Power grid fault monitoring method, device and storage medium

By judging the associated switch faults in the power grid substation and using topological relationships and video data for grid fault monitoring, the problem of low grid fault monitoring efficiency in the existing technology is solved, and rapid and timely fault location and processing are achieved.

CN115474026BActive Publication Date: 2024-11-29STATE GRID BEIJING ELECTRIC POWER CO +1
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202211110605.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-13
Publication Date
2024-11-29
Estimated Expiration
2042-09-13

AI Technical Summary

Technical Problem

In the prior art, the power grid fault monitoring efficiency is low and not timely, and fault identification and positioning cannot be carried out efficiently and quickly.

Method used

By determining whether there is a fault in the associated switch in the target substation, grid fault monitoring is carried out based on topological relationships and video data of the monitoring equipment, quickly locate the fault switch and collect video data for fault type and level judgment.

Benefits of technology

It realizes rapid and timely monitoring and positioning of power grid faults, improves fault handling efficiency, and ensures the safety and stability of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115474026B_ABST
    Figure CN115474026B_ABST
Patent Text Reader

Abstract

The present invention discloses a method, device and storage medium for monitoring power grid faults. The method includes: determining whether there is a first faulty switch that has failed among multiple first associated switches in the current target substation; if there is a first faulty switch among multiple first associated switches, determining the first target switch connected to the first faulty switch among multiple second associated switches in multiple associated substations according to the first faulty switch and the topological relationship between the target substation and multiple associated substations; determining the first target monitoring device corresponding to the first target switch according to the corresponding relationship between the second associated switch and the first monitoring device; acquiring the first video data collected by the first target monitoring device within a first predetermined time period, and then performing power grid fault monitoring. The present invention solves the technical problem in the related art that power grid fault monitoring cannot be performed efficiently and timely.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of data processing, and in particular to a method, device and storage medium for monitoring power grid faults. Background Art

[0002] Substation video monitoring system is one of the means for controllers to promptly and accurately determine the cause of power grid operation failure. The power grid usually includes multiple monitoring rooms, each of which is equipped with multiple monitoring devices. If a fault occurs in the power grid, the fault current will be transmitted along the power grid and will involve an area of ​​the power grid.

[0003] In the related art, the control personnel rely on their experience to check the video surveillance images of multiple rooms in a substation, or even multiple rooms in a multi-level substation, to monitor the power grid faults. This method has the problems of low efficiency and untimely fault monitoring. That is, in the related art, there is a technical problem that the power grid fault monitoring cannot be carried out efficiently and timely.

[0004] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention

[0005] The embodiments of the present invention provide a method, device and storage medium for monitoring power grid faults, so as to at least solve the technical problem in the related art that power grid fault monitoring cannot be performed efficiently and timely.

[0006] According to one aspect of an embodiment of the present invention, a method for monitoring power grid faults is provided, comprising: determining whether there is a first faulty switch in a plurality of first associated switches in a current target substation, wherein the plurality of first associated switches are switches for controlling the bus connection status between the target substation and a plurality of associated substations; in the case where there is a first faulty switch in the plurality of first associated switches, determining, according to the first faulty switch and a topological relationship between the target substation and the plurality of associated substations, a first target switch connected to the first faulty switch among a plurality of second associated switches in the plurality of associated substations, wherein the topological relationship includes a connection relationship between the plurality of first associated switches and the plurality of second associated switches; determining, according to a correspondence between the second associated switch and a first monitoring device for monitoring the working status of the second associated switch, a first target monitoring device corresponding to the first target switch; acquiring first video data collected by the first target monitoring device within a first predetermined time period, and performing power grid fault monitoring based on the first video data, wherein the first predetermined time period includes a current moment.

[0007] Optionally, determining whether there is a first faulty switch that has failed among multiple first associated switches in the current target substation includes: determining a second monitoring device for monitoring the working status of the multiple first associated switches in the target substation; acquiring second video data collected by the second monitoring device within a second predetermined time period; and determining the first faulty switch that has failed among the multiple first associated switches based on the second video data.

[0008] Optionally, it also includes: in the case that there is no first fault switch among the multiple first associated switches, respectively obtaining power parameters on multiple busbars connected to the target substation and the multiple associated substations within a third predetermined time period; determining the target busbar with abnormal power parameters among the multiple busbars according to the power parameters on the multiple busbars and the abnormality judgment strategy; determining the second target switch and the third target switch corresponding to the busbar according to the target busbar and the topological relationship between the target substation and the multiple associated substations, wherein the second target switch is a switch among the multiple first associated switches in the target substation, and the third target switch is a switch among the multiple second associated switches in the multiple associated substations; determining the second target monitoring device corresponding to the second target switch in the target substation according to the second target switch; determining the third target monitoring device corresponding to the third target switch in the multiple associated substations according to the third target switch; respectively obtaining the third video data and the fourth video data collected by the second target monitoring device and the third target monitoring device within the second predetermined time period, and performing power grid fault monitoring based on the third video data and the fourth video data.

