Master-substation coordinated remote sequential control operation method based on substation status matrix

By constructing the substation status matrix and hierarchical finite state machine model, the remote sequence control operation of the master and substations is realized, which solves the problems of equipment status identification and cross-interval operation in the existing technology, and improves the operation efficiency and accuracy.

CN115333242BActive Publication Date: 2024-10-22WUHAN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211036143.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-27
Publication Date
2024-10-22
Estimated Expiration
2042-08-27

AI Technical Summary

Technical Problem

The existing sequence control system implements sequence control at the substation end, but cannot realize equipment status identification and automatic generation of operation sequences in real-time topology operation mode, and cannot realize collaborative operations across intervals. There are problems such as large network information access and inconsistent operation ticket storage. question.

Method used

By constructing a master-substation collaborative remote sequence control operation method based on the substation status matrix, including the substation uploading the substation status matrix, the master station identifies the equipment status, performs primary and secondary equipment collaborative intelligent error prevention verification, and generates multi-station collaborative operation tickets. A hierarchical finite state machine model is used to implement operation ticket reasoning and generation.

Benefits of technology

It realizes the coordinated remote sequence control operation of the master and substations, improves the efficiency of equipment status identification and operation ticket generation, ensures the coordination and accuracy of cross-interval and substation operations, and reduces the network load.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115333242B_ABST
    Figure CN115333242B_ABST
Patent Text Reader

Abstract

The present invention provides a master-substation collaborative remote sequential control operation method based on a substation state matrix. Based on this method, the state identification of the operating equipment is realized by constructing a substation state matrix. The primary and secondary equipment collaborative intelligent error prevention is realized by checking the error prevention rules of the substation state matrix. Multi-station collaborative operation ticket generation is realized by constructing a two-layer operation ticket generation model based on the substation state matrix; the lower layer is an interval operation ticket generation model based on the interval state value, which adopts Q learning to solve and generate the action sequence within the interval; the upper layer is a multi-interval and substation operation ticket generation model based on the substation state matrix, and the decision-making level table is constructed by graph theory to classify the action sequence in each interval, so as to realize the operation ticket generation of multiple intervals and substations. Finally, the master-substation interaction process based on the substation state matrix is ​​given, so as to realize the full process of remote sequential control operation of the master-substation collaboration.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of power system operation and automation technology, and in particular to a master-substation coordinated remote sequential control operation method based on a transformer substation state matrix. Background Art

[0002] At present, the sequence control at home and abroad is mainly implemented at the substation end. It has not been realized to identify the operating equipment status based on the real-time topological operation mode, and it has not been realized to automatically generate the operation sequence and actively judge the locking signal. Among them, for the centralized control sequential control system, when the plant and station are expanded, the operation ticket debugging of the newly added interval can only be targeted at the current interval, and it cannot be coordinated with the operating interval. In the distributed control sequential control system, the background server needs to frequently access the interval layer equipment, which may lead to excessive network information access, and the operation ticket storage mechanism is inconsistent, which is not conducive to cross-interval operation. There are also some sequential control systems that can only realize local (plant and station end) sequential control operations, and the remote sequential control function cannot be realized. The five-protection locking function in the existing sequential control program is mainly based on the opening and closing sequence and connectivity of the circuit breaker and the knife switch. When performing sequential control operations, operation and maintenance personnel often judge whether there is a signal abnormality from the protection signal based on experience and logical reasoning, so as to determine whether to terminate the sequential control operation.

[0003] Therefore, how to realize remote sequential control operation of master-substation collaboration, realize full-business remote collaborative sequential control operation technology such as operation equipment status recognition, primary and secondary equipment collaborative intelligent error prevention, cross-interval and substation operation ticket generation, etc. has become a technical problem that needs to be solved urgently. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides a master-substation collaborative remote sequential control operation method based on a substation status matrix.

[0005] The present invention provides a master-substation coordinated remote sequential control operation method based on a substation state matrix, and the master-substation coordinated remote sequential control operation method based on a substation state matrix comprises:

[0006] The substation uploads the substation status matrix to the master station. The master station identifies the equipment status by reading the substation status matrix. The generation steps of the substation status matrix are divided into three steps: interval status value generation, substation status matrix generation, and inter-station correlation vector generation.

[0007] Based on the substation status matrix, the primary and secondary equipments conduct intelligent error prevention verification. The master station verifies the cross-substation error prevention rules based on the substation status matrix and the inter-station correlation vector. The substation verifies the cross-interval and intra-interval error prevention rules based on the substation status matrix.

[0008] Based on the substation state matrix, a multi-station collaborative operation ticket generation model is constructed based on the substation state matrix to realize the multi-station collaborative operation ticket generation; the lower model is the plant-side operation ticket reasoning model based on the substation state matrix, which is constructed with the conversion of the plant-side state matrix as the objective function and the intra-interval and multi-interval parallel anti-error rules as constraints; the upper model is the multi-station-side operation ticket reasoning model based on the substation state matrix, which is constructed with the conversion of the multi-station-side state matrix as the objective function and the multi-station-side parallel anti-error rules as constraints; the idea of ​​hierarchical finite state machine is used to construct a multi-layer finite state machine model under rule constraints, so as to realize the solution of the double-layer operation ticket reasoning model and realize the reasoning generation of multi-station-side operation tickets;

[0009] Based on the master-substation collaborative interaction process of the substation status matrix, the master station sends the action matrix to guide the substation action, and the substation uploads the status matrix to enable the master station to confirm the equipment action status.

[0010] Optionally, interval status value generation includes:

[0011] The bay status value is generated based on the typical switching operation ticket of the bay, and the bay status value is used to describe the status of each device in the bay.

[0012] Optionally, the substation status matrix generation includes:

[0013] Perform node settings on each interval model to obtain a node association matrix;

[0014] Combining the node association matrix and the interval status value, the substation status matrix is ​​obtained.

[0015] Optionally, the inter-station association vector generation includes:

[0016] Based on the physical association relationship between substations, the inter-station association vector is obtained.

[0017] Optionally, the primary and secondary equipment collaborative intelligent error prevention verification based on the substation state matrix includes:

[0018] Set multi-substation parallel error prevention rule constraints, interval parallel error prevention rule constraints, and interval error prevention rule constraints. The multi-substation parallel error prevention rule constraints are as follows:

[0019] For the bays at both ends of the inter-substation connection line, when switching from operation to cold standby, the switch bay on the load side should be switched to cold standby first, and then the switch bay on the power supply side should be switched to cold standby;

[0020] For the bays at both ends of the interconnecting lines between substations, when switching from cold standby to operation, the switch bays on the power supply side should be switched to operation first, and then the switch bays on the load side should be switched to operation;

[0021] The actions of the interval protection at both ends of the inter-substation connection line must be synchronized. Synchronization means that the interval states or protection actions of the two intervals cannot be different after two consecutive operation items are completed.

