A heavy water group collecting device for heavy water reactor loading and unloading
By designing a heavy water group collection device and using the automatic connection between the trigger rod of the loading and unloading machine and the valve, the problem of pollution and tritium absorption risks caused by the outflow of heavy water during the loading and unloading process of the heavy water reactor has been solved, and the safe and effective collection of heavy water and environmental protection have been achieved.
Patent Information
- Application Number
- CN202110270863.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-03-12
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2041-03-12
AI Technical Summary
During the loading and unloading process of the heavy water reactor, after the loading and unloading machine is released from the channel, a corresponding amount of heavy water will flow out to the ground, causing ground contamination and the risk of tritium absorption by the staff. Existing technology cannot effectively solve this problem.
A heavy water group collection device is designed. It is connected to the valve through the loading and unloading machine trigger rod, automatically opens the valve under the channel, and guides the heavy water to flow into the heavy water collection box. It uses a water funnel, a reset valve, a valve trigger rod, a valve spring and a connecting device. The structure of the water device pipeline joint ensures that heavy water flows into the collection bucket.
It achieves effective collection of heavy water, avoids ground pollution and the risk of tritium inhalation by staff, and ensures the safety and environmental protection of the heavy water stacker loading and unloading machine.
Smart Images

Figure CN115083645B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to fuel transmission, and in particular relates to a heavy water group collecting device for heavy water reactor loading and unloading. Background Art
[0002] The two heavy water reactor nuclear power units of Qinshan Nuclear Power Plant are the only two heavy water reactor units in China. The advantage of heavy water reactors is that they are continuously loaded and unloaded. There are four channels in the maintenance area for loading and unloading, namely the spent fuel channel, the calibration channel, the auxiliary channel and the new fuel channel. The above four channels have different functions as long as the loader and unloader are carrying out loading and unloading operations. When the loader and unloader release their grip on these channels and leave the channel screen, a corresponding amount of heavy water will flow out to the ground, causing ground pollution, loss of heavy water in the unit and the risk of tritium inhalation for the staff. In view of the above events, it is necessary to develop a set of group heavy water collection devices to uniformly flow the water into a heavy water collection box for collection. Summary of the invention
[0003] The object of the present invention is to provide a heavy water group collection device for heavy water reactor loading and unloading. The installation and implementation method is simple. As long as the loader and unloader are connected to any channel, the trigger rod of the loader and unloader triggers the valve touch rod under the corresponding channel, the valve opens, and once the channel is opened, the heavy water will flow into the heavy water collection box.
[0004] The technical scheme of the present invention is as follows: A heavy water group collection device for loading and unloading heavy water in a heavy water reactor comprises a loading and unloading machine, wherein the loading and unloading machine is connected to a trigger rod of the loading and unloading machine, the trigger rod of the loading and unloading machine is connected to a valve spring, the valve spring is connected to the trigger rod, the trigger rod is connected to a reset valve, the reset valve is connected to a water receiving funnel, the reset valve is connected to a pipeline joint of a water receiving device, the pipeline joint of the water receiving device is connected to a pipeline joint of the water receiving device through a pipeline, and the pipeline joint of the water receiving device is connected to a heavy water collection bucket,
[0005] The structure consisting of the water receiving funnel, the reset valve, the valve trigger rod, the valve spring and the water receiving device pipeline joint has 5 groups in total.
[0006] The water receiving funnel is fixed by a fixing pipe clamp.
[0007] The fixed pipe clamp is embedded in the pipeline fixing plate.
[0008] Both ends of the pipeline fixing plate are fixed to the concrete wall by fixing bolts respectively.
[0009] The top heavy water bucket pipeline joint of the heavy water collection bucket.
[0010] The side of the heavy water collection barrel is connected to a heavy water collection barrel liquid level gauge.
[0011] The bottom of the heavy water collection barrel is also connected with a rotating wheel.
[0012] The beneficial effects of the present invention are: simple installation and implementation, easy to understand, strong practicality, and the heavy water reactor unit has been in operation for several years, with good use and good heavy water recovery effect, which effectively ensures that heavy water does not leak, and the risk of accidental tritium inhalation by workers and plant environmental pollution is "zero". It effectively ensures that the heavy water reactor loading and unloading machine is connected with each channel in the maintenance area to carry out the preparation work before loading. When connecting with each corresponding channel, when the corresponding channel is opened for a moment, the heavy water in the channel and the loading and unloading machine flows out and flows directly through the trumpet of the grouped heavy water collection device, and finally flows into the heavy water collection box through the pipeline and the corresponding valve, so that it will not cause plant environmental pollution, and the work will not be subject to the risk of accidental tritium inhalation, effectively protecting the public and the environment. This grouped collection device is simple, safe and reliable, and strong in practicality. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 The present invention provides a schematic diagram of a heavy water cluster collection device for heavy water reactor loading and unloading.