[0009] Optionally, the abnormality judgment strategy includes at least one of the following: when the power parameter on the bus is less than a first predetermined parameter threshold or greater than a second predetermined parameter threshold, it is determined that a power parameter abnormality has occurred in the bus; when the rate of change of the power parameter on the bus is greater than a predetermined change threshold, it is determined that a power parameter abnormality has occurred in the bus.

[0010] Optionally, determining the second target monitoring device corresponding to the second target switch in the target substation according to the second target switch includes: determining the second target monitoring device corresponding to the second target switch according to the second target switch and the correspondence between the first associated switch and the second monitoring device for monitoring the working status of the first associated switch; determining the third target monitoring device corresponding to the third target switch in the multiple associated substations according to the third target switch includes: determining the second target monitoring device corresponding to the second target switch according to the third target switch and the correspondence between the second associated switch and the first monitoring device for monitoring the working status of the second associated switch.

[0011] Optionally, the acquiring of the first video data collected by the first target monitoring device and the performance of power grid fault monitoring include: determining whether the first target switch is currently faulty based on the first video data collected by the first target monitoring device within the first predetermined time period; in the case that the first target switch is currently faulty, determining multiple fault types of the first target switch within the first predetermined time period based on the first video data; and determining the fault level of the first target switch based on the multiple fault types.

[0012] Optionally, determining the fault level of the first target switch failure based on the multiple fault types includes: respectively determining the historical moments when the multiple fault types occurred; determining a predetermined number of fault types closest to the current moment based on the historical moments when the multiple fault types occurred; determining the target fault level of the first target switch failure based on the predetermined number of fault types and the current fault type of the first target switch failure at the current moment, in combination with the correspondence between the fault level and multiple consecutive fault types.

[0013] Optionally, it also includes: issuing an early warning according to the target fault level.

[0014] According to another aspect of an embodiment of the present invention, there is also provided a device for monitoring power grid faults, comprising: a judgment module, used to judge whether there is a first faulty switch in a plurality of first associated switches in a current target substation, wherein the plurality of first associated switches are switches for controlling the bus connection status between the target substation and the plurality of associated substations; a first determination module, used to determine, when there is a first faulty switch in the plurality of first associated switches, a first target switch connected to the first faulty switch among a plurality of second associated switches in the plurality of associated substations according to the first faulty switch and a topological relationship between the target substation and the plurality of associated substations, wherein the topological relationship includes a connection relationship between the plurality of first associated switches and the plurality of second associated switches; a second determination module, used to determine a first target monitoring device corresponding to the first target switch according to a corresponding relationship between the second associated switch and a first monitoring device for monitoring the working status of the second associated switch; an acquisition module, used to acquire first video data collected by the first target monitoring device within a first predetermined time period, and perform power grid fault monitoring based on the first video data, wherein the first predetermined time period includes the current moment.

[0015] According to another aspect of an embodiment of the present invention, a computer device is provided, comprising: a memory and a processor, wherein the memory stores a computer program; the processor is used to execute the computer program stored in the memory, wherein when the computer program is executed, the processor executes any one of the methods described above.

[0016] In an embodiment of the present invention, it is determined whether there is a first fault switch in a plurality of first associated switches in the current target substation, wherein the plurality of first associated switches are switches for controlling the busbar connection state between the target substation and the plurality of associated substations; in the case where there is a first fault switch in the plurality of first associated switches, according to the first fault switch and the topological relationship between the target substation and the plurality of associated substations, the first target switch connected to the first fault switch among the plurality of second associated switches in the plurality of associated substations is determined, wherein the topological relationship includes the connection relationship between the plurality of first associated switches and the plurality of second associated switches; according to the correspondence between the second associated switch and the first monitoring device for monitoring the working state of the second associated switch, the first target monitoring device corresponding to the first target switch is determined; the first video data collected by the first target monitoring device within a first predetermined time period is obtained, and power grid fault monitoring is performed based on the first video data, wherein the first predetermined time period includes the current moment. Thus, the technical problem that power grid fault monitoring cannot be performed efficiently and timely in the related technology is solved. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0018] Figure 1 is a flow chart of an optional method for monitoring power grid faults according to an embodiment of the present invention;

[0019] Figure 2 is a schematic diagram of distribution of multiple substations in an optional power grid according to an embodiment of the present invention;

[0020] Figure 3 is a flow chart of another optional method for monitoring power grid faults according to an embodiment of the present invention;

[0021] Figure 4 It is a structural block diagram of an optional power grid fault monitoring device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0022] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0023] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0024] Example 1

[0025] According to an embodiment of the present invention, a method embodiment of power grid fault monitoring is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0026] Figure 1 is a flow chart of an optional method for monitoring power grid faults according to an embodiment of the present invention. Figure 1 As shown, the method comprises the following steps:

[0027] Step S102, determining whether there is a first faulty switch that has failed among a plurality of first associated switches in the current target substation, wherein the plurality of first associated switches are switches that control the busbar connection state between the target substation and a plurality of associated substations.

