Multi-stage scheduling
By using multiple parallel interleaved HARQ processes in the PDCCH, and using the first scheduling information and the second scheduling information to allocate and receive data channels, the problems of HARQ process delay and starvation are solved, and data transmission efficiency and system stability are improved.
Patent Information
- Application Number
- CN202180034594.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2020-05-14
- Filing Date
- 2021-04-15
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2041-04-15
AI Technical Summary
The HARQ process is prone to starvation when faced with large round-trip delays, and existing technologies are difficult to effectively alleviate the problems of processing delay and waiting delay, resulting in a decrease in data transmission efficiency.
By using multiple parallel and interleaved HARQ processes in the physical downlink control channel (PDCCH), the first scheduling information and the second scheduling information are used to allocate and receive the HARQ process of the data channel to ensure that data is transmitted independently in different time slots and receive, reducing the delay of HARQ response.
It effectively alleviates the delay problem of the HARQ process, improves data transmission efficiency, avoids HARQ starvation, and enhances the system's processing capability and data transmission stability.
Smart Images

Figure CN115552826B_ABST
Abstract
Description
[0001] CROSS-REFERENCE TO RELATED APPLICATIONS
[0002] This application claims priority to European Application No. 20174684.9 filed on May 14, 2020, which is incorporated herein by reference in its entirety Technical Field
[0003] Embodiments of the present disclosure relate to multi-level scheduling.Some embodiments relate to using PDCCH to configure hybrid automatic repeat request (HARQ). Background Art
[0004] HARQ is a stop-and-wait process that stops and waits for acknowledgment, so an increase in processing delay increases the wait and round-trip delay. Therefore, multiple parallel / time-overlapping HARQ processes are used. Larger round-trip delays require an increase in the number of HARQ processes. HARQ process starvation occurs when there are insufficient HARQ processes compared to the HARQ-ACK timeline for a given scenario. Summary of the invention
[0005] According to various but not necessarily all embodiments, there is provided an apparatus comprising means for:
[0006] receiving first scheduling information for a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from next first scheduling information by a first period of at least one multi-slot; and
[0007] receiving second scheduling information for a data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of multiple time slots,
[0008] wherein the first scheduling information in the first time slot points to at least the second scheduling information; and
[0009] The second scheduling information is associated with at least one hybrid automatic request (HARQ) process of the data channel.
[0010] In some but not necessarily all examples, the first scheduling information points in frequency and / or time to at least the second scheduling information.
[0011] In some but not necessarily all examples, at least one of the first scheduling information and the second scheduling information is configured to enable at least two HARQ processes of the data channel, wherein the two HARQ processes do not overlap in the time domain.
[0012] In some but not necessarily all examples, the first scheduling information and the second scheduling information combine to enable:
[0013] receiving first data in a time slot of a data channel during at least one first time period;
[0014] During at least one first time period, receiving second data in a different time slot of the data channel; and
[0015] The HARQ acknowledgement for the first data is transmitted separately from the HARQ acknowledgement for the second data.
[0016] In some but not necessarily all examples, the first scheduling information and the second scheduling information combine to enable:
[0017] During at least one first time period, transmitting first data in a time slot of a data channel; and
[0018] During at least one first time period, second data is transmitted in different time slots of the data channel.
[0019] In some but not necessarily all examples, the first scheduling information is configured to allocate one or more early HARQ processes prior to receipt of the second scheduling information, and wherein the second scheduling information is configured to assist in allocation of one or more late HARQ processes after receipt of the second scheduling information.
[0020] In some but not necessarily all examples, reception in the PDCCH uses subcarrier spacing of 480 kHz, 960 kHz, 1920 kHz, or greater.
[0021] In some but not necessarily all examples, the apparatus may be configured to enable remote control of one or more of the following in response to the received control signaling:
[0022] at least one first period duration;
[0023] content of the first scheduling information;
[0024] a pointer to at least second scheduling information in frequency and / or time;
[0025] a timing of a first time slot including first scheduling information;
[0026] the number of second time slots including second scheduling information within the first time period;
[0027] content of the second scheduling information;
[0028] a timing of a second time slot including second scheduling information;
[0029] Timing of HARQ responses;
[0030] An early HARQ process is enabled prior to reception of the second scheduling information.
[0031] In some but not necessarily all examples, the apparatus is configured as user equipment or mobile device of a radio access network.
[0032] According to various but not necessarily all embodiments, there is provided a computer program which, when run on a computer included in a user device, enables the user device to perform:
[0033] Receiving first scheduling information for a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from a next first scheduling information by at least one first period of multiple time slots;
[0034] receiving second scheduling information for a data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of multiple time slots,
[0035] wherein the first scheduling information in the first time slot points to at least the second scheduling information; and
[0036] The second scheduling information is associated with at least one hybrid automatic request (HARQ) process of the data channel.
[0037] According to various but not necessarily all embodiments, there is provided a method comprising:
[0038] transmitting first scheduling information of a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from the next first scheduling information by a first period of at least one multi-slot; and
[0039] transmitting second scheduling information for a data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of multiple time slots,
[0040] wherein the first scheduling information in the first time slot points to at least the second scheduling information; and
[0041] The second scheduling information is associated with at least one hybrid automatic request (HARQ) process of the data channel.
[0042] According to various but not necessarily all embodiments, there is provided a system comprising components for:
[0043] transmitting first scheduling information of a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from the next first scheduling information by a first period of at least one multi-slot; and
[0044] transmitting second scheduling information for a data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of multiple time slots,
[0045] wherein the first scheduling information in the first time slot points to at least the second scheduling information; and
[0046] The second scheduling information is associated with at least one hybrid automatic request (HARQ) process of the data channel.
