A nuclear fuel cycle high pressure leakage simulation test device and method

By designing a nuclear fuel cycle high-pressure leakage simulation test device to collect pressure, temperature and image data during the leakage process, the problem of being unable to obtain high-pressure leakage data in the existing technology was solved, and accurate assessment of nuclear fuel cycle leakage and safety improvement were achieved.

CN115424744BActive Publication Date: 2024-10-22CHINA INST FOR RADIATION PROTECTION
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202210971278.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-12
Publication Date
2024-10-22
Estimated Expiration
2042-08-12

AI Technical Summary

Technical Problem

The existing technology lacks the means to obtain detailed data on high-pressure leakage during the nuclear fuel cycle, resulting in the inability to accurately assess parameters during the leakage process and formulate preventive and remedial measures.

Method used

Design a nuclear fuel cycle high-pressure leakage simulation test device, including a high-pressure chamber, a circulation chamber and an information collection component. By forming a predetermined high-pressure environment, the leakage is pressed to the circulation chamber, and pressure sensors, temperature sensors and cameras are used to collect data and transmit it to the terminal. Equipment, simulate leakage scenarios to obtain various parameters.

Benefits of technology

By simulating high-pressure leakage scenarios, we can accurately obtain the pressure values, temperature values ​​and propagation process images during the high-pressure leakage process of the nuclear fuel cycle, provide accurate leakage prevention and remediation solutions, and improve the safety of the nuclear fuel cycle.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115424744B_ABST
    Figure CN115424744B_ABST
Patent Text Reader

Abstract

The present invention relates to a nuclear fuel cycle high-pressure leakage simulation test device, comprising a pressure chamber, a circulation chamber, an information collection component and a terminal device, wherein the high-pressure chamber is connected to the circulation chamber, and the information collection component is connected to the terminal device in communication; wherein the high-pressure chamber is configured to form a predetermined high-pressure environment to press the leaked material toward the circulation chamber; the information collection component is configured to collect the temperature and pressure in the high-pressure chamber and the circulation chamber, and the image of the propagation process of the leaked material in the circulation chamber, and transmit it to the terminal device. The present invention also provides a nuclear fuel cycle high-pressure leakage simulation test method, and the nuclear fuel cycle high-pressure leakage simulation test device and method described in the present invention can be used to simulate and obtain various parameters in the nuclear fuel cycle high-pressure leakage process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of nuclear fuel cycle safety, and in particular relates to a nuclear fuel cycle high-pressure leakage simulation test device and method. Background Art

[0002] The nuclear fuel cycle refers to the entire process of preparing nuclear fuel before it enters the reactor and treating it after it is burned in the reactor. This name reflects the fact that nuclear fuel can only be burned to a certain extent in the reactor before it must be unloaded and replaced with new fuel. The uranium and plutonium in the spent fuel (i.e. the burned fuel) can be separated and returned to the reactor to be used as a fuel cycle, forming a nuclear fuel cycle.

[0003] During the nuclear fuel cycle, high-pressure leaks may occur, resulting in the release of radioactive gases, aerosols and iodine under high pressure, posing a hazard to the safety of workers, the public and the environment.

[0004] There are many existing calculation models and methods used in the assessment of nuclear fuel leaks to calculate the consequences of leaks. However, there is a lack of data means to obtain detailed data information during high-pressure leaks, which makes it impossible to accurately assess the various parameters of the leak process, and it is also impossible to accurately formulate leak prevention measures and post-leakage remedial measures.

[0005] Therefore, a device is needed to simulate the high-pressure leakage generated during the nuclear fuel cycle to obtain various parameters during the leakage process. Summary of the invention

[0006] In view of the defects existing in the prior art, the purpose of the present invention is to provide a nuclear fuel cycle high pressure leakage simulation test device and method to obtain various parameters when high pressure leakage occurs in the nuclear fuel cycle process.