[0028] In an optional embodiment, the target substation and multiple associated substations connected to the target substation. The target substation is provided with multiple first associated switches, and the target substation controls the connection status between the target substation and the multiple associated substations through the multiple first associated switches. In some optional embodiments, the target substation is provided with multiple monitoring rooms, each monitoring room is provided with multiple electric cabinets, each electric cabinet is provided with multiple first associated switches, and the multiple first associated switches in the same electric cabinet control the connection status between the target substation and a predetermined number of associated substations.

[0029] Optionally, there are multiple methods for determining whether there is a first faulty switch that has failed among multiple first associated switches in the current target substation, which may include the following steps: determining a second monitoring device for monitoring the working status of multiple first associated switches in the target substation; obtaining second video data collected by the second monitoring device within a second predetermined time period; and determining a first faulty switch that has failed among multiple first associated switches based on the second video data, wherein the second predetermined time period includes the current moment and a time period of a predetermined length before the current moment. By determining whether there is a first faulty switch that has failed among multiple first associated switches based on the second video data collected by the second monitoring device, it is possible to quickly determine whether there is a first faulty switch among multiple first associated switches, with high processing efficiency.

[0030] Step S104: when there is a first faulty switch among the plurality of first associated switches, determine the first target switch connected to the first faulty switch among the plurality of second associated switches in the plurality of associated substations according to the first faulty switch and the topological relationship between the target substation and the plurality of associated substations, wherein the topological relationship includes the connection relationship between the plurality of first associated switches and the plurality of second associated switches. The equipment between the target substation and the plurality of associated substations is connected through a bus, the target substation is provided with a plurality of first associated switches, the associated substation is provided with a plurality of second associated switches, the plurality of first associated switches, the plurality of second associated switches, and the bus between the plurality of first associated switches and the plurality of second associated switches together constitute the topological relationship between the target substation and the plurality of associated substations.

[0031] Step S106: determining a first target monitoring device corresponding to the first target switch according to a corresponding relationship between the second associated switch and the first monitoring device used to monitor the working state of the second associated switch.

[0032] In some optional embodiments, there are multiple types of first monitoring devices, for example, a video acquisition device for video acquisition may be included. Each of the multiple associated substations connected to the target substation is provided with multiple second associated switches and multiple first monitoring devices, wherein each first monitoring device is used to monitor the state of at least one second associated switch. That is, there is a corresponding relationship between the second associated switch and the first monitoring device.

[0033] Step S108, obtaining first video data collected by the first target monitoring device within a first predetermined time period, and performing power grid fault monitoring based on the first video data, wherein the first predetermined time period includes the current moment.

[0034] In this optional embodiment, when there is a first fault switch in the first associated switches of the target substation, it means that a fault has occurred in the target substation. In this case, the second associated switch connected to the first fault switch is confirmed through the first fault switch in the target substation and the connection relationship between multiple first associated switches and multiple second associated switches in the associated substation. The second associated switch is the first target switch. The first monitoring device is determined according to the first target switch, and the power grid fault monitoring is performed according to the first video data collected by the first monitoring device, so that the purpose of fast and timely fault monitoring can be achieved. The technical problem that the power grid fault monitoring cannot be performed efficiently and timely in the related technology is solved.

[0035] In some optional embodiments: when there is no first fault switch among multiple first associated switches, power parameters on multiple busbars connected to the target substation and multiple associated substations are obtained respectively within a third predetermined time period; based on the power parameters on the multiple busbars and the abnormality judgment strategy, a target busbar with abnormal power parameters among the multiple busbars is determined; based on the target busbar and the topological relationship between the target substation and the multiple associated substations, a second target switch and a third target switch corresponding to the busbar are determined, wherein the second target switch is a switch among the multiple first associated switches in the target substation, and the third target switch is a switch among the multiple second associated switches in the multiple associated substations; a second target monitoring device corresponding to the second target switch in the target substation is determined according to the second target switch; a third target monitoring device corresponding to the third target switch in the multiple associated substations is determined according to the third target switch; third video data and fourth video data collected by the second target monitoring device and the third target monitoring device within the second predetermined time period are respectively obtained, and power grid fault monitoring is performed based on the third video data and the fourth video data. According to the target bus and the topological relationship between the target substation and multiple associated substations, the second target switch and the third target switch corresponding to the bus are determined, and then the video data of the second target monitoring device and the third target monitoring device corresponding to the second target switch and the third target switch are obtained respectively, so as to quickly and accurately locate the fault of the power grid.

[0036] In one embodiment, after determining the second target monitoring device and the third target monitoring device, the monitoring rooms corresponding to the second target monitoring device and the third target monitoring device respectively can be determined, and other monitoring devices in the corresponding monitoring rooms can be obtained, and the video data of the other monitoring devices can be obtained, and power grid fault monitoring can be performed based on the second target monitoring device, the third target monitoring device, and the video data of the other monitoring devices.