[0047] In some but not necessarily all examples, the system is configured to control one or more of the following:
[0048] at least one first period duration;
[0049] content of the first scheduling information;
[0050] a pointer to at least second scheduling information in frequency and / or time;
[0051] a timing of a first time slot including first scheduling information;
[0052] the number of second time slots including second scheduling information within the first time period;
[0053] content of the second scheduling information;
[0054] a timing of a second time slot including second scheduling information;
[0055] Timing of HARQ responses;
[0056] An early HARQ process is enabled prior to reception of the second scheduling information.
[0057] In some but not necessarily all examples, the second scheduling information is based on information that was not available when the first scheduling information was transmitted.
[0058] In some but not necessarily all examples, the system is configured as a base station of a radio access network.
[0059] According to various but not necessarily all embodiments, there is provided a computer program which, when run on a computer comprised in a base station, enables the base station to perform:
[0060] transmitting first scheduling information of a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from the next first scheduling information by a first period of at least one multi-slot; and
[0061] transmitting second scheduling information of the data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of multiple time slots,
[0062] wherein the first scheduling information in the first time slot points to at least the second scheduling information; and
[0063] The second scheduling information is associated with at least one hybrid automatic request (HARQ) process of the data channel.
[0064] According to various but not necessarily all embodiments, there is provided an apparatus comprising means for:
[0065] receiving first scheduling information for a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from next first scheduling information by a first period of at least one multi-slot; and
[0066] receiving second scheduling information for a data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of multiple time slots,
[0067] wherein the first scheduling information in the first time slot provides a pointer in frequency and / or time to at least the second scheduling information; and
[0068] The second scheduling information is associated with at least one hybrid automatic request (HARQ) process of the data channel.
[0069] According to various but not necessarily all embodiments, there is provided a computer program which, when run on a computer included in a user device, enables the user device to perform:
[0070] Receiving first scheduling information for a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from a next first scheduling information by at least one first period of multiple time slots;
[0071] receiving second scheduling information for a data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of multiple time slots,
[0072] wherein the first scheduling information in the first time slot provides a pointer in frequency and / or time to at least the second scheduling information; and
[0073] The second scheduling information is associated with at least one hybrid automatic request (HARQ) process of the data channel.
[0074] According to various but not necessarily all embodiments, there is provided a system comprising components for:
[0075] transmitting first scheduling information of a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from the next first scheduling information by a first period of at least one multi-slot; and
[0076] transmitting second scheduling information for a data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of multiple time slots,
[0077] wherein the first scheduling information in the first time slot provides a pointer in frequency and / or time to at least the second scheduling information; and
[0078] The second scheduling information is associated with at least one hybrid automatic request (HARQ) process of the data channel.
[0079] According to various but not necessarily all embodiments, there is provided a computer program which, when run on a computer comprised in a base station, enables the base station to perform:
[0080] transmitting first scheduling information of a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from the next first scheduling information by a first period of at least one multi-slot; and
[0081] transmitting second scheduling information for a data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of multiple time slots,
[0082] wherein the first scheduling information in the first time slot provides a pointer in frequency and / or time to at least the second scheduling information; and
[0083] The second scheduling information is associated with at least one hybrid automatic request (HARQ) process of the data channel.
[0084] According to various, but not necessarily all, embodiments, examples are provided as claimed in the following claims.
[0085] A new method for configuring HARQ using PDCCH is proposed. BRIEF DESCRIPTION OF THE DRAWINGS
[0086] Some examples will now be described with reference to the accompanying drawings, in which:
[0087] Figure 1 An example of the subject matter described herein is shown;
[0088] Figure 2 Another example of the subject matter described herein is shown;
[0089] Figure 3 Another example of the subject matter described herein is shown;
[0090] Figure 4 Another example of the subject matter described herein is shown;
[0091] Figure 5 Another example of the subject matter described herein is shown;
[0092] Figure 6 Another example of the subject matter described herein is shown;
[0093] Figure 7 Another example of the subject matter described herein is shown;
[0094] Figure 8 Another example of the subject matter described herein is shown. DETAILED DESCRIPTION
[0095] Figure 1 An example of a network 100 is shown that includes multiple network nodes, including terminal nodes 110, access nodes 120, and one or more core nodes 129. Terminal nodes 110 and access nodes 120 communicate with each other. One or more core nodes 129 communicate with access nodes 120.
[0096] In some examples, one or more core nodes 129 can communicate with each other. In some examples, one or more access nodes 120 can communicate with each other.
[0097] The network 100 may be a cellular network comprising a plurality of cells 122, each cell 122 being served by an access node 120. The interface between the terminal node 110 and the access nodes 120 defining the cells 122 is a wireless interface 124 in this example.
[0098] The access node 120 is a cellular radio transceiver. The terminal node 110 is a cellular radio transceiver.
[0099] In the illustrated example, the cellular network 100 is a 3rd Generation Partnership Project (3GPP) network, wherein the terminal nodes 110 are user equipments (UEs) and the access nodes 120 are base stations.
[0100] In the particular example shown, the network 100 is an Evolved Universal Terrestrial Radio Access Network (E-UTRAN). The E-UTRAN includes E-UTRAN NodeBs (eNBs) 120 to provide E-UTRA user plane and control plane (RRC) protocol terminations towards the UE 110. The eNBs 120 are interconnected to each other via an X2 interface 126. The eNBs are also connected to a Mobility Management Entity (MME) 129 via an S1 interface 128.
[0101] In another example, the network 100 is a next generation (or new radio NR) radio access network (NG-RAN). The NG-RAN includes gNodeBs (gNBs) 120 to provide user plane and control plane (RRC) protocol terminations towards the UE 110. The gNBs 120 are interconnected to each other via an X2 / Xn interface 126. The gNBs are also connected to an access and mobility management function (AMF) via an N2 interface 128.