[0014] In the figure, 1 channel, 2 water collecting funnel, 3 fixed pipe clamp, 4 fixing bolt, 5 reset valve, 6 heavy water collecting bucket, 7 heavy water collecting bucket liquid level gauge, 8 valve trigger rod, 9 valve spring, 10 concrete wall, 11 pipeline fixing plate, 12 heavy water bucket pipeline joint, 13 water receiving device pipeline joint, 14 loader and unloader trigger rod, 15 loader and unloader, A new fuel channel, B auxiliary channel, C calibration channel, D drill channel, E spent fuel channel. DETAILED DESCRIPTION
[0015] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0016] The present invention provides a heavy water group collecting device for heavy water reactor loading and unloading. The loader moves to the corresponding channel. When forward docking is implemented, a trigger rod with a valve is triggered by a trigger rod installed on the loader. At this time, the valve opens automatically. When the docking of the loader is completed, the channel and the nozzle plug of the loader are opened, and the heavy water flows into the square funnel at the lower part of the corresponding channel of the collecting device, and then flows into the heavy water collection box through the valve and the corresponding pipeline. When the work in the corresponding channel is completed, the sealing plug and the nozzle plug of the loader are reinstalled, the connection between the loader and the channel is released, the loader is withdrawn, the trigger rod of the loader is separated from the trigger rod of the valve, and the valve core is automatically reset to the seat under the action of the spring, and the valve is closed.
[0017] like Figure 1As shown, a heavy water group collecting device for loading and unloading heavy water in a heavy water reactor comprises a channel 1, a water receiving funnel 2, a fixed pipe clamp 3, a fixing bolt 4, a reset valve 5, a heavy water collecting bucket 6, a heavy water collecting bucket level gauge 7, a valve trigger rod 8, a valve spring 9, a concrete wall 10, a pipeline fixing plate 11, a heavy water bucket pipeline joint 12, a water receiving device pipeline joint 13, a loader and unloader trigger rod 14 and a loader and unloader 15, wherein the channel 1 comprises a new fuel channel A, an auxiliary channel B, a calibration channel C, a drill channel D and a spent fuel channel E, the loader and unloader 15 is connected to the loader and unloader trigger rod 14, the loader and unloader trigger rod 14 is connected to the valve spring 9, the valve spring 9 is connected to the trigger rod 8, the trigger rod 8 is connected to the reset valve 5, and the reset valve 5 is connected There is a water receiving funnel 2, a reset valve 5 is connected to a water receiving device pipeline joint 13, the water receiving device pipeline joint 13 is connected to the water receiving device pipeline joint 13 through a pipeline, and the water receiving device pipeline joint 13 is connected to a heavy water collecting bucket 6. In this embodiment, there are 5 groups of structures composed of the water receiving funnel 2, the reset valve 5, the valve trigger rod 8, the valve spring 9 and the water receiving device pipeline joint 13. The water receiving funnel 2 is fixed by a fixed pipe clamp 3, and the fixed pipe clamp 3 is embedded in a pipeline fixing plate 11. The two ends of the pipeline fixing plate 11 are respectively fixed to the concrete wall 10 by fixing bolts 4. The top of the heavy water collecting bucket 6 is connected to a heavy water bucket pipeline joint 12, and the side of the heavy water collecting bucket 6 is connected to a heavy water collecting bucket level gauge 7. The bottom of the heavy water collecting bucket 6 is also connected to a rotating wheel.
[0018] Device production and installation:
[0019] The group heavy water collection device is composed of a water receiving funnel, a fixed pipe clamp, a heavy water level valve, a heavy water collection bucket, a heavy water collection level gauge, a valve trigger rod, a pipeline fixing plate, a pipeline joint (1 / 2, 3 / 4 inch Swagelok joint), a stainless steel pipeline (1 / 2 inch stainless steel pipe 304), etc.
