Pipe water blowing pressure testing device with multi-station synchronous position change function

By introducing a staggered transposition mechanism and a flexible ring joint into the pipe water blowing pressure test device, combined with a stop mechanism and a one-way throttle valve, the problems of position offset and poor flexibility of the existing device are solved, achieving high efficiency and flexibility. Pipe water blowing and pressure testing operations.

CN115258551BActive Publication Date: 2024-10-11MOON ENVIRONMENT TECH CO LTD +4
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210861209.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-22
Publication Date
2024-10-11
Estimated Expiration
2042-07-22

AI Technical Summary

Technical Problem

The existing water blowing pressure test device is prone to position deviation and cumulative errors during long-term use, and does not have the ability to flexibly adjust pipes of different lengths, resulting in cumbersome operation and poor flexibility.

Method used

A pipe water blowing and pressure testing device with multi-station synchronous transposition function is designed. It adopts a staggered transposition mechanism and a flexible ring joint, combined with a stop mechanism and a one-way throttle valve, to realize the pipe flow between different stations. Precise movement and sealing, adaptable to different lengths of pipe.

Benefits of technology

It effectively reduces the position error of the pipe between work stations, avoids position deviation under the influence of joints, improves the efficiency and flexibility of water blowing and pressure testing, and ensures the sealing and pressure testing effects of the pipe.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115258551B_ABST
    Figure CN115258551B_ABST
Patent Text Reader

Abstract

The present invention discloses a pipe water blowing pressure testing device with a multi-station synchronous transposition function, comprising a frame, the frame is provided with a plurality of water blowing stations and at least one pressure testing station arranged in sequence along the left and right directions, the frame is also provided with a staggered transposition mechanism, a first platform and a second platform located in front of the first platform, the first platform and the second platform are both provided with joints, and the joints are provided with expandable flexible rings. The present invention can reduce the position error of the pipe moving between the stations, avoid the position deviation of the pipe affected by the joint, and also has the advantages of good sealing effect, high reliability, wide applicability, etc.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a pipe inspection device, in particular to a water blowing pressure test device for pipes. Background Art

[0002] After the cleaning process, heat exchange tubes and other pipes need to be blown dry by water to dry the residual water on the inner surface of the heat exchange tubes, and the performance of the pipes is tested by pressure testing. In order to improve efficiency, the water blowing and pressure testing process is generally carried out in a single-tube multi-station manner, that is, a single pipe is transferred between multiple stations through a conveying device, and each station performs water blowing or pressure testing operations respectively.

[0003] The existing water blowing pressure test device uses a grooved chain or synchronous belt to transport the pipe, and uses a stepper motor to control the displacement. Its defects are: during long-term operation, it is easy to produce cumulative errors, and there is an offset between the conveying position and the water blowing pressure test station, causing water blowing pressure test failure or waste. On the other hand, the current water blowing method is to directly insert the water blowing joint into the pipe, which can easily blow the round pipe and cause position deviation.

[0004] In addition, the existing water blowing pressure test devices are all for pipes of fixed length. Once the length of the pipe changes, the position of the joints and other components needs to be reinstalled and adjusted, which is cumbersome to operate and has poor flexibility. Summary of the invention

[0005] The present invention proposes a pipe water blowing pressure testing device with a multi-station synchronous position change function, the purposes of which are: (1) to reduce the position error of the pipe when it moves between stations; (2) to prevent the pipe from being affected by the joint and causing position deviation; and (3) to flexibly adjust according to the length of the pipe to adapt to the water blowing pressure testing of pipes of different lengths.

[0006] The technical solution of the present invention is as follows:

[0007] A pipe water blowing and pressure testing device with a multi-station synchronous shifting function comprises a frame, the frame is provided with a plurality of water blowing stations and at least one pressure testing station arranged in sequence along the left-right direction, the frame is also provided with a staggered shifting mechanism, a first platform and a second platform located in front of the first platform, the staggered shifting mechanism, the water blowing station and the pressure testing station are all located between the first platform and the second platform, and the staggered shifting mechanism is used to move the pipe workpiece in the left-right direction to pass through each station in sequence;

[0008] The first platform and the second platform are respectively mounted on the frame by means of sliding cooperation, and the frame is also equipped with a first moving driving mechanism for driving the first platform to move in the front-rear direction and a second moving driving mechanism for driving the second platform to move in the front-rear direction;

[0009] The first platform is provided with a water tank corresponding to the position of the water blowing station, and an alignment baffle is installed at the rear end of the water tank, and the alignment baffle can move forward and backward relative to the first platform; the first platform is also provided with a joint corresponding to the pressure test station, and the joint is connected to the air pressure pump;

[0010] The second platform is provided with joints corresponding to the water blowing station and the pressure testing station respectively, and the joints are connected to the air pressure pump;

[0011] An expandable flexible ring is provided on the outer circumferential surface of the joint, and the flexible ring is used to contact the inner hole of the pipe workpiece, fix the pipe workpiece and the joint together and realize the sealing of the end of the pipe workpiece.