[0007] To achieve the above purpose, the technical solution adopted by the present invention is: a nuclear fuel cycle high-pressure leakage simulation test device, including a pressure chamber, a circulation chamber, an information collection component and a terminal device, the high-pressure chamber is connected to the circulation chamber, and the information collection component is communicatively connected to the terminal device; wherein the high-pressure chamber is configured to form a predetermined high-pressure environment to press the leaked material toward the circulation chamber; the information collection component is configured to collect the temperature and pressure in the high-pressure chamber and the circulation chamber and the propagation process image of the leaked material in the circulation chamber, and transmit them to the terminal device.

[0008] Furthermore, a partition is provided in the high-pressure chamber, and the partition separates the high-pressure chamber into a pressurization chamber and a release chamber. The pressurization chamber is connected to an external gas source, and the leaked material is arranged in the release chamber. The circulation chamber is connected to an end of the release chamber away from the pressurization chamber. A quick valve is provided on the partition, and the quick valve is communicatively connected to the terminal device.

[0009] Furthermore, the information collection component includes a pressure sensor component, a temperature sensor component and a camera. The pressure sensor component respectively collects the pressure values ​​in the pressurization chamber, the release chamber and the circulation chamber. The temperature sensor component respectively collects the temperature values ​​in the pressurization chamber, the release chamber and the circulation chamber. The camera collects image information in the circulation chamber. The pressure sensor component, the temperature sensor component and the camera are all communicatively connected to the terminal device.

[0010] Further, the pressure sensing component includes an intake pressure sensor, a release pressure sensor and a flow pressure sensor, the intake pressure sensor is arranged in the pressurizing chamber, the release pressure sensor is arranged in the release chamber, and the flow pressure sensor is arranged in the flow bin, and the intake pressure sensor, the release pressure sensor and the flow pressure sensor are all communicatively connected with the terminal device; the temperature sensing component includes an intake temperature sensor, a release temperature sensor and a flow temperature sensor, the intake temperature sensor is arranged in the pressurizing chamber, the release temperature sensor is arranged in the release chamber, and the flow temperature sensor is arranged in the flow bin, and the intake temperature sensor, the release temperature sensor and the flow temperature sensor are all communicatively connected with the terminal device.

[0011] Furthermore, there are multiple circulation pressure sensors, which are arranged at equal intervals in the circulation bin; there are multiple circulation temperature sensors, which are arranged at equal intervals in the circulation bin.

[0012] Furthermore, the pressure sensing assembly also includes a first pressure collector and a second pressure collector. The intake pressure sensor and the release pressure sensor are both communicatively connected to the terminal device via the first pressure collector, and the flow pressure sensor is communicatively connected to the terminal device via the second collector.

[0013] Furthermore, the temperature sensing assembly also includes a first temperature collector and a second temperature collector, the intake temperature sensor and the release temperature sensor are connected to the terminal device via the first temperature collector, and the flow temperature sensor is communicatively connected to the terminal device via the second collector.

[0014] Furthermore, an observation port is provided on the circulation bin, and the camera obtains the image in the circulation bin through the observation port.

[0015] Furthermore, a pressurizing hole is provided on the pressurizing chamber, and an external gas source is connected to the pressurizing chamber through the pressurizing hole. A feed hole is provided on the release chamber, and an electronic valve is provided on the feed hole. The electronic valve is communicatively connected to the terminal device.

[0016] The present invention also provides a nuclear fuel cycle high-pressure leakage simulation test method, comprising the steps of: injecting gas into a pressurized chamber and monitoring the pressure value in the pressurized chamber in real time; when the pressure value in the pressurized chamber reaches a predetermined pressure value, injecting leakage into a release chamber; using pressure to pressurize the leakage in the release chamber into a circulation chamber to simulate a high-pressure release scenario of the leakage; obtaining and recording the pressure value, temperature value and propagation process image of the leakage during high-pressure release.

[0017] The effect of the present invention is that by simulating the high-pressure leakage scenario, various parameters in the high-pressure leakage process of the nuclear fuel cycle, namely the pressure value, temperature value and the propagation process image, can be obtained, so as to accurately evaluate the various parameters in the leakage process, thereby accurately formulating leakage prevention measures and remedial measures after the leakage. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 A schematic diagram of a module of a nuclear fuel cycle high pressure leakage simulation test device provided by the present invention;

[0019] Figure 2 for Figure 1 Schematic diagram of the structure of the medium and high pressure chamber;

[0020] Figure 3 for Figure 1 Module diagram of the information collection component;

[0021] Figure 4 A schematic structural diagram of a nuclear fuel cycle high pressure leakage simulation test device provided by the present invention;

[0022] Figure 5 A flow chart of the steps of a nuclear fuel cycle high pressure leakage simulation test method provided by the present invention.

