A safety protection platform for hanging basket horizontally connecting trusses

Through the combined design of cantilever bracket assembly, pedestrian plate assembly, guardrail assembly and ladder assembly, the problems of inconvenient installation, high loss rate and insufficient safety of the hanging basket horizontally connected truss protection platform are solved, and an efficient and safe construction environment is achieved.

CN115094783BActive Publication Date: 2025-08-12HUNAN WUXIN DIGITAL INTELLIGENCE TECHNOLOGY CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202210725207.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-24
Publication Date
2025-08-12
Estimated Expiration
2042-06-24

AI Technical Summary

Technical Problem

The existing protective platform for hanging baskets horizontally connected trusses has problems such as inconvenient installation, high loss rate, insufficient safety and difficult construction, especially when operating at high altitudes, there are greater safety risks.

Method used

The combination design of cantilever bracket assembly, pedestrian board assembly, guardrail assembly and ladder assembly is adopted to realize the installation of the safety protection platform through removable connection, and the locking clamp and limit plate are used for positioning and locking. The bolt assembly is hidden in the rectangular tube to avoid exposure. The ladder adopts an arched structure to improve safety.

Benefits of technology

It realizes a safety protection platform with convenient installation and disassembly, high reuse rate, low cost and high safety, reduces the risk of high altitude operations, reduces component damage and welding workload, and improves construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115094783B_ABST
    Figure CN115094783B_ABST
Patent Text Reader

Abstract

The present invention discloses a safety protection platform for a hanging basket transverse connection truss, comprising: a cantilever support assembly, a walking board assembly, a guardrail assembly, and a ladder assembly; one end of the cantilever support assembly is detachably connected to the hanging basket transverse connection truss, and a walking board assembly is detachably laid on the cantilever support assembly, and the cantilever support assembly is used to enable the walking board assembly to be suspended on the transverse connection truss; the guardrail assembly is connected to the walking board assembly for achieving safety protection; and the ladder assembly is connected to the walking board assembly for enabling workers to climb from the bridge surface to the safety protection platform. The present invention has the advantages of compact structure, high safety, strong versatility, and easy installation and maintenance. It abandons the practice of welding the walking board to the bracket, reduces the workload of on-site welding, reduces the labor intensity of workers, and also eliminates the safety risks caused by workers directly climbing from the unprotected hanging basket bracket to the end of the transverse connection truss to adjust the suspension rod.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge construction, and in particular relates to a safety protection platform for a hanging basket to be transversely connected to a truss. Background Art

[0002] There are hangers at both ends of the hanging basket's transverse connecting trusses for adjusting the bottom basket elevation. The frequency of adjustment of the hangers here is relatively low. In order to save costs, most construction methods currently require workers to climb directly from the unprotected hanging basket bracket to the end of the transverse connecting truss to adjust the hangers. This method poses a huge safety hazard.

[0003] In addition, the existing hanging basket transversely connected truss platform generally includes a bracket, a walking board, and a guardrail. The bracket is connected to the crossbeam by bolts, the walking board is placed on the bracket and welded to the bracket, and steel bars are welded to the side of the walking board as a guardrail, or the guardrail is connected to the walking board with bolts. This method has the following disadvantages:

[0004] 1. The walking board and the bracket are generally fixed by on-site welding. Multiple welding and disassembly increase the loss rate of the hanging basket protection system.

[0005] 2. The bolts on the side of the walking board are exposed, which can cause interference between the walking board, brackets, and crossbeams. Interference areas must be welded. This method results in heavy on-site installation and disassembly work, high labor intensity, and difficulty in high-altitude operations. Furthermore, the hanging basket is prone to deformation after multiple disassembly and welding, resulting in high product damage and scrap rates and poor appearance.

[0006] 3. The connecting flange between the walking boards is located below the walking boards. High-altitude operations make bolt connection difficult, so on-site workers basically use welding to connect the walking boards.

[0007] 4. To build the guardrail, one needs to climb to the top of the horizontal connecting truss to weld the steel bars on site. In addition, the horizontal bars are built after the vertical bars are installed, and cross fasteners are used to connect the horizontal bars to the vertical bars. This operation method has a greater safety risk and poor appearance. Summary of the Invention

[0008] The technical problem to be solved by the present invention is to overcome the shortcomings of the existing technology such as insufficient protection, inconvenient installation, and high loss rate of the hanging basket cross beam protection platform, and to provide a safety protection platform for the hanging basket transverse connecting truss with a simple structure, easy installation and disassembly, high reuse rate, low cost, high safety, and strong versatility.

