A method for automatically determining the number of mud dumping times based on satellite positioning data
By setting up a gridded area in the dredging construction area and installing the AIS system on the dredging vessel, the location and frequency of mud-throwing vessels can be determined in real time, which solves the problem of inaccurate statistics of the location and number of mud-throwing vessels and realizes automated monitoring and control of dredging vessels. Environmental protection.
Patent Information
- Application Number
- CN202210668086.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-14
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2042-06-14
AI Technical Summary
In the existing dredging technology, the location of mud dumping cannot be found, and the statistics of the number of mud thrown in the area are inaccurate, resulting in serious damage to the water and underwater ecological environment, and it is difficult to monitor private dumping by dredging vessels.
By setting up the grid processing of the dredging construction area and mud throwing area, and installing the AIS system on the dredging vessel, real-time reading of satellite positioning data can automatically determine the area where the dredging vessel is located, and calculate the azimuth angle based on three consecutive positioning data to determine the throwing The number of mud throws must be within the specified area and does not exceed the maximum number of times.
It realizes automated monitoring of dredging vessels and accurate statistics of the number of mud throws, ensuring the accuracy of the location and number of mud throws, avoiding damage to the water environment, and promptly prompting the maximum number of mud throws to reach early warning, improving construction safety.
Smart Images

Figure CN115079209B_ABST
Abstract
Description
Technical Field
[0001] The present invention specifically relates to a method for automatically determining the number of mud dumping times based on satellite positioning data. Background Art
[0002] Dredging engineering has a long history. In ancient times, dredging engineering was carried out by manpower using simple manual tools, which were gradually replaced by machinery. Nowadays, mechanical methods usually use dredgers. Dredged soil treatment is an inevitable extension of the engineering after the dredged soil is excavated. The main purpose of dredging engineering is to: excavate harbors, port channels, etc., to build docks, port areas and port-side industrial areas, coastal urban land and entertainment and leisure land, shore maintenance, water conservancy flood control and reservoir dredging, improvement of water environment and ecological restoration of rivers, lakes and seas, and construction and landfill of various underwater pipeline trenches. Dredging engineering plays a very important role in the progress of human society, environmental improvement and economic development.
[0003] Dredging is currently used to deepen shallow sections of rivers or bays to improve navigation or flood discharge capacity of waterways; it is an economically feasible method to fill the dredged soil from excavated waterways or harbors into nearby low-lying areas for land reclamation. Dredged soil has always been mainly disposed of by discarding or dumping it in waters near the project. The reclamation project has created a new way of turning waste into treasure and treating it through comprehensive utilization. Later, it developed into using dredged soil as building materials and materials for building renovation. However, the main method is to dump it in nearby watersheds. During the dredging process, it cannot be dumped in a centralized manner, which will cause serious damage to the ecological environment of the water area and the bottom of the water. Therefore, it is necessary to monitor the dumping of dredged soil to prevent dredging ships from privately dumping it in a centralized manner, which solves the problem that the traditional method of mud dumping cannot find the location and the number of mud dumping in the region is not accurate. Summary of the invention
[0004] The technical problem to be solved by the present invention is to provide a method for automatically determining the number of mud dumping based on satellite positioning data, which has accurate positioning statistics, can monitor dredging vessels, and reasonably plan dredging areas.
