Aircraft equipment transfer scheduling method and device considering pick-up and delivery coordination
By constructing the platform coordinate system and aircraft posture conversion model, integrating the equipment storage area and mounting equipment workstations, and using the shortest path algorithm to optimize the equipment transfer path, the problem of low airborne equipment transfer efficiency is solved and efficient equipment support is achieved. Operation.
Patent Information
- Application Number
- CN202210374076.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-11
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2042-04-11
AI Technical Summary
In the existing technology, the transfer efficiency of airborne equipment is low, especially when different types of equipment need to be unloaded and mounted when tasks change, which takes a long time and becomes a bottleneck in the platform's operating cycle.
By constructing the platform coordinate system and aircraft posture conversion model, integrating the equipment storage area, mounting equipment station points and platform boundary points, a visual undirected graph is constructed, the shortest path algorithm is used to calculate the equipment transfer path library, and priority is given based on equipment support Level scheduling tasks to optimize the path planning of equipment trucks.
It improves the efficiency of equipment transfer and support operations, shortens the equipment support cycle, and improves the efficiency of platform aircraft equipment transfer.
Smart Images

Figure CN114943366B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of equipment support, and in particular to a method and device for scheduling aircraft equipment transportation taking into account pick-up and delivery coordination. Background Art
[0002] Regarding the airborne equipment transfer support operation in the actual platform aircraft airborne equipment support mission, before the maintenance and service support operation begins, the equipment support personnel will transfer all kinds of airborne equipment required for the mission to the equipment storage area where the platform has been fixed, and make various technical preparations; during the maintenance and service support implementation stage, according to the equipment mounting sequence plan of each aircraft support, the airborne equipment will be transferred to the corresponding mounting equipment workstation by equipment transport vehicles to perform equipment mounting operations. After the batch mounting is completed, it will return to the equipment storage area to prepare for the next batch mounting. However, equipment transport vehicles can only carry equipment of the same type, and when the mission change involves changing the model of the airborne equipment, it is necessary to simultaneously remove the mounted equipment from the mounting equipment point and re-transfer and mount another type of equipment. At this time, an efficient transfer scheduling mechanism is very necessary.
[0003] However, according to statistics, the average operation time of airborne equipment support accounts for the largest proportion of platform maintenance and service support, and the efficiency of equipment transfer has become one of the important bottleneck factors restricting the platform operation cycle. When it involves mission changes and needs to unload several types of equipment (take) and mount several other types of equipment (deliver) at the same time, equipment support operations take longer. Summary of the invention
[0004] Based on this, it is necessary to provide an aircraft equipment transfer scheduling method and device that takes into account the coordination of pick-up and delivery and can improve the efficiency of platform aircraft equipment support operations in response to the above-mentioned technical problems.
[0005] A method for aircraft equipment transfer scheduling considering pick-up and delivery coordination, the method comprising:
[0006] Construct the platform coordinate system and the aircraft posture transformation model of the aircraft on the platform;
[0007] According to the arrangement state of the platform in the platform coordinate system and the aircraft posture conversion model, a convex hull vertex set corresponding to the aircraft vertex, a mounting equipment workstation set on the aircraft, a platform boundary vertex set and an equipment storage center point are obtained;
[0008] The convex hull vertex set, the mounting equipment workstation set, the platform boundary point set and the equipment storage center point are fused to obtain a fused point set, and a visual undirected graph of the fused point set is constructed;
[0009] The visual undirected graph is calculated using a shortest path algorithm to obtain a device transport path library; the device transport path library includes the shortest path between any two points in the visual undirected graph;
[0010] According to the time consumption of equipment support operations and the performance parameters of equipment handling vehicles, the equipment support priority is obtained; according to the platform aircraft equipment support operations, a set of scheduled tasks, a set of tasks to be decided, and a set of infeasible tasks are obtained; according to the equipment transfer path library, equipment support priority, a set of scheduled tasks, a set of tasks to be decided, and a set of infeasible tasks, the aircraft equipment transfer scheduling result is obtained.
[0011] In one of the embodiments, it also includes: determining the coordinates of the convex shell vertices and the mounting equipment workstations corresponding to the aircraft vertices in the standard state according to the arrangement state of the platform in the platform coordinate system and the aircraft posture conversion model; performing coordinate transformation on the coordinates of the aircraft convex shell vertices and the mounting equipment workstations in the standard state to obtain the aircraft convex shell vertex coordinates and the mounting equipment workstation coordinates corresponding to the aircraft vertices in the non-standard state; obtaining the platform boundary vertices according to the platform coordinate system, and obtaining the equipment storage center point by taking the equipment storage area as the vertex; obtaining the convex shell vertex set corresponding to the aircraft vertex, the mounting equipment workstation set on the aircraft, the platform boundary vertex set and the equipment storage center point according to the aircraft convex shell vertex coordinates, the mounting equipment workstation coordinates, the platform boundary vertices and the equipment storage center point.
[0012] In one embodiment, the method further includes: fusing the convex shell vertices of the aircraft and the mounting equipment workstations to obtain a first fusion point set; fusing the first fusion point set of the platform layout aircraft to obtain a second fusion point set; fusing the platform boundary vertex set and the second fusion point set to obtain a third fusion point set; fusing the equipment storage center point and the third fusion point set to obtain a fusion point set. Where N is the number of aircraft on the platform, Vc i 、Vw i are the convex hull vertex set and the mounting equipment workstation set of the i-th aircraft respectively. B is the vertex set of the platform boundary, and Wsc is the device storage center point.
[0013] In one of the embodiments, it also includes: according to the fusion point set, cyclically and non-repeatedly selecting two vertices in the fusion point set, and connecting them into line segments to obtain pairwise lines in the fusion point set; using a graph visualization method to visualize the pairwise lines and obstacles in the fusion point set, for the two-point lines that do not pass through the obstacle, calculating the Euclidean distance between the two points, and for the two-point lines that pass through the obstacle, defining the distance between the two points as infinite; traversing the fusion point set, according to the two-point lines that do not pass through the obstacle in the pairwise lines, obtaining a set of visible path segments E, and according to the set of visible path segments E, obtaining a visible undirected graph G = (V, E) of the fusion point set.
[0014] In one of the embodiments, it also includes: according to the visual undirected graph and the shortest path algorithm, cyclically selecting the starting point Ps and the end point Pe to obtain the shortest distance between the starting point Ps and the end point Pe; wherein, Ps∈(Vw∪Wsc), Pe∈(Vw∪Wsc), Ps≠Pe, Vw is a set of mounting equipment workstations, and Wsc is an equipment storage center point; using a through-view graph method to through-view the path between the starting point Ps and the end point Pe, and obtaining the shortest path between any starting point Ps and the end point Pe according to the vertices passed by the shortest path; traversing and selecting the starting point Ps and the end point Pe to obtain a shortest distance matrix and a shortest path list, and obtaining an equipment transfer path library according to the shortest distance matrix and the shortest path list.
[0015] In one embodiment, it also includes: according to all aircraft platform airborne equipment support operations Get the scheduled task set Sg, the pending decision task set Dg and the infeasible task set Ug; the scheduled task set Sg includes all the guaranteed tasks that have been scheduled for start time and allocated the required equipment resources; the pending decision task set Dg includes all the guaranteed tasks that can be scheduled for guarantee but have not yet been scheduled for start time, expressed as The infeasible task set Ug includes all the guaranteed tasks that cannot be arranged for guarantee at the current moment, expressed as in, For P ij Unloading equipment operation on For P ij Mounting device operations performed on Indicates that in P eg The unloading equipment operation is performed on the aircraft, I represents the set of aircraft to be supported, i, e represent the aircraft numbers, i, e∈I, OW i represents the set of mounting equipment points of the i-th aircraft, j and g represent the mounting equipment point numbers, j∈OW i , g∈OW e , OWe represents the set of equipment points of the e-th aircraft, P ij represents the jth mounting point of the i-th aircraft, P eg Indicates the g-th mount point of the e-th aircraft.
