Combined treatment method for thick and hard layered roof
By dividing the fracturing holes in the area and combining hydraulic fracturing and jet fracturing technology, the problem of poor treatment of shallow top plates in traditional methods is solved, achieving uniform weakening of deep and shallow rocks and improving roof plate treatment efficiency .
Patent Information
- Application Number
- CN202210805223.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-08
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2042-07-08
AI Technical Summary
The traditional roof fracturing method has poor effect on shallow pressure relief, is complex in operation and is prone to damage the support system, making it difficult to effectively deal with the shallow direct roof of the thick and hard layered roof.
By adopting a joint treatment method, the fracturing holes are divided into areas, hydraulic fracturing is used in deep areas, and jet fracturing is used in shallow areas. Combined with hydraulic fracturing and jet fracturing technology, the first treatment area and the second treatment area of the fracturing hole are treated separately. Treat the area to ensure weakening of the strength of the deep and shallow rocks while avoiding damage to the original support system.
It effectively improves the efficiency and quality of roof plate treatment, ensures uniform weakening of deep and shallow rocks, reduces damage to shallow support systems, and improves the effect of roof plate treatment.
Smart Images

Figure CN115341901B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal mining, and in particular to a method for jointly processing thick and hard layered roof. Background Art
[0002] For the treatment of thick hard roof, one method is to use hydraulic fracturing and blasting. Existing tests have shown that the use of blasting or hydraulic fracturing methods to make the suspended roof fall in time can reduce the deformation of the tunnel. The blasting vibration has an adverse effect on the underground support structure and the ground structure. Hydraulic fracturing can avoid the additional vibration caused by the release of blasting energy, so it is easy to apply and promote. Traditional hydraulic fracturing process: first push the drill pipe, then seal the hole with a sealer, and finally use high-pressure water in the fracturing hole to fractur the rock. Under the action of high-pressure splitting, cracks are generated along the maximum principal stress, the rock is destroyed, the crack width is 0.1~5mm, the fracturing diffusion range is 10~15m, and the fracture pressure is 15~35MPa. The specific value is related to the ground stress and rock properties.
[0003] In order to reduce the damage to the shallow support of the roof after fracturing, fracturing is generally not carried out within 5 to 10 meters above the roof. Similarly, the "Coal Mine Safety Regulations" also stipulate that the hole must be sealed by blasting, and the length of the sealed hole must not be less than 1 / 3 of the depth of the fracturing hole. The sealing section uses yellow mud and other methods. Therefore, no blasting is performed in the shallow part. However, if the strength and hardness of the shallow direct roof are large, the roof is difficult to collapse. These roofs are widely found in the No. 8 coal in Luliang area, the limestone roof of the No. 15 coal in Jincheng and Changzhi areas, and the K2 sandstone roof in Datong area. Therefore, hydraulic fracturing and blasting are currently mainly used to deal with high-level basic roofs, and there are fewer treatments for shallow direct roofs.
[0004] Therefore, providing a construction method that can treat both the deep and shallow parts of the fracturing hole is a technical problem that technical personnel in this field urgently need to solve. Summary of the invention
[0005] The present invention provides a method for jointly treating thick and hard layered roof, aiming to solve the problems that the traditional roof fracturing method has poor shallow pressure relief effect, is relatively complicated to operate, and is easy to damage the support system.
[0006] In view of the problems existing in the prior art, an embodiment of the present invention provides a method for jointly processing a thick and hard layered roof, comprising:
[0007] Determine the length and angle of the fracturing hole according to the stratum distribution of the roof rock;
[0008] Drilling a fracturing hole on the top plate according to the determined fracturing hole length and fracturing hole angle;
[0009] determining a first treatment area and a second treatment area of the fracturing hole;
[0010] treating the first treatment area using hydraulic fracturing;
[0011] The second treatment zone is treated using jet fracturing.
[0012] According to a method for jointly processing a thick and hard layered roof provided by the present invention, determining the length and angle of the fracturing hole according to the layer distribution of the roof rock includes:
[0013] Determine the stratigraphic distribution of roof rocks;
[0014] Determine the vertical distribution range of each layer;
[0015] Determine the target fracturing hole layer;
[0016] The length and angle of the fracturing hole are determined according to the longitudinal distribution range of the target fracturing hole layer.