[0005] In order to solve the above technical problems, the present invention is solved by the following technical solutions: a method for automatically determining the number of mud dumping times based on satellite positioning data, comprising the following steps:
[0006] Step 1, set up the dredging construction area and the mud dumping area, and grid the mud dumping area to set the corresponding area labels A1, A2, A3...An; the mud dumping times of the corresponding areas are D1, D2, D3...Dn, the initial mud dumping times are all 0, and the maximum mud dumping times are D1max, D2max, D3max...Dnmax respectively;
[0007] Step 2: Install an AIS system on the dredging vessel, and read the dredging vessel information transmitted by the AIS in real time during the voyage. The dredging vessel information transmitted by the AIS includes the dredging vessel identification number and satellite positioning data;
[0008] Step 3, comparing the satellite positioning data obtained in real time in step 2 with the mud dumping area in step 1 to determine the corresponding area number where the dredging vessel is located;
[0009] Step 4: When the dredging vessel arrives at the dumping area, obtain three consecutive satellite positioning data s1, s2 and s3 output by the AIS system, the corresponding coordinates are (x1, y1), (x2, y2), (x3, y3), and calculate the azimuths b1 and b2 between two adjacent coordinates;
[0010] Step 5: Calculate the difference between b1 and b2 in step 4, and take the absolute value θ of the difference to determine whether θ satisfies 100º≤θ≤220º;
[0011] Step 6, if θ in step 5 is satisfied, then s2 (x2, y2) is the mud throwing coordinate, calculate the area label Ai where s2 is located, and the number of mud throwing in the area is Di+1, where i=1, 2, 3…n; if step 5 is not satisfied, continue to monitor and repeat steps 2 to 5;
[0012] Step 7: Determine whether Di+1 obtained in step 6 is equal to Dimax. If Di+1 is equal to Dimax, a warning is given that the number of mud dumping times in the area Ai has reached the upper limit; if Di+1 is less than Dimax, repeat steps 2 to 7.
[0013] Furthermore, the azimuth angles in step 4 are: b1=arctan((y2-y1) / (x2-x1)), b2=arctan((y3-y2) / (x3-x2)).
[0014] Furthermore, in step 6, the center coordinates of the Ai region are (xii, yii). If |x2-xii|≤|xi3-xi1| / 2 and |y2-yii|≤|yi3-yi1| / 2, it is determined that the dredging vessel is located in the Ai region.
[0015] Furthermore, the coordinates of the two diagonal points of the Ai area are (xi2, yi1) and (xi3, yi3), and the coordinates of the center point are xii=(xi1+xi3) / 2, yii=(yi1+yi3) / 2, where i=1, 2, 3…n.
[0016] Furthermore, the grid size of the A1, A2, A3...An areas is 80m×40m.
[0017] Compared with the prior art, the present invention has the following beneficial effects: the status information of the dredging vessel can be automatically acquired in real time through the AIS system, including the identification number and coordinate information of the dredging vessel. This application can not only ensure that the mud is dumped in the designated area, but also automatically accumulate the number of mud dumpings of each dredging vessel, solving the problems of inadequate mud dumping positions, slow manual counting of the number of mud dumpings of each dredging vessel, and easy errors. Especially in the comprehensive utilization projects of dredged materials from rivers, seas and rivers, which are affected by the tide level and have precise requirements for the mud dumping positions and times, the mud dumping positions and times can be automatically and effectively counted, and the maximum number of mud dumping times can be automatically prompted to ensure construction safety. At the same time, the intelligent system can automatically analyze these data to form relevant mud dumping reports, which is conducive to the advancement of the project. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0019] Figure 1 It is a navigation schematic diagram of the dredging vessel of the present invention;
[0020] Figure 2 It is a grid schematic diagram of the mud dumping area of the present invention;
[0021] Figure 3 It is a schematic diagram of the grid coordinates of the mud dumping area of the present invention. DETAILED DESCRIPTION
[0022] The present invention is further described in detail below with reference to the accompanying drawings.
[0023] The following description is used to disclose the present invention so that those skilled in the art can implement the present invention. The preferred embodiments described below are only examples, and those skilled in the art can think of other obvious variations. The basic principles of the present invention defined in the following description can be used for other embodiments, variations, improvements, equivalents, and other technical solutions that do not deviate from the spirit and scope of the present invention.
[0024] Those skilled in the art should understand that, in the disclosure of the present invention, the directions or positions indicated by the terms "longitudinal", "lateral", "up", "down", "left", "right", "front", "back", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc. are based on the directions or positional relationships shown in the accompanying drawings, which are only simplified descriptions for the convenience of describing the present invention, and do not indicate or imply that the device or component referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, the above terms should not be understood as limitations on the present invention.