[0016] In one of the embodiments, it also includes: according to the equipment transfer path library and the equipment guarantee priority, in order of priority from high to low, arranging equipment transport vehicles to perform equipment guarantee operations for picking up and delivering at the mounting equipment workstation to obtain a start guarantee time and an end guarantee time; according to the start guarantee time and the end guarantee time, updating the scheduled task set, the task set to be decided, and the infeasible task set; when the set to be decided is an empty set, completing the equipment guarantee operation.
[0017] In one embodiment, the method further includes: for two adjacent equipment support operations O supported by an equipment transport vehicle of type m and having a capacity of Q, ij and O kl , Equipment support operation kl The guaranteed start time is SO kl for:
[0018] SO kl =EO ij +T ijkl
[0019] in, For P ij Unloading equipment operation on For P ij Mounting device operations performed on For P kl Unloading equipment operation on For P kl The equipment mounting operation is performed on the aircraft, i, k represent the aircraft number, i, k∈I, I represents the set of aircraft to be supported, j, l represent the equipment mounting point number, j∈OW i , l∈OW k , OW i represents the set of equipment points of the i-th aircraft, OW k represents the set of equipment points of the kth aircraft, P ij represents the jth mounting point of the i-th aircraft, P kl represents the lth mounting point of the kth aircraft, EO ij To ensure equipment operation ij The end time of the guarantee, T ijkl Complete support operations for equipment transport vehicles ij Then click P from the mount device ijArrive at the mount device point P kl Time, O kl ∈Dg, Dg is the set of tasks to be decided.
[0020] In one embodiment, the method further comprises: And the transport vehicle completes the equipment support operation O ij When the capacity of the rear transporter is less than Q, when And the transport vehicle completes the equipment support operation O ij When the capacity of the rear transporter is equal to Q, when And the transport vehicle completes the equipment support operation O ij When the number of remaining equipment on the rear transport vehicle is greater than 0, when And the transport vehicle completes the equipment support operation O ij When the number of remaining equipment on the rear transport vehicle is equal to 0, when hour, when hour, in, For P ij Unloading equipment operation on For P ij Mounting device operations performed on Indicates that in P kl Unloading equipment operation on For P kl The equipment mounting operation is performed on the aircraft, I represents the set of aircraft to be supported, i, k represent the aircraft numbers, i, k∈I, OW i represents the set of mounting equipment points of the i-th aircraft, j, l represent the mounting equipment point numbers, j∈OW i , l∈OW k , OW k represents the set of equipment points of the kth aircraft, P ij represents the jth mounting point of the i-th aircraft, P kl represents the lth mounting point of the kth aircraft, T ijkl Complete equipment support operations for equipment transport vehicles ij Then click P from the mount device ij Arrive at the mount device point P kl time, Click P to mount the device ij Point P with the mounted device kl The distance between m is the speed of the m-type equipment transport vehicle, Click P to mount the device ij Distance to equipment storage center, It is the equipment storage center and the equipment mounting point P kl Δt2 is the time required for the transport truck to load the next batch of equipment at the equipment storage center, and Δt1 is the time required for the transport truck to unload the equipment at the equipment storage center and retrieve the equipment.
[0021] An aircraft equipment transfer scheduling device considering pick-up and delivery coordination, the device comprising:
[0022] A model building module is used to build a platform coordinate system and an aircraft posture transformation model of the aircraft on the platform;
[0023] A set acquisition module is used to obtain a convex hull vertex set corresponding to the aircraft vertex, a mounting equipment workstation set on the aircraft, a platform boundary vertex set and an equipment storage center point according to the arrangement state of the platform in the platform coordinate system and the aircraft posture conversion model;
[0024] A point set fusion module is used to fuse the convex hull vertex set, the mounting equipment workstation set, the platform boundary point set and the equipment storage center point to obtain a fused point set and construct a visual undirected graph of the fused point set;
[0025] A path library construction module is used to calculate the visual undirected graph using a shortest path algorithm to obtain an equipment transportation path library; the equipment transportation path library includes the shortest path between any two points in the visual undirected graph;
[0026] The scheduling module is used to obtain the equipment support priority according to the time consumption of the equipment support operation and the performance parameters of the equipment handling vehicle, obtain the scheduled task set, the task set to be decided and the infeasible task set according to the platform aircraft equipment support operation, and obtain the aircraft equipment transfer scheduling result according to the equipment transfer path library, equipment support priority, scheduled task set, task set to be decided and infeasible task set.
[0027] A computer device comprises a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the following steps are implemented:
[0028] Construct the platform coordinate system and the aircraft posture transformation model of the aircraft on the platform;
[0029] According to the arrangement state of the platform in the platform coordinate system and the aircraft posture conversion model, a convex hull vertex set corresponding to the aircraft vertex, a mounting equipment workstation set on the aircraft, a platform boundary vertex set and an equipment storage center point are obtained;
[0030] The convex hull vertex set, the mounting equipment workstation set, the platform boundary point set and the equipment storage center point are fused to obtain a fused point set, and a visual undirected graph of the fused point set is constructed;
[0031] The visual undirected graph is calculated using a shortest path algorithm to obtain a device transport path library; the device transport path library includes the shortest path between any two points in the visual undirected graph;
[0032] According to the time consumption of equipment support operations and the performance parameters of equipment handling vehicles, the equipment support priority is obtained; according to the platform aircraft equipment support operations, a set of scheduled tasks, a set of tasks to be decided, and a set of infeasible tasks are obtained; according to the equipment transfer path library, equipment support priority, a set of scheduled tasks, a set of tasks to be decided, and a set of infeasible tasks, the aircraft equipment transfer scheduling result is obtained.
[0033] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the following steps:
[0034] Construct the platform coordinate system and the aircraft posture transformation model of the aircraft on the platform;
[0035] According to the arrangement state of the platform in the platform coordinate system and the aircraft posture conversion model, a convex hull vertex set corresponding to the aircraft vertex, a mounting equipment workstation set on the aircraft, a platform boundary vertex set and an equipment storage center point are obtained;
[0036] The convex hull vertex set, the mounting equipment workstation set, the platform boundary point set and the equipment storage center point are fused to obtain a fused point set, and a visual undirected graph of the fused point set is constructed;
[0037] The visual undirected graph is calculated using a shortest path algorithm to obtain a device transport path library; the device transport path library includes the shortest path between any two points in the visual undirected graph;
[0038] According to the time consumption of equipment support operations and the performance parameters of equipment handling vehicles, the equipment support priority is obtained; according to the platform aircraft equipment support operations, a set of scheduled tasks, a set of tasks to be decided, and a set of infeasible tasks are obtained; according to the equipment transfer path library, equipment support priority, a set of scheduled tasks, a set of tasks to be decided, and a set of infeasible tasks, the aircraft equipment transfer scheduling result is obtained.
