Health status assessment method, system, device and medium for new energy equipment
By obtaining the charging and discharging process data of new energy equipment, and using anomaly detection and trend analysis methods to dynamically assess battery health, it solves the problem that fixed safety thresholds in the existing technology cannot adapt to changes in battery performance, and achieves a more accurate health status assessment. and more efficient identification responses.
Patent Information
- Application Number
- CN202210826298.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-14
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-07-14
AI Technical Summary
Existing battery health assessment methods for new energy equipment rely on fixed safety thresholds and cannot dynamically adapt to changes in battery performance, resulting in inaccurate judgment results and inability to identify charging abnormalities, affecting user experience.
By obtaining the reference charging and discharging process data and actual charging and discharging process data of new energy equipment, anomaly detection and trend analysis methods are used to determine the safety threshold and health, comprehensively evaluate the health status of the equipment, and dynamically adjust the evaluation standards.
It achieves timely confirmation of the health status of new energy equipment, improves identification response efficiency, avoids inaccurate judgments caused by fixed safety thresholds, and provides a more accurate battery health assessment.
Smart Images

Figure CN115219935B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of new energy technology, and in particular to a health status assessment method, system, device and medium for new energy equipment. Background Art
[0002] With the development of new energy technologies, new energy devices have become the new favorite of users, such as new energy vehicles, devices that use batteries to provide kinetic energy.
[0003] In order to prevent charging accidents caused by factors such as excessive battery temperature during the charging process, manufacturers usually test the batteries to obtain the safety thresholds of various variables for safe charging of the batteries, and write them into the Battery Management System (BMS). The BMS system is an indispensable and important component of electric vehicles. It is the hub for managing and monitoring power batteries. It manages, maintains, and monitors each battery module, and is responsible for preventing overcharging and over-discharging of the battery, extending the battery life, and helping the battery to operate normally.
[0004] In order to prevent charging accidents caused by factors such as excessive battery temperature during the charging process, manufacturers usually conduct test experiments on the batteries, obtain the safety thresholds of various variables for safe charging of the batteries through test experiments, and write them into the BMS system. During the charging process, the current battery parameters are compared with the set safety thresholds to determine whether there are any abnormalities in the battery charging. Obviously, the safety thresholds obtained by the test experiment are usually fixed. As the battery performance changes, the corresponding thresholds are also constantly changing. If a fixed safety threshold is used as the abnormality judgment standard, it will inevitably lead to inaccurate judgment results. In addition, the existing safety thresholds usually quantify a static feature, such as the temperature of the power battery, without considering the dynamic development of the variables, so it is impossible to identify charging abnormalities. For users, they cannot determine the health of the power battery, so it brings many uncertainties to subsequent use, and the user experience is poor.
[0005] Therefore, how to evaluate the health status of power batteries of new energy equipment is an urgent problem that technical personnel in this field need to solve. Summary of the invention
[0006] The purpose of the present invention is to provide a method, system, device and medium for evaluating the health status of new energy equipment, which are used to timely confirm the health status of the new energy equipment to be detected and improve the efficiency of identification response.
[0007] In order to solve the above technical problems, the present invention provides a health status assessment method for new energy equipment, comprising:
[0008] Confirm the type of new energy equipment to be tested;
[0009] Select multiple new energy equipment sets under Type as analysis objects;
[0010] Acquire reference charge / discharge process data of the analysis object within a preset time range and matching the analysis object, wherein the reference charge / discharge process data comes from data generated by the analysis object during the charge / discharge process;
[0011] Acquire actual charging / discharging process data of the new energy device to be detected within a preset time range, wherein the actual charging / discharging process data comes from data generated during the charging / discharging process of the new energy device to be detected;
[0012] According to the corresponding relationship between the reference charge / discharge process data and time, a safety threshold corresponding to the reference charge / discharge process data is determined by an abnormality detection method;
[0013] According to the corresponding relationship between the actual charge / discharge process data and time, the trend of the actual charge / discharge process data is determined by a trend analysis method, wherein the trend analysis method is a method for determining the actual charge / discharge process data by regression fitting;
[0014] The first health degree is determined based on the correspondence between the deviation degree and the health state, and the second health degree is determined based on the correspondence between the trend factor corresponding to the trend of the determined actual charging / discharging process data and the health state, wherein the deviation degree is the deviation degree between the actual charging / discharging process data of the new energy equipment to be detected after mean processing and the safety threshold;
[0015] The comprehensive health status of the new energy equipment to be detected is determined by combining the first health status and the second health status.
[0016] Preferably, according to the corresponding relationship between the actual charge / discharge process data and time, the trend of the actual charge / discharge process data is determined by a trend analysis method, including:
[0017] According to the corresponding relationship between each variable and time of the actual charge / discharge process data, a regression curve is obtained by fitting each variable of the actual charge / discharge process data through a regression fitting method;
[0018] Determine the corresponding current curve slope according to the regression curve between the current time and the set time;
[0019] The trend situation corresponding to the current curve slope is determined according to the corresponding relationship between the current curve slope and the preset conditions.
[0020] Preferably, before determining the second health level according to the corresponding relationship between the trend factor corresponding to the trend situation of the determined actual charge / discharge process data and the health status, after determining the trend situation corresponding to the current curve slope according to the corresponding relationship between the current curve slope and the preset condition, the method further includes:
[0021] The trend situation is taken as the initial trend situation. When the initial trend situation is an upward trend or no trend, the final regression curve is obtained by fitting through a curve fitting method.
[0022] Calculate the gradient value corresponding to each preset time period between the current time and the set time period according to the gradient descent method;
[0023] The final trend corresponding to the current curve slope is determined according to the corresponding relationship between each gradient value and the preset value.
[0024] Preferably, the regression curve is obtained by fitting each variable of the actual charge / discharge process data by a regression fitting method, including:
[0025] The regression curve is obtained by fitting each variable of the actual charge / discharge process data through robust analysis method and / or least square method.
[0026] Preferably, the preset conditions include a first preset condition, a second preset condition and a third preset condition; determining the trend corresponding to the current curve slope according to the corresponding relationship between the current curve slope and the preset conditions includes:
[0027] When the current curve slope meets the first preset condition, determining that the trend situation corresponding to the current curve slope is no trend;
[0028] When the current curve slope meets the second preset condition, determining that the trend corresponding to the current curve slope is an upward trend;
[0029] When the current curve slope meets the third preset condition, determining that the trend corresponding to the current curve slope is a downward trend;
[0030] Among them, the first preset condition is that the slope of the current curve is greater than or equal to the first threshold and less than or equal to the second threshold, and the first threshold is less than the second threshold; the second preset condition is that the slope of the current curve is greater than the second threshold; the third preset condition is that the slope of the current curve is less than the first threshold.
[0031] Preferably, determining the final trend corresponding to the current curve slope according to the corresponding relationship between each gradient value and the preset value includes:
[0032] Obtain a first preset time period, a second preset time period, and a third preset time period, wherein the first preset time period is a preset time period set starting from the current time, the second preset time period is a preset time period set before the first preset time period, and the third preset time period is a preset time period set before the second preset time period;
[0033] The final trend situation is determined according to the corresponding relationship between each gradient value corresponding to the first preset time period, the second preset time period and the third preset time period and the preset value.
[0034] Preferably, determining the final trend according to the corresponding relationship between each gradient value and the preset value corresponding to the first preset time period, the second preset time period and the third preset time period includes:
[0035] When the gradient values corresponding to the first preset time period and the second preset time period are both greater than 0, the final trend is an upward trend.
[0036] Preferably, determining the final trend according to the corresponding relationship between each gradient value and the preset value corresponding to the first preset time period, the second preset time period and the third preset time period includes:
[0037] When the gradient values corresponding to the first preset time period, the second preset time period and the third preset time period meet any of the preset gradient conditions, it is determined that the final trend situation is no trend;
[0038] Among them, the preset gradient conditions include a first gradient condition, a second gradient condition and a third gradient condition; the first gradient condition is that the gradient value of the first preset time period is equal to 0; the second gradient condition is that the gradient value of the first preset time period is not greater than 0 and the gradient value of the second preset time period is equal to 0; the third gradient condition is that the gradient value of the third preset time period is equal to 0.