[0017] According to a method for jointly treating a thick and hard layered roof provided by the present invention, determining a first treatment area and a second treatment area of a fracturing hole comprises:
[0018] According to the length of the fracturing hole, the front 1 / 3 area of the fracturing hole is determined as the second treatment area, and the rear 2 / 3 area of the fracturing hole is determined as the first treatment area.
[0019] According to a method for jointly treating a thick and hard layered roof provided by the present invention, determining a first treatment area and a second treatment area of a fracturing hole comprises:
[0020] Determine the positional relationship between the roof support and the fracturing hole;
[0021] The portion of the fracturing hole located at a vertical height of 3-5 m near the roof support is determined as the second treatment area, and the other areas of the fracturing hole are determined as the first treatment area.
[0022] According to a method for combined treatment of thick and hard layered roof provided by the present invention, treating the first treatment area by hydraulic fracturing comprises:
[0023] placing a packer with a water injection tube and an expansion tube into a first treatment section of a first treatment area;
[0024] Connecting a manual pump to the expansion tube to pressurize the packer to seal the first treatment section of the first treatment area;
[0025] Connect a high-pressure water pump to the water injection pipe to inject water into the first treatment section of the first treatment area.
[0026] According to a method for combined treatment of thick and hard layered roof provided by the present invention, after water is injected into the first treatment section of the first treatment area, the method comprises:
[0027] After the fracturing of the first treatment section of the first treatment area is completed, depressurizing the packer;
[0028] moving the packer to a second treatment section of the first treatment zone;
[0029] Connecting the manual pump to the expansion tube to pressurize the packer to seal the second treatment section of the first treatment area;
[0030] Connecting the high-pressure water pump to the water injection pipe to inject water into the second treatment section of the first treatment area;
[0031] The first processing section of the first processing area is 3-5m away from the second processing section of the first processing area.
[0032] According to a method for jointly treating a thick and hard layered roof provided by the present invention, treating the second treatment area by jet fracturing comprises:
[0033] Disassembling the expansion tube and the packer, and installing an ejector at the end of the water injection tube;
[0034] placing the ejector in a first treatment section of the second treatment zone;
[0035] The high-pressure water pump is connected to the water injection pipe to perform high-pressure jetting toward the inner wall of the first treatment section of the second treatment area.
[0036] According to a method for combined treatment of a thick and hard layered roof provided by the present invention, after high-pressure jetting is applied to the inner wall of the first treatment section of the second treatment area, the method comprises:
[0037] After the ejection of the first treatment section of the second treatment area is completed, placing the ejector in the second treatment section of the second treatment area;
[0038] Connecting the high-pressure water pump to the water injection pipe to perform high-pressure jetting toward the inner wall of the second treatment section of the second treatment area;
[0039] The first processing section of the second processing area is 1.5-2.5 m away from the second processing section of the second processing area.
[0040] According to a method for combined treatment of thick and hard layered roof panels provided by the present invention, the radial peripheral side of the ejector has a plurality of high-pressure ejection holes, and the ejection radius of the ejector is 0.5 m.
[0041] The method for jointly treating thick and hard layered roof provided by the present invention divides the fracturing holes into regions, adopts hydraulic fracturing in the deep part of the fracturing holes, and adopts jetting in the shallow part of the fracturing holes, thereby effectively weakening the strength of the deep and shallow rocks. At the same time, the jet water in the shallow part will not cause damage to the anchor rods and anchor cables in the original support system, thereby effectively improving the efficiency and quality of roof treatment. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] In order to more clearly illustrate the technical solutions in the present invention or the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0043] Figure 1 It is a schematic flow chart of the method for combined treatment of thick and hard layered roof provided by the present invention;
[0044] Figure 2 It is a schematic diagram of rock layer distribution;
[0045] Figure 3 It is a schematic diagram of the layout of the fracturing device;
[0046] Figure 4 It is a schematic diagram of the ejector structure. DETAILED DESCRIPTION
[0047] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0048] In the description of the embodiments of the present invention, it should be noted that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the embodiments of the present invention and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limitations on the embodiments of the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0049] In the description of the embodiments of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the embodiments of the present invention can be understood according to specific circumstances.
[0050] In the embodiments of the present invention, unless otherwise clearly specified and limited, the first feature being "above" or "below" the second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, the first feature being "above", "above" and "above" the second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. The first feature being "below", "below" and "below" the second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0051] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the embodiment of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0052] Combine the following Figure 1-Figure 4 The method of the present invention for combined treatment of thick hard delaminated roof slabs is described.