[0039] The above-mentioned aircraft equipment transfer scheduling method, device, computer equipment and storage medium considering the coordination of pick-up and delivery, by constructing the platform coordinate system and the aircraft posture conversion model of the aircraft on the platform, obtains the fusion point set of the position coordinates related to the equipment support operation, and constructs a visual undirected graph based on the fusion point set. The visual undirected graph is calculated using the shortest path algorithm to obtain the equipment transfer path library, which can improve the operation efficiency of the equipment transport vehicle, and obtain the equipment support priority according to the time consumption of the equipment support operation and the performance parameters of the equipment transport vehicle. According to the platform aircraft equipment support operation, the scheduled task set, the task set to be decided and the infeasible task set are obtained, thereby obtaining the aircraft equipment transfer scheduling result, and the equipment transport vehicle can be made path planning according to the equipment support priority to complete the equipment support operation. The embodiment of the present invention can improve the efficiency of platform aircraft equipment transfer and the efficiency of equipment support operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 A schematic diagram of a flow chart of an aircraft equipment transfer scheduling method considering pickup and delivery coordination in one embodiment;
[0041] Figure 2 A schematic diagram of a convex hull model of an aircraft in one embodiment;
[0042] Figure 3 A schematic diagram of a model of an aircraft posture conversion model of an aircraft on a platform in one embodiment;
[0043] Figure 4 It is a flowchart of an aircraft equipment transfer scheduling method considering pick-up and delivery coordination in a specific embodiment;
[0044] Figure 5 It is a structural block diagram of an aircraft equipment transfer scheduling device considering pick-up and delivery coordination in one embodiment;
[0045] Figure 6 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION
[0046] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0047] In one embodiment, Figure 1 As shown, a method for aircraft equipment transfer scheduling considering pick-up and delivery coordination is provided, comprising the following steps:
[0048] Step 102: construct a platform coordinate system and an aircraft posture conversion model of the aircraft on the platform.
[0049] According to the structural characteristics of the aircraft and the platform environment, an equipment transfer obstacle model is established, and obstacles such as aircraft and buildings arranged on the platform are constructed as a convex shell model. The platform is arranged with aircraft, equipment transport vehicles and buildings, etc. The platform can be a sea surface platform. The obstacles are relative to the equipment transport vehicles, including the convex shell of the aircraft arranged on the platform, buildings and platform boundaries, etc. The equipment transport vehicles cannot directly pass through. Taking full account of the space occupied by the aircraft, using the shape characteristics and spatial structure of the aircraft, the aircraft arranged on the platform are modeled as a pentagonal convex shell, such as Figure 2 As shown in the figure, the height of the obstacle convex hull of the aircraft is smaller than the area where the equipment transporter can safely pass. By establishing the platform coordinate system and the aircraft posture transformation model of the aircraft on the platform, the posture of the aircraft at any time on the platform can be described. The posture refers to the coordinates and azimuth, such as Figure 3 As shown in the figure, state A represents the standard state of the aircraft at the coordinate origin. State A is obtained by rotation and translation to obtain state B. State B represents the non-standard state. The center position of the two rear wheels of the aircraft is taken as the coordinate reference point. The angle between the vector connecting the center of the front and rear wheels of the aircraft pointing to the nose and the positive direction of the X-axis of the aircraft surface is the direction angle. When convex hull modeling is performed, the size of the aircraft is known. When the aircraft coordinate reference point is located at the coordinate origin of the aircraft surface and the aircraft azimuth is 0°, the coordinates of the convex hull vertex and the mounting equipment workstation can be described. This state is recorded as the standard state of the aircraft.
[0050] Step 104, according to the arrangement state of the platform in the platform coordinate system and the aircraft posture conversion model, obtain the convex hull vertex set corresponding to the aircraft vertex, the mounting equipment workstation set on the aircraft, the platform boundary vertex set and the equipment storage center point.
[0051] An aircraft model is established according to the shape and structure of the aircraft. The aircraft model is a pentagonal convex shell model. The aircraft vertices correspond to the convex shell vertices. The convex shell vertex set includes the convex shell vertex coordinates of the platform-arranged aircraft. The mounting equipment workstation refers to the position coordinates of the equipment transport personnel when mounting or unloading equipment at the mounting equipment point. The mounting equipment workstation set includes the mounting equipment workstation of the platform-arranged aircraft. The mounting equipment point is located under the wing and is the position coordinate of the airborne equipment connected to the aircraft. The platform boundary vertices can be directly determined by the platform coordinate system. The area within the platform boundary is the working range of the equipment transporter. The platform boundary vertices are regarded as positions that the equipment transporter cannot pass through. The equipment storage center point is obtained by reducing the equipment storage area to one vertex.
[0052] Step 106, merging the convex hull vertex set, the mounting equipment workstation set, the platform boundary point set and the equipment storage center point to obtain a fused point set, and constructing a visual undirected graph of the fused point set.
[0053] The fusion is performed in the form of union. By fusing the point sets, the distance between the points can be calculated to obtain an undirected graph.
[0054] Step 108, using the shortest path algorithm to calculate the visible undirected graph to obtain a device transfer path library; the device transfer path library includes the shortest path between any two points in the visible undirected graph.
[0055] The platform layout includes aircraft, buildings, and equipment transporters carrying different types of equipment. The equipment transporters have different travel speeds and operating times to load different types of equipment. Therefore, the equipment transfer route is not a fixed route and needs to be planned according to the platform layout. The shortest path algorithm includes the Warshall-Floy algorithm, which can solve the multi-source shortest distance problem. By building an equipment transfer path library, the equipment transporter can reach the equipment mounting site or the equipment storage center with the shortest distance, thereby improving the equipment transfer rate.
[0056] Step 110, obtain the equipment support priority according to the time consumption of the equipment support operation and the performance parameters of the equipment handling vehicle, obtain the scheduled task set, the task set to be decided and the infeasible task set according to the platform aircraft equipment support operation, and obtain the aircraft equipment transfer scheduling result according to the equipment transfer path library, equipment support priority, the scheduled task set, the task set to be decided and the infeasible task set.
[0057] Equipment support operations refer to the process of loading and unloading aircraft-borne equipment. After the equipment is transported to the equipment mounting point, it is hoisted by support personnel and completed by mechanized methods. Aircraft equipment transportation needs to meet the requirements that when a mounting equipment workstation needs to perform equipment unloading operations and equipment mounting operations at the same time, the equipment unloading operation must be performed first, and then the equipment mounting operation can be performed. The equipment support priority can enable the equipment transporter to select equipment mounting points on aircraft with high priority for equipment support operations until all mounting equipment points on the aircraft complete the support task.
[0058] In the above-mentioned aircraft equipment transfer scheduling method considering the coordination of pick-up and delivery, by constructing the platform coordinate system and the aircraft posture conversion model of the aircraft on the platform, a fusion point set of position coordinates related to the equipment support operation is obtained. According to the fusion point set, a visual undirected graph is constructed. Based on the platform layout state and considering the good maneuverability of the equipment transfer equipment, it can move along any broken line on the platform. The equipment transfer path library is constructed using the through-graph method. The visual undirected graph is calculated using the shortest path algorithm to obtain the equipment transfer path library. According to the time consumption of the equipment support operation and the performance parameters of the equipment handling vehicle, the equipment support priority is obtained. According to the platform aircraft equipment support operation, the scheduled task set, the task set to be decided and the infeasible task set are obtained, thereby obtaining the aircraft equipment transfer scheduling result. The embodiment of the present invention can improve the efficiency of platform aircraft equipment transfer and the efficiency of equipment support operations.
[0059] In one of the embodiments, obtaining a set of convex hull vertices corresponding to aircraft vertices, a set of mounting equipment workstations on the aircraft, a set of platform boundary vertices, and an equipment storage center point according to the arrangement state of the platforms in the platform coordinate system and the aircraft posture conversion model can be: determining the coordinates of the convex hull vertices and mounting equipment workstations corresponding to the aircraft vertices in the standard state according to the arrangement state of the platforms in the platform coordinate system and the aircraft posture conversion model; performing coordinate transformation on the coordinates of the aircraft convex hull vertices and mounting equipment workstations in the standard state to obtain the aircraft convex hull vertex coordinates and mounting equipment workstation coordinates corresponding to the aircraft vertices in the non-standard state; obtaining the platform boundary vertices according to the platform coordinate system, and taking the equipment storage area as the vertex to obtain the equipment storage center point; obtaining a set of convex hull vertices corresponding to the aircraft vertices, a set of mounting equipment workstations on the aircraft, a set of platform boundary vertices, and an equipment storage center point according to the aircraft convex hull vertex coordinates, the mounting equipment workstation coordinates, the platform boundary vertices, and the equipment storage center point.