[0039] Preferably, determining the final trend according to the corresponding relationship between each gradient value and the preset value corresponding to the first preset time period, the second preset time period and the third preset time period includes:
[0040] According to each gradient value, variable data corresponding to the first preset time period, the second preset time period and the third preset time period are respectively obtained;
[0041] When the variable data meets any of the preset variable conditions, the final trend is determined to be a downward trend;
[0042] Among them, the preset variable conditions include a first preset variable condition, a second preset variable condition and a third preset variable condition; the first preset variable condition is that the difference between the variable data of the first preset time period and the second preset time period is less than a third threshold; the second preset variable condition is that the difference between the variable data of the first preset time period and the third preset time period is less than the third threshold; the third preset variable condition is that the difference between the variable data of the second preset time period and the third preset time period is less than the third threshold.
[0043] Preferably, determining the second health level according to the corresponding relationship between the trend factor corresponding to the trend of the determined actual charge / discharge process data and the health status includes:
[0044] Determine the slope of the curve based on a regression curve between the current time of actual charge / discharge process data and the preset time;
[0045] Determine the corresponding actual trend factor according to the corresponding relationship between the slope of the curve and the trend factor;
[0046] The second health degree is determined according to the corresponding relationship between the actual trend factor and the health condition.
[0047] Preferably, determining the first health level based on the correspondence between the deviation degree and the health status includes:
[0048] Obtain multiple historical charging / discharging orders within a predetermined time for the new energy equipment to be tested;
[0049] Obtain historical charging / discharging process data from each historical charging / discharging order, and use the average value corresponding to each variable in the historical charging / discharging process data as the actual average value;
[0050] Determine the degree of deviation between the actual mean value corresponding to the same variable and the safety threshold;
[0051] The first health degree is determined according to the corresponding relationship between the deviation degree and the health condition.
[0052] Preferably, the average value corresponding to each variable in the historical charge / discharge process data is used as the actual average value, including:
[0053] The average value corresponding to each variable is obtained by performing average processing on each variable of the historical charging / discharging process data or by performing time and distance weighted average processing on the historical charging / discharging process data.
[0054] Preferably, the average values corresponding to the variables obtained by weighted average processing of the time and distance of the historical charging / discharging process data specifically include:
[0055] Get the charge / discharge time corresponding to the historical charge / discharge process data;
[0056] Weight the charge / discharge time by the cube of the time to obtain the weighted time;
[0057] Determine a first weighted value of each variable according to a corresponding relationship between an absolute value of each variable and a weighted time in historical charge / discharge process data;
[0058] Determining a second weighted value of each variable according to a corresponding relationship between the first weighted value and the charge / discharge time;
[0059] The second weighted value and each variable are weighted averaged to obtain the actual average value corresponding to each variable.
[0060] Preferably, the comprehensive health status of the new energy equipment to be detected is determined by combining the first health status and the second health status, including:
[0061] Determining a score for the degree of deviation according to a corresponding relationship between the degree of deviation and the first score;
[0062] Determining the score of the regression curve according to the corresponding relationship between the slope of the curve and the second score;
[0063] The comprehensive health status of the new energy equipment to be tested is determined according to the corresponding relationship between the score of the deviation degree and the score of the regression curve.
[0064] In order to solve the above technical problems, the present invention also provides a health status evaluation system for new energy equipment, comprising:
[0065] A confirmation module, used to confirm the type of new energy equipment to be detected;
[0066] A selection module is used to select multiple sets of new energy equipment under a type as analysis objects;
[0067] A first acquisition module is used to acquire reference charge / discharge process data of the analysis object within a preset time range and matching the analysis object, wherein the reference charge / discharge process data comes from data generated by the analysis object during the charge / discharge process;
[0068] A second acquisition module is used to acquire actual charging / discharging process data of the new energy device to be detected within a preset time range, wherein the actual charging / discharging process data comes from data generated during the charging / discharging process of the new energy device to be detected;
[0069] A first determination module, configured to determine a safety threshold corresponding to the reference charge / discharge process data by an abnormality detection method according to a corresponding relationship between the reference charge / discharge process data and time;
[0070] A second determination module is used to determine the trend of the actual charging / discharging process data by a trend analysis method according to the corresponding relationship between the actual charging / discharging process data and time, wherein the trend analysis method is a method for determining the actual charging / discharging process data by performing regression fitting;
[0071] A third determination module is used to determine a first health level based on a correspondence between a deviation degree and a health status, and to determine a second health level based on a correspondence between a trend factor corresponding to a trend of the determined actual charging / discharging process data and the health status, wherein the deviation degree is a deviation degree between the actual charging / discharging process data of the new energy device to be detected after mean processing and a safety threshold;
[0072] The fourth determination module is used to determine the comprehensive health status of the new energy equipment to be detected by comprehensively combining the first health status and the second health status.
[0073] In order to solve the above technical problems, the present invention also provides a health status assessment device for new energy equipment, comprising:
[0074] Memory for storing computer programs;
[0075] A processor is used to implement the steps of the health status assessment method of new energy equipment as described above when executing a computer program.
[0076] In order to solve the above technical problems, the present invention also provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the health status assessment method of new energy equipment as mentioned above are implemented.
[0077] The present invention provides a health status evaluation method for new energy equipment, comprising: confirming the type of new energy equipment to be detected; selecting multiple new energy equipment sets under the type as analysis objects; obtaining reference charge / discharge process data of the analysis object within a preset time range and matching the analysis object, wherein the reference charge / discharge process data comes from data generated by the analysis object during the charge / discharge process; obtaining actual charge / discharge process data of the new energy equipment to be detected within a preset time range, wherein the actual charge / discharge process data comes from data generated during the charge / discharge process of the new energy equipment to be detected; determining the reference charge / discharge process data through an abnormality detection method according to the corresponding relationship between the reference charge / discharge process data and time. a safety threshold corresponding to the data; according to the corresponding relationship between the actual charging / discharging process data and time, the trend of the actual charging / discharging process data is determined by a trend analysis method, wherein the trend analysis method is a method for determining the actual charging / discharging process data by regression fitting; a first health degree is determined based on the corresponding relationship between the degree of deviation and the health status, and a second health degree is determined according to the corresponding relationship between the trend factor corresponding to the determined trend of the actual charging / discharging process data and the health status, wherein the degree of deviation is the degree of deviation between the data after mean processing of the actual charging / discharging process data of the new energy equipment to be detected and the safety threshold; the comprehensive health status of the new energy equipment to be detected is determined by combining the first health degree and the second health degree. Applied to the present technical scheme, the degree of deviation from the safety threshold is determined by the average value method based on the same variable, and then the first health degree is determined according to the relationship between the degree of deviation and the health status, and then the trend of the actual charging process data is determined by the trend analysis method. Taking into account the trend change, the change of the variable can be viewed in a short time, avoiding the problem of a long time to confirm the health status due to small or even unobvious changes in the average value. The second health degree is determined according to the relationship between the trend factor corresponding to the trend situation and the health status. The comprehensive health status can be determined through the two health degrees, avoiding the problem of inaccurate judgment results and corresponding health status assessment caused by the existing fixed safety threshold as the abnormal judgment standard, and the health status of the new energy equipment to be detected can be confirmed in time, improving the efficiency of identification response.
[0078] In addition, the present invention also provides a health status assessment system, device and medium for new energy equipment, which have the same beneficial effects as the health status assessment method for new energy equipment mentioned above. BRIEF DESCRIPTION OF THE DRAWINGS
[0079] In order to more clearly illustrate the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0080] Figure 1 A flowchart of a health status assessment method for new energy equipment provided by an embodiment of the present invention;
[0081] Figure 2 A structural diagram of a health status evaluation system for new energy equipment provided by an embodiment of the present invention;
[0082] Figure 3 A structural diagram of a health status assessment device for new energy equipment provided by an embodiment of the present invention;
[0083] Figure 4 A flow chart of another method for evaluating the health status of new energy equipment provided by an embodiment of the present invention;
[0084] Figure 5 A flowchart of a health status assessment method for new energy equipment provided by another embodiment of the present invention;
[0085] Figure 6 A schematic diagram of an application of a trend analysis method to determine a second health level provided by an embodiment of the present invention;
[0086] Figure 7 A schematic diagram of the maximum temperature variation trend provided by an embodiment of the present invention;
[0087] Figure 8 A schematic diagram of another maximum temperature variation trend provided by an embodiment of the present invention;
[0088] Fig. 9 A schematic diagram of the SOC jump trend provided by an embodiment of the present invention;
[0089] Fig.10 A schematic diagram of the maximum pressure difference change trend provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0090] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0091] The core of the present invention is to provide a method, system, device and medium for evaluating the health status of new energy equipment, which are used to timely confirm the health status of the new energy equipment to be detected and improve the efficiency of identification response.