[0102] Each terminal node 110 is typically a device, such as a mobile device. In another example, the terminal node 110 is a function of a relay node that facilitates backhaul (also referred to as a parent link), such as a mobile terminal portion of an integrated access and backhaul (IAB) node. The mobile device may have a storage / warehouse configuration and a standby configuration. The standby configuration enables use, but is not necessarily in use. Such a standby configuration may, for example, include inserting a smart card (such as a suitable subscriber identity module (SIM)) into the device. When in the standby configuration, the mobile device may be described as a user device.
[0103] Each access node 120 (base station) is typically a system that includes multiple interconnected components. In some examples, the base station architecture can be split between remote centralized units and distributed units. In another example, the access node 120 is a relay node that facilitates the function of an access link (also referred to as (multiple) sub-links), such as a distributed unit portion of an IAB node.
[0104] In the following, an apparatus 110 is described, the apparatus 110 comprising components for the following operations:
[0105] Receiving first scheduling information 20_1 for a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from the next first scheduling information 20_1 by a first period of at least one multi-slot; and
[0106] receiving second scheduling information 20_2 for a data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of multiple time slots,
[0107] wherein the first scheduling information 20_1 in the first time slot is associated with at least the second scheduling information 20_2 (eg, points to at least the second scheduling information 20_2); and
[0108] The second scheduling information 20_2 is related to at least one hybrid automatic request (HARQ) process of the data channel.
[0109] Also described is a system comprising components for:
[0110] Transmitting first scheduling information 20_1 for a data channel in a first time slot in a physical downlink control channel (PDCCH), wherein the first time slot is separated from the next first scheduling information 20_1 by at least one first period of multiple time slots; and
[0111] transmitting second scheduling information 20_2 for a data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of multiple time slots,
[0112] wherein the first scheduling information 20_1 in the first time slot is associated with at least the second scheduling information 20_2 (eg, points to at least the second scheduling information 20_2); and
[0113] The second scheduling information 20_2 is related to at least one hybrid automatic request (HARQ) process of the data channel.
[0114] Figure 2 Scheduling operations involving a physical downlink control channel (PDCCH) 30 are shown.
[0115] The physical downlink control channel 30 is used to transmit control information in the downlink direction from the base station 120 to the user equipment 110. This channel exists in the physical layer in time slot 10.
[0116] The first slots 10_1 having the PDCCH 30 are separated from each other by at least one first period 40 of a multi-slot 10 .
[0117] Data Channel( Figure 2The first scheduling information 20_1 (not shown) is located in the first time slot 10_1. Different first time slots 10_1 may include different first scheduling information 20_1. For example, the initial first time slot 10_1 includes the initial first scheduling information 20_1, and the subsequent first time slot 10_1 includes the next first scheduling information 20_1.
[0118] The (initial) first time slot 10_1 is separated from the next first scheduling information 20_1 by at least one first period 40 of a multi-time slot 10 .
[0119] Data Channel( Figure 2 The second scheduling information 20_2 (not shown) is located in one or more second time slots 10_2. The one or more second time slots 10_2 are associated with the previous first time slot 10_1.
[0120] The one or more second time slots 10_2 are delayed by one or more time slots 10 relative to the associated first time slot 10_1 and are received within the first period 40 of the multi-time slot 10 after the associated first time slot 10_1.
[0121] The first scheduling information 20_1 in the first time slot 10_1 is associated with (eg, points to) at least the second scheduling information 20_2 in the associated second time slot 10_2.
[0122] In some examples, the first scheduling information 20_1 points to at least the second scheduling information 20_2 in frequency and / or time.
[0123] The second scheduling information 20_2 is associated with at least one hybrid automatic request (HARQ) process of the data channel.
[0124] The base station 120 transmits first scheduling information 20_1 in a first time slot 10_1 and transmits second scheduling information 20_2 in one or more second time slots 10_2.
[0125] The user equipment 110 receives first scheduling information 20_1 in a first time slot 10_1 and receives second scheduling information 20_2 in one or more second time slots 10_2.
[0126] HARQ is a stop-and-wait process that stops and waits for acknowledgment. The impact of round-trip delay is mitigated to some extent by using multiple HARQ processes in parallel and sequentially (interleaved). However, larger round-trip delays require increasing the number of HARQ processes, and this is not necessarily possible or desirable. Therefore, HARQ process starvation may occur when there are not enough HARQ processes for the round-trip delay. The round-trip delay (measured in slots) generally increases as the slot size decreases. For example, the UE / gNB processing time (measured in slots) generally increases as the slot size decreases.
[0127] exist Figure 2 In the embodiment, HARQ starvation is further alleviated by allocating one or more HARQ processes for the data channel using the second scheduling information 20_2. In response to the first scheduling information 20_1 (if any), the allocation is delayed relative to the HARQ process allocation, and the allocation can alleviate HARQ starvation.
[0128] In some but not necessarily all examples, the number of available HARQ processes is limited to a maximum of sixteen.
[0129] The scheduling information provides control information from the base station 120 to the user equipment 110 for data transmission via a data channel with HARQ.
[0130] For example, the control information may include information on resource allocation (frequency domain resource allocation and / or time domain resource allocation) for a data channel, information for decoding assistance, and HARQ parameters.
[0131] For example, the information for decoding assistance for a transport block (TB) may include a modulation and coding scheme (MCS) and a redundancy version (RV) which defines a puncturing pattern after channel coding.