[0037] In some optional embodiments, obtaining the first video data collected by the first target monitoring device and performing power grid fault monitoring includes: determining whether the first target switch is currently faulty based on the first video data collected by the first target monitoring device within the first predetermined time period; if the first target switch is currently faulty, determining multiple fault types of the first target switch within the first predetermined time period based on the first video data; and determining the fault level of the first target switch fault based on the multiple fault types. Thus, the fault level can be accurately and quickly determined.

[0038] In some optional embodiments, determining the fault level of the first target switch according to multiple fault types includes: determining the historical moments of the multiple fault types respectively; determining a predetermined number of fault types closest to the current moment according to the historical moments of the multiple fault types; determining the target fault level of the first target switch according to the predetermined number of fault types and the current fault type of the first target switch at the current moment, combined with the correspondence between the fault level and multiple continuous fault types. In this way, the fault level can be accurately and quickly determined. Taking the occurrence of N types of faults in the first target switch within the first predetermined time period as an example, in one embodiment, the three fault types closest to the current moment are extracted, and the target fault level is determined based on these three fault types.

[0039] In some optional embodiments, after the target fault level is confirmed, an early warning is issued according to the fault level to remind relevant personnel to handle the fault. Reminding relevant personnel to handle the fault according to the fault level can enable relevant personnel to preferentially handle faults with higher fault levels to ensure the safety of the power grid.

[0040] In this optional embodiment, when there is no first fault in the first associated switch, it is equivalent to that the target substation has no fault. In this case, the target busbar with abnormal power parameters is determined by the power parameters on multiple buses connected to the target substation and multiple associated substations in the third predetermined time period. According to the target busbar and the topological relationship between the target substation and multiple associated substations, the second target switch and the third target switch corresponding to the busbar are determined among the multiple buses. According to the second target switch and the third target switch, the corresponding second target monitoring device and the third target monitoring device are determined, and the power grid fault monitoring is performed according to the video data of the second target monitoring device and the third target monitoring device. That is, when the target substation has no fault and an associated fault occurs, the second target monitoring device in the target substation and the third target monitoring device in the associated substation are determined according to the target busbar with abnormal power parameters, and the fault monitoring is performed according to the video information collected by the second target monitoring device and the third target monitoring device, so that the fault monitoring can be performed quickly and timely.

[0041] In some optional embodiments, when the power parameter on the bus is less than the first predetermined parameter threshold or greater than the second predetermined parameter threshold, it is determined that the power parameter abnormality occurs in the bus; when the rate of change of the power parameter on the bus is greater than the predetermined change threshold, it is determined that the power parameter abnormality occurs in the bus. When the power parameter on the bus is too large or too small, or increases or decreases rapidly, it can be determined that the power parameter abnormality occurs in the bus. Therefore, according to the method of this optional embodiment, it is possible to quickly and accurately determine whether the power parameter abnormality occurs in the bus, so as to perform subsequent fault monitoring according to the judgment result. In some optional embodiments, determining the second target monitoring device corresponding to the second target switch in the target substation according to the second target switch includes: determining the second target monitoring device corresponding to the second target switch according to the second target switch, and the corresponding relationship between the first associated switch and the second monitoring device for monitoring the working state of the first associated switch; determining the third target monitoring device corresponding to the third target switch in multiple associated substations according to the third target switch includes: determining the second target monitoring device corresponding to the second target switch according to the third target switch, and the corresponding relationship between the second associated switch and the first monitoring device for monitoring the working state of the second associated switch. According to the correspondence between the associated switches and the monitoring devices, the second target monitoring device corresponding to the second target switch and the third target monitoring device corresponding to the third target switch can be quickly located, and fault monitoring can be performed based on the video data collected by the second target monitoring device and the third target monitoring device, thereby improving processing efficiency and the method is simple.

[0042] Based on the above embodiment and optional embodiment, the present invention provides an optional implementation of a method for monitoring power grid faults.

[0043] It should be understood that with the popularization of unmanned substations, substation video surveillance systems have become one of the important means for controllers to promptly and accurately determine the cause of power grid operation failures. In some application scenarios, important substations in the power grid contain four to five monitoring rooms that need to be equipped with monitoring systems, and each monitoring room needs to be equipped with at least four or more video cameras. In actual application scenarios, if a fault occurs in the power grid, the fault current will be transmitted along the power grid and will involve an area of ​​the power grid. This requires controllers to rely on experience to view the data collected by multiple cameras in multiple monitoring rooms in a substation to monitor power grid faults. In some application scenarios, controllers need to obtain video surveillance images from multiple rooms in multi-level substations to find abnormal phenomena, and then determine the cause of the fault and locate the fault.