[0060] In this embodiment, for the coordinates (x′, y′) of a certain point on the aircraft in the non-standard state, the coordinates (x, y) of the corresponding point on the aircraft in the standard state can be obtained by coordinate transformation:
[0061]
[0062] Among them, (x0, y0) represents the reference point coordinates corresponding to the non-standard state aircraft coordinates, and θ is the aircraft azimuth. Therefore, for the known convex hull vertex or mounting equipment workstation coordinates (x n ,y n ), and the aircraft attitude in the current state The corresponding convex hull vertex or mounting equipment workstation coordinates in this state can be expressed as:
[0063]
[0064] Thus, the set of vertices Vc of the convex shell of the platform layout aircraft and the set of workstations Vw of the mounting equipment can be obtained.
[0065] In one embodiment, the convex hull vertex set, the mounting equipment workstation set, the platform boundary point set and the equipment storage center point are fused to obtain a fused point set: the convex hull vertices and the mounting equipment workstation of the aircraft are fused to obtain a first fused point set; the first fused point set of the platform layout aircraft is fused to obtain a second fused point set; the platform boundary vertex set and the second fused point set are fused to obtain a third fused point set; the equipment storage center point and the third fused point set are fused to obtain a fused point set Where N is the number of aircraft on the platform, Vc i 、Vw iare the convex hull vertex set and the mounting equipment workstation set of the i-th aircraft respectively. B is the vertex set of the platform boundary, and Wsc is the device storage center point.
[0066] In this embodiment, points on the platform related to equipment support operations are fused according to the platform layout to form a fused point set, thereby constructing a visual undirected graph to connect unrelated points.
[0067] In one of the embodiments, the steps of constructing a visual undirected graph of the fused point set may be: according to the fused point set, cyclically and non-repeatedly select two vertices in the fused point set, and connect them into line segments to obtain pairwise lines in the fused point set; use a graph visualization method to visualize the pairwise lines and obstacles in the fused point set, for the two-point lines that do not pass through the obstacle, calculate the Euclidean distance between the two points, and for the two-point lines that pass through the obstacle, define the distance between the two points as infinite; traverse the fused point set, and obtain a visual path segment set E according to the two-point lines that do not pass through the obstacle in the pairwise lines, and obtain a visual undirected graph G = (V, E) of the fused point set according to the visual path segment set E.
[0068] In this embodiment, the visual undirected graph is often used for path planning and real-time collision avoidance of drones to facilitate solving the optimal support path. The steps of constructing the visual undirected graph can be to construct an undirected graph between the convex hull vertices, an undirected graph between the mounting equipment workstations, and an undirected graph between the convex hull vertices and the mounting equipment workstations for each aircraft arranged on the platform; for different aircraft arranged on the platform, construct an undirected graph between the convex hull vertices, an undirected graph between the mounting equipment workstations, and an undirected graph between the mounting equipment workstations and the convex hull vertices; construct an undirected graph between all aircraft convex hull vertices, mounting equipment workstations, and equipment storage centers; construct an undirected graph between boundary points; construct an undirected graph between all aircraft convex hull vertices, mounting equipment workstations, and platform boundary vertices; construct an undirected graph between the platform boundary points and the equipment storage center points. Taking the undirected graph between the convex hull vertices, the undirected graph between the mounting equipment workstations, and the undirected graph between the mounting equipment workstations and the convex hull vertices as an example, the specific steps of constructing the visual undirected graph are:
[0069] S10, cyclically and non-repeatedly connecting the convex shell vertices or mounting equipment workstations on two different aircraft arranged in the platform to form a line segment L.
[0070] S12, determining the intersection of the line segment L and obstacles on the platform, where the obstacles include aircraft convex shells arranged on the platform, buildings, platform boundaries and other parts that equipment transport vehicles cannot directly pass through.
[0071] S14, if the line segment L does not intersect with the obstacle on the platform, that is, the line segment L is a line connecting two points that does not pass through the obstacle, then it is a visible line, and the Euclidean distance of the line segment is defined as the weight of the undirected graph. Otherwise, the distance between the two points is defined as infinite, and the corresponding weight is also infinite.
[0072] S16, after completing the traversal of the fused point set V, select visible line segments to form a set E, and then construct a visible undirected graph G = (V, E) of the point set V, and obtain the weight matrix Wg of the graph.
[0073] In one of the embodiments, the shortest path algorithm is used to calculate the visual undirected graph, and the equipment transfer path library can be obtained by: according to the visual undirected graph and the shortest path algorithm, the starting point Ps and the end point Pe are cyclically selected to obtain the shortest distance between the starting point Ps and the end point Pe; wherein, Ps∈(Vw∪Wsc), Pe∈(Vw∪Wsc), Ps≠Pe, Vw is the set of mounting equipment workstations, and Wsc is the equipment storage center point; the path between the starting point Ps and the end point Pe is visually viewed using the through-graph method, and the shortest path between the two points is obtained according to the vertices passed by the shortest path between any starting point Ps and the end point Pe; the starting point Ps and the end point Pe are traversed and selected to obtain the shortest distance matrix and the shortest path list, and the equipment transfer path library is obtained according to the shortest distance matrix and the shortest path list.
[0074] In this embodiment, the equipment transporter has good maneuverability and can move along any broken line on the platform. Therefore, the optimal support path can be solved by using a visual undirected graph for path planning. Specifically, it is necessary to construct a convex hull model of all obstacles on the platform, and use a graph visualization method to connect the visible vertices to form a visual undirected graph. Based on the visual undirected graph, a through-graph method and the Warshall-Floy algorithm are used to construct an equipment transfer path library, and the visual undirected graph G and its weight matrix Wg are calculated. The equipment transfer path library is obtained by calculating the shortest path between the equipment storage center and the mounting equipment workstation and between different mounting equipment workstations. According to the equipment transfer path library, combined with the transfer scheduling results, the equipment support operation can be efficiently carried out, thereby shortening the equipment support cycle.
[0075] In one embodiment, all aircraft platform airborne equipment support operations The scheduled task set Sg, the task set to be decided Dg and the infeasible task set Ug are obtained; the scheduled task set Sg includes all the guarantee jobs that have been scheduled for start time and allocated the required equipment resources; the task set to be decided Dg includes all the guarantee jobs that can be scheduled for guarantee but have not yet been scheduled for start time, expressed as The infeasible task set Ug includes all the guaranteed tasks that cannot be scheduled for guarantee at the current moment, expressed as in, For P ij Unloading equipment operation on For P ij Mounting device operations performed on Indicates that in P eg The unloading equipment operation is performed on the aircraft, I represents the set of aircraft to be supported, i, e represent the aircraft numbers, i, e∈I, OW i represents the set of mounting equipment points of the i-th aircraft, j and g represent the mounting equipment point numbers, j∈OW i , g∈OW e , OW e represents the set of equipment points of the e-th aircraft, P ij represents the jth mounting point of the i-th aircraft, P eg Indicates the g-th mount point of the e-th aircraft.
[0076] In this embodiment, the equipment support operations can be classified by defining the scheduled task set Sg, the task set to be decided Dg and the infeasible task set Ug, and the scheduled task set Sg, the task set to be decided Dg and the infeasible task set Ug are updated. When the task set to be decided Dg is an empty set, all equipment support operations are completed.