[0132] The HARQ parameters include: a HARQ process number and a new data indicator (NDI). For downlink data transmission, the HARQ parameters may also include parameters for HARQ acknowledgment / feedback, such as acknowledgment timing and / or a PUCCH resource indicator.
[0133] For example, the second scheduling information 20_2 may include information that is not available when the first scheduling information 20_1 is transmitted. For example, the "unavailable" information may include one or more of the following: information on resource allocation (frequency domain resource allocation and / or time domain resource allocation) for a data channel, decoding assistance information, and HARQ parameters. The second scheduling information 20_2 may optionally include information that is common to (shared by) the first scheduling information 20_1 and the second scheduling information 20_2.
[0134] At least some of the scheduling information required for data transmission may be delayed and provided in the second scheduling information 20_2 instead of the first scheduling information 20_1. Therefore, the second scheduling information 20_2 includes scheduling information (original scheduling information) that is not present in the first scheduling information 20_1 or is not applicable to the first scheduling information 20_1.
[0135] From the user equipment's perspective, "data transmission" may cover reception (downlink) or transmission (uplink), for example, it may cover at least one of PDSCH reception and PUSCH transmission.
[0136] The original scheduling information may be associated with at least one hybrid automatic request (HARQ) process of the data channel.
[0137] For example, the original scheduling information may be any suitable control information that may be used for the HARQ process. For example, the original scheduling information may include one or more of the following: resource allocation for a data channel, decoding assistance information, and one or more HARQ parameters.
[0138] For example, the original scheduling information may be one or more HARQ parameters, such as a HARQ process number and / or a new data indicator (NDI). For downlink data transmission, for example, the original scheduling information may be a HARQ parameter of a HARQ response, such as a response timing and / or a PUCCH resource indicator. Thus, the original second scheduling information 20_2 may cause the allocation of an original HARQ process, i.e., an allocation of a process that has not been allocated by the associated previous first scheduling information 20_1 (or the associated previous second scheduling information 20_2).
[0139] The splitting of the scheduling information between the first scheduling information 20_1 and the one or more second scheduling information 20_2 may be controlled via control plane signaling (eg, radio resource control (RRC) signaling) from the base station.
[0140] The scheduling information may be associated with at least two time-separated Hybrid Automatic Request (HARQ) processes for time-separated data transmission in the data channel.
[0141] In some examples, the first scheduling information 20_1 and the second scheduling information 20_2 are configured to enable at least two HARQ processes for the data channel, where the two HARQ processes do not overlap in the time domain.
[0142] The first scheduling information 20_1 and the second scheduling information 20_2 combined enable:
[0143] transmitting first data in a time slot of a data channel during at least one first time period;
[0144] Second data is transmitted in different time slots of the data channel during at least one first time period.
[0145] In some examples, the first scheduling information 20_1 and the second scheduling information 20_2 combine to enable:
[0146] The HARQ acknowledgement for the first data is transmitted separately from receiving the HARQ acknowledgement for the second data.
[0147] For example, the data channel may be a physical shared channel. For example, a physical downlink shared channel (PDSCH) or a physical uplink shared channel (PUSCH). For example, a HARQ acknowledgment channel for sending an acknowledgement (HARQ acknowledgment) of a successful data transmission may be a physical channel, a physical control channel (PUCCH), or a PUSCH with a HARQ acknowledgment multiplexed with UL data or other UL control information.
[0148] The second scheduling information of the data channel may enable a HARQ response for the second data.
[0149] In one example, the first scheduling information 20_1 may cause a HARQ process to be allocated for an earlier data transmission (e.g., first data), while the second scheduling information 20_2 may cause a different HARQ process to be allocated for a later data transmission (e.g., second data). In this example, allocating different HARQ processes for later data transmission may also require or may not require at least some of the first scheduling information 20_1. In this example, the first scheduling information 20_1 is sufficient to allocate a HARQ process for the earlier data transmission. In this example, the second scheduling information 20_2 is sufficient to allocate a HARQ process for the later data transmission. In some examples, the second scheduling information 20_2 is sufficient to allocate a HARQ process for the later data transmission. In other examples, the first scheduling information 20_1 and the second scheduling information 20_2 are combined to allocate a HARQ process for the later data transmission. In this way, the first scheduling information 20_1 can assist in allocating a HARQ process for data transmission.
[0150] In another example, the first scheduling information 20_1 does not cause the HARQ process to be allocated for the earlier data transmission. However, the earlier second scheduling information 20_2 may cause the HARQ process to be allocated for the earlier data transmission (e.g., the first data), and the later second scheduling information 20_2 may cause different HARQ processes to be allocated for the later data transmission (e.g., the second data). In this example, the allocation of HARQ processes for the earlier and later data transmissions may also require at least some of the first scheduling information 20_1. The first scheduling information 20_1 assists in allocating HARQ processes for data transmission. In this example, the first scheduling information 20_1 is sufficient to allocate HARQ processes for the earlier data transmission. In this example, the second scheduling information 20_2 is sufficient to allocate HARQ processes for the later data transmission. In some examples, the second scheduling information 20_2 is sufficient to allocate HARQ processes for the later data transmission, while in other examples, the first scheduling information 20_1 and the second scheduling information 20_2 are combined to allocate HARQ processes for the later data transmission.
[0151] It will therefore be understood that in some examples, the first scheduling information 20_1 causes one or more HARQ processes to be allocated for one or more data transmissions, and / or assists in allocating one or more HARQ processes for one or more data transmissions.
[0152] It will therefore be understood that in some examples, the second scheduling information 20_2 causes one or more HARQ processes to be allocated for one or more data transmissions.
[0153] The HARQ feedback for data transmission in the data channel is split into multiple HARQ acknowledgments for smaller data transmissions.