[0044] In the related art, the control system fault identification system is basically based on the information collected by the camera, and through image processing methods, such as color recognition technology to identify fireworks faults, and temperature recognition to identify the heating of the equipment in the station and then find the faulty equipment. This method is basically the post-fault phenomenon identification after the fault occurs, and it actively tracks and identifies the fault after the power grid fails. In addition, when confirming the fault, it basically relies on manual observation of a large number of video images, and manual judgment is made based on the experience of the control personnel. When the control personnel remotely monitor the operation of the substation, they can analyze the data collected by the on-site sensors, but many fault characteristics cannot be reflected in the data. In addition to sending personnel to the site for investigation and inspection, it is difficult to obtain first-hand intuitive information. In the related art, when a power grid fault occurs, when confirming the operating status of the on-site equipment, the fault monitoring can be carried out by manually selecting and retrieving the on-site video. However, if a large-scale power grid fault occurs, the control personnel will not be able to accurately judge the on-site equipment situation in a short time, which will seriously affect the fault handling process. Therefore, there is an urgent need for a method for rapid fault monitoring to achieve fault monitoring of the power grid.

[0045] In this optional implementation, based on the electrical link relationship after the power grid fault, the distribution room in the relevant substation is quickly located, and the object is captured by the position of the indoor camera of the station to the station, and then the fault-related fault is determined and located, thereby solving the problem that the controller needs to rely on experience to view the video surveillance images of multiple rooms in a substation, or even multiple rooms in a multi-level substation, to find abnormal phenomena to determine the cause and location of the fault, thereby improving processing efficiency. In addition, in this optional implementation, video abnormal fault judgment is realized based on substation video abnormality recognition, and power grid fault monitoring is performed based on the multi-level association rules of fault abnormality types between different types and the linkage relationship of the power grid knife switch topology diagram. When performing power grid fault monitoring, it is necessary to first determine whether the fault is a local station fault or an associated fault, and perform corresponding operations based on the judgment result, as described below.

[0046] In one embodiment, when determining that the fault in the power grid is a fault of this station, the fault room of this station can be determined first, and then all the station room cameras of this station can be checked, and then the mother switch of the associated station (equivalent to the first associated switch in the aforementioned embodiment) can be extracted from the power grid system, or the associated device connected to the switch at the current moment can be confirmed based on whether the switch is switched on and off, and then the corresponding associated camera (equivalent to the second associated switch in the aforementioned embodiment) can be determined based on the information of the associated device, and then the video data of all the cameras in the distribution room where the camera is located can be pushed, or the video data collected by the camera can be pushed. Among them, this station is equivalent to the target substation in the aforementioned embodiment.

[0047] In one embodiment, after determining that an associated device failure occurs in the power grid, it is necessary to determine whether the associated device and the main substation (equivalent to the target substation in the aforementioned embodiment) bus tie switch or switch are closed and disconnected, and according to whether the associated device and the main substation bus tie switch or switch are closed and disconnected, the camera of the device associated with the associated device in the main substation is determined, and the video information collected by the camera is pushed to the control personnel. After pushing the video information collected by the camera, the video information collected by other cameras in the monitoring room where the camera is located is pushed.

[0048] Figure 2 FIG. 1 is a schematic diagram of the distribution of multiple substations in an optional power grid according to an embodiment of the present invention. Figure 2 , the fault monitoring method of the substation in the scenario of associated equipment failure is explained. Figure 2 As shown, the target substation is respectively connected to six associated substations, from the first associated station to the sixth associated station. Taking the failure of the equipment in the first associated station as an example, when the failure of the equipment in the first associated station is determined based on the video data collected by the camera used to monitor the switch status in the first associated station, the associated switch associated with the switch in the target substation is determined based on the connection status of the corresponding switch. After pushing the video data collected by the camera used to monitor the associated switch, the video data collected by other cameras in the monitoring room where the camera is located is pushed. Figure 2 As shown, the target substation is not only connected to the first associated station, but also to the second to fifth associated stations. After obtaining the video data collected by the camera corresponding to the associated switch in the target substation, the secondary associated switch corresponding to the associated switch located in other associated stations can be determined, and the corresponding camera can be determined according to each secondary associated switch, and the video data collected by these cameras can be pushed to the control personnel or terminal equipment for power grid fault monitoring.

[0049] Figure 3 FIG. 1 is a flowchart of another optional method for monitoring power grid faults according to an embodiment of the present invention. Figure 3 As shown, the power grid fault monitoring method is further explained: after confirming that there is a faulty device in the associated substation, the faulty device signal is reported, and the associated device connected to the faulty device is determined based on the associated switches and the topological relationship between the devices in the power grid, the data of the associated device camera is reported, and the associated station room located in the target substation is determined based on the corresponding camera, and the video data collected by the camera in the associated station room is reported to the control personnel or terminal equipment for power grid fault monitoring.

[0050] After obtaining the video information of the corresponding camera, the fault level is judged according to the video information. When judging the fault level, the fault level is judged according to the current fault type and the predetermined number of fault types closest to the current one. Specifically, it is possible to judge whether the switch in the video has the following types of faults based on the video information: fire, smoke or electric arc. It should be understood that fire and electric arc are usually accompanied by smoke. In order to accurately present the accident scene to the dispatcher, the abnormal alarm log corresponding to the video information can also be retrieved, and the time of occurrence of the predetermined number of fault types can be determined according to the abnormal alarm log, and the faults of the predetermined number of fault types can be sorted according to the time of occurrence of the fault, and the fault level can be determined according to the sorting of the predetermined number of fault types and the correspondence between the predetermined fault level and multiple fault types.