[0077] In one of the embodiments, the steps for obtaining the aircraft equipment transfer scheduling result according to the equipment transfer path library, equipment support priority, scheduled task set, pending decision task set and infeasible task set may be: according to the equipment transfer path library and equipment support priority, in order of priority from high to low, arrange the equipment transport vehicle to perform equipment support operations for pick-up and delivery coordination at the equipment mounting work station to obtain the start support time and the end support time; according to the start support time and the end support time, update the scheduled task set, pending decision task set and infeasible task set; when the pending decision set is an empty set, complete the equipment support operation.
[0078] Specifically, the steps to obtain the equipment transfer scheduling results are:
[0079] S20: Count the time consumption of equipment support operations and the performance parameters of equipment handling vehicles to determine the priority of aircraft support.
[0080] Further, with respect to the technical problem described in the background technology of the present invention, when a mounting device point has both the requirement of unloading a device and the requirement of mounting a device, there is a priority constraint. In this case, the work of unloading a device is completed first.
[0081] S22, construct the scheduled task set Sg, the pending decision task set Dg and the infeasible task set Ug. S24, select one equipment guarantee task in turn according to the equipment guarantee priority.
[0082] S26, arrange equipment transport vehicles to perform equipment support operations. ij , record the start and end guarantee time of the operation.
[0083] S28, update the scheduled task set Sg, the pending decision task set Dg and the infeasible task set Ug.
[0084] Furthermore, the operation O ij Add to Sg, expressed as Sg = Sg ∪ {O ij}, remove equipment support job O from Dg ij , expressed as Dg=Dg\{O ij},if Then Added to Dg, expressed as And remove the job from Ug Expressed as in, To unload the equipment, For equipment mounting operations, I represents the set of aircraft to be supported, i represents the aircraft number, i∈I, OW i represents the set of mounting equipment points of the i-th aircraft, j represents the mounting equipment point number, j∈OW i .
[0085] S30, judging whether the conditions are met: That is, all equipment protection operations have been completed. If the conditions are not met, return to step S24. If the conditions are met, exit the loop.
[0086] In one embodiment, the step of obtaining the start guarantee time and the end guarantee time may be: for two adjacent equipment guarantee operations O guaranteed by an equipment transport vehicle of type m and having a capacity of Q, ij and O kl , Equipment support operation kl The guaranteed start time is SO kl for:
[0087] SO kl =EO ij +T ijkl
[0088] in, For P ij Unloading equipment operation on For P ij Mounting device operations performed on For P kl Unloading equipment operation on For P kl The equipment mounting operation is performed on the aircraft, i, k represent the aircraft number, i, k∈I, I represents the set of aircraft to be supported, j, l represent the equipment mounting point number, j∈OW i , l∈OW k , OW i represents the set of equipment points of the i-th aircraft, OW k represents the set of equipment points of the kth aircraft, P ij represents the jth mounting point of the i-th aircraft, P kl represents the lth mounting point of the kth aircraft, EO ij To ensure equipment operation ij The end time of the guarantee, T ijkl Complete support operations for equipment transport vehicles ij Then click P from the mount device ij Arrive at the mount device point P kl Time, O kl ∈Dg, Dg is the set of tasks to be decided.
[0089] In one embodiment, the step of obtaining the start time and end time of the equipment maintenance operation may also be: And the transport vehicle completes the equipment support operation O ij When the capacity of the rear transporter is less than Q, when And the transport vehicle completes the equipment support operation O ij When the capacity of the rear transporter is equal to Q, when And the transport vehicle completes the equipment support operation O ij When the number of remaining equipment on the rear transport vehicle is greater than 0, when And the transport vehicle completes the equipment support operation O ij When the number of remaining equipment on the rear transport vehicle is equal to 0, when hour, when hour, in, For P ij Unloading equipment operation on For P ij Mounting device operations performed on Indicates that in P kl Unloading equipment operation on For P kl The equipment mounting operation is performed on the aircraft, I represents the set of aircraft to be supported, i, k represent the aircraft numbers, i, k∈I, OW irepresents the set of mounting equipment points of the i-th aircraft, j, l represent the mounting equipment point numbers, j∈OW i , l∈OW k , OW k represents the set of equipment points of the kth aircraft, P ij represents the jth mounting point of the i-th aircraft, P kl represents the lth mounting point of the kth aircraft, T ijkl Complete equipment support operations for equipment transport vehicles ij Then click P from the mount device ij Arrive at the mount device point P kl time, Click P to mount the device ij Point P with the mounted device kl The distance between m is the speed of the m-type equipment transport vehicle, Click P to mount the device ij Distance to equipment storage center, It is the equipment storage center and the equipment mounting point P kl Δt2 is the time required for the transport truck to load the next batch of equipment at the equipment storage center, and Δt1 is the time required for the transport truck to unload the equipment at the equipment storage center and retrieve the equipment.
[0090] In a specific embodiment, Figure 4 As shown in FIG. 1 , a schematic diagram of a flow chart of aircraft equipment transfer scheduling considering pick-up and delivery coordination is provided. Figure 4 In the process, the platform coordinate system is established, the set of platform boundary vertices can be determined, the coordinates of the aircraft convex shell vertices and the mounting equipment workstations under the standard state can be determined, the aircraft convex shell model and the aircraft posture conversion model can be constructed, and the set of aircraft convex shell vertices and the mounting equipment workstations can be obtained through coordinate transformation. The equipment storage area is reduced to a vertex to obtain the equipment storage center point, and the convex shell vertices, mounting equipment workstations, platform boundary vertices and equipment storage center point can be integrated to obtain the fusion point set, and a visual undirected graph of the fusion point set is constructed. The Warshall-Floy algorithm is used to calculate the shortest distance between any two points and the path nodes passed through, and the path library of the fusion point set is obtained. The shortest path can be planned for the equipment transporter to improve the equipment transfer efficiency, thereby obtaining the platform aircraft equipment transfer scheduling result.
[0091] It should be understood that although Figure 1 and 4The steps in the flowchart are shown in sequence as indicated by the arrows, but these steps are not necessarily executed in the order indicated by the arrows. Unless otherwise specified in this document, there is no strict order restriction for the execution of these steps, and these steps can be executed in other orders. Moreover, Figure 1 and 4 At least part of the steps may include multiple sub-steps or multiple stages. These sub-steps or stages are not necessarily executed at the same time, but can be executed at different times. The execution order of these sub-steps or stages is not necessarily sequential, but can be executed in turn or alternately with other steps or at least part of the sub-steps or stages of other steps.
[0092] In one embodiment, Figure 5 As shown, an aircraft equipment transfer scheduling device considering pick-up and delivery coordination is provided, including: a model building module 502, a set acquisition module 504, a point set fusion module 506, a path library building module 508 and a scheduling module 510, wherein:
[0093] Model building module 502, used to build a platform coordinate system and an aircraft posture conversion model of the aircraft on the platform;
[0094] The set acquisition module 504 is used to obtain the convex hull vertex set corresponding to the aircraft vertex, the mounting equipment workstation set on the aircraft, the platform boundary vertex set and the equipment storage center point according to the arrangement state of the platform in the platform coordinate system and the aircraft posture conversion model;
[0095] The point set fusion module 506 is used to fuse the convex hull vertex set, the mounting equipment workstation set, the platform boundary point set and the equipment storage center point to obtain a fused point set and construct a visual undirected graph of the fused point set;
[0096] The path library construction module 508 is used to calculate the visual undirected graph using the shortest path algorithm to obtain the equipment transportation path library; the equipment transportation path library includes the shortest path between any two points in the visual undirected graph;
[0097] The scheduling module 510 is used to obtain the equipment support priority according to the time consumption of the equipment support operation and the performance parameters of the equipment handling vehicle, obtain the scheduled task set, the task set to be decided and the infeasible task set according to the platform aircraft equipment support operation, and obtain the aircraft equipment transfer scheduling result according to the equipment transfer path library, the equipment support priority, the scheduled task set, the task set to be decided and the infeasible task set.