[0022] The interval parallel error prevention rule constraints are:

[0023] When the main transformer, line, or bus bay is switched from operation to maintenance, the relevant switch bays are required to be in cold standby or maintenance status;

[0024] If the switch bays involved in the operation are on the same line, they need to maintain state synchronization;

[0025] If the switch bays involved in the operation are on the same line, their protection actions must be synchronized;

[0026] When performing busbar reversal operation in double busbar connection mode, the busbar tie switch bay is in operation state, and the related line switch bays in operation state need to be connected to the standby busbar, and the standby busbar is in operation state;

[0027] The error prevention rule constraints within the interval are:

[0028] When the circuit breaker is closed, the isolating switch, grounding switch, secondary protection equipment and maintenance handle should be in the operating state;

[0029] When the busbar side disconnector is opened or closed, the load side disconnector should be in the open position, the circuit breaker in this compartment should be in the open position, and the grounding switch, secondary protection equipment, and maintenance handle should be in the operating state;

[0030] When the load-side disconnector is opened or closed, the busbar-side disconnector should be in the closed position, the circuit breaker in this compartment should be in the open position, and the grounding switch, secondary protection equipment, and maintenance handle should be in the operating state;

[0031] When the earthing knife switch is closed, the isolating switch should be in the open position;

[0032] Before closing the isolating switch and circuit breaker, you need to close the corresponding circuit breaker motor power switch, operating power supply and isolating switch motor, control power switch;

[0033] When operating the opening and closing of the grounding switch, the corresponding grounding switch motor and the control power switch must be closed before operation.

[0034] Optionally, the generation of a multi-station collaborative operation ticket based on a substation status matrix includes:

[0035] Based on the two-layer model of multi-substation collaborative operation ticket, a three-layer finite state machine model is constructed to solve the model. For the lower-layer plant-side operation ticket model, a finite state machine operation ticket model based on the interval state value is first constructed; then a plant-side finite state machine operation ticket model based on the substation state matrix is ​​constructed;

[0036] The specific solution steps of the plant-side finite state machine operation ticket model are as follows:

[0037] 1) Decompose the initial state matrix and the target state matrix into initial state values ​​and target state values ​​in interval units, and substitute them into the finite state machine operation ticket model in the interval to obtain the action sequence of each interval;

[0038] 2) Take the first action of each interval action sequence to form the action matrix A. The elements of the interval without action sequence are set to 0, that is, no action;

[0039] 3) Traverse each action a in the action matrix in turn. If the error prevention rule is violated, the element indicating the interval action in the action matrix is ​​set to 0. If the error prevention rule is not violated, no change is made;

[0040] 4) Output the adjusted action matrix and remove the first action of the action sequence in the interval of the action;

[0041] 5) Repeat steps (2-4) until the target state is reached or all action sequences are empty, the solution is completed, and the plant-side action matrix sequence is output, which is the generated plant-side operation ticket;

[0042] For the upper-layer multi-station operation ticket model, a multi-station finite state machine operation ticket model based on the inter-station association vector is constructed on the basis of the plant-station finite state machine operation ticket model.

[0043] The steps for solving the multi-station finite state machine operation ticket model are as follows:

[0044] 1) Decompose the initial state matrix set and the target state matrix set into the initial state matrix and the target state matrix of each substation, and substitute them into the finite state machine operation ticket model at the plant end to obtain the action matrix sequence of each substation;

[0045] 2) Take the first action matrix of each substation action matrix sequence to form an action matrix set Az, and the matrix unit of the substation without an action matrix sequence is set to 0 matrix, that is, no action;

[0046] 3) Traverse each action matrix Azi in the action matrix set in turn. If the error prevention rule is violated, the matrix unit indicating the substation action in the action matrix set is set to 0. If the error prevention rule is not violated, no change is made;

[0047] 4) Output the adjusted action matrix and remove the first action of the action sequence in the interval of the action;

[0048] 5) Repeat steps (2-4) until the target state is reached or all action sequences are empty, the solution is completed, and the action matrix set sequence is output, which is the generated multi-station operation ticket.

[0049] Optionally, the finite state machine operation ticket model within the interval is described as follows:

[0050] m=(s,a,f,s end ,s0)

[0051] Where s is the state set of the finite state machine in the interval, and the interval state value set appearing in the typical interval operation ticket is taken, that is, s = {s(0), s(1), s(2), ..., s(t)};

[0052] a is the set of actions of the finite state machine within the interval, and its actions refer to the actions that change the state of the device within the interval;

[0053] f is the state transfer function;

[0054] S end is the target state, when s(t)=S end When , the state action is terminated and the action sequence is output, s0 is the initial state of the interval.

[0055] Optionally, the plant-side finite state machine operation ticket model is described as follows:

[0056] M=(S,A,F,O(a),S end ,S0)

[0057] Among them, S is the state matrix set of the finite state machine at the plant end, and its value is composed of the substation state matrix P composed of interval state values;

[0058] A is the set of finite state machine action matrices at the plant end, which is composed of the corresponding actions a of each interval, and its structure is consistent with the substation state matrix;

[0059] F is the state transfer function, S(t)=F(S(t-1),A), the principle is to change the interval state according to the interval state transfer diagram for the action of each interval based on the action matrix A, so as to obtain the state matrix after the action;

[0060] O(a) is the error prevention rule constraint judgment function. In order to ensure that the generated plant-side operation ticket does not violate the error prevention rule constraint between intervals, each interval action in the action matrix needs to be verified by the O(a) function in turn. If the error prevention rule is violated, that is, O(a) = 1, the interval action is set to 0, that is, no action is taken, and the original action sequence is moved back one step.

[0061] S end is the target state matrix of the plant end, when S(t)=S end When , the process is terminated and the action matrix sequence is output, where S0 is the initial state matrix of the plant end.

[0062] Optionally, the multi-station finite state machine operation ticket model is described as follows:

[0063] M z =(S z ,A z ,F,O(A zi ),S z end ,S z 0)

[0064] Among them, S z =[S z1 ,S z2 ,…,S zn ] is the set of multi-station finite state machine state matrix sets, consisting of the substation state matrices P of substations z1~zn;

[0065] A z =[A z1 ,A z2 ,…,A zn ] is a set of multi-station finite state machine action matrix sets, consisting of substation action matrices of substations z1~zn;

[0066] F is the state transfer function, Sz(t) = F(Sz(t-1), Az), and its principle is based on the action matrix set A z The state matrix of each substation is changed according to the action matrix, so as to obtain a state matrix set after the action;

[0067] O(A zi ) is the error prevention rule constraint judgment function. In order to ensure that the generated multi-station operation ticket does not violate the multi-substation error prevention rule constraint, the action matrix concentration action matrix needs to pass through O(A zi ) function to check, if the error prevention rule is violated, that is, O(A zi )=1, then the substation action matrix is ​​set to 0 matrix, that is, no action, and the atomic station action matrix sequence moves back one step;

[0068] S z end is the target state matrix set of multiple stations, when S z (t) = S z end When , the process is terminated and the multi-station action matrix set sequence is output, S z 0 is the initial state matrix set of multiple stations.

