A method for filling top coal goaf

By opening up filling tunnels above the coal seam mining area and setting up filling drilling holes, combined with coal column division, the problems of spontaneous combustion and gas treatment in comprehensive mechanized top-loading coal technology are solved, and the safe and green mining of thick coal seams are achieved, suitable for complex Coal seam mining under geological conditions.

CN115263412BActive Publication Date: 2024-12-03CHINA UNIV OF MINING & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210873273.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-22
Publication Date
2024-12-03
Estimated Expiration
2042-07-22

AI Technical Summary

Technical Problem

The existing comprehensive mechanized top-release coal technology has difficulties in spontaneous combustion and ignition and gas over-limit treatment, and cannot be used in combination with filling mining, especially in the conditions of constructs, railways, and water bodies. .

Method used

Open up straight and strong semicircular arch-shaped filling tunnels above the mining area, set up filling drilling holes and leave coal columns between the working surfaces, fill the goaf area with filling materials to ensure gas treatment and spontaneous combustion and fire prevention, while achieving filling mining and mechanization Combination of top coal.

Benefits of technology

It effectively solved the problems of gas over-limit control and spontaneous combustion and ignition, achieved green and safe mining of thick coal seams, and promoted the application of comprehensive mechanized top-release coal technology, which was suitable for coal seam mining under complex geological conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115263412B_ABST
    Figure CN115263412B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for filling a coal caving goaf area, comprising the following steps: (1) developing a filling tunnel above a coal seam in a mining area; (2) dividing the mining area into a plurality of comprehensive mechanized coal caving mining working faces, and leaving coal pillars between the working faces; (3) drilling filling boreholes from the inner side of the tunnel to the coal seam direction in the filling tunnel, with a borehole spacing of 200 m; (4) delivering filling materials to the filling tunnel in the mining area, and delivering them to the goaf area behind the coal caving working face through the filling boreholes, wherein the distance between the filling location and the coal caving working face is less than or equal to 100 m; (5) mining the coal caving working faces in sequence, and filling the goaf area; (6) constructing an isolation wall at the stop mining line when the distance between the filling location and the stop mining line is less than or equal to 100 m; and (7) repeating steps (4) to (6) until the goaf areas of all coal caving working faces in the entire mining area are filled, thereby better realizing the combined use of comprehensive mechanized coal caving technology and filling mining.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal mining, in particular to a method for filling a top coal caving goaf area with filling materials. Background Art

[0002] Coal has always been my country's basic energy source and important industrial raw material. Due to its reliability, price stability and clean utilization, it will occupy the main energy source position in my country for a long time in the future.

[0003] my country has large reserves of thick coal seams, which are mainly distributed in the northwest region. At present, the main mining methods for thick coal seams are stratified mining and comprehensive top coal caving. Compared with stratified mining, comprehensive mechanized top coal caving technology has the advantages of high yield, high efficiency, high block rate, low tunnel excavation rate, low cost, low investment, simple tunnel layout and system, high economic benefits and safety. However, in practice, it is also found that this method has serious spontaneous combustion and large absolute gas outflow at the working face, which makes it difficult to control gas over-limit and prevent spontaneous combustion in goafs. Moreover, the comprehensive mechanized top coal caving technology under existing buildings (structures), railways, and water bodies cannot be combined with backfill mining. Summary of the invention

[0004] In view of the above-mentioned technical deficiencies, the purpose of the present invention is to provide a method for filling a top coal caving goaf, which can ensure the safe control of excessive gas between the goaf of the upper working face and the lower working face and the prevention and extinguishing of spontaneous combustion in the goaf, and can better realize the combined use of comprehensive mechanized top coal caving technology and filling mining.

[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0006] The present invention provides a method for filling a top coal caving goaf, comprising the following steps:

[0007] (1) A backfill tunnel is developed above the coal seam in the mining area. The tunnel is located in the rock layer and has a short service life. The tunnel adopts a straight strong semi-circular arch type and anchor mesh spraying support. The anchor rod model is φ20×2400 threaded steel anchor rod, and the spacing is 800×800mm. The maintenance conditions are good, the maintenance cost is low, and the support cost is reduced.