[0098] In one of the embodiments, the model building module 502 is also used to determine the coordinates of the convex shell vertices and mounting equipment workstations corresponding to the aircraft vertices in the standard state according to the layout state of the platform in the platform coordinate system and the aircraft posture conversion model; perform coordinate transformation on the coordinates of the aircraft convex shell vertices and mounting equipment workstations in the standard state to obtain the aircraft convex shell vertex coordinates and mounting equipment workstation coordinates corresponding to the aircraft vertices in the non-standard state; obtain the platform boundary vertices according to the platform coordinate system, and obtain the equipment storage center point by taking the equipment storage area as the vertex; obtain the convex shell vertex set corresponding to the aircraft vertex, the mounting equipment workstation set on the aircraft, the platform boundary vertex set and the equipment storage center point according to the aircraft convex shell vertex coordinates, the mounting equipment workstation coordinates, the platform boundary vertices and the equipment storage center point.
[0099] In one embodiment, the set acquisition module 504 is also used to fuse the convex hull vertices of the aircraft and the mounting equipment workstations to obtain a first fusion point set; fuse the first fusion point set of the platform layout aircraft to obtain a second fusion point set; fuse the platform boundary vertex set and the second fusion point set to obtain a third fusion point set; fuse the equipment storage center point and the third fusion point set to obtain a fusion point set Where N is the number of aircraft on the platform, Vc i 、Vw i are the convex hull vertex set and the mounting equipment workstation set of the i-th aircraft respectively. B is the vertex set of the platform boundary, and Wsc is the device storage center point.
[0100] In one of the embodiments, the point set fusion module 506 is also used to visualize the pairwise lines and obstacles in the fused point set using a graph visualization method. For the two-point line that does not pass through the obstacle, the Euclidean distance between the two points is calculated, and for the two-point line that passes through the obstacle, the distance between the two points is defined as infinite; the fused point set is traversed, and a visible path segment set E is obtained based on the two-point lines that do not pass through the obstacle in the pairwise lines, and a visible undirected graph G = (V, E) of the fused point set is obtained based on the visible path segment set E.
[0101] In one of the embodiments, the path library construction module 508 is also used to cyclically select the starting point Ps and the end point Pe according to the visual undirected graph and the shortest path algorithm to obtain the shortest distance between the starting point Ps and the end point Pe; wherein, Ps∈(Vw∪Wsc), Pe∈(Vw∪Wsc), Ps≠Pe, Vw is a set of mounting equipment workstations, and Wsc is the equipment storage center point; the path between the starting point Ps and the end point Pe is visually viewed using a through-view graph method, and the shortest path between the two points is obtained based on the vertices passed by the shortest path between any starting point Ps and the end point Pe; the starting point Ps and the end point Pe are traversed and selected to obtain the shortest distance matrix and the shortest path list, and the equipment transfer path library is obtained based on the shortest distance matrix and the shortest path list.
[0102] In one embodiment, the scheduling module 510 is further used to obtain the scheduled task set, the pending decision task set and the infeasible task set according to the aircraft equipment support operation. The scheduled task set, the pending decision task set and the infeasible task set can be: The scheduled task set Sg, the task set to be decided Dg and the infeasible task set Ug are obtained; the scheduled task set Sg includes all the guarantee jobs that have been scheduled for start time and allocated the required equipment resources; the task set to be decided Dg includes all the guarantee jobs that can be scheduled for guarantee but have not yet been scheduled for start time, expressed as The infeasible task set Ug includes all the guaranteed tasks that cannot be scheduled for guarantee at the current moment, expressed as in, For P ij Unloading equipment operation on For P ij Mounting device operations performed on Indicates that in P eg The unloading equipment operation is performed on the aircraft, I represents the set of aircraft to be supported, i, e represent the aircraft numbers, i, e∈I, OW i represents the set of mounting equipment points of the i-th aircraft, j and g represent the mounting equipment point numbers, j∈OW i , g∈OW e , OW e represents the set of equipment points of the e-th aircraft, P ij represents the jth mounting point of the i-th aircraft, P eg Indicates the g-th mount point of the e-th aircraft.
[0103] In one of the embodiments, the scheduling module 510 is also used to arrange equipment transport vehicles to perform equipment support operations for pick-up and delivery coordination at the mounting equipment workstation in order of priority from high to low according to the equipment transfer path library and the equipment support priority, and obtain the start support time and the end support time; according to the start support time and the end support time, update the scheduled task set, the task set to be decided, and the infeasible task set; when the set to be decided is an empty set, the equipment support operation is completed.
[0104] In one embodiment, the scheduling module 510 is further configured to schedule two adjacent equipment support operations O to be supported by an equipment transport vehicle of type m and having a capacity of Q. ij and O kl , Equipment support operation kl The guaranteed start time is SO kl for:
[0105] SO kl =EO ij +T ijkl
[0106] in, For P ij Unloading equipment operation on For P ij Mounting device operations performed on For P kl Unloading equipment operation on For P kl The equipment mounting operation is performed on the aircraft, i, k represent the aircraft number, i, k∈I, I represents the set of aircraft to be supported, j, l represent the equipment mounting point number, j∈OW i , l∈OW k , OW i represents the set of equipment points of the i-th aircraft, OW k represents the set of equipment points of the kth aircraft, P ij represents the jth mounting point of the i-th aircraft, P kl represents the lth mounting point of the kth aircraft, EO ij To ensure equipment operation ij The end time of the guarantee, T ijkl Complete support operations for equipment transport vehicles ij Then click P from the mount device ij Arrive at the mount device point P kl Time, O kl ∈Dg, Dg is the set of tasks to be decided.
[0107] In one embodiment, the scheduling module 510 is also used when And the transport vehicle completes the equipment support operation O ij When the capacity of the rear transporter is less than Q, when And the transport vehicle completes the equipment support operation O ij When the capacity of the rear transporter is equal to Q, when And the transport vehicle completes the equipment support operation O ij When the number of remaining equipment on the rear transport vehicle is greater than 0, when And the transport vehicle completes the equipment support operation O ij When the number of remaining equipment on the rear transport vehicle is equal to 0, when hour, when hour, in, For P ij Unloading equipment operation on For P ij Mounting device operations performed on Indicates that in P kl Unloading equipment operation on For P kl The equipment mounting operation is performed on the aircraft, I represents the set of aircraft to be supported, i, k represent the aircraft numbers, i, k∈I, OW i represents the set of mounting equipment points of the i-th aircraft, j, l represent the mounting equipment point numbers, j∈OW i , l∈OW k , OW k represents the set of equipment points of the kth aircraft, P ij represents the jth mounting point of the i-th aircraft, P kl represents the lth mounting point of the kth aircraft, T ijkl Complete equipment support operations for equipment transport vehicles ij Then click P from the mount device ij Arrive at the mount device point P kl time, Click P to mount the device ij Point P with the mounted device kl The distance between m is the speed of the m-type equipment transport vehicle, Click P to mount the device ij Distance to equipment storage center, P is the equipment storage center and the equipment mounting point kl Δt2 is the time required for the transport truck to load the next batch of equipment at the equipment storage center, and Δt1 is the time required for the transport truck to unload the equipment at the equipment storage center and retrieve the equipment.
[0108] The specific definition of the aircraft equipment transfer scheduling device considering the coordination of pick-up and delivery can be found in the above definition of the aircraft equipment transfer scheduling method considering the coordination of pick-up and delivery, which will not be repeated here. Each module in the above-mentioned aircraft equipment transfer scheduling device considering the coordination of pick-up and delivery can be implemented in whole or in part by software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.