[0092] In order to enable those skilled in the art to better understand the solution of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0093] The health status assessment method of new energy equipment provided by the present invention can be applied to a charging cloud platform or a complete charging device, and can also be applied to new energy vehicles or self-driving vehicles, etc., without specific limitation. In addition, there is no specific limitation on the structure of the charging equipment, which can be a charger and a charging terminal integrated, or a charger corresponding to multiple charging terminals.
[0094] Figure 1 A flowchart of a method for evaluating the health status of a new energy device provided by an embodiment of the present invention is shown in FIG. Figure 1 As shown, the method includes:
[0095] S11: Confirm the type of new energy equipment to be tested;
[0096] Specifically, the new energy device to be detected is one of multiple new energy device types among new energy devices, such as the brand type of new energy equipment (BYD brand). The type confirmed in this embodiment facilitates the subsequent selection of multiple new energy devices of this type as analysis objects.
[0097] S12: Select multiple new energy equipment sets under the type as analysis objects;
[0098] It can be understood that other new energy equipment of the same type as the new energy equipment to be detected in step S11 is selected as a set of multiple new energy equipment. Specifically, the analysis object can be the same type as the new energy equipment to be detected, or it can be the same type with the same age as the new energy equipment to be detected, or it can be the same type with other same type features added on the basis of the former two, and no specific limitation is made here.
[0099] Selecting multiple new energy devices of the same type as analysis objects is to ensure that the reference charging process data obtained subsequently can fit the charging process data of the new energy device to be tested, so that the obtained test results are more accurate.
[0100] S13: Acquire reference charge / discharge process data of the analysis object within a preset time range and matching the analysis object, wherein the reference charge / discharge process data comes from data generated by the analysis object during the charge / discharge process;
[0101] The reference charge / discharge process data of this embodiment is any data generated by the analysis object during the charge / discharge process. The charge process data may be terminal data, user data, vehicle parameter data, etc. generated in the charging cloud platform and the charging device during the charging process. The discharge process data may be data generated by the new energy device to be detected during the power consumption process. The reference charge / discharge process data may be a single reference charge / discharge process data, or a single reference charge / discharge process data and a secondary reference charge / discharge process data.
[0102] The reference charging / discharging process data is only one charging / discharging process data. The data generated in the charging / discharging process data is of the same type as the new energy equipment to be detected, or of the same type as the new energy equipment to be detected + the same vehicle age, etc.
[0103] Since the reference charging process data and the reference discharging process data have the same data format and usage, taking the reference charging process data as an example, the reference charging process data can be the data generated by the new energy equipment during the charging process in the following formats: same vehicle model and specific time period, same vehicle model and same region (city) + specific time period, same vehicle model + same vehicle age + same season, etc.
[0104] The reference charging process data includes primary reference charging process data and secondary reference charging process data. The primary reference charging process data is data generated by the analysis object during the charging process, and the secondary reference process data is data generated by processing the data generated by the analysis object during the charging process.
[0105] As a preferred embodiment, the primary reference charging process data includes the highest temperature of the power battery, the lowest temperature of the power battery, the SOC of the power battery, the highest voltage of the single cell, the lowest voltage of the single cell, the number of the highest voltage of the single cell, the number of the highest temperature monitoring point and the number of the lowest temperature monitoring point. The secondary reference charging process data is based on the primary reference charging process, and obtains the maximum temperature difference of the power battery, the maximum pressure difference of the power battery, the maximum temperature rise rate of the power battery, the maximum SOC change rate of the power battery, the maximum change rate of the single cell voltage, the Shannon entropy value of the highest temperature monitoring point number, the Shannon entropy value of the lowest temperature monitoring point number, and the Shannon entropy value of the highest voltage of the single cell. It can be understood that the Shannon entropy value can show the degree of discreteness of the highest temperature monitoring point number and the highest voltage of the single cell number during the charging process. The lower the degree of discreteness, the worse the health of the new energy equipment to be detected.
[0106] For example, the maximum temperature difference of a power battery refers to the temperature difference between the highest and lowest temperatures of multiple cells in a battery pack at the same time during the charging process, or the temperature difference between the highest and lowest temperatures of the battery at different times in a fixed time period. The maximum temperature difference refers to the maximum value of the temperature difference during a single charging process.
[0107] The maximum voltage difference of a power battery refers to the difference between the highest voltage of a single cell and the lowest voltage of a single cell after a charging process.
[0108] S14: Acquire actual charging / discharging process data of the new energy device to be detected within a preset time range, wherein the actual charging / discharging process data comes from data generated during the charging / discharging process of the new energy device to be detected;
[0109] It should be noted that the preset time range is the same as the preset time range in step S13. The same here can be the same time period, for example, the same time period is one day, or the same time point. For example, the reference charge / discharge process data of the analysis object is collected at 8:00-12:00 on 2022.6.30, and the actual charge / discharge process data of the new energy equipment to be tested needs to be the same as the former, collected at 8:00-12:00 on 2022..7.1.
[0110] The actual charge / discharge process data may be one actual charge / discharge process data, or one actual charge / discharge process data and two actual charge / discharge process data. The specific data of the actual charge / discharge process data is the same as the reference charge / discharge process data in the above embodiment, and will not be explained here. It should be noted that if the reference charge / discharge process data adopts one reference charge / discharge process data, the actual charge / discharge process data is also one actual charge / discharge process data. Keeping the data type the same facilitates subsequent data analysis.
[0111] S15: Determine a safety threshold corresponding to the reference charge / discharge process data by an abnormality detection method according to the corresponding relationship between the reference charge / discharge process data and time;
[0112] It should be noted that the method for determining the safety threshold in this embodiment is not specifically limited, and can be obtained by the mean method or cluster analysis method of the statistical analysis method, which is not specifically limited in the embodiment of the present invention. The safety threshold can be determined by a primary reference to the charge / discharge process data, or by a secondary reference to the charge / discharge process data, and is set according to the actual situation.
[0113] As a preferred embodiment, taking the reference charging process data as an example, the safety threshold corresponding to the reference charging process data is determined by the mean method of the statistical analysis method. For the mean method processing, the reference charging process data can be directly processed by the average value, or by the time and distance weighted average processing method corresponding to the reference charging process data. The time and distance weighted average processing method is used in subsequent processing, and reference can be made to the subsequent embodiments.
[0114] S16: determining the trend of the actual charging / discharging process data by a trend analysis method according to the corresponding relationship between the actual charging / discharging process data and time, wherein the trend analysis method is a method for determining the actual charging / discharging process data by performing regression fitting;
[0115] Specifically, according to the corresponding relationship between the actual charge / discharge process data and time, it performs trend analysis. The trend analysis method is to present the mapping relationship between the actual charge / discharge process data and time through a graph. The trend analysis method of this embodiment mainly performs regression fitting processing. Through time series and the discovery of causal relationships between variables, regression analysis uses curves to fit data points, and the distance difference from the curve to the data point is the smallest. The specific regression analysis can be performed by linear regression, logistic regression, robust analysis, least squares method, etc., or it can be a trend analysis of the actual charge / discharge process data obtained by a combination of multiple regression analyses.
[0116] S17: determining a first health level based on a correspondence between the degree of deviation and the health status, and determining a second health level based on a correspondence between a trend factor corresponding to the determined trend of the actual charging / discharging process data and the health status, wherein the degree of deviation is a degree of deviation between the actual charging / discharging process data of the new energy device to be detected after mean processing and the safety threshold;
[0117] In this embodiment, the first health level is determined based on the correspondence between the degree of deviation and the health status, where the degree of deviation is the degree of deviation between the actual charging / discharging process data of the new energy equipment to be detected after mean processing and the safety threshold. The actual charging / discharging process data here can be the actual charging / discharging process data of one time or the actual charging / discharging process data of two times. The present invention does not make specific limitations and can be processed according to actual conditions.