[0154] In some examples, the first scheduling information 20_1 enables data transmission with HARQ for an earlier scheduled data transmission, while the second scheduling information 20_2 enables data transmission with HARQ for a later scheduled data transmission.
[0155] In some examples, the first scheduling information 20_1 is configured to allocate one or more early HARQ processes prior to the reception of the second scheduling information 20_2, and the second scheduling information 20_2 is configured to assist in the allocation of one or more HARQ processes enabled by the second scheduling information 20_2. The one or more HARQ processes enabled by the second scheduling information 20_2 are performed after and / or simultaneously with the reception of the second scheduling information 20_2.
[0156] Data scheduling in the data channel may be controlled by scheduling information in both uplink and downlink.
[0157] The scheduling information may include information on resource allocation (frequency domain resources and / or time domain resources) for the data channel. The scheduling information may be in whole or in part in the first scheduling information 20_1. The scheduling information may be in whole or in part in the second scheduling information 20_2.
[0158] Therefore, the scheduling of data transmission in the time slot of the data channel can be controlled by the first scheduling information 20_1 directly using the first scheduling information 20_1 or indirectly using the second scheduling information 20_2.
[0159] For example, the first scheduling information 20_1 may schedule a time slot for initial data transmission, or the second scheduling information 20_2 may schedule a time slot for initial data transmission.
[0160] The second scheduling information 20_2 occurs between periodic time slots 10_1 that can be used for transmission of the first scheduling information 20_1. The second scheduling information 20_2 provides delayed delivery of a portion of HARQ-related control information for the data channel. For example, the delay can be 4, 8, or 16 time slots.
[0161] The second scheduling information 20_2 may have a specific PDCCH (subspace) monitoring operation, which depends on the blindly detected first scheduling information 20_1, such as a candidate position.
[0162] The first scheduling information 20_1 may indicate whether the second scheduling information 20_2 exists.
[0163] In some examples, an empty second time slot (without second scheduling information 20_2) can be used to transmit information to the UE, such as canceling downlink data transmission.
[0164] The PDCCH 30 may have a variable subcarrier spacing controlled by the network.
[0165] The subcarrier spacing may be, for example, 480 kHz, 960 kHz, 1920 kHz or greater.
[0166] A larger subcarrier spacing provides a larger bandwidth for the same FFT size and increases the bandwidth part (BWP) and physical resource block (PRB) size in the frequency domain, but reduces the duration of a slot and the duration of a symbol.
[0167] In some but not necessarily all examples, the operating frequency of the modulated carrier used for the PDCCH 30 may have a frequency higher than 52.6 GHz, for example between 52.6 GHz and 71 GHz. These solutions may also be used in other frequency bands.
[0168] Period 40 may have a duration of 2^n time slots.
[0169] A first time slot 10_1 including first information 20_1 may be separated from a subsequent first time slot 10_1 including first information by one or more scheduling units of a period 40 .
[0170] For example, the period 40 may be static (set by a standard) or semi-static (set by higher layers, eg, control plane signaling, such as RRC signaling).
[0171] Compared to the second scheduling information 20_2, the first scheduling information 20_1 may have additional functions.
[0172] In at least some examples, the first scheduling information 20_1 facilitates / assists receipt of the second scheduling information 20_2.
[0173] In at least some examples, for example, the first scheduling information 20_1 is blindly detected / decoded once in each scheduling unit corresponding to the time period 40, and the receipt of the first scheduling information 20_1 assists in the blind detection / decoding of one or more second scheduling information 20_2 in each scheduling unit or time period 40.
[0174] The assistance provided by the first scheduling information 20_1 may be that the resources used for the second scheduling information 20_2 have a relationship with the resources used for detecting / decoding the first scheduling information 20_1. For example, the relationship may be an expected relationship that is implicitly defined, for example, statically (by a standard) or semi-statically (by high-level control plane signaling such as RRC signaling). For example, the relationship may be an explicitly defined relationship that is potentially variable and is conveyed by certain variability of the first scheduling information 20_1 (e.g., variability of the variable content and / or its position in the time-frequency space).
[0175] Therefore, it should be understood that there is an association between the first time slot and the second time slot and between the first scheduling information 20_1 and the second scheduling information 20_2. In some examples, the association can be used to facilitate / assist the reception of the second scheduling information 20_2. The association can be: (i) indicated by the first scheduling information 20_1, (ii) pre-configured by high-layer signaling, and / or (iii) specified by the specification.
[0176] There is an association from the first scheduling information 20_1 in the first time slot 10_1 to the second scheduling information 20_2. For example, the first scheduling information 20_1 may be associated with (e.g., pointing to) the second scheduling information 20_2 because, when receiving the second scheduling information 20_2, the user equipment 110 has knowledge of facilitating / assisting the reception of the second scheduling information 20_2. For example, the knowledge may be knowledge of a time and / or frequency relationship between the first scheduling information 20_1 (and / or the first time slot including the first scheduling information 20_1) and the second scheduling information 20_2 (and / or the second time slot including the second scheduling information 20_2). For example, the relationship may be an offset in the time domain and / or an offset in the frequency domain between the time-frequency resources used to receive the first scheduling information 20_1 (and / or the first time slot including the first scheduling information 20_1) and the time-frequency resources used to receive the second scheduling information 20_2 (and / or the second time slot including the second scheduling information 20_2). If the UE has not received the first scheduling information 20_1, the UE may not be able to try / detect the second scheduling information 20_2.
