Q L,i Represents the reactive load size of the i-th node; Nbus is the total number of distribution network nodes, G ij , B ij are the conductance and susceptance between the i-th and j-th nodes respectively; θ ij is the voltage phase difference between the i-th and j-th nodes.

[0051] 3) Node voltage constraints:

[0052] V i,min ≤V i ≤V i,max

[0053] Where V i,min 、V i,max are the lower and upper limits of the voltage at the i-th node in the distribution network, respectively.

[0054] 4) Line current carrying capacity constraints are:

[0055] |S ij |≤S ij,max

[0056] In the formula, S ij , S ij,max are the apparent power flowing through the branch between the i-th and j-th nodes of the distribution network and the maximum current carrying capacity allowed to flow.

[0057] 5) Controllable source load output constraints:

[0058] Active output constraints of doubly-fed wind turbines:

[0059] P DFIG,i,min ≤P DFIG,i ≤P DFIG,i,mpp

[0060] Where P DFIG,i is the output active power of the doubly-fed wind turbine at the i-th node; P DFIG,i,mpp , P DFIG,i,min are the upper and lower limits of the output active power of the doubly-fed wind turbine at the i-th node respectively.

[0061] Reactive output constraints of doubly-fed wind turbines:

[0062] Q DFIG,i,min ≤Q DFIG,i ≤Q DFIG,i,max

[0063]

[0064]

[0065]

[0066] In the formula, Q DFIG,i is the reactive power output by the doubly-fed wind turbine generator set at the i-th node; Q DFIG,max , Q DFIG,min are the upper and lower limits of the reactive power output of the doubly-fed wind turbine at the i-th node; S g,i,d is the capacity of the grid-side converter of the doubly-fed wind turbine at the i-th node, Q g,i,max , Q g,i,min are the upper and lower limits of the reactive power output of the grid-side converter of the doubly-fed wind turbine at the i-th node; Q s,i,max , Q s,i,min are the upper and lower limits of the reactive power output on the stator side of the doubly-fed wind turbine at the i-th node; V s,i is the stator voltage of the doubly-fed wind turbine at the i-th node, X s,i , X m,i are the stator impedance and excitation impedance of the doubly-fed wind turbine at the i-th node respectively; I r,i,max is the maximum allowable current of the doubly-fed wind turbine rotor at the i-th node; s i is the slip rate of the doubly-fed wind turbine at the i-th node.

[0067] Active output constraints of energy storage:

[0068]

[0069] Where P ESS,i is the active reference value of energy storage at the i-th node; are the maximum charging and discharging powers of the energy storage at the i-th node respectively.

[0070] Reactive output constraints of energy storage:

[0071] -Q ESS,i,max ≤Q ESS,i ≤Q ESS,i,max

[0072]

[0073] In the formula, Q ESS,i is the reactive reference value of energy storage at the i-th node; Q ESS,i,max , Q ESS,i,min are the upper and lower limits of the adjustable reactive power of the energy storage at the i-th node respectively; S ESS,i is the inverter capacity of energy storage at the i-th node.

[0074] Active output constraints of permanent magnet direct-drive wind turbines and photovoltaics:

[0075] P P,i,min ≤P P,i ≤P P,i,mpp

[0076] Where P P,i is the active output of permanent magnet direct-drive wind turbine / photovoltaic at the i-th node; P P,i,min is the minimum active power required for the permanent magnet direct-drive wind turbine / photovoltaic to maintain operation at the i-th node, P P,i,mpp is the maximum power operating point of the permanent magnet direct-drive wind turbine / photovoltaic at the i-th node.

[0077] Reactive output constraints of permanent magnet direct-drive wind turbines and photovoltaics:

[0078]

[0079] In the formula, Q P,i is the permanent magnet direct-drive wind turbine / photovoltaic reactive power output at the i-th node; S g,i,p is the capacity of the permanent magnet direct-drive wind turbine / photovoltaic interface converter at the i-th node.