[0118] It should be noted that the actual charging / discharging process data is processed by averaging, and the deviation degree of the obtained data from the safety threshold value is set according to the actual situation because the safety threshold value mentioned in the above embodiment can be determined based on the primary reference charging / discharging process data or the secondary reference charging / discharging process data. In addition, the averaging process can be directly averaging the actual charging process data or can be processed by time and distance weighted average, etc., which is not specifically described in the present invention.
[0119] The second health level is determined based on the corresponding relationship between the trend factor corresponding to the trend of the actual charge / discharge process data and the health status, and the trend factor is obtained by the slope of the trend curve. It can be understood that since the trend curve is not a linear relationship, there will be multiple different trend factors in the whole process. The trend curve is not for the actual charge / discharge process data within the entire preset time range, but is based on the trend factor obtained by the curve starting from the closest time to the current time and working backwards to the specified time. The smaller the time period from the specified time to the current time, the smaller the curve, the closer the trend factor obtained and the determined health level are to the real safety assessment, that is, the more accurate and timely the assessment judgment is.
[0120] S18: Determine the comprehensive health status of the new energy equipment to be tested by combining the first health status and the second health status.
[0121] The first health degree and the second health degree are combined to determine the comprehensive health status of the new energy device to be detected, and when the health status indicates that the new energy device to be detected is a high-risk device, the charging protection mechanism is triggered. The charging protection mechanism is set according to the actual situation, and the present invention does not provide a specific description.
[0122] The present invention does not make any specific limitation on how to determine the health status of the two health degrees. It can be determined comprehensively by weighting and in the form of a score, or it can be determined based on a model relationship between a certain health degree and a score. The present invention does not make any specific limitation on this.
[0123] The present invention provides a health status evaluation method for new energy equipment, comprising: confirming the type of new energy equipment to be detected; selecting multiple new energy equipment sets under the type as analysis objects; obtaining reference charge / discharge process data of the analysis object within a preset time range and matching the analysis object, wherein the reference charge / discharge process data comes from data generated by the analysis object during the charge / discharge process; obtaining actual charge / discharge process data of the new energy equipment to be detected within a preset time range, wherein the actual charge / discharge process data comes from data generated during the charge / discharge process of the new energy equipment to be detected; determining the reference charge / discharge process data through an abnormality detection method according to the corresponding relationship between the reference charge / discharge process data and time. a safety threshold corresponding to the data; according to the corresponding relationship between the actual charging / discharging process data and time, the trend of the actual charging / discharging process data is determined by a trend analysis method, wherein the trend analysis method is a method for determining the actual charging / discharging process data by regression fitting; a first health degree is determined based on the corresponding relationship between the degree of deviation and the health status, and a second health degree is determined according to the corresponding relationship between the trend factor corresponding to the determined trend of the actual charging / discharging process data and the health status, wherein the degree of deviation is the degree of deviation between the data after mean processing of the actual charging / discharging process data of the new energy equipment to be detected and the safety threshold; the comprehensive health status of the new energy equipment to be detected is determined by combining the first health degree and the second health degree. Applied to the present technical scheme, the degree of deviation from the safety threshold is determined by the average value method based on the same variable, and then the first health degree is determined according to the relationship between the degree of deviation and the health status, and then the trend of the actual charging process data is determined by the trend analysis method. Taking into account the trend change, the change of the variable can be viewed in a short time, avoiding the problem of a long time to confirm the health status due to small or even unobvious changes in the average value. The second health degree is determined according to the relationship between the trend factor corresponding to the trend situation and the health status. The comprehensive health status can be determined through the two health degrees, avoiding the problem of inaccurate judgment results and corresponding health status assessment caused by the existing fixed safety threshold as the abnormal judgment standard, and the health status of the new energy equipment to be detected can be confirmed in time, improving the efficiency of identification response.
[0124] On the basis of the above embodiment, the step S16 determines the trend of the actual charging / discharging process data by a trend analysis method according to the corresponding relationship between the actual charging / discharging process data and time, including:
[0125] According to the corresponding relationship between each variable and time of the actual charge / discharge process data, a regression curve is obtained by fitting each variable of the actual charge / discharge process data through a regression fitting method;
[0126] Determine the corresponding current curve slope according to the regression curve between the current time and the set time;
[0127] The trend situation corresponding to the current curve slope is determined according to the corresponding relationship between the current curve slope and the preset conditions.
[0128] It should be noted that, since there are multiple variables in the actual charge / discharge process data, the trend determined by the trend analysis method is for the same variable. Specifically, according to the corresponding relationship between each variable and time in the actual charge / discharge process data, the data of each variable is fitted by the regression fitting method to obtain a regression curve.
[0129] The regression fitting method is used for prediction, time series model and finding the causal effect relationship between two variables, so that the distance deviation from the data point to the curve / straight line is minimized. Correspondingly, the regression fitting method can use the robust analysis method, the least square method or other regression methods (polynomial regression method, logistic regression method, etc.), or a regression fitting method composed of a combination of multiple methods. No specific limitation is made here.
[0130] The corresponding current curve slope is determined based on the regression curve between the current time and the set time. The current time and the set time can be selected according to the actual situation. The current time can be the time corresponding to the last data of the actual charging process data, or it can be the time of a specific time period; the set time is based on the current time and is reversed to the set time.
[0131] The corresponding trend situation is determined according to the correspondence between the current curve slope and the preset conditions. The trend situation can be divided into an upward trend, no trend and a downward trend. The preset conditions can be set according to the three trends and the corresponding preset conditions can be set respectively. If the current curve slope meets any of the preset conditions, it can be determined that the trend situation is the trend corresponding to the preset condition that is met.
[0132] The present invention does not make any specific limitation on the setting of the preset conditions, which can be analyzed according to actual conditions. The preset conditions of different corresponding variables are different and will not be specifically described.
[0133] According to the corresponding relationship between the actual charge / discharge process data and time, the embodiment of the present invention determines the trend of the actual charge / discharge process data through a trend analysis method, so as to facilitate the subsequent acquisition of the corresponding trend factor.
[0134] On the basis of the above embodiment, before determining the second health level according to the correspondence relationship between the trend factor corresponding to the trend situation of the actual charge / discharge process data and the health status, after determining the trend situation corresponding to the current curve slope according to the correspondence relationship between the current curve slope and the preset condition, it also includes:
[0135] The trend situation is taken as the initial trend situation, and the trend situation of the actual charge / discharge process data is determined by the trend analysis method, including:
[0136] When the initial trend is an upward trend or no trend, the final regression curve is obtained by fitting through the curve fitting method;
[0137] Calculate the gradient value corresponding to each preset time period between the current time and the set time period according to the gradient descent method;
[0138] The final trend corresponding to the current curve slope is determined according to the corresponding relationship between each gradient value and the preset value.
[0139] Specifically, after the trend situation is obtained, it is used as the initial trend situation. Since the trend situation is determined only by the regression curve between two time periods, in order to further accurately determine the trend situation, double determination is required.
[0140] Among the three trends, the downward trend indicates that the new energy equipment to be tested is not in a high-risk health condition, so there is no need to process the regression curve under no trend again. Therefore, when the initial trend is an upward trend or no trend, the final regression curve is further fitted by the curve fitting method.
[0141] It should be noted that the specific methods of the curve fitting method and the above-mentioned regression fitting method can be the same or different, and the present invention does not make specific limitations. As a preferred embodiment, the least square method can be used as a curve fitting method for fitting, and the least square method finds the best function matching of the data by minimizing the square sum of the errors. In actual engineering, when the distribution of the sample points is not a straight line, a polynomial curve can be fitted. The specific least square method processing process is not the focus of the present invention, so it is not specifically limited.
[0142] Secondly, the gradient value corresponding to each preset time period between the current time and the set time period is calculated according to the gradient descent method, and its discrete situation can be obtained through the gradient value. The final trend situation is determined according to the corresponding relationship between each gradient value and the gradient preset value. It should be noted that the trend type of the final trend situation is the same as that of the initial trend situation. There are three trend types in this embodiment, namely, no trend, rising trend and falling trend.
[0143] The corresponding final trend situation is determined according to the corresponding relationship between each gradient and the preset value. The preset value can set different preset values and corresponding gradient conditions according to the specific trend situation. The present invention does not make any specific limitation on the setting of the preset value and the corresponding gradient condition, which can be analyzed according to the actual situation. The corresponding preset values of different variables are different and no specific explanation is given.
