A method and system for controlling process flow of line equipment

By designing an automation equipment system and control control system in the magnetic steel assembly production line process, the instability of glue use and equipment process flow is solved, the production efficiency and yield rate are improved, and the precise management and analysis of data is achieved.

CN115016408BActive Publication Date: 2025-04-29HANGZHOU QUADRANT FUTURE TECH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210607506.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-31
Publication Date
2025-04-29
Estimated Expiration
2042-05-31

AI Technical Summary

Technical Problem

In the production line process of magnetic steel components, due to different glue characteristics and employee interference, the product yield rate of the component cannot be stable, the production efficiency is ineffective, and data management is chaotic.

Method used

A linear equipment system is designed, including automatic dispensing equipment, automatic assembly equipment, hot pressing equipment, automatic laser engraving equipment and automatic glue cleaning equipment, equipped with a control and control system, and the process flow is accurately controlled and data acquisition is achieved through the code scanning mechanism and the PLC CNC module.

Benefits of technology

It realizes precise control of glue use and equipment process flow, improves the efficiency and yield rate of the production process, reduces human resources costs, and facilitates maintenance and data analysis.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115016408B_ABST
    Figure CN115016408B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for controlling the process flow of a line equipment system, wherein the line equipment system comprises an automatic dispensing device, an automatic assembly device, an automatic handling device, a hot pressing device, an automatic laser engraving device, and an automatic glue cleaning device which are sequentially connected and arranged, and the line equipment system also comprises a control system for realizing precise control of the process flow. The present invention also proposes a method for controlling the process flow of the above-mentioned line equipment system, wherein a scanning mechanism, a two-dimensional code data collection, and an equipment data collection and communication are used to uniformly collect, analyze, trace, control, and control the system in the component production process, in particular, two-dimensional code labels are affixed to the equipment fixtures, and the corresponding scanning mechanism reader reads the data information of the two-dimensional code label, and the information data is collected and analyzed and controlled by the PLC numerical control module and the upper computer communication module, thereby realizing precise control, analysis, and tracing of the process flow of the glue-using equipment in the production process of the permanent magnet component.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of line process control, and in particular to a method and system for line equipment process flow control. Background Art

[0002] At present, in the production process of magnetic steel components, due to the different characteristics of the glue used, the specific glue application temperature and process time are not accurately controlled, which will lead to unstable component product yield. At the same time, the "extensive" process of glue in the entire control link will cause difficulty and confusion in the control of a series of links such as glue reception, glue splitting, glue distribution, glue use, and glue recycling. The unclear glue use process will cause inefficiency in normal component production activities and reduce the yield of component production.

[0003] In addition, in the production process of magnetic steel components, due to employee interference, the jigs are interchanged on the transmission line during the production process, and the processes are reduced, increased, or skipped. Or the middle and rear equipment of the line are abnormally unable to work while the front equipment continues to produce, causing the product defect rate to rise sharply. It will also cause the normal component production activities to be inefficient. The efficiency, yield, defect rate ratio, equipment status, line achievement rate and other data of each equipment in the line are unclear, causing on-site managers to be unsure of the accuracy of the data, resulting in erroneous data reporting that affects the production progress of the entire project. Summary of the invention

[0004] The purpose of the present invention is to provide a method and system for controlling the process flow of line equipment, which can improve the control process of glue usage and equipment process flow in the production process of magnetic steel components, and realize the control, traceability and data collection and analysis of the glue usage process and various process flows and equipment status at different stages of the line.

[0005] In order to achieve the above-mentioned purpose, the technical solution provided by the present invention is: a line equipment system, including automatic dispensing equipment, automatic assembly equipment, automatic handling equipment, hot pressing equipment, automatic laser engraving equipment, and automatic glue cleaning equipment connected in sequence. The line equipment system also includes a management and control system for accurately controlling the process flow.

[0006] The automatic dispensing equipment includes a special dispensing machine, a dispensing conveying line, a fixture reflux conveying line, a first code scanning mechanism, a dispensing positioning mechanism, a CCD detection mechanism, a CCD detection positioning mechanism, and a fifth fixture reflux conveying line.

[0007] The assembly equipment includes an assembly rack, an assembly transmission line, a vibration plate, a direct vibration mechanism, a staggered cylinder, a module transport and movement mechanism, a second code scanning mechanism, a third code scanning mechanism, a component assembly positioning mechanism, and a fourth fixture reflux conveyor line.

[0008] The automatic transporting equipment includes a pre-hot pressing transporting mechanism, a fourth code scanning mechanism, an XY transporting mechanism, a hot pressing mechanism, and a post-hot pressing transporting mechanism.

[0009] The hot pressing equipment is composed of several hot pressing units, including a hot pressing frame, a right clamping cylinder, a lifting and pressure-maintaining cylinder, a fixture base, a heating rod, a thermocouple, a clamping push pin, a push pin base, a pressure-maintaining head, and a third fixture reflux conveyor line.

