Method and system for identifying cascading failure evolution patterns considering the impact of prevention and control measures

By constructing a planning model that considers prevention and control measures in the power grid and using prefix projection pattern mining technology, the key evolution patterns of high-risk cascading failures are identified, which solves the problem of failure to effectively consider the impact of prevention and control measures in the existing technology, and achieves Optimization and risk reduction of power grid prevention and control strategies.

CN115241884BActive Publication Date: 2024-10-18STATE GRID SHANDONG ELECTRIC POWER CO +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210855973.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-20
Publication Date
2024-10-18
Estimated Expiration
2042-07-20

AI Technical Summary

Technical Problem

Existing technologies fail to effectively consider the impact of prevention and control measures when analyzing the evolution patterns of cascading faults, making it difficult to accurately identify weak links in power grid prevention and control and to effectively reduce the risk of cascading failures.

Method used

A cascading fault evolution pattern identification method that considers the impact of prevention and control measures is adopted. By obtaining power grid operating status information, prevention and control measures are constructed based on a preset planning model, high-probability cascading faults are screened, and pattern mining using prefix projection is used to identify key evolutions. model, combined with the weighted PrefixSpan algorithm and the effectiveness index of prevention and control measures, to identify key evolution patterns where high-risk cascading failures are concentrated.

Benefits of technology

In the process of simulating cascading faults, a planning model has been established for generator output adjustment, DC modulation and load shedding measures, which can quickly provide the optimal power grid prevention and control strategy, significantly reduce the risk value, and identify power grid prevention and control measures. weak links to reduce the risk of cascading failures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115241884B_ABST
    Figure CN115241884B_ABST
Patent Text Reader

Abstract

The present invention provides a method and system for identifying the evolutionary pattern of cascading failures that considers the influence of prevention and control measures, the method comprising obtaining power grid operation status information and obtaining prevention and control measures after the failure; considering the prevention and control measures, screening out high-probability cascading failures caused by the current failure, and calculating the risk value of the high-probability cascading failures to obtain a high-risk cascading failure set; using the high-risk cascading failure set as a sequence, and identifying the key evolutionary patterns in the sequence based on pattern mining based on prefix projection. The present invention establishes a planning model for generator output adjustment, DC modulation and load shedding measures, which can quickly give the optimal power grid prevention and control strategy; calculates and sorts the risk of cascading failures, and finally screens out a high-risk cascading failure set; and identifies the key evolutionary patterns in the high-risk cascading failure set, which can effectively identify the weak links in power grid prevention and control. The present invention considers the impact of prevention and control measures on cascading failures and can significantly reduce the risk value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of cascading failure evolution analysis of power supply systems, and in particular to a cascading failure evolution pattern identification method and system taking into account the influence of prevention and control measures. Background Art

[0002] In many major power outages, the spread of cascading failures took a long time. In this process, if the correct prevention and control measures are taken, the scale of power outages can be reduced and major power outages can be avoided. In the process of the occurrence and development of cascading failures, the control system can take prevention and control measures such as generator output adjustment, DC modulation, and load shedding to change the evolution path of cascading failures and reduce the risk of cascading failures. When screening high-risk cascading failures, the impact of power grid prevention and control measures should be taken into account in order to accurately screen out high-risk cascading failures. Mining the key evolution patterns of these high-risk cascading failures helps to accurately identify the weak links in power grid prevention and control, which is of great significance for preventing major power outages.

[0003] When simulating prevention and control measures, the existing technology only takes power adjustment measures for the current overloaded line, without considering the impact of subsequent faults. For example, existing research points out that for the predicted chain of chain failures, the Apriori algorithm is used to quantitatively analyze the correlation between the fault lines and study the main causes of chain failures; for example, considering the sequential characteristics between the faults in the chain failures, an improved Apriori algorithm that considers the item order and transaction weight is proposed, and the strong correlation fault combination that threatens the system security is identified based on the algorithm; for example, the support vector machine automatically learns and judges the correlation between feature events, and realizes the matching and judgment of the upper and lower correlation relationships of feature events; for example, the identification of chain failure patterns based on the sequence pattern mining method focuses on mining chain failure patterns from a large number of accident chains, and quantifies the impact of evolution patterns on system power outages, and then identifies key evolution patterns.

[0004] It can be seen that most of the existing research methods do not take into account the impact of subsequent failures, and it is difficult to effectively reduce the risk of cascading failures; when analyzing evolutionary patterns, there is a lack of consideration of the impact of prevention and control measures, making it difficult to accurately identify the weak links in power grid prevention and control. Summary of the invention

[0005] The present invention provides a method and system for identifying the evolution pattern of chain failures taking into account the influence of prevention and control measures, which is used to solve the problem that when analyzing the evolution pattern of power grid faults, the influence of prevention and control measures is not taken into consideration, and the weak links in power grid prevention and control are difficult to identify.

[0006] To achieve the above object, the present invention adopts the following technical solutions:

[0007] A first aspect of the present invention provides a method for identifying a cascading failure evolution pattern taking into account the influence of prevention and control measures, the method comprising the following steps:

[0008] Obtain grid operation status information and obtain post-fault prevention and control measures based on the preset planning model;

[0009] Taking the prevention and control measures into consideration, screening out high-probability cascading failures caused by the current failure, and calculating the risk value of the high-probability cascading failures to obtain a high-risk cascading failure set;

[0010] The high-risk cascading failure set is taken as a sequence, and pattern mining based on prefix projection is performed to identify key evolution patterns in the sequence.