[0023] Description of reference numerals:

[0024] 10. High-pressure chamber; 20. Circulation chamber; 30. Information collection component; 40. Terminal equipment;

[0025] 11. diaphragm; 12. pressurizing chamber; 13. releasing chamber; 111. quick valve;

[0026] 31. Pressure sensor component; 32. Temperature sensor component; 33. Camera;

[0027] 311, intake pressure sensor; 312, release pressure sensor; 313, flow pressure sensor; 314, first pressure acquisition instrument; 315, second pressure acquisition instrument;

[0028] 321. Intake air temperature sensor; 322. Release temperature sensor; 323. Flow temperature sensor; 324. First temperature collector; 325. Second temperature collector. DETAILED DESCRIPTION

[0029] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments.

[0030] like Figure 1 As shown, the present invention provides a nuclear fuel cycle high-pressure leakage simulation test device, which includes a high-pressure chamber 10, a circulation chamber 20, an information collection component 30 and a terminal device 40. The high-pressure chamber 10 is connected to the circulation chamber 20, and the information collection component 30 is communicatively connected to the terminal device 40.

[0031] Among them, the high-pressure chamber 10 is configured to form a predetermined high-pressure environment to press the leaked material toward the circulation chamber 20. The information collection component 30 collects the temperature, pressure in the high-pressure chamber 10 and the circulation chamber 20 and the propagation process image of the leaked material in the circulation chamber 20, and transmits the collected information to the terminal device 40.

[0032] By simulating high-pressure leakage during the nuclear fuel cycle and obtaining various data during the simulated high-pressure leakage process, we can fully understand the various parameters of the leakage and the impact on the environment when nuclear fuel high-pressure leakage occurs, so as to more accurately evaluate the consequences and formulate targeted prevention plans, and provide support for the safety protection and improvement of the nuclear fuel cycle.

[0033] It can be understood that the predetermined high-pressure environment is to set the pressure value in the high-pressure chamber according to the environment to be simulated, so as to simulate the high-pressure leakage scene with the set pressure value.

[0034] It can be understood that forming a predetermined high-pressure environment in the high-pressure chamber 10 can be accomplished by injecting gas into the high-pressure chamber 10 to increase the internal air pressure, or it can be accomplished by any other method. The leaked material is initially located in the high-pressure chamber 10, as long as the air pressure inside the high-pressure chamber 10 can be increased so that the leaked material is pressed toward the circulation chamber 20.

[0035] It can be understood that the high-pressure chamber 10 and the circulation chamber 20 can be connected in any manner as long as the leaked material in the high-pressure chamber 10 can be pressed into the circulation chamber 20 to form a simulated high-pressure leakage scenario.

[0036] It can be understood that the information collection component 30 can be set at any place of the high-pressure chamber 10 and the circulation chamber 20, as long as it can collect the temperature, pressure and leakage propagation process images in the high-pressure chamber 10 and the circulation chamber 20.

[0037] It is understandable that the terminal device 40 can be a computer, cloud or other device with storage and computing functions.

[0038] See also Figure 2 A partition 11 is provided in the high-pressure chamber 10, and the partition 11 divides the high-pressure chamber 10 into a pressurization chamber 12 and a release chamber 13. The pressurization chamber 12 is connected to an external gas source, and the leakage is arranged in the release chamber 13. The circulation chamber 20 is connected to one end of the release chamber 13 away from the pressurization chamber 12. A quick valve 111 is provided on the partition 11, and the quick valve 111 is connected to the terminal device 40 signal.