[0051] In an optional implementation, the set fault levels include eight categories, and the correspondence between each fault level and fault type includes: the first category, the associated switch first has a fire fault and then a smoke fault; the second category, the associated switch first has a fire fault, then a smoke fault, and finally an arc fault; the third category, the associated switch only has a smoke fault; the fourth category, the associated switch first has a smoke fault and then a fire fault; the fifth category, the associated switch first has a smoke fault, then a fire fault, and finally an arc fault; the sixth category, the associated switch only has an arc fault; the seventh category, the associated switch first has an arc fault, then a fire fault, and finally a smoke fault; the eighth category, a person appears in the video and enters the screen.

[0052] In some embodiments, the same type of fault in the video may appear repeatedly. In order to improve processing efficiency, 3 frames or other number of frames in the video can be intercepted at a predetermined time interval, and the fault type in the intercepted image can be extracted. The extracted fault type is arranged in chronological order, and the corresponding fault level is determined according to the arrangement result and the correspondence between the fault level and the fault type. Among them, multiple groups of image samples can be obtained, and the multiple groups of image samples are taken from the video collected by the monitoring equipment in the substation. The machine model is trained according to the multiple groups of image samples to obtain the fault extraction model. In actual application, the fault extraction in the image is performed according to the fault extraction model. When the fault level is determined, an alarm message is generated, and the alarm message is pushed to the information comprehensive processing platform to inform the dispatcher to make a decision.

[0053] According to the grid association relationship and the current state of the grid, fault video information with high priority or high fault level is pushed quickly, so that the dispatcher can quickly judge the grid fault situation. After pushing the fault video information with high priority or high fault level, the fault video information with low priority or low fault level is recommended to ensure the comprehensive push of fault video information.

[0054] Example 2

[0055] Figure 4 is a structural block diagram of an optional power grid fault monitoring device according to an embodiment of the present invention. Figure 4 As shown, the device includes a judgment module 402, a first determination module 404, a second determination module 406, and an acquisition module 408. The details are described below.

[0056] The judging module 402 is used to judge whether there is a first faulty switch in the current target substation among the multiple first associated switches, wherein the multiple first associated switches are switches for controlling the bus connection status between the target substation and the multiple associated substations; the first determining module 404 is connected to the judging module 402, and is used to determine, when there is a first faulty switch in the multiple first associated switches, a first target switch connected to the first faulty switch among the multiple second associated switches in the multiple associated substations according to the first faulty switch and the topological relationship between the target substation and the multiple associated substations, wherein the topological relationship includes the connection relationship between the multiple first associated switches and the multiple second associated switches; the second determining module 406 is connected to the first determining module 404, and is used to determine the first target monitoring device corresponding to the first target switch according to the corresponding relationship between the second associated switch and the first monitoring device for monitoring the working status of the second associated switch; the acquiring module 408 is connected to the second determining module 406, and is used to acquire the first video data collected by the first target monitoring device in a first predetermined time period, and perform power grid fault monitoring based on the first video data, wherein the first predetermined time period includes the current moment.

[0057] It should be noted here that the above-mentioned judgment module 402, first determination module 404, second determination module 406, and acquisition module 408 correspond to steps S102 to S108 in Example 1, and the instances and application scenarios implemented by several modules and corresponding steps are the same, but are not limited to the contents disclosed in the above-mentioned Example 1.

[0058] Example 3

[0059] The embodiment of the present invention may provide a computer device. Optionally, in this embodiment, the computer device may be located in at least one network device among a plurality of network devices of a computer network. The computer device includes a memory and a processor.

[0060] Among them, the memory can be used to store software programs and modules, such as program instructions / modules corresponding to the data processing method and device in the embodiment of the present invention. The processor executes various functional applications and data processing by running the software programs and modules stored in the memory, that is, realizing the above-mentioned data processing method. The memory may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some instances, the memory may further include a memory remotely arranged relative to the processor, and these remote memories may be connected to the computer terminal via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0061] The processor can call the information and application stored in the memory through the transmission device to perform the following steps:

[0062] Optionally, the processor may also execute the program code of the following steps: determining whether there is a first faulty switch that has failed among multiple first associated switches in the current target substation, wherein the multiple first associated switches are switches that control the bus connection status between the target substation and multiple associated substations; in the case where there is a first faulty switch among multiple first associated switches, determining the first target switch connected to the first faulty switch among multiple second associated switches in the multiple associated substations according to the first faulty switch and the topological relationship between the target substation and the multiple associated substations, wherein the topological relationship includes the connection relationship between the multiple first associated switches and the multiple second associated switches; determining the first target monitoring device corresponding to the first target switch according to the correspondence between the second associated switch and the first monitoring device for monitoring the working status of the second associated switch; obtaining the first video data collected by the first target monitoring device within a first predetermined time period, and performing power grid fault monitoring based on the first video data, wherein the first predetermined time period includes the current moment.

