Resource allocation method, device, electronic device and storage medium

By allocating resources according to the beam space division efficiency between the primary user and the secondary user in the 5G NR millimeter wave system, the problem of low resource allocation efficiency in the existing technology is solved, and rational allocation and efficient utilization of resources are achieved.

CN115278898BActive Publication Date: 2024-10-22CHINA UNITED NETWORK COMM GRP CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202210862232.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-20
Publication Date
2024-10-22
Estimated Expiration
2042-07-20

AI Technical Summary

Technical Problem

At this stage, there is no solution for scheduling and resource allocation for users based on the narrow beam characteristics brought about by the large-scale multi-antenna array and hybrid beamforming unique to the 5G NR millimeter wave system, resulting in low resource allocation efficiency.

Method used

By determining the beam space division efficiency between primary users and secondary users, resources are allocated to primary users with high scheduling priority first, and transmission resources are allocated to secondary users based on the remaining resources of primary users to ensure reasonable allocation and utilization of resources.

Benefits of technology

It realizes the reasonable allocation of downlink transmission resources for users in the 5G NR millimeter wave system, meets the needs of most users with high scheduling priority, avoids the waste of transmission resources, and improves the efficiency of resource allocation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115278898B_ABST
    Figure CN115278898B_ABST
Patent Text Reader

Abstract

The present application discloses a resource allocation method, device, electronic device and storage medium, which relates to the field of communication and is used to solve the problem of how to reasonably allocate downlink transmission resources to users, including: determining a first auxiliary user and a first main user paired with the first auxiliary user; the first main user and the first auxiliary user are users among multiple users to be scheduled, the scheduling priority of the first main user is higher than that of the first auxiliary user, the beam space division efficiency between the first main user and the first auxiliary user meets the first preset condition, and the beam space division efficiency is used to characterize the communication efficiency when the first main user and the first auxiliary user share transmission resources; determining the remaining transmission resource amount of the first main user; and allocating transmission resources to the first auxiliary user according to the remaining transmission resource amount of the first main user. The present application is used for the allocation of downlink transmission resources.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of communications, and in particular to a resource allocation method, device, electronic device and storage medium. Background Art

[0002] The fifth generation mobile communication technology (5G) new radio (NR) millimeter wave base station usually adopts a large-scale multi-antenna array and a hybrid beamforming method of analog beam and digital beam to form a narrow beam to accurately shape the user signal. Due to the narrow beam characteristics of the 5G NR millimeter wave system, users can make good use of spatial differentiation for multi-user-multiple-input multiple-output (MU-MIMO) transmission. However, at this stage, there is no solution for scheduling and allocating resources for users based on the characteristics of the narrow beams brought by the large-scale multi-antenna array unique to the 5G NR millimeter wave system and hybrid beamforming. Summary of the invention

[0003] The present application provides a resource allocation method, device, electronic device and storage medium, which can solve the problem of how to reasonably allocate downlink transmission resources to users.

[0004] In order to achieve the above purpose, this application adopts the following technical solutions:

[0005] In a first aspect, the present application provides a resource allocation method, comprising:

[0006] Determine a first secondary user and a first main user paired with the first secondary user; the first main user and the first secondary user are users among multiple users to be scheduled, the scheduling priority of the first main user is higher than that of the first secondary user, the beam space division efficiency between the first main user and the first secondary user meets a first preset condition, and the beam space division efficiency is used to characterize the communication efficiency when the first main user and the first secondary user share transmission resources; determine the remaining transmission resource amount of the first main user; and allocate transmission resources to the first secondary user according to the remaining transmission resource amount of the first main user.

[0007] Based on the above technical solution, the present application allocates resources to the main user with high scheduling priority among the users to be scheduled first, determines the remaining resources of the main user after satisfying the data transmission of the main user, and then determines the main user paired with the auxiliary user according to the beam space division efficiency, and allocates resources to the auxiliary user according to the remaining resources of the main user. Therefore, the present solution meets the needs of most users with high scheduling priority, reasonably allocates transmission resources to the users to be scheduled, and avoids the waste of transmission resources.

[0008] In a possible implementation, before determining the remaining transmission resource amount of the first primary user, the method further includes: determining a first user sequence according to the descending order of the scheduling priorities of the plurality of users to be scheduled; and allocating transmission resources to the users to be scheduled in the first user sequence in order;

[0009] Each user to be scheduled and to which transmission resources are allocated in the first user sequence is determined as a primary user; wherein there are multiple primary users, and the first primary user is a user with the highest scheduling priority among the multiple primary users.

[0010] In a possible implementation, the above-mentioned determination of the first auxiliary user and the first main user paired with the first auxiliary user specifically includes: determining the beam space division efficiency between the first alternative user and each main user in the third user sequence; the alternative users include users other than multiple main users among multiple users to be scheduled; if the beam space division efficiency between the first alternative user and the main user meets the first preset condition, the first alternative user is determined as the first auxiliary user, and the main user is determined as the first main user; wherein the first preset condition is that the beam space division efficiency is the largest among the beam space division efficiencies between the first alternative user and each main user.

[0011] In a possible implementation, the above-mentioned determination of the beam space division efficiency between the first alternative user and each main user in the third user sequence specifically includes: determining a beam space division efficiency library; the beam space division efficiency library includes the beam space division efficiency corresponding to the beam combination composed of each pair of two users to be scheduled among multiple users to be scheduled; determining the beam identity ID of the first main user and the alternative user; and determining the beam space division efficiency between the first main user and each alternative user from the beam space division efficiency library according to the beam identity ID of the first main user and the alternative user.

[0012] In a possible implementation, the method further includes: determining a second user sequence according to descending order of scheduling priorities of multiple main users; wherein the second user sequence includes multiple main users; determining a third user sequence according to descending order of scheduling priorities of multiple alternative users; wherein the third user sequence includes multiple alternative users.

[0013] In a possible implementation, the above-mentioned allocating transmission resources to the first secondary user based on the remaining transmission resources of the first main user specifically includes: determining the resource demand of the first secondary user; if the remaining transmission resources of the first main user are greater than the resource demand of the first secondary user, allocating a first number of transmission resources to the first secondary user from the remaining transmission resources of the first main user, and the first number is equal to the resource demand of the first secondary user; removing the first secondary user from the third user sequence; if the remaining transmission resources of the first main user are equal to the resource demand of the first secondary user, determining the remaining transmission resources of the first main user as the transmission resources of the first secondary user; removing the first main user from the second user sequence, and removing the first secondary user from the third user sequence; if the remaining transmission resources of the first main user are less than the resource demand of the first secondary user, determining the remaining transmission resources of the first main user as the transmission resources of the first secondary user, and updating the resource demand of the first secondary user; removing the first main user from the second user sequence.

[0014] In a possible implementation, the method further includes: when the remaining transmission resource amount of the first main user is greater than the resource demand amount of the first secondary user, after removing the first secondary user from the third user sequence, determining the second secondary user from the third user sequence, and determining the second main user paired with the second secondary user from the second user sequence; allocating transmission resources to the second secondary user according to the remaining transmission resource amount of the first main user; wherein the second secondary user is the user with the highest scheduling priority in the third user sequence after the first secondary user is removed from the third user sequence; the beam space division efficiency between the second secondary user and the second main user meets the first preset condition; when the remaining transmission resource amount of the first main user is equal to the resource demand amount of the first secondary user, removing the first main user from the second user sequence, and after removing the first secondary user from the third user sequence, determining the third secondary user from the third user sequence, and selecting the second secondary user from the second main user sequence; A third main user paired with a third auxiliary user is determined in a user sequence; transmission resources are allocated to the third auxiliary user according to the remaining transmission resources of the third main user; wherein the third auxiliary user is a user with the highest scheduling priority in the third user sequence after the first auxiliary user is removed from the third user sequence; the beam space division efficiency between the third auxiliary user and the third main user meets the first preset condition; when the remaining transmission resources of the first main user are less than the resource demand of the first auxiliary user, after the first main user is removed from the second user sequence, a fourth main user paired with the first auxiliary user is determined from the second user sequence; transmission resources are allocated to the first auxiliary user according to the remaining transmission resources of the fourth main user; wherein the fourth main user is a user to be scheduled with the highest scheduling priority in the second user sequence after the first main user is removed from the second user sequence; the beam space division efficiency between the first auxiliary user and the third main user meets the first preset condition.