[0009] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0010] A safety protection platform for a hanging basket transversely connected truss, comprising: a cantilever support assembly, a walking board assembly, a guardrail assembly and a ladder assembly; the end of the cantilever support assembly is detachably connected to the transversely connected truss of the hanging basket, and a walking board assembly is detachably laid on the cantilever support assembly, and the cantilever support assembly is used to enable the walking board assembly to be suspended on the transversely connected truss; the guardrail assembly is connected to the walking board assembly for achieving safety protection; the ladder assembly is connected to the walking board assembly for enabling workers to climb from the bridge surface to the safety protection platform.

[0011] As a further improvement of the present invention, the cantilever bracket assembly includes a first cantilever bracket or a second cantilever bracket, and the first cantilever bracket and the second cantilever bracket both include: a mounting plate, a load-bearing plate and a locking assembly, the mounting plate is fixed to the end of the load-bearing plate, and is used to realize a detachable connection between the cantilever bracket and the transverse connecting truss; a walking plate assembly is detachably laid on the load-bearing plate; the locking assembly is arranged on the load-bearing plate, and is used to limit the displacement of the walking plate assembly.

[0012] As a further improvement of the present invention, the locking assembly includes a locking clamp and a limit plate, and the locking clamp and the limit plate are respectively arranged on opposite sides of the load-bearing plate. The locking clamp and the limit plate cooperate with each other to realize the locking and fixing of the walking board assembly on the load-bearing plate.

[0013] As a further improvement of the present invention, the first cantilever bracket is a T-shaped cantilever bracket; the second cantilever bracket is an L-shaped cantilever bracket, and the second cantilever bracket also includes a U-shaped clip, and the mounting plate is connected to the U-shaped clip to realize a detachable connection between the second cantilever bracket and the transverse connecting truss.

[0014] As a further improvement of the present invention, the locking fixture includes an adjusting screw assembly, and the adjusting screw assembly is used to lock the walking board assembly.

[0015] As a further improvement of the present invention, the walking board assembly includes a rectangular tube and a pedal, the rectangular tube is located on the side of the pedal, and both ends of the rectangular tube are provided with a first connecting hole, which is used to achieve detachable connection between adjacent pedals.

[0016] As a further improvement of the present invention, the rectangular tube is further provided with a plurality of side holes, and the pedal is provided with a plurality of mounting holes. The side holes and the mounting holes cooperate with each other to achieve a detachable connection between the guardrail assembly and the pedal.

[0017] As a further improvement of the present invention, the guardrail assembly includes an end guardrail and an intermediate guardrail used in combination.

[0018] As a further improvement of the present invention, the end guardrail includes: a guardrail body, a skirting board and a support leg. The skirting board and the support leg are both located at the lower part of the guardrail body. The support leg cooperates with the mounting hole to realize the connection between the guardrail body and the pedal.

[0019] As a further improvement of the present invention, mounting ear plates are provided on both sides of the skirting board, and a second connecting hole is provided on the mounting ear plate. The second connecting hole cooperates with the first connecting hole to realize the connection between the guardrail body and the pedal end.

[0020] As a further improvement of the present invention, adjacent intermediate guardrails or end guardrails and the intermediate guardrail are connected by bolts.

[0021] As a further improvement of the present invention, the ladder assembly includes a ladder guardrail and a ladder; the ladder guardrail is an arched structure, the ladder guardrail is fixed on the ladder, and the arched passage formed by the ladder guardrail surrounds the outside of the ladder; the lower part of the ladder is located on the bridge surface, and the upper part of the ladder is detachably connected to the end of the walking board assembly.

[0022] Compared with the prior art, the advantages of the present invention are:

[0023] 1. The safety protection platform for the transverse connecting truss of the hanging basket of the present invention forms a safety protection system with a simple structure and reliability through the cantilever bracket assembly, the walking board assembly, the guardrail assembly and the climbing ladder assembly; the cantilever bracket assembly is detachably connected to the transverse connecting truss of the hanging basket, and the walking board assembly is laid on the cantilever bracket assembly in a detachable form, so that the walking board assembly is hung on the transverse connecting truss of the hanging basket; the guardrail assembly is fixed to the walking board assembly, so that the transverse connecting truss of the hanging basket is safely protected; and the climbing ladder assembly is then connected to the walking board assembly, so that workers can climb from the bridge surface to the safety protection platform, which has the advantages of easy installation and disassembly, high reuse rate, low cost, high safety, and strong versatility, ensuring the safety of high-altitude operations, and also eliminating the safety risks caused by workers directly climbing from the unprotected hanging basket bracket to the end adjustment boom of the transverse connecting truss.