[0063] Optionally, the processor may also execute program codes of the following steps: determining a second monitoring device for monitoring the working status of multiple first associated switches in the target substation; obtaining second video data collected by the second monitoring device within a second predetermined time period; and determining a first faulty switch among multiple first associated switches based on the second video data.

[0064] Optionally, the processor may also execute the program code of the following steps: in the case that there is no first faulty switch among the multiple first associated switches, respectively obtaining power parameters on multiple busbars connected to the target substation and the multiple associated substations within a third predetermined time period; determining the target busbar with abnormal power parameters among the multiple busbars according to the power parameters on the multiple busbars and the abnormality judgment strategy; determining the second target switch and the third target switch corresponding to the busbar according to the target busbar and the topological relationship between the target substation and the multiple associated substations, wherein the second target switch is a switch among the multiple first associated switches in the target substation, and the third target switch is a switch among the multiple second associated switches in the multiple associated substations; determining the second target monitoring device corresponding to the second target switch in the target substation according to the second target switch; determining the third target monitoring device corresponding to the third target switch in the multiple associated substations according to the third target switch; respectively obtaining the third video data and the fourth video data collected by the second target monitoring device and the third target monitoring device within the second predetermined time period, and performing power grid fault monitoring based on the third video data and the fourth video data.

[0065] The abnormality judgment strategy includes at least one of the following: when the power parameter on the bus is less than a first predetermined parameter threshold or greater than a second predetermined parameter threshold, it is determined that a power parameter abnormality has occurred in the bus; when the rate of change of the power parameter on the bus is greater than a predetermined change threshold, it is determined that a power parameter abnormality has occurred in the bus.

[0066] Optionally, the processor may also execute program codes of the following steps: determining a second target monitoring device corresponding to the second target switch according to the second target switch and the correspondence between the first associated switch and the second monitoring device for monitoring the working status of the first associated switch; determining a third target monitoring device corresponding to the third target switch in multiple associated substations according to the third target switch, including: determining the second target monitoring device corresponding to the second target switch according to the third target switch and the correspondence between the second associated switch and the first monitoring device for monitoring the working status of the second associated switch.

[0067] Optionally, the processor may also execute program codes for the following steps: respectively determining the historical moments at which multiple fault types occurred; determining a predetermined number of fault types closest to the current moment based on the historical moments at which multiple fault types occurred; determining the target fault level of the first target switch failure based on the predetermined number of fault types and the current fault type of the first target switch failure at the current moment, combined with the correspondence between the fault level and multiple continuous fault types.

[0068] Optionally, the processor may also execute program code for the following steps: determining, based on multiple historical moments at which multiple fault types occurred, multiple historical fault types corresponding to a predetermined number of historical moments closest to the current moment among the multiple historical moments; determining, based on the multiple historical fault types and the current fault type of the first target switch at the current moment, a target fault level of the first target switch failure in combination with the correspondence between the fault level and multiple continuous fault types.

[0069] A person of ordinary skill in the art can understand that all or part of the steps in the various methods of the above embodiments can be completed by instructing the hardware related to the terminal device through a program, and the program can be stored in a computer-readable storage medium, and the storage medium may include: a flash drive, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, etc.

[0070] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.

[0071] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0072] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.

[0073] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed over multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.

[0074] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0075] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the methods of each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.

[0076] The above are only preferred embodiments of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A method for monitoring power grid faults, characterized in that: include: Determine whether there is a first faulty switch that fails among a plurality of first associated switches in the current target substation, wherein the plurality of first associated switches are switches that control the busbar connection state between the target substation and a plurality of associated substations; In the case where there is a first faulty switch among the plurality of first associated switches, determining a first target switch connected to the first faulty switch among a plurality of second associated switches in the plurality of associated substations according to the first faulty switch and a topological relationship between the target substation and the plurality of associated substations, wherein the topological relationship includes a connection relationship between the plurality of first associated switches and the plurality of second associated switches; Determining a first target monitoring device corresponding to the first target switch according to a corresponding relationship between the second associated switch and a first monitoring device for monitoring the working state of the second associated switch; Acquire first video data collected by the first target monitoring device within a first predetermined time period, and perform power grid fault monitoring based on the first video data, wherein the first predetermined time period includes the current moment; The method further comprises: when there is no first fault switch among the plurality of first associated switches, respectively obtaining power parameters on a plurality of busbars connected to the target substation and the plurality of associated substations within a third predetermined time period; According to the power parameters on the multiple buses and the abnormality judgment strategy, determining a target bus having abnormal power parameters among the multiple buses; According to the target bus and the topological relationship between the target substation and the multiple associated substations, determine a second target switch and a third target switch corresponding to the bus, wherein the second target switch is a switch among the multiple first associated switches in the target substation, and the third target switch is a switch among the multiple second associated switches in the multiple associated substations; Determine, according to the second target switch, a second target monitoring device in the target substation corresponding to the second target switch; Determine, according to the third target switch, a third target monitoring device corresponding to the third target switch in the plurality of associated substations; The third video data and the fourth video data collected by the second target monitoring device and the third target monitoring device within a second predetermined time period are respectively obtained, and power grid fault monitoring is performed based on the third video data and the fourth video data.