[0012] As a further improvement of the pipe water blowing and pressure testing device with multi-station synchronous shifting function: the staggered shifting mechanism includes a serrated support plate and a serrated lifting plate; the serrated support plate is fixedly mounted on the frame, and a plurality of V-grooves corresponding to the positions of the water blowing station and the pressure testing station are provided on the top; the serrated lifting plate is mounted on the frame through a lifting drive mechanism, and the top of the serrated lifting plate is provided with inclined serrations arranged in a stepped manner, and the top surface of each inclined serration corresponds one-to-one to the position of each V-groove of the serrated support plate, and the inclination direction of the inclined serrations is gradually reduced along the moving direction of the pipe workpiece.

[0013] As a further improvement of the pipe water blowing pressure testing device with multi-station synchronous position change function: the frame is also provided with a lifting mechanism located on the rear side of the second platform, and the top of the lifting mechanism is provided with a plurality of V-shaped grooves corresponding to the positions of the water blowing stations.

[0014] As a further improvement of the pipe water blowing and pressure testing device with multi-station synchronous position change function: an auxiliary support frame located between the first platform and the second platform is also installed on the frame, and the top of the auxiliary support frame is provided with a plurality of V-shaped grooves corresponding to the positions of the water blowing station and the pressure testing station.

[0015] As a further improvement of the pipe water blowing pressure testing device with multi-station synchronous position change function: the frame is also equipped with air grippers corresponding to the position of the pressure testing station, and the air grippers are used to clamp the pipe workpiece located at the pressure testing station.

[0016] As a further improvement of the pipe water blowing pressure testing device with multi-station synchronous position change function: the joint includes an annular mounting seat, and also includes a telescopic tube passing through the inner hole of the mounting seat, the outer end of the telescopic tube is connected to the air pressure pump through a flexible gas pipeline, and the inner end is provided with a pressure ring, and the flexible ring is located between the pressure ring and the mounting seat; the joint also includes a locking cylinder for driving the telescopic tube to move forward and backward relative to the mounting seat.

[0017] As a further improvement of the pipe water blowing pressure testing device with multi-station synchronous shifting function: the inner end of the telescopic tube is also connected to a guide cap located on the inner side of the pressure ring, a distance is left between the guide cap and the pressure ring, and the air outlet of the telescopic tube is arranged between the guide cap and the pressure ring; a spiral guide groove is provided at the end of the guide cap close to the pressure ring.

[0018] As a further improvement of the pipe water blowing pressure testing device with multi-station synchronous position change function: the second platform is also connected to the frame through a stop mechanism;

[0019] The stopping mechanism comprises a stopping rod and a positioning rack;

[0020] The positioning rack is fixedly mounted on the frame; the upper end of the stop rod is rotatably connected to the second platform, and the lower end is used to cooperate with the stop groove obliquely arranged on the positioning rack;

[0021] The stopping mechanism also includes an airbag and a return spring, or also includes a one-way cylinder; when the stopping mechanism includes the airbag and the return spring, the airbag is arranged between the stop rod and the second platform base, and the airbag is connected to the gas pipeline connected to the joint of the pressure test station. When compressed gas is passed into the joint of the pressure test station, the airbag expands and pushes the stop rod so that its lower end is stuck in the stop groove, and the return spring is used to drive the lower end of the stop rod to leave the stop groove; when the stopping mechanism includes the one-way cylinder, one end of the one-way cylinder is rotatably connected to the stop rod and the other end is rotatably connected to the second platform, and the air inlet of the one-way cylinder is connected to the gas pipeline connected to the joint of the pressure test station. When compressed gas is passed into the joint of the pressure test station, the one-way cylinder extends and causes the lower end of the stop rod to be stuck in the stop groove, and the spring inside the one-way cylinder is used to drive the one-way cylinder to contract so that the lower end of the stop rod leaves the stop groove.

[0022] As a further improvement of the pipe water blowing pressure test device with multi-station synchronous position change function: the air outlet of the air pressure pump is connected to one end of the first gas pipeline, the other end of the first gas pipeline is connected to the air bag or the one-way cylinder through the second gas pipeline, and the other end is also connected to the joint of the pressure test station through the third gas pipeline;

[0023] The first gas pipeline is provided with a control valve;

[0024] A first one-way throttle valve is provided on the second gas pipeline. When the compressed gas flows along the second gas pipeline to the air bag or the one-way cylinder, the one-way valve inside the first one-way throttle valve opens. When the compressed gas flows back from the air bag or the one-way cylinder along the second gas pipeline to release pressure, the one-way valve inside the first one-way throttle valve closes.