[0024] 2. The safety protection platform for the transverse connecting truss of the hanging basket in the preferred example of the present invention realizes the bolt connection between the cantilever bracket and the transverse connecting truss of the hanging basket by means of the mounting plate arranged at the end of the load-bearing plate; the walking board assembly is laid on the load-bearing plate, and the load-bearing plate is used to bear the weight load of the safety protection platform, which is safe and reliable; and the locking clamps and the limit plates arranged at the opposite ends of the load-bearing plate cooperate with each other to realize the longitudinal, transverse and vertical positioning and locking of the walking board assembly, thereby improving the installation stability of the walking board assembly; the cantilever bracket has a simple structure, does not require welding or a large number of bolts, and is convenient and quick to install and dismantle, thereby improving the reliability of the safety protection system while also reducing the installation workload of the safety protection system.

[0025] 3. In a preferred embodiment of the present invention, a safety protection platform for connecting a hanging basket to a truss is provided with a rectangular tube on both sides of the tread, and connecting holes are provided at both ends of the rectangular tube, thereby enabling bolt connection between adjacent treads, while also allowing the bolt assembly to be hidden within the rectangular tube. Furthermore, the rectangular tube is provided with a plurality of side holes, and the tread is provided with a plurality of mounting holes. The side holes and the mounting holes correspond to each other, thereby enabling bolt connection between the guardrail assembly and the tread, and the bolt assembly can be hidden within the rectangular tube. The provision of the rectangular tube prevents the bolt assembly from contacting external objects during transportation, hoisting, and stacking of the walking board assembly, making the bolt assembly less susceptible to damage and deformation, thereby increasing the service life and reuse rate of the bolt assembly. Furthermore, the internal structure of the bolt assembly ensures that the walking board assembly has a uniform profile in any cross-section, without any protruding structures, and does not interfere structurally with the locking clamps and limit plates. Therefore, the walking board assembly can be installed at any position on the cantilever support assembly, greatly facilitating operation by on-site workers and avoiding on-site cutting and modification of components due to structural interference. This greatly extends the service life of the components, facilitates repeated turnover, and significantly improves economic benefits.

[0026] 4. The safety protection platform for the hanging basket horizontally connected to the truss in the preferred example of the present invention can achieve a stable connection between the end guardrail and the pedal by arranging a support leg at the bottom of the end guardrail, inserting the support leg into the mounting hole on the pedal, and then fastening it with a bolt assembly. Moreover, the bolt assembly can be hidden in the rectangular tube on the side of the pedal, which is both stable and beautiful. By arranging a skirting board at the bottom of the end guardrail, it can effectively prevent people from accidentally stepping on the air and objects placed on the walking board from falling. At the same time, mounting ear plates with connection holes are provided on both sides of the skirting board. When the end guardrail is installed on the pedal When installing the end, the ear plate can be connected to the connecting hole at the end of the pedal, which improves the flexibility of the guardrail assembly. Furthermore, by using a combination of intermediate guardrails or end guardrails, the guardrail gap can be set at any position on the horizontal connecting truss of the hanging basket to meet the installation requirements of ladders in different positions, increase the versatility of guardrail parts, and greatly broaden the scope of application of the guardrail assembly. In addition, adjacent intermediate guardrails or end guardrails and intermediate guardrails can be fixed with bolts, which greatly improves the overall lateral stability of the guardrail assembly and makes the guardrail protection safer.

[0027] 5. The safety protection platform for the hanging basket transversely connected trusses in the preferred example of the present invention forms an arched passage on the outside of the ladder by fixing the arched ladder guardrail on the ladder, thereby solving the problem of low safety factor of the ladder and ensuring on-site construction safety; by detachably connecting the upper part of the ladder to the walking board assembly, the amount of welding on the construction site is reduced and the flexibility of the ladder assembly is improved; further, based on cost savings and the low frequency of use of the transversely connected truss platform, a low-cost vertical ladder is adopted, which is conducive to reducing the construction cost of the safety protection platform. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of the structural principle of the safety protection system in the present invention.

[0029] Figure 2 for Figure 1 Schematic diagram of the connection structure principle at A in the middle.

[0030] Figure 3 This is a schematic diagram of the connection structure principle between the safety protection system and the hanging basket transverse connection truss in the present invention.

[0031] Figure 4 Schematic diagram of the structural principle of the first cantilever bracket in the present invention.

[0032] Figure 5 Schematic diagram of the structural principle of the second cantilever bracket in the present invention.

[0033] Figure 6 Schematic diagram of the top view of the structural principle of the walking board assembly in the present invention.

[0034] Figure 7 Schematic diagram of the side view of the structural principle of the walking board assembly in the present invention.