[0011] Furthermore, the construction of the planning model is specifically as follows:

[0012] Taking the minimum over-limit degree of line load, the minimum consequence of failure and the lowest cost of prevention and control measures as the objective function of the prevention and control measures, the planning model is formed by considering the steady-state safety constraints.

[0013] Furthermore, the steady-state safety constraints include:

[0014] Line flow constraints, load rate constraints of out-of-limit lines, upper and lower limit constraints of generator output, generator output climbing constraints, DC transmission power constraints, load node shedding constraints, total load shedding constraints, power balance constraints and N-1 fault consequence constraints of faulty lines.

[0015] Furthermore, the objective function of the prevention and control measures is specifically:

[0016] min f=f1+f2+f3,

[0017] in,

[0018]

[0019]

[0020]

[0021] In the formula, f1, f2 and f3 represent the over-limit degree of line load, the consequences of failure and the cost of prevention and control measures respectively. is the active power of line c after the k-level cascading fault occurs, P c,n is the rated active power of line c, L ol L is the set of power flow crossing lines; a is the preset N-1 fault line set; δ c is a variable, taking the value 0 or 1; q c is the failure consequence of line c; are active load shedding, is the DC power active adjustment amount, is the active adjustment amount of generator output, a pc,ld is the active load shedding cost coefficient, a pc,h is the DC power active adjustment cost coefficient, a pc,g Automatically adjust the cost factor for generator output.

[0022] Furthermore, the screening process of high probability cascading failures is specifically as follows:

[0023] According to the grid operation status information, the initial fault is determined and a fault set is formed;

[0024] Based on the prevention and control measures, the power supply system is optimized for power flow, and the failure probability of each line in the fault concentration is calculated;

[0025] Select the lines with higher fault probability as the lower-level fault lines to form a new fault set, and repeat the previous step until a preset number of high-probability fault lines are obtained to form a high-probability cascading fault set.

[0026] Furthermore, the screening process of the high probability cascading failures also includes calculating the prevention and control cost corresponding to the current prevention and control measures after the power flow optimization, specifically:

[0027]

[0028] In the formula, k represents the fault level, a pc,ld 、a pc,h and a pc,g They represent the load shedding prevention and control cost coefficient, the DC power adjustment prevention and control cost coefficient, and the generator processing adjustment prevention and control cost coefficient, respectively. and They represent the total amount of load shedding, total DC power loss and total amount of generator shedding caused by prevention and control measures respectively.

[0029] Furthermore, the risk value is calculated specifically as follows:

[0030]

[0031] represents the probability of k-level cascading failures, represents the probability of K-level cascading failures, where K is the number of levels of a complete cascading failure. and C e They represent the costs of prevention and control measures and the passive losses caused by cascading failures respectively.

[0032] Furthermore, the specific process of taking the high-risk cascading failure set as a sequence and mining the pattern based on prefix projection to identify the key evolution pattern in the sequence is:

[0033] For the high-risk cascading failure set, obtain all prefixes with a length of 1 and calculate the weighted support;

[0034] Get the frequent item whose weighted support is higher than the preset threshold and whose length is 1, and use the frequent item as the initial prefix;

[0035] Calculate the weighted support of the projection database and each item corresponding to the current prefix, and add the single item with weighted support higher than the threshold to the current prefix to form a new prefix;

[0036] Repeat the previous step until the projection database is empty or the weighted support of each item in the projection database is lower than the preset threshold, then the current prefix corresponds to the key evolution pattern set.

[0037] Furthermore, the method further comprises the steps of:

[0038] For the key evolution patterns, calculate the effectiveness of the corresponding prevention and control measures.

[0039] A second aspect of the present invention provides a cascading failure evolution pattern identification system taking into account the influence of prevention and control measures, the system comprising:

[0040] The fault prevention and control calculation unit is used to obtain the grid operation status information and obtain the post-fault prevention and control measures based on the preset planning model;

[0041] A cascading failure analysis unit, taking into account the prevention and control measures, screens out high-probability cascading failures caused by the current failure, and calculates the risk value of the high-probability cascading failures to obtain a high-risk cascading failure set;

[0042] The fault evolution pattern recognition unit is used to take the high-risk cascading fault set as a sequence, and identify the key evolution pattern in the sequence based on pattern mining of prefix projection.

[0043] The cascading failure evolution pattern identification system of the second aspect of the present invention can implement the method of the first aspect and the various implementation methods of the first aspect, and achieve the same effect.

[0044] The effects provided in the content of the invention are only the effects of the embodiments, not all the effects of the invention. One of the above technical solutions has the following advantages or beneficial effects:

[0045] In order to reasonably simulate the prevention and control measures taken by the power grid during the chain failure process, the present invention establishes a planning model for generator output adjustment, DC modulation and load shedding measures. The model takes into account the influence of line overload, subsequent fault consequences and prevention and control capability factors, and can quickly give the optimal power grid prevention and control strategy; and proposes a two-stage screening strategy to calculate and sort the chain failure risks, and finally screen out a high-risk chain failure set; through the weighted PrefixSpan algorithm and the effectiveness index of the prevention and control measures, the key evolution mode in the high-risk chain failure set can be identified, and the weak links of the power grid prevention and control can be effectively identified. Compared with the existing methods, the method of this embodiment can significantly reduce the risk value. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0047] Figure 1 is a schematic diagram of a flow chart of an embodiment of the method of the present invention;