[0039] It can be understood that the information collection component 30 is respectively arranged in the pressurization chamber 12 and the release chamber 13 to respectively collect the pressure and temperature in the pressurization chamber 12 and the release chamber 13 in real time. When the internal air pressure of the pressurization chamber 12 is increased to a predetermined high-pressure environment through the connected external air source, the terminal device 40 controls the quick valve 111 to open, so as to utilize the air pressure in the pressurization chamber 12 to press the leaked material in the release chamber 13 into the circulation chamber 20.

[0040] It can be understood that the leaked material in the release chamber 13 can be injected before the pressurization chamber 12 is pressurized, can be injected during the pressurization process of the pressurization chamber 12, or can be injected after the pressurization of the pressurization chamber 12 is completed.

[0041] The leaked materials may be radioactive gases, aerosols, iodine and other objects.

[0042] In a specific embodiment, the predetermined high pressure environment is a pressure value reaching 2 MPa.

[0043] Furthermore, a pressurizing hole is provided on the pressurizing chamber 12 , and an external gas source is connected to the pressurizing chamber 12 through the pressurizing hole to inject gas into the pressurizing chamber 12 , so that the pressurizing chamber 12 reaches a predetermined high-pressure environment.

[0044] It can be understood that the external air source is connected to the pressurization hole through the air inlet pipe, and the pressurization hole can be set at any place on the pressurization chamber 12, as long as the external air source can inject air into the pressurization chamber 12 through the pressurization hole to increase the air pressure in the pressurization chamber 12.

[0045] In some embodiments, in order to improve the sealing performance of the pressurizing hole, a sealing member such as a sealing ring may be provided at the connection between the pressurizing hole and the external gas source to prevent gas leakage from the pressurizing hole.

[0046] Furthermore, a feed hole is provided on the release chamber 13, and the leaked material is injected into the release chamber 13 through the liquid inlet.

[0047] It can be understood that the feed hole can be set at any position on the release chamber 13, as long as the leak can be injected into the release chamber 13 from the feed hole. The leaked matter such as radioactive gas, aerosol and iodine enters the release chamber 13 through the feed hole, so as to simulate the scene where the leak is pressed out under high pressure after the pressurized chamber 12 reaches the predetermined high pressure environment.

[0048] Furthermore, an electronic valve (not shown) is provided on the feed hole, and the electronic valve is communicatively connected with the terminal device 40 .

[0049] It can be understood that by setting up an electronic valve, the terminal device 40 can be used to control the opening or closing of the electronic valve to prevent people from getting close to the leak and causing safety hazards.

[0050] In a specific embodiment, when the information collection component 30 monitors that the air pressure in the pressurized chamber 12 has reached a predetermined high pressure environment and transmits the information to the terminal device 40, the terminal device 40 controls the electronic valve to open, and the leaked material can be injected into the release chamber 13 from the feed hole. By first bringing the pressurized chamber 12 to a predetermined high pressure environment and then injecting the leaked material into the release chamber 13, it is possible to avoid unexpected factors such as leakage during the pressurization of the pressurized chamber 12, which may cause the leaked material to be pressed out in advance, thereby destroying the test results and forming a safety hazard.

[0051] See also Figure 3-4 The information collection component 30 includes a pressure sensor component 31, a temperature sensor component 32 and a camera 33. The pressure sensor component 31 collects the pressure values ​​in the pressurizing chamber 12, the releasing chamber 13 and the circulation chamber 20, and both are connected to the terminal device 40 for communication. The temperature sensor component 32 collects the temperature in the pressurizing chamber 12, the releasing chamber 13 and the circulation chamber 20, and both are connected to the terminal device 40 for communication. The camera 33 collects the image information in the circulation chamber, that is, the propagation image of the leaked object in the circulation chamber 20, and is connected to the terminal device 40 for communication.

[0052] Further, the pressure sensing assembly 31 includes an intake pressure sensor 311, a release pressure sensor 312 and a circulation pressure sensor 313. The intake pressure sensor 311 is disposed in the pressurized chamber 12 and is communicatively connected to the terminal device 40. The release pressure sensor 312 is disposed in the release chamber 13 and is communicatively connected to the terminal device 40. The circulation pressure sensor 313 is disposed in the circulation chamber 20 and is communicatively connected to the terminal device 40.