[0035] Figure 8 Schematic diagram of the connection structure principle of the pedal in the present invention.

[0036] Figure 9 It is a schematic diagram of the side structural principle of the rectangular tube in the present invention.

[0037] Figure 10 It is a schematic diagram of the structural principle of the end guardrail in the present invention.

[0038] Figure 11 Schematic diagram of the connection structure principle of the guardrail assembly in the present invention.

[0039] Legend: 1. Cantilever bracket assembly; 11. First cantilever bracket; 111. First mounting plate; 112. First locking fixture; 113. First bearing plate; 114. First limit plate; 115. First adjusting screw assembly; 12. Second cantilever bracket; 121. Second mounting plate; 122. U-shaped bracket; 123. Second bearing plate; 124. Second locking fixture; 125. Second limit plate; 126. Second adjusting screw assembly ; 2. Walking board assembly; 21. Rectangular tube; 211. Side hole; 212. First connecting hole; 22. Pedal; 221. Mounting hole; 3. Guardrail assembly; 31. End guardrail; 311. Guardrail body; 312. Skirting board; 3121. Mounting ear plate; 3122. Second connecting hole; 313. Support leg; 32. Middle guardrail; 4. Ladder assembly; 41. Ladder guardrail; 42. Reinforcement rod; 43. Ladder; 5. Horizontal connecting truss. DETAILED DESCRIPTION

[0040] The present invention will be further described below in conjunction with the accompanying drawings and specific preferred embodiments, but the scope of protection of the present invention is not limited thereby.

[0041] In the description of the present invention, it should be understood that the terms "side", "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like to indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0042] In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined.

[0043] Example 1

[0044] like Figures 1 to 4 、 Figures 6 to 11 As shown, the safety protection platform for the hanging basket transverse connection truss of the present invention includes: a cantilever support assembly 1, a walking board assembly 2, a guardrail assembly 3 and a ladder assembly 4. One end of the cantilever support assembly 1 is detachably connected to the transverse connection truss 5 of the hanging basket by a bolt assembly, and a walking board assembly 2 is detachably laid on the cantilever support assembly 1, and the cantilever support assembly 1 is used to realize that the walking board assembly 2 is suspended on the transverse connection truss 5. The guardrail assembly 3 is connected to the walking board assembly 2 for realizing safety protection. The ladder assembly 4 is connected to the walking board assembly 2 for realizing that the staff climbs from the bridge surface to the safety protection platform. The connection structure of the safety protection platform and the hanging basket transverse connection truss is shown in FIG. Figure 3 It can be understood that the safety protection platform of this embodiment is mainly installed at the end of the transverse connecting truss 5 for adjusting the boom.

[0045] In this embodiment, a safety protection system with a simple structure and reliability is formed by the cantilever support assembly 1, the walking board assembly 2, the guardrail assembly 3 and the ladder assembly 4; the cantilever support assembly 1 is detachably connected to the transverse connecting truss 5 of the hanging basket, and the walking board assembly 2 is detachably laid on the cantilever support assembly 1, so that the walking board assembly 2 is suspended on the transverse connecting truss 5 of the hanging basket; the guardrail assembly 3 is fixed to the walking board assembly 2, so that the transverse connecting truss 5 of the hanging basket is safely protected; and the ladder assembly 4 is connected to the walking board assembly 2, so that the staff can climb from the bridge surface to the safety protection platform, which has the advantages of easy installation and disassembly, high reuse rate, low cost, high safety, and strong versatility, ensuring the safety of high-altitude operations, and also eliminating the safety risks caused by the staff directly climbing from the unprotected hanging basket support to the end of the transverse connecting truss to adjust the boom.

[0046] like Figure 4As shown, in this embodiment, the cantilever support assembly 1 includes a first cantilever support 11 of a T-shaped structure, and the first cantilever support 11 includes: a first mounting plate 111, a first load-bearing plate 113 and a first limit plate 114. One end of the first load-bearing plate 113 is welded to the first mounting plate 111, and the other end of the first load-bearing plate 113 is welded to the first limit plate 114; bolt connection holes are provided at both ends of the first mounting plate 111, for realizing bolt connection between the first cantilever support 11 and the transverse connecting truss 5; the walking plate assembly 2 is detachably laid on the first load-bearing plate 113, and a groove is provided on the upper part of the first limit plate 114, and the first limit plate 114 can limit the longitudinal and vertical displacement of the walking plate assembly 2. It can be understood that in order to improve the load-bearing capacity of the cantilever support assembly 1, the first load-bearing plate 113 can be prepared using steel sections.