[0025] A second one-way throttle valve is provided on the third gas pipeline. When the compressed gas flows along the third gas pipeline to the joint, the one-way valve inside the second one-way throttle valve is closed. When the compressed gas flows back from the joint along the third gas pipeline to release pressure, the one-way valve inside the second one-way throttle valve is opened.

[0026] As a further improvement of the pipe water blowing pressure testing device with multi-station synchronous shifting function: a loading buffer mechanism is provided at the loading end of the frame; the loading buffer mechanism includes a plurality of step baffles installed on the frame along the front-back direction, the step baffles are provided with buffer grooves for placing pipe workpieces, and the top of the step baffles is inclined toward the water blowing station; the loading buffer mechanism also includes a first lifting inclined block installed on the frame, the position of the first lifting inclined block corresponds to the position of the buffer groove, and the top inclination direction is the same as the inclination direction of the top of the step baffle, which is used to lift the buffered pipe workpiece and send the pipe workpiece to the water blowing station closest to the loading buffer mechanism;

[0027] A discharging screening mechanism is provided at the unloading end of the frame; the discharging screening mechanism includes a second lifting inclined block installed on the frame, when the pipe workpiece on the pressure test station closest to the discharging screening mechanism passes the pressure test, the second lifting inclined block is in a high position or a low position, when the pipe workpiece on the pressure test station closest to the discharging screening mechanism fails the pressure test, the second lifting inclined block is in a low position or a high position.

[0028] Compared with the prior art, the present invention has the following beneficial effects: (1) The present invention completes the position conversion of the pipe fitting by means of an interlaced position change mechanism. After each movement, the pipe fitting is located in the V-shaped groove, thereby reducing the position error of the pipe when moving between the positions; (2) The flexible ring on the joint can not only position the pipe fitting to prevent the pipe from being affected by the joint and causing position deviation, but also play a sealing role to improve the water blowing and pressure test effects; (3) The spiral groove at the inner end of the joint can play a guiding role, guiding the compressed air to rush to the dead angle between the flexible ring and the inner wall of the pipe fitting first, thereby ensuring that the water blowing is thorough; (4) The stop mechanism can fix the position of the second platform during the pressure test operation to prevent the platform from moving under the action of air pressure; (5) The present invention also controls the sequence of the joint and the stop mechanism by means of two sets of one-way throttle valves to ensure that the stop mechanism is in a stopped state when the internal pressure of the pipe fitting is high; (6) The first platform can move over a wide range and can be flexibly adjusted according to the length of the pipe to adapt to the water blowing and pressure test of pipes of different lengths. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 is a three-dimensional diagram of the device;

[0030] Figure 2 for Figure 1 A partial enlarged view of part A;

[0031] Figure 3 for Figure 1 A partial enlarged view of part B;

[0032] Figure 4 is a side view of the device;

[0033] Figure 5 for Figure 4 AA section view;

[0034] Figure 6 FIG. 1 is a schematic diagram of the action process of the staggered transposition mechanism, in which the staggered transposition mechanism is in a state before transposition;

[0035] Figure 7 The second schematic diagram of the action process of the staggered transposition mechanism is shown in which the staggered transposition mechanism is in the transposition state;

[0036] Figure 8 The third schematic diagram of the action process of the staggered transposition mechanism is shown in the staggered transposition mechanism after transposition;

[0037] Fig. 9 It is a three-dimensional schematic diagram of the joint and the end of the pipe workpiece;

[0038] Fig.10 One of the schematic diagrams of the connection between the joint and the end of the pipe workpiece, in which the joint has not yet been inserted into the pipe workpiece;

[0039] Fig.11 The second schematic diagram of the connection between the joint and the end of the pipe workpiece, in which the joint has been inserted into the pipe workpiece but not locked;

[0040] Fig.12 The third schematic diagram of the connection between the joint and the end of the pipe workpiece, in which the joint has been inserted into the pipe workpiece and locked;

[0041] Fig.13 This is a schematic diagram of the structure of the stop mechanism in the first embodiment, in which the airbag is in an expanded state;

[0042] Fig.14 Schematic diagram of the structure of the stop mechanism in the first embodiment, in which the airbag is in a contracted state;

[0043] Fig.15 This is a schematic diagram of the structure of the stop mechanism in the second embodiment, in which the one-way cylinder is in a contracted state;

[0044] Fig.16 It is a schematic diagram of the connection relationship between the first gas pipeline, the second gas pipeline, the third gas pipeline, the joint of the pressure test station and the one-way cylinder in the second embodiment.