[0109] In one embodiment, a computer device is provided. The computer device may be a terminal, and its internal structure diagram may be as follows: Figure 6 As shown. The computer device includes a processor, a memory, a network interface, a display screen and an input device connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a method for transporting and scheduling aircraft equipment that takes into account the coordination of pick-up and delivery is implemented. The display screen of the computer device can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covering the display screen, or a key, trackball or touchpad set on the computer device housing, or an external keyboard, touchpad or mouse, etc.
[0110] Those skilled in the art will understand that Figure 6 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0111] In one embodiment, a computer device is provided, including a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the method in the above embodiment when executing the computer program.
[0112] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps of the method in the above embodiment are implemented.
[0113] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in the present application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
[0114] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0115] The above embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.
Claims
1. A method for scheduling aircraft equipment transportation considering pick-up and delivery coordination, characterized in that: The method comprises: Construct the platform coordinate system and the aircraft posture transformation model of the aircraft on the platform; According to the arrangement state of the platform in the platform coordinate system and the aircraft posture conversion model, a convex hull vertex set corresponding to the aircraft vertex, a mounting equipment workstation set on the aircraft, a platform boundary vertex set and an equipment storage center point are obtained; The convex hull vertex set, the mounting equipment workstation set, the platform boundary point set and the equipment storage center point are fused to obtain a fused point set, and a visual undirected graph of the fused point set is constructed; The visual undirected graph is calculated using a shortest path algorithm to obtain a device transport path library; the device transport path library includes the shortest path between any two points in the visual undirected graph; According to the time consumption of equipment support operation and the performance parameters of equipment handling vehicles, the equipment support priority is obtained; according to the platform aircraft equipment support operation, a scheduled task set, a task set to be decided and an infeasible task set are obtained; according to the equipment transfer path library, the equipment support priority, the scheduled task set, the task set to be decided and the infeasible task set, the aircraft equipment transfer scheduling result is obtained; The step of obtaining, according to the arrangement state of the platforms in the platform coordinate system and the aircraft posture conversion model, a convex hull vertex set corresponding to the aircraft vertex, a mounting equipment workstation set on the aircraft, a platform boundary vertex set, and an equipment storage center point includes: Determine the coordinates of the convex hull vertex and the mounting equipment workstation corresponding to the aircraft vertex in the standard state according to the arrangement state of the platform in the platform coordinate system and the aircraft posture conversion model; Performing coordinate transformation on the coordinates of the aircraft convex shell vertex and the mounting equipment workstation in the standard state to obtain the aircraft convex shell vertex coordinates and the mounting equipment workstation coordinates corresponding to the aircraft vertex in the non-standard state; According to the platform coordinate system, the platform boundary vertices are obtained, and the equipment storage area is used as a vertex to obtain the equipment storage center point; According to the coordinates of the convex hull vertices of the aircraft, the coordinates of the mounting equipment workstations, the platform boundary vertices and the equipment storage center, a convex hull vertex set corresponding to the aircraft vertex, a mounting equipment workstation set on the aircraft, a platform boundary vertex set and an equipment storage center are obtained; The fusion point set obtained by fusion of the convex hull vertex set, the mounting equipment workstation set, the platform boundary point set and the equipment storage center point includes: Fusing the convex hull vertices of the aircraft and the mounting equipment workstations to obtain a first fusion point set; Fusing the first fusion point set of the platform layout aircraft to obtain a second fusion point set; Fusing the platform boundary vertex set and the second fused point set to obtain a third fused point set; The device storage center point and the third fusion point set are fused to obtain a fusion point set. Where N is the number of aircraft on the platform, Vc i 、Vw i are the convex hull vertex set and the mounting equipment workstation set of the i-th aircraft respectively. B is the vertex set of the platform boundary, and Wsc is the center point of equipment storage; The steps of constructing a visual undirected graph of the fused point set include: According to the fusion point set, two vertices are selected cyclically and non-repeatedly in the fusion point set, and connected into line segments to obtain pairwise connecting lines in the fusion point set; A graph visualization method is used to visualize the two-point connecting lines and obstacles in the fusion point set, and for a two-point connecting line that does not pass through an obstacle, the Euclidean distance between the two points is calculated, and for a two-point connecting line that passes through an obstacle, the distance between the two points is defined as infinite; Traversing the fused point set, obtaining a set of visible path segments E according to the two-point connecting lines that do not pass through obstacles in the pairwise connecting lines, and obtaining a visible undirected graph G = (V, E) of the fused point set according to the set of visible path segments E; The shortest path algorithm is used to calculate the visual undirected graph to obtain the equipment transport path library including: According to the visual undirected graph and the shortest path algorithm, the starting point Ps and the ending point Pe are cyclically selected to obtain the shortest distance between the starting point Ps and the ending point Pe; wherein, Ps∈(Vw∪Wsc), Pe∈(Vw∪Wsc), Ps≠Pe, Vw is a set of mounting equipment workstations, and Wsc is a center point for equipment storage; The path between the starting point Ps and the ending point Pe is viewed through the graph method, and the shortest path between any starting point Ps and the ending point Pe is obtained according to the vertices passed by the shortest path; Traverse and select the starting point Ps and the ending point Pe to obtain a shortest distance matrix and a shortest path list, and obtain a device transport path library according to the shortest distance matrix and the shortest path list; The scheduled task set, the task set to be decided, and the infeasible task set obtained according to the platform aircraft equipment support operation include: Support operations based on all aircraft platform airborne equipment Get the scheduled task set Sg, the pending decision task set Dg and the infeasible task set Ug; The scheduled task set Sg includes all the guarantee jobs that have been scheduled to start and have been allocated the required equipment resources; The set of pending decision tasks Dg includes all the guarantee tasks that can be scheduled for guarantee but have not yet been scheduled for start time, which is expressed as The infeasible task set Ug includes all the guaranteed tasks that cannot be arranged for guarantee at the current moment, expressed as in, For P ij Unloading equipment operation on For P ij Mounting device operations performed on Indicates that in P eg The unloading equipment operation is performed on the aircraft, I represents the set of aircraft to be supported, i, e represent the aircraft numbers, i, e∈I, OW i represents the set of mounting equipment points of the i-th aircraft, j and g represent the mounting equipment point numbers, j∈OW i , g∈OW e , OW e represents the set of equipment points of the e-th aircraft, P ij represents the jth mounting point of the i-th aircraft, P eg Indicates the g-th mounting point of the e-th aircraft; The step of obtaining the aircraft equipment transfer scheduling result according to the equipment transfer path library, the equipment guarantee priority, the scheduled task set, the pending decision task set and the infeasible task set comprises: According to the equipment transfer path library and the equipment guarantee priority, in descending order of priority, arrange the equipment transport vehicle to perform equipment guarantee operations for picking up and delivering at the equipment mounting workstation to obtain the start guarantee time and the end guarantee time; According to the start guarantee time and the end guarantee time, the scheduled task set, the pending decision task set and the infeasible task set are updated; When the set of tasks to be decided is an empty set, the equipment guarantee operation is completed.
2. The method according to claim 1, characterized in that The steps to obtain the start guarantee time and the end guarantee time include: For the two adjacent equipment support operations O supported by an equipment transport vehicle of type m and capacity Q, ij and O kl , Equipment support operation kl The guaranteed start time is SO kl for: SO kl =EO ij +T ijkl in, For P ij Unloading equipment operation on For P ij Mounting device operations performed on For P kl Unloading equipment operation on For P kl The equipment mounting operation is performed on the aircraft, i, k represent the aircraft number, i, k∈I, I represents the set of aircraft to be supported, j, l represent the equipment mounting point number, j∈OW i , l∈OW k , OW i represents the set of equipment points of the i-th aircraft, OW k represents the set of equipment points of the kth aircraft, P ij represents the jth mounting point of the i-th aircraft, P kl represents the lth mounting point of the kth aircraft, EO ij To ensure equipment operation ij The end time of the guarantee, T ijkl Complete support operations for equipment transport vehicles ij Then click P from the mount device ij Arrive at the mount device point P kl Time, O kl ∈Dg, Dg is the set of tasks to be decided.