[0048] Figure 2 is a schematic diagram of a cascading failure game tree search in an embodiment of the method of the present invention;

[0049] Figure 3 is a schematic diagram of a high-risk cascading failure screening process in an embodiment of the present invention;

[0050] Figure 4 It is a schematic diagram comparing the risk values ​​obtained by the method of the embodiment of the present invention and the existing method. DETAILED DESCRIPTION

[0051] In order to clearly illustrate the technical features of the present solution, the present invention is described in detail below through specific implementation methods and in conjunction with the accompanying drawings. The disclosure below provides many different embodiments or examples for realizing different structures of the present invention. In order to simplify the disclosure of the present invention, the components and settings of specific examples are described below. In addition, the present invention may repeat reference numbers and / or letters in different examples. This repetition is for the purpose of simplification and clarity, and does not itself indicate the relationship between the various embodiments and / or settings discussed. It should be noted that the components illustrated in the accompanying drawings are not necessarily drawn to scale. The present invention omits the description of known components and processing techniques and processes to avoid unnecessary limitations on the present invention.

[0052] like Figure 1 As shown, an embodiment of the present invention provides a method for identifying a cascading failure evolution pattern taking into account the influence of prevention and control measures, comprising the following steps:

[0053] S1, obtain the grid operation status information and obtain the post-fault prevention and control measures based on the preset planning model;

[0054] S2, considering the prevention and control measures, screening out high-probability cascading failures caused by the current failure, and calculating the risk value of the high-probability cascading failures to obtain a high-risk cascading failure set;

[0055] S3, taking the high-risk cascading failure set as a sequence, and identifying key evolution patterns in the sequence based on pattern mining based on prefix projection.

[0056] In step S1, the planning model is constructed as follows:

[0057] Taking the minimum over-limit degree of line load, the minimum consequence of failure and the lowest cost of prevention and control measures as the objective function of the prevention and control measures, the planning model is formed by considering the steady-state safety constraints.

[0058] Prevention and control measures include generator output adjustment, DC power modulation and removal of a small amount of controllable load. The purpose is to minimize the risk of cascading failures at a lower cost within a limited time.

[0059] When the system has a heavy or even overloaded line, the probability of failure of the line is high, and the power flow transfer caused by the failure is more serious. Therefore, the primary goal of the prevention and control measures is to balance the system power flow distribution and reduce the degree of line load exceeding the limit. For the overloaded line in the system, set the optimization objective function:

[0060]

[0061] In the formula, is the active power of line c after the k-level cascading fault occurs, P c,n is the rated active power of line c, L ol is the set of power flow crossing lines, η n Indicates the rated load factor.

[0062] In addition, although some lines are in normal load state, most of the power flow after the failure is borne by one or a few lines with high correlation, which may cause these related lines to be instantly overloaded and the probability of failure to increase significantly. Therefore, in addition to considering the load state of the current line, the formulation of prevention and control measures must also minimize the consequences of subsequent failures caused by line failures. In order to reduce the difficulty of solving the model, only line N-1 failures are considered, and the established objective function is:

[0063]

[0064] Where, L a is the preset N-1 fault line set; δ cis a 0 / 1 variable, δ c =1 means considering the fault risk of line c, δ c =0 means ignoring the failure risk of line c; q c is the failure consequence of line c. a In addition to the over-limit lines, the lines in L also include some lines that are not over-limit but still have a high load rate. a It can also include lines that require special attention as designated by the dispatcher.

[0065] While reducing the risk of cascading failures, the generator output adjustment, DC modulation and load shedding should be minimized to reduce the cost of prevention and control measures. The objective function for optimizing the cost of prevention and control measures is:

[0066]

[0067] In the formula, are active load shedding, is the DC power active adjustment amount, is the active adjustment amount of generator output, a pc,ld is the active load shedding cost coefficient, a pc,h is the DC power active adjustment cost coefficient, a pc,g Automatically adjust the cost factor for generator output.

[0068] In summary, the objective function of the prevention and control measures is:

[0069] min f=f1+f2+f3 (4)

[0070] The steady-state safety constraints include:

[0071] Line flow constraints, load rate constraints of out-of-limit lines, upper and lower limit constraints of generator output, generator output climbing constraints, DC transmission power constraints, load node shedding constraints, total load shedding constraints, power balance constraints and N-1 fault consequence constraints of faulty lines.

[0072] Line flow constraints. After taking preventive measures, the power of the line can be quickly calculated using the generation transfer distribution factor method, that is:

[0073]

[0074] In the formula, To adjust the active power of the front line c, B is the injection power transfer distribution factor matrix, and is the injected power transfer distribution factor of generator g, DC h, load ld and line c after a level k fault occurs.

[0075] When adjusting the over-limit line, we should avoid adjusting too much, which will lead to too small load rate of the over-limit line. For this reason, the model adopts a conservative prevention and control strategy. After taking adjustment measures, the load rate of the over-limit line should not be less than the load rate of the original line that did not over-limit, that is:

[0076]

[0077] Where P l k is the active power of line l after the k-level cascading fault occurs, S n For normal load line collection.

[0078] Generator output upper and lower limit constraints:

[0079]

[0080] In the formula, is the output of the generator g, P g,min is the lower limit of generator output, P g,max is the upper limit of generator output, ΔP g is the change in generator output.