[0069] In the present invention, the state of the operating equipment is identified by constructing a substation state matrix. The primary and secondary equipment are collaboratively intelligently prevented from errors by checking the error prevention rules of the substation state matrix. Multi-station collaborative operation ticket generation is achieved by constructing a two-layer operation ticket generation model based on the substation state matrix; the lower layer is an operation ticket generation model within the interval based on the interval state value, which uses Q learning to solve and generate the action sequence within the interval; the upper layer is a multi-interval and substation operation ticket generation model based on the substation state matrix, which uses graph theory to construct a decision-making level table to classify the action sequence within each interval, and realize the operation ticket generation of multiple intervals and substations. Finally, the master-substation interaction process based on the substation state matrix is ​​given, thereby realizing the full process of remote sequential control operation of the master-substation collaboration. BRIEF DESCRIPTION OF THE DRAWINGS

[0070] Figure 1 The present invention is a sequential control system operation flow chart based on the substation state matrix;

[0071] Figure 2 It is a flow chart of an embodiment of a master-substation collaborative remote sequential control operation method based on a substation status matrix of the present invention;

[0072] Figure 3 This is a typical switching operation diagram for a certain interval;

[0073] Figure 4 Set up graphs for each type of interval model node;

[0074] Figure 5 Set up graphs for model partitioning and nodes;

[0075] Figure 6 is the node association graph;

[0076] Figure 7 Solve the flow chart for the two-tier model of multi-substation collaborative operation tickets;

[0077] Figure 8 This is a typical switch interval state transition diagram of type ①;

[0078] Fig. 9 This is the wiring diagram of part 1 of the substation;

[0079] Fig.10 It is the wiring diagram of the 2nd part of the substation;

[0080] Fig.11 It is the master-substation interaction diagram of the sequential control system based on the substation status matrix.

[0081] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0082] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.

[0083] The purpose of the embodiments of the present invention is to propose an overall process framework for the remote collaborative sequential control operation technology of all services of substation equipment, to realize key technologies such as operating equipment status identification, collaborative intelligent error prevention of primary and secondary equipment, and generation of multi-station collaborative operation tickets, thereby realizing the full process of remote sequential control operation of the main and substation collaboration.

[0084] To achieve the above object, the solution of the present invention is:

[0085] Based on the master-substation collaborative remote sequential control operating system of the substation status matrix, the system operation process is as follows:

[0086] 1) The master station generates a substation status matrix describing the status of all operating equipment in the substation according to the operating equipment status in each bay of the substation and the topological relationship between bays;

[0087] 2) The master station converts the cross-substation, interval error prevention rules and interval error prevention rules into the substation status matrix format;

[0088] 3) Receive the operation tasks issued by the operator and convert them into the substation status matrix format;

[0089] 4) The master station generates a multi-station collaborative operation ticket that complies with the error prevention rules based on the substation status matrix;

[0090] 5) The master station rehearses the operation steps, verifies the updated substation status matrix after each operation, and finally feeds back the results;

[0091] 6) The master station sends the operation content to the slave station, and the slave station rehearses the operation steps and performs error prevention checks and feedback results;

[0092] 7) The master station confirms the preview results and sends the sequence control to execute the operation;

[0093] 8) The substation executes the operation steps according to the operation ticket and performs the primary and secondary equipment collaborative intelligent error prevention check at the same time. If there is no error, it will continue to execute until all operations are completed and the results will be fed back to the main station. Otherwise, the operation will be stopped immediately and the results will be fed back to the main station;

[0094] 9) The master station receives the feedback results and displays them on the human-machine interface.

[0095] The operation process of master-substation coordinated remote sequential control based on substation status matrix is ​​as follows: Figure 1 shown.

[0096] The operation task input module is used to receive the operation tasks issued by the operator, and obtain its target state matrix in combination with the initial state matrix of the substation at the substation end, so as to realize the issuance and escape of the operation tasks.

[0097] The operation ticket generation module takes the list of substations that need to change states obtained by the operation task input module and their corresponding initial state matrix and target state matrix as input, and generates a multi-substation collaborative sequential control operation ticket based on the known topological association information between the substations.

[0098] The operation ticket simulation rehearsal module gradually simulates the execution of the sequential control operation ticket, updates the substation status matrix for error-proof rule verification, and further verifies the correctness of the sequential control operation ticket.

[0099] After the sequential control operation ticket passes the simulation rehearsal module, it is formally executed through the sequential control operation module and the operation command is issued to the substation. After the substation executes the operation command, it updates the substation status matrix and uploads it. The master station performs action verification based on the uploaded matrix to determine whether the operation is successful, and thus decides to execute the next step or stop the sequential control operation and return an exception. If all items are completed, the operation is successful and ends.

[0100] Based on the above operation process, a master-substation collaborative remote sequential control operation method based on substation status matrix is ​​proposed.

[0101] In one embodiment, referring to Figure 2 , Figure 2 FIG. 1 is a flow chart of an embodiment of a master-substation coordinated remote sequential control operation method based on a substation status matrix of the present invention. Figure 2 As shown, the master-substation coordinated remote sequential control operation method based on the substation state matrix includes:

[0102] Step S10, the substation uploads the substation status matrix to the master station, and the master station identifies the equipment status by reading the substation status matrix. The substation status matrix generation step is divided into three steps: interval status value generation, substation status matrix generation, and inter-station correlation vector generation;

[0103] Further, in one embodiment, the interval state value generation includes:

[0104] The bay status value is generated based on the typical switching operation ticket of the bay, and the bay status value is used to describe the status of each device in the bay.

[0105] In this embodiment, the bay status value is used to describe the status value of each component device in the bay, which is generated based on a typical switching operation ticket of the bay. Figure 3 This is a typical switching operation diagram of a certain interval. The load side and bus side of the disconnector are defined as the side where the current flows into the interval during interval operation is the bus side, and the side where the current flows out of the interval is the load side.

[0106] According to the content of the switching operation, the interval can be divided into component equipment and its component status value can be defined, as shown in Table 1. The equipment is arranged in sequence according to the equipment operation sequence from operation to maintenance switching operation of the circuit breaker. The equipment status value is set according to the equipment status when the circuit breaker is in maintenance state as 0 and the opposite state as 1.