[0053] See also Figure 1 The present invention provides a method for jointly treating a thick and hard layered roof, comprising:
[0054] S10. Determine the length and angle of the fracturing hole according to the stratum distribution of the roof rock;
[0055] S20, drilling a fracturing hole on the top plate according to the determined fracturing hole length and fracturing hole angle;
[0056] S30, determining a first processing area and a second processing area of the fracturing hole;
[0057] S40, treating the first treatment area by hydraulic fracturing;
[0058] S50, treating the second treatment area by using jet fracturing.
[0059] As mentioned above, hydraulic fracturing and blasting are currently mainly used to treat high-position basic roofs, and there is less treatment for shallow parts. In the technical solution provided by the present invention, by dividing the fracturing hole into regions, that is, dividing the deep first treatment region and the shallow second treatment region, hydraulic fracturing is used for the first treatment region, and high-pressure jetting is used for the second treatment region. In this way, all areas of the fracturing hole can be treated, which can effectively weaken the strength of deep and shallow rocks. At the same time, the jet water in the shallow part will not cause damage to the anchor rods and anchor cables in the original support system, effectively improving the efficiency and quality of roof treatment.
[0060] Specifically, S10, according to the layer distribution of the roof rock, determining the length and angle of the fracturing hole includes:
[0061] S11. Determine the stratigraphic distribution of roof rocks;
[0062] S12, determine the vertical distribution range of each layer;
[0063] S13, determining the target fracturing hole layer;
[0064] S14. Determine the length and angle of the fracturing hole according to the longitudinal distribution range of the target fracturing hole layer.
[0065] See also Figure 2 There are many rock formations distributed on the top plate, such as limestone, sandy mudstone, mudstone, etc. Among these rock formations, limestone has the highest hardness, so limestone is preferred for fracturing holes. In general, there will be multiple limestone distributions. It is preferred to select limestone with a larger longitudinal distribution range for fracturing holes, so that the target fracturing hole layer can be selected. According to the position of the target fracturing hole layer and the actual position of the fracturing device, the fracturing hole can only be drilled into the target fracturing hole layer within the target angle range. When a target angle is selected, the length of the fracturing hole needs to be determined according to the longitudinal distribution range of the target fracturing hole layer. The longitudinal length of the target fracturing hole layer can be regarded as the height of the triangle, and the length of the fracturing hole can be regarded as the hypotenuse of the triangle. At this time, the target angle is the angle between the hypotenuse and the height. Since the height is determined and the angle is determined, the length of the fracturing hole can be obtained according to the cosine relationship, so that the extension range of the fracturing hole can be guaranteed to be within the target fracturing hole layer. According to the length and angle of the fracturing hole, a fracturing hole can be drilled in the target fracturing hole layer using a drill pipe.
[0066] Further, S30, determining the first processing area and the second processing area of the fracturing hole includes:
[0067] S31. According to the length of the fracturing hole, determine the front 1 / 3 area of the fracturing hole as the second treatment area, and determine the rear 2 / 3 area of the fracturing hole as the first treatment area.
[0068] The present invention provides two zoning methods for the first treatment area and the second treatment area. In the first zoning method, the first 1 / 3 area of the fracturing hole is determined as the second treatment area, that is, the shallow area, and the remaining 2 / 3 area is determined as the first treatment area, that is, the deep area;
[0069] Further, in the second zoning method, S30, determining the first processing area and the second processing area of the fracturing hole includes:
[0070] S32, determining the positional relationship between the roof support and the fracturing hole;
[0071] S33, determining the portion of the fracturing hole located at a vertical height of 3-5 m near the roof support as the second treatment area, and determining the other areas of the fracturing hole as the first treatment area.
[0072] As mentioned above, in order to reduce the damage to the shallow support of the roof after fracturing, the conventional technology generally does not perform fracturing within 3 to 10 meters above the roof. Therefore, the area near the top support can be limited to the shallow area. The jet flow in the shallow area can effectively reduce the impact of fracturing on the top support. Therefore, in the technical solution provided by the present invention, the part of 3-5 meters near the roof support is determined as the second treatment area, that is, the shallow area, and the other areas of the fracturing hole are determined as the first treatment area, that is, the deep area.