[0144] According to the corresponding relationship between the actual charge / discharge process data and time, the embodiment of the present invention further accurately determines the final trend situation through a curve fitting method after determining the trend situation of the actual charge / discharge process data through a trend analysis method, thereby improving the accuracy of trend determination and facilitating subsequent acquisition of the corresponding trend factor.
[0145] Based on the above embodiment, the regression curve is obtained by fitting each variable of the actual charge / discharge process data through a regression fitting method, including:
[0146] The regression curve is obtained by fitting each variable of the actual charge / discharge process data through robust analysis method and / or least square method.
[0147] The purpose of robust analysis is to fit the regression model in the presence of outliers or model errors, applying linear loss to the samples of classification and outliers, and if the absolute error of the sample is less than a certain threshold, the sample is classified as an outlier. Robust analysis does not ignore the impact of outliers, but gives them lower weight.
[0148] The least squares method finds the best function match for the data by minimizing the sum of squared errors. It can be used alone to get a regression curve, or it can be used in combination to make the regression curve more accurate so as to determine its corresponding trend.
[0149] The embodiment of the present invention provides a method for fitting each variable of the actual charge / discharge process data by a robust analysis method and / or a least square method to obtain a regression curve, so as to facilitate determining the corresponding trend through the regression curve.
[0150] On the basis of the above embodiment, the trend situation corresponding to the current curve slope is further determined according to the corresponding relationship between the current curve slope and the preset conditions, and the trend situation includes no trend, rising trend and falling trend. As a preferred embodiment, the preset conditions are set to three according to the classification of the trend situation, namely the first preset condition, the second preset condition and the third preset condition, the first preset condition is that the current curve slope is greater than or equal to the first threshold and less than or equal to the second threshold, and the first threshold is less than the second threshold; the second preset condition is that the current curve slope is greater than the second threshold; the third preset condition is that the current curve slope is less than the first threshold.
[0151] When the current curve slope meets the first preset condition, determining that the trend situation corresponding to the current curve slope is no trend;
[0152] When the current curve slope meets the second preset condition, determining that the trend corresponding to the current curve slope is an upward trend;
[0153] When the current curve slope meets the third preset condition, it is determined that the trend corresponding to the current curve slope is a downward trend.
[0154] For example, the current curve slope is k, the first threshold is -0.15, and the second threshold is 0.15. If the current curve slope K meets the first preset condition, that is, -0.15≤k≤0.15, it means that the current curve is in a trendless state; if the current curve slope K meets the second preset condition, that is, k>0.15, it means that the current curve is in an upward trend; if the current curve slope K meets the third preset condition, that is, k<-0.15, it means that the current curve is in a downward trend.
[0155] The different trend conditions provided by the embodiment of the present invention correspond to different preset conditions. When the current curve slope meets any preset condition, the trend condition corresponding to the preset condition can be determined. The setting of the preset condition is simplified, so that the process of determining the trend condition is concise and clear.
[0156] As a preferred embodiment, based on the above embodiment, the final trend corresponding to the current curve slope is determined according to the corresponding relationship between each gradient value and the preset value, including:
[0157] Obtain a first preset time period, a second preset time period, and a third preset time period, wherein the first preset time period is a preset time period set starting from the current time, the second preset time period is a preset time period set before the first preset time period, and the third preset time period is a preset time period set before the second preset time period;
[0158] The final trend situation is determined according to the corresponding relationship between each gradient value corresponding to the first preset time period, the second preset time period and the third preset time period and the preset value.
[0159] It should be noted that the first preset time period, the second preset time period and the third preset time period mentioned in the present embodiment are set based on the current time, and the corresponding preset time period is formed by working backwards from the previous preset time period. For example, the current time is 11:20 and the preset time period is 5 minutes. The first preset time period is worked backwards by 5 minutes based on the current time, and 11:16-11:20 is the first preset time period; the second preset time period is worked backwards by 5 minutes based on the first preset time period, and 11:11-11:15 is the second preset time period; the third preset time period is worked backwards by 5 minutes based on the second preset time period, and 11:06-11:10 is the third preset time period.
[0160] The final trend is determined based on the corresponding relationship between the gradient values corresponding to the three time periods and the preset values. Since the present invention is only for the judgment of the subsequent trend caused by not being affected by the extreme value, it is necessary to use the gradient value corresponding to the adjacent time of the current time as the basis for judgment. It is not necessary to judge the gradients corresponding to the entire regression curve, and then determine the final trend based on the corresponding relationship between the gradient value and the preset value. The preset value can set different preset values and corresponding gradient conditions according to the specific trend situation. The present invention does not make specific restrictions on the setting of the preset value and the corresponding gradient condition, and can be analyzed according to the actual situation. The preset values of the corresponding different variables are different, and no specific explanation is made.
[0161] As a preferred embodiment, when the gradient values corresponding to the first preset time period and the second preset time period are both greater than 0, the final trend is an upward trend;
[0162] Correspondingly, when the gradient values corresponding to the first preset time period, the second preset time period and the third preset time period meet any one of the preset gradient conditions, it is determined that the final trend situation is no trend;
[0163] Among them, the preset gradient conditions include a first gradient condition, a second gradient condition and a third gradient condition; the first gradient condition is that the gradient value of the first preset time period is equal to 0; the second gradient condition is that the gradient value of the first preset time period is not greater than 0 and the gradient value of the second preset time period is equal to 0; the third gradient condition is that the gradient value of the third preset time period is equal to 0.
[0164] Correspondingly and in parallel, variable data corresponding to the first preset time period, the second preset time period and the third preset time period are respectively obtained according to each gradient value;
[0165] When the variable data meets any of the preset variable conditions, the final trend is determined to be a downward trend;
[0166] Among them, the preset variable conditions include a first preset variable condition, a second preset variable condition and a third preset variable condition; the first preset variable condition is that the difference between the variable data of the first preset time period and the second preset time period is less than a third threshold; the second preset variable condition is that the difference between the variable data of the first preset time period and the third preset time period is less than the third threshold; the third preset variable condition is that the difference between the variable data of the second preset time period and the third preset time period is less than the third threshold.
[0167] In combination with the above embodiment, the gradient values of three preset time periods are selected, and the final trend is determined according to the relationship between the three gradient values and the preset values. When the gradient values corresponding to the first preset time period and the second preset time period are both greater than 0, the final trend is determined to be an upward trend; when the three gradient values meet any of the preset gradient conditions, it is determined to be no trend. It should be noted that the preset gradient conditions are set for the three gradient values respectively, so as long as any one of the conditions is met, it can be determined to be no trend.
[0168] Since the present invention is mainly aimed at the determination of high-risk vehicles, the downward trend situation needs to be accurately handled. Therefore, on the basis of the gradient value, the variable data corresponding to the gradient value, such as temperature, is obtained, and the time period is calculated in days. If the charging temperature difference between the last day and the second to last day is less than 5°C, or the charging temperature difference between the last day and the third to last day is less than 5°C, or the charging temperature difference between the second to last day and the third to last day is less than 5°C, that is, the charging temperature difference between the first preset time period and the second preset time period is less than 5°C, or the charging temperature difference between the first preset time period and the third preset time period is less than 5°C, or the charging temperature difference between the second preset time period and the third preset time period is less than 5°C, it is determined that the vehicle has returned to normal.
[0169] According to the corresponding relationship between the actual charge / discharge process data and time, the embodiment of the present invention determines the trend of the actual charge / discharge process data through a trend analysis method, improves the accuracy of the trend determination, and facilitates the subsequent acquisition of a more accurate trend factor.
[0170] Based on the above embodiment, the second health level is determined according to the corresponding relationship between the trend factor corresponding to the trend of the actual charge / discharge process data and the health status in step S17, including:
[0171] Determine the slope of the curve based on a regression curve between the current time of actual charge / discharge process data and the preset time;
[0172] Determine the corresponding actual trend factor according to the corresponding relationship between the slope of the curve and the trend factor;
[0173] The second health degree is determined according to the corresponding relationship between the actual trend factor and the health condition.
[0174] Specifically, the time period between the current time and the preset time mentioned in this embodiment is smaller than the time period between the current time and the set time, and the slope of the curve is determined according to the regression curve between the current time and the preset time. The corresponding actual trend factor is determined according to the corresponding relationship between the slope of the curve and the trend factor, and the trend factor is a factor with the characteristic of correcting the prediction direction, such as the seasonal factor in the time series for the total retail sales of consumer goods series.
