Transformer load balancing distribution method and device in regional power grid

By calculating the transformer load rate in the power grid and selecting feasible transfer lines, combined with environmental information, the problem of passive time-consuming processing of overloaded power grid equipment is solved, and a method of quickly responding to load overload is realized, and the safety of power grid equipment is improved. and reliability.

CN115441434BActive Publication Date: 2024-11-01CHENGDU POWER SUPPLY COMPANY OF STATE GRID SICHUAN ELECTRIC POWER +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210979074.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-16
Publication Date
2024-11-01
Estimated Expiration
2042-08-16

Smart Images

  • Figure CN115441434B_ABST
    Figure CN115441434B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and device for balancing load distribution of transformers in a regional power grid, the method comprising: determining a feasible load transfer line between a load-overload transformer and a load-in transformer, screening and obtaining an actual load transfer line in the load transfer line according to constraints, and calculating the load transfer amount between the load-overload transformer and the load-in transformer; recording environmental information in each transfer time period; obtaining current environmental information, matching it with historical environmental information, and determining and executing the actual load transfer line according to the matching result. By adopting the above technical solution, a feasible transfer line can be quickly queried and executed, and matching can be performed according to historical environmental information to quickly execute a reasonable transfer plan.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power grid equipment control, and in particular to a method and device for balancing transformer load distribution in a regional power grid. Background Art

[0002] As cities and economies continue to grow, the contradiction between power supply capacity and growing electricity demand becomes more prominent. During the peak periods of electricity consumption such as the peak summer and peak winter, due to uneven load distribution, some substations frequently and seriously overload the main transformers. Long-term overload operation will bring serious safety hazards to power grid equipment.

[0003] The current processing mode is that when the main transformer is overloaded, the power grid operation, the load conditions of the main transformer and line equipment, the transfer method, the power supply service and other information are manually checked to comprehensively decide on the distribution network load transfer plan. The disadvantages of this mode are that it is passive and time-consuming, and the decision-making relies on the professional ability of the dispatchers themselves. It is not forward-looking, and the emergency handling effect is not good when dealing with short-term sudden overloads of multiple main transformers. Summary of the invention

[0004] Purpose of the invention: The present invention provides a method and device for balancing the load distribution of transformers in a regional power grid, which aims to comprehensively consider the load rate and transfer lines of loads transferred out and into substations, quickly query and obtain feasible transfer lines and execute them, and at the same time, record corresponding environmental information. When a load overload occurs subsequently, it can be matched according to historical environmental information and a reasonable transfer plan can be quickly executed.

[0005] Technical solution: The present invention provides a method for balancing the load distribution of transformers in a regional power grid, comprising: step 1, calculating the load rate of the transformer according to the transformer parameters and the load amount, selecting the overload transformer in the regional power grid according to the load rate, and selecting the load transfer transformer in the regional power grid according to the load rate and the cross-sectional flow of the transformer upper power supply; the regional power grid is a ring-shaped closed-loop topology structure, which includes multiple open-loop points, and each open-loop point corresponds to an operating area; step 21, determining a feasible load transfer line between the overload transformer and the load transfer transformer, and in the load transfer line, according to the constraint conditions, the actual load transfer line is screened so that the transfer line is not overloaded, and the load overload transformer and the load transfer transformer are calculated. The amount of load transferred between the input and output transformers; the constraint condition means that after each overload transformer transfers out the load, the load rate is lower than the standard load rate, and at the same time, after each load-in transformer transfers in the load, the load rate is still lower than the standard load rate; step 22, record the environmental information during each transfer time period; step 31, in the actual load transfer line, if the transfer line is within the operating area, perform non-stop power transfer, if the transfer line crosses the operating area, perform power outage transfer; record the actual load transfer line actually executed, and establish an association with the environmental information within the corresponding transfer time period; step 32, obtain the current environmental information, match it with the historical environmental information, and determine and execute the actual load transfer line according to the matching result.

[0006] Specifically, if the load rate continues to be higher than the standard load rate for a period exceeding a time threshold, the transformer is identified as being overloaded.

[0007] Specifically, if the load rate continues to be lower than the standard load rate for a period exceeding a time threshold and the section flow of the upper power source is not overloaded, it is determined that the load is transferred to the transformer.