[0045] In the figure:

[0046] 1. Frame; 2. First platform; 3. Auxiliary support frame; 4. Second platform; 5. Air claw; 6. Staggered displacement mechanism; 7. Water tank; 8. Alignment baffle; 9. Lifting mechanism; 10. Discharging screening mechanism; 11. Loading buffer mechanism; 12. Stop rod; 13. Air bag; 14. Positioning rack; 15. Reset spring; 16. One-way cylinder; 17. First one-way throttle valve; 18. Second one-way throttle valve; 6-1. Serrated support plate; 6-2. Serrated lifting plate; 11-1. Step baffle; 11-2. First lifting inclined block; 100. Joint; 100-1. Mounting seat; 100-2. Telescopic tube; 100-3. Flexible ring; 100-4. Pressure ring; 100-5. Guide cap. DETAILED DESCRIPTION

[0047] The technical solution of the present invention is described in detail below with reference to the accompanying drawings: Embodiment 1

[0048] like Figures 1 to 4 A pipe water blowing and pressure testing device with a multi-station synchronous position-changing function comprises a frame 1, on which a plurality of water blowing stations and at least one pressure testing station are arranged in sequence along the left-right direction.

[0049] The frame 1 is also provided with a staggered position-changing mechanism 6, a first platform 2 and a second platform 4 located in front of the first platform 2. The staggered position-changing mechanism 6, the water blowing station and the pressure testing station are all located between the first platform 2 and the second platform 4. The staggered position-changing mechanism 6 is used to move the pipe workpiece (or "pipe fitting") in the left and right directions through each water blowing station and the pressure testing station in sequence.

[0050] Specifically, Figure 5 The staggered position-changing mechanism 6 includes a sawtooth support plate 6-1 and a sawtooth lifting plate 6-2. The sawtooth support plate 6-1 is fixedly mounted on the frame 1, and a plurality of V-shaped grooves corresponding to the positions of the water blowing station and the pressure test station are arranged on the top. The sawtooth lifting plate 6-2 is mounted on the frame 1 through a lifting drive mechanism, and a stepped inclined sawtooth is arranged on the top of the sawtooth lifting plate 6-2, and the top surface of each inclined sawtooth corresponds to the position of each V-shaped groove of the sawtooth support plate 6-1, and the inclined direction of the inclined sawtooth is gradually reduced along the moving direction of the pipe workpiece.

[0051] like Figures 6 to 8 When it is necessary to change positions, the sawtooth lifting plate 6-2 is first raised, and the pipe workpiece is lifted from the V-shaped groove by the top surface of the inclined sawtooth, and then all the pipe workpieces will roll along the inclined sawtooth to the V-shaped groove of the next station, and the workpieces in the last station will roll to the discharge screening mechanism 10 at the unloading end of the frame 1. Then the sawtooth lifting plate 6-2 falls, and the workpieces of all stations fall into the V-shaped groove of the next station, thereby completing the station change.

[0052] Furthermore, a loading buffer mechanism 11 is provided at the loading end of the frame 1. The loading buffer mechanism 11 includes a plurality of stepped baffles 11-1 installed on the frame 1 along the front-to-back direction, and a buffer slot for placing the pipe workpiece is provided on the stepped baffle 11-1, and the top of the stepped baffle 11-1 is inclined toward the water blowing station. The loading buffer mechanism 11 also includes a first lifting inclined block 11-2 installed on the frame 1, the position of the first lifting inclined block 11-2 corresponds to the position of the buffer slot, and the top inclination direction is the same as the inclination direction of the top of the stepped baffle 11-1, which is used to lift the buffered pipe workpiece and send the pipe workpiece to the V-shaped groove on the serrated support plate 6-1 on the water blowing station closest to the loading buffer mechanism 11.

[0053] Furthermore, the discharging screening mechanism 10 includes a second lifting inclined block installed on the frame 1. When the pipe workpiece on the pressure test station closest to the discharging screening mechanism 10 passes the pressure test, the second lifting inclined block is in a high position or a low position. When the pipe workpiece on the pressure test station closest to the discharging screening mechanism 10 fails the pressure test, the second lifting inclined block is in a low position or a high position. By controlling the position of the second lifting inclined block, the discharging pipe workpiece can be directed to different positions to complete the screening of the workpiece.

[0054] Further, such as Figures 1 to 4 The first platform 2 and the second platform 4 are respectively mounted on the frame 1 by sliding cooperation. The frame 1 is also equipped with a first moving drive mechanism for driving the first platform 2 to move along the front-rear direction and a second moving drive mechanism for driving the second platform 4 to move along the front-rear direction.

[0055] The first moving driving mechanism is a gear rack mechanism, which can drive the first platform 2 to move over a wide range, and can not only complete the action of inserting the connector 100 by moving the second platform 4, but also adjust its initial working position according to the length of the pipe workpiece. The first moving driving mechanism can also be a combination of a gear rack mechanism and a cylinder, the gear rack mechanism is used to adjust the initial position, and the cylinder is used to push the connector 100 into the pipe.