[0010] The automatic laser engraving equipment includes a laser engraving machine, a laser engraving transmission line, a laser engraving positioning mechanism, a fifth code scanning mechanism, and a second fixture reflux conveying line.

[0011] The automatic glue cleaning equipment includes a carbon dioxide laser glue cleaning machine, a glue cleaning conveyor line, a sixth code scanning mechanism, a glue cleaning material taking and positioning mechanism, a glue cleaning conveying module mechanism, a rotary glue cleaning mechanism, a rotary material taking mechanism, a fixture reflux conveying module, and a first fixture reflux conveyor line.

[0012] The management and control system mainly includes a two-digit code label, a code scanning mechanism, a host computer communication module, a PLC numerical control module, and a communication module. The two-digit code label is affixed to the fixture of the equipment, and the code scanning mechanism is installed and fixed at the corresponding position of each device. The host computer communication module includes an industrial computer and a human-machine interface. The detection module includes a dispensing temperature detection circuit, a dispensing time detection circuit, a dispensing hot pressing process interval time detection circuit, a hot pressing temperature detection circuit, and a holding time detection circuit. The PLC numerical control module and the detection module form a feedback circuit.

[0013] Preferably, the automatic glue dispensing equipment can perform glue dispensing process actions on the magnetic steel assembly, and the equipment is equipped with a temperature controller, which can control the glue application temperature and provide feedback on the glue temperature.

[0014] Preferably, the assembly glue equipment can perform assembly process actions on the magnetic steel components. The equipment is equipped with a code scanning mechanism, which can provide feedback and control on the fixture process flow and glue application time.

[0015] Preferably, a code scanning mechanism is installed on the left side of the hot pressing equipment, and glue control is performed according to the current code scanning fixture from the start of dispensing T1, the timing before hot pressing T2, open time = T2-T1≤60S. The hot pressing equipment has multiple station slots, and multiple stations can be hot pressed at the same time, which greatly reduces the cycle time and improves the hot pressing efficiency. The thermocouple in each station detects, feedbacks and controls the hot pressing temperature.

[0016] Preferably, the automatic laser engraving equipment can perform laser engraving process actions on components after magnetic steel dispensing, component assembly, and hot pressing are completed, and is equipped with a code scanning mechanism to provide feedback and control on the fixture process flow.

[0017] Preferably, the automatic glue cleaning equipment can perform glue cleaning process actions on components after magnetic steel glue dispensing, component assembly, hot pressing, and laser engraving. The equipment is equipped with a code scanning mechanism, which can provide feedback and control on the fixture process flow.

[0018] The management and control system mainly includes a two-digit code label, a code scanning mechanism, a host computer communication module, a PLC numerical control module, and a detection module. The two-digit code label is affixed to the fixture of the equipment, and the code scanning mechanism is installed and fixed at the corresponding position of each device. The host computer communication module includes an industrial computer and a human-machine interface. The detection module includes a dispensing temperature detection circuit, a dispensing time detection circuit, a dispensing hot pressing process interval time detection circuit, a hot pressing temperature detection circuit, and a holding time detection circuit. The PLC numerical control module and the detection module form a feedback circuit.

[0019] Preferably, the industrial computer adopts configuration software to complete functions such as data collection and analysis control, alarm, and graphic data display. It also has the function of uploading data to the cloud server in real time, and can send on-site data to a remote industrial control cloud management platform.

[0020] Preferably, the PLC numerical control module performs protocol data communication with the code scanning mechanism, and the PLC numerical control module performs OPC Ethernet communication with the industrial computer and the human-machine interface through the Ethernet module.

[0021] A method for process flow control of a line equipment system as described above of the present invention is specifically, based on the properties of the glue used and the characteristics of the line process control, a communication command is sent through a code scanning mechanism, and after receiving the command, the server first analyzes the QR code data and then transmits different discrimination information to the corresponding device. After the equipment starts the process action, the code scanning mechanism reader reads the QR code information of the fixture from the QR code label on the fixture for identification, and the information data is transmitted to the PLC numerical control module through the serial port protocol data communication. The PLC numerical control module edits and processes multiple groups of information data. Since the industrial computer and the human-machine interface are also electrically connected to the PLC numerical control module through the communication module (OPC Ethernet communication), the industrial computer will collect and display the information data, and analyze the corresponding process time, process interval time, glue temperature in the dispensing process, hot pressing temperature and holding time, and equipment process sequence according to the QR code process flow characteristic information. If the normal use temperature of the glue is exceeded, the process time is exceeded, and the corresponding work flow is missing, it is judged as NG, and an alarm will be sent back to the PLC numerical control module of the corresponding equipment. Manual equipment adjustments are made according to the NG information displayed on the human-machine interface of the corresponding equipment.