[0080] In specific implementation, in step S104, the fault recovery lower layer model is:

[0081] The objective functions f1 and f2 are the minimum deviation between the output of distributed power sources and the optimization result of the upper model and the minimum expected real-time regulation of the output of distributed power sources, respectively:

[0082]

[0083] Where P g,i,ref , Q g,i,ref are respectively the active and reactive reference values ​​of the distributed generation at the ith node obtained by the upper model; P g,i,t , Q g,i,t are respectively the active and reactive regulation values ​​of the distributed generation at the ith node at the basic step t; α g,i is the weight of the distributed generation at the i-th node; P g,i,t-1 , Q g,i,t-1 They are respectively the active and reactive regulation values ​​of the distributed generation at the i-th node in the basic step t-1.

[0084] In specific implementation, the constraints of objective functions f1 and f2 are:

[0085] 1) The radial topology constraints are:

[0086]

[0087]

[0088]

[0089] In the formula, u ij,tis the switch state of the branch between the i-th node and the j-th node when the basic step t is completed, u ij,t =1 means that the branch switch between the i-th node and the j-th node is in the closed state, u ij,t = 0 means that the branch switch between the i-th node and the j-th node is in the disconnected state when the basic step t is completed; C and P are the set of all rings in the network and the set of all paths between the root nodes respectively; C k , P k They represent any path between any ring and the root node in the network; E is the set of all branches in the network; N rt The total number of root nodes in the system.

[0090] 2) Distribution network flow constraints:

[0091]

[0092]

[0093] Where V j,t is the voltage amplitude of the ith node of the distribution network in basic step t; P i,t , Q i,t are respectively the active and reactive power injected by the upper level power grid at the i-th node of the distribution network in the basic step t; P L,i,t is the active load of the ith node in basic step t; Q L,i,t represents the reactive load of the ith node in basic step t; G ij,t , B ij,t are the conductance and susceptance of the branch between the i-th node and the j-th node in the basic step t, respectively; θ ij,t is the voltage phase difference between the i-th node and the j-th node in basic step t.

[0094] 3) Node voltage constraints:

[0095] V i,min ≤V i,t ≤V i,max

[0096] Where V i,min 、V i,max are the lower and upper limits of the voltage at the i-th node respectively.

[0097] 4) Line current carrying capacity constraints:

[0098] |S ij,t |≤S ij,max

[0099] In the formula, S ij,t is the apparent power flowing through the branch between the i-th node and the j-th node in the basic step t; Sij,max is the maximum current carrying capacity allowed to flow through the branch between the i-th node and the j-th node.

[0100] 5) Controllable source load output constraints:

[0101] The active output constraint of the doubly-fed wind turbine is:

[0102] P DFIG,i,min ≤P DFIG,i,t ≤P DFIG,i,mpp

[0103] Where P DFIG,i,t is the output active power of the doubly-fed wind turbine at the i-th node in the basic step t; P DFIG,i,mpp , P DFIG,i,min They are the upper and lower limits of the output active power of the doubly-fed wind turbine respectively.

[0104] The reactive output constraint of the doubly-fed wind turbine is:

[0105] Q DFIG,i,t,min ≤Q DFIG,i,t ≤Q DFIG,i,t,max

[0106]

[0107]

[0108]

[0109] In the formula, Q DFIG,i,t is the reactive power output by the doubly-fed wind turbine generator set at the i-th node in the basic step t; Q DFIG,i,t,max , Q DFI,i,t,min are the upper and lower limits of the reactive power output of the doubly-fed wind turbine at the i-th node in the basic step t; S g,i,d is the capacity of the grid-side converter of the doubly-fed wind turbine at the i-th node, Q g,i,t,max , Q g,i,t,min are the upper and lower limits of the reactive power output of the grid-side converter of the doubly-fed wind turbine at the i-th node in the basic step t; Q s,i,t,max , Q s,i,t,min are respectively the upper and lower limits of the reactive power output on the stator side of the doubly-fed wind turbine at the i-th node in the basic step t.

[0110] The active output constraint of energy storage is:

[0111]

[0112] Where P ESS,i,t is the active reference value of energy storage at the i-th node in basic step t; are the maximum charging and discharging powers of the energy storage at the i-th node respectively.

[0113] The reactive output constraint of energy storage is:

[0114]

[0115] In the formula, Q ESS,i,t is the reactive reference value of the energy storage at the i-th node in the basic step t; S ESS,i,t is the inverter capacity of energy storage at the i-th node in basic step t; Q ESS,i,t is the reactive reference value of the energy storage at the i-th node in the basic step t.