[0015] In a second aspect, the present application provides a resource allocation device, comprising: a processing unit; a processing unit, used to determine a first secondary user and a first main user paired with the first secondary user; the first main user and the first secondary user are users among multiple users to be scheduled, the scheduling priority of the first main user is higher than that of the first secondary user, and the beam space division efficiency between the first main user and the first secondary user meets a first preset condition, and the beam space division efficiency is used to characterize the communication efficiency when the first main user and the first secondary user share transmission resources; the processing unit is also used to determine the remaining transmission resource amount of the first main user; the processing unit is also used to allocate transmission resources to the first secondary user based on the remaining transmission resource amount of the first main user.

[0016] In a possible implementation, the processing unit is further used to determine a first user sequence according to descending order of scheduling priorities of multiple users to be scheduled; the processing unit is further used to allocate transmission resources to the users to be scheduled in the first user sequence in sequence; the processing unit is further used to determine each user to be scheduled in the first user sequence to which transmission resources are allocated as a primary user; wherein the number of primary users is multiple, and the first primary user is a user with the highest scheduling priority among the multiple primary users.

[0017] In one possible implementation, the processing unit is further used to determine the beam space division efficiency between the first alternative user and each main user in the third user sequence; the alternative users include users other than multiple main users among multiple users to be scheduled; the processing unit is further used to determine the first alternative user as the first auxiliary user and the main user as the first main user when the beam space division efficiency between the first alternative user and the main user meets a first preset condition; wherein the first preset condition beam space division efficiency is the maximum of the beam space division efficiencies between the first alternative user and each main user.

[0018] In a possible implementation, the processing unit is also used to determine a beam space division efficiency library; the beam space division efficiency library includes the beam space division efficiency corresponding to the beam combination composed of each pair of two users to be scheduled among multiple users to be scheduled; the processing unit is also used to determine the beam identity ID of the first main user and the alternative user; the processing unit is also used to determine the beam space division efficiency between the first main user and each alternative user from the beam space division efficiency library based on the beam identity ID of the first main user and the alternative user.

[0019] In a possible implementation, the processing unit is further used to determine a second user sequence according to the descending order of scheduling priorities of multiple main users; wherein the second user sequence includes multiple main users; the processing unit is further used to determine a third user sequence according to the descending order of scheduling priorities of multiple alternative users; wherein the third user sequence includes multiple alternative users.

[0020] In one possible implementation, the processing unit is further used to determine the resource demand of the first secondary user; the processing unit is further used to allocate a first amount of transmission resources to the first secondary user from the remaining transmission resources of the first main user when the remaining transmission resources of the first main user are greater than the resource demand of the first secondary user, and the first amount is equal to the resource demand of the first secondary user; remove the first secondary user from the third user sequence; the processing unit is further used to determine the remaining transmission resources of the first main user as the transmission resources of the first secondary user when the remaining transmission resources of the first main user are equal to the resource demand of the first secondary user; remove the first main user from the second user sequence, and remove the first secondary user from the third user sequence; the processing unit is further used to determine the remaining transmission resources of the first main user as part of the transmission resources of the first secondary user when the remaining transmission resources of the first main user are less than the resource demand of the first secondary user, and update the resource demand of the first secondary user; remove the first main user from the second user sequence.

[0021] In a possible implementation, the processing unit is further used to, when the remaining transmission resource amount of the first main user is greater than the resource demand amount of the first secondary user, after removing the first secondary user from the third user sequence, determine the second secondary user from the third user sequence, and determine the second main user paired with the second secondary user from the second user sequence; allocate transmission resources to the second secondary user according to the remaining transmission resource amount of the first main user; wherein the second secondary user is the user with the highest scheduling priority in the third user sequence after the first secondary user is removed from the third user sequence; the beam space division efficiency between the second secondary user and the second main user meets the first preset condition; the processing unit is further used to, when the remaining transmission resource amount of the first main user is equal to the resource demand amount of the first secondary user, and after removing the first secondary user from the third user sequence, determine the third secondary user from the third user sequence, and pair the second main user with the second secondary user from the second user sequence. A third main user paired with a third auxiliary user is determined in a user sequence; transmission resources are allocated to the third auxiliary user according to the remaining transmission resources of the third main user; wherein the third auxiliary user is a user with the highest scheduling priority in the third user sequence after the first auxiliary user is removed from the third user sequence; the beam space division efficiency between the third auxiliary user and the third main user meets the first preset condition; the processing unit is also used to determine a fourth main user paired with the first auxiliary user from the second user sequence after the first main user is removed from the second user sequence when the remaining transmission resources of the first main user are less than the resource demand of the first auxiliary user; transmission resources are allocated to the first auxiliary user according to the remaining transmission resources of the fourth main user; wherein the fourth main user is a user to be scheduled with the highest scheduling priority in the second user sequence after the first main user is removed from the second user sequence; the beam space division efficiency between the first auxiliary user and the third main user meets the first preset condition.

[0022] In a third aspect, the present application provides a computer-readable storage medium storing one or more programs, wherein the one or more programs include instructions, which, when executed by an electronic device of the present application, enable the electronic device to perform a resource allocation method as described in the first aspect and any possible implementation of the first aspect.

[0023] In a fourth aspect, the present application provides an electronic device, comprising: a processor and a memory; wherein the memory is used to store one or more programs, and the one or more programs include computer execution instructions. When the electronic device is running, the processor executes the computer execution instructions stored in the memory to enable the electronic device to perform the resource allocation method described in the first aspect and any possible implementation of the first aspect.

[0024] In a fifth aspect, the present application provides a computer program product comprising instructions, which, when executed on a computer, enables the electronic device of the present application to execute the resource allocation method as described in the first aspect and any possible implementation manner of the first aspect.

[0025] In a sixth aspect, the present application provides a chip system, which is applied to a resource allocation device; the chip system includes one or more interface circuits and one or more processors. The interface circuit and the processor are interconnected through a line; the interface circuit is used to receive a signal from the memory of the resource allocation device and send the signal to the processor, wherein the signal includes a computer instruction stored in the memory. When the processor executes the computer instruction, the resource allocation device executes the resource allocation method as described in the first aspect and any possible design thereof.

[0026] In this application, the name of the resource allocation device does not limit the device or functional unit itself. In actual implementation, these devices or functional units may appear with other names. As long as the functions of each device or functional unit are similar to those of this application, they are within the scope of the claims of this application and their equivalent technologies. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 A schematic diagram of an application scenario of a resource allocation method provided in an embodiment of the present application;

[0028] Figure 2 A schematic diagram of a resource allocation method provided in an embodiment of the present application;

[0029] Figure 3 A flowchart of another resource allocation method provided in an embodiment of the present application;

[0030] Figure 4A flowchart of another resource allocation method provided in an embodiment of the present application;

[0031] Figure 5 A flowchart of another resource allocation method provided in an embodiment of the present application;

[0032] Figure 6 A flowchart of another resource allocation method provided in an embodiment of the present application;

[0033] Figure 7 A flowchart of another resource allocation method provided in an embodiment of the present application;

[0034] Figure 8 A schematic diagram of the structure of a resource allocation device provided in an embodiment of the present application;

[0035] Fig. 9 A schematic diagram of the structure of another resource allocation device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0036] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0037] In this article, the character " / " generally indicates that the objects before and after are in an "or" relationship. For example, A / B can be understood as A or B.

[0038] The terms "first" and "second" in the specification and claims of this application are used to distinguish different objects rather than to describe a specific order of objects. For example, a first edge service node and a second edge service node are used to distinguish different edge service nodes rather than to describe a characteristic order of edge service nodes.

[0039] In addition, the terms "including" and "having" and any variations thereof mentioned in the description of the present application are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device comprising a series of steps or units is not limited to the listed steps or units, but may optionally include other steps or units that are not listed, or may optionally include other steps or units that are inherent to these processes, methods, products or devices.

[0040] In addition, in the embodiments of the present application, words such as "exemplarily" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplarily" or "for example" in the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplarily" or "for example" is intended to present concepts in a specific way.

[0041] The fifth generation mobile communication technology (5G) new radio (NR) millimeter wave base station usually uses a large-scale multi-antenna array and a hybrid beamforming method of analog beam and digital beam to form a narrow beam to accurately shape the user signal. Due to the narrow beam characteristics of the 5G NR millimeter wave system, users can make good use of spatial differentiation for multi-user multiple-input multiple-output (MU-MIMO) transmission.