[0073] Specifically, S40, using hydraulic fracturing to treat the first treatment area includes:
[0074] S41, placing a packer with a water injection pipe and an expansion pipe into a first treatment section of a first treatment area;
[0075] S42, connecting a manual pump to the expansion tube to pressurize the packer to seal the first treatment section of the first treatment area;
[0076] S43, connecting a high-pressure water pump to the water injection pipe to inject water into the first processing section of the first processing area.
[0077] The present invention adopts a segmented treatment method to segment the first treatment area, and adopts a backward hydraulic fracturing method section by section. Specifically, the packer includes two pressurized expandable airbags, and an expansion tube is provided in the airbags, which is used to fill the medium into the airbags, so that the airbags swell and fill and seal the fracturing holes, forming a nearly closed first treatment section. Between the two airbags, there is a water injection pipe, which is used to fill the closed space between the two airbags with high-pressure water, so that the water fractures the fracturing holes. It should be noted that a protective ring or a protective plate should be provided on the outside of the airbag to prevent the airbag from being cut by rocks. In the present embodiment, the expansion medium is set to water, and of course, oil, water, nitrogen or air and other media can also be selected, and the present invention does not limit this.
[0078] Further, after S43, injecting water into the first treatment section of the first treatment area, the method further comprises:
[0079] S44, after the fracturing of the first treatment section of the first treatment area is completed, depressurizing the packer;
[0080] S45, moving the packer to the second processing section of the first processing area;
[0081] S46, connecting the manual pump to the expansion tube, pressurizing the packer to seal the second treatment section of the first treatment area;
[0082] S47, connecting the high-pressure water pump to the water injection pipe to inject water into the second treatment section of the first treatment area;
[0083] The first processing section of the first processing area is 3-5m away from the second processing section of the first processing area.
[0084] After the first treatment section of the first treatment area is injected with water, wait for a period of time and release the pressure on the airbag. At this time, the airbag is moved to seal the second treatment section of the first treatment area and inject water. After the second treatment section of the first treatment area is fracturing, the airbag is moved to fracturing the third treatment section of the first treatment area, and the cycle is repeated until the first treatment area is completely treated. It should be noted that in the technical solution provided by the present invention, a backward fracturing treatment is adopted, and two drill pipes are withdrawn each time. When the drill pipe is 1.5m, 3m is withdrawn each time before the next treatment section is treated. When the drill pipe is 2.5m, 5m is withdrawn each time before the next treatment section is treated, that is, each treatment section is 3-5m apart.
[0085] Specifically, S50, treating the second treatment area by jet fracturing includes:
[0086] S51, disassembling the expansion tube and the packer, and installing an ejector at the end of the water injection pipe;
[0087] S52, placing the ejector in the first processing section of the second processing area;
[0088] S53, connecting the high-pressure water pump to the water injection pipe to perform high-pressure jetting toward the inner wall of the first processing section of the second processing area.
[0089] In the technical solution provided by the present invention, there is no need to replace the entire fracturing equipment. In the process of switching between deep fracturing and shallow jetting, it is only necessary to remove the expansion tube and the packer, install an ejector at the end of the injection pipe, and connect it to the injection pipe through a high-pressure water pump. High-pressure water is ejected from a special small nozzle in the ejector, converting pressure energy into kinetic energy, thereby forming a high-speed water jet. Through shallow jetting and cavitation, a crack network is formed in the shallow part, thereby enhancing the weakening of shallow rocks.
[0090] After S53, high pressure jet is applied to the inner wall of the first processing section of the second processing area, the method further comprises:
[0091] S54, after the ejection of the first processing section of the second processing area is completed, placing the ejector in the second processing section of the second processing area;
[0092] S55, connecting the high-pressure water pump to the water injection pipe to perform high-pressure jetting toward the inner wall of the second treatment section of the second treatment area;
[0093] The first processing section of the second processing area is 1.5-2.5 m away from the second processing section of the second processing area.
[0094] After the jetting of the first treatment section of the second treatment area is completed, wait for a period of time, move the jetter to jet the second treatment section of the second treatment area, and after the jetting of the second treatment section of the second treatment area is completed, move the jetter to jet the third treatment section of the second treatment area, and so on, until the second treatment area is completely treated. It should be noted that in the technical solution provided by the present invention, a backward jet treatment is adopted, and one drill rod is retreated each time. When the drill rod is 1.5m, retreat 1.5m each time and then process the next treatment section. When the drill rod is 2.5m, retreat 2.5m each time and then process the next treatment section, that is, each treatment section is 1.5-2.5m apart.