[0053] It can be understood that the intake pressure sensor 311 is used to collect the pressure value in the pressurized chamber 12 to monitor whether the pressurized chamber 12 reaches the predetermined high pressure environment, the release pressure sensor 312 is used to collect the pressure value in the release chamber 13, and the circulation pressure sensor 313 is used to collect the pressure value in the circulation chamber 20.

[0054] Furthermore, there are multiple circulation pressure sensors 313 , and the multiple circulation pressure sensors 313 are arranged in the circulation chamber 20 at equal intervals to monitor the pressure value in the circulation chamber 20 in all directions.

[0055] It can be understood that when the leaked material in the release chamber 13 is pressed toward the circulation chamber 20 by pressure, as the pressure decays after the leaked material is ejected, the pressure values ​​of the circulation chamber 20 at positions close to the release chamber 13 and far away from the release chamber 13 are different. By arranging multiple circulation pressure sensors 313 at equal intervals, the pressure value in the entire circulation chamber 20 can be monitored more comprehensively.

[0056] Furthermore, the pressure sensing assembly 31 also includes a first pressure collector 314 and a second pressure collector 315. The intake pressure sensor 311 and the release pressure sensor 312 are both connected to the terminal device 40 through the first pressure collector 314, and the flow pressure sensor 313 is connected to the terminal device 40 through the second pressure collector 315.

[0057] By providing the first pressure collector 314 and the second pressure collector 315 , when collecting pressure values, the collected results can be intuitively observed through the first pressure collector 314 and the second pressure collector 315 .

[0058] Furthermore, the temperature sensing assembly 32 includes an intake temperature sensor 321, a release temperature sensor 322 and a circulation temperature sensor 323. The intake temperature sensor 321 is arranged in the pressurization chamber 12 and is communicatively connected to the terminal device 40. The release temperature sensor 322 is arranged in the release chamber 13 and is communicatively connected to the terminal device 40. The circulation temperature sensor 323 is arranged in the circulation bin 20 and is communicatively connected to the terminal device 40.

[0059] It can be understood that the intake temperature sensor 321 is used to collect the temperature value in the pressurization chamber 12, the release temperature sensor 322 is used to collect the temperature value in the release chamber 13, and the circulation temperature sensor 323 is used to collect the temperature value in the circulation chamber 20.

[0060] Furthermore, there are multiple circulation temperature sensors 323 , and the multiple circulation temperature sensors 323 are arranged in the circulation chamber 20 at equal intervals to monitor the temperature value in the circulation chamber 20 in all directions.

[0061] It can be understood that when the leaked material in the release chamber 13 is pressed toward the circulation chamber 20 by pressure, as the temperature of the leaked material decays after being ejected, the temperature of the circulation chamber 20 near the release chamber 13 and far away from the release chamber 13 are different. By arranging multiple circulation temperature sensors 323 at equal intervals, the temperature value in the entire circulation chamber 20 can be monitored more comprehensively.

[0062] Furthermore, the temperature sensing assembly 32 also includes a first temperature collector 324 and a second temperature collector 325 . The intake temperature sensor 321 and the release temperature sensor 322 are communicatively connected to the terminal device 40 via the first temperature collector 324 , and the flow temperature sensor 323 is communicatively connected to the terminal device 40 via the second temperature collector 325 .

[0063] By providing the first temperature collector 324 and the second temperature collector 325 , when collecting temperature values, the collected results can be intuitively observed through the first temperature collector 324 and the second temperature collector 325 .

[0064] Furthermore, an observation port is provided on the circulation chamber 20, and the camera 33 obtains the image inside the circulation chamber 20, that is, the image of the propagation process of the leaked object, through the observation port.

[0065] In some specific embodiments, the camera 33 is a high-speed camera, and the ranges of the intake pressure sensor 311, the release pressure sensor 312, and the circulation pressure sensor 313 are all 0-2Mpa, and the response frequency is 200KHz. The ranges of the intake temperature sensor 321, the release temperature sensor 322, and the circulation temperature sensor 323 are all 0-3000°C, and the response frequency is 200KHz. There are multiple groups of flange holes on the top and side walls of the pressurized chamber 12, the release chamber 13, and the circulation chamber 20. The interface is a standard flange connection hole, which can be used to install various sensors for testing. All interfaces are equipped with flange covers. During the test, the measuring sensor is installed on the interface according to the test needs, and the unnecessary interface is sealed with a flange cover.