[0107] Table 1 Interval element equipment division and status value setting

[0108]

[0109] According to Table 1, the interval binary state value p of the interval model to characterize the state of each device can be given e(2) , that is, the device status values ​​are arranged from left to right in sequence. Table 2 shows the interval status represented by interval binary status values.

[0110] Table 2 Interval status value representation interval status comparison table

[0111]

[0112]

[0113] p e(2) The status of the component equipment in the bay can be described, but the premise is to determine the type of the bay. According to the substation equipment wiring diagram, the bay is divided into 11 categories: typical, double-mother, single-side switch bay with grounding knife, typical, double-mother, single-side switch bay without grounding knife, component bay with grounding knife, component bay without grounding knife, main transformer, busbar, line bay, etc., which are sequentially represented by an octal number p t(8) To characterize the interval type, the interval state value p can be represented by p e(2) 、p t(8) As shown in formula (1), we can see that p is also an octal number.

[0114] p=10 (8) ×p e(8) +p t(8) (1)

[0115] The above is the method for generating the interval status value. To generate other types of interval model status values, it is only necessary to modify the device division and status value setting in the corresponding model on this basis to obtain the corresponding interval status value p.

[0116] Further, in one embodiment, generating the substation state matrix includes:

[0117] Nodes are set for each bay model to obtain a node association matrix; the substation state matrix is ​​obtained by combining the node association matrix and the bay state value.

[0118] In this embodiment, the nodes are set to associate the bays with each other, a node association matrix is ​​constructed, and a substation state matrix is ​​further obtained to associate each bay. To construct the node association matrix, nodes need to be set for each bay model, such as Figure 4 As shown, three nodes are set in the double mother switch interval (1-2 nodes are not associated, 1-3 and 2-3 nodes are associated), one node is set in the bus interval with the bus itself as the node, and two nodes are set in the other models with the two ends as nodes.

[0119] Figure 5 This is the bay model division and node setting diagram of a substation primary wiring diagram, from which the node association diagram can be obtained (if a node represents a bus bay, it is self-associated), such as Figure 6 As shown, solid points represent self-correlation and hollow points represent no self-correlation.

[0120] According to formula (2), the node association matrix A can be obtained from the node association graph, and the substation state matrix P can be obtained from formula (3).

[0121]

[0122]

[0123] Where i,j=1,2,…,n, n is the total number of nodes, and p is the corresponding interval state value of the interval associated with node i and node j.

[0124] The substation state matrix can be used to associate all equipment state values ​​in the corresponding substation. To associate the equipment states between multiple substations, it is necessary to introduce inter-station association vectors based on the substation state matrix.

[0125] Furthermore, in one embodiment, generating the inter-station correlation vector includes:

[0126] Based on the physical association relationship between substations, the inter-station association vector is obtained.

[0127] In this embodiment, the association between substations refers to the connection between the outgoing side of a substation and the incoming side of another substation, and current flows through the connecting line. Figure 5 Node No. 9 is the node connected to another substation.

[0128] The physical relationship between substations can be represented by the inter-station association vector, and the representation method is as follows:

[0129] If the substation state matrix of substation 1 is P 1 , there are n nodes, the substation state matrix of substation 2 is P 2 , there are m nodes, the physical association relationship between substations 1 and 2 is that node α of substation 1 is connected to node β of substation 2, then the inter-station association vector is:

[0130] Con(1,2)=[α,β] (4)

[0131] Where: Con(1,2) represents the inter-station correlation vector between substation 1 and substation 2.

[0132] The inter-station correlation vector can be used to determine whether the two substations are physically related. The Boolean variable CI is introduced to determine whether there is current flowing. α,β Indicates that 1 means current is flowing, and 0 means no current is flowing. Whether current is flowing through the connection line can be indirectly determined by judging whether the intervals at both ends of the connection line have been in the running state at the same time during the sequential control operation. Therefore, CI α,β The value needs to be obtained according to the given operation task.

[0133] After obtaining the substation status matrix, for the equipment operation status to be obtained, as long as its interval is determined, its interval status value can be found from the substation status matrix, thereby obtaining its equipment operation status.

[0134] Step S20, based on the substation state matrix, the primary and secondary equipments perform collaborative intelligent error prevention verification. The master station performs cross-substation error prevention rule verification based on the substation state matrix and the inter-station correlation vector. The substation performs cross-interval and intra-interval error prevention rule verification based on the substation state matrix.

[0135] In this embodiment, the primary and secondary equipment collaborative intelligent error prevention verification based on the substation state matrix includes:

[0136] Set multi-substation parallel error prevention rule constraints, interval parallel error prevention rule constraints, and interval error prevention rule constraints. The multi-substation parallel error prevention rule constraints are as follows:

[0137] For the bays at both ends of the inter-substation connection line, when switching from operation to cold standby, the switch bay on the load side should be switched to cold standby first, and then the switch bay on the power supply side should be switched to cold standby;

[0138] For the bays at both ends of the interconnecting lines between substations, when switching from cold standby to operation, the switch bays on the power supply side should be switched to operation first, and then the switch bays on the load side should be switched to operation;

[0139] The actions of the interval protection at both ends of the inter-substation connection line must be synchronized. Synchronization means that the interval states or protection actions of the two intervals cannot be different after two consecutive operation items are completed.

[0140] The interval parallel error prevention rule constraints are:

[0141] When the main transformer, line, or bus bay is switched from operation to maintenance, the relevant switch bays are required to be in cold standby or maintenance status;

[0142] If the switch bays involved in the operation are on the same line, they need to maintain state synchronization;

[0143] If the switch bays involved in the operation are on the same line, their protection actions must be synchronized;

[0144] When performing busbar reversal operation in double busbar connection mode, the busbar tie switch bay is in operation state, and the related line switch bays in operation state need to be connected to the standby busbar, and the standby busbar is in operation state;

[0145] The error prevention rule constraints within the interval are:

[0146] When the circuit breaker is closed, the isolating switch, grounding switch, secondary protection equipment and maintenance handle should be in the operating state;

[0147] When the busbar side disconnector is opened or closed, the load side disconnector should be in the open position, the circuit breaker in this compartment should be in the open position, and the grounding switch, secondary protection equipment, and maintenance handle should be in the operating state;

[0148] When the load-side disconnector is opened or closed, the busbar-side disconnector should be in the closed position, the circuit breaker in this compartment should be in the open position, and the grounding switch, secondary protection equipment, and maintenance handle should be in the operating state;

[0149] When the earthing knife switch is closed, the isolating switch should be in the open position;

[0150] Before closing the isolating switch and circuit breaker, you need to close the corresponding circuit breaker motor power switch, operating power supply and isolating switch motor, control power switch;

[0151] When operating the opening and closing of the grounding switch, the corresponding grounding switch motor and the control power switch must be closed before operation.