[0025] As attached Figure 1-3 A method for automatically determining the number of mud dumping times based on satellite positioning data is shown, comprising the following steps:
[0026] Step 1. Set up the dredging construction area and mud dumping area, and grid the mud dumping area to set the corresponding area labels A1, A2, A3...An; the mud dumping times of the corresponding areas are D1, D2, D3...Dn, the initial mud dumping times are all 0, and the maximum mud dumping times are D1max, D2max, D3max...Dnmax respectively; since the ship length is generally around 60m and the ship width is around 13m, considering reserving some surplus width, the large grid is further refined into 48 80m×40m grids. At the same time, considering that there may be two ships operating at the same time in the grid, in order to avoid construction interference, the grid is first divided into two areas, A and B, and numbered to facilitate ship zoning operations;
[0027] Step 2: Install an AIS system on the dredging vessel, and read the dredging vessel information transmitted by the AIS in real time during the voyage. The dredging vessel information transmitted by the AIS includes the dredging vessel identification number and satellite positioning data;
[0028] Step 3, comparing the satellite positioning data obtained in real time in step 2 with the mud dumping area in step 1 to determine the corresponding area number where the dredging vessel is located;
[0029] Step 4. When the dredging vessel arrives at the dumping area, obtain three consecutive satellite positioning data s1, s2 and s3 output by the AIS system. The corresponding coordinates are (x1, y1), (x2, y2), (x3, y3), and calculate the azimuths b1 and b2 between two adjacent coordinates; b1=arctan((y2-y1) / (x2-x1)), b2=arctan((y3-y2) / (x3-x2));
[0030] Step 5. Calculate the difference between b1 and b2 in step 4, and take the absolute value θ of the difference to determine whether θ satisfies 100º≤θ≤220º; Specifically, after the dredger reaches the designated location and dumps the dredged materials, it will turn around and return to the dredging construction area along the original route to carry out the next round of operations. Therefore, it can be determined whether the dredging is completed based on whether the difference in the front and rear sailing directions of the dredger is 180°. Considering the inertia of the ship's navigation, it is impossible to turn around directly 180°. According to the on-site conditions, if the absolute value of b1 and b2 is in the range of (100°, 220°), it can be determined that the dredging has been completed. The system automatically adds 1 to the number of times the ship has dumped the dredged materials, and determines that the current dredging position is (x2, y2);
[0031] Step 6. If θ in step 5 is satisfied, s2 (x2, y2) is the mud dumping coordinate, calculate the area number Ai where s2 is located, and the number of mud dumping in the area is Di+1, where i=1, 2, 3…n; the coordinates of the two diagonal points of the above Ai area are (xi2, yi1) and (xi3, yi3), respectively, the coordinates of the center point are xii=(xi1+xi3) / 2, yii=(yi1+yi3) / 2, the center coordinates of the Ai area are (xii, yii), if |x2-xii|≤|xi3-xi1| / 2 and |y2-yii|≤|yi3-yi1| / 2, it is determined that the dredging ship is located in the Ai area; if the condition in step 5 is not satisfied, continue to monitor and repeat steps 2 to 5;
[0032] Step 7: Determine whether Di+1 obtained in step 6 is equal to Dimax. If Di+1 is equal to Dimax, a warning is given that the number of mud dumping times in the area Ai has reached the upper limit; if Di+1 is less than Dimax, repeat steps 2 to 7.
[0033] The above-mentioned AIS system is the abbreviation of Automatic Identification System, which is composed of shore-based facilities and ship-borne equipment. It is a new type of digital navigation aid system and equipment integrating network technology, modern communication technology, computer technology, and electronic information display technology. It is an existing technology to obtain the dredging vessel identification number and satellite positioning coordinates through the AIS system.
