Control method of tunnel excavation device and tunnel excavation device

By using a thrust cylinder configuration between the front body and the rear body of multiple cutters in the tunnel excavation device, the control device moves on the inner wall of the tunnel, which solves the problem of difficulty in moving the rear body when the curve has a large curvature, and achieves for stable and efficient tunnel excavation.

CN115279991BActive Publication Date: 2024-10-08KOMATSU LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202180021456.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2020-05-29
Filing Date
2021-04-22
Publication Date
2024-10-08
Estimated Expiration
2041-04-22

AI Technical Summary

Technical Problem

It is difficult for the existing tunnel excavation device to move along the inner wall of the tunnel when the curve is large, and it is especially difficult for the rear trunk to move on the inner wall.

Method used

Using a thrust cylinder configuration between the front and rear trunks with multiple cutters, the thrust cylinder is controlled to make the front and rear trunks move along the preset movement prediction by extending the support shoes and fixing them on the inner wall of the tunnel. Line movement ensures that the device can effectively move forward and backward on curves with large curvatures.

Benefits of technology

This enables the tunnel excavation device to move stably along the inner wall of the tunnel under large curves, improving excavation efficiency and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115279991B_ABST
    Figure CN115279991B_ABST
Patent Text Reader

Abstract

The present invention provides a control method for a tunnel excavation device and a tunnel excavation device. The control method for a tunnel excavation device (10) comprises a step (S21) and a step (S22). In step (S21), a plurality of thrust cylinders (13a to 13f) are controlled to move a front section (11) forward along a predicted movement line (D1) set based on a tunnel excavation plan line (D10) while the support shoe (12a) of the rear section (12) is extended and the rear section (12) is fixed to the inner wall of the tunnel. In step (S22), a plurality of thrust cylinders (13a to 13f) are controlled to move a rear section (12) forward along a predicted movement line (D1) set based on an actual excavation line (D20) while the support shoe (11b) of the front section (11) is extended and the front section (11) is fixed to the inner wall of the tunnel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a control method of a tunnel excavation device used when excavating a tunnel and the tunnel excavation device. Background Art

[0002] The excavator is provided with a cutter head including a tool on the front surface of the machine and grippers provided on the left and right sides of the rear of the machine to excavate a tunnel. The excavator rotates the cutter head while pressing the left and right grippers against the left and right side walls of the tunnel to press the excavation face and excavate the tunnel (see, for example, Patent Document 1).

[0003] Patent document 1 discloses a control method for a tunnel excavation device having a front section having a cutter for excavating a tunnel and a rear section having grippers for obtaining a reaction force for excavating and connected to a plurality of thrust cylinders via the front section.

[0004] In this tunnel excavation device, when performing curved tunnel excavation, if the travel direction of the tunnel excavation device changes from the planned excavation line due to changes in the hardness of the bedrock texture, the operator checks the display monitor and adjusts the stroke of the thrust cylinder so as not to deviate from the planned excavation line.

[0005] Prior art literature

[0006] Patent Literature

[0007] Patent Document 1: (Japanese) Patent Publication No. 2015-105512 Summary of the invention

[0008] However, in the above-mentioned Patent Document 1, since only the position of the front section is adjusted, it is difficult to move the rear section along the inner wall when the tunnel has a large curve.

[0009] An object of the present disclosure is to provide a control method of a tunnel boring device and a tunnel boring device that can move along the inner wall of a tunnel even on a curve with a large curvature.

[0010] (Technical solutions for solving technical problems)

[0011] The first disclosed control method of a tunnel excavation device is a control method of a tunnel excavation device that is configured with a front section having a plurality of cutters, a rear section configured behind the front section, and a plurality of thrust cylinders configured between the front section and the rear section, and includes a first advancing step and a second advancing step. In the first advancing step, the plurality of thrust cylinders are controlled to move the front section forward along a movement prediction line set based on a first path line while the grippers of the rear section are extended and the rear section is fixed to the inner wall of the tunnel. In the second advancing step, the plurality of thrust cylinders are controlled to move the rear section forward along a movement prediction line set based on a second path line while the grippers of the front section are extended and the front section is fixed to the inner wall of the tunnel.

[0012] A second disclosed method for controlling a tunnel excavation device is a method for controlling a tunnel excavation device that includes a front section having a plurality of cutters, a rear section disposed behind the front section, and a plurality of thrust cylinders disposed between the front section and the rear section, and includes a first retreat step. The first retreat step controls the plurality of thrust cylinders to move the rear section rearward along a movement prediction line set based on a third path line in a state where grippers of the front section are extended and the front section is fixed to an inner wall of a tunnel.

[0013] The third disclosed tunnel excavation device comprises: a front section, a rear section, a plurality of thrust cylinders, and a control section. The front section has a plurality of cutters and support shoes for pressing the inner wall of the tunnel. The rear section has support shoes for pressing the inner wall of the tunnel and is arranged behind the front section. A plurality of thrust cylinders are arranged between the front section and the rear section. The control section controls the plurality of thrust cylinders so that the front section moves forward along a movement prediction line set based on a first path line when the support shoes of the rear section are extended and the rear section is fixed to the inner wall of the tunnel, and controls the plurality of thrust cylinders so that the rear section moves forward along a movement prediction line set based on a second path line when the support shoes of the front section are extended and the front section is fixed to the inner wall of the tunnel.

[0014] The fourth disclosed tunnel excavation device comprises: a front section, a rear section, a plurality of thrust cylinders, and a control section. The front section has a plurality of cutters and grippers for pressing the inner wall of the tunnel. The rear section has grippers for pressing the inner wall of the tunnel and is arranged behind the front section. A plurality of thrust cylinders are arranged between the front section and the rear section. The control section controls the plurality of thrust cylinders to move the rear section rearward along a movement prediction line set based on a third path line while the grippers of the front section are extended and the front section is fixed to the inner wall of the tunnel.

[0015] (Effects of the Invention)

[0016] According to the present disclosure, it is possible to provide a control method for a tunnel boring device and a tunnel boring device that can move along the inner wall of a tunnel even on a curve with a large curvature. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is an overall view showing the structure of a tunnel boring device according to an embodiment of the present invention.

[0018] Figure 2 It means use Figure 1 A cross-sectional view of a tunnel excavation device performing tunnel excavation in a straight line.

[0019] Figure 3 It means use Figure 1 A cross-sectional view of a tunnel excavation device performing tunnel excavation in a curved shape.

[0020] Figure 4 Yes means Figure 1 Block diagram of the control structure of the tunnel boring device.

[0021] Figure 5 It means in control Figure 1 An illustration of the curves used when drilling tunnels.

[0022] Figure 6 Yes means Figure 1 A diagram of a display input portion of a tunnel boring device.

[0023] Fig. 7A This is a diagram for explaining the display of the front body offset amount display unit during excavation.

[0024] Figure 7B This is a diagram for explaining the display of the front body offset amount display unit during excavation.

[0025] Fig. 8A This is a diagram for explaining the display of the rear body offset amount display unit during excavation.

[0026] Figure 8B This is a diagram for explaining the display of the rear body offset amount display unit during excavation.

[0027] Fig.9A This is a diagram for explaining the display of the rear body offset amount display unit during backward movement.

[0028] Fig. 9B This is a diagram for explaining the display of the rear body offset amount display unit during backward movement.

[0029] Fig. 10A This is a diagram for explaining the display of the front body offset amount display unit during backward movement.

[0030] Fig. 10B This is a diagram for explaining the display of the front body offset amount display unit during backward movement.

[0031] Fig.11 Yes means Figure 1Flow chart of the control work of the tunnel excavation device during excavation.

[0032] Fig.12 Yes means Figure 1 Flow chart of the control work of the tunnel excavation device when retreating. DETAILED DESCRIPTION

[0033] A tunnel boring device and a method for controlling the tunnel boring device according to an embodiment of the present disclosure will be described with reference to the drawings.

[0034] The tunnel excavation device 10 ( Figure 1 The tunnel boring machine 10 is an excavation device used for tunnel excavation, and is called a so-called gripper TBM or hard rock TBM in TBM (Tunnel Boring Machine). In addition, in the present embodiment, the tunnel (tunnel T1) excavated by the tunnel excavation device 10 is a tunnel with a substantially circular cross section (tunnel T1 (refer to Figure 2 )). It should be noted that the cross-sectional shape of the tunnel excavated by the tunnel excavation device 10 of this embodiment is not limited to a circle, and may also be an ellipse, a compound circle, a horseshoe, or the like.

[0035] (Overview of Tunnel Excavation Device 10)

[0036] Figure 1 It is an overall view showing the structure of the tunnel boring device 10 .

[0037] The tunnel boring device 10 conducts, for example, a first tunnel T1 (see Figure 2 It should be noted that the tunnel excavation device 10 described in the present embodiment rotates the cutter head 11a and excavates in a state where the cutter head 11a is supported from behind by the gripper shoe 12a.

[0038] The tunnel excavation device 10 is a device that excavates bedrock and the like and advances to perform excavation construction of the first tunnel T1. Figure 1 As shown, it has: a front body 11, a rear body 12, a link mechanism 13, a belt conveyor 14, and a control unit 15 (refer to Figure 4 ), and the display input unit 16 (refer to Figure 4 ).

[0039] The front section 11 has a cutter head 11a, and excavates bedrock, etc. The rear section 12 is disposed at the rear side of the front section 11. The link mechanism 13 connects the front section 11 and the rear section 12. The front section 11 can be bent relative to the rear section 12 by the link mechanism 13. The belt conveyor 14 transports the sand and soil excavated by the cutter head 11a to the rear.

[0040] The control unit 15 controls the operation of the front section 11, the rear section 12, the connecting rod mechanism 13, and the belt conveyor 14. The display input unit 16 is, for example, a touch panel monitor interface, which receives operation input from the operator. Through the input of the operator, the connecting rod mechanism 13 is operated to change the bending of the front section 11 relative to the rear section 12. It should be noted that, although not shown in the figure, a plurality of vehicles equipped with a control device, a power supply device, and a hydraulic system for driving the cutter head 11a, the support shoe 12a, the belt conveyor 14, and the plurality of thrust cylinders 13a to 13f of the connecting rod mechanism 13 are connected to the rear of the rear section 12, and the above-mentioned vehicles are all provided with a driver's seat. The display input unit 16 is configured in front of the driver's seat, for example.