[0022] Compared with the prior art, the technical solution provided by the present invention has the following beneficial effects:

[0023] The present invention provides a method and system for controlling the process flow of line equipment, which uses a code scanning mechanism, two-dimensional code data collection, and equipment data collection and communication to uniformly collect, analyze, trace, control, and control the system in the component production process. In particular, two-dimensional code labels are affixed to equipment fixtures, and the corresponding code scanning mechanism reader reads the data information in the two-dimensional code label. The information data is collected and analyzed by a PLC numerical control module and a host computer communication module, thereby realizing accurate control, analysis, and tracing of the process flow of glue-using equipment in the production process of permanent magnet components. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The present invention is further described below in conjunction with the accompanying drawings and embodiments:

[0025] Figure 1 It is a structural schematic diagram of the line equipment system in an embodiment of the present invention;

[0026] Figure 2 It is a top view schematic diagram of the line equipment system in an embodiment of the present invention;

[0027] Figure 3 It is a structural schematic diagram of an automatic dispensing device in an embodiment of the present invention;

[0028] Figure 4 Schematic diagram of the structure of the glue dispensing positioning mechanism of the automatic glue dispensing equipment in the embodiment of the present invention;

[0029] Figure 5 It is a structural schematic diagram of an automatic assembly device in an embodiment of the present invention;

[0030] Figure 6 A schematic diagram of a feeding structure of an automatic assembly device in an embodiment of the present invention;

[0031] Figure 7 A schematic diagram of a transport structure of an automatic assembly device in an embodiment of the present invention;

[0032] Figure 8 It is a structural schematic diagram of a hot pressing device in an embodiment of the present invention;

[0033] Fig. 9 It is a schematic diagram of the structure of the transport mechanism of the hot pressing equipment in an embodiment of the present invention;

[0034] Fig.10 It is a schematic diagram of the hot pressing mechanism structure of the hot pressing equipment in an embodiment of the present invention;

[0035] Fig.11 It is a structural schematic diagram of an automatic laser engraving device in an embodiment of the present invention;

[0036] Fig.12 It is a structural schematic diagram of an automatic glue cleaning device in an embodiment of the present invention;

[0037] Fig.13 It is a structural schematic diagram of a rotary glue cleaning mechanism of an automatic glue cleaning device in an embodiment of the present invention;

[0038] Illustrations: 1. Automatic dispensing equipment; 2. Automatic assembly equipment; 3. Hot pressing equipment; 4. Automatic laser engraving equipment; 5. Automatic glue cleaning equipment; 6. Dispensing positioning mechanism; 7. First code scanning mechanism; 17. Second code scanning mechanism; 18. Third code scanning mechanism; 34. Fourth code scanning mechanism; 47. Fifth code scanning mechanism; 49. Sixth code scanning mechanism; 8. Dispensing machine; 9. CCD detection equipment; 10. Dispensing three-color alarm light; 11. Dispensing transmission line; 12. Dispensing fixture side stop cylinder; 13. Dispensing lifting positioning cylinder; 14. Dispensing lifting cylinder installation bottom plate; 15. Dispensing lifting cylinder upper top plate; 16. Assembly transmission line; 19. Assembly feeding mechanism; 20. Assembly handling mechanism; 21. Assemble three-color alarm lights; 22. Vibration plate; 23. Material channel; 24. Straight vibration mechanism; 25. Staggered cylinders; 26. Assemble the base of the handling module; 27. Assemble the handling module; 28. Assemble the demoulding cylinder; 29. ​​Handling and lifting cylinders; 30. Handling mechanism before hot pressing; 31. XY handling mechanism; 32. Hot pressing mechanism; 33. Material throwing box; 35. Handling and clamping cylinders; 36. Handling front and rear cylinders; 37. Handling and lifting cylinders; 38. Pressure-maintaining pressure head; 39. Lifting and pressure-maintaining cylinders; 40. Push pins; 41. Push pin base; 42. Side push cylinders; 43. Pressure-maintaining completion signal lights; 44. Jig base; 45. Laser engraving conveyor line; 46. Laser engraving machine; 48. Glue cleaning conveyor line; 50. Laser glue cleaning machine; 51. Rotating glue cleaning mechanism; 52. Rotating material taking mechanism; 53. Glue cleaning transport mechanism; 54. First fixture return conveyor line; 55. Fixture return transport mechanism; 56. Rotating base; 57. Rotating motor; 58. 180° rotating motor. DETAILED DESCRIPTION

[0039] In order to further understand the content of the present invention, the present invention is described in detail in conjunction with examples. The following examples are used to illustrate the present invention but are not used to limit the scope of the present invention.

[0040] Combined with Figure 1 , 2 As shown, a line equipment system includes automatic dispensing equipment 1, automatic assembly equipment 2, automatic handling equipment, hot pressing equipment 3, automatic laser engraving equipment 4, and automatic glue cleaning equipment 5 which are connected in sequence. The line equipment system also includes a management and control system for achieving precise management and control of the process flow.