[0177] The assistance provided by the first scheduling information 20_1 depends at least on the identification of the decoded / detected information as the first scheduling information 20_1. Thus, in at least some examples, the first scheduling information 20_1 provides a pointer in frequency and / or time to at least the second scheduling information 20_2. That is, unless the first scheduling information 20_1 is received, the second scheduling information 20_2 cannot or is not easily found. However, the reception of the first scheduling information 20_1 assists the reception of the second scheduling information 20_2 (points to the second scheduling information 20_2, provides a pointer to the second scheduling information 20_2, and / or provides some other indication of the second scheduling information 20_2).
[0178] In some variants, the pointer may be implicit, such as hard-coded in the specification or configured by RRC. In other variants, the pointer may be variable and indicated by the first scheduling information 20_1. For example, the position of the first scheduling information 20_1 within the time slot may be used to define the pointer. For example, the position of the first scheduling information 20_1 in the frequency domain may be used to define the pointer. For example, the content defining, indicating or encoding the pointer may be included in the first scheduling information 20_1.
[0179] For example, the first scheduling information 20_1 may provide a selection of a predefined mode (e.g., from a plurality of modes configured by RRC signaling), or provide a bitmap (or a code for identifying a bitmap) covering the number / timing of second time slots transmitted by the second scheduling information 20_2. If a bitmap is included in the first scheduling information 20_1, the bitmap may have a fixed length but variable content. The number of second time slots 10_2 and the timing between the first time slot 10_1 and (multiple) second time slots 10_2 and the timing between the second time slots 10_2 may be dynamically changed by indicating different bitmaps in a set of bitmaps configured by RRC signaling.
[0180] For example, the pointer may be a time offset relative to the first time slot or the first scheduling information 20_1. In some examples, the second scheduling information 20_2 in the second time slot may be detected based on the resource configuration used for the first scheduling information 20_1 in the first time slot. For example, the position of the second scheduling information 20_2 in time may be determined based on which position (a position among many predefined positions) the first scheduling information 20_1 has within the first time slot, and / or the position of the second scheduling information 20_2 in frequency may be determined based on the frequency position of the first scheduling information 20_1.
[0181] Indicating or providing a pointer to at least the second scheduling information 20_2 in frequency and / or time means providing sufficient information that may be required to obtain the second scheduling information 20_2 via the reception of the first scheduling information 20_1. The information may be communicated in any suitable manner.
[0182] For example, the pointer can provide constraints for a restricted search in frequency and / or time, such as to assist in blind detection. The pointer can provide the constraints directly (e.g., defining or indicating it using scheduling information) or can provide the constraints indirectly (e.g., providing coded information for accessing or reproducing the constraints). For example, the pointer can provide a single candidate position of the second scheduling information 20_2 in the search space (time and frequency), for example, it defines a searchable subspace of the search space. In one example, the same PDCCH candidate (an exact set of control channel elements (CCEs) or candidates with the same index) that carries the first scheduling information 20_1 in the first time slot can be used to convey the second scheduling information 20_2 in the second time slot.
[0183] In some examples, the first scheduling information 20_1 may provide pointers to all occurrences of the second scheduling information 20_2 within a scheduling unit. The occurrence may be one or more times.
[0184] In at least some examples, the pointer is a function that the first scheduling information 20_1 has, but the second scheduling information 20_2 does not have. The second scheduling information 20_2 does not provide a pointer to one or more subsequent second scheduling information 20_2.
[0185] Figure 3 An example of scheduled data transmission via a downlink data channel 44 with HARQ is shown.
[0186] The PDCCH 30 is used to transmit first scheduling information 20_1 in a first time slot and to transmit second scheduling information 20_2 in a second time slot from the base station 120 to the UE 110 .
[0187] The order of messages varies from scenario to scenario. For example, in DL scenario.
[0188] The first scheduling information 20_1 and the second scheduling information 20_2 may be as described above. As described above, the scheduling information may be split between the first scheduling information 20_1 and the second scheduling information 20_2. For example, the scheduling information may include one or more of the following: resource allocation of the data channel (frequency domain resource allocation and / or time domain resource allocation), decoding assistance information, and HARQ parameters.
[0189] The base station 120 transmits the first data and the UE 110 receives the first data in the time slot 42_A of the data channel 44 during one or more periods of the scheduling unit 40 .
[0190] The base station 120 transmits the second data and the UE 110 receives the second data in the time slot 42_B of the data channel 44 during one or more periods of the scheduling unit 40 .
[0191] UE 110 transmits and base station 120 receives a HARQ response 50_A for the first data.
[0192] The UE 110 transmits and the base station 120 receives the HARQ response 50_B for the second data. The HARQ response 50_B for the second data is transmitted separately from the HARQ response 50_A for the first data.
[0193] The data channel 44 is a physical downlink shared channel (PDSCH).
[0194] The channel 52 used for the individual HARQ acknowledgements 50_A, 50_B is a physical uplink channel, such as the Physical Uplink Control Channel (PUCCH) or the Physical Uplink Shared Channel (PUSCH).
[0195] In some examples, HARQ acknowledgements may be combined. For example, HARQ acknowledgement 50_A may be combined with the transmission of HARQ acknowledgement 50_B.
[0196] Figure 4 An example of scheduled data transmission via the uplink data channel 48 with HARQ is shown.
[0197] The PDCCH 30 is used to transmit first scheduling information 20_1 in a first time slot and to transmit second scheduling information 20_2 in a second time slot from the base station 120 to the UE 110 .
[0198] The first scheduling information 20_1 and the second scheduling information 20_2 may be as described above. As described above, the scheduling information may be split between the first scheduling information 20_1 and the second scheduling information 20_2. For example, the scheduling information may include one or more of the following: resource allocation of the data channel (frequency domain resource allocation and / or time domain resource allocation), decoding assistance information, and HARQ parameters.
[0199] During one or more periods of the scheduling unit 40, in the time slot 46_A of the data channel 48, the base station 120 transmits the first data and the UE 110 receives the first data.