[0041] (Front body 11)

[0042] The front section 11 is disposed at the front of the tunnel boring machine 10. The front section 11 changes its position and posture relative to the rear section 12 by a plurality of thrust cylinders 13a to 13f included in a link mechanism 13 described later. The front section 11 includes a cutter head 11a and gripper shoes 11b.

[0043] The cutter head 11a is disposed at the front end of the front body 11. The cutter head 11a is roughly circular in front view, and rotates with the central axis as the rotation center to dig the bedrock, etc. using a plurality of disc cutters 11c provided on the front end side surface. In addition, the cutter head 11a takes the bedrock, rocks, etc. cut by the disc cutters 11c into the inside through an opening (not shown) formed on the surface.

[0044] The gripper shoes 11b are provided at least on both sides of the width direction of the front body 11. Figure 2 As shown, the shoe 11b protrudes from the outer peripheral surface of the front section 11 toward the side wall T1a of the tunnel T1 and presses against the side wall T1a. Thus, for example, when the tunnel excavation device 10 is moved backward, the front section 11 is supported in the tunnel T1 and the link mechanism 13 is driven in the extension direction, so that the rear section 12 can be moved backward.

[0045] (Rear body 12)

[0046] like Figure 1 As shown, the rear section 12 is arranged at the rear of the tunnel boring device 10. The rear section 12 is arranged at the rear side of the front section 11.

[0047] Gripper shoes 12a are provided on both sides in the width direction of the rear section 12. The rear section 12 and the front section 11 are connected by a link mechanism 13.

[0048] like Figure 2As shown, the gripper 12a protrudes radially outward from the outer peripheral surface of the rear section 12 to press against the side wall T1a of the first tunnel T1 being excavated. Thus, the rear section 12 can be supported in the first tunnel T1.

[0049] (Linkage 13)

[0050] like Figure 1 As shown, the link mechanism 13 is arranged in the middle section of the front-back direction of the tunnel excavation device 10, and the link mechanism 13 has six thrust cylinders 13a to 13f as hydraulic actuators. Therefore, by extending and retracting each thrust cylinder 13a to 13f between the front section 11 and the rear section 12, the posture (direction) of the front section 11 relative to the rear section 12 is controlled to be a desired direction, and the cutter head 11a excavates the first tunnel T1.

[0051] The six thrust cylinders 13a to 13f are arranged in parallel as connecting rods between the front section 11 and the rear section 12 to connect the front section 11 and the rear section 12. The six thrust cylinders 13a to 13f are arranged in a grid structure. One end of the rod side of the six thrust cylinders 13a to 13f is connected to the portion of the front section 11 facing the rear section 12. In addition, one end of the cylinder side of the thrust cylinders 13a to 13f is connected to the portion of the rear section 12 facing the front section 11.

[0052] By extending the thrust cylinders 13a to 13f, the front section 11 can be advanced relative to the rear section 12, or the rear section 12 can be retreated relative to the front section 11, thereby gradually advancing / retreating the tunnel boring device 10. In addition, by contracting the thrust cylinders 13a to 13f, the rear section 12 can be brought closer to the front section 11, or the front section 11 can be brought closer to the rear section 12, thereby gradually advancing / retreating the tunnel boring device 10.

[0053] As described later Figure 4 As shown in FIG. 1 , stroke sensors 17a to 17f are attached to the thrust cylinders 13a to 13f, respectively. The stroke sensors 17a to 17f acquire the stroke amounts of the thrust cylinders 13a to 13f, respectively.

[0054] (Belt conveyor 14)

[0055] The belt conveyor 14 is provided between the front body 11 and the rear body 12 , and conveys bedrock, sand, etc. excavated by the cutter head 11 a from the front body 11 to the rear body 12 .

[0056] It should be noted that, near the belt conveyor 14, there is a virtual inflection point Px (see FIG. Figure 5). By adjusting the stroke of the thrust cylinders 13a to 13f, the front section 11 is tilted relative to the rear section 12 with the virtual inflection point Px as the bending point, thereby enabling excavation in directions other than the straight-ahead direction.

[0057] The tunnel excavation device 10 utilizes the above-mentioned structure to press the gripper shoe 12a against the side wall T1a of the first tunnel T1, thereby holding it in the first tunnel T1 without moving. In this state, the cutter head 11a at the front end is rotated, and the thrust cylinders 13a to 13f of the extension link mechanism 13 are used to press the cutter head 11a, thereby excavating the bedrock and advancing.

[0058] At this time, in the tunnel excavation device 10, the excavated bedrock, sand, etc. are transported to the rear by the belt conveyor 14 or the like. In this way, the tunnel excavation device 10 can Figure 2 ) Excavation.

[0059] In addition, by excavating with the front section 11 tilted relative to the rear section 12, it is also possible to Figure 3 Shown is excavation of the curved tunnel T2.

[0060] (Operation Classification of Tunnel Excavation Device 10)

[0061] With the above-described configuration, the tunnel boring device 10 performs the following operations, thereby performing excavation (advance) or retreat.

[0062] (Excavation)

[0063] During excavation, the front section 11 is moved forward relative to the rear section 12 by extending the thrust cylinders 13a to 13f while the gripper 12a of the rear section 12 is extended and the rear section 12 is fixed to the inner wall of the tunnel. At this time, the cutter head 11a is rotated to perform excavation.

[0064] During excavation, the rear section 12 is advanced toward the front section 11 by retracting the thrust cylinders 13a to 13f while the support shoe 11b of the front section 11 is extended and the front section 11 is fixed to the inner wall of the tunnel (also called replacement work).

[0065] By repeating the above-mentioned operations, the tunnel boring device 10 can move forward.

[0066] (Back)

[0067] When retreating, the thrust cylinders 13a to 13f are extended while the gripper shoes 11b of the front section 11 are extended to fix the front section 11 to the inner wall of the tunnel, so that the rear section 12 retreats.

[0068] When retreating, with the gripper 12a of the rear section 12 extended and the rear section 12 fixed to the inner wall of the tunnel, the thrust cylinders 13a to 13f are retracted to move the front section 11 closer to the rear section 12 and retreat.

[0069] By repeating the above-mentioned operation, the tunnel boring device 10 can move backward.

[0070] (Control Unit 15)

[0071] The control unit 15 includes a processor and a storage device. The processor is, for example, a CPU (Central Processing Unit). Alternatively, the processor may be a processor different from the CPU. The processor executes processing for controlling the tunnel excavation device 10 according to a program. The storage device includes a non-volatile memory such as a ROM (Read Only Memory) and a volatile memory such as a RAM (Random Access Memory). The storage device may also include an auxiliary storage device such as a hard disk or an SSD (Solid State Drive). The storage device is an example of a storage medium that is readable by a non-transitory computer. The storage device stores programs and data for controlling the tunnel excavation device 10.

[0072] The control unit 15 receives a command signal from the display input unit 16 issued by the operator. The operator can select excavation or retreat by operating the display input unit 16. The control unit 15 receives information on the operation selected by the operator.

[0073] Furthermore, the detection values ​​of the stroke sensors 17 a to 17 f are input to the control unit 15 , so that the control unit 15 can acquire the stroke amounts of the thrust cylinders 13 a to 13 f .

[0074] The control unit 15 includes a rear torso posture reading unit 21 , a front torso posture calculation unit 22 , a mid-bend position calculation unit 23 , a movement prediction line calculation unit 24 , a position calculation unit 25 , a display control unit 26 , and a cylinder control unit 27 . Figure 5 It is a diagram showing the movement prediction line obtained by the control unit 15.

[0075] The rear body posture reading unit 21 obtains the center position P1 and the center line C1 (direction) of the rear body 12 based on the current position / posture of the rear body 12 (refer to Figure 5). It should be noted that the center position P1 and the center line C1 of the rear carcass 12 can be obtained by measuring, for example, using a total station (not shown). The center position P1 can be set, for example, to the center of the width direction of the rear carcass 12 and the center of the entire length of the front-to-back direction of the rear carcass 12. In addition, the center line C1 can be set, for example, to the center line of the width direction of the rear carcass 12. The height positions of the center position P1 and the center line C1 can be set to any positions, but can also be set to the center of the entire height of the rear carcass 12, for example.

[0076] The front section posture calculation unit 22 calculates the center position P2 / posture (center line C2) of the front section 11 relative to the rear section 12 based on the position information of the center position P1 / center line C1 of the rear section 12 obtained in the rear section posture reading unit 21 and the stroke amount of each thrust cylinder 13a to 13f. More specifically, Figure 4 As shown, the front trunk posture calculation unit 22 is connected to the stroke sensors 17a~17f respectively installed on the thrust cylinders 13a~13f, and obtains the stroke amount of each thrust cylinder 13a~13f. As a result, the front trunk posture calculation unit 22 can obtain the information related to the stroke amount of each thrust cylinder 13a~13f required for calculating the position / posture of the front trunk 11. It should be noted that the center position P2 can be set to, for example, the center of the width direction of the front trunk 11 and the center of the entire length of the front trunk 11 in the front-to-back direction. In addition, the center line C2 can be set to, for example, the center line of the width direction of the front trunk 11. The height position of the center position P2 and the center line C2 can be set to any position, but for example, it can also be set to the center of the entire height of the front trunk 11.

[0077] The center folding point position calculation unit 23 calculates the virtual center folding point Px (see FIG. 1 ) by calculation based on the center position P1 and the position information of the center line C1 of the rear section 12 obtained by the rear section posture reading unit 21, and the center position P2 and the position information of the center line C2 of the front section 11 obtained by the front section posture calculation unit 22. Figure 5 )’s location.

[0078] like Figure 5 As shown, the predicted movement line calculation unit 24 calculates a smooth three-dimensional curve connecting the center position P1 of the rear section 12 and the center position P2 of the front section 11 based on information related to the center position P1 of the rear section 12, position information related to the virtual mid-point Px, and information related to the center position P2 of the front section 11. This line is the predicted movement line D1 (see the following description) of the tunnel excavation device 10 according to the current posture. Fig. 7A wait).

[0079] In addition, the curve is a parameter curve with the three points of the center position P1 of the rear section 12, the center position P2 of the front section 11, and the mid-point Px as control points, and the center line C1 of the rear section 12 and the center line C2 of the front section 11 as connecting lines. It should be noted that the parameter curve in this embodiment is a quadratic Bezier curve.