[0042] For example, with respect to the problem of how to allocate transmission resources to users in a 5G NR millimeter wave system, the following two solutions are currently provided:

[0043] Solution 1: A resource allocation method for MU-MIMO user pairing, comprising the following steps: A. Sort the users to be scheduled according to user priority; B. Pair the users in order of user priority from high to low, define the users with higher priority among the paired users as paired main users, and define the users with lower priority as paired auxiliary users; C. Determine whether the paired auxiliary users of the paired main users to be scheduled exist, and if so, put them into the available paired user queue in order from high to low according to the pairing matching degree of the paired auxiliary users; D. Allocate resources for the paired main users, and define the allocated resources as available paired resources; E. Allocate the available paired resources to each paired auxiliary user in the available paired user queue in segments. Analysis shows that the invention is applicable to long term evolution (LTE) or long term evolution–advanced (LTE-A) systems, and the invention does not perform scheduling and resource allocation for users based on the characteristics of large-scale multi-antenna arrays and narrow beams brought by hybrid beamforming that are unique to 5G NR millimeter wave systems.

[0044] Solution 2: A resource allocation method for an LTE MU-MIMO system, the method comprising: calculating service quality metric values ​​of N UEs to be allocated resources, the service quality metric values ​​being used to indicate service quality requirement information of the UE; selecting M UEs to be allocated resources with the largest service quality metric values ​​to form a pairing object set according to the size of the service quality metric values, wherein M is less than N; performing pairing processing on the UEs to be allocated resources in the pairing object set; and allocating the same time-frequency resources to the paired UEs. The present invention also discloses a resource allocation device for an LTE MU-MIMO system. The present invention can enable related services that really need resources to obtain resources in a timely manner. Analysis shows that the invention does not perform scheduling and resource allocation for users based on the characteristics of the large-scale multi-antenna array unique to the 5G NR millimeter wave system and the narrow beam brought about by hybrid beamforming.

[0045] In summary, at this stage, there is no solution for scheduling and allocating resources for users based on the characteristics of the large-scale multi-antenna array unique to the 5G NR millimeter wave system and the narrow beam brought by hybrid beamforming.

[0046] In order to solve the above-mentioned problem that scheduling and resource allocation for users are not performed according to the characteristics of the 5G NR millimeter wave system at this stage, the present application provides a resource allocation method to realize the reasonable allocation of downlink transmission resources for users in the 5G NR millimeter wave system.

[0047] For example, Figure 1 FIG. 1 is a schematic diagram of an application scenario of a resource allocation method provided in the present application. The application scenario includes a base station 11 and a user terminal 12 .

[0048] The base station 11 uses a large-scale multi-antenna array and a hybrid beamforming method of analog beams and digital beams to form a narrow beam to accurately shape the signal of the user terminal 12. The base station 11 can allocate downlink transmission resources to the user terminal 12, so that the user terminal 12 can realize downlink transmission of data with the base station 11 based on the allocated downlink transmission resources.

[0049] It should be noted that in the resource allocation method provided in the present application, the execution subject is a resource allocation device. The resource allocation device can be an electronic device (such as a computer terminal, a server), a processor in an electronic device, a control module for resource allocation in an electronic device, or a client for resource allocation in an electronic device.

[0050] The process of the resource allocation method provided in this embodiment is described below.

[0051] For example, Figure 2As shown, the present application provides a resource allocation method, which specifically includes the following S201-S203:

[0052] S201. A resource allocation apparatus determines a first secondary user and a first primary user paired with the first secondary user.

[0053] Among them, the first main user and the first auxiliary user are users among multiple users to be scheduled, and the scheduling priority of the first main user is higher than that of the first auxiliary user. It can be understood that the user to be scheduled is a user who needs to perform downlink transmission between the base station to realize the allocation of downlink transmission resources. Exemplarily, the transmission resources mentioned in this application can be physical resource blocks (PRBs) or other types of transmission resources, which are not limited in this application. Unless otherwise specified in this application, the transmission resource is PRB as an example.

[0054] It should be noted that the first primary user and the first secondary user may be any one of the multiple users to be scheduled, or may be users screened out from the multiple users to be scheduled according to specific conditions.

[0055] Optionally, the resource allocation device sorts the multiple users to be scheduled in descending order according to the scheduling priorities of the multiple users to be scheduled, and determines a first user sequence; then the resource allocation device determines multiple primary users according to the first user sequence, and the first primary user is one of the multiple primary users. It can be understood that determining the primary user according to the scheduling priority can ensure that users with high scheduling priorities can be allocated transmission resources first, thereby ensuring the user experience of users with high scheduling priorities. The specific process of the resource allocation device determining multiple primary users according to the scheduling priorities of multiple users to be scheduled is shown in the following steps S301-S303, which will not be repeated here.

[0056] Optionally, the resource allocation device arranges all the determined primary users in descending order of calling priority to obtain a second user sequence to facilitate subsequent processes.

[0057] Optionally, after determining multiple primary users from multiple users to be scheduled, the resource allocation device determines users other than the remaining multiple primary users as multiple candidate users, and the first secondary user is one of the multiple secondary users.

[0058] Optionally, the resource allocation device arranges all determined candidate users in descending order of calling priority to obtain a third user sequence to facilitate subsequent processes.

[0059] It should be noted that the beam space efficiency is used to characterize the communication efficiency when two users share transmission resources. That is, the higher the beam space efficiency between the first auxiliary user and the first primary user, the lower the communication interference between the first auxiliary user and the first primary user.

[0060] In a possible implementation, the resource allocation device determines the beam space efficiency between two users based on the beam identity documents (IDs) of the two users and a beam space efficiency library. The specific process of the resource allocation device determining the beam space efficiency between two users based on the beam IDs of the two users and the beam space efficiency library is shown in the following steps S401-S403, which will not be repeated here.

[0061] Optionally, the resource allocation device determines the beam space efficiency between the first candidate user and each primary user in the third user sequence. Further, if the beam space efficiency between the candidate user and a primary user satisfies the first preset condition, the candidate user is determined as the first secondary user, and the primary user is determined as the first primary user paired with the first secondary user. The specific process of the resource allocation device determining the first secondary user and the first primary user paired with the first secondary user is referred to the following steps S501-S502, which will not be repeated here.

[0062] S202: The resource allocation device determines the remaining transmission resource amount of the first primary user.

[0063] It can be understood that after the first primary user completes downlink transmission of data according to the allocated transmission resources, the resource allocation device determines the remaining transmission resource amount of the first primary user.

[0064] S203: The resource allocation device allocates transmission resources to the first secondary user according to the remaining transmission resources of the first primary user.

[0065] Optionally, after determining the first secondary user, the resource allocation device obtains the resource requirement of the first secondary user. It can be understood that the resource requirement of the first secondary user is the transmission resource required by the first secondary user to complete downlink transmission of data.

[0066] Furthermore, the resource allocation device allocates transmission resources to the first secondary user in three cases. The following describes the cases:

[0067] Case 1: The remaining transmission resource amount of the first primary user is greater than the resource demand amount of the first secondary user.

[0068] At this time, a first amount of transmission resources is allocated to the first secondary user from the remaining transmission resources of the first primary user, and the first amount is equal to the resource demand of the first secondary user. In addition, the first secondary user is removed from the third user sequence.

[0069] It is understandable that the first situation indicates that after the remaining resources of the first primary user meet the resource requirements of the first secondary user, there are still remaining resources to be allocated to other secondary users. Therefore, after the resources are allocated to the first secondary user, the first secondary user is removed from the third user sequence.

[0070] Afterwards, a second secondary user is determined from the third user sequence, a second primary user paired with the second secondary user is determined from the second user sequence, and resources are allocated to the second secondary user according to the remaining transmission resources of the second primary user.

[0071] The second secondary user is a user with the highest scheduling priority in the third user sequence after the first secondary user is removed from the third user sequence; and the beam space division efficiency between the second secondary user and the second primary user meets the first preset condition.

[0072] Case 2: The remaining transmission resource amount of the first primary user is equal to the resource demand amount of the first secondary user.