[0041] Combined with Figure 3 , 4As shown, the automatic glue dispensing equipment includes a glue dispensing machine 8, a glue dispensing conveying line 11, a first code scanning mechanism 7, a glue dispensing positioning mechanism 6, a CCD detection mechanism 9, a CCD detection positioning mechanism (not marked in the figure), and a fifth fixture reflux conveying line (not marked in the figure). The XYZ glue dispensing module of the glue dispensing machine 8 and the glue dispensing conveying line 11 are vertically mounted on the bottom plate of the frame, the first code scanning mechanism 7 is mounted in front of the glue dispensing positioning mechanism 6, the glue dispensing positioning mechanism 6 is mounted on the glue dispensing conveying line 11, the CCD detection mechanism is mounted behind the glue dispensing positioning mechanism, and the CCD detection positioning mechanism is mounted directly below the CCD detection mechanism 9. The fifth fixture reflux conveying line and the fourth fixture reflux conveying line are connected end to end. The glue dispensing positioning mechanism 6 is as shown Figure 4 As shown, it includes a dispensing fixture side stop cylinder 12, a dispensing lifting positioning cylinder 13, a dispensing lifting cylinder mounting base plate 14 and a dispensing lifting cylinder upper top plate 15.

[0042] Combined with Figure 5 , 6 As shown in , 7, the automatic assembly equipment 2 includes an assembly rack, an assembly transmission line 16, a second code scanning mechanism 17, a third code scanning mechanism 18, an assembly three-color alarm light 21, a vibration plate 22, a feeding channel 23, a direct vibration mechanism 24, a staggered cylinder 25, a conveying base 26, an assembly handling module 27, a conveying demoulding cylinder 28, a conveying lifting cylinder 29, a component assembly positioning mechanism, and a fourth fixture reflux conveyor line. The assembly transmission line 16 and the vibration plate 22 are fixedly mounted on the bottom plate of the assembly rack, the direct vibration mechanism 24 is mounted on the bottom plate of the assembly rack at the discharge port of the vibration plate 22, the staggered cylinder 25 is mounted on the bottom plate of the assembly equipment rack at the discharge port of the direct vibration mechanism 24, the assembly handling module 27 is mounted on the conveying base 26 perpendicular to the assembly transmission line 16, the conveying demoulding cylinder 28 is mounted on the assembly handling module 27, and the conveying lifting cylinder 29 is mounted on the conveying demoulding cylinder 28. The assembly and handling module 27, the assembly and handling base 26, the handling lifting cylinder 29 and the handling and demolding cylinder 28 together constitute the assembly and handling mechanism 20; the vibration plate 22, the feeding channel 23, the straight vibration mechanism 24 and the staggered cylinder 25 together constitute the assembly feeding mechanism 19; the second code scanning mechanism 17 is at the front of the assembly transmission line 16, the third code scanning mechanism 18 is fixed at the front and upper part of the fixture positioning installation position of the assembly transmission line 16, and the fourth fixture return conveying line and the third fixture return conveying line are connected head to tail.

[0043] Combined with Figure 8 , 9As shown in 10, the automatic handling equipment includes a pre-hot pressing handling mechanism 30, a fourth code scanning mechanism 34, an XY handling mechanism 31, a hot pressing mechanism 32, a material throwing box 33, and a post-hot pressing handling mechanism. The pre-hot pressing handling mechanism 30 is installed on the bottom plate of the handling frame, on the left side of the hot pressing mechanism 32, for loading and handling of the jig. The fourth code scanning mechanism 34 is fixed on the bottom plate of the handling frame on the left side of the hot press. The hot pressing mechanism 32 is installed in parallel with the XY handling mechanism 31. The XY handling mechanism 31 is installed on the bottom plate of the frame. The post-hot pressing handling mechanism is installed on the bottom plate of the handling frame, on the right side of the hot pressing mechanism 32, for unloading and handling. The handling mechanism of the hot pressing equipment is composed of a handling clamping cylinder 35, a handling front and rear cylinder 36, and a handling lifting cylinder 37.

[0044] The hot pressing mechanism is composed of a number of hot pressing units, which include a hot pressing frame, a right clamping cylinder 42, a lifting and pressure-maintaining cylinder 39, a fixture bottom plate 44, a heating rod, a thermocouple, a push pin 40, a push pin base 41, a pressure-maintaining head 38, and a third fixture reflux conveyor line. The pressure-maintaining frame is fixedly mounted on the bottom plate of the hot pressing frame, the lifting and pressure-maintaining cylinder 39 is mounted on the top plate of the pressure-maintaining frame station slot, the fixture bottom plate 44 is mounted on the bottom plate of the pressure-maintaining frame station slot, the heating rod is fixed inside the pressure-maintaining head 38, the push pin 40 is mounted on the push pin base 41, the push pin base 41 is fixed at the front end of the right clamping cylinder 42, the thermocouple is installed behind the fixture floor, and the third fixture reflux conveyor line is installed in parallel with the XY transport mechanism 31 and connected with the second fixture reflux conveyor line.