[0175] The mapping relationship between the trend slope and the trend factor is determined, and the actual trend factor is obtained according to the current curve slope, and then the second health degree corresponding to the actual trend factor is determined according to the mapping relationship between the trend factor and the health status.
[0176] The embodiment of the present invention provides a method for determining the slope of a curve based on a regression curve between the current time and the preset time of actual charge / discharge process data; determining the corresponding actual trend factor based on the corresponding relationship between the slope of the curve and the trend factor; and determining the second health level based on the corresponding relationship between the actual trend factor and the health status. The trend factor is determined by the slope of the curve, and the second health level is determined again by the relationship between the trend factor and the health status, which ensures that the determination of the second health level is authoritative and improves accuracy.
[0177] Based on the above embodiment, determining the first health level based on the correspondence between the deviation degree and the health status in step S17 includes:
[0178] Obtain multiple historical charging / discharging orders within a predetermined time for the new energy equipment to be tested;
[0179] Obtain historical charging / discharging process data from each historical charging order, and use the average value corresponding to each variable in the historical charging / discharging process data as the actual average value;
[0180] Determine the degree of deviation between the actual mean value corresponding to the same variable and the safety threshold;
[0181] The first health degree is determined according to the corresponding relationship between the deviation degree and the health condition.
[0182] Specifically, since the historical charge / discharge orders are of the new energy equipment to be tested and are authentic, the first health degree is determined based on the correspondence between the degree of deviation and the health state by processing the average value as a reference standard.
[0183] In the embodiment of the present invention, the dynamic development of the variables of the power battery is taken into account, and the fixed safety threshold of the static characteristics is changed to a safety threshold of the dynamic characteristics according to the dynamic development of the battery variables. However, to a certain extent, the degree of deviation from the safety threshold for the same variable is determined by the average value method, thereby improving the user experience.
[0184] On the basis of the above embodiment, the average value corresponding to each variable in the historical charge / discharge process data is used as the actual average value. The processing of the average value can be directly calculated according to the historical charge / discharge process data, or according to the weighted average rule. The weighted average rule is an embodiment, which specifically includes:
[0185] The average value corresponding to each variable is obtained by processing the average value of each variable of the historical charging / discharging process data or by processing the time and distance weighted average of the historical charging / discharging process data;
[0186] The average values corresponding to the variables obtained by weighted average processing of the time and distance of the historical charging / discharging process data include:
[0187] Get the charge / discharge time corresponding to the historical charge / discharge process data;
[0188] Weight the charge / discharge time by the cube of the time to obtain the weighted time;
[0189] Determine a first weighted value of each variable according to a corresponding relationship between an absolute value of each variable and a weighted time in historical charge / discharge process data;
[0190] Determining a second weighted value of each variable according to a corresponding relationship between the first weighted value and the charge / discharge time;
[0191] The second weighted value and each variable are weighted averaged to obtain the actual average value corresponding to each variable.
[0192] Specifically, taking the temperature difference value of the historical charging process data as an example, first obtain the corresponding charging time t, and perform time cubic weighting, the formula is as follows:
[0193]
[0194] Among them, t w is the weighted time.
[0195] The distance is then weighted according to time. It should be noted that the distance corresponding to the trend is the distance between the variable and the x-axis, that is, the absolute value in this embodiment. The corresponding first weighted value is determined according to the corresponding relationship between the absolute value and the weighted time. The formula is as follows:
[0196] d w =t w *T d
[0197] Among them, T d is the distance from the temperature value to the x-axis, d w is the first weighted value;
[0198] Further, according to the relationship between the first weighted value and the charging time t, the corresponding second weighted value is determined, and the formula is as follows:
[0199] td w =d w / Σd w
[0200] Among them, td wis the second weighted value.
[0201] Secondly, the second weighted value and each variable are weighted averaged to obtain the corresponding actual average value ΣT*td w .
[0202] An average value algorithm provided by an embodiment of the present invention adopts a weighted average rule, considers the influence of timeliness and discrete values, and improves the accuracy of evaluation.
[0203] Based on the above embodiment, the comprehensive health status of the new energy equipment to be detected is determined by combining the first health status and the second health status in step S18, including:
[0204] Determining a score for the degree of deviation according to a corresponding relationship between the degree of deviation and the first score;
[0205] Determining the score of the regression curve according to the corresponding relationship between the slope of the curve and the second score;
[0206] The comprehensive health status of the new energy equipment to be tested is determined according to the corresponding relationship between the score of the deviation degree and the score of the regression curve.
[0207] Specifically, the health status is quantitatively evaluated, corresponding scores are set for the specific contents of different health levels, the score of the deviation level is obtained according to the corresponding relationship between the deviation level and the first score, and the score of the regression curve is obtained according to the corresponding relationship between the slope of the curve and the second score. The comprehensive health status of the new energy equipment to be tested is determined again according to the scores corresponding to the two health levels.
[0208] There is no specific limitation on the construction of the scoring model. The interval division can be performed by the interval range composed of the mean value and the variance, and it can also be set according to empirical values.
[0209] The embodiment of the present invention provides a method for determining the comprehensive health status of the new energy equipment to be detected by combining the first health status and the second health status, which can timely confirm the health status of the new energy equipment to be detected and improve the efficiency of identification response.
[0210] In addition, as an embodiment, determining the abnormal conditions of the health status and the charge / discharge status may be independent of each other or may assist each other. After determining the safety threshold, the following steps may be further included:
[0211] The safety threshold is used as a comparison object to compare with the actual charging / discharging process data to determine the charging / discharging status of the new energy equipment to be detected;
[0212] When the actual charging / discharging process data exceeds the safety threshold, it is determined that the charging / discharging status of the new energy equipment to be detected is abnormal.
[0213] The above describes in detail various embodiments corresponding to the health status evaluation method of new energy equipment. On this basis, the present invention also discloses a health status evaluation system for new energy equipment corresponding to the above method. Figure 2 This is a structural diagram of a health status evaluation system for new energy equipment provided by an embodiment of the present invention. Figure 2 As shown in the figure, the health status evaluation system of new energy equipment includes:
[0214] A confirmation module 11 is used to confirm the type of new energy equipment to be detected;
[0215] A selection module 12, used for selecting a plurality of the new energy equipment sets under the type as analysis objects;
[0216] A first acquisition module 13 is used to acquire reference charge / discharge process data of the analysis object within a preset time range and matching the analysis object, wherein the reference charge / discharge process data comes from data generated by the analysis object during the charge / discharge process;
[0217] A second acquisition module 14 is used to acquire actual charging / discharging process data of the new energy device to be detected within the preset time range, wherein the actual charging / discharging process data comes from data generated during the charging / discharging process of the new energy device to be detected;
[0218] A first determination module 15, configured to determine a safety threshold corresponding to the reference charge / discharge process data by an abnormality detection method according to a correspondence between the reference charge / discharge process data and time;
[0219] A second determination module 16 is used to determine the trend of the actual charge / discharge process data by a trend analysis method according to the corresponding relationship between the actual charge / discharge process data and time, wherein the trend analysis method is a method for determining the actual charge / discharge process data by performing regression fitting;
[0220] A third determination module 17 is used to determine a first health level based on a correspondence between a deviation degree and a health status, and to determine a second health level based on a correspondence between a trend factor corresponding to a trend condition of the determined actual charge / discharge process data and the health status, wherein the deviation degree is a deviation degree between the mean-processed data of the actual charge / discharge process data of the new energy equipment to be detected and the safety threshold;
[0221] The fourth determination module 18 is used to determine the comprehensive health status of the new energy equipment to be detected by comprehensively combining the first health status and the second health status.
[0222] Since the embodiments of the system part correspond to the above embodiments, please refer to the description of the embodiments of the method part for the embodiments of the system part, and will not be repeated here.
[0223] For an introduction to a health status assessment system for new energy equipment provided by the present invention, please refer to the above method embodiment, and the present invention will not be repeated here. It has the same beneficial effects as the above-mentioned health status assessment method for new energy equipment.
[0224] Figure 3 A structural diagram of a health status evaluation device for new energy equipment provided by an embodiment of the present invention, such as Figure 3 As shown, the device comprises:
[0225] A memory 21, used for storing computer programs;
[0226] The processor 22 is used to implement the steps of the health status assessment method of new energy equipment when executing the computer program.