[0116] The active output constraints of permanent magnet direct-drive wind turbines and photovoltaics are:

[0117] P P,i,min ≤P P,i,t ≤P P,i,mpp

[0118] Where P P,i,t is the permanent magnet direct-drive wind turbine / photovoltaic active output P at the i-th node in the basic step t P,i,min is the minimum active power required for the permanent magnet direct-drive wind turbine / photovoltaic to maintain operation at the i-th node, P P,i,mpp is the maximum power operating point of the permanent magnet direct-drive wind turbine / photovoltaic at the i-th node.

[0119] The reactive output constraints of permanent magnet direct-drive wind turbines and photovoltaics are:

[0120]

[0121] In the formula, Q P,i,t is the permanent magnet direct-drive wind turbine or photovoltaic reactive power output at the i-th node in the basic step t; S g,i,p is the capacity of the permanent magnet direct-drive wind turbine / photovoltaic interface converter at the i-th node; P P,i,t is the active output of the permanent magnet direct-drive wind turbine / photovoltaic at the i-th node in the basic step t.

[0122] In specific implementation, in step S4, the fault recovery plan generation algorithm is as follows: Figure 2 As shown, the following steps are included:

[0123] S401, the optimization result of the upper model, that is, the branch set S of the disconnected switch op , the branch set S of the closed switch cl , and the optimal active output P of each distributed generation DG Gs , optimal reactive power output Q Gs As the parameter of the lower model, let the number of basic steps be Scl The total number of initial elements in and initialize the basic step t = 1;

[0124] S402. In the first basic step, select S cl The closed branch elements in the network are used to construct equivalent networks based on the selected branches, and the optimal control point of the distributed power source before the branch switch in the network is closed is calculated by using the distributed power source optimal control point search method considering the closed loop voltage fluctuation;

[0125] S403, respectively performing power flow calculation on the network after the selected branch switches are closed, selecting closed branches that meet the constraints of the lower model after the switch action, and substituting the corresponding distributed power supply optimal control points into the lower model objective function;

[0126] S404, search for the closed branch and distributed generation output combination that minimizes the objective function value of the lower model, record it as the action combination reference value of the first basic step, and remove the corresponding branch from S cl Remove it and determine the distributed generation output regulation and branch switch closing plan in the first basic step;

[0127] S405, from S cl , S op Select the disconnected branch and closed branch elements to form a branch combination, build an equivalent network based on the selected branch combination, and use the distributed power supply optimal control point search method considering the closed-loop voltage fluctuation to calculate the optimal control point of the distributed power supply before the branch switch in the network is closed;

[0128] In the embodiment of the present invention, the branch set S cl , S op A closed branch and a disconnected branch are selected to form a branch combination. In each selection process, the branch combination contains a closed branch and a disconnected branch. An equivalent network is constructed based on the branch combination selected each time. Based on the equivalent network, the optimal control point of the distributed power supply before the branch switch is closed can be calculated.

[0129] S406, respectively perform power flow calculation on the network after the selected branch combination is operated, select the branch combination that meets the constraint conditions of the lower model after the branch disconnection and branch closing actions, and substitute the corresponding distributed power supply optimal control points into the lower model objective function respectively;

[0130] S407, search for the branch combination and distributed power output combination that minimizes the value of the objective function of the lower model, use it as the action combination reference value of the tth basic step, and remove the corresponding branch from S cl , S opRemove; determine the branch disconnection plan in the tth basic step of the fault recovery plan, and the distributed generation output adjustment and branch switch closing plan in the t+1th basic step.

[0131] S408, judge S cl Are all branches in the circuit removed? If so, determine whether S op The only branch with the disconnected switch left in the t+1th basic step is used as the branch disconnection plan to complete the generation of the fault recovery plan; if not, i is incremented by 1 and the process returns to step S405.

[0132] In the embodiment of the present invention, the method for searching the optimal control point of the distributed power source considering the ring voltage fluctuation in step S402 and step S405 may be:

[0133] Select the distributed power source closest to the closing point for adjustment to minimize the non-periodic component of the closing voltage. If the non-periodic component of the closing voltage is not 0 after adjusting the distributed power source, adjust the output of the upstream distributed power source of the closing branch in turn according to the distance from the closing branch until the non-periodic component of the closing voltage is 0 or all distributed power sources have been adjusted. At this time, the output of each distributed power source is the optimal control point of the distributed power source.