[0081] In addition to meeting the upper and lower limit constraints, the generator output also needs to meet the climbing constraint:

[0082]

[0083] In the formula, is the ramp rate of generator g, is the ramp rate of the generator g, Δt k is the time interval between the occurrence of the lower-level failure, that is, the time available for implementing prevention and control measures. The time interval between two-level failures in a chain failure will affect the implementation of prevention and control measures, but this interval is difficult to quantify accurately and has a strong randomness. Assume that Δt k =5min. In practice, different values ​​can be set according to the actual situation.

[0084] DC transmission power upper and lower limit constraints:

[0085]

[0086] In the formula, is the DC h output, P h,min is the lower limit of DC h transmission power, P h,max is the upper limit of DC transmission power, ΔP h is the change in the DC power transmission. The upper and lower limits of DC power transmission are closely related to the power receiving capacity of the receiving grid and the power transmission capacity of the sending grid. The limit is usually given by offline simulation results.

[0087] In the power system, loads have different levels of importance, and some loads can be cut off by the dispatching system at any time to deal with grid security risks. Some controllable loads in the load nodes can be used as prevention and control resources for cascading failures. The load cut amount of the load node is constrained as follows:

[0088] ΔP ld ≤ΔP ld,max (10)

[0089] Where ΔP ld,max is the upper limit of load that can be cut by ld, ΔP ld For shear load.

[0090] For a regional power grid, the total amount of load removed cannot be too large, that is, the total amount of load removed should meet certain constraints:

[0091]

[0092] Where ΔP Ld,max The upper limit of the total load shedding amount.

[0093] When adjusting the overloaded line, the change of injected power may cause the flow of some other lines to increase. Therefore, when taking preventive measures, the flow of normal load lines should be avoided from exceeding the limit. The flow constraint of normal load lines is:

[0094] -η n P l,n ≤P l k ≤η n P l,n ,l∈S n (12)

[0095] Where P l,n is the rated power of line l.

[0096] When adjusting the generator output, DC power and load, the power balance constraint of the power grid needs to be met. At the same time, considering that the power grid has a certain proportion of reserve and the reserve is allowed to fluctuate within the specified range, the sum of the power adjustment needs to meet the constraint:

[0097]

[0098] In the formula, S h For DC power injection into the busbar set, S g is the set of switchable generator busbars, S ld It is a collection of shelvable load busbars;

[0099] The fault consequence of line c is determined based on the over-limit situation of other lines after the fault of line c is disconnected. The N-1 fault consequence of line c is q c It can be expressed as:

[0100]

[0101] In the formula, q l,c Indicates the over-limit situation of line l after c is disconnected. When l does not exceed the rated load rate η n When , it indicates that the fault of c has little impact on l, and q l,c =0, when l exceeds the limit, the amount of flow exceeding the limit is used as a measure of the consequences of c on l. is the active power of line l after line c is disconnected, To adjust the active power of the front line l, P l k is the active power of line l after adjustment. l,n Indicates the rated active power of line 1.

[0102] Formula (1) to Formula (14) constitute the planning model of prevention and control measures. By solving the model, the optimal generator adjustment, DC adjustment and load shedding measures can be obtained to reduce the risk of cascading failures. In this model, various constraints need to be determined according to the actual situation of the power grid, and the implementation time of the prevention and control measures can be specified by the dispatching and operation personnel. Since there are nonlinear expressions such as absolute value, variable multiplication, and piecewise linear function in the model, the model is a mixed integer nonlinear programming model. In order to facilitate the solution, it is necessary to linearize the nonlinear part of the model and construct a mixed integer linear programming model.

[0103] In formula (1), Due to the existence of absolute value operations, nonlinear problems will occur and need to be linearized:

[0104]

[0105] In the formula, x c is the introduced auxiliary variable.

[0106] In formula (2), δ c is a 0-1 variable, q c is a continuous variable, δ c With q c The multiplication of will bring about nonlinear problems, which are difficult to solve directly. In order to transform this nonlinear problem, the Big M method is used to deal with it, and y c =δ c q c , the original problem becomes:

[0107]

[0108] In the formula, M is a very large number. It can be seen from formula (16) that when δ c = 0, yc =0, when δ c =1, y c =q c .

[0109] There is a piecewise linear function in formula (14), so it needs to be linearized. The piecewise function can be linearized by introducing auxiliary variables. Formula (14) can be replaced by formula (17):

[0110]

[0111] In the formula, M is a very large number, z1~z3 are introduced 0-1 variables, whose function is to determine the variable P c k and The value interval of w1~w4 is a continuous variable, and its function is to realize the linearization of the function.

[0112] Through the above linearization process, the MINLP model is transformed into the MILP model. The objective function of the model is given by equations (15), (16), (3) and (4), and the constraints are equations (5)-(13) and (17). By solving the model, a prevention and control strategy for cascading failures can be obtained.

[0113] In step S2, considering the prevention and control measures taken by the control system during the evolution of cascading failures, a two-stage screening strategy for cascading failures is established. First, high-probability cascading failures are searched out, and then the risk value of each cascading failure is calculated in turn according to the probability ranking, and finally a high-risk cascading failure set is obtained.

[0114] The screening process is divided into two stages: high probability cascading failure search and cascading failure risk calculation. The first stage adopts the game tree search strategy, such as Figure 2 As shown in the figure, during the search process, the fault party and the defender are parties with conflicting interests, and the fault selection and prevention and control measures are implemented in alternating iterations. First, after the initial fault occurs, the established prevention and control measures model is used to optimize the system flow, and the next level of fault is determined based on the optimized power grid operation status. The principle for determining the next level of fault is: calculate the failure probability of the normal line and select the line with a higher probability as the next level of fault line. Through continuous iteration, a high probability chain fault set can be obtained. Then, the risk of each chain fault is calculated in turn, and finally a specified number of high-risk chain faults are screened out.