[0080] That is, in this embodiment, the center position P1 of the rear body 12 is used as the first control point, the mid-fold point Px is used as the second control point, and the center position P2 of the front body is used as the third control point, so that the three-dimensional arc trajectory can be approximated with good accuracy. Thus, by using the second control point as the mid-fold center, the trajectory (target value) of the three-dimensional curvature radius R can be calculated by changing the one-dimensional parameter.

[0081] The position calculation unit 25 calculates the current position deviation amount (Q1f, Q1r) and the target position deviation amount (Q0f, Q0r).

[0082] The current position offset Q1f is the position offset of the center position P2 of the front section 11 obtained by the rear section posture reading unit 21 and the front section posture calculation unit 22 during excavation from the first path line, and also includes the direction of the position offset from the first path line. In addition, the current position offset Q1f is the position offset of the center position P2 of the front section 11 obtained by the rear section posture reading unit 21 and the front section posture calculation unit 22 during retreat from the third path line, and also includes the direction of the position offset from the third path line.

[0083] The current position offset Q1r is the position offset of the center position P1 of the rear section 12 obtained by the rear section posture reading unit 21 from the second path line during excavation, and also includes the direction of the position offset from the second path line. In addition, the current position offset Q1r is the position offset of the center position P2 of the rear section 12 obtained by the rear section posture reading unit 21 from the third path line during retreat, and also includes the direction of the position offset from the third path line.

[0084] The target position offset Q0f is the position offset from the first path line when the front section 11 is assumed to have advanced a predetermined distance along the predicted movement line D1 obtained based on the current posture during excavation. The target position offset Q0f is the position offset from the third path line when the front section 11 is assumed to have retreated a predetermined distance along the predicted movement line D1 obtained based on the current posture during retreat.

[0085] The target position offset Q0r is the position offset from the second path line when the rear section 12 is assumed to have advanced a predetermined distance along the predicted movement line D1 obtained based on the current posture during excavation. The target position offset Q0r is the position offset from the third path line when the rear section 12 is assumed to have retreated a predetermined distance along the predicted movement line D1 obtained based on the current posture during retreat.

[0086] The predetermined distance may be set to a plurality of values, for example, 50 cm, 1 m, etc.

[0087] It should be noted that, during the excavation work, the first path line is the planned excavation line of the tunnel. The planned excavation line of the tunnel (first path line) can be set, for example, as a line connecting the vertical line of the center of the planned tunnel in the width direction and the position at the same height as the center position P2 of the front section 11. In addition, because the rear section 12 needs to move along the tunnel excavated by the front section 11, the second path line is actually the actual excavation line of the front section 11 after excavation. The actual excavation line (second path line) can be set as the line to which the center position P2 of the front section 11 moves during actual excavation.

[0088] In addition, since it is necessary to retreat along the excavated tunnel during retreat work, the third path line is actually the actual excavation line of the excavated front body 11 or rear body 12. The actual excavation line (third path line) can be set to the line along which the center position P2 of the front body 11 or the center position P1 of the rear body 12 moves during actual excavation.

[0089] When the operator selects excavation, the position calculation unit 25 calculates the current position offset of the front section 11 from the first path line, i.e., the current position offset Q1f, and the position offset of the front section 11 from the first path line when the front section 11 advances a specified distance, i.e., the target position offset Q0f, and calculates the current position offset of the rear section 12 from the second path line, i.e., the current position offset Q1r, and the position offset of the rear section 12 from the second path line when the rear section 12 advances a specified distance, i.e., the target position offset Q0r.

[0090] In addition, when the operator chooses to retreat, the position calculation unit 25 calculates the current position offset of the rear section 12 from the third path line, i.e., the current position offset Q1r, and the position offset of the rear section 12 from the third path line when it retreats a specified distance, i.e., the target position offset Q0r, and calculates the current position offset of the front section 11 from the third path line, i.e., the current position offset Q1f, and the position offset of the front section 11 from the third path line when it retreats a specified distance, i.e., the target position offset Q0f.

[0091] The display control unit 26 causes the display input unit 16 to display each positional deviation amount calculated by the position calculation unit 25 .

[0092] When the operator selects the excavation work, the display control unit 26 displays the current position offset Q1f of the front section 11 calculated by the position calculation unit 25 and the target position offset Q0f when the front section 11 moves forward a specified distance on the display input unit 16, and displays the current position offset Q1r of the rear section 12 calculated by the position calculation unit 25 and the target position offset Q0r when the rear section 12 moves forward a specified distance on the display input unit 16.

[0093] In addition, when the operator selects the retreat operation, the display control unit 26 displays the current position offset Q1f of the front section 11 calculated by the position calculation unit 25 and the target position offset Q0f when the front section 11 retreats a specified distance on the display input unit 16, and displays the current position offset Q1r of the rear section 12 calculated by the position calculation unit 25 and the target position offset Q0r when the rear section 12 retreats a specified distance on the display input unit 16.

[0094] It should be noted that, based on the display of the offset amount between the position on the excavation plan line or the position on the actual excavation line in the display input unit 16, the operator operates the display input unit 16 to reduce the offset amount, so that the thrust cylinders 13a~13f are operated, thereby calculating the movement prediction line D1 again, and calculating and displaying the position offset amount again, which will be described later.

[0095] The cylinder control unit 27 controls the stroke amount of each thrust cylinder 13 a to 13 f included in the link mechanism 13 so that the front section 11 or the rear section 12 moves along the predicted movement line D1 calculated by the predicted movement line calculation unit 24 .

[0096] When the operator selects the extension operation during excavation, the cylinder control unit 27 controls the thrust cylinders 13a to 13f so that the center position P2 of the front section 11 is along the predicted movement line D1, and moves the front section 11 forward.

[0097] When the operator selects the retracting operation during excavation, the cylinder control unit 27 controls the thrust cylinders 13 a to 13 f so that the center position P1 of the rear section 12 is along the predicted movement line D1 , thereby advancing the rear section 12 .

[0098] When the operator selects the extension operation during the backward movement, the cylinder control unit 27 controls the thrust cylinders 13a to 13f so that the center position P1 of the rear section 12 is along the predicted movement line D1, and the rear section 12 is backward moved.

[0099] When the operator selects the retracting operation during the backward movement, the cylinder control unit 27 controls the thrust cylinders 13a to 13f so that the center position P2 of the front section 11 is along the predicted movement line D1, and the front section 11 is retreated.

[0100] (Display input unit 16)

[0101] The display input unit 16 is, for example, a touch panel monitor display interface, and in the present embodiment, is used as an interface for setting a movement prediction line.

[0102] The display input unit 16 displays an advance / retreat setting unit 30 , a posture changing unit 31 , and an offset amount display unit 32 .

[0103] The advance / retreat setting unit 30 is used by the operator to set the forward or backward movement of the tunnel excavation device 10. The offset display unit 32 displays the offset between the current position and the excavation plan line or the actual excavation line, and the offset between the position that has advanced a predetermined distance along the movement prediction line and the position that has advanced a predetermined distance along the excavation plan line or the actual excavation line. The posture changing unit 31 displays a direction input unit 43 for the operator to correct the direction based on the display of the offset display unit 32.

[0104] (Advance / Retreat Setting Unit 30)

[0105] The excavation / retraction setting unit 30 is a switch for switching the moving direction (forward / retraction) of the tunnel excavation device 10 , and performs setting of excavation or retreat of the tunnel excavation device 10 .

[0106] The excavation / retraction setting unit 30 is provided with an excavation button 41 , a retraction button 42 , and a cylinder operation unit 44 for extending and retracting the thrust cylinders 13 a to 13 f as a whole.

[0107] The cylinder operation unit 44 is an operation input unit for setting the operation of the six thrust cylinders 13 a to 13 f included in the link mechanism 13 , and includes an extension button 44 a , a stop button 44 b , and a contraction button 44 c .

[0108] When the thrust cylinders 13a to 13f are driven in the extension direction, the extension button 44a is operated.

[0109] The stop button 44b is operated to stop the movement of the thrust cylinders 13a to 13f.

[0110] When the thrust cylinders 13a to 13f are driven in the contraction direction, the contraction button 44c is operated.

[0111] The excavation button 41 is pressed when digging a tunnel. In a state where the gripper 12a of the rear section 12 is extended and the rear section 12 is fixed in the tunnel, by pressing the extension button 44a of the cylinder operating unit 44 after pressing the excavation button 41, the thrust cylinders 13a to 13f are extended along the movement prediction line D1 so that the center position P2 of the front section 11 is extended, and the front section 11 moves forward.

[0112] In addition, when the support shoe 11b of the front section 11 is extended and the front section 11 is fixed in the tunnel, by pressing the retraction button 44c of the cylinder operating part 44 after pressing the excavation button 41, the thrust cylinders 13a~13f are retracted along the movement prediction line D1 so that the center position P1 of the rear section 12 is moved forward.

[0113] It should be noted that the gripper 12a of the rear section 12 and the gripper 11b of the front section 11 are operated by an operator through an operation unit (not shown).

[0114] In addition, the backward button 42 is pressed when retreating along the tunnel. In a state where the gripper 11b of the front section 11 is extended and the front section 11 is fixed in the tunnel, by pressing the backward button 42 and then pressing the extension button 44a of the cylinder operating unit 44, the thrust cylinders 13a to 13f are extended along the movement prediction line D1 so that the center position P1 of the rear section 12 is extended, and the rear section 12 retreats.

[0115] When the support shoe 12a of the rear section 12 is extended and fixed in the tunnel, by pressing the backward button 42 and then pressing the retraction button 44c of the cylinder operating part 44, the thrust cylinders 13a~13f are retracted along the movement prediction line D1 so that the center position P2 of the front section 11 is moved backward.

[0116] (Posture Changing Unit 31)

[0117] The posture changing unit 31 includes a direction input unit 43. By operating the direction input unit 43 in a desired direction, the thrust cylinders 13a to 13f can be operated to face in the desired direction.

[0118] In order to correct the posture of the tunnel excavation device 10 when a deviation occurs during excavation or retreat to the target position, the direction input unit 43 is operated by the operator and has multiple direction buttons (up button 43a, down button 43b, right button 43c, left button 43d).

[0119] The up button 43a, the down button 43b, the right button 43c, and the left button 43d are buttons for the operator to observe the offset display unit 32, confirm in which direction the offset is generated, and operate in the direction of reducing the offset. Thus, the operator can control the tunnel excavation device 10 to excavate toward the excavation plan line or the actual excavation line only by observing the offset display unit 32 and operating the buttons in the direction of intuitively eliminating the offset.