[0034] To ensure the safety of ships, a test was conducted in area A to obtain the water depth map of each small grid. Two ships of dredged materials were thrown in each small grid of area A, and then the water depth map of each small grid was measured. Comparing the water depth maps of the two measurements, the average thickness of each grid was calculated, which was basically around 0.4±0.05m, and the comprehensive average was about 0.4m, that is, about 0.2m each time. The maximum number of ships thrown in the grid Di was calculated according to the following formula, and the number of ships thrown in each grid was strictly controlled not to exceed:
[0035] Dimax=(D1-D2-D3) / 0.2, where D1 is the average water depth of the grid before mud dumping; D2 is the maximum draft of the fully loaded mud barge and the suction dredger; D3 is the surplus safety depth to ensure the safe construction of the ship, which is determined according to the "General and Process Design Specifications for Seaports".
[0036] Those skilled in the art should understand that the embodiments of the present invention described above and shown in the accompanying drawings are only examples and do not limit the present invention. The purpose of the present invention has been fully and effectively achieved. The functions and structural principles of the present invention have been demonstrated and explained in the embodiments, and the embodiments of the present invention may be deformed or modified in any way without departing from the principles.
Claims
1. A method for automatically determining the number of mud dumping times based on satellite positioning data, characterized in that: The following steps are involved: Step 1, set up the dredging construction area and the mud dumping area, and grid the mud dumping area to set the corresponding area labels A1, A2, A3...An; the mud dumping times of the corresponding areas are D1, D2, D3...Dn, the initial mud dumping times are all 0, and the maximum mud dumping times are D1max, D2max, D3max...Dnmax respectively; Step 2: Install an AIS system on the dredging vessel, and read the dredging vessel information transmitted by the AIS in real time during the voyage. The dredging vessel information transmitted by the AIS includes the dredging vessel identification number and satellite positioning data; Step 3, comparing the satellite positioning data obtained in real time in step 2 with the mud dumping area in step 1 to determine the corresponding area number where the dredging vessel is located; Step 4: When the dredging vessel arrives at the dumping area, obtain three consecutive satellite positioning data s1, s2 and s3 output by the AIS system, the corresponding coordinates are (x1, y1), (x2, y2), (x3, y3), and calculate the azimuths b1 and b2 between two adjacent coordinates; Step 5: Calculate the difference between b1 and b2 in step 4, and take the absolute value θ of the difference to determine whether θ satisfies 100º≤θ≤220º; Step 6, if θ in step 5 is satisfied, then s2 (x2, y2) is the mud throwing coordinate, calculate the area label Ai where s2 is located, and the number of mud throwing in the area is Di+1, where i=1, 2, 3…n; if step 5 is not satisfied, continue to monitor and repeat steps 2 to 5; Step 7: Determine whether Di+1 obtained in step 6 is equal to Dimax. If Di+1 is equal to Dimax, a warning is given that the number of mud dumping times in the area Ai has reached the upper limit; if Di+1 is less than Dimax, repeat steps 2 to 7.
2. The method for automatically determining the number of mud dumping times based on satellite positioning data according to claim 1, characterized in that: The azimuth angle in step 4 is: b1=arctan((y2-y1) / (x2-x1)), b2=arctan((y3-y2) / (x3-x2)).
3. The method for automatically determining the number of mud dumping times based on satellite positioning data according to claim 1, characterized in that: In step 6, the center coordinates of the Ai area are (xii, yii). If |x2-xii|≤|xi3-xi1| / 2 and |y2-yii|≤|yi3-yi1| / 2, it is determined that the dredging ship is located in the Ai area.
4. The method for automatically determining the number of mud dumping times based on satellite positioning data according to claim 3 is characterized in that: The coordinates of the two diagonal points of the Ai area are (xi2, yi1) and (xi3, yi3), and the coordinates of the center point are xii=(xi1+xi3) / 2, yii=(yi1+yi3) / 2, where i=1, 2, 3…n.
5. The method for automatically determining the number of mud dumping times based on satellite positioning data according to claim 1, characterized in that: The grid size of A1, A2, A3…An areas is 80m×40m.