[0115] The specific implementation process is as follows Figure 3 As shown, according to the grid operation status information, the initial fault is determined, and the k value of the k-level fault is 1, forming a fault set S k , the line number i takes the value of 1; disconnect the lines S in the fault concentration one by one k(i), determine whether to disconnect, if so, form a disconnection chain fault set, if not, optimize the power supply system based on the prevention and control measures, and calculate the fault probability of each line in the fault set; select the line with a higher fault probability as the lower-level fault line to form a new fault set, repeat the previous step until a preset number of high-probability fault lines are obtained to form a high-probability chain fault set.

[0116] The screening process of the high probability cascading failures also includes calculating the prevention and control cost corresponding to the current prevention and control measures after the power flow optimization, specifically:

[0117]

[0118] In the formula, k represents the fault level, a pc,ld 、a pc,h and a pc,g They represent the load shedding prevention and control cost coefficient, the DC power adjustment prevention and control cost coefficient, and the generator processing adjustment prevention and control cost coefficient, respectively. and They represent the total amount of load shedding, total DC power loss and total amount of generator shedding caused by prevention and control measures respectively.

[0119] In stage 2, for high-probability and decoupling cascading failures, their emergency control costs and cascading failure risks are calculated in turn, and a high-risk cascading failure set is screened out.

[0120] The passive loss caused by the cascading failure of the emergency control cost machine is expressed as:

[0121] C e =a e,ld ΔP e,ld +a e,h ΔP e,h +a e,g ΔP e,g (18)

[0122] In the formula, ΔP e,ld Indicates the total amount of load shedding, ΔP e,h Represents the total DC power loss, ΔP e,g Indicates the total amount of generator cut, a e,ld is the load shedding cost coefficient, a e,h is the DC power adjustment cost coefficient, a e,g Adjust the cost factor for generator output.

[0123] Considering the prevention and control cost and the passive emergency control cost, the cascading failure risk can be expressed as:

[0124]

[0125] In the formula, and represents the probability of k-level and K-level cascading failures, where K is the number of levels of a complete cascading failure, i.e., the number of faulty components.

[0126] and It can be expressed as:

[0127]

[0128] Where, L K ={l1→l2→···→l K}, represents a set of faulty components with a K-level cascading failure, For L K The set of top k faulty components.

[0129] In step S3, the cascading failure can be regarded as a sequence, and each single failure in the cascading failure is an item in the sequence, and there is a temporal order between the items in the sequence. The cascading failure set is a huge sequence database, and the key evolution patterns in it can be discovered using the sequence pattern mining method.

[0130] The PrefixSpan algorithm is a classic sequential pattern mining algorithm. Suppose there is a sequence A = {a1, a2, ···, a n} and sequence B={b1,b2,···,b m}, n≤m, where a1,a2,···,a n and b1,b2,···,b m It is called the item set of a sequence. Each item set can be composed of one or more items. For example, assuming B = {(cd), e, (fgh)}, then (cd), e, etc. are the item sets of B, and c and d are the items in the item set. When using the PrefixSpan algorithm to mine sequence patterns, the definitions of subsequence, prefix, projection, and support should be clarified first.

[0131] Subsequence: If there exists a sequence of numbers 1≤j1≤j2≤···≤j n ≤m, satisfying Then A is said to be a subsequence of B, expressed as In particular, when the elements in the sequence are all single items, it is necessary to satisfy

[0132] Prefix: Sequence A is a prefix of sequence B if the following conditions are met: ①a i =b i (i <m);②a m =b m ; ③ in b m In, a mIn particular, when all elements in the sequence are single items, conditions ②③ are combined and simplified to: a m =b m For example, for B = {(cd), e, (fgh)}, when A = {c}, A = {(cd)}, A = {(cd), e, f}, A is the prefix of B. It can be seen that a sequence may have multiple prefixes.

[0133] Projection: The subsequence left after removing the prefix from the sequence is called prefix projection, also known as suffix. The set of all suffixes corresponding to the same prefix is ​​called the projection database corresponding to the prefix.

[0134] Support: In the sequence database D, the support of a subsequence e is defined as shown in formula (22):

[0135]

[0136] In the formula, That is, E is a sub-library of D, and each sequence in E contains subsequence e. E and N D denote the number of sequences in E and D respectively.

[0137] The goal of the PrefixSpan algorithm is to mine frequent sequences that meet the minimum support. The input of the algorithm is the sequence data set and the support threshold, and the output is the set of all frequent sequences that meet the support requirements. It first finds the frequent items in the sequence database, and then generates a projection database. Search for frequent items in the projection database and add them to the prefix sequence to generate a second-order frequent sequence as a new prefix. Then search for the next level of frequent sequences, and so on. It recursively continues until no longer prefix sequences can be mined, and all frequent sequences can be searched.

[0138] The traditional PrefixSpan algorithm does not consider the different importance levels among sequences, and the risk differences among the chain failures screened out are large. Therefore, a weighted PrefixSpan algorithm is proposed to mine the key evolution patterns in the chain failure concentration.