[0120] For example, when the extension button 44a is pressed during excavation work, when the left button 43d is operated, the specified thrust cylinder is slightly extended, and the front section 11 is bent to the left side relative to the rear section 12 more than the current state, and the front section 11 moves forward. In addition, when the contraction button 44c is pressed during excavation work, when the left button 43d is operated, the specified thrust cylinder is slightly contracted, and the rear section 12 is bent to the left side relative to the front section 11 more than the current state, and the rear section 12 moves forward.

[0121] As described above, the operator can correct the predicted movement line D1 by viewing the offset amount display unit 32 and operating the direction input unit 43 and the cylinder operation unit 44 to correct the posture of the tunnel boring device 10 .

[0122] (Offset Display Section 32)

[0123] The deviation amount display unit 32 includes a front section deviation amount display unit 45 and a rear section deviation amount display unit 46. The front section deviation amount display unit 45 displays the current position deviation amount Q1f and the target position deviation amount Q0f of the front section 11 during excavation and retreat.

[0124] The rear section deviation amount display unit 46 displays the current position deviation amount Q1r and the target position deviation amount Q0r of the rear section 12 during excavation and retreat.

[0125] (Display during excavation work)

[0126] Next, the display of the front section offset amount display unit 45 and the rear section offset amount display unit 46 when the operator sets the excavation work will be described.

[0127] (Display of the front body offset amount display unit 45 during excavation work)

[0128] During the excavation work performed by pressing the excavation button 41, the operator presses the extension button 44a to extend the thrust cylinders 13a to 13f, and confirms and performs the display of the front section displacement display part 45. During the excavation work, when the extension button 44a is pressed, the front section 11 moves forward by extending the thrust cylinders 13a to 13f, and excavation is performed in a state where the gripper 12a of the rear section 12 is extended and the rear section 12 is fixed to the tunnel.

[0129] Fig. 7A Schematic diagram for explaining the current position offset Q1f and the target position offset Q0f. The upper part shows the posture of the tunnel boring device 10, and the lower part shows the display of the front body offset display unit 45. Fig. 7A In the upper section of FIG. 1 , a tunnel excavation plan line D10 is indicated by a dashed line. In addition, a movement prediction line D1 calculated based on the current posture of the tunnel excavation device 10 is indicated.

[0130] like Fig. 7A As shown, the current position deviation amount Q1f during the excavation work is the deviation amount of the center position P2 of the front section 11 from the tunnel excavation plan line D10. The current position deviation amount Q1f includes the deviation amount in the horizontal direction and the deviation amount in the vertical direction.

[0131] The current position deviation Q1f is the current position deviation of the front body 11 relative to the center line C2 (refer to Figure 5 It should be noted that the current position offset Q1f may also be the position offset of the center position P2 of the front body 11 from the excavation plan line D10 in the direction perpendicular to the connecting direction of the excavation plan line D10.

[0132] The current position deviation amount Q1f may not be limited to the position deviation amount based on the center position P2 of the front section 11, and may be based on, for example, the center position in the width direction of the front end or rear end of the front section 11.

[0133] The target position offset Q0f is the offset of the center position P2 of the front section 11 from the tunnel excavation plan line D10 when the front section 11 moves a predetermined distance M along the movement prediction line D1. The target position offset Q0f includes the offset in the horizontal direction and the offset in the vertical direction. Fig. 7AIn the above, the target position offset Q0f is the offset in the direction perpendicular to the center line C2 in the current posture of the front section 11, but is not limited thereto. For example, it may be the offset in the direction perpendicular to the center line C2 in the posture of the front section 11 assuming that it has advanced a predetermined distance M along the predicted movement line D1. In addition, the target position offset Q0f may be the position offset of the center position P2 of the front section 11 from the excavation plan line D10 in the direction perpendicular to the connecting direction of the excavation plan line D10 assuming that it has advanced a predetermined distance M.

[0134] In addition, although the target position deviation amount Q0f is recorded as a position deviation amount based on the center position P2 of the front body 11, it is not limited to this. For example, the center position of the front end or rear end of the front body 11 can also be used as a reference.

[0135] The front section offset display 45 shows a horizontal line X and a vertical line Y, and the intersection of XY is set as the tunnel excavation plan line D10 (also called the target point). As described above, the driver's seat is arranged closer to the rear than the rear section 12, and during excavation, the front section offset display 45 displays the current position offset Q1f and the target position offset Q0f when the front section 11 is observed from the driver's seat. In the front section offset display 45, the current position offset Q1f is indicated by a black triangle "▲", and the target position offset Q0f is indicated by a black circle "●". The operator can identify the current horizontal and vertical position offsets and the horizontal and vertical position offsets when the excavation extension operation is performed and the excavation is advanced in the current posture through the front section offset display 45.

[0136] Next, the operator operates the posture changing unit 31 to change the posture of the tunnel excavation device 10. Specifically, Figure 7B As shown in the upper part of , by pressing the right button 43c, a desired thrust cylinder among the thrust cylinders 13a to 13g is operated, so that the bending of the front section 11 to the left relative to the rear section 12 is reduced. Thus, a new movement prediction line D1 is created. Figure 7B It means by Fig. 7A A diagram showing a state in which the posture of the front body 11 is changed. Figure 7B In FIG. 1 , the previous movement prediction line is represented by a two-dot chain line as D1 ′.

[0137] Then, the offset of the position of the front section 11 from the tunnel excavation plan line D10 when the current front section 11, assuming that the curvature has been reduced, moves a predetermined distance M along the new movement prediction line D1 is calculated to obtain a new target position offset Q0f. In addition, since the position / posture of the front section 11 has changed, the new current position offset Q1f is calculated.

[0138] based on Figure 7B The posture of the tunnel excavation device 10 is corrected by the display of the front body deviation amount display unit 45 shown in the lower section of the figure, thereby the operator can confirm whether the posture can be corrected to be close to the tunnel excavation plan line D10. Then, if it is judged that the correction amount is insufficient, the posture changing unit 31 is changed again, thereby enabling the setting to be close to the tunnel excavation plan line D10.

[0139] Thus, even in a curve with a large curvature, the front section 11 can be advanced along the tunnel excavation plan line D10 formed by excavation.

[0140] (Display of the rear body deviation amount display unit 46 during excavation work)

[0141] When the operator presses the retraction button 44c to retract the thrust cylinders 13a to 13f during the excavation work performed by pressing the excavation button 41, the operator confirms and performs the display of the rear section deviation amount display part 46. During the excavation work, when the retraction button 44c is pressed while the gripper 11b of the front section 11 is extended and the front section 11 is fixed to the tunnel, the thrust cylinders 13a to 13f are retracted and the rear section 12 moves forward.

[0142] Fig. 8A Schematic diagram for explaining the current position offset amount Q1r and the target position offset amount Q0r. The upper part shows the posture of the tunnel boring device 10, and the lower part shows the display of the rear body offset amount display unit 46. Fig. 8A In the upper section of , the actual excavation line D20 is indicated by a dashed line. In addition, the movement prediction line D1 calculated based on the current posture of the tunnel excavation device 10 is indicated.

[0143] Here, the actual excavation line D20 is a line through which the front body 11 actually passes, and coincides with the center line of the excavated tunnel.

[0144] like Fig. 8A As shown, the current position offset Q1r during excavation work is the offset of the center position P1 of the rear body 12 from the actual excavation line D20. The current position offset Q1r includes the offset in the horizontal direction and the offset in the vertical direction.

[0145] The current position deviation Q1r is the current position deviation of the rear body 12 relative to the center line C1 (refer to Figure 5 It should be noted that the current position offset Q1r may also be the position offset of the center position P1 of the rear body 12 from the actual digging line D20 in the direction perpendicular to the connecting direction of the actual digging line D20.

[0146] The current position deviation amount Q1r is not limited to the position deviation amount based on the center position P1 of the rear section 12, and may be based on the center position in the width direction of the front end or rear end of the rear section 12, for example.

[0147] The target position offset Q0r in the excavation work is the offset of the center position P1 of the rear section 12 from the actual excavation line D20 when the rear section 12 moves a predetermined distance M along the predicted movement line D1. The target position offset Q0r includes the offset in the horizontal direction and the offset in the vertical direction. Fig. 8A In the above, the target position offset Q0r is the offset in the direction perpendicular to the center line C1 in the current posture of the rear section 12, but is not limited thereto. For example, it may be the offset in the direction perpendicular to the center line C1 in the posture of the rear section 12 when it is assumed that it has advanced a predetermined distance M along the predicted movement line D1. In addition, the target position offset Q0r may be the position offset of the center position P1 of the rear section 12 from the actual excavation line D20 in the direction perpendicular to the connecting direction of the actual excavation line D20 when it is assumed that it has advanced a predetermined distance M.

[0148] In addition, although the target position deviation amount Q0r is recorded as a position deviation amount based on the center position P1 of the rear body 12, it is not limited to this. For example, the center position in the width direction of the front end or rear end of the rear body 12 can also be used as a reference.

[0149] The rear section offset display 46 displays a horizontal line X and a vertical line Y, and the intersection of XY is set as the actual excavation line D20 (also called the target point). As described above, the driver's seat is arranged closer to the rear than the rear section 12, and during excavation, the rear section offset display 46 displays the current position offset Q1r and the target position offset Q0r when the rear section 12 is observed from the driver's seat. In the rear section offset display 46, the current position offset Q1r is indicated by a black triangle "▲", and the target position offset Q0r is indicated by a black circle "●". The operator can recognize the current horizontal and vertical position offsets through the rear section offset display 46, as well as the horizontal and vertical position offsets when the excavation and retraction work is performed in the current posture and the excavation is advanced.

[0150] Next, the operator operates the posture changing unit 31 to change the posture of the tunnel excavation device 10. Specifically, Figure 8B As shown in the upper part of , by pressing the right button 43c, a desired thrust cylinder among the thrust cylinders 13a to 13g is operated, so that the bending of the rear section 12 to the left relative to the front section 11 is reduced. Thus, a new movement prediction line D1 is created. Figure 8B It means by Fig. 8AA diagram showing a state in which the posture of the rear body 12 is changed. Figure 8B In FIG. 1 , the previous movement prediction line is represented by a two-dot chain line as D1 ′.

[0151] Then, the offset of the position of the rear section 12 from the tunnel excavation plan line D10 when the current rear section 12, assuming that the curvature has been reduced, moves a predetermined distance M along the new movement prediction line D1 is calculated to obtain a new target position offset Q0r. In addition, since the position / posture of the rear section 12 has changed, the new current position offset Q1r is calculated.