[0073] At this time, the remaining transmission resources of the first primary user are determined as the transmission resources of the first secondary user. In addition, the first primary user is removed from the second user sequence, and the first secondary user is removed from the third user sequence.

[0074] It is understandable that the second situation indicates that the remaining resources of the first primary user just meet the resource requirements of the first secondary user. Therefore, after allocating resources to the first secondary user, the first primary user is removed from the second user sequence, and the first secondary user is removed from the third user sequence.

[0075] After that, a third secondary user is determined from the second user sequence and a third primary user paired with the third secondary user is determined from the second user sequence, and resources are allocated to the third secondary user according to the remaining transmission resources of the third primary user.

[0076] Among them, the third secondary user is the user with the highest scheduling priority in the third user sequence after the first secondary user is removed from the third user sequence; the beam space division efficiency between the third secondary user and the third primary user meets the first preset condition.

[0077] Case 3: The remaining transmission resources of the first primary user are less than the resource demand of the first secondary user.

[0078] At this time, the remaining transmission resources of the first primary user are determined as part of the transmission resources of the first secondary user. In addition, the first primary user is removed from the second user sequence.

[0079] It is understandable that situation 3 indicates that the remaining resources of the first primary user cannot meet the resource demand of the first secondary user. Therefore, after allocating the remaining resources of the first primary user to the first secondary user, the first primary user is removed from the second user sequence, and the resource demand of the first secondary user is updated.

[0080] Afterwards, a fourth primary user paired with the first secondary user is determined from the second user sequence; and transmission resources are allocated to the first secondary user according to the remaining transmission resource amount of the fourth primary user.

[0081] Among them, the fourth main user is the user to be scheduled with the highest scheduling priority in the second user sequence after the first main user is removed from the second user sequence; the beam space division efficiency between the first auxiliary user and the third main user meets the first preset condition.

[0082] It should be noted that in case 1, since the secondary user to be paired has changed from the first secondary user to the second secondary user, the second primary user determined subsequently may not be the same user as the first primary user. In the case where the second primary user is not the same user as the first primary user, the remaining transmission resources of the first primary user have not been allocated, so the first primary user is still in the second user sequence. Furthermore, when the first primary user is successfully paired with other secondary users in the third user sequence, the resource allocation device can still allocate transmission resources to other secondary users based on the remaining transmission resources of the first primary user to meet the resource requirements of other secondary users.

[0083] The above specifically introduces the resource allocation device allocating transmission resources to the first auxiliary user according to the remaining resources of the first primary user in three cases. It should be pointed out that in the above three cases, the method of specifically determining the second auxiliary user, the third auxiliary user, the second primary user, the third primary user and the fourth primary user is the same as the method of determining the first primary user and the first auxiliary user in the previous text, and will not be repeated here. Similarly, the method of allocating resources to the second auxiliary user and the third auxiliary user by the resource allocation device is also the same as that described in the above three cases.

[0084] It should be noted that if there are still candidate users in the third user sequence that have not been allocated transmission resources after the remaining resources of all first primary users have been allocated, the resource allocation device stops allocating transmission resources.

[0085] Based on the above technical solution, the embodiment of the present application allocates resources to the main user with high scheduling priority among the users to be scheduled first, determines the remaining resources of the main user after satisfying the data transmission of the main user, and then determines the main user paired with the auxiliary user according to the beam space division efficiency, and allocates resources to the auxiliary user according to the remaining resources of the main user. Therefore, this solution meets the needs of most users with high scheduling priority, reasonably allocates transmission resources to the users to be scheduled, and avoids the waste of transmission resources.

[0086] For example, in combination Figure 2 ,like Figure 3 As shown, in the resource allocation method provided by the present application, the resource allocation device determines multiple primary users according to the scheduling priorities of multiple users to be scheduled, specifically including the following S301-S303:

[0087] S301. A resource allocation apparatus determines a first user sequence according to descending order of scheduling priorities of a plurality of users to be scheduled.

[0088] Optionally, the resource allocation device determines the scheduling priority of the user to be scheduled according to the proportional fairness (PF) principle. Specifically, the resource allocation device determines the scheduling priority of each user to be scheduled according to the scheduling weight W set in the PF principle, and the scheduling weight W is equal to the ratio of the amount of data requested to be transmitted by the user to the amount of data already transmitted.

[0089] Optionally, after determining the scheduling priorities of the multiple users to be scheduled, the resource allocation device determines a first user sequence in descending order of the scheduling priorities. The first user sequence includes all the users to be scheduled.

[0090] S302: The resource allocation device allocates transmission resources to the users to be scheduled in the first user sequence in order.

[0091] It can be understood that the resource allocation device allocates transmission resources to the users to be scheduled according to the arrangement order of the users to be scheduled in the first user sequence.

[0092] Optionally, when the transmission resource is a PRB, for each user to be scheduled in the first user sequence, the resource allocation device determines the total spectrum efficiency between the user to be scheduled and each PRB according to the channel quality information (CQI) reported by the user to be scheduled. The process of determining the total spectrum efficiency between the user to be scheduled and each PRB by the resource allocation device is described below:

[0093] (1) The resource allocation device determines the CQI of each PRB corresponding to the user to be scheduled according to the CQI reported by the user to be scheduled.

[0094] It should be noted that, for each PRB, the CQI of the PRB is the same as the CQI of the subband where the PRB is located; if the CQI reported by the user to be scheduled does not include its own CQI, the CQI of the PRB is the same as the CQI of the broadband.

[0095] (2) The resource allocation device determines the modulation and coding scheme (MCS) level corresponding to the CQI of each PRB according to the CQI of each PRB.

[0096] Optionally, the resource allocation device queries the "SNR vs MCS" interface curve according to the CQI of each PRB to obtain the MCS level I corresponding to the CQI of each PRB. MCS It should be noted that querying and obtaining the MSC level of a PRB based on the CQI and "SNR vs MCS" interface curve of the PRB is a prior art in the art and will not be described in detail here. In addition, in this embodiment, the MCS level of each PRB may also be determined by other methods, which is not limited in this embodiment.

[0097] (3) The resource allocation device determines the spectrum efficiency corresponding to the MCS level of each PRB according to the MCS level of each PRB.

[0098] Optionally, the resource allocation device queries the TR38.214 5.1.3.1 table according to the MCS level of each PRB to obtain the spectrum efficiency η corresponding to the MCS level of each PRB. i PRB . Wherein, i represents the codeword number when there are multiple codeword CQIs.

[0099] For example, the TR38.214 5.1.3.1 table is shown in Table 1 below:

[0100] Table 1 TR38.214 5.1.3.1 Table

[0101]

[0102] The first column of Table 1 indicates the MCS level, the second column indicates the modulation order, the third column indicates the target code rate, and the fourth column indicates the spectrum efficiency.

[0103] (4) The resource allocation device determines the total spectrum efficiency between the user to be scheduled and each PRB.

[0104] Optionally, the total spectrum efficiency between the user to be scheduled and each PRB satisfies: Here, i represents the codeword number when there are multiple codeword CQIs.

[0105] The above describes the process of the resource allocation apparatus determining the total spectrum efficiency between the user to be scheduled and each PRB.

[0106] Optionally, the resource allocation device determines the number of PRBs allocated to the user to be scheduled according to the amount of data that the user to be scheduled needs to transmit and the total spectrum efficiency between the user to be scheduled and each PRB.

[0107] S303: The resource allocation device determines each user to be scheduled and to which transmission resources are allocated in the first user sequence as a primary user.

[0108] It can be understood that the resource allocation device allocates transmission resources to the users in the first user sequence in order until the transmission resources are allocated. After that, the resource allocation device determines the scheduled users allocated with transmission resources in the first user sequence as primary users. There are multiple primary users, and the first primary user is the user with the highest scheduling priority in the first user sequence.

[0109] Optionally, the resource allocation device determines a second user sequence according to the descending order of scheduling priorities of the plurality of primary users, wherein the second user sequence includes the plurality of primary users.

[0110] Based on the above technical solution, the embodiment of the present application can determine the primary user among the users to be scheduled according to the scheduling priority, so as to facilitate the subsequent resource allocation process.

[0111] For example, in combination Figure 2 ,like Figure 4 As shown, in the resource allocation method provided in the present application, determining the beam space division efficiency between two users according to the beam IDs, horizontal beam pointing angles and vertical beam pointing angles of the two users specifically includes the following steps:

[0112] S401. The resource allocation device determines a beam space division efficiency library.