[0056] The second moving driving mechanism is a cylinder, which is mainly used to drive the second platform 4 to move in a small range to complete the insertion action of the connector 100.

[0057] The frame 1 is also provided with a lifting mechanism 9 located at the rear side of the second platform 4, and the top of the lifting mechanism 9 is provided with a plurality of V-shaped grooves corresponding to the positions of the water blowing stations.

[0058] An auxiliary support frame 3 located between the first platform 2 and the second platform 4 is also installed on the frame 1. The top of the auxiliary support frame 3 is provided with a plurality of V-shaped grooves corresponding to the positions of the water blowing station and the pressure testing station.

[0059] like Figure 2 The first platform 2 is provided with a water tank 7 corresponding to the position of the water blowing station, and an alignment baffle 8 is installed at the rear end of the water tank 7. The alignment baffle 8 can move forward and backward relative to the first platform 2 under the action of the cylinder. The first platform 2 is also provided with a joint 100 corresponding to the pressure test station, and the joint 100 is connected to the air pressure pump.

[0060] The second platform 4 is provided with joints 100 corresponding to the water blowing station and the pressure testing station respectively, and the joints 100 are connected to the air pressure pump.

[0061] like Fig. 9 and 10 The joint 100 should be able to be inserted into the inner hole of the end of the pipe workpiece to blow compressed air into it, and at the same time, it should be able to ensure the relative position between the joint 100 and the workpiece to prevent the pipe from moving after being stressed, resulting in failure of water blowing or pressure test.

[0062] In the present invention, an expandable flexible ring 100-3 is provided on the outer circumferential surface of the joint 100. The flexible ring 100-3 is a rubber ring used to contact the inner hole of the pipe workpiece, fix the pipe workpiece and the joint 100 together and seal the end of the pipe workpiece.

[0063] Specifically: the joint 100 includes an annular mounting seat 100-1, and also includes a telescopic tube 100-2 passing through the inner hole of the mounting seat 100-1. The outer end of the telescopic tube 100-2 is connected to the air pump through a flexible gas pipeline, and the inner end is provided with a pressure ring 100-4. The flexible ring 100-3 is located between the pressure ring 100-4 and the mounting seat 100-1; the joint 100 also includes a locking cylinder for driving the telescopic tube 100-2 to move forward and backward relative to the mounting seat 100-1. The locking cylinder is connected to the telescopic tube through a pin shaft, driving the telescopic tube to move in the mounting seat.

[0064] like Fig.11 When the joint 100 is just inserted into the end of the workpiece, the flexible ring 100-3 is in a free state, and its outer surface does not contact the inner hole of the pipe. Fig.12 The telescopic tube 100-2 moves toward the outer end under the action of the locking cylinder (not shown in the figure), and the pressure ring 100-4 squeezes the flexible ring 100-3, so that the outer cylindrical surface of the flexible ring 100-3 expands and is in close contact with the inner hole of the workpiece, which not only completes the positioning of the end of the pipe fitting, but also realizes the sealing of the end of the pipe workpiece.

[0065] Further, such as Figures 9 to 12, for the joint 100 of the water blowing station (but not limited to), the inner end of the telescopic tube 100-2 is also connected to a guide cap 100-5 located on the inner side of the pressure ring 100-4, and a gap is left between the guide cap 100-5 and the pressure ring 100-4, and the air outlet of the telescopic tube 100-2 is arranged between the guide cap 100-5 and the pressure ring 100-4. The guide cap 100-5 is provided with a spiral guide groove at one end close to the pressure ring 100-4. After the compressed gas is output from between the guide cap 100-5 and the pressure ring 100-4, it flows along the guide groove to the dead angle formed by the contact between the flexible ring 100-3 and the inner hole of the pipe fitting, and then flows to the inner cavity of the pipe fitting, so as to avoid the residual water accumulating at the end of the pipe fitting and being unable to be discharged.

[0066] The frame 1 is also provided with an air gripper 5 corresponding to the pressure test station. The air gripper 5 is used to clamp the pipe workpiece located at the pressure test station.

[0067] A pressure gauge is also provided on the gas pipeline connected to the joint 100 of the pressure test station for detecting the pressure value inside the pipe fitting and judging whether the pressure test requirement can be met according to the pressure value.

[0068] The second platform 4 is also connected to the frame 1 via a stop mechanism. The stop mechanism is used to prevent the first platform 2 or the second platform 4 from moving due to a large reaction force during the pressure test, which may cause the joint 100 to separate from the pipe workpiece.