[0134] It can be understood that in each basic step, the size of the distributed power output adjustment will be determined according to the optimal control point of the distributed power before the branch switch is closed in the current basic step, and the corresponding adjustment decision will be executed; and the branch set S of the closed switch will be cl Select an optimal closing switch to execute the closing decision, and then select the branch set S of the open switch op Select an optimal disconnect switch to perform the disconnection decision, so when the branch set S of the closed switch cl If all branches in the circuit are removed, the branch set S of the switch is disconnected. op There is still only one branch with a disconnected switch that has not executed the closing decision, so in the embodiment of the present invention, it is directly used as the branch disconnection solution in the last basic step. At this time, the fault recovery solutions of all basic steps have been generated.

[0135] In an embodiment of the present invention, a fault recovery decision for each basic step can be generated while the fault recovery decision for the basic step is issued to each terminal device and distributed power source as a control instruction to adjust the power reference value of the distributed power source and perform switch opening and closing operations; or after the fault recovery decisions for all basic steps are generated, the fault recovery decisions for all basic steps can be uniformly issued to each terminal device and distributed power source as a control instruction, and each terminal device and distributed power source adjusts the power reference value of the distributed power source and performs switch opening and closing operations in the order of the basic steps.

[0136] Figure 3 This is an example of the topology of the IEEE-14 node distribution network system, with a rated frequency of 50 Hz. Node 8 is connected to DFIG, nodes 3 and 14 are connected to ESS1 and ESS2 respectively, and node 4 is connected to PV.

[0137] by Figure 3 Taking the example system shown in the figure as an example, the operating parameters of each distributed power source are shown in Table 1. Branch L 6-7 A fault occurs at 0s, and branch L 3-9 The tie switch is immediately closed to supply power to the power-off loads on nodes 7, 8, and 9. Solving the fault recovery upper model, the branch combination that needs to be operated and the optimal output of each distributed generation can be obtained, as shown in Table 2. According to the optimization results shown in Table 1, there are two branches that need to close the switch, and the two closing times of the branch switch are set to 0.5s and 1.5s respectively.

[0138] Table 1 Distributed power supply operating parameters

[0139]

[0140] Table 2. Optimization results of the fault recovery upper layer model

[0141]

[0142] Figure 4 Shows the Figure 3 The example system shown in the figure uses the prior art method to perform distribution network fault recovery. Each time the branch switch is closed, the instantaneous value waveform of the A phase voltage of the corresponding node is shown. The recovery scheme under the prior art method is: that is, the corresponding scheme is: the power of the distributed generation is adjusted according to the optimization result of the upper model, and the branch switch action sequence is: ① Close branch L 8-12 , disconnect branch circuit L 6-8 ; ② Closed branch L 5-14 , disconnect branch circuit L 4-5 . Figure 4 In (a), branch L 8-12 At the moment the switch is closed, the instantaneous value of the voltage at node 8 changes sharply and then slowly decays to a steady-state level. The peak voltage at the moment of closing the loop rises from a steady-state 32.48 kV to 60.19 kV, which is far beyond the allowable range of the source load connected to the node. Figure 4 In (b), branch L 5-14 When closed, the instantaneous voltage value of node 5 is slightly distorted and within the allowable variation range. Figure 5As shown, by using the method disclosed in the present invention, the instantaneous value waveform of the A-phase voltage of the corresponding node can be obtained after adjusting the power of the corresponding distributed power source before closing the branch switch each time. In this scheme, the optimal control point of the distributed power source under each basic step is shown in Table 3. Figure 5 In (a), L 5-14 At the moment the branch switch is closed, the voltage at node 5 transitions smoothly, and the peak value of the steady-state voltage changes from 31.90 kV to 32.33 kV. Figure 5 (b) In 8-12 When the branch switch is closed, the steady-state voltage peak value of node 8 also smoothly transitions from 31.95 kV to 32.34 kV. It can be seen that the active and reactive power reference values ​​of each branch switch and each distributed power source are controlled by the method of the present invention, which effectively suppresses the ring voltage fluctuation during the fault recovery process and ensures the safety of the system.