[0113] The beam space division efficiency library includes the beam space division efficiency corresponding to the beam combination composed of every pair of two users to be scheduled among multiple users to be scheduled.

[0114] In a possible implementation, the resource allocation device counts the beam combinations that form user pairs among multiple users to be scheduled according to a certain statistical period to determine and update the beam space efficiency library. Exemplarily, the following steps describe how the resource allocation device determines the beam space efficiency library:

[0115] S4011. The resource allocation device starts a statistical period and sets the amount of beam space division transmission data and the number of beam space division transmission resources.

[0116] The amount of data transmitted by beam space division refers to the total amount of data transmitted after pairing is formed between two users in a certain beam combination within the statistical period.

[0117] The number of beam space division transmission resources indicates the number of transmission resources used by two users in a certain beam combination after the two users are paired within the statistical period. For example, the number of PRBs used by the two paired users. In the subsequent steps, the transmission resources are described as PRBs.

[0118] S4012. The resource allocation device records the beam combination of the paired users.

[0119] For each pair of paired users, the beam IDs of the two users are determined and recorded as (BP, BS). It should be noted that the beam IDs of the two users here are partially sequential and only record the combination relationship.

[0120] S4013: The resource allocation device determines the transmission data amount of the user to be scheduled.

[0121] Optionally, the resource allocation device calculates the transmission data amount of the user to be scheduled under each beam combination according to the transmission data amount of the user to be scheduled and the number of paired transmission resources.

[0122] It is understandable that one user to be scheduled may be paired with multiple other users to be scheduled on different transmission resources. For example, the following Table 2 shows the pairing between multiple users to be scheduled.

[0123] Table 2 User pairing table to be scheduled

[0124] PRB Number PRB0 PRB1 PRB2 PRB3 PRB4 PRB5 Pairing users UE1-UE2 UE1-UE3 UE1-UE3 UE1-UE2 UE4-UE3 UE4-UE3 Beam combining (B1,B2) (B1,B3) (B1,B2) (B4,B3) (B4,B3) (B4,B3)

[0125] Among them, UE represents the communication terminal used by the user, and B1 in Table 2 represents the beam ID of UE1.

[0126] Optionally, the total transmission data volume of the user to be scheduled at the current scheduling time satisfies the following formula:

[0127]

[0128] Among them, S k represents the total transmission data volume of the user to be scheduled, BP and BS represent the beam IDs of the user to be scheduled and the user paired with it, and N (BP,BS) Indicates the number of transmission resources PRB used by the two users after pairing, N k Indicates the total number of transmission resources PRB.

[0129] S4014. The resource allocation device counts the accumulated beam space division data volume.

[0130] The resource allocation device adds the amount of data transmitted by the user to be scheduled under the current beam combination to the transmission data amount S. Exemplarily, the transmission data amount S satisfies the following formula:

[0131]

[0132] Among them, S represents the amount of data transmitted, S 1 Indicates the amount of data transmitted before accumulation, S k Indicates the total transmission data volume of the users to be scheduled.

[0133] S4015. The resource allocation device counts the accumulated number of beam space-division transmission resources.

[0134] The resource allocation device adds the number of paired resources of the user to be scheduled to the corresponding number of transmission resources N under the corresponding beam combination. Exemplarily, the number of transmission resources N satisfies the following formula:

[0135] N=N 1 +N (BP,BS)

[0136] Where N represents the number of transmission resources, N 1 Indicates the number of transmission resources before accumulation, N (BP,BS) It indicates the number of transmission resources PRB used by the user to be scheduled and the user after pairing with the user. It should be noted that, in order to avoid repeated accumulation, each primary user and secondary user is accumulated only once and not repeatedly accumulated.

[0137] S4016. The resource allocation device updates the amount of beam space division transmission data.

[0138] When the resource allocation device receives a NACK message from the user to be scheduled, that is, the user to be scheduled does not correctly receive the transmitted data, it determines the corresponding beam combination and the amount of transmission data based on the scheduling time of the user to be scheduled, and updates the transmission data amount corresponding to the corresponding beam combination, that is, deducts the data amount of the user from the total transmission data amount S.

[0139] S4017: The resource allocation device statistical cycle ends and updates the beam space division efficiency.

[0140] When the statistical period ends, the resource allocation device updates the space division efficiency corresponding to the beam combination according to the amount of transmission data and the number of transmission resources corresponding to each pair of beam combinations counted during the statistical period. The updating method is as follows:

[0141] (1) Initially, the historical beam space division efficiency is initialized to an invalid value, that is, β = -1.

[0142] (2) Calculate the beam space efficiency of this statistical period

[0143] Among them, β new represents the beam space efficiency of the current statistical period, β old Indicates the beam space division efficiency of the previous statistical period.

[0144] (3) If the historical air separation efficiency is an invalid value, the air separation efficiency of the latest cycle is assigned to the historical air separation efficiency, that is, β = β new , β old =β, otherwise the historical air separation efficiency is updated using the genetic factor α, that is: β = β old α+β new (1-α),β old =β, where 0≤α≤1, and the default value is 0.8.

[0145] S4018. The resource allocation device determines a beam space division efficiency library.

[0146] For each beam combination (BP, BS) formed after pairing the scheduled users, there is a corresponding space efficiency β. The corresponding beam combination and space efficiency are recorded to form a beam space efficiency library. The beam space efficiency library is continuously updated and used to pair the scheduled users in the subsequent transmission resource allocation.

[0147] The above describes how the resource allocation device determines the beam space efficiency library.

[0148] S402: The resource allocation device determines beam IDs of a first primary user and a candidate user.

[0149] Optionally, the resource allocation device determines the beam IDs of the first primary user and the backup user according to CRI (CSI-RS resource indicator) or SSBRI (SS / PBCH block resource indicator) reported by the first primary user and the backup user.

[0150] S403: The resource allocation device determines the beam space efficiency between the first primary user and each candidate user from a beam space efficiency library according to the beam IDs of the first primary user and each candidate user.

[0151] It can be understood that after determining the beam space efficiency library, the resource allocation device can query the beam space efficiency between the first primary user and the candidate user from the beam space efficiency library according to the beam IDs of the first primary user and the candidate user.

[0152] Based on the above technical solution, the beam space division efficiency between the first candidate user and the main user can be determined in the embodiment of the present application, so that the resource allocation device can determine a paired main user for the first candidate user based on this, so as to facilitate the allocation of subsequent transmission resources.

[0153] For example, in combination Figure 2 ,like Figure 5As shown, determining the first secondary user and the first primary user paired with the first secondary user in the resource allocation method provided in the present application specifically includes the following steps:

[0154] S501. A resource allocation device determines whether a beam space division efficiency between a first candidate user and a primary user satisfies a first preset condition.

[0155] In a possible implementation manner, the first preset condition is that the beam space division efficiency is the beam space division efficiency with the largest parameter value among the beam space division efficiencies between the first main user and each candidate user.

[0156] S502: When the beam space division efficiency between the first candidate user and the primary user meets a first preset condition, the resource allocation device determines the first candidate user as a first secondary user and determines the primary user as a first primary user.

[0157] It can be understood that, in the aforementioned S203, when the resource allocation device determines the primary user to be paired with other secondary users in the third user sequence, the process is the same as S501-S502.

[0158] Based on the above technical solution, in the embodiment of the present application, the secondary user and the primary user paired with the secondary user can be determined based on the beam space division efficiency between the alternative user and the primary user to facilitate the allocation of subsequent transmission resources.

[0159] For example, Figure 6 As shown, the transmission resource allocation process in the present application can be completed through a loop step, and the specific steps are as follows:

[0160] In this embodiment, it is assumed that the number of users to be scheduled is 10, and the transmission resources that can be allocated are 20 PRBs in total.

[0161] S601: Determine a first user sequence L.

[0162] The first user sequence L includes all 10 users to be scheduled and is sorted according to the scheduling priority. It is assumed here that the scheduling priorities of the 10 users to be scheduled are numbered 1-10 from high to low.

[0163] It should be noted that the specific method for determining the first user sequence L refers to the aforementioned S301 and will not be repeated here.

[0164] S602: Move the first user in the first user sequence L into the second user sequence P, and remove the user from the first user sequence.