[0008] (2) Divide the mining area into several comprehensive mechanized top coal caving mining working faces, leaving coal pillars between the working faces;

[0009] (3) In the filling tunnel of step (1), filling boreholes are drilled from the inside of the tunnel toward the coal seam, with a spacing of 200m between the boreholes. The depth and azimuth of the filling boreholes vary with the position of the top coal caving working face, and the inclination of the filling boreholes is determined by the horizontal distance between the working face and the filling tunnel. The number of rows of filling boreholes is equal to the number of top coal caving working faces, and one row of filling boreholes serves one comprehensive mechanized top coal caving working face;

[0010] (4) The filling material is delivered to the filling tunnel of the mining area and transported to the goaf behind the top coal caving working face through the filling borehole. The distance between the filling place and the top coal caving working face is less than or equal to 100m;

[0011] (5) mining and caving the top coal working face in sequence, and filling the goaf in the manner of step (4);

[0012] (6) When the distance between the filling point and the stop-mining line is less than or equal to 100 m, a separation wall is constructed at the stop-mining line and the goaf behind the separation wall is continued to be filled;

[0013] (7) Repeat steps (4) to (6) until all goafs of all top coal caving working faces in the entire mining area are filled.

[0014] Preferably, the filling tunnel in step (1) is arranged in the rock formation.

[0015] Preferably, in step (4), when filling the material, a filling pipeline is set in the filling tunnel for filling the goaf material.

[0016] Preferably, when filling the material in step (4), it is necessary to adjust the azimuth and depth of the filling borehole according to the advancement distance of the top coal caving working face.

[0017] Preferably, the filling tunnel in step (1) is excavated along the center line in the upper rock layer along the direction of the coal seam.

[0018] The beneficial effects of the present invention are:

[0019] The present invention can ensure the safe implementation of gas over-limit control and spontaneous combustion prevention and fire extinguishing work between the goaf of the upper working face and the lower working face by leaving coal pillars between the working faces. The present invention provides an upper filling tunnel with a simple and effective filling method, thereby achieving a perfect combination of comprehensive mechanized top coal caving mining and filling mining. The comprehensive mechanized top coal caving technology can be applied to thick coal seams under geological conditions of coal pressure under buildings (structures), railways and water bodies through the combination of filling, thereby achieving green and safe mining of thick coal seams. The invention has good popularization potential. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0021] Figure 1 Schematic diagram of the filling area division for the filling mining method of the fully mechanized top coal caving working face.

[0022] Figure 2 This is a schematic diagram of the filling mining plan of the fully mechanized top coal caving working face.

[0023] Figure 3 This is a schematic diagram of the filling mining profile of the fully mechanized top coal caving working face.

[0024] Figure 4 This is a schematic diagram of the drilling relationship between the filling tunnel and the filling position of the fully mechanized top coal caving working face.

[0025] Figure 5 This is the cross-section diagram of the filling tunnel support.

[0026] In the figure: 1-mining area tunnel; 2-mining area stop line; 3-mining area boundary; 4-comprehensive mechanized top coal caving working face; 5-coal pillar left at the working face; 6-filling tunnel; 7-filling material transportation route; 8-filling drill hole; 9-mining position of top coal caving working face; 10-filling position of goaf. DETAILED DESCRIPTION

[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0028] like Figures 1 to 5 As shown, this embodiment provides a method for filling a top coal caving goaf, comprising the following steps:

[0029] Step 1: If Figure 2 , Figure 3As shown, a filling tunnel 6 is developed above the coal seam in the mining area. The tunnel is located in the rock layer and serves the filling process of the entire mining area. The tunnel is located in the middle of the mining area and is excavated along the center line parallel to the direction of the coal seam. The filling tunnel 6 is located in the rock layer and can adapt to the changes in geological structure, which is convenient for maintaining a certain direction and slope. It can be arranged in a straight line over a long distance with fewer bends and turns, reducing the equivalent length and resistance along the filling pipeline; secondly, the filling tunnel 6 adopts a straight and strong semi-circular arch tunnel, anchor mesh spraying support, anchor rod model φ20×2400 threaded steel anchor rod, spacing 800×800mm, short service life, good tunnel maintenance conditions, low maintenance costs, and reduced support costs;

[0030] Step 2: If Figure 1 As shown, the mining area is divided into several comprehensive mechanized top coal caving mining working faces 4 according to the comprehensive mechanization degree of the mine. The specific division method is the existing division method well known to those skilled in the art, which will not be described in detail here. A coal pillar 5 of a certain width is left between the working faces. The width of the coal pillar 5 of this embodiment is determined by the existing method well known to those skilled in the art, which will not be described in detail here, to ensure the safety of gas over-limit control between the goaf of the upper working face and the lower working face and the prevention and extinguishing of spontaneous combustion in the goaf;