[0047] In this embodiment, the first cantilever bracket 11 further includes a first locking fixture 112 connected to the first bearing plate 113. The first locking fixture 112 and the first bearing plate 113 can be removably connected using a bolt assembly. The first locking fixture 112 is located between the first mounting plate 111 and the first limiting plate 114, and is located on a side proximal to the first mounting plate 111. Specifically, the first locking fixture 112 and the first limiting plate 114 are located on opposite sides of the first bearing plate 113. The first locking fixture 112 and the first limiting plate 114 cooperate with each other to respectively lock the two sides of the walking board assembly 2, thereby securing the walking board assembly 2 to the first bearing plate 113 and improving the installation stability of the walking board assembly 2. It is understood that the specific placement of the first locking fixture 112 and the first limiting plate 114 on the first bearing plate 113 is not particularly limited, as long as they can effectively secure the two sides of the walking board assembly 2.

[0048] Furthermore, the first locking fixture 112 includes a first adjusting screw assembly 115 . By screwing the first adjusting screw assembly 115 , the walking board assembly 2 can be well locked in the longitudinal and transverse directions.

[0049] In this embodiment, a bolt connection is achieved between the first cantilever bracket 11 and the transverse connecting truss 5 by setting a first mounting plate 111 at the end of the first bearing plate 113; the walking board assembly 2 is laid on the first bearing plate 113, and the first bearing plate 113 is used to bear the weight of the safety protection platform, which is safe and reliable. Then, by the mutual cooperation between the first locking clamp 112 and the first limiting plate 114 set at the opposite ends of the first bearing plate 113, the walking board assembly 2 is positioned and locked in the longitudinal, transverse and vertical directions, thereby improving the installation stability of the walking board assembly 2. The first cantilever bracket 11 of this embodiment has a simple structure and does not require welding or a large number of bolts. It is easy and quick to install and remove, which improves the reliability of the safety protection platform while also reducing the installation workload of the safety protection platform.

[0050] like Figures 6 to 9 As shown, in this embodiment, the walking board assembly 2 includes a rectangular tube 21 and a pedal 22. The rectangular tube 21 is disposed on both sides of the pedal 22 along its length. First connection holes 212 are defined at both ends of the rectangular tube 21. The first connection holes 212 are used to detachably connect adjacent pedals 22. Specifically, adjacent pedals 22 are connected by bolt assemblies via the first connection holes 212 disposed at the ends of the rectangular tube 21. The bolt assemblies are placed within the first connection holes 212 and do not need to be exposed.

[0051] Furthermore, a plurality of side holes 211 are provided on the rectangular tube 21, and a plurality of mounting holes 221 are correspondingly provided on the pedal 22. The side holes 211 correspond to the mounting holes 221 one by one and are used to realize the bolt connection between the guardrail assembly 3 and the pedal 22, and the bolt assembly is hidden in the side hole 211 and does not need to be exposed.

[0052] In this embodiment, by providing rectangular tubes 21 on both sides of the pedals 22 and opening connecting holes at both ends of the rectangular tubes 21, bolt connection between adjacent pedals is achieved, and the bolt assembly can be hidden in the rectangular plate; further, a plurality of side holes 211 are provided on the rectangular tube 21, and a plurality of mounting holes 221 are provided on the pedals 22. The side holes 211 and the mounting holes 221 correspond to each other, so that the guardrail assembly 3 and the pedals 22 are bolted together, and the bolt assembly can be hidden in the rectangular tube 21; the provision of the rectangular tube 21 prevents the bolt assembly from contacting with external objects during transportation, hoisting, and stacking of the walking board assembly 2, so that The bolt assembly is not easily damaged or deformed, thereby increasing the service life and reuse rate of the bolt assembly; further, the built-in structure of the bolt assembly allows the walking board assembly 2 to have the same external contour in any cross-section, without any protruding structure, and does not structurally interfere with the second locking clamp 124 and the second limit plate 125. Therefore, the walking board assembly 2 can be installed at any position on the cantilever bracket assembly 1, which greatly facilitates the operation of on-site workers and avoids the on-site cutting and modification of components by workers due to structural interference, greatly extending the service life of the components, being more conducive to repeated turnover, and significantly improving economic benefits.

[0053] like Figure 10 and Figure 11 As shown, in this embodiment, the guardrail assembly 3 includes an end guardrail 31 and a middle guardrail 32 used in combination. Figure 11 Figures (a), (b), (c), (d), and (e) illustrate five different combinations of end guardrails 31 and intermediate guardrails 32. These combinations can be flexibly tailored to meet the specific needs of different hanging basket installations. Furthermore, bolt assemblies secure adjacent intermediate guardrails 32, or between end guardrails 31 and intermediate guardrails 32, significantly improving the overall lateral stability of the guardrail assembly 3 and enhancing the safety of the guardrail system.