2. The method according to claim 1, characterized in that The step of determining whether there is a first faulty switch that has failed among a plurality of first associated switches in the current target substation includes: Determining a second monitoring device for monitoring the working status of the plurality of first associated switches in the target substation; Acquire second video data collected by the second monitoring device within a second predetermined time period; A first faulty switch that fails among the plurality of first associated switches is determined according to the second video data.

3. The method according to claim 1, characterized in that The abnormality judgment strategy includes at least one of the following: When the power parameter on the bus is less than a first predetermined parameter threshold or greater than a second predetermined parameter threshold, determining that a power parameter abnormality occurs in the bus; When the change rate of the power parameter on the bus is greater than a predetermined change threshold, it is determined that a power parameter abnormality occurs in the bus.

4. The method according to claim 1, characterized in that: The determining, according to the second target switch, a second target monitoring device corresponding to the second target switch in the target substation comprises: determining, according to the second target switch, a correspondence between the first associated switch and a second monitoring device for monitoring the working state of the first associated switch, a second target monitoring device corresponding to the second target switch; Determining a third target monitoring device corresponding to the third target switch in the multiple associated substations according to the third target switch includes: determining a second target monitoring device corresponding to the second target switch according to the third target switch and a correspondence between the second associated switch and a first monitoring device for monitoring the working status of the second associated switch.

5. The method according to claim 1, characterized in that The acquiring the first video data collected by the first target monitoring device to perform power grid fault monitoring includes: determining whether the first target switch is currently faulty according to the first video data collected by the first target monitoring device within the first predetermined time period; In the case that the first target switch currently fails, determining, according to the first video data, a plurality of fault types of the first target switch that fails within the first predetermined time period; A fault level of the first target switch fault is determined according to the multiple fault types.

6. The method according to claim 5, characterized in that Determining the fault level of the first target switch fault according to the multiple fault types includes: respectively determining historical moments at which the faults of the plurality of fault types occurred; Determining a predetermined number of fault types closest to a current moment according to historical moments at which the faults of the multiple fault types occurred; According to the predetermined number of fault types and the current fault type of the first target switch at the current moment, combined with the correspondence between the fault level and multiple consecutive fault types, the target fault level of the first target switch is determined.

7. The method according to claim 6, characterized in that Also includes: An early warning is issued according to the target fault level.

8. A device for monitoring power grid faults, characterized in that: include: A judgment module, used to judge whether there is a first faulty switch that has failed among a plurality of first associated switches in the current target substation, wherein the plurality of first associated switches are switches that control the busbar connection state between the target substation and a plurality of associated substations; A first determining module is used to determine, when there is a first faulty switch among the plurality of first associated switches, a first target switch connected to the first faulty switch among a plurality of second associated switches in the plurality of associated substations according to the first faulty switch and a topological relationship between the target substation and the plurality of associated substations, wherein the topological relationship includes a connection relationship between the plurality of first associated switches and the plurality of second associated switches; a second determining module, configured to determine a first target monitoring device corresponding to the first target switch according to a corresponding relationship between the second associated switch and a first monitoring device for monitoring a working state of the second associated switch; an acquisition module, configured to acquire first video data collected by the first target monitoring device within a first predetermined time period, and perform power grid fault monitoring based on the first video data, wherein the first predetermined time period includes the current moment; The device is further configured to, when there is no first faulty switch among the plurality of first associated switches, respectively obtain power parameters on a plurality of busbars connected to the target substation and the plurality of associated substations within a third predetermined time period; According to the power parameters on the multiple buses and the abnormality judgment strategy, determining a target bus having abnormal power parameters among the multiple buses; According to the target bus and the topological relationship between the target substation and the multiple associated substations, determine a second target switch and a third target switch corresponding to the bus, wherein the second target switch is a switch among the multiple first associated switches in the target substation, and the third target switch is a switch among the multiple second associated switches in the multiple associated substations; Determine, according to the second target switch, a second target monitoring device in the target substation corresponding to the second target switch; Determine, according to the third target switch, a third target monitoring device corresponding to the third target switch in the plurality of associated substations; The third video data and the fourth video data collected by the second target monitoring device and the third target monitoring device within a second predetermined time period are respectively obtained, and power grid fault monitoring is performed based on the third video data and the fourth video data.

9. A computer device, characterized in that: include: Memory and processor, The memory stores a computer program; The processor is used to execute the computer program stored in the memory, and when the computer program is run, the processor is enabled to execute the method according to any one of claims 1 to 7.

Citation Information

Patent Citations

  • Simulation method of monitoring signals in power grid fault line

    CN103616610A

  • Monitoring method, device and system based on SCADA (Supervisory Control And Data Acquisition) system

    CN104503405A

  • Monitoring method and apparatus for distribution network

    CN105071539A

  • Analyzing method of grid fault current shock topological graph

    CN106021596A

  • Topology automatic identification master station prototype system of medium-low voltage distribution network

    CN110927626A