[0069] like Fig.13 and 14 In this embodiment, the stop mechanism includes a stop rod 12 and a positioning rack 14. The positioning rack 14 is fixedly mounted on the frame 1; the upper end of the stop rod 12 is rotatably connected to the second platform 4, and the lower end is used to cooperate with the stop groove obliquely arranged on the positioning rack 14.

[0070] The stop mechanism further includes an airbag 13 and a return spring 15. The airbag 13 is disposed between the stop rod 12 and the base of the second platform 4, and is connected to a gas pipeline connected to the joint 100 of the pressure test station. When compressed gas is introduced into the joint 100 of the pressure test station, the airbag 13 expands and pushes the stop rod 12 to make its lower end snap into the stop groove, and the return spring 15 is used to drive the lower end of the stop rod 12 to leave the stop groove.

[0071] During operation, the pipe fittings first arrive at the loading buffer mechanism 11, and then the loading buffer mechanism 11, the staggered position change mechanism 6 and the discharging screening mechanism 10 act synchronously, and simultaneously complete the single-piece loading, the movement from the water blowing station to the pressure test station and the single-piece screening and discharging. After being in place, the alignment baffle 8 moves forward first to align the pipe fittings at the water blowing station, and then the lifting mechanism 9 lifts the front end of the pipe fittings to make it in an inclined state, so that the residual water inside can flow into the water tank 7, and at the same time the air claw acts to clamp the pipe fittings at the pressure test station. Then the first platform 2 and the second platform 4 move closer to each other, and the joint 100 at the water blowing station is inserted into the inner hole of the pipe fitting from the front end of the pipe fitting, and the joint 100 at the pressure test station is inserted into the pipe fitting from both ends at the same time. Afterwards, the telescopic tube 100-2 of each joint 100 moves outward under the action of the locking cylinder, the flexible ring 100-3 expands and fixes the pipe fitting, and then the alignment baffle 8 returns to its position. Next, all joints 100 begin to pass compressed gas, and the residual water inside the pipe fittings at the water blowing station is blown into the water tank 7 by the gas, while the inside of the pipe fittings at the pressure test station is filled with high-pressure gas. It should be noted that while the compressed gas is passed into the pressure test station, the airbag 13 also expands rapidly under the action of the compressed gas, pushing the stop rod 12 so that its lower end is embedded in the stop groove to prevent the first platform 2 from retreating under the action of the gas. After the water blowing and pressure test operations are completed, the compressed gas is disconnected, the compressed gas refluxes and is released, and at the same time the airbag 13 shrinks, and the stop rod 12 leaves the stop groove under the action of the reset spring 15. Then the telescopic tube 100-2 of each joint 100 moves to the inner end, the flexible ring 100-3 leaves the inner hole of the pipe fitting, and the pipe fitting is released, and then the air claw opens, the lifting mechanism 9 is reset, the first platform 2 and the second platform 4 are reset, and each pipe fitting is moved to the next station respectively under the action of the interlaced position change mechanism. Generally, a single pipe fitting needs to pass through more than 5 water blowing stations and more than 2 pressure testing stations in sequence. Embodiment 2

[0072] like Fig.15 In the stop mechanism of this embodiment, a one-way cylinder 16 with a spring inside is used to replace the airbag 13 and the return spring 15 in the first embodiment. One end of the one-way cylinder 16 is rotatably connected to the stop rod 12, and the other end is rotatably connected to the second platform 4. The air inlet of the one-way cylinder 16 is connected to the gas pipeline connected to the joint 100 of the pressure test station.

[0073] The function of the one-way cylinder 16 is the same as that of the airbag 13: when compressed gas is introduced into the joint 100 of the pressure test station, the one-way cylinder 16 extends to make the lower end of the stop rod 12 fit into the stop groove, and the spring inside the one-way cylinder 16 is used to drive the one-way cylinder 16 to contract so that the lower end of the stop rod 12 leaves the stop groove.

[0074] Further, such as Fig.16The gas outlet of the air pressure pump is connected to one end of the first gas pipeline, the other end of the first gas pipeline is connected to the one-way cylinder 16 through the second gas pipeline, and the other end is also connected to the joint 100 of the pressure test station through the third gas pipeline. A control valve is provided on the first gas pipeline, and the control valve is used to control the introduction of compressed gas or the release of gas in the pipe.

[0075] The second gas pipeline is provided with a first one-way throttle valve 17. When the compressed gas flows along the second gas pipeline to the one-way cylinder 16, the one-way valve inside the first one-way throttle valve 17 opens. When the compressed gas flows back from the one-way cylinder 16 along the second gas pipeline to release pressure, the one-way valve inside the first one-way throttle valve 17 closes.