[0054] In this embodiment, the end guardrail 31 comprises a guardrail body 311, a kickboard 312, and legs 313. The guardrail body 311 can be welded from steel pipes. The kickboard 312 and legs 313 are both located below the guardrail body 311. The kickboard 312 is used to prevent workers from accidentally stepping on empty space and objects placed on the walking board from falling. During guardrail installation, the legs 313 are inserted into the mounting holes 221 and bolt assemblies are installed in the side holes 211 to achieve a detachable connection between the end guardrail 31 and the pedal 22. The bolt assemblies can be concealed within the rectangular tube 21 and do not need to be exposed.

[0055] Furthermore, mounting lugs 3121 are provided on both sides of the skirting board 312, and second connecting holes 3122 are provided on the mounting lugs 3121. Figure 2As shown, when the end guardrail 31 is set at the end of the pedal 22, the second connection hole 3122 cooperates with the first connection hole 212, and the end guardrail 31 can be connected to the end of the pedal 22 by using a bolt assembly, which is simple and reliable.

[0056] It is understood that the middle guardrail 32 has a similar structure to the end guardrail 31. The middle guardrail 32 also includes a guardrail body, a kickboard, and a leg. The connection between the middle guardrail 32 and the pedal 22 is also similar to that of the end guardrail 31. To further expand the applicability of the guardrail assembly, the middle guardrail 32 can be provided in different lengths, such as 1m, 2m, or 3m.

[0057] In this embodiment, by providing a support leg 313 at the bottom of the end guardrail 31, inserting the support leg 313 into the mounting hole 221 on the pedal 22, and then tightening it with a bolt assembly, a secure connection between the end guardrail 31 and the pedal 22 is achieved. The bolt assembly can also be hidden within the rectangular tube 21 on the side of the pedal 22, making it both stable and aesthetically pleasing. By providing a kickboard 312 at the bottom of the end guardrail 21, it effectively prevents people from accidentally stepping on empty space. At the same time, mounting lugs 3121 with connection holes are provided on both sides of the kickboard 312. When the end guardrail 31 is installed at the end of the pedal 22, the mounting lugs 3121 can connect with the connection holes at the end of the pedal, thereby increasing the flexibility of the guardrail assembly. Furthermore, by combining the intermediate guardrail with the end guardrail, the guardrail gap can be set at any position on the horizontal connecting truss of the hanging basket to meet the installation requirements of ladders in different locations, increasing the versatility of the guardrail components and greatly broadening the scope of application of the guardrail assembly.

[0058] like Figure 1 As shown, in this embodiment, the ladder assembly 4 includes a ladder guardrail 41 and a ladder 43. The ladder guardrail 41 is an arched structure, and the ladder guardrail 41 is welded and fixed to the ladder 43, and the arched channel surrounded by the ladder guardrail 41 surrounds the outside of the ladder 43. The lower part of the ladder 43 is located on the bridge surface, that is, the lower part of the ladder 43 can be connected to the bridge surface, or it can be suspended on the bridge surface, as long as it can meet the climbing needs of the staff; the upper part of the ladder 43 is provided with a connecting hole, and the connecting hole can be bolted to the first connecting hole 212 at the end of the pedal 22 to achieve the fixation of the ladder. Furthermore, in order to improve the safety of the ladder assembly 4, a reinforcing rod 42 is provided on the outside of the ladder guardrail 41 in the vertical direction.

[0059] In this embodiment, by fixing the arched ladder guardrail on the ladder, an arched passage is formed on the outside of the ladder, which solves the problem of low safety factor of the ladder and ensures the safety of on-site construction; by detachably connecting the upper part of the ladder to the walking board assembly, the amount of welding on the construction site is reduced and the flexibility of use of the ladder assembly is improved; further, based on cost savings and the low frequency of use of the horizontally connected truss platform, a lower-cost vertical ladder is adopted, which is conducive to reducing the cost of building a safety protection platform.

[0060] The safety protection platform of this embodiment is installed as follows: first, the cantilever support assembly 1 is fixedly connected to the transverse connecting truss 5, and then the walking board assembly 2 is laid on the first load-bearing plate 113 of the cantilever support. After the walking board assembly 2 is laid, the walking board assembly 2 is locked and fixed using the first locking clamp 112, and finally the guardrail assembly 3 is installed. This installation method is simple to operate and requires little experience from the construction personnel. The modularization of components eliminates the need for separate welding and cutting between components, greatly reducing the installation workload of the safety protection platform and improving the assembly efficiency of the hanging basket. Moreover, the above components are universally usable after installation, reducing the number of components and facilitating storage and transportation during recycling. The reduction in the number of components can also significantly reduce maintenance and service costs.