[0200] UE 110 transmits and base station 120 receives a HARQ response 54_A for the first data.
[0201] Data channel 48 is the physical uplink shared channel (PUSCH)
[0202] The channel 54 used for the HARQ response 54_A is the physical downlink control channel 30.
[0203] Figure 2 , Figure 3 and Figure 4 A method at a user equipment 110 is shown, the method comprising:
[0204] Receiving first scheduling information 20_1 of a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from the next first scheduling information 20_1 by a first period of at least one multi-slot; and
[0205] receiving second scheduling information 20_2 for a data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of multiple time slots,
[0206] wherein the first scheduling information 20_1 in the first time slot is associated with at least the second scheduling information 20_2 (eg, points to at least the second scheduling information 20_2); and
[0207] The second scheduling information 20_2 is related to at least one hybrid automatic request (HARQ) process of the data channel.
[0208] Figure 2 , Figure 3 and Figure 4 An equivalent method at the base station 120 is shown, the method comprising:
[0209] Transmitting first scheduling information 20_1 of a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from the next first scheduling information 20_1 by a first period of at least one multi-slot; and
[0210] transmitting second scheduling information 20_2 for a data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of multiple time slots,
[0211] wherein the first scheduling information 20_1 in the first time slot is associated with at least the second scheduling information 20_2 (eg, points to at least the second scheduling information 20_2); and
[0212] The second scheduling information 20_2 is related to at least one hybrid automatic request (HARQ) process of the data channel.
[0213] It can be understood from the above that the base station 120 is a system that includes components for the following operations:
[0214] Transmitting first scheduling information 20_1 of a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from the next first scheduling information 20_1 by a first period of at least one multi-slot; and
[0215] transmitting second scheduling information 20_2 for a data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of multiple time slots,
[0216] wherein the first scheduling information 20_1 in the first time slot is associated with at least the second scheduling information 20_2 (eg, points to at least the second scheduling information 20_2); and
[0217] The second scheduling information 20_2 is related to at least one hybrid automatic request (HARQ) process of the data channel.
[0218] The base station 120 may be configured to control one or more of the following using control plane signaling (e.g., radio resource control signaling) sent from the base station 120 to the user 110:
[0219] at least one first period duration (scheduling unit 40 duration);
[0220] Contents of the first scheduling information 20_1;
[0221] A pointer to at least second scheduling information 20_2 in frequency and / or time;
[0222] The timing of the first time slot 20_1 including the first scheduling information 20_1;
[0223] The number of the second time slot 20_2 including the second scheduling information 20_2;
[0224] Contents of the second scheduling information 20_2;
[0225] The timing of the second time slot 20_2 including the second scheduling information 20_2
[0226] Timing of HARQ responses 50_A, 50_B; 54_A;
[0227] The early HARQ process is enabled before reception of the second scheduling information 20_2.
[0228] The user equipment 110 may be configured to respond to the control plane signaling, such as RRC signaling, so that the base station 120 can remotely control one or more of the following at the user equipment 110:
[0229] at least one first period duration (scheduling unit 40 duration);
[0230] Contents of the first scheduling information 20_1;
[0231] A frequency and / or time pointer pointing to at least second scheduling information 20_2;
[0232] The timing of the first time slot including the first scheduling information 20_1;
[0233] The number of the second time slot including the second scheduling information 20_2;
[0234] Contents of the second scheduling information 20_2;
[0235] The timing of the second time slot including the second scheduling information 20_2;
[0236] Timing of HARQ responses;
[0237] The early HARQ process is enabled before reception of the second scheduling information 20_2.
[0238] The control plane signaling may control the splitting of the scheduling information between the first scheduling information 20_1 and the second scheduling information 20_2. For example, how many time slots / sub-time slots / TTIs are fully scheduled by the first scheduling information 20_1 and how many time slots / sub-time slots / TTIs also depend on the second scheduling information 20_2.
[0239] Control plane signaling may control the timing mode of uplink data transmission via the PUCCH.
[0240] Control plane signaling may control the search space of the second scheduling information 20_2.
[0241] Control plane signaling may control the duration of this period.
[0242] In some but not necessarily all examples, splitting the scheduling information into the first scheduling information 20_1 and the second scheduling information 20_2 may be activated. For example, a trigger for activation may be that the HARQ round trip delay (or some portion thereof) has exceeded a threshold. For example, the threshold may depend on the current subcarrier spacing used for the PDCCH 30. The threshold may indicate when it is no longer possible to continuously schedule the available HARQ processes in the available time slots. Thus, if the threshold is variable, the threshold may also depend on the number of HARQ processes.
[0243] If the round trip time is defined as UE processing time + control channel duration + gNB processing time (including scheduling time), activation can occur when the round trip time is greater than N_HARQ (of the first PDCCH monitored blindly) N_PDCCH_peridicity. N_HARQ is the number of DL (or UL) shared channel HARQ processes. N_PDCCH_periodicity is the period of the first slot 20_1 (the above period). In the definition of the round trip time for scheduling, the control channel duration is the PUCCH duration in the case of PDSCH and the PDCCH duration in the case of PUSCH. However, in practice, in the TDD case (which is the main use case), these can take the value of zero by multiplexing the control channel with the shared channel or by shortening the shared channel length within the slot so that there is time for Tx / Rx switching gaps and control channels. For example, N_HARQ is equal to m*N_PDCCH_peridicity, where m is an integer.
[0244] Figure 5 Another example of scheduling data transmission via a downlink data channel 44 with HARQ is shown. This is similar to Figure 3 .