[0152] In this embodiment, the above rule constraints can be set according to actual needs.

[0153] Associate the variable CI with the connecting line α,β have:

[0154]

[0155] Among them, node α of substation z1 is physically connected to node β of substation z2, j1, j2 = 1, 2, ..., m, m is the total number of nodes of substation z, k takes 0 and end, that is, for the initial state matrix or the target state matrix, if there is no interval on node α and an interval on node β are both in operation, then the value is 0, otherwise the value is 1.

[0156] According to the state matrix P z The state value P in z i,jThe interval status and the corresponding protection action can be obtained. Construct the matrix S z And the matrix T z To describe the state matrix P z Each state value P z i,j The interval status and corresponding protection action conditions are constructed as follows:

[0157]

[0158]

[0159] Where: z = 1, 2, ..., n, n is the number of substations, i is the associated node between substations, j = 1, 2, ..., m, m is the total number of nodes in substation z, S z i,j is the interval state matrix, T z i,j To protect the action state matrix.

[0160] The substation status matrix can be obtained:

[0161] The constraints of the multi-substation parallel error prevention rule are:

[0162]

[0163] Among them, z=1,2,…,n, n is the number of substations, Con(z1,z2)=[α,β] means that the α node of substation z1 is connected to the β node of substation z2, and the voltage level of substation z1 is higher than that of substation z2. The interval within the α,j1 node is the switch interval on the load side of the tie line, and the interval within the β,j2 node is the switch interval on the power supply side of the tie line.

[0164] The constraints of multi-interval parallel error prevention rules are:

[0165]

[0166] Among them, j1, j2 = 1, 2, ..., m, m is the total number of nodes in substation z. In constraint 1, the intervals in nodes i and j1 are main transformer, line, and bus intervals, and the intervals in nodes i and j2 are switch intervals; in constraints 2 and 3, the intervals in nodes i and j1 and i and j2 are switch intervals; in constraint 4, the intervals in nodes i and j1 are bus intervals and double-mother switch intervals, and nodes i and j2 are typical switch intervals; in constraint 5, the intervals in nodes i and j1 are double-mother switch intervals, and nodes i and j2 are bus intervals.

[0167] The error prevention rule within the interval is expressed as the binary status value of the interval device:

[0168]

[0169] Where: p e(2) (k) refers to the binary status value of the interval device after the kth operation item is completed.

[0170] Step S30, based on the substation state matrix, multi-station collaborative operation ticket generation, construct a double-layer operation ticket generation model based on the substation state matrix to realize multi-station collaborative operation ticket generation; the lower model is a plant-side operation ticket reasoning model based on the substation state matrix, which is constructed with the conversion of the plant-side state matrix as the objective function and the intra-interval and multi-interval parallel anti-error rules as constraints; the upper model is a multi-station-side operation ticket reasoning model based on the substation state matrix, which is constructed with the conversion of the multi-station-side state matrix as the objective function and the multi-station-side parallel anti-error rules as constraints; the idea of ​​hierarchical finite state machine is used to construct a multi-layer finite state machine model under rule constraints, so as to realize the solution of the double-layer operation ticket reasoning model and realize the reasoning generation of multi-station-side operation tickets;

[0171] In this embodiment, the operation ticket generation system needs to realize the collaborative operation ticket generation of multiple sub-stations, so the operation ticket should be generated by the main station end and sent to the sub-station end. The operation ticket generation process is as follows: Figure 7 As shown:

[0172] A three-layer finite state machine model is constructed based on the two-layer model of multi-substation collaborative operation ticket. For the lower-layer plant-station operation ticket model, the interval finite state machine operation ticket model based on the interval state value is first constructed, and then the plant-station finite state machine operation ticket model based on the substation state matrix is ​​constructed; for the upper-layer multi-station operation ticket model, a multi-station finite state machine operation ticket model based on the inter-station association vector is constructed on the basis of the plant-station finite state machine operation ticket model.

[0173] (1) Interval finite state machine operation ticket model based on interval state value

[0174] The finite state machine operation ticket model within the interval is described as follows:

[0175] m=(s,a,f,s end ,s0) (11)

[0176] 1) s is the state set of the finite state machine in the interval. The interval state value (pe(2)) set appearing in the typical interval operation ticket is taken, that is, s = {s(0), s(1), s(2), ..., s(t)}. Taking the typical switch interval with grounding switch as an example, its typical switching operation is as follows: Figure 3 As shown, the state set that appears is shown in Table 3.

[0177] Table 3 Type ① Typical switch interval status set table

[0178]

[0179] 2) a is the action set of the finite state machine in the interval, and its action refers to the action that causes the state of the equipment in the interval to change. Taking the typical switch interval in type ① as an example, there are 8 devices, so there are 8 actions that can be taken, as shown in Table 4.

[0180] Table 4 Type ① Typical switch bay equipment action comparison table

[0181]

[0182] 3)f is the state transfer function, Figure 8 This is a typical switch interval state transition diagram in type ①.

[0183] 4)s end is the target state, when s(t)=s end When , the state action is terminated and the action sequence is output. s0 is the initial state of the interval.

[0184] (2) Substation-side finite state machine operation ticket model based on substation state matrix

[0185] Based on the finite state machine model within the interval, the action sequence of each interval in the plant and station can be generated, but it does not take into account the error prevention rule constraints between intervals. The plant and station finite state machine operation ticket model constructed in this section generates a plant and station action matrix that meets the error prevention rule constraints between intervals based on the original model to realize the generation of plant and station operation tickets. Its finite state machine model is described as follows:

[0186] M=(S,A,F,O(a),S end ,S0) (12)

[0187] 1) S is the state matrix set of the finite state machine at the plant end, and its value is composed of the substation state matrix P composed of interval state values.

[0188] 2) A is the set of finite state machine action matrices at the plant end, which is composed of the corresponding actions a of each interval, and its structure is consistent with the substation state matrix.

[0189] 3) F is the state transfer function, and S(t)=F(S(t-1),A). The principle is to change the interval state according to the interval state transfer diagram for the action of each interval based on the action matrix A, so as to obtain the state matrix after the action.

[0190] 4) O(a) is the error prevention rule constraint judgment function. In order to ensure that the generated plant-side operation ticket does not violate the error prevention rule constraints between intervals, each interval action in the action matrix must be verified by the O(a) function in turn. If the error prevention rule is violated, that is, O(a) = 1, the interval action is set to 0, that is, no action is taken, and the original action sequence is moved back one step.

[0191] 5) S end is the target state matrix of the plant end, when S(t)=S end When , the process is terminated and the action matrix sequence is output. S0 is the initial state matrix of the plant end.