[0008] Specifically, the standard load rate is 85%, and the time threshold is 30 minutes.

[0009] Specifically, the actual load transfer line is obtained by screening using the following formula:

[0010] (C nnz +d nnz ) / N dnnz <85%,

[0011] Among them, C nnz It represents the transfer load of the receiving end of the zth transfer line between the nth overload transformer and the nth load transfer transformer, d nnz It represents the current load of the receiving end of the zth transfer line between the nth overload transformer and the nth load transfer transformer, N dnnzIt represents the rated load of the receiving end of the zth transfer line between the nth overload transformer and the nth load transfer transformer.

[0012] Specifically, the constraint condition adopts the following formula:

[0013] (a n -C n1 -C n2 -C n3 -……-C nn ) / N an =α n <85%,

[0014] (b n +C 1n +C 2n +C 3n +……+C nn ) / N bn =β n <85%,

[0015] Among them, a n and b n They represent the load of the nth load overload transformer and the load transferred to the nth load transformer, respectively. n ∈(a1, a2, a3, …, a i ), b n ∈(b1, b2, b3, …, b i ), N an and N bn They represent the rated load of the nth load overload transformer and the nth load transfer transformer, respectively. n and β n They respectively represent the load of the nth load overload transformer and the load of the nth load transferred into the transformer after the transfer.

[0016] Specifically, if there are sensitive users on the power outage and power transfer line, the power outage and power transfer on the corresponding line will not be performed.

[0017] Specifically, the environmental information includes: temperature, humidity, weather type, date and 24-hour time.

[0018] Specifically, according to the date and weather type when the current load overload occurs, the historical temperature and humidity information of the corresponding historical date time period and the same historical weather type is queried, and multiple sets of temperature curves and humidity curves are fitted; the temperature change rate and humidity change rate at the current moment when the current load overload occurs are calculated, and a reference time corresponding to the same temperature change rate as the current moment is queried in multiple temperature curves; the temperature curve whose reference time is closest to the current moment is selected, and if the maximum change rate of the humidity curve corresponding to the temperature curve is greater than the humidity change rate at the current moment, the corresponding temperature and humidity are used as the matched historical environmental information; and the transfer is performed according to the actual load transfer line actually executed according to the matched historical environmental information.

[0019] The present invention also provides a load balancing distribution device for transformers in a regional power grid, comprising: an equipment operation evaluation unit, a load balancing distribution unit and an execution unit, wherein: the equipment operation evaluation unit is used to calculate the load rate of the transformer according to the transformer parameters and the load amount, select the overload transformer in the regional power grid according to the load rate, and select the load transfer transformer in the regional power grid according to the load rate and the cross-sectional flow of the transformer upper power supply; the regional power grid is a ring closed-loop topology structure, which includes multiple open-loop points, each open-loop point corresponds to an operation area; the load balancing distribution unit is used to determine a feasible load transfer line between the overload transformer and the load transfer transformer, and select the actual load transfer line in the load transfer line according to the constraint conditions, and calculate the load transfer line. The amount of load transferred between the overload transformer and the load transfer transformer; the constraint condition refers to that after each overload transformer transfers out the load, the load rate is lower than the standard load rate, and at the same time, after each load transfer transformer transfers in the load, the load rate is still lower than the standard load rate; record the environmental information during each transfer time period; obtain the current environmental information and match it with the historical environmental information; the execution unit is used to, in the actual load transfer line, if the transfer line is within the operating area, perform non-stop power transfer, if the transfer line crosses the operating area, perform power outage transfer; record the actual load transfer line actually executed, and establish an association with the environmental information in the corresponding transfer time period; determine and execute the actual load transfer line according to the matching result with the historical environmental information.

[0020] Beneficial effects: Compared with the prior art, the present invention has the following significant advantages: fast query to obtain feasible transfer routes and execute them, and can match according to historical environmental information to quickly execute reasonable transfer plans. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 A schematic diagram of a flow chart of a method for balancing transformer load distribution in a regional power grid provided by the present invention;

[0022] Figure 2 It is a schematic diagram of a ring-shaped closed-loop topological structure;

[0023] Figure 3 A schematic diagram of the load distribution path combination method provided by the present invention. DETAILED DESCRIPTION

[0024] The technical solution of the present invention is further described below in conjunction with the accompanying drawings.