[0076] A second one-way throttle valve 18 is provided on the third gas pipeline. When the compressed gas flows along the third gas pipeline to the connector 100, the one-way valve inside the second one-way throttle valve 18 is closed. When the compressed gas flows back from the connector 100 along the third gas pipeline to release pressure, the one-way valve inside the second one-way throttle valve 18 is opened.

[0077] After adding a one-way throttle valve: when the pressure test begins, the one-way valve inside the first one-way throttle valve 17 is directly opened, and the compressed gas on the third gas pipeline can only reach the connector 100 through the throttle valve of the second one-way throttle valve 18, so the stop rod 12 will be stuck in the stop groove before the pressure in the pipe increases significantly. Similarly, after the pressure test is completed, the gas in the connector 100 will push open the one-way valve of the second one-way throttle valve 18 and release quickly, so that the pressure inside the pipe is quickly reduced, and the compressed gas in the one-way cylinder 16 can only be released through the throttle valve inside the first one-way throttle valve 17. When the stop rod 12 leaves the stop groove, the pipe has completed pressure relief. Therefore, this device can ensure that the stop rod 12 is always stuck in the stop groove when the pressure in the pipe is high, thereby improving the reliability of the stop mechanism.

[0078] Obviously, the one-way throttle valve mentioned above can also be applied to the first embodiment, which will not be described in detail here.

[0079] The stopping mechanism can also be simultaneously applied on one side of the first platform.

Claims

1. A pipe water blowing and pressure testing device with a multi-station synchronous position-changing function, comprising a frame (1), wherein the frame (1) is provided with a plurality of water blowing stations and at least one pressure testing station sequentially arranged in a left-right direction, and characterized in that: The frame (1) is also provided with a staggered position-changing mechanism (6), a first platform (2) and a second platform (4) located in front of the first platform (2); the staggered position-changing mechanism (6), the water blowing station and the pressure testing station are all located between the first platform (2) and the second platform (4); the staggered position-changing mechanism (6) is used to move the pipe workpiece in the left-right direction to pass through each station in sequence; The first platform (2) and the second platform (4) are respectively mounted on the frame (1) by means of sliding fit, and the frame (1) is also mounted with a first moving drive mechanism for driving the first platform (2) to move in the front-rear direction and a second moving drive mechanism for driving the second platform (4) to move in the front-rear direction; The first platform (2) is provided with a water tank (7) corresponding to the position of the water blowing station, and an alignment baffle (8) is installed at the rear end of the water tank (7), and the alignment baffle (8) moves forward and backward relative to the first platform (2); the first platform (2) is also provided with a joint (100) corresponding to the pressure test station, and the joint (100) is connected to the air pressure pump; The second platform (4) is provided with joints (100) corresponding to the water blowing station and the pressure testing station respectively, and the joints (100) are connected to the air pressure pump; An inflatable flexible ring (100-3) is provided on the outer circumferential surface of the joint (100), and the flexible ring (100-3) is used to contact the inner hole of the pipe workpiece, fix the pipe workpiece and the joint (100) together, and seal the end of the pipe workpiece; The joint (100) comprises an annular mounting seat (100-1), and also comprises a telescopic tube (100-2) passing through the inner hole of the mounting seat (100-1); the outer end of the telescopic tube (100-2) is connected to the air pressure pump via a flexible gas pipeline, and the inner end is provided with a pressure ring (100-4); the flexible ring (100-3) is located between the pressure ring (100-4) and the mounting seat (100-1); the joint (100) also comprises a locking cylinder for driving the telescopic tube (100-2) to move forward and backward relative to the mounting seat (100-1); The inner end of the telescopic tube (100-2) is also connected to a flow guide cap (100-5) located inside the pressure ring (100-4); a distance is left between the flow guide cap (100-5) and the pressure ring (100-4); an air outlet of the telescopic tube (100-2) is arranged between the flow guide cap (100-5) and the pressure ring (100-4); a spiral flow guide groove is provided at one end of the flow guide cap (100-5) close to the pressure ring (100-4); The second platform (4) is also connected to the frame (1) via a stop mechanism; The stopping mechanism comprises a stopping rod (12) and a positioning rack (14); The positioning rack (14) is fixedly mounted on the frame (1); the upper end of the stop rod (12) is rotatably connected to the second platform (4), and the lower end is used to cooperate with a stop groove obliquely arranged on the positioning rack (14); The stop mechanism further comprises an airbag (13) and a return spring (15); the airbag (13) is arranged between the stop rod (12) and the base of the second platform (4); the airbag (13) is connected to a gas pipeline connected to a joint (100) of the pressure test station; when compressed gas is passed through the joint (100) of the pressure test station, the airbag (13) expands and pushes the stop rod (12) so that its lower end is stuck in the stop groove; the return spring (15) is used to drive the lower end of the stop rod (12) to leave the stop groove; Alternatively, the stop mechanism further comprises a one-way cylinder (16), one end of the one-way cylinder (16) being rotatably connected to the stop rod (12) and the other end being rotatably connected to the second platform (4); an air inlet of the one-way cylinder (16) being connected to a gas pipeline connected to a joint (100) of the pressure test station; when compressed gas is introduced into the joint (100) of the pressure test station, the one-way cylinder (16) is extended to cause the lower end of the stop rod (12) to be inserted into the stop groove; a spring inside the one-way cylinder (16) is used to drive the one-way cylinder (16) to contract so that the lower end of the stop rod (12) leaves the stop groove; The gas outlet of the air pressure pump is connected to one end of a first gas pipeline, the other end of the first gas pipeline is connected to the air bag (13) or the one-way cylinder (16) through a second gas pipeline, and the other end is also connected to a joint (100) of a pressure test station through a third gas pipeline; The first gas pipeline is provided with a control valve; A first one-way throttle valve (17) is provided on the second gas pipeline. When the compressed gas flows along the second gas pipeline to the air bag (13) or the one-way cylinder (16), the one-way valve inside the first one-way throttle valve (17) opens. When the compressed gas flows back from the air bag (13) or the one-way cylinder (16) along the second gas pipeline to release pressure, the one-way valve inside the first one-way throttle valve (17) closes. A second one-way throttle valve (18) is provided on the third gas pipeline. When the compressed gas flows along the third gas pipeline to the joint (100), the one-way valve inside the second one-way throttle valve (18) is closed. When the compressed gas flows back from the joint (100) along the third gas pipeline to release pressure, the one-way valve inside the second one-way throttle valve (18) is opened.