[0066] The working principle of the present invention is to first inject air into the pressurized chamber 12 through the pressurized hole to increase the air pressure in the pressurized chamber 12 to a predetermined high pressure environment, then inject the leaked material into the release chamber 13 through the feed hole, and open the quick valve 111 so that the air pressure in the pressurized chamber 12 presses the leaked material into the circulation chamber to simulate the scene of the leaked material leaking under high pressure. The pressure value, temperature value and propagation process image during the leakage process are collected by the pressure sensing component 31, the temperature sensing component 32 and the camera 33 respectively to obtain various parameters during the leakage process.

[0067] See also Figure 5 The present invention also provides a nuclear fuel cycle high pressure leakage simulation test method, which comprises the steps of:

[0068] S1, injecting gas into the pressurized chamber and monitoring the pressure value in the pressurized chamber in real time;

[0069] Specifically, gas is injected into the pressurized chamber through an external gas source to increase the pressure value in the pressurized chamber. At the same time, a sensor is used to monitor the pressure value in the pressurized chamber in real time.

[0070] S2, when the pressure value in the pressurized chamber reaches a predetermined pressure value, the leaked material is injected into the release chamber;

[0071] Specifically, when the pressure value in the pressurizing chamber reaches a predetermined pressure value, the leakage material for the simulation test is injected into the releasing chamber.

[0072] In a specific embodiment, the predetermined pressure value is 2 MPa, and the leaked substances are radioactive gas, aerosol and iodine.

[0073] In a specific embodiment, the pressurizing chamber and the releasing chamber are connected or closed by a valve.

[0074] S3, using pressure to press the leaked material in the release chamber into the circulation chamber, simulating the high-pressure release scenario of the leaked material;

[0075] Specifically, after the leak is injected, the valve is opened, and the pressure in the pressurized chamber is used to press the leak in the release chamber into the circulation chamber, so as to form a scene in which the leak is leaked under a high-pressure environment.

[0076] S4, obtaining and recording the pressure value, temperature value and propagation process image of the leaked material during high-pressure release;

[0077] Specifically, the pressure value, temperature value and propagation process image in the entire simulated leakage scene are obtained and recorded through the pressure sensing component, the temperature sensing component and the camera to obtain various parameters in the simulated scene.

[0078] It can be seen from the above embodiments that the present invention can obtain various parameters in the high-pressure leakage process of the nuclear fuel cycle, namely, pressure value, temperature value and propagation process image, by simulating the high-pressure leakage scenario, so as to accurately evaluate various parameters in the leakage process, thereby accurately formulating leakage prevention measures and remedial measures after leakage.

[0079] The device described in the present invention is not limited to the embodiments described in the specific implementation manner. Those skilled in the art may derive other implementation manners based on the technical solution of the present invention, which also fall within the technical innovation scope of the present invention.