[0152] based on Figure 8B The rear body deviation amount display unit 46 shown in the lower section of the figure shows that the posture of the tunnel excavation device 10 is corrected, thereby allowing the operator to confirm whether the posture can be corrected to be close to the actual excavation line D20. Then, if it is determined that the correction amount is insufficient, the posture changing unit 31 is changed again, thereby enabling the setting to be close to the actual excavation line D20.

[0153] Thereby, even if the curve is large, the rear body 12 can be advanced along the tunnel formed by excavation.

[0154] It should be noted that in Fig. 7A and Figure 7B In FIG. 4 , only the front body offset display unit 45 is shown. Fig. 8A and Figure 8B In FIG. 4 , only the rear body offset amount display portion 46 is shown, but both can be displayed at the same time, and both can be changed by setting the movement prediction line D1.

[0155] In addition, Figure 7B and Figure 8B In the description, as an example, pressing the right button 43c to correct the positional deviation in the horizontal direction is described, but not only the horizontal direction but also the positional deviation in the vertical direction can be corrected by pressing the up button 43a or the down button 43b.

[0156] (Back working display)

[0157] Next, the display of the front section offset amount display section 45 and the rear section offset amount display section 46 when the operator sets the backward operation will be described.

[0158] (Display of the rear body deviation amount display unit 46 during the backward operation)

[0159] During the backward operation by pressing the backward button 42, the operator presses the extension button 44a to extend the thrust cylinders 13a to 13f, and confirms and performs the display of the rear section deviation amount display section 46. During the backward operation, when the extension button 44a is pressed in a state where the gripper 11b of the front section 11 is extended and the front section 11 is fixed to the tunnel, the rear section 12 moves backward by extending the thrust cylinders 13a to 13f.

[0160] Fig.9A Schematic diagram for explaining the current position offset amount Q1r and the target position offset amount Q0r. The upper part shows the posture of the tunnel boring device 10, and the lower part shows the display of the rear body offset amount display unit 46. Fig.9A In the upper part of FIG. , an actual excavation line D30 is indicated by a dashed line. In addition, a movement prediction line D1 calculated based on the current posture of the tunnel excavation device 10 is indicated.

[0161] Here, the actual excavation line D30 is a line through which the front section 11 or the rear section 12 actually passes, and coincides with the center line of the excavated tunnel.

[0162] like Fig.9A As shown in FIG. 1 , the current position offset Q1r in the backward operation is the offset of the center position P1 of the rear section 12 from the actual excavation line D30. The current position offset Q1r includes the offset in the horizontal direction and the offset in the vertical direction. The current position offset Q1r is the current position of the rear section 12 relative to the center line C1 (refer to FIG. 1 ). Figure 5 It should be noted that the current position offset Q1r may also be the position offset of the center position P1 of the rear body 12 from the actual digging line D30 in the direction perpendicular to the connecting direction of the actual digging line D30.

[0163] The current position deviation amount Q1r is not limited to the position deviation amount based on the center position P1 of the rear section 12, and may be based on the center position in the width direction of the front end or rear end of the rear section 12, for example.

[0164] The target position offset Q0r in the retreat operation is the offset of the center position P1 of the rear section 12 from the actual excavation line D30 when the rear section 12 retreats a predetermined distance M along the predicted movement line D1. The target position offset Q0r includes the offset in the horizontal direction and the offset in the vertical direction. Fig.9AIn the above, the target position offset Q0r is the offset in the direction perpendicular to the center line C1 in the current posture of the rear section 12, but it is not limited thereto, and for example, it may be the offset in the direction perpendicular to the center line C1 in the posture of the rear section 12 when it is assumed to retreat along the predicted movement line D1 by a predetermined distance M. In addition, the target position offset Q0r may be the position offset of the center position P1 of the rear section 12 from the actual excavation line D30 in the direction perpendicular to the connecting direction of the actual excavation line D30 when it is assumed to retreat by a predetermined distance M.

[0165] In addition, although the target position deviation amount Q0r is calculated using the center position P1 of the rear section 12 as a reference, it is not limited to this. For example, the center position in the width direction of the front end or rear end of the rear section 12 may be used as a reference.

[0166] The rear section offset amount display unit 46 displays a horizontal line X and a vertical line Y, and the intersection of XY is set as the actual excavation line D30 (also called the target point). As described above, the driver's seat is arranged farther to the rear than the rear section 12, and when retreating, the rear section offset amount display unit 46 displays the current position offset amount Q1r and the target position offset amount Q0r when the rear section 12 is viewed from the driver's seat. In the rear section offset amount display unit 46, the current position offset amount Q1r is indicated by a black triangle "▲", and the target position offset amount Q0r is indicated by a black circle "●". The operator can recognize the current horizontal and vertical position offsets and the horizontal and vertical position offsets when retreating in the current posture by performing the retreat extension operation and retreating.

[0167] Next, the operator operates the posture changing unit 31 to change the posture of the tunnel excavation device 10. Specifically, Fig. 9B As shown in the upper part of , by pressing the right button 43c, a desired thrust cylinder among the thrust cylinders 13a to 13g is operated to reduce the curvature of the rear section 12 relative to the front section 11. Thus, a new predicted movement line D1 is created. Fig. 9B It means by Fig.9A A diagram showing a state in which the posture of the rear body 12 is changed. Fig. 9B In FIG. 1 , the previous movement prediction line is represented by a two-dot chain line as D1 ′.

[0168] Then, the position offset of the rear section 12 from the actual excavation line D30 when the current rear section 12, assuming that the curvature has been reduced, retreats a predetermined distance M along the new predicted movement line D1 is calculated to obtain a new target position offset Q0r. In addition, since the position / posture of the rear section 12 has changed, the new current position offset Q1r is calculated.

[0169] based on Fig. 9B The rear body deviation amount display unit 46 shown in the lower section of the figure shows that the posture of the tunnel excavation device 10 is corrected, so that the operator can confirm whether the posture can be corrected to be close to the actual excavation line D30. Then, if it is determined that the correction amount is insufficient, the posture changing unit 31 is changed again, so that it can be set close to the actual excavation line D30.

[0170] Thereby, even if the curve is large, the rear body 12 can be retreated along the tunnel formed by excavation.

[0171] (Display of the front body deviation amount display unit 45 during the backward operation)

[0172] During the backward operation by pressing the backward button 42, the operator confirms and performs the display of the front section deviation display section 45 when the retraction button 44c is pressed to retract the thrust cylinders 13a to 13f. During the backward operation, when the retraction button 44c is pressed with the gripper 12a of the rear section 12 extended and the rear section 12 fixed to the tunnel, the front section 11 is moved backward by retracting the thrust cylinders 13a to 13f.

[0173] Fig. 10A Schematic diagram for explaining the current position offset Q1f and the target position offset Q0f. The upper part shows the posture of the tunnel boring device 10, and the lower part shows the display of the front body offset display unit 45. Fig. 10A In the upper part of FIG. , an actual excavation line D30 is indicated by a dashed line. In addition, a movement prediction line D1 calculated based on the current posture of the tunnel excavation device 10 is indicated.

[0174] Here, the actual excavation line D30 is a line through which the front section 11 or the rear section 12 actually passes, and coincides with the center line of the excavated tunnel.

[0175] like Fig. 10A As shown in FIG. 1 , the current position offset Q1f during the retreat operation is the offset of the center position P2 of the front section 11 from the actual excavation line D30. The current position offset Q1f also includes the offset in the horizontal direction and the offset in the vertical direction. The current position offset Q1f is the current position of the front section 11 relative to the center line C2 (refer to FIG. 1 ). Figure 5 It should be noted that the current position offset Q1f may also be the position offset of the center position P2 of the front body 11 from the actual digging line D30 in the direction perpendicular to the connecting direction of the actual digging line D30.

[0176] The current position deviation amount Q1f may not be limited to the position deviation amount based on the center position P2 of the front section 11, and may be based on, for example, the center position in the width direction of the front end or rear end of the front section 11.

[0177] The target position offset Q0f in the retreat operation is the offset of the center position P2 of the front section 11 from the actual excavation line D30 when the front section 11 retreats a predetermined distance M along the predicted movement line D1. The target position offset Q0f includes the offset in the horizontal direction and the offset in the vertical direction. Fig. 10A In the above, the target position offset Q0f is the offset in the direction perpendicular to the center line C2 in the current posture of the front section 11, but it is not limited thereto, and may be the offset in the direction perpendicular to the center line C2 in the posture of the front section 11 when it is assumed to retreat along the predicted movement line D1 by a predetermined distance M. In addition, the target position offset Q0f may be the position offset of the center position P2 of the front section 11 from the actual excavation line D30 in the direction perpendicular to the connecting direction of the actual excavation line D30 when it is assumed to retreat by a predetermined distance M.

[0178] In addition, although the target position deviation amount Q0f is calculated based on the center position P2 of the front section 11, it is not limited to this. For example, the center position of the front end or rear end of the front section 11 may be used as a reference.

[0179] The front section offset amount display unit 45 displays a horizontal line X and a vertical line Y, and the intersection of XY is set as the target point. It should be noted that, as described above, the driver's seat is arranged farther to the rear than the rear section 12, and when retreating, the front section offset amount display unit 45 displays the current position offset amount Q1f and the target position offset amount Q0f when the front section 11 is viewed from the driver's seat. In the front section offset amount display unit 45, the current position offset amount Q1f is indicated by a black triangle "▲", and the target position offset amount Q0f is indicated by a black circle "●". The operator can recognize the current horizontal and vertical position offsets and the horizontal and vertical position offsets when retreating and retracting in the current posture through the front section offset amount display unit 45.

[0180] Next, the operator operates the posture changing unit 31 to change the posture of the tunnel excavation device 10. Specifically, Fig. 10B As shown in the upper part of , by pressing the right button 43c, a desired thrust cylinder among the thrust cylinders 13a to 13g is operated to reduce the curvature of the front section 11 relative to the rear section 12. Thus, a new predicted movement line D1 is created. Fig. 10B It means by Fig. 10AA diagram showing a state in which the posture of the front body 11 is changed. Fig. 10B In FIG. 1 , the previous movement prediction line is represented by a two-dot chain line as D1 ′.

[0181] Then, the offset of the position of the front section 11 from the actual excavation line D30 when the current front section 11, assuming that the curvature has been reduced, retreats a predetermined distance M along the new predicted movement line D1 is calculated to obtain a new target position offset Q0f. In addition, since the position / posture of the front section 11 has changed, the new current position offset Q1f is calculated.