[0139] The set of cascading failures U = {L k,1 ,L k,2 ,···,L k,j ,···,L k,n} can be regarded as a sequence database, where L k,j = {l 1,j → 2,j →···→l k,j}, represents a chain of cascading failures, and the key evolution pattern is the frequent subsequence v of U. The weighted support of v can be expressed as:

[0140]

[0141] Where V is a subset of U, and each sequence in V contains subsequences v, R i , R j is the risk value of cascading failures i and j.

[0142] In order to further analyze the impact of prevention and control measures in the evolution model, the effectiveness index of prevention and control measures is defined:

[0143]

[0144] In the formula, R i,gt is the risk value of cascading failure i obtained by screening the prevention and control measures, R i,nc is the risk value of cascading failure i without considering prevention and control measures, N V is the number of cascading failures contained in V. Effectiveness index W eff The larger it is, the more effective the prevention and control measures are in reducing the risk of cascading failures brought about by this mode.

[0145] The steps of using the weighted PrefixSpan algorithm to mine the key evolution patterns of cascading failures and further analyze the weak links of prevention and control are as follows:

[0146] Step 1: Generate a high-risk cascading failure set U, find all prefixes of length 1 in U and calculate their weighted support.

[0147] Step 2: Get the support higher than the preset threshold W th And the frequent item with a length of 1 is used as the initial prefix, i=1.

[0148] Step 3: Find the projection database corresponding to the prefix and calculate the weighted support of each item. If the projection database is empty or the support of all items is lower than the threshold, proceed to step 6.

[0149] Step 4: Merge each item that meets the support requirement with the current prefix to obtain a new prefix.

[0150] Step 5: Let i=i+1, prefix is ​​each prefix after merging single items, and recursively execute steps 3 to 5 respectively.

[0151] Step 6: Obtain the set of all key evolution patterns, and calculate the effectiveness index of the prevention and control measures of each pattern according to formula (24). For patterns with lower effectiveness, it is necessary to conduct in-depth analysis on the reasons why the prevention and control measures are not effective.

[0152] The key evolution modes with high support are the weak links in the prevention and control of cascading failures. The existence of these weak links is, on the one hand, the influence of the power grid structure. If the local power grid structure is fragile and cannot bear the task of transmitting a large amount of power, it is easy to become a weak link in the evolution of cascading failures. On the other hand, it is the influence of prevention and control resources. The power adjustment capacity of some key nodes is insufficient, which makes it impossible for the power grid to effectively adjust the power of overloaded or overloaded lines in time, resulting in the occurrence of subsequent cascading failures. For these weak links, it is necessary to take preventive control measures in time, optimize prevention and control resources, and enhance the prevention and control capabilities of the power grid. Considering the impact of prevention and control measures to screen high-risk cascading failures and analyze and identify the hidden weak links, it can assist dispatchers in formulating more reasonable defense strategies and improve the defense capabilities of power grid security risks.

[0153] The above-mentioned embodiments of the present invention are applied below in conjunction with specific examples to intuitively demonstrate the effects.

[0154] The East China Power Grid example is used to verify the effectiveness of the proposed high-risk cascading failure screening method and key evolution pattern identification method considering the impact of prevention and control measures. The simulation uses the Gurobi optimizer to solve the prevention and control measures model, and the computing resources used are Core i7-6700(TM) 3.40GHz / 16GB RAM. The parameters in the simulation are set as follows: a e,ld =1, a e,h =0.3, a e,g =0.1, a pc,ld =0.5, a pc,h =0.1, a pc,g =0.02.

[0155] Analysis of the effectiveness of high-risk cascading failure screening considering the impact of prevention and control measures:

[0156] The Shaoxing-Lanting double-circuit line is taken as the initial fault. No prevention and control measures are taken. The proposed two-stage screening strategy is used to search for cascading faults, and the top 30 cascading faults with the highest risk values ​​are obtained. Then, the overload line flow adjustment method and the method based on the MILP model are used to generate prevention and control measures and screen out high-risk cascading faults. The simulation results of the three methods are shown in Figure 2. Figure 4 shown.

[0157] It can be seen that when no prevention and control measures are taken, the risk values ​​of the first six chain failures are high and very close, but after taking prevention and control measures, the risk values ​​of each chain failure are reduced to varying degrees, but the risk values ​​of chain failures 3 and 4 are reduced to a lesser extent. The overload line flow adjustment method is only for overloaded lines, and the flow is adjusted by cutting loads and changing generator output to avoid exceeding the limit. This method does not further consider the impact of subsequent faults, nor does it consider DC modulation capabilities. According to the simulation results, the prevention and control model adopted by the present invention can fully consider the prevention and control capabilities of the power grid and reduce the risk of chain failures to a greater extent.

[0158] After taking prevention and control measures, the risk of chain failures in the power grid has been reduced to different degrees, but there are still some chain failures with higher risks. This is because the prevention and control capabilities of the power grid are limited and unbalanced due to factors such as generator output, DC power adjustment range, load shedding capacity, and generator climbing ability. In particular, considering that some lines are responsible for transmitting power to heavy-load buses, and the amount of load that can be shelved is small, in this case, the risk of chain failures is difficult to effectively reduce. As can be seen from Table 1, after taking prevention and control measures, the risk of chain failure 4 is still high. For this type of fault, the reasons for its high risk should be deeply analyzed, and control resources should be allocated in a timely and reasonable manner to better prevent the risk of chain failures. For fault scenarios where the risk cannot be effectively reduced, emergency control plans should be formulated in a targeted manner to reduce the scope of the accident.