[0227] The health status assessment device for new energy equipment provided in this embodiment may include but is not limited to a smart phone, a tablet computer, a laptop computer or a desktop computer.
[0228] Among them, the processor 22 may include one or more processing cores, such as a 4-core processor, an 8-core processor, etc. The processor 22 may be implemented in at least one hardware form of a digital signal processor (DSP), a field-programmable gate array (FPGA), and a programmable logic array (PLA). The processor 22 may also include a main processor and a coprocessor. The main processor is a processor for processing data in an awake state, also known as a central processing unit (CPU); the coprocessor is a low-power processor for processing data in a standby state. In some embodiments, the processor 22 may be integrated with a graphics processing unit (GPU), which is responsible for rendering and drawing the content to be displayed on the display screen. In some embodiments, the processor 22 may also include an artificial intelligence (AI) processor, which is used to process computing operations related to machine learning.
[0229] The memory 21 may include one or more computer-readable storage media, which may be non-transitory. The memory 21 may also include a high-speed random access memory, and a non-volatile memory, such as one or more disk storage devices, flash memory storage devices. In this embodiment, the memory 21 is at least used to store the following computer program 201, wherein, after the computer program is loaded and executed by the processor 22, it can implement the relevant steps of the health status assessment method of the new energy equipment disclosed in any of the aforementioned embodiments. In addition, the resources stored in the memory 21 may also include an operating system 202 and data 203, etc., and the storage method may be temporary storage or permanent storage. Among them, the operating system 202 may include Windows, Unix, Linux, etc. Data 203 may include, but is not limited to, data involved in the health status assessment method of new energy equipment, etc.
[0230] In some embodiments, the health status assessment device for new energy equipment may also include a display screen 23 , an input / output interface 24 , a communication interface 25 , a power supply 26 , and a communication bus 27 .
[0231] Those skilled in the art can understand that Figure 3 The structure shown in the figure does not constitute a limitation on the health status assessment device of new energy equipment, and may include more or fewer components than those shown in the figure.
[0232] The processor 22 implements the health status assessment method of the new energy equipment provided by any of the above embodiments by calling the instructions stored in the memory 21.
[0233] For an introduction to a health status assessment device for new energy equipment provided by the present invention, please refer to the above method embodiment, and the present invention will not be repeated here. It has the same beneficial effects as the above-mentioned health status assessment method for new energy equipment.
[0234] Furthermore, the present invention also provides a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by the processor 22, the steps of the health status assessment method of the new energy equipment as described above are implemented.
[0235] It is understandable that if the method in the above embodiment is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM), random access memory (RAM), disk or optical disk and other media that can store program code.
[0236] For an introduction to a computer-readable storage medium provided by the present invention, please refer to the above method embodiment, which will not be described in detail herein. It has the same beneficial effects as the above-mentioned health status assessment method for new energy equipment.
[0237] As a preferred embodiment, Figure 4 A flowchart of another method for evaluating the health status of new energy equipment provided by an embodiment of the present invention is shown in FIG. Figure 4 As shown, specifically including:
[0238] S21: Obtain the model of the charging vehicle;
[0239] S22: extracting batch orders of all vehicles under the model within a preset time range;
[0240] S23: extracting required reference variables from each order;
[0241] S24: establishing a corresponding relationship between reference variables and time;
[0242] S25: averaging all data under the required reference variable (such as mean model or time and distance weighted average model);
[0243] S26: Obtain historical charging orders (including current orders) of the charging vehicle;
[0244] S27: extract the required variables from each order;
[0245] S28: Establish the corresponding relationship between variables and time;
[0246] S29: average all data under the required variables (such as mean model or time and distance weighted average model);
[0247] S30: comparing the vehicle model average and the vehicle average, and setting a corresponding first health level according to the degree of deviation;
[0248] S31: Perform trend analysis (such as rising, falling, and no trend) by fitting trend curves through regression algorithms;
[0249] S32: Calculate a trend factor based on the curve derivative to measure the second health level;
[0250] S33: Comprehensively determine the health level.
[0251] in addition, Figure 5 A flowchart of a method for evaluating the health status of a new energy device provided by another embodiment of the present invention is shown in FIG. Figure 5 As shown, in Figure 4 On the basis of , anomaly detection function is added, and the corresponding added processes include:
[0252] S34: Obtain secondary variables and proceed to step S24;
[0253] S35: Obtaining a safety threshold through anomaly detection;
[0254] S36: Acquire current charging data of the charging vehicle;
[0255] S37: Compare the safety threshold with the current charging data of the charging vehicle;
[0256] S38: Determine the abnormal condition;
[0257] S39: Output report.
[0258] Figure 6 A schematic diagram of an application of a trend analysis method to determine the second health level provided by an embodiment of the present invention. Figure 6 As shown, the trend analysis is refined to determine the corresponding trend factors corresponding to different trend situations to obtain the second health level. Figure 7 A schematic diagram of the maximum temperature variation trend provided by an embodiment of the present invention; Figure 8 A schematic diagram of another maximum temperature variation trend provided by an embodiment of the present invention, Figure 8 For the trend change content when the charging time is longer than 20 minutes, Fig. 9 A schematic diagram of the SOC jump trend provided by an embodiment of the present invention; Fig.10 A schematic diagram of the maximum pressure difference variation trend provided by an embodiment of the present invention; Figures 7 to 10 It can reflect the trend changes, which is of great significance for the health assessment of vehicles.
[0259] For an introduction to another health status assessment method for new energy equipment provided by the present invention, please refer to the above method embodiment, and the present invention will not go into details here. It has the same beneficial effects as the above-mentioned health status assessment method for new energy equipment.
[0260] The above is a detailed introduction to a health status assessment method for new energy equipment, a health status assessment device for new energy equipment, and a medium provided by the present invention. The various embodiments in the specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same and similar parts between the embodiments can be referenced to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part description. It should be pointed out that for ordinary technicians in this technical field, without departing from the principle of the present invention, several improvements and modifications can be made to the present invention, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.
[0261] It should also be noted that, in this specification, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "comprises", "comprising" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprising a ..." does not exclude the presence of other identical elements in the process, method, article or device including the element.
Claims
1. A method for evaluating the health status of new energy equipment, characterized in that: include: Confirm the type of new energy equipment to be tested; Select multiple sets of new energy equipment under the type as analysis objects; Acquire reference charge / discharge process data of the analysis object within a preset time range and matching the analysis object, wherein the reference charge / discharge process data comes from data generated by the analysis object during the charge / discharge process; Acquire actual charging / discharging process data of the new energy device to be detected within the preset time range, wherein the actual charging / discharging process data comes from data generated during the charging / discharging process of the new energy device to be detected; According to the corresponding relationship between the reference charge / discharge process data and time, determining the safety threshold corresponding to the reference charge / discharge process data by an abnormality detection method; According to the correspondence between the actual charge / discharge process data and time, determining the trend of the actual charge / discharge process data by a trend analysis method, wherein the trend analysis method is a method for determining the actual charge / discharge process data by performing regression fitting; Determine a first health level based on a correspondence between the degree of deviation and a health status, and determine a second health level based on a correspondence between a trend factor corresponding to the determined trend of the actual charging / discharging process data and the health status, wherein the degree of deviation is a degree of deviation between the mean-processed data of the actual charging / discharging process data of the new energy equipment to be detected and the safety threshold; The first health level and the second health level are combined to determine the comprehensive health status of the new energy equipment to be detected.
2. The health status evaluation method of new energy equipment according to claim 1 is characterized in that: The determining the trend of the actual charging / discharging process data by a trend analysis method according to the corresponding relationship between the actual charging / discharging process data and time includes: According to the corresponding relationship between each variable of the actual charge / discharge process data and time, fitting each variable of the actual charge / discharge process data by a regression fitting method to obtain a regression curve; Determine the corresponding current curve slope according to the regression curve between the current time and the set time; The trend situation corresponding to the slope of the current curve is determined according to the corresponding relationship between the slope of the current curve and the preset condition.