[0192] The specific solution steps of the plant-side finite state machine operation ticket model are as follows:

[0193] 1) Decompose the initial state matrix and the target state matrix into initial state values ​​and target state values ​​in interval units, and substitute them into the finite state machine operation ticket model in the interval to obtain the action sequence of each interval.

[0194] 2) Take the first action of each interval action sequence to form the action matrix A. The elements of the interval without action sequence are set to 0, that is, no action.

[0195] 3) Traverse each action a in the action matrix in turn. If executing the action makes O(a) = 1, set the element indicating the interval action in the action matrix to 0. If executing the action makes O(a) = 0, that is, the error prevention rule is not violated, no change is made.

[0196] 4) Output the adjusted action matrix and remove the action corresponding to the action sequence in the interval of the action (i.e., the first action in the sequence).

[0197] 5) Repeat steps (2-4) until S(t) = S end (or all action sequences are empty), the solution is completed, and the plant-side action matrix sequence is output, which is the generated plant-side operation ticket.

[0198] (3) Multi-station finite state machine operation ticket model based on inter-station association vector

[0199] The multi-station finite state machine operation ticket model constructed in this section generates a multi-station action matrix that complies with the multi-substation error prevention rule constraints based on the original model to realize the generation of multi-station operation tickets. The finite state machine model is described as follows:

[0200]

[0201] 1) S z =[S z1 ,S z2 ,…,S zn ] is a set of multi-station finite state machine state matrix sets, which is composed of the substation state matrices P of substations z1~zn.

[0202] 2) A z =[A z1 ,A z2 ,…,A zn] is a set of multi-station finite state machine action matrix sets, which is composed of the substation action matrices of substations z1~zn.

[0203] 3) F is the state transfer function, Sz(t)=F(Sz(t-1),Az). The principle is to change the state matrix of each substation according to the action matrix based on the action matrix set Az, so as to obtain the state matrix set after the action.

[0204] 4)O(A zi ) is the error prevention rule constraint judgment function. In order to ensure that the generated multi-station operation ticket does not violate the multi-substation error prevention rule constraint, the action matrix concentration action matrix needs to pass through O(A zi ) function to check, if the error prevention rule is violated, that is, O(A zi )=1, the action matrix of the substation is set to 0 matrix, that is, no action, and the action matrix sequence of the atomic station moves back one step.

[0205] 5) S z end is the target state matrix set of multiple stations, when S z (t) = S z end When , the process is terminated and the multi-station action matrix set sequence is output. z 0 is the initial state matrix set of multiple stations.

[0206] The steps for solving the multi-station finite state machine operation ticket model are similar to those of the plant station, specifically:

[0207] 1) Decompose the initial state matrix set and the target state matrix set into the initial state matrix and the target state matrix of each substation, and substitute them into the finite state machine operation ticket model at the plant end to obtain the action matrix sequence of each substation.

[0208] 2) Take the first action matrix of each substation action matrix sequence to form an action matrix set A z , the matrix unit of the substation without action matrix sequence is set to 0 matrix, that is, no action.

[0209] 3) Traverse each action matrix A in the action matrix set in turn zi , if executing this action makes O(A zi ), then the matrix unit indicating the action of the substation in the action matrix set is set to 0. If the action is executed, O(A zi ), that is, if the error prevention rules are not violated, no changes will be made.

[0210] 4) Output the adjusted action matrix set, and remove the action matrix corresponding to the substation action matrix sequence of the action (ie, the first action matrix in the sequence).

[0211] 5) Repeat steps (2-4) until Sz (t) = S z end (or all action matrix sequences are empty), the solution is completed, and the action matrix set sequence is output, which is the generated multi-station operation ticket.

[0212] Step S40, based on the master-substation collaborative interaction process of the substation status matrix, the master station sends down the action matrix to guide the substation action, and the substation uploads the status matrix to enable the master station to confirm the equipment action status.

[0213] In this embodiment, the state of the operating equipment is identified by constructing a substation state matrix. The primary and secondary equipment are collaboratively intelligently prevented from errors by checking the error prevention rules of the substation state matrix. Multi-station collaborative operation ticket generation is achieved by constructing a two-layer operation ticket generation model based on the substation state matrix; the lower layer is an operation ticket generation model within the interval based on the interval state value, which uses Q learning to solve and generate the action sequence within the interval; the upper layer is a multi-interval and substation operation ticket generation model based on the substation state matrix, which uses graph theory to construct a decision-making level table to classify the action sequence within each interval, and realize the generation of operation tickets for multiple intervals and substations. Finally, the master-substation interaction process based on the substation state matrix is ​​given, thereby realizing the full process of remote sequential control operation of the master-substation collaboration.

[0214] Furthermore, in one embodiment, the workflow of the multi-station collaborative remote sequential control operating system is explained with a 500kV 1 substation and part of the bay equipment of the connected 220kV 2 substation in a certain power grid as the background.

[0215] Reference Fig. 9 , Fig. 9 This is the wiring diagram of part of the substation 1. Fig. 9 As shown, in substation 1, 220 kV busbar, 012 switch bay, and 12 lines are all in operation, and the initial state matrix is ​​shown in formula (13).

[0216] Reference Fig.10 , Fig.10 This is the wiring diagram of the substation 2 parts. Fig.10 As shown, in substation 2, 220kV #1 bus, 21 lines, and 22 lines are in operation, 021 switch bay and 022 switch bay are connected to #1 bus and are in operation, 023 switch bay is in cold standby state, and 220kV #2 bus is in maintenance state. Its initial state matrix is ​​shown in formula (15).

[0217] based on Figure 7 The initial state matrix of some bays of the two substations and the corresponding bay name matrix can be obtained as follows:

[0218]

[0219]

[0220]

[0221]

[0222] Formulas (12) and (13) are the state matrix of some bays of substation 1 and the corresponding bay name matrix; Formulas (14) and (15) are the state matrix of some bays of substation 2 and the corresponding bay name matrix.

[0223] The correlation vector between the two substations is:

[0224] Con(1,2)=[2,3] (16)

[0225] That is, node 2 of substation 1 is associated with node 3 of substation 2.

[0226] In the initial state matrix, there are intervals in operation at both node 2 of substation 1 and node 3 of substation 2, so CI α,β The value is 1.

[0227] The operation tasks are:

[0228] 1) Substation 12 line is switched from operation to maintenance;

[0229] 2) Substation 21 line was switched from operation to maintenance;

[0230] 3) The 220kV#1 busbar of 2 substation was switched from operation to maintenance.