[0143] Table 3 Optimal control points of distributed power sources in the method disclosed in the present invention

[0144]

[0145] In summary, the present invention proposes a distribution network fault recovery method based on the coordinated cooperation of power supply output and switch action, which comprehensively considers the requirements of maximum load recovery and voltage fluctuation suppression in the fault recovery process, and adopts a distributed power supply optimal control point search method considering the closed-loop voltage fluctuation. The reference value of the distributed power supply output is determined by searching for the distributed power supply optimal control point that minimizes the non-periodic component of the closed-loop voltage when a certain switch is closed. Finally, the optimal switch action plan and distributed power supply output adjustment plan are determined by optimization, so as to maximize the economy and safety of the fault recovery process and effectively improve the reliability of the distribution network containing distributed power supplies.

[0146] In the description of the present invention, it is necessary to understand that the terms "coaxial", "bottom", "one end", "top", "middle", "the other end", "upper", "one side", "top", "inside", "outside", "front", "center", "both ends" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0147] In the present invention, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation" and "rotation" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the present invention according to the specific circumstances.

[0148] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A distribution network fault recovery method based on coordination between power output and switch action, characterized in that: The method is used to perform distribution network fault recovery control after disconnecting the adjacent switches of the fault section when a fault occurs in the distribution network, and includes the following steps: S101, collecting operating parameters of each node of the distribution network in real time; the operating parameters include voltage amplitude, voltage phase angle, active load, reactive load, initial active output, initial reactive output and initial switch state of the node; S102, when a fault occurs in the distribution network, disconnect the adjacent switches of the fault section to isolate the fault, and upload the collected operating parameters to the control center to perform fault recovery optimization calculation; S103, with the goal of maximizing the load recovery amount and minimizing the voltage deviation, constructing a distribution network fault recovery upper-level model, and using the distribution network fault recovery upper-level model to calculate the optimal branch set of open switches and the branch set of closed switches as well as the optimal active output and optimal reactive output of each distributed power source; S104, with the goal of minimizing the deviation between the output of distributed power sources and the output of distributed power sources in the optimization result of the upper model, and minimizing the expected real-time adjustment amount of the output of distributed power sources, construct a lower-level model for distribution network fault recovery, and use the lower-level recovery model of the distribution network to solve the fault recovery plan generation algorithm and calculate the fault recovery decision; In step S104, the fault recovery solution generation algorithm includes the following steps: S401, the optimization result of the upper model, that is, the branch set S of the disconnected switch op , the branch set S of the closed switch cl , and the optimal active output P of each distributed power source Gs , optimal reactive power output Q Gs As the parameter of the lower model, let the number of basic steps be S cl The total number of initial elements in and initialize the basic step t = 1; S402, in the tth basic step, select S cl The closed branch elements in the network are used to construct equivalent networks based on the selected branches respectively, and the optimal control point of the distributed power source before the branch switch in the network is closed is calculated by using the distributed power source optimal control point search method considering the closed-loop voltage fluctuation; the distributed power source optimal control point search method considering the closed-loop voltage fluctuation includes: selecting the distributed power source closest to the closed-loop point for adjustment to minimize the non-periodic component of the closed-loop voltage as much as possible; if the non-periodic component of the closed-loop voltage is not 0 after the distributed power source is adjusted, then the output of the upstream distributed power source of the closed-loop branch is adjusted in turn according to the distance from the closed-loop branch until the non-periodic component of the closed-loop voltage is 0 or all distributed power sources have been adjusted, at which time the output of each distributed power source is the optimal control point of the distributed power source; S403, respectively performing power flow calculation on the network after the selected branch switches are closed, selecting closed branches that meet the constraints of the lower model after the switch action, and substituting the corresponding distributed power supply optimal control points into the lower model objective function; S404, search for the closed branch and distributed generation output combination that minimizes the objective function value of the lower model, record it as the action combination reference value of the tth basic step, and remove the corresponding branch from S cl Remove it, and determine the distributed generation output regulation and branch switch closing plan in the tth basic step; S405, from S cl , S op Select the disconnected branch and closed branch elements to form a branch combination, build an equivalent network based on the selected branch combination, and use the distributed power supply optimal control point search method considering the closed-loop voltage fluctuation to calculate the optimal control point of the distributed power supply before the branch switch in the network is closed; S406, respectively perform power flow calculation on the network after the selected branch combination is operated, select the branch combination that meets the constraint conditions of the lower model after the branch disconnection and branch closing actions, and substitute the corresponding distributed power supply optimal control points into the lower model objective function respectively; S407, search for the branch combination and distributed power output combination that minimizes the objective function value of the lower model, use it as the action combination reference value of the t-th basic step, and remove the corresponding branch from S cl , S op Remove; determine the branch disconnection plan in the tth basic step of the fault recovery plan, and the distributed generation output adjustment and branch switch closing plan in the t+1th basic step; S408, judge S cl Are all branches in the circuit removed? If so, determine whether S op The only branch with the disconnected switch left in the t+1th basic step is used as the branch disconnection plan to complete the generation of the fault recovery plan; if not, t is incremented by 1 and the process returns to step S405; S105, issuing the fault recovery decision of S104 to each terminal device and distributed power source as a control instruction, adjusting the power reference value of the distributed power source and performing switch opening and closing operations; Among them, the fault recovery decision includes corresponding the number of branches in the optimal closed switch branch set calculated in step 103 to the total number of basic steps. In basic step t, the distributed power supply power adjustment decision and the branch switch closing decision are executed in the branch of the tth closed switch, and then the branch switch disconnection decision is executed in the branch of the tth disconnected branch.