[0061] Example 2

[0062] like Figures 1 to 3 、 Figures 5 to 11 As shown, the safety protection platform for the transverse connection truss of the hanging basket of the present invention has a similar structural arrangement to the safety protection platform of Example 1, differing primarily in that: in this embodiment, the cantilever support assembly 1 includes an L-shaped second cantilever support 12, which comprises a second mounting plate 121, a U-shaped clip 122, a second bearing plate 123, and a second limit plate 125. The second bearing plate 123 is L-shaped. One end of the second bearing plate 123 is welded to the second mounting plate 121, and the other end of the second bearing plate 123 is welded to the second limit plate 125. Bolt holes are provided at both ends of the second mounting plate 121, and the opening of the U-shaped clip 122 is connected to the mounting plate via a bolt assembly, thereby enabling the second cantilever support 12 to be detachably connected to the horizontal rod of the transverse connection truss 5. A walking plate assembly 2 is detachably placed on the second bearing plate 123, and a groove is provided on the upper portion of the second limit plate 125 to limit the longitudinal and vertical displacement of the walking plate assembly 2. It can be understood that in order to improve the load-bearing capacity of the cantilever support assembly 1, the second load-bearing plate 123 can be made of steel.

[0063] In this embodiment, the second cantilever bracket 12 further includes a second locking fixture 124 connected to the second bearing plate 123. The second locking fixture 124 and the second bearing plate 123 can be detachably connected using a bolt assembly. The second locking fixture 124 and the second limiting plate 125 are arranged on both sides of the bottom of the second bearing plate 123 relative to each other. The second locking fixture 124 and the second limiting plate 125 cooperate with each other to lock the two sides of the walking board assembly 2 respectively, so as to achieve the fixing of the walking board assembly 2 to the second bearing plate 123 and improve the installation stability of the walking board assembly 2. It is understood that the specific location of the second locking fixture 124 and the second limiting plate 125 on the second bearing plate 123 does not need to be particularly limited, as long as they can achieve the limiting and fixing of the two sides of the walking board assembly 2.

[0064] Furthermore, the second locking fixture 124 includes a second adjusting screw assembly 126 . By screwing the second adjusting screw assembly 126 , the walking board assembly 2 can be well locked in the longitudinal and transverse directions.

[0065] In this embodiment, the second cantilever bracket 12 is bolted to the transverse connecting truss 5 of the hanging basket by cooperating with the second mounting plate 121 and the U-shaped clamping plate 122 arranged at the end of the L-shaped second load-bearing plate 123; the walking board assembly 2 is laid on the load-bearing plate, and the load-bearing plate is used to bear the weight load of the safety protection platform, which is safe and reliable; and the second locking clamps 124 and the second limit plates 125 arranged at the opposite ends of the load-bearing plate cooperate with each other to achieve the longitudinal, transverse and vertical positioning and locking of the walking board assembly 2, thereby improving the installation stability of the walking board assembly; the second cantilever bracket 12 has a simple structure, does not require welding or a large number of bolts, and is quick and easy to install and remove, which improves the reliability of the safety protection system while also reducing the installation workload of the safety protection system.

[0066] The safety protection platform of this embodiment is installed as follows: first, the cantilever support assembly 1 is fixed to the horizontal connecting truss 5 of the hanging basket, and then the walking board assembly 2 is laid on the second load-bearing plate 123 of the cantilever support. After the walking board assembly 2 is laid, the walking board assembly 2 is locked and fixed using the second locking clamp 124. Finally, the guardrail assembly 3 and the ladder assembly 4 are installed. The above-mentioned installation method is simple to operate and requires little experience from the construction personnel. The modularization of the components eliminates the need for separate welding and cutting between the components, greatly reducing the installation workload of the safety protection platform and improving the assembly efficiency of the hanging basket. Moreover, the above-mentioned components are universally usable after installation, reducing the number of components and facilitating storage and transportation during recycling. The reduction in the number of components can also significantly reduce maintenance and service costs.

[0067] Although the present invention is disclosed above with reference to preferred embodiments, it is not intended to limit the present invention. Any person skilled in the art can, without departing from the spirit and technical solutions of the present invention, use the methods and technical contents disclosed above to make many possible changes and modifications to the technical solutions of the present invention, or modify them into equivalent embodiments with equivalent changes. Therefore, any simple modification, equivalent replacement, equivalent change and modification made to the above embodiments based on the technical spirit of the present invention without departing from the content of the technical solutions of the present invention, shall still fall within the scope of protection of the technical solutions of the present invention.