[0165] The second user sequence P is a primary user sequence including all primary users.

[0166] In this step, in the initial state, the user 1 to be scheduled is moved from the first user sequence L to the second user sequence P.

[0167] S603: Determine whether the current number of idle transmission resources is greater than the resource demand of the user.

[0168] If the judgment result is yes, then execute the subsequent S604;

[0169] If the judgment result is no, the subsequent step S605 is executed.

[0170] S604: Allocate transmission resources to the user.

[0171] It can be understood that in this step, PRBs are allocated to user 1 to be scheduled in the initial state.

[0172] It should be noted that the specific method of allocating PRBs to users can be found in the aforementioned S203, which will not be described in detail here.

[0173] In this step, after the PRB allocation to the user is completed, the process returns to S603.

[0174] S605: Allocate all idle transmission resources to the user.

[0175] It should be noted that the specific method of allocating PRBs to users can be found in the aforementioned S203, which will not be described in detail here.

[0176] In this step, after the PRB allocation to the user is completed, S606 is executed.

[0177] S606: End the main user determination loop process and output the final second user sequence P.

[0178] It can be understood that, at this time, all users included in the second user sequence P are allocated PRBs.

[0179] S607: Allocate transmission resources to the secondary user based on the primary user.

[0180] Exemplarily, in combination with the example that the number of users to be scheduled is 10 and the transmission resources that can be used for allocation are a total of 20 PRBs, it is assumed that a total of 4 primary users (that is, users 1-4 to be scheduled) are determined at this time, and the number of PRB resources allocated to each user is 5. At this time, there are 6 users to be scheduled (that is, users 5-10 to be scheduled) in the first user sequence L, and the second user sequence P includes 4 primary users.

[0181] It is understandable that the users to be scheduled included in the first user sequence L are candidate users. That is, the users included in the first user sequence L at this time are the same as the users included in the third user sequence in S201 above, except that the users in the third user sequence may be sorted by scheduling priority according to a new principle.

[0182] For example, Figure 7 As shown, when the transmission resource allocation process in the present application is completed through a loop step, S607 specifically includes the following steps:

[0183] S701: Determine whether there is a user in the first user sequence L.

[0184] If the judgment result is yes, then execute the subsequent S702;

[0185] If the judgment result is no, the subsequent S703 is executed.

[0186] S702: Determine the beam ID of each user in the first user sequence L.

[0187] In this step, after the beam ID of each user in the first user sequence L is determined, the subsequent S704 is executed.

[0188] S703: End resource allocation.

[0189] It can be understood that the resource allocation is terminated here because all users have been fully allocated resources.

[0190] S704: Determine whether there is a user in the second user sequence P.

[0191] If the judgment result is yes, then execute the subsequent S705;

[0192] If the judgment result is no, the subsequent step S706 is executed.

[0193] It can be understood that there are still users in the second user sequence P, which means that there are primary users who have not yet been paired with secondary users.

[0194] S705: Determine, from the second user sequence P, a primary user paired with the secondary user.

[0195] It should be noted that the specific method for determining the primary user to be paired with the secondary user from the second user sequence P can be found in the aforementioned S201, which will not be described in detail here.

[0196] S706: End resource allocation.

[0197] It can be understood that the resource allocation is terminated here because all transmission resources have been allocated.

[0198] S707: Determine whether the remaining transmission resource amount of the primary user is greater than the resource demand amount of the secondary user.

[0199] If the judgment result is yes, then execute the subsequent S708;

[0200] If the judgment result is no, the subsequent step S709 is executed.

[0201] S708. Allocate resources to the auxiliary user according to the resource demand of the auxiliary user.

[0202] It should be noted that the specific method of allocating resources to the auxiliary users according to the resource demand of the auxiliary users can be found in the aforementioned S203, which will not be described in detail here.

[0203] In this step, after allocating resources to the secondary user according to the resource demand of the secondary user, the subsequent S712 is executed.

[0204] S709: Allocate the remaining transmission resources of the primary user to the secondary user, and update the resource demand of the secondary user.

[0205] S710: Remove the primary user from the second user sequence P.

[0206] S711. Determine whether the resource demand of the auxiliary user is zero.

[0207] If the judgment result is yes, then execute the subsequent S712;

[0208] If the judgment result is no, the process returns to execute S704.

[0209] S712: Remove the secondary user from the first user sequence L.

[0210] Exemplarily, in combination with the example of the above embodiment, it is assumed that the remaining transmission resources of each primary user (i.e., users 1-4 to be scheduled) are all 3 PRBs. At this time, for the 6 users to be scheduled in the third user sequence Q (i.e., users 5-10 to be scheduled), the primary user paired with each user is determined in sequence, and the transmission resources are allocated to the 6 users to be scheduled according to the remaining transmission resources of the primary user. After the above cycle of S701-S712, the 6 secondary users (i.e., users 5-10 to be scheduled) are all allocated 2 PRBs for data transmission.

[0211] The embodiment of the present application can divide the resource allocation device into functional modules or functional units according to the above method example. For example, each functional module or functional unit can be divided according to each function, or two or more functions can be integrated into one processing module. The above integrated module can be implemented in the form of hardware or in the form of software functional modules or functional units. Among them, the division of modules or units in the embodiment of the present application is schematic, which is only a logical function division. There may be other division methods in actual implementation.

[0212] For example, Figure 8 FIG. 8 is a possible structural diagram of a resource allocation device according to an embodiment of the present application. The resource allocation device 800 includes: a processing unit 801 .

[0213] Among them, the processing unit 801 is used to determine a first secondary user and a first main user paired with the first secondary user; the first main user and the first secondary user are users among the multiple users to be scheduled, the scheduling priority of the first main user is higher than that of the first secondary user, and the beam space division efficiency between the first main user and the first secondary user meets a first preset condition, and the beam space division efficiency is used to characterize the communication efficiency when the first main user and the first secondary user share transmission resources.

[0214] The processing unit 801 is further configured to determine the remaining transmission resource amount of the first primary user.

[0215] The processing unit 801 is further configured to allocate transmission resources to the first secondary user according to the remaining transmission resources of the first primary user.

[0216] Optionally, the processing unit 801 is further configured to determine a first user sequence according to descending order of scheduling priorities of the multiple users to be scheduled.

[0217] Optionally, the processing unit 801 is further configured to sequentially allocate transmission resources to the to-be-scheduled users in the first user sequence.

[0218] Optionally, the processing unit 801 is further used to determine each of the to-be-scheduled users allocated with transmission resources in the first user sequence as a primary user; wherein the number of the primary users is multiple, and the first primary user is the user with the highest scheduling priority among the multiple primary users.

[0219] Optionally, the processing unit 801 is further used to determine the beam space division efficiency between the first candidate user in the third user sequence and each of the main users; the candidate users include users other than the multiple main users among the multiple users to be scheduled.

[0220] Optionally, the processing unit 801 is also used to determine the first alternative user as the first auxiliary user and the main user as the first main user when the beam spatial division efficiency between the first alternative user and the main user meets the first preset condition; wherein the first preset condition is that the beam spatial division efficiency is the largest among the beam spatial division efficiencies between the first alternative user and each of the main users.

[0221] Optionally, the processing unit 801 is further used to determine a beam space division efficiency library; the beam space division efficiency library includes the beam space division efficiency corresponding to the beam combination composed of each pair of two of the multiple users to be scheduled.

[0222] Optionally, the processing unit 801 is further configured to determine beam identities IDs of the first primary user and the candidate user;

[0223] Optionally, the processing unit 801 is further used to determine the beam space division efficiency between the first primary user and each of the candidate users from the beam space division efficiency library according to the beam identity IDs of the first primary user and the candidate users.

[0224] Optionally, the processing unit 801 is further configured to determine a second user sequence according to descending order of scheduling priorities of the multiple primary users; wherein the second user sequence includes the multiple primary users.

[0225] Optionally, the processing unit 801 is further configured to determine a third user sequence according to the descending order of scheduling priorities of the multiple candidate users; wherein the third user sequence includes the multiple candidate users.

[0226] Optionally, the processing unit 801 is further configured to determine a resource requirement of the first secondary user.

[0227] Optionally, the processing unit 801 is also used to allocate a first number of transmission resources to the first secondary user from the remaining transmission resources of the first main user when the remaining transmission resources of the first main user are greater than the resource demand of the first secondary user, and the first number is equal to the resource demand of the first secondary user; and remove the first secondary user from the third user sequence.