2. The method for distribution network fault recovery based on coordination of power output and switch action according to claim 1 is characterized in that: In step S103, the distribution network fault recovery upper model includes the goals of maximizing load recovery and minimizing voltage deviation, and the radial topology constraints of nodes, distribution network flow constraints, node voltage constraints, line current carrying capacity constraints, and controllable source load output constraints as constraints, wherein the controllable source load output constraints include the active output constraints of doubly fed wind turbines, the reactive output constraints of doubly fed wind turbines, the active output constraints of energy storage, the reactive output constraints of energy storage, the active output constraints of permanent magnet direct-drive wind turbines and photovoltaics, and the reactive output constraints of permanent magnet direct-drive wind turbines and photovoltaics.

3. The method for distribution network fault recovery based on coordination of power output and switch action according to claim 1 or 2, characterized in that: The objective function of the upper model of distribution network fault recovery is expressed as: Where, F1 represents the objective function of maximizing the load recovery amount, and F2 represents the objective function of minimizing the voltage deviation; N bus is the total number of distribution network nodes; ω i is the importance of the load at the i-th node, P L,i is the active load of the ith node; V i is the voltage of the ith node in the system, V i,N is the rated voltage of the ith node.

4. The method for distribution network fault recovery based on coordination of power output and switch action according to claim 3 is characterized in that: For the objective functions F1 and F2, the constraints include: In the formula, u ij is the switch state of the branch between the i-th node and the j-th node, u ij =1 means the branch switch is in the closed state, u ij =0 means the branch switch is in the off state; C and P are the set of all rings in the network and the set of all paths between root nodes respectively; C k , P k They represent any path between any ring and the root node in the network; E is the set of all branches in the network; N rt is the total number of system root nodes; 2) Distribution network flow constraints: Where P i , Q i are the active and reactive power injected into the i-th node by the upper level power grid, P g,i , Q g,i are the active and reactive powers injected by the distributed generation at the i-th node respectively; Q L,i represents the reactive load size of the ith node; V j is the voltage amplitude of the jth node; G ij , B ij are the conductance and susceptance between the i-th and j-th nodes respectively; θ ij is the voltage phase difference between the i-th and j-th nodes; 3) Node voltage constraints: In i,min ≤V i ≤V i,max Where V i,min 、V i,max are the lower and upper limits of the voltage of the i-th node respectively; 4) Line current carrying capacity constraints: |S ij |≤S ij,max In the formula, S ij , S ij,max are the apparent power flowing through the branch between the i-th and j-th nodes and the maximum current carrying capacity allowed to flow; 5) Controllable source load output constraints: Active output constraints of doubly-fed wind turbines: P DFIG,i,min ≤P DFIG,i ≤P DFIG,i,mpp Where P DFIG,i is the output active power of the doubly-fed wind turbine at the i-th node; P DFIG,i,mpp , P DFIG,i,min are the upper and lower limits of the output active power of the doubly-fed wind turbine generator set at the i-th node respectively; Reactive output constraints of doubly-fed wind turbines: Q DFIG,i,min ≤Q DFIG,i ≤Q DFIG,i,max In the formula, Q DFIG,i is the reactive power output by the doubly-fed wind turbine generator set at the i-th node; Q DFIG,i,max , Q DFIG,i,min are the upper and lower limits of the reactive power output of the doubly-fed wind turbine at the i-th node; S g,i,d is the capacity of the grid-side converter of the doubly-fed wind turbine at the i-th node, Q g,i,max , Q g,i,min are the upper and lower limits of the reactive power output of the grid-side converter of the doubly-fed wind turbine at the i-th node; Q s,i,max , Q s,i,min are the upper and lower limits of the reactive power output on the stator side of