2. The pipe water blowing pressure testing device with multi-station synchronous position switching function as claimed in claim 1, characterized in that: The staggered position-changing mechanism (6) comprises a sawtooth support plate (6-1) and a sawtooth lifting plate (6-2); the sawtooth support plate (6-1) is fixedly mounted on the frame (1), and is provided with a plurality of V-shaped grooves corresponding to the positions of the water blowing station and the pressure testing station on the top; the sawtooth lifting plate (6-2) is mounted on the frame (1) via a lifting drive mechanism, and is provided with stepped inclined saw teeth on the top of the sawtooth lifting plate (6-2), the top surface of each inclined saw tooth corresponding to the position of each V-shaped groove of the sawtooth support plate (6-1), and the inclined direction of the inclined saw teeth is gradually lowered along the moving direction of the pipe workpiece.

3. The pipe water blowing pressure testing device with multi-station synchronous position switching function as claimed in claim 1, characterized in that: The frame (1) is also provided with a lifting mechanism (9) located at the rear side of the second platform (4), and the top of the lifting mechanism (9) is provided with a plurality of V-shaped grooves corresponding to the positions of the water blowing stations.

4. The pipe water blowing pressure testing device with multi-station synchronous position switching function as claimed in claim 1, characterized in that: An auxiliary support frame (3) located between the first platform (2) and the second platform (4) is also installed on the frame (1), and a plurality of V-shaped grooves corresponding to the positions of the water blowing station and the pressure testing station are provided on the top of the auxiliary support frame (3).

5. The pipe water blowing pressure testing device with multi-station synchronous position switching function as claimed in claim 1, characterized in that: The frame (1) is also provided with an air gripper (5) located opposite to the pressure test station, and the air gripper (5) is used to clamp the pipe workpiece located at the pressure test station.

6. The pipe water blowing pressure testing device with multi-station synchronous position switching function according to any one of claims 1 to 5, characterized in that: A loading buffer mechanism (11) is provided at the loading end of the frame (1); the loading buffer mechanism (11) comprises a plurality of stepped baffles (11-1) mounted on the frame (1) along the front-rear direction, the stepped baffles (11-1) being provided with buffer slots for placing pipe workpieces, the top of the stepped baffles (11-1) being inclined towards the water blowing station; the loading buffer mechanism (11) further comprises a first lifting inclined block (11-2) mounted on the frame (1), the position of the first lifting inclined block (11-2) corresponding to the position of the buffer slot, the top inclination direction being the same as the top inclination direction of the stepped baffles (11-1), and being used for lifting the buffered pipe workpieces and delivering the pipe workpieces to the water blowing station closest to the loading buffer mechanism (11); A discharge screening mechanism (10) is provided at the unloading end of the frame (1); the discharge screening mechanism (10) comprises a second lifting inclined block mounted on the frame (1); when the pipe workpiece at the pressure test station closest to the discharge screening mechanism (10) passes the pressure test, the second lifting inclined block is in a high position; when the pipe workpiece at the pressure test station closest to the discharge screening mechanism (10) fails the pressure test, the second lifting inclined block is in a low position.