[0182] based on Fig. 10B The display of the front body deviation amount display unit 45 shown in the lower section of the figure changes the posture of the tunnel excavation device 10, thereby allowing the operator to confirm whether the correction can be made to be close to the actual excavation line D30. Then, if it is determined that the change amount is insufficient, the posture change unit 31 is corrected again, thereby enabling the setting to be close to the actual excavation line D30.

[0183] Thereby, even if the curve is large, the front body 11 can be retreated along the tunnel formed by excavation.

[0184] It should be noted that in Fig.9A and Fig. 9B In FIG. 4 , only the front body offset display unit 45 is shown. Fig. 10A and Fig. 10B In the figure, only the rear body offset display unit 46 is shown, but both can be displayed at the same time, and the display of both can be changed by correcting the posture.

[0185] In addition, Fig. 9B and Fig. 10B In the description, as an example, pressing the right button 43c to correct the positional deviation in the horizontal direction is described. However, not only the horizontal direction but also the positional deviation in the vertical direction can be corrected by pressing the up button 43a or the down button 43b.

[0186] <Work>

[0187] Next, the operation of the tunnel boring device 10 according to the embodiment of the present disclosure will be described, and a method for controlling the tunnel boring device will also be described at the same time.

[0188] (Work during excavation)

[0189] Fig.11 1 is a flowchart showing the control operation of the tunnel boring device 10 during the excavation operation.

[0190] When the excavation button 41 is pressed by the operator, the excavation work starts in step S11.

[0191] Next, in step S12, the rear section posture reading unit 21 obtains the center position P1 and the center line C1 (direction) of the rear section 12 (see Figure 4 ). It should be noted that the center position P1 and the center line C1 of the rear section 12 can be obtained by, for example, measuring with a total station (not shown) or using a posture sensor provided in the rear section 12.

[0192] In addition, in step S12, the front torso posture calculation unit 22 calculates the center position P2 / posture (center line C2) of the front torso 11 relative to the rear torso 12 based on the position information and posture of the center position P1 / center line C1 of the rear torso 12 obtained by the rear torso posture reading unit 21, and the stroke amount of each thrust cylinder 13a~13f.

[0193] Next, in step S13, the mid-folding point position calculation unit 23 calculates the virtual mid-folding point Px (refer to the mid-folding point Px) by calculation based on the position information of the center position P1 and the center line C1 of the rear section 12 obtained by the rear section posture reading unit 21, and the position information of the center position P2 and the center line C2 of the front section 11 obtained by the front section posture calculation unit 22. Figure 4 )’s location.

[0194] Next, in step S14, the movement prediction line calculation unit 24 calculates a smooth movement prediction line D1 connecting the center position P1 of the rear section 12 and the center position P2 of the front section 11 based on information related to the center position P1 of the rear section 12, position information related to the virtual mid-point Px, and information related to the center position P2 of the front section 11.

[0195] Next, in step S15, the position calculation unit 25 calculates the current position offset Q1f and the target position offset Q0f of the front section 11 relative to the excavation plan line D10, and calculates the current position offset Q1r and the target position offset Q0r of the rear section 12 relative to the actual excavation line D20. Fig. 7A As shown, the display control unit 26 displays the current position deviation amount Q1f and the target position deviation amount Q0f on the front body deviation amount display unit 45, and Fig. 8A As shown, the rear body deviation amount display unit 46 displays the current position deviation amount Q1r and the target position deviation amount Q0r.

[0196] Next, in step S16, the control unit 15 determines whether the extension button 44a has been pressed or whether the contraction button 44c has been pressed. In a state where the support shoe 12a of the rear section 12 is extended and the rear section 12 is fixed in the tunnel, if the extension button 44a has been pressed, control enters step S17. In step S17, the thrust cylinders 13a~13f are extended so that the center position P2 of the front section 11 is along the latest movement prediction line D1. The latest movement prediction line D1 mentioned here is repeated in steps S19~S21 described later, and when the posture has been changed, it means the movement prediction line D1 calculated based on the last changed posture. In addition, when the posture is not changed once in step S19, that is, when the control of steps S20 and S21 is not performed, the initial movement prediction line D1 is the latest movement prediction line.

[0197] In step S16, when the gripper 11b of the front section 11 is extended and the front section 11 is fixed in the tunnel, if the retraction button 44c is pressed, the control proceeds to step S18. In step S18, the thrust cylinders 13a to 13f are retracted so that the center position P1 of the rear section 12 is along the latest predicted movement line D1.

[0198] Next, in step S19, the control unit 15 determines whether the operator has operated the direction input unit 43 of the posture changing unit 31. The operator checks the display of the forebody deviation display unit 45 to determine whether the posture of the tunnel excavation device 10 needs to be changed. If it is determined that the deviation is large and the posture needs to be changed, the operator operates the posture changing unit 31.

[0199] If it is determined in step S19 that the operator has performed the operation, in step S20 , the direction instruction manual operation of the thrust cylinders 13 a to 13 f is input, and in step S21 , the predetermined thrust cylinders 13 a to 13 f are slightly extended or retracted.

[0200] Next, the control proceeds to step S22, and the control unit 15 determines whether the control of the thrust cylinders 13a to 13f in step S17 or step S18 has been completed.

[0201] If it is determined in step S22 that the process is not completed, the control returns to step S12.

[0202] As determined in step S22, the thrust cylinders 13a to 13f are being driven, so the posture is changed. In steps S12 to S14, a new predicted movement line D1 is calculated based on the changed posture, and the predicted movement line D1 is updated.

[0203] Then, in step S15, the position calculation unit 25 calculates the current position offsets Q1f and Q1r and the new target position offsets Q0f and Q0r based on the updated movement prediction line D1, and calculates the current position offsets Q1f and Q1r. Figure 7B As shown, the display control unit 26 displays the calculated target position deviation amount Q0f and the current position deviation amount Q1f, and updates the display of the front body deviation amount display unit 45. Figure 8B As shown, the display control unit 26 updates the display of the target position deviation amount Q0r and the current position deviation amount Q1r on the rear body deviation amount display unit 46.

[0204] Thus, the operator can confirm that the target position (tunnel excavation plan line D10 or actual excavation line D20) is approached by changing the posture as the thrust cylinders 13a to 13f are driven. In addition, if the position deviation amount cannot be satisfied, the operator can change the posture in step S19 to create a new movement prediction line D1.

[0205] When the control unit 15 determines in step S22 that the control of the thrust cylinders 13a to 13f has ended, the excavation work ends in step S23.

[0206] In this way, steps S12 to S21 are repeated until the control of the thrust cylinders 13a to 13f is completed. That is, before the control of the thrust cylinders 13a to 13f is completed, the movement prediction line D1 is changed at any time, and the current position offset amount Q1f and the target position offset amount Q0f in the front body offset amount display unit 45, and the current position offset amount Q1r and the target position offset amount Q0r in the rear body offset amount display unit 46 are also changed at any time. Then, based on the display that changes at any time, the operator can manually intervene in the control in steps S19 to S21.

[0207] (Working in reverse)

[0208] Fig.12 1 is a flowchart showing the control operation of the tunnel boring device 10 during the retreat operation.

[0209] When the operator presses the reverse button 42, the reverse operation starts in step S31.

[0210] Working backwards and Fig.11 Compared with the operation during excavation shown in FIG. 1 , steps S15 to S18 are different. Therefore, the difference will be described, and the description of other steps will be omitted.

[0211] In the work of retreat, in the replacement Fig.11In step S35 of step S15, the position calculation unit 25 calculates the current position deviation Q1f of the front section 11 and the target position deviation Q0f when the front section 11 retreats the predetermined distance M, and calculates the current position deviation Q1r of the rear section 12 and the target position deviation Q0r when the rear section 12 retreats the predetermined distance M. Then, as Fig.9A As shown, the display control unit 26 displays the current position offset Q1f and the target position offset Q0f on the front body offset display unit 45, and Fig. 10A As shown, the rear body deviation amount display unit 46 displays the current position deviation amount Q1r and the target position deviation amount Q0r.

[0212] Then, in step S36 following step S35, the control unit 15 determines whether the extension button 44a has been pressed or the retraction button 44c has been pressed. In the state where the gripper 11b of the front section 11 is extended and the front section 11 is fixed in the tunnel, if the extension button 44a has been pressed, the control proceeds to step S37. In step S37, the thrust cylinders 13a to 13f are extended so that the center position P1 of the rear section 12 is along the latest predicted movement line D.

[0213] In step S36, when the gripper 12a of the rear section 12 is extended and the rear section 12 is fixed to the tunnel, if the retraction button 44c is pressed, the control proceeds to step S38. In step S38, the thrust cylinders 13a to 13f are retracted so that the center position P2 of the front section 11 is along the latest predicted movement line D.

[0214] Then, when the control of the cylinder is completed in step S22, the retracting operation is completed in step S43.

[0215] When moving backward, if the control of the thrust cylinders 13a to 13f is not completed in step S37 or step S38, steps S12 to S14, step S35, and step S19 to S21 are repeated. That is, before the control of the thrust cylinders 13a to 13f is completed, the movement prediction line D1 is changed at any time, and the target position offset Q0f and the current position offset Q1f in the front body offset amount display unit 45, and the target position offset Q0r and the current position offset Q1r in the rear body offset amount display unit 46 are also changed at any time. Then, based on the display that changes at any time, the operator can manually intervene in the control in steps S19 to S21.

[0216] (Features, etc.) (1)

[0218] The control method of the tunnel excavation device 10 of the present embodiment is a control method of the tunnel excavation device which is provided with a front section 11 having a plurality of disc cutters 11c (an example of cutters), a rear section 12 arranged behind the front section 11, and a plurality of thrust cylinders 13a to 13f arranged between the front section 11 and the rear section 12, and comprises step S21 (an example of a first forward step) and step S22 (an example of a second forward step). In step S21, the plurality of thrust cylinders 13a to 13f are controlled so that the front section 11 moves forward along a movement prediction line D1 set based on a tunnel excavation plan line D10 (an example of a first path line) in a state where the gripper 12a of the rear section 12 is extended and the rear section 12 is fixed to the inner wall of the tunnel. In step S22, with the support shoe 11b of the front section 11 extended and the front section 11 fixed to the inner wall of the tunnel, multiple thrust cylinders 13a~13f are controlled to move the rear section 12 forward along the movement prediction line D1 set based on the actual excavation line D20 (an example of the second path line).