[0095] Please note that Figure 4 In the technical solution provided by the present invention, the radial circumferential side of the ejector is provided with a plurality of high-pressure jet holes, so that the circumferential wall of the fracturing hole can be jetted. In this embodiment, the number of the high-pressure jet holes is set to 3, and the distribution interval of the three high-pressure jet holes is 120°. The jet radius of the ejector is 0.5m.
[0096] The method for combined treatment of thick and hard layered roof provided by the present invention adopts the hydraulic fracturing method of "deep pressure-shallow injection", which effectively weakens the strength of deep and shallow hard rocks, while the shallow water does not cause damage to the anchor rods and anchor cables in the original support system; the shallow jet is conducive to destroying the integrity of the shallow hard rock layer and increasing the collapse and venting. In addition, the method adopts the same fracturing system, and only partial structural replacement is required to complete the conversion of the two fracturing methods, which is conducive to reducing the complexity of operation and management.
[0097] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for combined treatment of thick and hard layered roof, characterized in that: include: Determine the length and angle of the fracturing hole according to the stratum distribution of the roof rock; Drilling a fracturing hole on the top plate according to the determined fracturing hole length and fracturing hole angle; determining a first treatment area and a second treatment area of the fracturing hole; treating the first treatment area using hydraulic fracturing; Treating the second treatment zone using jet fracturing; Determining a first treatment area and a second treatment area of the fracturing hole includes: According to the length of the fracturing hole, the front 1 / 3 area of the fracturing hole is determined as the second treatment area, and the rear 2 / 3 area of the fracturing hole is determined as the first treatment area; Determine the positional relationship between the roof support and the fracturing hole; The portion of the fracturing hole located at a vertical height of 3-5 m near the roof support is determined as the second treatment area, and the other areas of the fracturing hole are determined as the first treatment area.
2. The method for combined treatment of thick and hard layered roof according to claim 1, characterized in that: According to the distribution of the top rock layers, the length and angle of the fracturing hole are determined as follows: Determine the stratigraphic distribution of roof rocks; Determine the lateral distribution range of each layer; Determine the target fracturing hole layer; The length and angle of the fracturing hole are determined according to the lateral distribution range of the target fracturing hole layer.
3. The method for combined treatment of thick and hard layered roof according to claim 1, characterized in that: Treating the first treatment area using hydraulic fracturing includes: placing a packer with a water injection tube and an expansion tube into a first treatment section of a first treatment area; Connecting a manual pump to the expansion tube to pressurize the packer to seal the first treatment section of the first treatment area; Connect a high-pressure water pump to the water injection pipe to inject water into the first treatment section of the first treatment area.
4. The method for combined treatment of thick and hard layered roof according to claim 3, characterized in that: After injecting water into the first treatment section of the first treatment area, the method comprises: After the fracturing of the first treatment section of the first treatment area is completed, depressurizing the packer; moving the packer to a second treatment section of the first treatment zone; Connecting the manual pump to the expansion tube to pressurize the packer to seal the second treatment section of the first treatment area; Connecting the high-pressure water pump to the water injection pipe to inject water into the second treatment section of the first treatment area; The first processing section of the first processing area is 3-5m away from the second processing section of the first processing area.
5. The method for combined treatment of thick and hard layered roof according to claim 3, characterized in that: Treating the second treatment zone using jet fracturing includes: Disassembling the expansion tube and the packer, and installing an ejector at the end of the water injection tube; placing the ejector in a first treatment section of the second treatment zone; The high-pressure water pump is connected to the water injection pipe to perform high-pressure jetting toward the inner wall of the first treatment section of the second treatment area.
6. The method for combined treatment of thick and hard layered roof according to claim 5, characterized in that: After high pressure jetting is applied to the inner wall of the first processing section of the second processing area, the method comprises: After the ejection of the first treatment section of the second treatment area is completed, placing the ejector in the second treatment section of the second treatment area; Connecting the high-pressure water pump to the water injection pipe to perform high-pressure jetting toward the inner wall of the second treatment section of the second treatment area; The first processing section of the second processing area is 1.5-2.5 m away from the second processing section of the second processing area.
7. The method for combined treatment of thick and hard layered roof according to claim 5, characterized in that: The radial circumferential side of the ejector is provided with a plurality of high-pressure ejection holes, and the ejection radius of the ejector is 0.5 m.