3. The method according to any one of claims 1 or 2, characterized in that: The step of obtaining the start time and end time of the equipment protection operation also includes: when And the transport vehicle completes the equipment support operation O ij When the capacity of the rear transporter is less than Q, when And the transport vehicle completes the equipment support operation O ij When the capacity of the rear transporter is equal to Q, when And the transport vehicle completes the equipment support operation O ij When the number of remaining equipment on the rear transport vehicle is greater than 0, when And the transport vehicle completes the equipment support operation O ij When the number of remaining equipment on the rear transport vehicle is equal to 0, when hour, when hour, in, For P ij Unloading equipment operation on For P ij Mounting device operations performed on Indicates that in P kl Unloading equipment operation on For P kl The equipment mounting operation is performed on the aircraft, I represents the set of aircraft to be supported, i, k represent the aircraft numbers, i, k∈I, OW i represents the set of mounting equipment points of the i-th aircraft, j, l represent the mounting equipment point numbers, j∈OW i , l∈OW k , OW k represents the set of equipment points of the kth aircraft, P ij represents the jth mounting point of the i-th aircraft, P kl represents the lth mounting point of the kth aircraft, T ijkl Complete equipment support operations for equipment transport vehicles ij Then click P from the mount device ij Arrive at the mount device point P kl time, Click P to mount the device ij Point P with the mounted device kl The distance between m is the speed of the m-type equipment transport vehicle, Click P to mount the device ij Distance to equipment storage center, It is the equipment storage center and the equipment mounting point P kl Δt2 is the time required for the transport truck to load the next batch of equipment at the equipment storage center, and Δt1 is the time required for the transport truck to unload the equipment at the equipment storage center and retrieve the equipment.
4. An aircraft equipment transfer scheduling device considering pick-up and delivery coordination, characterized in that: The device comprises: A model building module is used to build a platform coordinate system and an aircraft posture transformation model of the aircraft on the platform; A set acquisition module is used to obtain a convex hull vertex set corresponding to the aircraft vertex, a mounting equipment workstation set on the aircraft, a platform boundary vertex set and an equipment storage center point according to the arrangement state of the platform in the platform coordinate system and the aircraft posture conversion model; A point set fusion module is used to fuse the convex hull vertex set, the mounting equipment workstation set, the platform boundary point set and the equipment storage center point to obtain a fused point set and construct a visual undirected graph of the fused point set; A path library construction module is used to calculate the visual undirected graph using a shortest path algorithm to obtain an equipment transportation path library; the equipment transportation path library includes the shortest path between any two points in the visual undirected graph; The scheduling module is used to obtain the equipment support priority according to the equipment support operation time and the equipment handling vehicle performance parameters, obtain the scheduled task set, the task set to be decided and the infeasible task set according to the platform aircraft equipment support operation, and obtain the aircraft equipment transfer scheduling result according to the equipment transfer path library, the equipment support priority, the scheduled task set, the task set to be decided and the infeasible task set; The set acquisition module is also used to determine the coordinates of the convex shell vertices and the mounting equipment workstations corresponding to the aircraft vertices in the standard state according to the arrangement state of the platform in the platform coordinate system and the aircraft posture conversion model; perform coordinate transformation on the coordinates of the aircraft convex shell vertices and the mounting equipment workstations in the standard state to obtain the aircraft convex shell vertex coordinates and the mounting equipment workstation coordinates corresponding to the aircraft vertices in the non-standard state; obtain the platform boundary vertices according to the platform coordinate system, and obtain the equipment storage center point by taking the equipment storage area as the vertex; obtain the convex shell vertex set corresponding to the aircraft vertex, the mounting equipment workstation set on the aircraft, the platform boundary vertex set and the equipment storage center point according to the aircraft convex shell vertex coordinates, the mounting equipment workstation coordinates, the platform boundary vertices and the equipment storage center point; The point set fusion module is also used to fuse the convex shell vertices of the aircraft and the mounting equipment workstations to obtain a first fusion point set; fuse the first fusion point set of the platform layout aircraft to obtain a second fusion point set; fuse the platform boundary vertex set and the second fusion point set to obtain a third fusion point set; fuse the equipment storage center point and the third fusion point set to obtain a fusion point set Where N is the number of aircraft on the platform, Vc i 、Vw i are the convex hull vertex set and the mounting equipment workstation set of the i-th aircraft respectively. B is the vertex set of the platform boundary, and Wsc is the center point of equipment storage; The point set fusion module is further used to select two vertices in the fusion point set cyclically and non-repeatedly according to the fusion point set, and connect them into line segments to obtain the pairwise lines in the fusion point set; use a graph visualization method to visualize the pairwise lines and obstacles in the fusion point set, for the two-point lines that do not pass through the obstacle, calculate the Euclidean distance between the two points, and for the two-point lines that pass through the obstacle, define the distance between the two points as infinite; traverse the fusion point set, and obtain a visual path segment set E according to the two-point lines that do not pass through the obstacle in the pairwise lines, and obtain a visual undirected graph G = (V, E) of the fusion point set according to the visual path segment set E; The path library construction module is also used to cyclically select the starting point Ps and the end point Pe according to the visual undirected graph and the shortest path algorithm to obtain the shortest distance between the starting point Ps and the end point Pe; wherein, Ps∈(Vw∪Wsc), Pe∈(Vw∪Wsc), Ps≠Pe, Vw is a set of mounting equipment workstations, and Wsc is a center point of equipment storage; the path between the starting point Ps and the end point Pe is viewed by a through-view diagram method, and the shortest path between any starting point Ps and the end point Pe is obtained according to the vertices passed by the shortest path between the two points; the starting point Ps and the end point Pe are traversed and selected to obtain a shortest distance matrix and a shortest path list, and the equipment transfer path library is obtained according to the shortest distance matrix and the shortest path list; The scheduling module is also used to support operations based on all aircraft platform airborne equipment Get the scheduled task set Sg, the pending decision task set Dg and the infeasible task set Ug; the scheduled task set Sg includes all the guaranteed tasks that have been scheduled for start time and allocated the required equipment resources; the pending decision task set Dg includes all the guaranteed tasks that can be scheduled for guarantee but have not yet been scheduled for start time, expressed as The infeasible task set Ug includes all the guaranteed tasks that cannot be arranged for guarantee at the current moment, expressed as in, For P ij Unloading equipment operation on For P ij Mounting device operations performed on Indicates that in P eg The unloading equipment operation is performed on the aircraft, I represents the set of aircraft to be supported, i, e represent the aircraft numbers, i, e∈I, OW i represents the set of mounting equipment points of the i-th aircraft, j and g represent the mounting equipment point numbers, j∈OW i , g∈OW e , OW e represents the set of equipment points of the e-th aircraft, P ij represents the jth mounting point of the i-th aircraft, P eg Indicates the g-th mounting point of the e-th aircraft; The scheduling module is also used to arrange equipment transport vehicles to perform equipment support operations for pick-up and delivery coordination at the equipment mounting workstations in order of priority from high to low according to the equipment transfer path library and the equipment support priority, and obtain the start support time and the end support time; update the scheduled task set, the task set to be decided, and the infeasible task set according to the start support time and the end support time; when the task set to be decided is an empty set, the equipment support operation is completed.