[0219] In this way, when the tunnel excavation device 10 is moved forward, by moving the rear section 12 along the movement prediction line D1 set based on the actual excavation line D20, not only the front section 11 but also the rear section 12 can be moved along the inner wall of the tunnel in a curve with a large curvature. (2)

[0221] The control method of the tunnel excavation device 10 of the present embodiment is a control method of the tunnel excavation device 10 provided with a front section 11 having a plurality of disc cutters 11c (an example of cutters), a rear section 12 provided at the rear of the front section 11, and a plurality of thrust cylinders 13a to 13f provided between the front section 11 and the rear section 12, and comprises a step S41 (an example of a first retreat step). In the step S41, the plurality of thrust cylinders 13a to 13f are controlled so that the rear section 12 moves backward along a movement prediction line D1 set based on an actual excavation line D30 (an example of a third path line) in a state where the gripper 11b of the front section 11 is extended and the front section 11 is fixed to the inner wall of the tunnel.

[0222] In this way, when the tunnel excavation device 10 is retreated, by moving the rear section 12 along the movement prediction line D1 set based on the actual excavation line D30, not only the front section 11 but also the rear section 12 can be moved along the inner wall of the tunnel in a curve with a large curvature. (3)

[0224] The control method of the tunnel excavation device 10 of the present embodiment further includes step S42 (an example of the second retreat step). Step S42 extends the gripper 12a of the rear section 12 and fixes the rear section 12 to the inner wall of the tunnel, and controls the plurality of thrust cylinders 13a to 13f so that the front section 11 moves backward along the movement prediction line D1 set based on the actual excavation line D30 (an example of the third path line).

[0225] Thus, when the tunnel boring apparatus 10 is retreated, the front section 11 is moved along the predicted movement line D1 set based on the actual excavation line D30, so that the rear section 12 can be moved along the inner wall of the tunnel even in a curve with a large curvature. (4)

[0227] In the control method of the tunnel excavation device 10 according to the present embodiment, the predicted movement line D1 of step S21 is set based on the tunnel excavation plan line D10.

[0228] By setting the predicted movement line D1 along the tunnel excavation plan line D10 , the front body 11 can be moved along the tunnel excavation plan line D10 . (5)

[0230] In the control method of the tunnel excavation device 10 according to the present embodiment, the predicted movement line D1 of step S22 is set based on the actual excavation line D20 along which the front section 11 moves.

[0231] Thereby, the rear section 12 can be moved along the inner wall of the tunnel formed by excavating the front section 11 . (6)

[0233] In the control method of the tunnel excavation device 10 of the present embodiment, the predicted movement line D1 of steps S41 and S42 is the actual excavation line D30 of the tunnel excavation in which the front section 11 or the rear section 12 moves.

[0234] Thereby, it is possible to retreat along the inner wall of the tunnel formed by advancing. (7)

[0236] In the control method of the tunnel boring machine 10 of the present embodiment, in step S21 (an example of the first advancing step), the plurality of thrust cylinders 13a to 13f are controlled so that the center position P2 of the front section 11 is along the predicted movement line D1.

[0237] Thereby, the front section 11 can be moved forward along the predicted movement line D1. (8)

[0239] In the control method of the tunnel boring machine 10 of the present embodiment, in step S22 (an example of the second advancing step), the plurality of thrust cylinders 13a to 13f are controlled so that the center position P1 of the rear section 12 is along the predicted movement line D1.

[0240] Thereby, the rear section 12 can be moved forward along the predicted movement line D1. (9)

[0242] In the control method of the tunnel boring machine 10 of the present embodiment, in step S41 (an example of the first retreat step), the plurality of thrust cylinders 13a to 13f are controlled so that the center position P1 of the rear section 12 is along the predicted movement line D1.

[0243] Thereby, the rear section 12 can be moved backward along the predicted movement line D1. (10)

[0245] In the control method of the tunnel boring machine 10 of the present embodiment, in step S42 (an example of the second retreat step), the plurality of thrust cylinders 13a to 13f are controlled so that the center position P2 of the front section 11 is along the predicted movement line D1.

[0246] Thereby, the front section 11 can be moved backward along the predicted movement line D1. (11)

[0248] In the control method of the tunnel excavation device 10 of this embodiment, the movement prediction line D1 is calculated based on the center position P2 of the front section 11, the center position P1 of the rear section 12, and the intersection point Px of the center line C2 of the front section 11 and the center line C1 of the rear section 12.

[0249] Thereby, the predicted movement line D1 of the front section 11 or the predicted movement line D1 of the rear section 12 is calculated. (12)

[0251] The control method of the tunnel excavation device 10 of the present embodiment further includes step S15 (an example of a first forward display step). Step S15 displays a target position offset Q0f (an example of a first position offset) from a target position (an example of a position) on a tunnel excavation plan line D10 (an example of a first path line) at a predetermined distance M from the front body 11.

[0252] Through this display, the operator can check the offset between the first path line and the predicted movement line D1, and can change the predicted movement line D1 by manually operating the thrust cylinders 13a to 13f, for example, so that the predicted movement line D1 is set close to the first path line. Therefore, when the first path line is, for example, a planned line for tunnel excavation, the front body can be moved forward along the planned line. (13)

[0254] The control method of the tunnel excavation device 10 of the present embodiment further includes step S15 (an example of a second forward display step). Step S15 displays a target position offset Q0r (an example of a second position offset) from a target position (an example of a position) on an actual excavation line D20 (an example of a second path line) at a predetermined distance M from the rear body 12.

[0255] The operator can check the deviation between the actual excavation line D20 and the predicted movement line D1 through this display, and can change the predicted movement line D1 by, for example, manually operating the thrust cylinders 13a to 13f to set the predicted movement line D close to the actual excavation line D20. Therefore, the rear section 12 can be moved forward along the actual excavation line D20. (14)

[0257] The control method of the tunnel excavation device 10 of the present embodiment further includes step S35 (an example of the first backward display step). Step S35 displays a target position offset Q0f (an example of a third position offset) from a target position (an example of a position) on an actual excavation line D30 (an example of a third path line) at a predetermined distance M from the front body 11.

[0258] The operator can check the deviation between the actual excavation line D30 and the predicted movement line D1 through this display, and can change the predicted movement line D1 by, for example, manually operating the thrust cylinders 13a to 13f to set the predicted movement line D1 close to the actual excavation line D30. Therefore, the front section 11 can be moved backward along the actual excavation line D30. (15)

[0260] The control method of the tunnel excavation device 10 of this embodiment further includes step S35 (an example of a second backward display step). Step S35 displays a target position offset Q0f (an example of a fourth position offset) from a target position (an example of a position) on an actual excavation line D30 at a predetermined distance M from the rear body 12.

[0261] Through this display, the operator can check the deviation between the actual excavation line D30 and the predicted movement line D1, and can change the predicted movement line D1 by, for example, manually operating the thrust cylinders 13a to 13f to set the predicted movement line D1 close to the actual excavation line D30. Therefore, the rear section 12 can be moved backward along the actual excavation line D30. (16)

[0263] In the control method of the tunnel excavation device 10 of the present embodiment, together with the target position offset Q0f (an example of the first position offset), step S15 (an example of the first forward display step) also displays the current position offset Q1f (an example of the fifth position offset) of the current position of the front body 11 from the tunnel excavation plan line D10 (an example of the first path line).

[0264] Thus, when the tunnel boring apparatus 10 is moving forward in the current posture, the operator can easily determine whether the positional deviation of the front section 11 from the tunnel boring plan line D10 is smaller than the current amount. (17)

[0266] In the control method of the tunnel excavation device 10 of the present embodiment, together with the target position offset Q0r (an example of the second position offset), step S15 (an example of the second forward display step) also displays the current position offset Q1r (an example of the sixth position offset) of the current position of the rear body 12 from the actual excavation line D20 (an example of the second path line).

[0267] Thus, when the tunnel boring apparatus 10 is advancing in the current posture, the operator can easily determine whether the positional deviation amount of the rear section 12 from the actual excavation line D20 is smaller than the current amount. (18)

[0269] In the control method of the tunnel excavation device 10 of the present embodiment, together with the target position offset Q0r (an example of the third position offset), step S35 (an example of the first backward display step) also displays the current position offset Q1r (an example of the seventh position offset) of the current position of the rear body 12 from the actual excavation line D30 (an example of the third path line).

[0270] Thus, when the tunnel boring apparatus 10 is retreating in the current posture, the operator can easily determine whether the positional deviation amount of the rear section 12 from the actual excavation line D30 is smaller than the current amount. (19)

[0272] In the control method of the tunnel excavation device 10 of the present embodiment, together with the target position offset Q0f (an example of the fourth position offset), step S35 (an example of the second backward display step) also displays the current position offset Q1f (an example of the eighth position offset) of the current position of the front body 11 from the actual excavation line D30 (an example of the third path line).

[0273] Thus, when the tunnel boring apparatus 10 is retreated in the current posture, the operator can easily determine whether the positional deviation amount of the front section 11 from the actual excavation line D30 is smaller than the current amount. (20)

[0275] The tunnel excavation device 10 of this embodiment includes a front section 11, a rear section 12, and a plurality of thrust cylinders 13a to 13f. The front section 11 includes a plurality of disc cutters 11c (an example of cutters) and grippers 11b for pressing the inner wall of the tunnel. The rear section 12 includes grippers 12a for pressing the inner wall of the tunnel and is arranged behind the front section 11. The plurality of thrust cylinders 13a to 13f are arranged between the front section 11 and the rear section 12. The control unit 15 controls the multiple thrust cylinders 13a~13f to move the front section 11 forward along the predicted movement line D1 set based on the tunnel excavation plan line D10 (an example of the first path line) while the support shoe 12a of the rear section 12 is extended and fixed to the inner wall of the tunnel, and controls the multiple thrust cylinders 13a~13f to move the rear section 12 forward along the predicted movement line D1 set based on the actual excavation line D20 (an example of the second path line) while the support shoe 11b of the front section 11 is extended and fixed to the inner wall of the tunnel.