[0020] The water receiving funnel 2 is made of 3MM stainless steel plate. The upper part is square, and the lower part is connected to it with a 1 / 2-inch stainless steel pipe 304 from the top to the bottom (from large to small). Five identical models are also made. The processed water receiving funnel 2 is welded to the 1 / 2-inch stainless steel pipe 304, and one end is covered with a 1 / 2-inch Swagelok connector 12 to connect and tighten the reset valve 13. The pipeline fixing plate (8MM) stainless steel plate is processed and made. Holes are punched at both ends to facilitate fixing to the wall 11, and it is tightened with fixing bolts 4. A total of 5 sets of pipeline fixing pipe clamps 3 are processed and made. The connected water receiving funnel 2 and reset valve 5 are fixed to the fixing plate 10 with the fixing pipe clamp 3, and aligned with the channel. The remaining four installation methods are the same. After the 5 collecting funnels with valves are installed and fixed, press Figure 1A 1 / 2-inch stainless steel pipe 304 is processed accordingly, one end of which is connected to the 3 / 4-inch Swagelok joint 13 at the lower part of the reset valve 5, and a long pipeline is configured to be connected to the pipeline at the lower part of the reset valve 5 (welded connection here), and then a pipeline is led to the heavy water collection root 6, which is connected by a 3 / 4-inch Swagelok joint 13.
[0021] Heavy water collection mode:
[0022] The heavy water pile loading and unloading machine 12 moves to any corresponding channel A, B, C, D or E; after the heavy water pile loading and unloading machine moves to the same straight line as the corresponding channel, the loading and unloading machine moves forward and docks with the corresponding channel, at which time the trigger rod on the loading and unloading machine directly lifts the valve trigger rod on the corresponding channel funnel connecting the valve, and the valve is opened; after the shielding plug on the channel or the nozzle plug of the loading and unloading machine is opened, the heavy water flows into the collecting funnel, and the heavy water collecting barrel has an exhaust pipeline, so that the heavy water flows smoothly through the valve and pipeline to the heavy water collecting barrel; when the loading and unloading machine completes the corresponding work in the corresponding channel, the nozzle plug and the shielding plug are restored, the loading and unloading machine is removed, the loading and unloading trigger rod is separated from the valve trigger rod on the collecting device, and the valve core is automatically reset under the elastic force of the valve spring, and the valve is in a closed state. When the heavy water level indicator on the heavy water collecting barrel shows a high liquid level, a heavy water collecting barrel of the same model can be replaced.
Claims
1. A heavy water group collecting device for heavy water loading and unloading, characterized in that: The invention comprises a loading and unloading machine, wherein the loading and unloading machine is connected to a trigger rod of the loading and unloading machine, the trigger rod of the loading and unloading machine is connected to a valve spring, the valve spring is connected to the trigger rod, the trigger rod is connected to a reset valve, the reset valve is connected to a water receiving funnel, the reset valve is connected to a first water receiving device pipeline joint, the first water receiving device pipeline joint is connected to a second water receiving device pipeline joint through a pipeline, and the second water receiving device pipeline joint is connected to a heavy water collecting barrel.
2. A heavy water group collecting device for heavy water reactor loading and unloading as claimed in claim 1, characterized in that: The structure consisting of the water receiving funnel, the reset valve, the valve trigger rod, the valve spring and the water receiving device pipeline joint has 5 groups in total.
3. The heavy water grouping collection device for heavy water reactor loading and unloading as claimed in claim 1, characterized in that: The water receiving funnel is fixed by a fixing pipe clamp.
4. A heavy water group collecting device for heavy water reactor loading and unloading as claimed in claim 3, characterized in that: The fixed pipe clamp is embedded in the pipeline fixing plate.
5. The heavy water group collecting device for heavy water reactor loading and unloading as claimed in claim 4, characterized in that: Both ends of the pipeline fixing plate are fixed to the concrete wall by fixing bolts respectively.
6. The heavy water group collecting device for heavy water reactor loading and unloading as claimed in claim 1, characterized in that: A heavy water bucket pipeline joint is arranged on the top of the heavy water collecting bucket.
7. The heavy water grouping collection device for heavy water reactor loading and unloading as claimed in claim 1, characterized in that: The side of the heavy water collection barrel is connected to a heavy water collection barrel liquid level gauge.
8. The heavy water grouping collection device for heavy water reactor loading and unloading as claimed in claim 1, characterized in that: The bottom of the heavy water collection barrel is also connected with a rotating wheel.
Citation Information
Patent Citations
Heavy water grouping and collecting device for loading and unloading of heavy water reactor
CN215450917U