Claims

1. A safety protection platform for a hanging basket connected transversely to a truss, characterized in that: include: A cantilever support assembly (1), a walking board assembly (2), a guardrail assembly (3) and a ladder assembly (4); the end of the cantilever support assembly (1) is detachably connected to the transverse connecting truss (5) of the hanging basket, and the walking board assembly (2) is detachably laid on the cantilever support assembly (1); the cantilever support assembly (1) is used to enable the walking board assembly (2) to be suspended on the transverse connecting truss (5); the guardrail assembly (3) is connected to the walking board assembly (2) to achieve safety protection; the ladder assembly (4) is connected to the walking board assembly (2) to enable workers to climb from the bridge surface to the safety protection platform; The cantilever bracket assembly (1) includes a first cantilever bracket (11) or a second cantilever bracket (12), and the first cantilever bracket (11) and the second cantilever bracket (12) both include: a mounting plate, a bearing plate, and a locking assembly, wherein the mounting plate is connected to one end of the bearing plate, and the mounting plate is used to realize a detachable connection between the cantilever bracket and the transverse connecting truss (5); a walking plate assembly (2) is detachably laid on the bearing plate; and the locking assembly is arranged on the bearing plate and is used to limit the displacement of the walking plate assembly (2); The locking assembly includes a locking clamp and a limit plate, which are respectively arranged on opposite sides of the load-bearing plate. The locking clamp and the limit plate cooperate with each other to lock and fix the walking board assembly on the load-bearing plate.

2. The safety protection platform for the hanging basket transversely connected trusses according to claim 1 is characterized in that: The first cantilever bracket (11) is a T-shaped cantilever bracket; the second cantilever bracket (12) is an L-shaped cantilever bracket, and the second cantilever bracket (12) further includes a U-shaped card plate (122), and the mounting plate is connected to the U-shaped card plate (122) to achieve a detachable connection between the second cantilever bracket (12) and the transverse connecting truss (5).

3. The safety protection platform for the hanging basket transversely connected trusses according to any one of claims 1 to 2, characterized in that: The walking board assembly (2) comprises a rectangular tube (21) and a pedal (22), wherein the rectangular tube (21) is located on the side of the pedal (22), and first connection holes (212) are provided at both ends of the rectangular tube (21), and the first connection holes (212) are used to achieve detachable connection between adjacent pedals (22).

4. The safety protection platform for the hanging basket transversely connected trusses according to claim 3 is characterized in that: The rectangular tube (21) is further provided with a plurality of side holes (211), and the pedal (22) is provided with a plurality of mounting holes (221). The side holes (211) and the mounting holes (221) cooperate with each other to achieve a detachable connection between the guardrail assembly (3) and the pedal (22).

5. The safety protection platform for the hanging basket transversely connected trusses according to claim 4 is characterized in that: The guardrail assembly (3) comprises an end guardrail (31) and an intermediate guardrail (32) used in combination.

6. The safety protection platform for the hanging basket transversely connected trusses according to claim 5 is characterized in that: The end guardrail (31) comprises a guardrail body (311), a kickboard (312), and a support leg (313). The kickboard (312) and the support leg (313) are both located at the lower portion of the guardrail body (311). The support leg (313) cooperates with the mounting hole (221) to achieve connection between the guardrail body (311) and the pedal (22).

7. The safety protection platform for the hanging basket transversely connected trusses according to claim 6 is characterized in that: Mounting lugs (3121) are provided on both sides of the skirting board (312). The mounting lugs (3121) are provided with second connection holes (3122). The second connection holes (3122) cooperate with the first connection holes (212) to achieve connection between the guardrail body (311) and the end of the pedal (22).

8. The safety protection platform for the transverse connection trusses of the hanging basket according to any one of claims 1 to 2 or 4 to 7, characterized in that: The ladder assembly (4) comprises a ladder guardrail (41) and a ladder (43); the ladder guardrail (41) is an arched structure, the ladder guardrail (41) is fixed to the ladder (43), and an arched passage formed by the ladder guardrail (41) surrounds the outside of the ladder (43); the lower part of the ladder (43) is located on the bridge surface, and the upper part of the ladder (43) is detachably connected to the end of the walking board assembly (2).

Citation Information

Patent Citations

  • On-site assembly type aluminum alloy anti-skid roof maintenance crawling ladder

    CN114352184A

  • Wall-mounted safe operation platform for construction of outer vertical surface of constructional engineering structure

    CN212002171U

  • Modular maintenance platform structure and maintenance platform for cement plant storage warehouse

    CN212897815U