[0276] In this way, when the tunnel excavation device 10 is moved forward, by moving the rear section 12 along the movement prediction line D1 set based on the actual excavation line D20, not only the front section 11 but also the rear section 12 can be moved along the inner wall of the tunnel in a curve with a large curvature. (twenty one)

[0278] The tunnel excavation device 10 of the present embodiment includes: a front section 11, a rear section 12, and a plurality of thrust cylinders 13a to 13f. The front section 11 includes a plurality of disc cutters 11c (an example of cutters) and grippers 11b for pressing the inner wall of the tunnel. The rear section 12 includes grippers 12a for pressing the inner wall of the tunnel and is arranged at the rear of the front section 11. The plurality of thrust cylinders 13a to 13f are arranged between the front section 11 and the rear section 12. The control unit 15 controls the plurality of thrust cylinders 13a to 13f in a state where the grippers 11b of the front section 11 are extended and the front section 11 is fixed to the inner wall of the tunnel, so that the rear section 12 moves rearward along the movement prediction line D1 set based on the actual excavation line D30 (an example of the third path line).

[0279] In this way, when the tunnel excavation device 10 is retreated, by moving the rear section 12 along the movement prediction line D1 set based on the actual excavation line D30, not only the front section 11 but also the rear section 12 can be moved along the inner wall of the tunnel in a curve with a large curvature. (twenty two)

[0281] In the tunnel excavation device 10 of this embodiment, the control unit 15 controls multiple thrust cylinders 13a~13f to move the front section 11 rearward along the movement prediction line D1 set based on the actual excavation line D30 while the support shoe 12a of the rear section 12 is extended and the rear section 12 is fixed to the inner wall of the tunnel.

[0282] Thus, when the tunnel boring apparatus 10 is retreated, the front section 11 is moved along the predicted movement line D1 set based on the actual excavation line D30, so that the rear section 12 can also be moved along the inner wall of the tunnel in a curve with a large curvature.

[0283] (Other Embodiments)

[0284] As mentioned above, although embodiment of this invention was demonstrated, this invention is not limited to the said embodiment, Various changes can be made within the range which does not deviate from the summary of this invention.

[0285] (A)

[0286] In the above embodiment, the current position offset Q1f and target position offset Q0f of the front section 11, and the current position offset Q1r and target position offset Q0r of the rear section 12 are displayed on different display units (front section offset display unit 45 and rear section offset display unit 46), but may also be displayed on one display unit.

[0287] (B)

[0288] In the above-mentioned embodiment, in one step S15, the current position offset Q1f and the target position offset Q0f of the front body 11, and the current position offset Q1r and the target position offset Q0r of the rear body 12 are calculated and displayed, but the calculation and display of the current position offset Q1f and the target position offset Q0f, and the calculation and display of the current position offset Q1r and the target position offset Q0r may be performed in different steps.

[0289] (C)

[0290] In the above embodiment, the tunnel boring device 10 including the link mechanism 13 including six thrust cylinders 13a to 13f is described as an example. However, the present invention is not limited thereto.

[0291] The number of thrust cylinders constituting the link mechanism may be, for example, eight, ten, or any other number as long as it is greater than six.

[0292] (D)

[0293] In the above embodiment, the display input unit 16 is described by taking a touch panel monitor display interface as an example, but it is not limited to this. For example, a normal PC interface can be browsed, and operation input can be performed through a keyboard and mouse, or the display unit and the input unit can be separated.

[0294] (E)

[0295] In the above-described embodiment, a quadratic Bezier curve which is a parametric curve is used as the generated curve, but the present invention is not limited to this.

[0296] For example, a spline curve can also be used as a parametric curve.

[0297] (F)

[0298] In the above embodiment, as an example, the first path line is the tunnel excavation plan line D10, and the second path line is the actual excavation line D20, but it is not limited to this. The first path line and the second path line can be the same, for example, the second path line can also be the tunnel excavation plan line D10.

[0299] (G)

[0300] In the above embodiment, an example is described in which various operation units (advance / retreat setting unit 30, posture changing unit 31, offset amount display unit 32) are arranged in the display input unit 16. However, the present invention is not limited to this.

[0301] For example, other display methods may be used as the display method displayed on the monitor display interface.

[0302] (H)

[0303] In the above embodiment, it is determined in step S19 whether the operator has performed manual operation, and the direction correction operation in step S20 is reflected in the extension and retraction of the thrust cylinder in step S21, and the operator confirms the position deviation and performs the direction correction, but it is not limited to this, and automatic control can also be performed. For example, the control unit can also automatically identify the position deviation and automatically issue a direction correction instruction in the direction in which the position deviation decreases.

[0304] Industrial Applicability

[0305] The control method of the tunnel excavation device and the tunnel excavation device of the present invention have the effect of being able to move along the inner wall of the tunnel even if it is a curve with a large curvature, so it can also be used in mining, etc.

[0306] Description of Reference Numerals

[0307] 10 tunnel excavation device; 11 front body; 12 rear body; 13a to 13f thrust cylinder; 15 control unit

Claims

1. A control method for a tunnel excavation device, the tunnel excavation device comprising: a front section having a plurality of cutters, a rear section arranged behind the front section, and a plurality of thrust cylinders arranged between the front section and the rear section, the control method for the tunnel excavation device comprising: A first forward step, in which the plurality of thrust cylinders are controlled to move the front section forward along a movement prediction line set based on a first path line of an excavation plan line of the tunnel, while the gripper of the rear section is extended and the rear section is fixed to the inner wall of the tunnel; The second forward step controls the plurality of thrust cylinders while the support shoes of the front carcass are extended and the front carcass is fixed to the inner wall of the tunnel, so that the rear carcass moves forward along a predicted movement line set based on a second path line of an actual excavation line of tunnel excavation in which the front carcass moves.

2. A control method for a tunnel excavation device, the tunnel excavation device comprising: a front section having a plurality of cutters, a rear section arranged behind the front section, and a plurality of thrust cylinders arranged between the front section and the rear section, the control method for the tunnel excavation device being characterized by: The first retreat step controls the plurality of thrust cylinders while the support shoes of the front carcass are extended and the front carcass is fixed to the inner wall of the tunnel, so that the rear carcass moves rearward along a movement prediction line set based on a third path line of an actual excavation line of tunnel excavation in which the front carcass or the rear carcass moves.

3. The control method of the tunnel excavation device according to claim 2, characterized in that: There is also a second retreat step, which controls the multiple thrust cylinders to move the front section rearward along the movement prediction line set based on the third path line while the support boots of the rear section are extended and the rear section is fixed to the inner wall of the tunnel.

4. The control method of the tunnel excavation device according to claim 1, characterized in that: In the first forward step, the plurality of thrust cylinders are controlled so that the center position of the front carcass is along the predicted movement line.

5. The control method of a tunnel excavation device according to claim 1 or 4, characterized in that: In the second forward step, the plurality of thrust cylinders are controlled so that the center position of the rear body is along the predicted movement line.

6. The control method of the tunnel excavation device according to claim 2, characterized in that: In the first retreat step, the plurality of thrust cylinders are controlled so that the center position of the rear body is along the predicted movement line.

7. The control method of a tunnel excavation device according to claim 3, characterized in that: In the second retreat step, the plurality of thrust cylinders are controlled so that the center position of the front body is along the predicted movement line.

8. The control method of a tunnel excavation device according to any one of claims 1 to 3, characterized in that: The movement prediction line is obtained based on the center position of the front section, the center position of the rear section, and the intersection point of the center line of the front section and the center line of the rear section, namely, the midpoint.

9. The control method of a tunnel excavation device according to claim 1, characterized in that: There is also a first forward display step, which displays a first position offset between a position on the first path line at a predetermined distance from the front carcass and a position on a movement prediction line set based on the first path line.

10. The control method of a tunnel excavation device according to claim 1 or 9, characterized in that: There is also a second forward display step, which displays a second position offset between a position on the second path line at a predetermined distance from the rear body and a position on a movement prediction line set based on the second path line.

11. The control method of a tunnel excavation device according to claim 2, characterized in that: There is also a first backward display step, which displays a third position offset between a position on the third path line at a predetermined distance from the rear body and a position on a movement prediction line set based on the third path line.

12. The control method of a tunnel excavation device according to claim 3, characterized in that: There is also a second backward display step, which displays a fourth position offset between a position on the third path line at a predetermined distance from the front body and a position on a movement prediction line set based on the third path line.

13. The control method of a tunnel excavation device according to claim 9, characterized in that: Together with the first position offset, the first advancement display step also displays a fifth position offset of the current position of the front carcass from the first path line.

14. The control method of a tunnel excavation device according to claim 10, characterized in that: Together with the second position offset, the second advancement display step also combines and displays a sixth position offset of the current position of the rear carcass from the second path line.

15. The control method of a tunnel excavation device according to claim 11, characterized in that: Together with the third position offset, the first backward display step also displays a seventh position offset of the current position of the rear body portion from the third path line.

16. The control method of a tunnel excavation device according to claim 12, characterized in that: Together with the fourth position offset, the second backward display step also displays an eighth position offset of the current position of the front carcass from the third path line.

17. A tunnel excavation device, characterized in that: have: A front carcass having a plurality of knives and gripper shoes for pressing against the inner wall of the tunnel; a rear carcass having a gripper shoe for pressing the inner wall of the tunnel and arranged behind the front carcass; A plurality of thrust cylinders are arranged between the front carcass and the rear carcass; a control unit that controls the plurality of thrust cylinders to move the front section forward along a movement prediction line set based on a first path line of an excavation plan line of the tunnel, while the gripper of the rear section is extended and the rear section is fixed to the inner wall of the tunnel; And when the support shoes of the front section are extended and the front section is fixed to the inner wall of the tunnel, the multiple thrust cylinders are controlled to move the rear section forward along a movement prediction line set based on a second path line of an actual excavation line of tunnel excavation in which the front section moves.

18. A tunnel excavation device, characterized in that: have: A front carcass having a plurality of knives and gripper shoes for pressing against the inner wall of the tunnel; a rear carcass having a gripper shoe for pressing the inner wall of the tunnel and arranged behind the front carcass; A plurality of thrust cylinders are arranged between the front carcass and the rear carcass; A control unit controls the multiple thrust cylinders in a state where the support shoes of the front section are extended and the front section is fixed to the inner wall of the tunnel, so that the rear section moves rearward along a movement prediction line set based on a third path line of an actual excavation line of tunnel excavation in which the front section or the rear section moves.

19. The tunnel excavation device according to claim 18, characterized in that The control unit controls the plurality of thrust cylinders to move the front section rearward along a movement prediction line set based on the third path line, with the grippers of the rear section extended and the rear section fixed to the inner wall of the tunnel.