[0045] Combined with Fig.11 As shown, the automatic laser engraving equipment includes a laser engraving machine 46, a laser engraving transmission line 45, a laser engraving positioning mechanism, a fifth code scanning mechanism 47, and a second jig reflux conveyor line. The laser engraving transmission line 45 is fixedly mounted on the bottom plate of the laser engraving frame, the laser engraving positioning mechanism is fixedly mounted on the laser engraving transmission line 45, the fifth code scanning mechanism 47 is fixed behind the laser engraving positioning mechanism on the laser engraving transmission line 45, and the laser engraving lens of the laser engraving machine 46 is mounted directly above the laser engraving positioning mechanism. The second jig reflux conveyor line is mounted side by side with the laser engraving transmission line 45 on the bottom plate of the laser engraving frame

[0046] Combined with Fig.12 , 13As shown, the automatic glue cleaning equipment includes a carbon dioxide laser glue cleaning machine 50, a glue cleaning conveying line 48, a sixth code scanning mechanism 49, a glue cleaning material taking and positioning mechanism, a glue cleaning conveying mechanism 53, a rotating glue cleaning mechanism 51, a rotating material taking mechanism 52, a fixture return conveying module 55, and a first fixture return conveying line 54. The glue cleaning conveying line 48 is fixedly installed on the bottom plate of the glue cleaning machine frame, the sixth code scanning mechanism 49 is installed at the front end of the glue cleaning material taking and positioning mechanism, the glue cleaning positioning mechanism is fixedly installed on the glue cleaning conveying line 48, the glue cleaning conveying mechanism 53 is fixed on the bottom plate of the glue cleaning machine frame and is perpendicular to the glue cleaning conveying line 48, the rotating glue cleaning mechanism 51 is installed directly below the galvanometer lens of the carbon dioxide laser glue cleaning machine 50, and has two workstations, the rotating material taking mechanism 52 is installed behind the rotating glue cleaning mechanism 51, and the fixture return conveying module 55 is installed at the end of the glue cleaning conveying line 48. The first fixture return conveying line 54 is installed at the position where the fixture return conveying module 55 is in place.

[0047] The method for using the above-mentioned line equipment system includes the following steps:

[0048] Step 1: Manually put the jig into the dispensing transmission line 11, the first code scanning mechanism 7 scans the QR code on the jig and transmits it to the server. After the code is scanned, the dispensing jig positioning mechanism 6 positions the jig, and the dispensing machine 8 dispenses glue on the jig and starts timing. After the dispensing is completed, the dispensing positioning mechanism 6 cancels the positioning, and the jig flows through the dispensing transmission line 11 through the CCD detection mechanism 9. The detection and positioning mechanism locates and takes pictures to scan the dispensing status. After the photo analysis is completed, the corresponding data is uploaded and the detection and positioning is canceled, and the jig continues to flow to the next process;

[0049] Step 2: The fixture enters the range of the second code scanning mechanism 17 again through the dispensing transmission line. The code scanning mechanism reads the QR code data of the fixture and transmits the data to the server for judgment. According to the judgment of the system, the components in the fixture are assembled or flowed away directly without assembly. If the code scanning data is OK, the vibration plate 22 and the direct vibration 24 vibrate to feed the material through the material channel 23. The staggered cylinder 25 is used to stagger the feeding so that the feeding becomes 1 out of 6. The assembly positioning mechanism positions the jacking fixture, and the assembly handling module 27 moves to the material picking position. The handling lifting cylinder 29 descends to absorb the material. After completion, it rises and moves to the discharge position. The handling lifting cylinder 29 and the handling demoulding cylinder 28 descend at the same time. After reaching the position, the handling lifting cylinder 29 rises back to its original position to complete the assembly.

[0050] Step 3: The assembled fixture is transported to the end through the assembly transmission line 16. The pre-hot pressing transport mechanism 30 transports the fixture to the discharge position. At the same time, the fourth barcode scanning mechanism 34 scans the QR code on the fixture. According to the data previously collected by the system, it is analyzed whether the hot pressing process is required or the material is directly thrown. If the data of the fourth barcode scanning mechanism 34 is OK, that is, the time difference between the dispensing start time T1 and the pre-hot pressing detection time (T2) is ≤60S, the hot pressing process is carried out. Otherwise, the material is directly thrown. When the CT difference is ≤60S, the pre-hot pressing transport mechanism 30 places the fixture on the left loading tray of the XY transport mechanism 31. The XY transport mechanism moves to any hot pressing mechanism that has completed the hot pressing process and is in an idle state. After the hot pressing is completed, the right material picking tray of the right XY transport mechanism sucks the fixture and moves it to the post-hot pressing transport module and places it on the laser engraving transmission line 45.

[0051] Step 4: The jig flows into the automatic laser engraving equipment 4, and the laser engraving positioning mechanism positions the laser engraving. After the laser engraving is completed, the jig is scanned by the laser engraving transmission line 45 to the fifth scanning mechanism 47, merged with the data in the database, and uploaded to the server. If the first four processes are normally circulated, it will pass through the glue cleaning conveyor line 48 and enter the glue cleaning link.