[0159] Table 1 Search results for some cascading failures

[0160]

[0161] Analysis of cascading failure evolution patterns:

[0162] The high-risk cascading fault set obtained by screening the Shaoxing-Lanting double-circuit line as the initial fault is used to identify the key evolutionary patterns in the proposed evolutionary pattern identification method. Some key evolutionary patterns with higher support are shown in Table 2. It can be seen that after the Shaoxing-Lanting double-circuit line fault is disconnected, the Shaoxing-Zhuji I line and the Shaoxing-Zhuji II line are the most affected, followed by the Shaoxing-Tidal I line and the Shaoxing-Tidal II line. After the Shaoxing-Lanting double-circuit line is disconnected, the DC power originally sent by the Shaoxing-Lanting double-circuit line is transferred to the Shaoxing-Zhuji and Shaoxing-Tidal double-circuit lines. However, the Shaoxing-Zhuji and Shaoxing-Tideway double-circuit lines do not evenly share the DC power that needs to be transmitted. The load rate of the Shaoxing-Zhuji double-circuit line is much higher than that of the Shaoxing-Tideway double-circuit line. In this case, the failure probability of the Shaoxing-Zhuji double-circuit line is significantly increased. After the failure, only the Shaoxing-Tideway double-circuit line can transmit DC power. At this time, the DC transmission power should be reduced and the corresponding load should be cut off to avoid further spread of chain failures.

[0163] From the above analysis, it can be seen that after the Shaoxing-Lanting double-circuit line is disconnected due to a fault, if the system flow is adjusted in time to reduce the load rate of the Shaoxing-Zhuji double-circuit line as much as possible, the risk of subsequent faults can be effectively reduced. Therefore, for the fault modes of Shaoxing-Lanting double-circuit line → Shaoxing-Zhuji I (II) and Shaoxing-Lanting double-circuit line → Shaoxing-Zhuji double-circuit line, the effectiveness of taking prevention and control measures is relatively high.

[0164] Table 2 Key evolution patterns of some cascading failures in the East China power grid example

[0165]

[0166] The effectiveness of the proposed high-risk cascading fault screening method and key evolutionary pattern identification method considering the impact of prevention and control measures is verified by using the Shandong Western Power Grid example. The high-risk cascading fault set obtained by the initial fault screening of the Quancheng-Tianyan double-circuit line is identified by the proposed evolutionary pattern identification method. Some key evolutionary patterns with high support are shown in Table 3. It can be seen that after the Quancheng-Tianyan double-circuit line fault is disconnected, the Quancheng-Wenshao double-circuit line and the Quancheng-Huimin double-circuit line are most affected and have a greater fault risk.

[0167] Table 3 Key evolution patterns of partial cascading failures in the Shandong western power grid example

[0168]

[0169] Through the above example analysis, it can be seen that the prevention and control model adopted based on the identification method of the embodiment of the present invention can fully consider the prevention and control capabilities of the power grid, reduce the risk of cascading failures to a greater extent, and can timely discover the weak links in the power grid, so as to facilitate the timely and reasonable allocation of control resources to better prevent the risk of cascading failures. For fault scenarios that cannot effectively reduce risks, emergency control plans should be formulated in a targeted manner to reduce the scope of the accident.

[0170] The present invention constructs a mixed integer linear programming model for simulating prevention and control measures, which can take into account factors such as line over-limit, subsequent N-1 failure risks and prevention and control costs. It also takes into account the impact of prevention and control measures when analyzing the evolution pattern of cascading failures, and can effectively identify the weak links in power grid prevention and control.

[0171] Due to the large number of cascading failures and the complex search process, the present invention proposes a two-stage screening strategy. In the first stage, a cascading failure game tree search strategy is established. During the search process, fault selection and prevention and control measures are implemented alternately. In the second stage, the prevention and control cost and the emergency control cost are comprehensively considered, the cascading failure risk is calculated and sorted, and finally a high-risk cascading failure set is screened out.

[0172] In order to analyze the key evolution mode of cascading failures, this paper proposes a weighted PrefixSpan algorithm and an effectiveness index of prevention and control measures, and analyzes the weak links of prevention and control for the high-risk cascading failure set obtained by screening. Finally, a real power grid model is used as an example to verify the effectiveness of the proposed method.

[0173] An embodiment of the present invention further provides a cascading failure evolution pattern recognition system that takes into account the impact of prevention and control measures. The system includes a fault prevention and control calculation unit, a cascading failure analysis unit, and a fault evolution pattern recognition unit.

[0174] The fault prevention and control calculation unit is used to obtain the power grid operation status information, and obtain the post-fault prevention and control measures based on the preset planning model; the chain failure analysis unit considers the prevention and control measures, screens out the high-probability chain failures caused by the current fault, and calculates the risk value of the high-probability chain failures to obtain a high-risk chain failure set; the fault evolution pattern recognition unit is used to take the high-risk chain failure set as a sequence, and identify the key evolution patterns in the sequence based on pattern mining based on prefix projection.

[0175] When the cascading failure evolution pattern identification system of this embodiment is running, it executes the steps of the method embodiment and achieves the same technical effect.

[0176] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the scope of protection of the present invention.