[0231] The operation task is expanded by the multi-interval parallel error prevention rule 1 constraint as follows:

[0232] 4) 1 Substation 012 switch is switched from operation to cold standby;

[0233] 5) The 220kV#2 busbar of Substation 2 was switched from maintenance to operation;

[0234] 6) 2nd substation 021 switch changes from #1 operation to cold standby;

[0235] 7) The switch 022 of substation 2 changes from #1 operation to #2 operation;

[0236] 8) The switch 023 of substation 2 is switched from cold standby to operation;

[0237] 9) The switch 023 of substation 2 is switched from operation to cold standby.

[0238] The target state matrix of the two substations can be obtained from the operation task:

[0239]

[0240]

[0241] Based on the finite state machine model within the interval, the action sequence within each interval is obtained. For example, the action sequence of the switch interval 023 of substation 2 is [3611, 7611, 17611, 37611, 17611, 7611, 3611], the action sequence of the busbar interval #1 of substation 2 is [1515, 1715, 715, 515, 115, 15], and the action sequence of the switch interval 022 of substation 2 is [73621, 77621, 67621].

[0242] Based on the finite state machine model of the plant and substation end and the interval action sequence, the plant and substation end action matrix sequence is obtained. Based on the finite state machine model of the multi-station end and the action matrix sequence, the sequence of the multi-station end action matrix set is obtained, and its output is the multi-station collaborative operation ticket in the substation state matrix format, and the operation ticket does not violate the error prevention rule constraint.

[0243]

[0244]

[0245] The process of converting the multi-station coordinated operation ticket in the substation state matrix format into the multi-station coordinated operation ticket in the text format is taken as an example of the first step of substation 2. Its action matrix is ​​shown in formula (19), the state matrix before the action is formula (15), and the state matrix after the action is formula (20).

[0246] Record the interval names in the interval name matrix corresponding to the non-zero elements in the action matrix, remove duplicate names, and get the action interval as [023 switch, 021 switch]. Based on the corresponding state value in the state matrix, the action interval type is judged. The last two digits of the 023 switch state value are 11, so it is a typical switch interval; the last two digits of the 021 switch state value are 21, so it is a double-mother switch interval. The 023 switch action value is 3. According to the typical switch interval equipment classification, the action device is the power supply side disconnector; the 021 switch action value is 1, and the action device is the circuit breaker. Before the 023 switch is actuated, the power supply side disconnector state is 0, so its action is to close the 023 switch interval power supply side disconnector, that is, the 0231 switch is closed; before the 021 switch is actuated, the circuit breaker state is 1, so its action is to disconnect the 021 switch interval circuit breaker, that is, the 021 circuit breaker is disconnected.

[0247] Based on the above conversion process, the multi-station collaborative operation ticket in text format is obtained, see Table 5.

[0248] Table 5 Multi-station collaborative operation ticket

[0249]

[0250] After the above multi-station collaborative operation ticket is generated, the remote sequential control system will Fig.11 Execute the collaborative operation ticket. The master station sends the action matrix to the substation. The substation takes action based on the action matrix and performs multi-interval and intra-interval error prevention rule verification. After the action is completed, the status matrix is ​​updated and uploaded to the master station. After the master station receives the status matrices of all substations, it performs multi-substation error prevention rule verification. If there is no error, it continues to send the action matrix of the next operation item until all operations are completed.

[0251] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or system including the element.

[0252] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.

[0253] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk) as described above, and includes a number of instructions for a terminal device to execute the methods described in each embodiment of the present invention.

[0254] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A master-substation coordinated remote sequential control operation method based on a substation status matrix, characterized in that: The master-substation coordinated remote sequential control operation method based on the substation state matrix includes: The substation uploads the substation status matrix to the master station. The master station identifies the equipment status by reading the substation status matrix. The generation steps of the substation status matrix are divided into three steps: interval status value generation, substation status matrix generation, and inter-station correlation vector generation. Based on the substation status matrix, the primary and secondary equipments conduct intelligent error prevention verification. The master station verifies the cross-substation error prevention rules based on the substation status matrix and the inter-station correlation vector. The substation verifies the cross-interval and intra-interval error prevention rules based on the substation status matrix. Based on the substation state matrix, a multi-station collaborative operation ticket generation model is constructed based on the substation state matrix to realize the multi-station collaborative operation ticket generation; the lower model is the plant-side operation ticket reasoning model based on the substation state matrix, which is constructed with the conversion of the plant-side state matrix as the objective function and the intra-interval and multi-interval parallel anti-error rules as constraints; the upper model is the multi-station-side operation ticket reasoning model based on the substation state matrix, which is constructed with the conversion of the multi-station-side state matrix as the objective function and the multi-station-side parallel anti-error rules as constraints; the idea of ​​hierarchical finite state machine is used to construct a multi-layer finite state machine model under rule constraints, so as to realize the solution of the double-layer operation ticket reasoning model and realize the reasoning generation of multi-station-side operation tickets; Based on the master-substation collaborative interaction process of the substation status matrix, the master station sends the action matrix to guide the substation action, and the substation uploads the status matrix to enable the master station to confirm the equipment action status.

2. The master-substation coordinated remote sequential control operation method based on the substation status matrix according to claim 1 is characterized in that: Interval status value generation includes: The bay status value is generated based on the typical switching operation ticket of the bay, and the bay status value is used to describe the status of each device in the bay.

3. The master-substation coordinated remote sequential control operation method based on the substation status matrix according to claim 2 is characterized in that: Substation status matrix generation includes: Perform node settings on each interval model to obtain a node association matrix; Combining the node association matrix and the interval status value, the substation status matrix is ​​obtained.

4. The master-substation coordinated remote sequential control operation method based on the substation status matrix according to claim 3 is characterized in that: The generation of the inter-station association vector comprises: Based on the physical association relationship between substations, the inter-station association vector is obtained.