[0025] See also Figure 1 , which is a flow chart of the method for balancing transformer load distribution in a regional power grid provided by the present invention.

[0026] Step 1, calculate the load rate of the transformer according to the transformer parameters and the load, select the load overload transformer in the regional power grid according to the load rate, and select the load transfer transformer in the regional power grid according to the load rate and the section flow of the transformer upstream power supply.

[0027] In the embodiment of the present invention, the regional power grid is a ring-shaped closed-loop topology structure, which includes a plurality of open-loop points, and each open-loop point corresponds to an operating area.

[0028] See also Figure 2 , which is a schematic diagram of a ring-shaped closed-loop topological structure.

[0029] In a specific implementation, the ring closed loop topology specifically refers to a hand-in-hand distribution network structure, in which the open loop point ( Figure 2 The operating area corresponding to the mark in the figure is generally a distribution network area of ​​a relatively independent area, and each operating area is connected by a ring topology line.

[0030] In the embodiment of the present invention, if the load rate is continuously higher than the standard load rate for a period exceeding a time threshold (which can be set accordingly according to the actual application scenario), it is determined to be an overloaded transformer.

[0031] In specific implementation, since the load changes in real time, short-term load overload will not lead to more serious consequences. However, when the load overload reaches a certain time, it indicates that the load usage has reached a certain stable state and may last for a long time. At this time, load distribution is needed to reduce the working pressure of the overloaded transformer.

[0032] In the embodiment of the present invention, if the load rate is continuously lower than the standard load rate for a period exceeding a time threshold and the section flow of the upper power source is not overloaded, it is determined that the load is transferred to the transformer.

[0033] In the specific implementation, in addition to the load rate being continuously lower than the standard load rate, since the load transfer transformer needs to accept the load transfer of other overload transformers, and the load transfer is transmitted through the line, it is also required that the section flow of the upper power supply of the transformer is not overloaded. The section flow is not overloaded, which means that the ratio between the current carrying capacity of the line and the rated current carrying capacity is lower than the value of the standard load rate.

[0034] In the embodiment of the present invention, the standard load rate is 85%, and the time threshold is 30 minutes.

[0035] In the specific implementation, the reason why the standard load rate is set to 85% is that there is a 15% redundancy, which improves the reliability of the power grid. In addition, a standard load rate that is not too low can allow the transformer to accommodate a certain capacity of load, avoid no load transfer transformer to receive the load of other overloaded transformers, and achieve a balance between the overall overload transformers and load transfer transformers, that is, all load overload transformers can effectively transfer the load to one or more load transfer transformers, and ultimately achieve all transformers are not overloaded.

[0036] Step 21, determine the feasible load transfer line between the overload transformer and the load transfer transformer, and select the actual load transfer line according to the constraint conditions in the load transfer line so that the transfer line will not be overloaded, and calculate the transfer load amount between the overload transformer and the load transfer transformer.

[0037] In the embodiment of the present invention, the constraint condition means that after each overload transformer transfers out load, the load rate is lower than the standard load rate, and at the same time, after each load-in transformer transfers in load, the load rate is still lower than the standard load rate.

[0038] In the specific implementation, according to the actual distribution network line diagram, all feasible load transfer lines between each overload transformer and each load transfer transformer can be determined. Based on the principle that the line does not overload, and the constraint conditions as restrictions, the distribution of load transfer on each line between the overload transformer and the load transfer transformer is queried and calculated, and finally the actual load transfer line and the load transferred on each line can be screened.

[0039] See also Figure 3 , which is a schematic diagram of the load distribution path combination method provided by the present invention.

[0040] In the embodiment of the present invention, the actual load transfer lines are screened and the current carrying capacity of each line is limited by the following formula:

[0041] (C nnz +dnnz ) / N dnnz <85%,

[0042] Among them, C nnz It represents the transfer load of the receiving end of the zth transfer line between the nth overload transformer and the nth load transfer transformer, d nnz It represents the current load of the receiving end of the zth transfer line between the nth overload transformer and the nth load transfer transformer, N dnnz It represents the rated load of the receiving end of the zth transfer line between the nth overload transformer and the nth load transfer transformer.