[0228] Optionally, the processing unit 801 is further used to determine the remaining transmission resources of the first main user as the transmission resources of the first secondary user when the remaining transmission resources of the first main user are equal to the resource demand of the first secondary user; remove the first main user from the second user sequence, and remove the first secondary user from the third user sequence.

[0229] Optionally, the processing unit 801 is also used to determine the remaining transmission resources of the first main user as part of the transmission resources of the first secondary user and update the resource requirement of the first secondary user when the remaining transmission resources of the first main user are less than the resource requirement of the first secondary user; and remove the first main user from the second user sequence.

[0230] Optionally, the processing unit 801 is also used to, when the remaining transmission resources of the first main user are greater than the resource demand of the first secondary user, determine the second secondary user from the third user sequence after removing the first secondary user from the third user sequence, and determine the second main user paired with the second secondary user from the second user sequence; allocate transmission resources to the second secondary user according to the remaining transmission resources of the first main user; wherein the second secondary user is the user with the highest scheduling priority in the third user sequence after the first secondary user is removed from the third user sequence; and the beam space division efficiency between the second secondary user and the second main user meets a first preset condition.

[0231] Optionally, the processing unit 801 is further configured to, when the remaining transmission resource amount of the first primary user is equal to the resource demand amount of the first secondary user, remove the first primary user from the second user sequence, and after removing the first secondary user from the third user sequence, determine a third secondary user from the third user sequence, and determine a third primary user paired with the third secondary user from the second user sequence; allocate transmission resources to the third secondary user according to the remaining transmission resource amount of the third primary user; wherein the third secondary user is a user with the highest scheduling priority in the third user sequence after the first secondary user is removed from the third user sequence; and the beam space division efficiency between the third secondary user and the third primary user satisfies a first preset condition;

[0232] Optionally, the processing unit 801 is also used to, when the remaining transmission resources of the first main user are less than the resource demand of the first secondary user, determine a fourth main user paired with the first secondary user from the second user sequence after the first main user is removed from the second user sequence; allocate transmission resources to the first secondary user according to the remaining transmission resources of the fourth main user; wherein the fourth main user is the user to be scheduled with the highest scheduling priority in the second user sequence after the first main user is removed from the second user sequence; and the beam space division efficiency between the first secondary user and the third main user satisfies a first preset condition.

[0233] Optionally, the resource allocation device 800 may further include a storage unit ( Figure 8The storage unit stores a program or instruction. When the processing unit 801 executes the program or instruction, the resource allocation device can execute the resource allocation method described in the above method embodiment.

[0234] also, Figure 8 The technical effects of the resource allocation device can refer to the technical effects of the resource allocation method described in the above embodiment, which will not be repeated here.

[0235] For example, Fig. 9 FIG. 2 is another possible structural diagram of the resource allocation device involved in the above embodiment. Fig. 9 As shown, the resource allocation device 900 includes: a processor 902 .

[0236] The processor 902 is used to control and manage the actions of the resource allocation device, for example, to execute the steps executed by the above-mentioned processing unit 801, and / or to execute other processes of the technical solution described in this document.

[0237] The processor 902 may be a processor that implements or executes various exemplary logic blocks, modules, and circuits described in conjunction with the contents of this application. The processor may be a central processing unit, a general-purpose processor, a digital signal processor, an application-specific integrated circuit, a field programmable gate array, or other programmable logic devices, transistor logic devices, hardware components, or any combination thereof. It may implement or execute various exemplary logic blocks, modules, and circuits described in conjunction with the contents disclosed in this application. The processor may also be a combination that implements computing functions, such as a combination of one or more microprocessors, a combination of a DSP and a microprocessor, and the like.

[0238] Optionally, the resource allocation device 900 may further include a communication interface 903, a memory 901 and a bus 904. The communication interface 903 is used to support the communication between the resource allocation device 900 and other network entities. The memory 901 is used to store program codes and data of the resource allocation device.

[0239] Among them, the memory 901 can be a memory in the resource allocation device, which can include a volatile memory, such as a random access memory; the memory can also include a non-volatile memory, such as a read-only memory, a flash memory, a hard disk or a solid-state drive; the memory can also include a combination of the above types of memory.

[0240] The bus 904 may be an Extended Industry Standard Architecture (EISA) bus, etc. The bus 904 may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Fig. 9Only one thick line is used in the diagram, but this does not mean that there is only one bus or only one type of bus.

[0241] Through the description of the above implementation methods, those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above functional modules is used as an example. In actual applications, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. The specific working process of the system, device and module described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.

[0242] An embodiment of the present application provides a computer program product including instructions. When the computer program product is run on an electronic device of the present application, the computer is enabled to execute the resource allocation method described in the above method embodiment.

[0243] An embodiment of the present application also provides a computer-readable storage medium, in which instructions are stored. When a computer executes the instructions, the electronic device of the present application executes each step executed by the resource allocation device in the method flow shown in the above method embodiment.

[0244] Among them, the computer-readable storage medium can be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media (a non-exhaustive list) include: an electrical connection with one or more wires, a portable computer disk, and a hard disk. Random Access Memory (RAM), Read-Only Memory (ROM), Erasable Programmable Read Only Memory (EPROM), registers, hard disks, optical fibers, portable compact disk read-only memory (CD-ROM), optical storage devices, magnetic storage devices, or any other form of computer-readable storage medium in a suitable combination of the above, or numerical values ​​in the art. An exemplary storage medium is coupled to a processor so that the processor can read information from the storage medium and write information to the storage medium. Of course, the storage medium can also be a component of the processor. The processor and the storage medium can be located in an Application Specific Integrated Circuit (ASIC). In the embodiments of the present application, a computer-readable storage medium may be any tangible medium that contains or stores a program, which may be used by or in conjunction with an instruction execution system, apparatus, or device.

[0245] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A transmission resource allocation method, It is characterized in that The method comprises: Determine a first secondary user and a first primary user paired with the first secondary user; the first primary user and the first secondary user are users among a plurality of users to be scheduled, the scheduling priority of the first primary user is higher than that of the first secondary user, and a beam space division efficiency between the first primary user and the first secondary user satisfies a first preset condition, and the beam space division efficiency is used to characterize the communication efficiency when the first primary user and the first secondary user share transmission resources; determining a remaining amount of transmission resources for the first primary user; Allocating transmission resources to the first secondary user according to the remaining transmission resource amount of the first primary user specifically includes: determining a resource requirement of the first secondary user; Determine a second user sequence according to the descending order of scheduling priorities of the multiple primary users; wherein the second user sequence includes the multiple primary users; Determine a third user sequence according to the descending order of the scheduling priorities of the multiple candidate users; wherein the third user sequence includes the multiple candidate users; the candidate users include users other than the multiple primary users among the multiple users to be scheduled; If the remaining transmission resources of the first primary user are greater than the resource requirement of the first secondary user, allocating a first number of transmission resources to the first secondary user from the remaining transmission resources of the first primary user, where the first number is equal to the resource requirement of the first secondary user; and removing the first secondary user from the third user sequence; If the remaining transmission resource amount of the first primary user is equal to the resource demand amount of the first secondary user, determining the remaining transmission resource of the first primary user as the transmission resource of the first secondary user; removing the first primary user from the second user sequence, and removing the first secondary user from the third user sequence; If the remaining transmission resources of the first primary user are less than the resource requirement of the first secondary user, the remaining transmission resources of the first primary user are determined as part of the transmission resources of the first secondary user, and the resource requirement of the first secondary user is updated; the first primary user is removed from the second user sequence; In a case where the remaining transmission resource amount of the first primary user is greater than the resource requirement amount of the first secondary user, after removing the first secondary user from the third user sequence, determining a second secondary user from the third user sequence, and determining a second primary user paired with the second secondary user from the second user sequence; and allocating transmission resources to the second secondary user according to the remaining transmission resource amount of the first primary user; The second secondary user is a user with the highest scheduling priority in the third user sequence after the first secondary user is removed from the third user sequence; the beam space division efficiency between the second secondary user and the second primary user meets a first preset condition; In a case where the remaining transmission resource amount of the first primary user is equal to the resource demand amount of the first secondary user, after removing the first primary user from the second user sequence and removing the first secondary user from the third user sequence, determining a third secondary user from the third user sequence, and determining a third primary user paired with the third secondary user from the second user sequence; and allocating transmission resources to the third secondary user according to the remaining transmission resource amount of the third primary user; The third secondary user is a user with the highest scheduling priority in the third user sequence after the first secondary user is removed from the third user sequence; the beam space division efficiency between the third secondary user and the third primary user meets the first preset condition; When the remaining transmission resource amount of the first primary user is less than the resource requirement amount of the first secondary user, after removing the first primary user from the second user sequence, determining a fourth primary user paired with the first secondary user from the second user sequence; and allocating transmission resources to the first secondary user according to the remaining transmission resource amount of the fourth primary user; Among them, the fourth main user is the user to be scheduled with the highest scheduling priority in the second user sequence after the first main user is removed from the second user sequence; the beam space division efficiency between the first secondary user and the third main user meets the first preset condition.