[0052] Step 5: The jig flows into the cleaning glue conveying line 48 through the laser engraving transmission line 45 and enters the automatic cleaning glue link. The sixth scanning mechanism 49 scans the jig. The jig must go through the laser engraving process and each of the previous processes. If the jig goes directly to the cleaning glue process without going through the laser engraving process, the cleaning glue equipment will not grab the jig for cleaning glue, and the conveying mechanism will perform a reflux action, and the product will not leak the laser engraving phenomenon; if the jig goes directly to the cleaning glue process after the laser engraving process and reaches the end of the cleaning glue conveying line 48, the cleaning glue positioning mechanism positions the jig, and the cleaning glue conveying mechanism 53 conveys the assembly to the rotating cleaning glue mechanism 51. On the rotating base 56, the rotating motor 58 rotates 180° to the bottom of the galvanometer of the glue cleaning machine 50 to realize automatic rotating glue cleaning. After the glue cleaning is completed, the rotating motor 58 rotates 180° again to the unloading position, the rotating material picking mechanism 52 removes the glue cleaning completion component, the rotating unloading cylinder 63 rotates to the finished material box, the polyurethane clamping cylinder 54 is released, and the material falls into the finished product box. At the same time, the jig flows to the end of the glue cleaning conveying line 48, and is transported to the first jig reflux conveying line by the jig reflux conveying module, passes through the first jig reflux conveying line to the fifth jig reflux conveying line, and returns to the starting position.

[0053] The method for controlling the process flow of the line equipment system is specifically as follows: according to the characteristics of the glue used and the characteristics of the line process control, a communication command is sent through a code scanning mechanism. After receiving the command, the server first analyzes the QR code data and then transmits different identification information to the corresponding equipment. After the equipment starts the process action, the code scanning mechanism reader reads the QR code information of the fixture from the QR code label on the fixture for identification. The information data is transmitted to the PLC numerical control module through the serial port protocol data communication. The PLC numerical control module edits and processes multiple groups of information data. Since the industrial computer and the human-machine interface are also electrically connected to the PLC numerical control module through the communication module (OPC Ethernet communication), the industrial computer will collect and display the information data, and analyze the corresponding process time, process interval time, glue temperature in the dispensing process, hot pressing temperature and holding time, and equipment process sequence according to the QR code process flow characteristic information. If the normal use temperature of the glue is exceeded, the process time is exceeded, and the corresponding work flow is missing, it is judged to be NG, and an alarm will be sent back to the PLC numerical control module of the corresponding equipment. The equipment is adjusted manually according to the NG information displayed on the human-machine interface of the corresponding equipment.

[0054] In summary, the present invention utilizes a code scanning mechanism to scan, upload, analyze, record, feedback, and implement the QR code before and after each process, so as to realize glue control, laser engraving control, equipment status control, data collection, and fixture control. Glue control can be used to reduce the defective rate of the process; laser engraving control can be used to prevent laser engraving from being missed; equipment status control can be used to control the status of each device; data collection can be used to collect information on the data and status of each device, which is beneficial for abnormal problem analysis; fixture control can be used to control the service life of the fixture by inspecting the fixture, tracing fixture maintenance, and maintaining the fixture. The overall assembly line of the equipment operates automatically, and automatic process flow control can be realized through scanning and collecting data feedback of each process, thereby reducing the defective rate of the process, reducing human resource costs, and conveniently and quickly maintaining the equipment of each process.

[0055] The present invention is described in detail above in combination with the embodiments, but the contents described are only preferred embodiments of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made according to the scope of application of the present invention should still fall within the scope of the patent coverage of the present invention.

Claims

1. A line equipment system, characterized in that: It comprises an automatic dispensing device (1), an automatic assembly device (2), an automatic handling device, a hot pressing device (3), an automatic laser engraving device (4), and an automatic glue cleaning device (5) which are sequentially connected and arranged, and the line equipment system also comprises a control system for realizing precise control over the process flow; The control and management system includes a two-digit code label, a code scanning mechanism, a host computer communication module, a PLC numerical control module, and a detection module. The two-digit code label is attached to the fixture of the equipment; the code scanning mechanism is installed and fixed at the corresponding position of each device; the host computer communication module includes an industrial computer and a human-machine interface; the detection module includes a dispensing temperature detection circuit, a dispensing time detection circuit, a dispensing hot pressing process interval time detection circuit, a hot pressing temperature detection circuit, and a holding time detection circuit. The PLC numerical control module and the detection module form a feedback circuit; The automatic glue dispensing equipment (1), automatic assembly equipment (2), automatic handling equipment, hot pressing equipment (3), automatic laser engraving equipment (4), and automatic glue cleaning equipment (5) all contain a PLC numerical control module, which controls the operation of the equipment process and edits and processes multiple groups of production data, and the industrial computer manages the PLC numerical control module and reads data; According to the process flow characteristic information of the QR code, data analysis is performed on the corresponding process time, process interval time, glue temperature in the dispensing process, hot pressing temperature and holding time, and equipment process flow sequence. If the normal use temperature of the glue is exceeded, the process time is exceeded, and the corresponding workflow is missing, it will be judged as NG, and an alarm will be sent back to the PLC numerical control module of the corresponding equipment. Manual equipment adjustments will be made based on the NG information displayed on the human-machine interface of the corresponding equipment.