Claims

1. A method for identifying the evolutionary pattern of cascading failures taking into account the impact of prevention and control measures, characterized in that: The method comprises the following steps: Obtain grid operation status information and obtain post-fault prevention and control measures based on the preset planning model; Taking the prevention and control measures into consideration, screening out high-probability cascading failures caused by the current failure, and calculating the risk value of the high-probability cascading failures to obtain a high-risk cascading failure set; Taking the high-risk cascading failure set as a sequence, and identifying key evolution patterns in the sequence based on pattern mining based on prefix projection; The construction of the planning model is specifically as follows: Taking the minimum over-limit degree of line load, the minimum consequence of failure and the lowest cost of prevention and control measures as the objective function of prevention and control measures, the planning model is formed by considering the steady-state safety constraints; The objective function of the prevention and control measures is specifically: , in, , , , In the formula, , and They represent the degree of overload of the line, the consequences of the failure, and the cost of the prevention and control measures. for k The active power of line c after the cascading fault occurs, P c,n is the rated active power of line c, L ol It is a collection of power flow crossing lines; L a For preset N-1 Fault line collection; is a variable, taking the value 0 or 1; q c is the failure consequence of line c; are active load shedding, is the DC power active adjustment amount, Active adjustment of generator output. is the active load shedding cost coefficient, Actively adjust the cost coefficient for DC power, Automatically adjust the cost factor for generator output.

2. The method for identifying the evolutionary pattern of cascading failures taking into account the influence of prevention and control measures according to claim 1 is characterized in that: The steady-state safety constraints include: Line flow constraints, load rate constraints of out-of-limit lines, upper and lower limit constraints of generator output, generator output climbing constraints, DC transmission power constraints, load node shedding constraints, total load shedding constraints, power balance constraints and N-1 fault consequence constraints of faulty lines.

3. The method for identifying the evolutionary pattern of cascading failures taking into account the influence of prevention and control measures according to claim 1 is characterized in that: The screening process of the high probability cascading failures is specifically as follows: According to the grid operation status information, the initial fault is determined and a fault set is formed; Based on the prevention and control measures, the power supply system is optimized for power flow, and the failure probability of each line in the fault concentration is calculated; Select the lines with higher fault probability as the lower-level fault lines to form a new fault set, and repeat the previous step until a preset number of high-probability fault lines are obtained to form a high-probability cascading fault set.

4. The method for identifying the evolutionary pattern of cascading failures taking into account the influence of prevention and control measures according to claim 3 is characterized in that: The screening process of the high probability cascading failures also includes calculating the prevention and control cost corresponding to the current prevention and control measures after the power flow optimization, specifically: In the formula, k Indicates the fault level, , and They represent the load shedding prevention and control cost coefficient, the DC power adjustment prevention and control cost coefficient, and the generator processing adjustment prevention and control cost coefficient, respectively. , and They represent the total amount of load shedding, total DC power loss and total amount of generator shedding caused by prevention and control measures respectively.

5. The method for identifying the evolutionary pattern of cascading failures taking into account the influence of prevention and control measures according to claim 3 is characterized in that: The calculation of the risk value is specifically as follows: express k The probability of cascading failures, express K The probability of cascading failures, K is the number of complete cascading failures, and They represent the costs of prevention and control measures and the passive losses caused by cascading failures respectively.

6. The method for identifying the evolutionary pattern of cascading failures taking into account the influence of prevention and control measures according to claim 1 is characterized in that: The specific process of taking the high-risk cascading failure set as a sequence and identifying the key evolution pattern in the sequence through pattern mining based on prefix projection is as follows: For the high-risk cascading failure set, obtain all prefixes with a length of 1 and calculate the weighted support; Get the frequent item whose weighted support is higher than the preset threshold and whose length is 1, and use the frequent item as the initial prefix; Calculate the weighted support of the projection database and each item corresponding to the current prefix, and add the single item with weighted support higher than the threshold to the current prefix to form a new prefix; Repeat the previous step until the projection database is empty or the weighted support of each item in the projection database is lower than the preset threshold, then the current prefix corresponds to the key evolution pattern set.

7. The method for identifying the evolutionary pattern of cascading failures taking into account the influence of prevention and control measures according to claim 1 is characterized in that: The method further comprises the steps of: For the key evolution patterns, calculate the effectiveness of the corresponding prevention and control measures.

8. A cascading failure evolution pattern identification system considering the impact of prevention and control measures, characterized by: The system comprises: The fault prevention and control calculation unit is used to obtain the grid operation status information and obtain the post-fault prevention and control measures based on the preset planning model; A cascading failure analysis unit, taking into account the prevention and control measures, screens out high-probability cascading failures caused by the current failure, and calculates the risk value of the high-probability cascading failures to obtain a high-risk cascading failure set; A fault evolution pattern recognition unit, used for taking the high-risk cascading fault set as a sequence, and identifying a key evolution pattern in the sequence based on pattern mining of prefix projection; The construction of the planning model is specifically as follows: Taking the minimum over-limit degree of line load, the minimum consequence of failure and the lowest cost of prevention and control measures as the objective function of prevention and control measures, the planning model is formed by considering the steady-state safety constraints; The objective function of the prevention and control measures is specifically: , in, , , , In the formula, , and They represent the degree of overload of the line, the consequences of the failure, and the cost of the prevention and control measures. for k The active power of line c after the cascading fault occurs, P c,n is the rated active power of line c, L ol It is a collection of power flow crossing lines; L a For preset N-1 Fault line collection; is a variable, taking the value 0 or 1; q c is the failure consequence of line c; are active load shedding, is the DC power active adjustment amount, Active adjustment of generator output. is the active load shedding cost coefficient, Actively adjust the cost coefficient for DC power, Automatically adjust the cost factor for generator output.

Citation Information

Patent Citations

  • Electric power information physical system cascading failure prediction method based on risk meta-theory