2. The method according to claim 1, It is characterized in that Before determining the remaining transmission resource amount of the first primary user, the method further includes: Determine a first user sequence according to the descending order of scheduling priorities of the multiple users to be scheduled; Allocate transmission resources to the users to be scheduled in the first user sequence in order; Each of the to-be-scheduled users to which transmission resources are allocated in the first user sequence is determined as a primary user; wherein there are multiple primary users, and the first primary user is the user with the highest scheduling priority among the multiple primary users.

3. The method according to claim 2, It is characterized in that The determining a first secondary user and a first primary user paired with the first secondary user specifically includes: Determine the beam space division efficiency between the first candidate user and each primary user in the third user sequence; If the beam space division efficiency between the first alternative user and the main user meets the first preset condition, the first alternative user is determined as the first auxiliary user, and the main user is determined as the first main user; wherein the first preset condition is that the beam space division efficiency is the largest among the beam space division efficiencies between the first alternative user and each of the main users.

4. The method according to claim 3, It is characterized in that The determining the beam space division efficiency between the first candidate user and each primary user in the third user sequence specifically includes: Determine a beam space efficiency library; the beam space efficiency library includes the beam space efficiency corresponding to the beam combination composed of every two pairs of the multiple users to be scheduled; Determine beam identities IDs of the first primary user and the candidate user; The beam space division efficiency between the first primary user and each of the candidate users is determined from the beam space division efficiency library according to the beam identity IDs of the first primary user and the candidate users.

5. A resource allocation device, It is characterized in that The resource allocation device comprises: a processing unit; The processing unit is configured to determine a first secondary user and a first primary user paired with the first secondary user; the first primary user and the first secondary user are users among a plurality of users to be scheduled, the scheduling priority of the first primary user is higher than that of the first secondary user, and a beam space division efficiency between the first primary user and the first secondary user satisfies a first preset condition, and the beam space division efficiency is used to characterize the communication efficiency when the first primary user and the first secondary user share transmission resources; The processing unit is further used to determine the remaining transmission resource amount of the first primary user; The processing unit is further configured to allocate transmission resources to the first secondary user according to the remaining transmission resource amount of the first primary user; The processing unit is further configured to determine a second user sequence according to the scheduling priorities of the multiple primary users in descending order; wherein the second user sequence includes the multiple primary users; The processing unit is further configured to determine a third user sequence according to the descending order of the scheduling priorities of the multiple candidate users; wherein the third user sequence includes the multiple candidate users; and the candidate users include users other than the multiple primary users among the multiple users to be scheduled; The processing unit is further configured to determine a resource requirement of the first secondary user; The processing unit is further configured to allocate a first amount of transmission resources to the first secondary user from the remaining transmission resources of the first primary user when the remaining transmission resources of the first primary user are greater than the resource demand of the first secondary user, wherein the first amount is equal to the resource demand of the first secondary user; and remove the first secondary user from the third user sequence; The processing unit is further configured to, when the remaining transmission resource amount of the first primary user is equal to the resource demand amount of the first secondary user, determine the remaining transmission resource of the first primary user as the transmission resource of the first secondary user; remove the first primary user from the second user sequence, and remove the first secondary user from the third user sequence; The processing unit is further configured to, when the remaining transmission resource amount of the first primary user is less than the resource requirement amount of the first secondary user, determine the remaining transmission resource of the first primary user as part of the transmission resource of the first secondary user, and update the resource requirement amount of the first secondary user; and remove the first primary user from the second user sequence; The processing unit is further configured to, when the remaining transmission resource amount of the first primary user is greater than the resource demand amount of the first secondary user, determine a second secondary user from the third user sequence after removing the first secondary user from the third user sequence, and determine a second primary user paired with the second secondary user from the second user sequence; allocate transmission resources to the second secondary user according to the remaining transmission resource amount of the first primary user; wherein the second secondary user is a user with the highest scheduling priority in the third user sequence after the first secondary user is removed from the third user sequence; and the beam space division efficiency between the second secondary user and the second primary user meets a first preset condition; The processing unit is further configured to, when the remaining transmission resource amount of the first primary user is equal to the resource demand amount of the first secondary user, remove the first primary user from the second user sequence, and after removing the first secondary user from the third user sequence, determine a third secondary user from the third user sequence, and determine a third primary user paired with the third secondary user from the second user sequence; allocate transmission resources to the third secondary user according to the remaining transmission resource amount of the third primary user; wherein the third secondary user is a user with the highest scheduling priority in the third user sequence after the first secondary user is removed from the third user sequence; and the beam space division efficiency between the third secondary user and the third primary user meets a first preset condition; The processing unit is also used to, when the remaining transmission resources of the first main user are less than the resource demand of the first secondary user, determine a fourth main user paired with the first secondary user from the second user sequence after the first main user is removed from the second user sequence; allocate transmission resources to the first secondary user according to the remaining transmission resources of the fourth main user; wherein the fourth main user is the user to be scheduled with the highest scheduling priority in the second user sequence after the first main user is removed from the second user sequence; and the beam space division efficiency between the first secondary user and the third main user meets a first preset condition.

6. The resource allocation device according to claim 5, It is characterized in that The processing unit is further configured to determine a first user sequence according to the descending order of the scheduling priorities of the multiple users to be scheduled; The processing unit is further configured to sequentially allocate transmission resources to the to-be-scheduled users in the first user sequence; The processing unit is further used to determine each of the to-be-scheduled users to which transmission resources are allocated in the first user sequence as a primary user; wherein the number of the primary users is multiple, and the first primary user is the user with the highest scheduling priority among the multiple primary users.

7. The resource allocation device according to claim 6, It is characterized in that The processing unit is further used to determine the beam space division efficiency between the first candidate user and each primary user in the third user sequence; The processing unit is also used to determine the first alternative user as the first auxiliary user and the main user as the first main user when the beam space division efficiency between the first alternative user and the main user meets the first preset condition; wherein the first preset condition is that the beam space division efficiency is the largest among the beam space division efficiencies between the first alternative user and each of the main users.

8. The resource allocation device according to claim 7, It is characterized in that The processing unit is further used to determine a beam space division efficiency library; the beam space division efficiency library includes the beam space division efficiency corresponding to the beam combination composed of each pair of two users to be scheduled among the multiple users to be scheduled; The processing unit is further used to determine beam identification IDs of the first primary user and the candidate user; The processing unit is further used to determine the beam space division efficiency between the first main user and each of the candidate users from the beam space division efficiency library according to the beam identity IDs of the first main user and the candidate users.

9. An electronic device, It is characterized in that include: A processor and a memory; wherein the memory is used to store computer-executable instructions, and when the electronic device is running, the processor executes the computer-executable instructions stored in the memory, so that the electronic device executes the resource allocation method as described in any one of claims 1-4.

10. A computer-readable storage medium, It is characterized in that The computer-readable storage medium includes instructions. When the instructions in the computer-readable storage medium are executed by an electronic device, the electronic device is enabled to execute the resource allocation method according to any one of claims 1 to 4.

Citation Information

Patent Citations

  • Method for dispatching resources by combining network coding and user pairing

    CN102202413A

  • Method and device for interference suppression of paired users

    CN102740480A

  • Resource allocation method for MU-MIMO user pairing

    CN103369688A

  • Method and device for multi-user dispatching

    CN103731923A

  • MU-MIMO-ofdma systems and methods for servicing overlapping co-scheduled users

    US20100157924A1