2. A line equipment system according to claim 1, characterized in that: The automatic glue dispensing equipment (1) comprises a glue dispensing machine (8), a glue dispensing conveying line (11), a first code scanning mechanism (7), a glue dispensing positioning mechanism (6), a CCD detection mechanism (9), a glue dispensing three-color alarm light (10), a CCD detection positioning mechanism, and a fifth fixture reflux conveying line; the XYZ glue dispensing module of the glue dispensing machine and the glue dispensing conveying line (11) are vertically mounted on the bottom plate of the frame, the first code scanning mechanism (7) is mounted in front of the glue dispensing positioning mechanism (6), the glue dispensing positioning mechanism (6) is mounted on the glue dispensing conveying line (11), the CCD detection mechanism (9) is mounted at the rear of the glue dispensing machine, the CCD detection positioning mechanism is mounted directly below the CCD detection mechanism (9), and the glue dispensing three-color alarm light (10) is mounted on the entire top plate of the frame.

3. A line equipment system according to claim 1, characterized in that: The automatic assembly equipment (2) comprises an assembly rack, an assembly transmission line (16), a second code scanning mechanism (17), a third code scanning mechanism (18), an assembly feeding mechanism (19), an assembly transport mechanism (20), an assembly three-color alarm light (21), a vibration plate (22), a material channel (23), a straight vibration mechanism (24), a staggered cylinder (25), a component assembly positioning mechanism, and a fourth fixture return conveyor line. The assembly transmission line (16) and the vibration plate (22) are fixedly mounted on the bottom plate of the assembly rack, the material channel (23) is mounted on the straight vibration mechanism (24), the straight vibration mechanism (24) is mounted on the bottom plate of the assembly rack at the discharge port of the vibration plate (22), the staggered cylinder (25) is mounted on the bottom plate of the assembly equipment rack at the discharge port of the straight material channel (23), and the assembly transport mechanism (20) is mounted on the bottom plate of the assembly equipment and at the same The staggered cylinder is vertically above the assembly transmission line (16); the pick-and-place mechanism is fixed on a moving block of the assembly transport mechanism (20) and moves with it; the assembly transport mechanism (20) comprises an assembly transport base (26), an assembly transport module (27), a transport demoulding cylinder (28), and a transport lifting cylinder (29); the assembly transport module (27) is mounted on the assembly transport base (26) and is vertically connected to the assembly transmission line (16); the transport demoulding cylinder (28) is mounted on the assembly transport module (27); the transport lifting cylinder (29) is mounted on the transport demoulding cylinder (28); the second code scanning mechanism (17) is at the front of the assembly transmission line; the third code scanning mechanism (18) is fixed above the front of the component assembly positioning mechanism of the assembly transmission line; and the fifth fixture return conveying line and the fourth fixture return conveying line are connected head to tail.

4. A line equipment system according to claim 1, characterized in that: The automatic handling device comprises a pre-hot pressing handling mechanism (30), a fourth code scanning mechanism (34), an XY handling mechanism (31), a hot pressing mechanism (32), and a post-hot pressing handling mechanism. The pre-hot pressing handling mechanism (30) is mounted on the bottom plate of a handling frame, and is on the left side of the hot pressing mechanism (32) for loading and handling of a jig. The fourth code scanning mechanism (34) is fixed in front of a material taking-up position of a loading mechanism on the bottom plate of the handling frame. The hot pressing mechanism (32) is mounted in parallel with the XY handling mechanism (31), and the XY handling mechanism (31) is mounted on the bottom plate of the frame. The post-hot pressing handling mechanism is mounted on the bottom plate of the handling frame, and is on the right side of the hot pressing mechanism (32) for unloading and handling.

5. A line equipment system according to claim 1, characterized in that: The hot pressing equipment (3) is composed of a plurality of hot pressing units, including a hot pressing frame, a right clamping cylinder (42), a lifting and holding pressure cylinder (39), a fixture bottom plate (44), a heating rod, a thermocouple, a push pin (40), a push pin base (41), a holding pressure head (38), and a third fixture reflux conveying line. The holding pressure frame is fixedly mounted on the bottom plate of the hot pressing frame, the lifting and holding pressure cylinder (39) is mounted on the top plate of the pressure holding frame station slot, the fixture bottom plate (44) is mounted on the bottom plate of the pressure holding frame station slot, the heating rod is fixed inside the holding pressure head, the push pin (40) is mounted on the push pin base (41), the push pin base (41) is fixed on the right clamping cylinder (42), the thermocouple is mounted behind the fixture bottom plate (44), and the fourth fixture reflux conveying line and the third fixture reflux conveying line are connected end to end.