the doubly-fed wind turbine at the i-th node; V s,i is the stator voltage of the doubly-fed wind turbine at the i-th node, X s,i , X m,i are the stator impedance and excitation impedance of the doubly-fed wind turbine at the i-th node respectively; I r,i,max is the maximum allowable current of the doubly-fed wind turbine rotor at the i-th node; s i is the slip rate of the doubly-fed wind turbine generator set at the i-th node; Active output constraints of energy storage: Where P ESS,i is the active reference value of energy storage at the i-th node; are the maximum charging and discharging power of energy storage at the i-th node respectively; Reactive output constraints of energy storage: -Q ESS,i,max ≤Q ESS,i ≤Q ESS,i,max In the formula, Q ESS,i is the reactive reference value of energy storage at the i-th node; Q ESS,i,max , Q ESS,i,min are the upper and lower limits of the adjustable reactive power of the energy storage at the i-th node respectively; S ESS,i is the capacity of the energy storage inverter at the i-th node; Active output constraints of permanent magnet direct-drive wind turbines and photovoltaics: P P,i,min ≤P P,i ≤P P,i,mpp Where P P,i is the active output of permanent magnet direct-drive wind turbine / photovoltaic at the i-th node; P P,i,min is the minimum active power required for the permanent magnet direct-drive wind turbine / photovoltaic to maintain operation at the i-th node, P P,i,mpp is the maximum power operating point of the permanent magnet direct-drive wind turbine / photovoltaic at the i-th node; Reactive output constraints of permanent magnet direct-drive wind turbines and photovoltaics: In the formula, Q P,i is the permanent magnet direct-drive wind turbine / photovoltaic reactive power output at the i-th node; S g,i,p is the capacity of the permanent magnet direct-drive wind turbine / photovoltaic interface converter at the i-th node.

5. The method for distribution network fault recovery based on coordination of power output and switch action according to claim 1, characterized in that: In step S104, the distribution network fault recovery lower model includes minimizing the deviation of the distributed power output and the distributed power output in the upper model optimization result and minimizing the expected real-time adjustment amount of the distributed power output as the goal, and taking the radial topology constraints of the nodes in the branch of each closed switch, the distribution network flow constraints, the node voltage constraints, the line current carrying capacity constraints, and the controllable source load output constraints as constraint conditions, wherein the controllable source load output constraints include the active output constraints of the doubly fed wind turbine group, the reactive output constraints of the doubly fed wind turbine group, the active output constraints of the energy storage, the reactive output constraints of the energy storage, the active output constraints of the permanent magnet direct-drive wind turbine group and the photovoltaic group, and the reactive output constraints of the permanent magnet direct-drive wind turbine group and the photovoltaic group.

6. The method for distribution network fault recovery based on coordination of power output and switch action according to claim 1 or 5, characterized in that: In step S104: The objective function of the lower-level model of distribution network fault recovery is expressed as: Where f1 represents the objective function of minimizing the deviation between the output of distributed power sources and the output of distributed power sources in the optimization result of the upper model, and f2 represents the objective function of minimizing the expected real-time regulation amount of distributed power sources output; N bus is the total number of distribution network nodes; P g,i,ref , Q g,i,ref are respectively the active and reactive reference values ​​of the distributed generation at the ith node obtained by the upper model; P g,i,t , Q g,i,t are respectively the active and reactive regulation values ​​of the distributed generation at the ith node at the basic step t; α g,i is the weight of the distributed generation at the i-th node; P g,i,t-1 , Q g,i,t-1 They are respectively the active and reactive regulation values ​​of the distributed generation at the i-th node in the basic step t-1.