[0031] Step 3: If Figure 2 , Figure 3 As shown, in the filling tunnel 6, filling boreholes 8 are drilled from the inside of the tunnel to the coal seam direction, the borehole spacing is 200m, the borehole diameter is larger than the filling pipeline diameter, the depth and azimuth of the filling boreholes 8 change with the position of the top coal caving working face 4, the inclination of the filling boreholes 8 is determined by the horizontal distance between the working face and the filling tunnel, and the number of rows of the filling boreholes 8 is equal to the number of the top coal caving working faces 4, and one row of filling boreholes 8 serves one comprehensive mechanized top coal caving working face 4;

[0032] Step 4: If Figure 5 As shown, the filling material is delivered to the filling tunnel 6 in the mining area, and is transported to the goaf 10 behind the top coal caving working face by the filling borehole 8. The distance between the filling place and the top coal caving working face is less than or equal to 100m. The filling borehole 8 used is gradually moved forward as the top coal caving working face 9 advances. That is, the filling borehole 8 used is re-drilled or pre-drilled according to the position of the top coal caving working face 9. The drilling setting is shown in step three;

[0033] Step 5: If Figure 2 As shown, the top coal working face 4 is mined in sequence, and the goaf 10 is filled according to step 4;

[0034] Step 6: If Figure 2 As shown, when the distance between the filling point and the stop mining line 2 is less than or equal to 100m, a separation wall is constructed at the stop mining line 2, and the goaf behind the separation wall is continuously filled;

[0035] Step 7: If Figure 2 As shown, repeat the above steps 4 to 6 until all the goafs of the top coal caving working faces in the entire mining area are filled.

[0036] The mining area tunnel 1, mining area stop line 2, mining area boundary 3, comprehensive mechanized top coal caving working face 4, coal pillar 5 reserved at the working face, filling tunnel 6, filling material transportation route 7, filling borehole 8, top coal caving working face mining position 9, and goaf filling position 10 described in this embodiment all adopt existing settings well known to technical personnel in this field and will not be described in detail here.

[0037] The mining work and filling work of this embodiment all adopt existing working methods well known to those skilled in the art, and will not be described in detail here.

[0038] This embodiment can ensure the safe implementation of gas over-limit control and spontaneous combustion fire prevention and extinguishing work between the goaf of the upper working face and the lower working face by leaving coal pillars between the working faces. The present invention realizes the perfect combination of comprehensive mechanized top coal caving mining and filling mining by setting up the upper filling tunnel. The comprehensive mechanized top coal caving technology can be applied to thick coal seams under geological conditions of coal pressure under buildings (structures), railways and water bodies through the combination of filling, thereby realizing green and safe mining of thick coal seams and having good popularization potential.

[0039] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A method for filling a top coal caving goaf, characterized in that: The following steps are involved: (1) Developing and filling tunnels above the coal seams in the mining area; (2) Divide the mining area into several comprehensive mechanized top coal caving mining working faces, leaving coal pillars between the working faces; (3) In the filling tunnel of step (1), filling boreholes are drilled from the inner side of the tunnel toward the coal seam, with a drilling interval of 200m; (4) The filling materials are delivered to the filling tunnel of the mining area, and transported to the goaf behind the top coal caving working face by the filling borehole. The distance between the filling place and the top coal caving working face is less than or equal to 100m. When filling materials, the depth and azimuth of the filling boreholes change with the position of the top coal caving working face. The azimuth of the filling boreholes is determined by the horizontal distance between the working face and the filling tunnel. The number of rows of filling boreholes is equal to the number of top coal caving working faces. One row of filling boreholes serves a comprehensive mechanized top coal caving working face. (5) mining the top coal working face in sequence and filling the goaf in the manner of step (4); (6) When the distance between the filling point and the stop-mining line is less than or equal to 100 m, a separation wall is constructed at the stop-mining line and the goaf behind the separation wall is continued to be filled; (7) Repeat steps (4) to (6) until all goafs of all top coal caving working faces in the entire mining area are filled.

2. A method for filling a top coal caving goaf as claimed in claim 1, characterized in that: The filling tunnel in step (1) is arranged in the rock formation. The filling tunnel serves the filling process of the entire mining area. The filling tunnel is located in the rock formation, has a short service life, good maintenance conditions, low maintenance costs, and reduces support costs.

3. A method for filling a top coal caving goaf as claimed in claim 1, characterized in that: In step (4), when filling the material, a filling pipeline is set in the filling tunnel for filling the goaf material.

4. A method for filling a top coal caving goaf as claimed in claim 1, characterized in that: The filling tunnel in step (1) is excavated in parallel in the upper rock layer along the direction of the coal seam. The tunnel can adapt to the changes in geological structure, facilitate maintaining a certain direction and slope, and can be arranged in a straight line over a long distance, reducing the bending and turning of the filling pipeline, thereby reducing the equivalent length and along-the-way resistance of the filling pipeline.