6. A line equipment system according to claim 1, characterized in that: The automatic laser engraving equipment comprises a laser engraving machine (46), a laser engraving transmission line (45), a laser engraving positioning mechanism, a fifth code scanning mechanism (47), and a second jig reflux conveying line. The laser engraving transmission line (45) is fixedly mounted on the bottom plate of the laser engraving frame, the laser engraving positioning mechanism is fixedly mounted on the laser engraving transmission line (45), the fifth code scanning mechanism (47) is fixed behind the laser engraving positioning mechanism on the laser engraving transmission line (45), the laser engraving lens of the laser engraving machine (46) is mounted directly above the laser engraving positioning mechanism, the second jig reflux conveying line and the laser engraving transmission line (45) are mounted side by side on the bottom plate of the laser engraving frame; and the third jig reflux conveying line is mounted in parallel with the XY transport mechanism and connected to the second jig reflux conveying line.

7. A line equipment system according to claim 1, characterized in that: The automatic glue cleaning equipment comprises a glue cleaning conveyor line (48), a sixth code scanning mechanism (49), a laser glue cleaning machine (50), a rotating glue cleaning mechanism (51), a rotating material picking mechanism (52), a glue cleaning material picking positioning mechanism, a glue cleaning conveying mechanism (53), a first jig return conveyor line (54), a jig return conveying mechanism (55), the glue cleaning conveyor line (48) is fixedly mounted on the bottom plate of the glue cleaning machine frame, the sixth code scanning mechanism (49) is mounted on the front end of the glue cleaning material picking positioning mechanism, the glue cleaning positioning mechanism The structure is fixedly mounted on the glue cleaning conveyor line (48), the glue cleaning transport module mechanism (53) is fixed on the bottom plate of the glue cleaning machine frame and is perpendicular to the glue cleaning conveyor line (48), the rotating glue cleaning mechanism (51) is mounted directly below the galvanometer lens of the laser glue cleaning machine (50), the rotating material picking mechanism (52) is mounted behind the rotating glue cleaning mechanism (51), the fixture return transport mechanism (55) is mounted at the end of the glue cleaning conveyor line (48), and the first fixture return conveyor line (54) is mounted at the location where the fixture return transport module is in place.

8. A method for controlling the process flow of a line equipment system as claimed in claim 1, characterized in that: The process includes the following: according to the characteristics of the glue used and the characteristics of the line process control, the code scanning mechanism sends a communication command. After receiving the command, the server first analyzes the QR code data and then transmits different identification information to the corresponding equipment. After the equipment starts the process, the code scanning mechanism reader reads the QR code information of the fixture from the QR code label on the fixture for identification. The information data is transmitted to the PLC numerical control module through the serial port protocol data communication. The PLC numerical control module edits and processes multiple groups of information data. Since the industrial computer and the human-machine interface are electrically connected to the PLC numerical control module through the communication module, the industrial computer collects and displays the information data.

9. A method for controlling the process flow of a line equipment system according to claim 8, characterized in that: The automatic glue dispensing device (1) can perform glue dispensing on the magnetic steel component. The device is provided with a temperature controller for monitoring the glue application temperature. A first code scanning mechanism (7) is installed to scan the QR code on the fixture and analyze the data. After the QR code is intact, the glue dispensing machine (8) starts to dispense glue on the fixture and starts timing. The CCD detection mechanism takes photos of the glue path and glue fullness of the fixture after glue dispensing and provides feedback.

10. A method for controlling the process flow of a line equipment system according to claim 8, characterized in that: The automatic assembly equipment (2) is monitored by a code scanning mechanism before assembly to ensure the assembly yield; the hot pressing equipment (3) is equipped with a code scanning mechanism before hot pressing, and from the start of glue dispensing T1 to the code scanning before hot pressing T2, the open time = T2-T1≤60S, otherwise the handling equipment performs a material throwing action to ensure the hot pressing yield; the hot pressing equipment contains multiple station slots to achieve hot pressing and curing of glue at multiple stations at the same time, greatly reducing the cycle time and improving the hot pressing efficiency. The thermocouple in each station detects and feeds back the hot pressing temperature; the automatic laser engraving equipment (4) is equipped with a code scanning mechanism to scan the jig product after laser engraving, and transmit and analyze the data to the next link.

11. A method for controlling the process flow of a line equipment system according to claim 8, characterized in that: The automatic glue cleaning device (5) is equipped with a code scanning mechanism before glue cleaning to scan the code of the jig transmitted after laser engraving. The jig must go through the laser engraving process. If it does not go through the laser engraving process, it will go directly to the glue cleaning process. The automatic glue cleaning device (5) will not grab the jig for glue cleaning, and the transport mechanism will perform a reflux action, so that the product will not leak the laser engraving.

12. A method for controlling the process flow of a line equipment system according to claim 8, characterized in that: The industrial computer adopts configuration software to complete data collection and analysis control, alarm, and graphic data display functions. It also has the function of uploading data to the cloud server in real time, sending the on-site data to the remote industrial control cloud management platform.

13. A method for controlling the process flow of a line equipment system according to claim 8, characterized in that: The PLC numerical control module performs protocol data communication with the code scanning mechanism, and the PLC numerical control module performs OPC Ethernet communication with the industrial computer and the human-machine interface through the Ethernet module.

Citation Information

Patent Citations

  • Detection method for wrong installation of main control board of refrigerator

    CN110119798A

  • Method and system for applying RFID system to glue control

    CN114029196A