3. The health status evaluation method of new energy equipment according to claim 2 is characterized in that: Before determining the second health level according to the correspondence relationship between the trend factor corresponding to the trend situation of the actual charge / discharge process data and the health status, after determining the trend situation corresponding to the current curve slope according to the correspondence relationship between the current curve slope and the preset condition, the method further includes: Taking the trend situation as the initial trend situation, when the initial trend situation is an upward trend or no trend, obtaining a final regression curve by fitting through a curve fitting method; Calculate the gradient value corresponding to each preset time period between the current time and the set time period according to the gradient descent method; The final trend corresponding to the slope of the current curve is determined according to the corresponding relationship between each of the gradient values and the preset value.
4. The health status evaluation method of new energy equipment according to claim 2 is characterized in that: The step of fitting each variable of the actual charge / discharge process data by a regression fitting method to obtain a regression curve includes: The regression curve is obtained by fitting each variable of the actual charge / discharge process data through a robust analysis method and / or a least square method.
5. The health status evaluation method of new energy equipment according to claim 3 is characterized in that: The preset conditions include a first preset condition, a second preset condition and a third preset condition; and determining the trend corresponding to the current curve slope according to the corresponding relationship between the current curve slope and the preset conditions includes: When the current curve slope meets the first preset condition, determining that the trend situation corresponding to the current curve slope is no trend; When the current curve slope meets the second preset condition, determining that the trend corresponding to the current curve slope is an upward trend; When the current curve slope meets the third preset condition, determining that the trend corresponding to the current curve slope is a downward trend; Among them, the first preset condition is that the slope of the current curve is greater than or equal to a first threshold and less than or equal to a second threshold, and the first threshold is less than the second threshold; the second preset condition is that the slope of the current curve is greater than the second threshold; the third preset condition is that the slope of the current curve is less than the first threshold.
6. The health status evaluation method of new energy equipment according to claim 3 is characterized in that: The determining, according to the correspondence between each of the gradient values and the preset value, the final trend corresponding to the slope of the current curve comprises: Acquire a first preset time period, a second preset time period, and a third preset time period, wherein the first preset time period is a preset time period set starting from the current time, the second preset time period is a preset time period set before the first preset time period, and the third preset time period is a preset time period set before the second preset time period; The final trend situation is determined according to the corresponding relationship between the gradient values corresponding to the first preset time period, the second preset time period and the third preset time period and the preset value.
7. The health status evaluation method of new energy equipment according to claim 6 is characterized in that: The determining the final trend according to the correspondence between the gradient values corresponding to the first preset time period, the second preset time period, and the third preset time period and the preset value comprises: When the gradient values corresponding to the first preset time period and the second preset time period are both greater than 0, the final trend is an upward trend.
8. The health status evaluation method of new energy equipment according to claim 6 is characterized in that: The determining the final trend according to the correspondence between the gradient values corresponding to the first preset time period, the second preset time period, and the third preset time period and the preset value comprises: When the gradient values corresponding to the first preset time period, the second preset time period and the third preset time period meet any one of the preset gradient conditions, it is determined that the final trend condition is no trend; Among them, the preset gradient conditions include a first gradient condition, a second gradient condition and a third gradient condition; the first gradient condition is that the gradient value of the first preset time period is equal to 0; the second gradient condition is that the gradient value of the first preset time period is not greater than 0 and the gradient value of the second preset time period is equal to 0; the third gradient condition is that the gradient value of the third preset time period is equal to 0.
9. The health status evaluation method of new energy equipment according to claim 6, characterized in that: The determining the final trend according to the correspondence between the gradient values corresponding to the first preset time period, the second preset time period, and the third preset time period and the preset value comprises: respectively acquiring variable data corresponding to the first preset time period, the second preset time period and the third preset time period according to each of the gradient values; When each of the variable data satisfies any condition of the preset variable conditions, it is determined that the final trend is a downward trend; Among them, the preset variable conditions include a first preset variable condition, a second preset variable condition and a third preset variable condition; the first preset variable condition is that the difference between the variable data of the first preset time period and the second preset time period is less than a third threshold; the second preset variable condition is that the difference between the variable data of the first preset time period and the third preset time period is less than the third threshold; the third preset variable condition is that the difference between the variable data of the second preset time period and the third preset time period is less than the third threshold.
10. The health status evaluation method of new energy equipment according to claim 3, characterized in that: The determining of the second health level according to the corresponding relationship between the trend factor corresponding to the determined trend of the actual charge / discharge process data and the health status includes: Determine the slope of a curve according to a regression curve between a current time and a preset time of the actual charge / discharge process data; Determine the corresponding actual trend factor according to the corresponding relationship between the slope of the curve and the trend factor; The second health degree is determined according to the corresponding relationship between the actual trend factor and the health condition.
11. The health status evaluation method of new energy equipment according to claim 10, characterized in that: The determining of the first health level based on the correspondence between the deviation degree and the health status includes: Acquire multiple historical charge / discharge orders within a predetermined time period of the new energy equipment to be detected; Acquire historical charging / discharging process data from each of the historical charging / discharging orders, and use the average value corresponding to each of the variables in the historical charging / discharging process data as the actual average value; Determine the degree of deviation between the actual average value corresponding to the same variable and the safety threshold; The first health degree is determined according to a corresponding relationship between the deviation degree and the health condition.
12. The health status evaluation method of new energy equipment according to claim 11, characterized in that: The taking the average value corresponding to each of the variables in the historical charge / discharge process data as the actual average value includes: The average value corresponding to each of the variables is obtained by performing average value processing on each of the variables of the historical charge / discharge process data or by performing time and distance weighted average processing on the historical charge / discharge process data.
13. The health status evaluation method of new energy equipment according to claim 12, characterized in that: The average values corresponding to the variables obtained by weighted average processing of the time and distance of the historical charge / discharge process data specifically include: Obtaining the charge / discharge time corresponding to the historical charge / discharge process data; Weighting the charge / discharge time by the cube of the time to obtain a weighted time; Determining a first weighted value of each of the variables according to a corresponding relationship between an absolute value of each of the variables in the historical charge / discharge process data and the weighted time; Determining a second weighted value of each of the variables according to a correspondence between the first weighted value and the charge / discharge time; The second weighted value and each of the variables are weighted averaged to obtain the actual average value corresponding to each of the variables.
14. The health status evaluation method of new energy equipment according to any one of claims 10 to 13, characterized in that: The step of determining the comprehensive health status of the new energy equipment to be detected by integrating the first health status and the second health status includes: Determining a score for the degree of deviation according to a correspondence between the degree of deviation and the first score; Determining the score of the regression curve according to the corresponding relationship between the slope of the curve and the second score; The comprehensive health status of the new energy equipment to be detected is determined according to the corresponding relationship between the score of the deviation degree and the score of the regression curve.
15. A health status evaluation system for new energy equipment, characterized in that: include: A confirmation module, used to confirm the type of new energy equipment to be detected; A selection module, used for selecting a plurality of new energy equipment sets under the type as analysis objects; A first acquisition module is used to acquire reference charge / discharge process data of the analysis object within a preset time range and matching the analysis object, wherein the reference charge / discharge process data comes from data generated by the analysis object during the charge / discharge process; A second acquisition module is used to acquire actual charging / discharging process data of the new energy device to be detected within the preset time range, wherein the actual charging / discharging process data comes from data generated during the charging / discharging process of the new energy device to be detected; A first determination module, configured to determine a safety threshold corresponding to the reference charge / discharge process data by an abnormality detection method according to a correspondence between the reference charge / discharge process data and time; A second determination module is used to determine the trend of the actual charge / discharge process data by a trend analysis method according to the corresponding relationship between the actual charge / discharge process data and time, wherein the trend analysis method is a method for determining the actual charge / discharge process data by performing regression fitting; A third determination module is used to determine a first health level based on a correspondence between a deviation degree and a health status, and to determine a second health level based on a correspondence between a trend factor corresponding to a trend condition of the determined actual charge / discharge process data and the health status, wherein the deviation degree is a deviation degree between the mean-processed data of the actual charge / discharge process data of the new energy equipment to be detected and the safety threshold; The fourth determination module is used to determine the comprehensive health status of the new energy equipment to be detected by comprehensively combining the first health status and the second health status.
16. A health status evaluation device for new energy equipment, characterized in that: include: Memory for storing computer programs; A processor, used to implement the steps of the health status assessment method of new energy equipment as described in any one of claims 1 to 14 when executing the computer program.
17. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the health status assessment method of new energy equipment according to any one of claims 1 to 14 are implemented.