[0043] In a specific implementation, there may be multiple transfer lines for transferring out loads between a specific load overload transformer and a specific load transfer-in transformer. For the transfer line, there is a middle node. One side of the middle node close to the load overload transformer is the front end of the transfer line, which is used to transfer out the load. The other side of the middle node close to the load transfer-in transformer is the receiving end of the transfer line, which is used to receive the load. The receiving end of the transfer line also needs to meet the current carrying capacity restriction requirements, that is, (C nnz +d nnz ) / N dnnz <85%.

[0044] In the embodiment of the present invention, the constraint condition adopts the following formula:

[0045] (a n -C n1 -C n2 -C n3 -……-C nn ) / N an =α n <85%,

[0046] (b n +C 1n +C 2n +C 3n +……+C nn ) / N bn =β n <85%,

[0047] Among them, a n and b n They represent the load of the nth load overload transformer and the load transferred to the nth load transformer, respectively. n ∈(a1, a2, a3, …, a i ), b n ∈(b1, b2, b3, …, b i ), i∈(1,2,3,…), N anand N bn They represent the rated load of the nth load overload transformer and the nth load transfer transformer, respectively. n and β n They respectively represent the load of the nth load overload transformer and the load of the nth load transferred into the transformer after the transfer.

[0048] Step 22, recording the environmental information during each transfer time period.

[0049] In the embodiment of the present invention, the environmental information includes: temperature, humidity, weather type, date and 24-hour time.

[0050] In a specific implementation, the corresponding environmental information is recorded, which can be used for subsequent computer training and learning, as well as for making a transfer operation for the current load overload based on the historical environmental information.

[0051] Step 31, in the actual load transfer line, if the transfer line is within the operating area, perform power transfer without power outage; if the transfer line crosses the operating area, perform power outage transfer.

[0052] In the embodiment of the present invention, if there are sensitive users on the power outage and power transfer line, the power outage and power transfer for the sensitive users will not be performed.

[0053] In specific implementation, if the transfer supply lines are completely within the same operating area, the transfer can be carried out without power outage and will not cause any impact. However, when the transfer supply lines cross operating areas, since it involves transfer between areas, power outage and transfer are required to ensure safety and reliability.

[0054] In specific implementation, sensitive users include users who need guaranteed power supply and high-risk important users, such as hospitals, etc. Power outages have a greater impact on such users.

[0055] In the embodiment of the present invention, the actual load transfer line actually executed is recorded and an association is established with the environmental information in the corresponding transfer time period.

[0056] In a specific implementation, the purpose of establishing an association is that after the historical environmental information is matched, the load can be actually transferred to the line corresponding to the matched historical environmental information.

[0057] Step 32, obtaining current environmental information, matching it with historical environmental information, and determining and executing the actual load transfer line according to the matching result.

[0058] In an embodiment of the present invention, according to the date and weather type when the load overload currently occurs, the historical temperature and humidity information under the corresponding historical date time period and the same historical weather type is queried, and multiple groups of temperature curves and humidity curves are fitted; the temperature change rate and humidity change rate at the current moment when the load overload occurs are calculated, and a reference time corresponding to the same temperature change rate as the current moment is queried in multiple temperature curves; the temperature curve whose reference time is closest to the current moment is selected, and if the maximum change rate of the humidity curve corresponding to the temperature curve is greater than the humidity change rate at the current moment, the corresponding temperature and humidity are used as the matched historical environmental information; and the transfer is performed according to the load transfer line actually executed corresponding to the matched historical environmental information.

[0059] In a specific implementation, after collecting enough historical environmental information and corresponding actual load transfer lines, steps 21 and 22 can be skipped, and the actual load transfer line for the current load can be directly obtained and executed based on the matching results of the current environmental information and the historical environmental information.

[0060] In the specific implementation, the corresponding historical date time period can be centered on the date when the load overload occurs in previous years, and extended by a certain number of days. For example, the date and weather type when the load overload occurs are August 1, 2022 and sunny, respectively. Then, the historical temperature and humidity information of sunny days between July 15, 2021 and August 15, 2021 can be queried. Since the temperature and humidity during this period are generally similar to the temperature and humidity of the current load occurrence, and temperature and humidity are more important reasons for changes in electricity consumption, the queried historical environmental information has a strong reference significance.