7. The method for distribution network fault recovery based on coordination of power output and switch action according to claim 6, characterized in that: For the objective functions f1 and f2, the constraints include: 1) The radial topology constraints are: In the formula, u ij,t is the switch state of the branch between the i-th node and the j-th node when the basic step t is completed, u ij,t =1 means that when the basic step t is completed, the branch switch between the i-th node and the j-th node is in the closed state, u ij,t = 0 means that the branch switch between the i-th node and the j-th node is in the disconnected state when the basic step t is completed; C and P are the set of all rings in the network and the set of all paths between the root nodes respectively; C k , P k They represent any path between any ring and the root node in the network; E is the set of all branches in the network; N rt is the total number of system root nodes; 2) Distribution network flow constraints: Where V i,t is the voltage amplitude of the ith node of the distribution network in basic step t; P i,t , Q i,t are respectively the active and reactive power injected by the upper level power grid at the i-th node of the distribution network in the basic step t; P L,i,t is the active load of the ith node in basic step t; Q L,i,t represents the reactive load of the ith node in basic step t; V j,t is the voltage amplitude of the jth node of the distribution network in basic step t; G ij,t , B ij,t are the conductance and susceptance of the branch between the i-th node and the j-th node in the basic step t, respectively; θ ij,t is the voltage phase difference between the ith node and the jth node in basic step t; 3) Node voltage constraints: In i,min ≤V i,t ≤V i,max Where V i,min 、V i,max are the lower and upper limits of the voltage of the i-th node respectively; 4) Line current carrying capacity constraints: |S ij,t |≤S ij,max In the formula, S ij,t is the apparent power flowing through the branch between the i-th node and the j-th node in the basic step t; S ij,max is the maximum current carrying capacity allowed to flow through the branch between the i-th node and the j-th node; 5) The active output constraint of the doubly-fed wind turbine is: P DFIG,i,min ≤P DFIG,i,t ≤P DFIG,i,mpp Where P DFIG,i,t is the output active power of the doubly-fed wind turbine at the i-th node in the basic step t; P DFIG,i,mpp , P DFIG,i,min They are the upper and lower limits of the output active power of the doubly-fed wind turbine generator system respectively; The reactive output constraint of the doubly-fed wind turbine is: Q DFIG,i,t,min ≤Q DFIG,i,t ≤Q DFIG,i,t,max In the formula, Q DFIG,i,t is the reactive power output by the doubly-fed wind turbine generator set at the i-th node in the basic step t; Q DFIG,i,t,max , Q DFI,i,t,min are the upper and lower limits of the reactive power output of the doubly-fed wind turbine at the i-th node in the basic step t; S g,i,d is the capacity of the grid-side converter of the doubly-fed wind turbine at the i-th node, Q g,i,t,max , Q g,i,t,min are the upper and lower limits of the reactive power output of the grid-side converter of the doubly-fed wind turbine at the i-th node in the basic step t; Q s,i,t,max , Q s,i,t,min are the upper and lower limits of the reactive power output on the stator side of the doubly-fed wind turbine at the i-th node in the basic step t; V s,i is the stator voltage of the doubly-fed wind turbine at the i-th node, X s,i , X m,i are the stator impedance and excitation impedance of the doubly-fed wind turbine at the i-th node respectively; I r,i,max is the maximum allowable current of the doubly-fed wind turbine rotor at the i-th node; s i is the slip rate of the doubly-fed wind turbine generator set at the i-th node; The active output constraint of energy storage is: Where P ESS,i,t is the active reference value of energy storage at the i-th node in basic step t; The reactive output constraint of energy storage is: In the formula, Q ESS,i,t is the reactive reference value of the energy storage at the i-th node in the basic step t; S ESS,i,t is the inverter capacity of energy storage at the i-th node in basic step t; Q ESS,i,t is the reactive reference value of the energy storage at the i-th node in the basic step t; The active output constraints of permanent magnet direct-drive wind turbines and photovoltaics are: P P,i,min ≤P P,i,t ≤P P,i,mpp Where P P,i,t is the active output of the permanent magnet direct-drive wind turbine / photovoltaic at the i-th node in the basic step t; The reactive output constraints of permanent magnet direct-drive wind turbines and photovoltaics are: In the formula, Q P,i,t is the permanent magnet direct-drive wind turbine or photovoltaic reactive output at the i-th node in the basic step t.