5. The master-substation coordinated remote sequential control operation method based on the substation status matrix according to claim 1 is characterized in that: The primary and secondary equipment collaborative intelligent anti-error verification based on the substation state matrix includes: Set multi-substation parallel error prevention rule constraints, interval parallel error prevention rule constraints, and interval error prevention rule constraints. The multi-substation parallel error prevention rule constraints are as follows: For the bays at both ends of the inter-substation connection line, when switching from operation to cold standby, the switch bay on the load side should be switched to cold standby first, and then the switch bay on the power supply side should be switched to cold standby; For the bays at both ends of the interconnecting lines between substations, when switching from cold standby to operation, the switch bays on the power supply side should be switched to operation first, and then the switch bays on the load side should be switched to operation; The actions of the interval protection at both ends of the inter-substation connection line must be synchronized. Synchronization means that the interval states or protection actions of the two intervals cannot be different after two consecutive operation items are completed. The interval parallel error prevention rule constraints are: When the main transformer, line, or bus bay is switched from operation to maintenance, the relevant switch bays are required to be in cold standby or maintenance status; If the switch bays involved in the operation are on the same line, they need to maintain state synchronization; If the switch bays involved in the operation are on the same line, their protection actions must be synchronized; When performing busbar reversal operation in double busbar connection mode, the busbar tie switch bay is in operation state, and the related line switch bays in operation state need to be connected to the standby busbar, and the standby busbar is in operation state; The error prevention rule constraints within the interval are: When the circuit breaker is closed, the isolating switch, grounding switch, secondary protection equipment and maintenance handle should be in the operating state; When the busbar side disconnector is opened or closed, the load side disconnector should be in the open position, the circuit breaker in this compartment should be in the open position, and the grounding switch, secondary protection equipment, and maintenance handle should be in the operating state; When the load-side disconnector is opened or closed, the busbar-side disconnector should be in the closed position, the circuit breaker in this compartment should be in the open position, and the grounding switch, secondary protection equipment, and maintenance handle should be in the operating state; When the earthing knife switch is closed, the isolating switch should be in the open position; Before closing the isolating switch and circuit breaker, you need to close the corresponding circuit breaker motor power switch, operating power supply and isolating switch motor, control power switch; When operating the opening and closing of the grounding switch, the corresponding grounding switch motor and the control power switch must be closed before operation.

6. The master-substation coordinated remote sequential control operation method based on the substation status matrix according to claim 1 is characterized in that: The generation of multi-station coordinated operation tickets based on the substation status matrix includes: Based on the two-layer model of multi-substation collaborative operation ticket, a three-layer finite state machine model is constructed to solve the model. For the lower-layer plant-side operation ticket model, a finite state machine operation ticket model based on the interval state value is first constructed; then a plant-side finite state machine operation ticket model based on the substation state matrix is ​​constructed; The specific solution steps of the plant-side finite state machine operation ticket model are as follows: 1) Decompose the initial state matrix and the target state matrix into initial state values ​​and target state values ​​in interval units, and substitute them into the finite state machine operation ticket model in the interval to obtain the action sequence of each interval; 2) Take the first action of each interval action sequence to form the action matrix A. The elements of the interval without action sequence are set to 0, that is, no action; 3) Traverse each action a in the action matrix in turn. If the error prevention rule is violated, the element indicating the interval action in the action matrix is ​​set to 0. If the error prevention rule is not violated, no change is made; 4) Output the adjusted action matrix and remove the first action of the action sequence in the interval of the action; 5) Repeat steps (2-4) until the target state is reached or all action sequences are empty, the solution is completed, and the plant-side action matrix sequence is output, which is the generated plant-side operation ticket; For the upper-layer multi-station operation ticket model, a multi-station finite state machine operation ticket model based on the inter-station association vector is constructed on the basis of the plant-station finite state machine operation ticket model. The steps for solving the multi-station finite state machine operation ticket model are as follows: 1) Decompose the initial state matrix set and the target state matrix set into the initial state matrix and the target state matrix of each substation, and substitute them into the finite state machine operation ticket model at the plant end to obtain the action matrix sequence of each substation; 2) Take the first action matrix of each substation action matrix sequence to form an action matrix set Az, and the matrix unit of the substation without an action matrix sequence is set to 0 matrix, that is, no action; 3) Traverse each action matrix Azi in the action matrix set in turn. If the error prevention rule is violated, the matrix unit indicating the substation action in the action matrix set is set to 0. If the error prevention rule is not violated, no change is made; 4) Output the adjusted action matrix and remove the first action of the action sequence in the interval of the action; 5) Repeat steps (2-4) until the target state is reached or all action sequences are empty, the solution is completed, and the action matrix set sequence is output, which is the generated multi-station operation ticket.

7. The master-substation coordinated remote sequential control operation method based on the substation status matrix according to claim 6 is characterized in that: The finite state machine operation ticket model within the interval is described as follows: m=(s,a,f,s end ,s0) Where s is the state set of the finite state machine in the interval, and the interval state value set appearing in the typical interval operation ticket is taken, that is, s = {s(0), s(1), s(2), ..., s(t)}; a is the set of actions of the finite state machine within the interval, and its actions refer to the actions that change the state of the device within the interval; f is the state transfer function; S end is the target state, when s(t)=S end When , the state action is terminated and the action sequence is output, s0 is the initial state of the interval.

8. The master-substation coordinated remote sequential control operation method based on the substation status matrix according to claim 6 is characterized in that: The finite state machine operation ticket model of the plant side is described as follows: M=(S,A,F,O(a),S end ,S0) Among them, S is the state matrix set of the finite state machine at the plant end, and its value is composed of the substation state matrix P composed of interval state values; A is the set of finite state machine action matrices at the plant end, which is composed of the corresponding actions a of each interval, and its structure is consistent with the substation state matrix; F is the state transfer function, S(t)=F(S(t-1),A), the principle is to change the interval state according to the interval state transfer diagram for the action of each interval based on the action matrix A, so as to obtain the state matrix after the action; O(a) is the error prevention rule constraint judgment function. In order to ensure that the generated plant-side operation ticket does not violate the error prevention rule constraint between intervals, each interval action in the action matrix needs to be verified by the O(a) function in turn. If the error prevention rule is violated, that is, O(a) = 1, the interval action is set to 0, that is, no action is taken, and the original action sequence is moved back one step. S end is the target state matrix of the plant end, when S(t)=S end When , the process is terminated and the action matrix sequence is output, where S0 is the initial state matrix of the plant end.

9. The master-substation coordinated remote sequential control operation method based on the substation status matrix according to claim 6, characterized in that: The multi-station finite state machine operation ticket model is described as follows: Among them, S z =[S z1 ,S z2 ,…,S zn ] is the set of multi-station finite state machine state matrix sets, consisting of the substation state matrices P of substations z1~zn; A z =[A z1 ,A z2 ,…,A zn ] is a set of multi-station finite state machine action matrix sets, consisting of substation action matrices of substations z1~zn; F is the state transfer function, Sz(t) = F(Sz(t-1), Az), and its principle is based on the action matrix set A z The state matrix of each substation is changed according to the action matrix, so as to obtain a state matrix set after the action; O(A zi ) is the error prevention rule constraint judgment function. In order to ensure that the generated multi-station operation ticket does not violate the multi-substation error prevention rule constraint, the action matrix concentration action matrix needs to pass through O(A zi ) function to check, if the error prevention rule is violated, that is, O(A zi )=1, then the substation action matrix is ​​set to 0 matrix, that is, no action, and the atomic station action matrix sequence moves back one step; S z end is the target state matrix set of multiple stations, when S z (t) = S z end When , the process is terminated and the multi-station action matrix set sequence is output, S z 0 is the initial state matrix set of multiple stations.