[0061] In the specific implementation, after calculating the temperature change rate and humidity change rate at the current moment, for example, July 15, 2021 to August 15, 2021 corresponds to a set of temperature curves and humidity curves, and other historical environmental information can correspond to another set or multiple sets of temperature curves and humidity curves. If the temperature change rate in the temperature curve is the same as the temperature change rate at the current moment, the moment when the temperature change rate is queried in the temperature curve is recorded as the reference moment. Each temperature curve can correspond to a reference moment, and the temperature curve corresponding to the reference moment is selected from the reference moments. The reason is that the temperature change rate and time are the same or highly similar, indicating that the electricity consumption choices made by users will also be highly similar. Therefore, the actual load transfer line before has a strong reference significance and can be used for application execution.

[0062] In the specific implementation, the maximum change rate of the humidity curve corresponding to the selected temperature curve is greater than the humidity change rate at the current moment, indicating that the humidity at the current moment is also covered in the historical environmental information, indicating that the changes in other environmental factors are small and not enough to change the user's electricity consumption choice. The actual load transfer line corresponding to the historical environmental information is reliable, and therefore, it can be directly executed.

[0063] The present invention also provides a load balancing distribution device for transformers in a regional power grid, comprising: an equipment operation evaluation unit, a load balancing distribution unit and an execution unit, wherein: the equipment operation evaluation unit is used to calculate the load rate of the transformer according to the transformer parameters and the load amount, select the overload transformer in the regional power grid according to the load rate, and select the load transfer transformer in the regional power grid according to the load rate and the cross-sectional flow of the transformer upper power supply; the regional power grid is a ring closed-loop topology structure, which includes multiple open-loop points, each open-loop point corresponds to an operation area; the load balancing distribution unit is used to determine a feasible load transfer line between the overload transformer and the load transfer transformer, and in the load transfer line, according to the constraint conditions, the actual load transfer line is screened so that the transfer line does not overload. , and calculate the transferred load between the overload transformer and the load transfer transformer; the constraint condition means that after each overload transformer transfers out the load, the load rate is lower than the standard load rate, and at the same time, after each load transfer transformer transfers in the load, the load rate is still lower than the standard load rate; record the environmental information within each transfer time period; obtain the current environmental information and match it with the historical environmental information; the execution unit is used to, in the actual load transfer line, if the transfer line is within the operating area, perform non-stop power transfer, if the transfer line crosses the operating area, perform power outage transfer; record the actual load transfer line actually executed, and establish an association with the environmental information within the corresponding transfer time period; determine and execute the actual load transfer line according to the matching result with the historical environmental information.

Claims

1. A method for balancing transformer load distribution in a regional power grid, characterized in that: include: Step 1, calculating the load rate of the transformer according to the transformer parameters and the load, selecting the overload transformer in the regional power grid according to the load rate, and selecting the load transfer transformer in the regional power grid according to the load rate and the section flow of the transformer upper power supply; the regional power grid is a ring closed loop topology structure, which includes multiple open loop points, and each open loop point corresponds to an operation area; Step 21, determining a feasible load transfer line between the overload transformer and the load transfer transformer, and selecting the actual load transfer line according to the constraint condition in the load transfer line so that the transfer line is not overloaded, and calculating the transfer load between the overload transformer and the load transfer transformer; the constraint condition is that after each overload transformer transfers out the load, the load rate is lower than the standard load rate, and at the same time, after each load transfer transformer transfers in the load, the load rate is still lower than the standard load rate; Step 22, recording the environmental information during each transfer time period; Step 31, in the actual load transfer line, if the transfer line is within the operating area, perform non-stop power transfer; if the transfer line crosses the operating area, perform power outage transfer; Record the actual load transfer routes actually executed and establish a correlation with the environmental information during the corresponding transfer time period; Step 32, obtaining current environmental information, matching it with historical environmental information, and determining and executing the actual load transfer line according to the matching result.

2. The method for balancing transformer load distribution in a regional power grid according to claim 1, characterized in that: The step of selecting an overload transformer in a regional power grid according to the load rate includes: If the load rate continues to be higher than the standard load rate for a period exceeding the time threshold, the transformer is identified as overloaded.

3. The method for balancing transformer load distribution in a regional power grid according to claim 2, characterized in that: The method of selecting the load in the regional power grid and transferring it to the transformer according to the load rate and the section flow of the transformer upstream power supply comprises: If the load rate continues to be lower than the standard load rate for longer than the time threshold and the section flow of the upper power source is not overloaded, it is determined that the load is transferred to the transformer.