Claims

1. A nuclear fuel cycle high pressure leakage simulation test device, It is characterized in that include: A high-pressure chamber (10), a circulation chamber (20), an information collection component (30) and a terminal device (40), wherein the high-pressure chamber (10) is in communication with the circulation chamber (20), and the information collection component (30) is in communication connection with the terminal device (40); The high-pressure chamber (10) is configured to form a predetermined high-pressure environment to press the leaked material toward the circulation chamber (20); the information collection component (30) is configured to collect the temperature and pressure in the high-pressure chamber (10) and the circulation chamber (20) and an image of the propagation process of the leaked material in the circulation chamber (20), and transmit the information to the terminal device (40); A partition (11) is provided in the high-pressure chamber (10), and the partition (11) divides the high-pressure chamber (10) into a pressurizing chamber (12) and a releasing chamber (13); the pressurizing chamber (12) is connected to an external gas source, and leaked matter is arranged in the releasing chamber (13); the circulation chamber (20) is connected to an end of the releasing chamber (13) away from the pressurizing chamber (12); a quick valve (111) is provided on the partition (11), and the quick valve (111) is connected to the terminal device (40) for communication; The information collection component (30) comprises a pressure sensing component (31), a temperature sensing component (32) and a camera (33); the pressure sensing component (31) respectively collects pressure values ​​in the pressurizing chamber (12), the releasing chamber (13) and the circulation chamber (20); the temperature sensing component (32) respectively collects temperature values ​​in the pressurizing chamber (12), the releasing chamber (13) and the circulation chamber (20); the camera (33) collects image information in the circulation chamber (20); the pressure sensing component (31), the temperature sensing component (32) and the camera (33) are all connected to the terminal device (40) for communication; The pressure sensing assembly (31) comprises an intake pressure sensor (311), a release pressure sensor (312) and a circulation pressure sensor (313); the intake pressure sensor (311) is arranged in the pressurizing chamber (12); the release pressure sensor (312) is arranged in the release chamber (13); the circulation pressure sensor (313) is arranged in the circulation chamber (20); the intake pressure sensor (311), the release pressure sensor (312) and the circulation pressure sensor (313) are all communicatively connected to the terminal device (40); The temperature sensing assembly (32) comprises an intake temperature sensor (321), a release temperature sensor (322) and a circulation temperature sensor (323); the intake temperature sensor (321) is arranged in the pressurizing chamber (12); the release temperature sensor (322) is arranged in the release chamber (13); the circulation temperature sensor (323) is arranged in the circulation bin (20); the intake temperature sensor (321), the release temperature sensor (322) and the circulation temperature sensor (323) are all communicatively connected to the terminal device (40); The pressure sensing assembly (31) further comprises a first pressure acquisition instrument (314) and a second pressure acquisition instrument (315); the intake pressure sensor (311) and the release pressure sensor (312) are both communicatively connected to the terminal device (40) via the first pressure acquisition instrument (314); and the flow pressure sensor (313) is communicatively connected to the terminal device (40) via the second pressure acquisition instrument (315); The temperature sensing assembly (32) further comprises a first temperature collector (324) and a second temperature collector (325); the intake temperature sensor (321) and the release temperature sensor (322) are connected to the terminal device (40) via the first temperature collector (324); and the flow temperature sensor (323) is connected to the terminal device (40) via the second temperature collector (325); The circulation bin (20) is provided with an observation port, and the camera (33) acquires an image inside the circulation bin (20) through the observation port; The pressurizing chamber (12) is provided with a pressurizing hole, and an external gas source is connected to the pressurizing chamber (12) through the pressurizing hole. The release chamber (13) is provided with a material inlet hole, and an electronic valve is provided on the material inlet hole. The electronic valve is communicatively connected to the terminal device (40).

2. A nuclear fuel cycle high pressure leakage simulation test device as claimed in claim 1, Features: There are a plurality of the circulation pressure sensors (313), and the plurality of the circulation pressure sensors (313) are arranged in the circulation chamber (20) at equal intervals; There are a plurality of the circulation temperature sensors (323), and the plurality of the circulation temperature sensors (323) are arranged at equal intervals in the circulation bin (20).

3. A test method for a nuclear fuel cycle high pressure leakage simulation test device as claimed in any one of claims 1 to 2, It is characterized in that Includes steps: Injecting gas into the pressurized chamber and monitoring the pressure value in the pressurized chamber in real time; When the pressure value in the pressurized chamber reaches a predetermined pressure value, the leaked material is injected into the release chamber; Use pressure to press the leaked material in the release chamber into the circulation chamber to simulate the high-pressure release scenario of the leaked material; Obtain and record the pressure value, temperature value and propagation process image when the leak is released under high pressure.

Citation Information

Patent Citations

  • Radioactive substance transportation container hydraulic pressure test system and test method

    CN115452275A

  • Nuclear fuel transmission pipe pressing test device

    CN209625812U

  • Test device capable of measuring high-pressure gas leakage diffusion flow field in linkage manner

    CN211178897U

  • System for monitoring of nuclear power generation plant, and operation-maintenance data management system

    JP2011021977A