4. The method for balancing transformer load distribution in a regional power grid according to claim 3, characterized in that: The standard load rate is 85% and the time threshold is 30 minutes.

5. The method for balancing transformer load distribution in a regional power grid according to claim 4, characterized in that: The actual load transfer line is screened to obtain the load transfer line without overload, using the following formula: (C nnz +d nnz ) / N dnnz <85%, Among them, C nnz It represents the transfer load of the receiving end of the zth transfer line between the nth overload transformer and the nth load transfer transformer, d nnz It represents the current load of the receiving end of the zth transfer line between the nth overload transformer and the nth load transfer transformer, N dnnz It represents the rated load of the receiving end of the zth transfer line between the nth overload transformer and the nth load transfer transformer.

6. The method for balancing transformer load distribution in a regional power grid according to claim 5, characterized in that: The constraint condition adopts the following formula: (a n -C n1 -C n2 -C n3 -……-C nn ) / N an =α n <85%, (b n +C 1n +C 2n +C 3n +……+C nn ) / N bn =β n <85%, Among them, a n and b n They represent the load of the nth load overload transformer and the load transferred to the nth load transformer, respectively. n ∈(a1, a2, a3, …, a i ), b n ∈(b1, b2, b3, …, b i ), N an and N bn They represent the rated load of the nth load overload transformer and the nth load transfer transformer, respectively. n and β n They respectively represent the load of the nth load overload transformer and the load of the nth load transferred into the transformer after the transfer.

7. The method for balancing transformer load distribution in a regional power grid according to claim 6, characterized in that: During the power outage and power transfer process, if there are sensitive users on the power outage and power transfer lines, the power outage and power transfer for the sensitive users will be stopped.

8. The method for balancing transformer load distribution in a regional power grid according to claim 7, characterized in that: The environmental information includes: temperature, humidity, weather type, date and 24-hour time.

9. The method for balancing transformer load distribution in a regional power grid according to claim 8, characterized in that: The matching is performed with the historical environment information, and the actual load transfer line is determined and executed according to the matching result, including: According to the date and weather type when the current load overload occurs, query the historical temperature and humidity information of the corresponding historical date time period and the same historical weather type, and obtain multiple sets of temperature curves and humidity curves by fitting; Calculate the temperature change rate and humidity change rate at the current moment when the load overload occurs, and search for a reference time corresponding to the same change rate as the temperature change rate at the current moment in multiple temperature curves; Select the temperature curve whose reference time is closest to the current time. If the maximum change rate of the humidity curve corresponding to the temperature curve is greater than the humidity change rate at the current time, use the corresponding temperature and humidity as the historical environmental information obtained by matching. The transfer is performed according to the load transfer line actually executed according to the matched historical environmental information.

10. A transformer load balancing distribution device in a regional power grid, characterized in that: include: Equipment operation evaluation unit, load balancing distribution unit and execution unit, including: The equipment operation evaluation unit is used to calculate the load rate of the transformer according to the transformer parameters and the load, select the overload transformer in the regional power grid according to the load rate, and select the load transfer transformer in the regional power grid according to the load rate and the section flow of the transformer upper power supply; the regional power grid is a ring closed loop topology structure, which includes multiple open loop points, and each open loop point corresponds to an operation area; The load balancing distribution unit is used to determine a feasible load transfer line between a load overload transformer and a load transfer transformer, and select an actual load transfer line according to a constraint condition in the load transfer line so that the transfer line is not overloaded, and calculate the transfer load between the load overload transformer and the load transfer transformer; the constraint condition is that after each load overload transformer transfers out the load, the load rate is lower than the standard load rate, and at the same time, after each load transfer transformer transfers in the load, the load rate is still lower than the standard load rate; record the environmental information in each transfer time period; obtain the current environmental information and match it with the historical environmental information; The execution unit is used to execute non-stop power transfer in the actual load transfer line if the transfer line is within the operating area, and execute power transfer with power outage if the transfer line crosses the operating area; record the actual load transfer line actually executed and establish an association with the environmental information in the corresponding transfer time period; determine and execute the actual load transfer line based on the matching result with the historical environmental information.