[0245] PDCCH 30 is used to transmit data from base station 120 to UE 110 in the first time slot ( Figure 5 The first scheduling information 20_1 is transmitted in the time slots (time slots #0 and time slots #8) and the second scheduling information 20_2 is transmitted in the second time slots (time slots #2, 4, 6 and time slots #10, 12, 14).
[0246] The first scheduling information 20_1 (time slot #0) points to the second scheduling information 20_2 (time slots #2, 4, 6).
[0247] The first scheduling information 20_1 (time slot #8) points to the second scheduling information 20_2 (time slots #10, 12, 14).
[0248] The first scheduling information 20_1 may be as described above. As described above, the scheduling information may be split between the first scheduling information 20_1 and the second scheduling information 20_2. For example, the scheduling information may include one or more of the following: resource allocation of the data channel (frequency domain resource allocation and / or time domain resource allocation), decoding assistance information, and HARQ parameters.
[0249] In this example, the first scheduling information 20_1 (time slot #0) is configured to allocate two HARQ processes for downlink data received in two initial time slots (#0, 1). The HARQ response 50_A is provided in the PUCCH 52 at time slot #7.
[0250] The second scheduling information 20_2 (time slot #2) is configured to allocate two HARQ processes for downlink data received or scheduled for reception in the next two time slots (#2, 3). The HARQ response 50_B is provided in the PUCCH 52 at time slot #9.
[0251] The second scheduling information 20_2 (time slot #4) is configured to allocate two HARQ processes for downlink data received or scheduled for reception in the next two time slots (#4, 5). The HARQ response 50_C is provided in the PUCCH 52 at time slot #11.
[0252] The second scheduling information 20_2 (time slot #6) is configured to allocate two HARQ processes for downlink data received or scheduled for reception in the next two time slots (#6, 7). The HARQ response 50_D is provided in the PUCCH 52 at time slot #13.
[0253] As the HARQ acknowledgements are split, the base station may have more time to schedule / reschedule an earlier HARQ acknowledgement indicating a data transmission failure.
[0254] In this example, base station 120 transmits different data and UE 110 receives different data in different time slots of a data channel (PDSCH) 44 during one or more time periods 40 .
[0255] UE 110 transmits and base station 120 receives separate HARQ acknowledgements for different data. The channel 52 used for separate HARQ acknowledgements is a physical uplink channel, in this example a physical uplink control channel (PUCCH).
[0256] In this example, the first scheduling information 20_1 points to all the second scheduling information 20_2 (second time slots) in the immediately following period (time slots #0 to #8).
[0257] In this example, the first scheduling information 20_1 only provides a subset of HARQ parameters for a subset of HARQ processes.
[0258] In other examples, the first scheduling information 20_1 may provide all HARQ parameters for only a subset of HARQ processes.
[0259] In other examples, the first scheduling information 20_1 may provide a subset of HARQ parameters for all HARQ processes.
[0260] However, it does not provide all HARQ parameters for all HARQ processes, since each second scheduling information 20_2 provides at least a subset of HARQ parameters for at least a subset of HARQ processes.
[0261] The second scheduling information 20_2 may provide different HARQ parameter subsets for different HARQ processes.
[0262] For example, the first scheduling information 20_1 in time slot #0 may indicate the presence of the second scheduling information 20_2 in time slots #2, 4, 6, and provide NDI only for PDSCH 44 with process HARQ-ID #0 and #1.
[0263] The second scheduling information 20_2 in slot #2 provides K1 (acknowledgement timing) and PUCCH resources about the end of slot 2 for PDSCH 44 with HARQ-ID #0 and #1. The second scheduling information 20_2 in slot #2 provides NDI for PDSCH 44 with process HARQ-ID #2 and #3.
[0264] The second scheduling information 20_2 in slot #4 provides K1 (acknowledgement timing) and PUCCH resources about the end of slot 4 for PDSCH 44 with HARQ-ID #2 and #3. The second scheduling information 20_2 in slot #4 provides NDI for PDSCH 44 with process HARQ-ID #4 and #5.
[0265] The second scheduling information 20_2 in time slot #6 provides K1 (acknowledgement timing) and PUCCH resources about the end of time slot 6 for PDSCH 44 with HARQ-ID #4 and #5. The second scheduling information 20_2 in time slot #6 provides NDI for PDSCH 44 with process HARQ-ID #5 and #6, and also provides K1 (acknowledgement timing) and PUCCH resources about the end of time slot 6 for PDSCH 44 with HARQ-ID #6 and #7.
[0266] Figure 6 shows a HARQ (eg, corresponding to Figure 4 ) is another example of scheduled data transmission via the uplink data channel 48.
[0267] PDCCH 30 is used to transmit data from base station 120 to UE 110 in the first time slot 20_1 ( Figure 6 The first scheduling information 20_1 is transmitted in the time slot #1, 9, 17, 25) and the second scheduling information 20_2 is transmitted in the time slot #20_3 ( Figure 6 The second scheduling information 20_2 is transmitted in time slots #5, 13, 21).
[0268] The first scheduling information 20_1 (time slot #1) points to the second scheduling information 20_2 (time slot #5) in the period immediately following it.
[0269] The first scheduling information 20_1 (time slot #9) points to the second scheduling information 20_2 (time slot #13) in the period immediately following it.
[0270] The first scheduling information 20_1 (time slot #17) points to the second scheduling information 20_2 (time slot #21) in the period immediately following it.
[0271] The first scheduling information 20_1 may be as described above. As described above, the scheduling information may be split between the first scheduling information 20_1 and the second scheduling information 20_2. For example, the scheduling information may include one or more of the following: resource allocation of the data channel (frequency domain resource allocation and / or time domain resource allocation), decoding assistance information, and HARQ parameters.
[0272] In this example, the first scheduling information 20_1 (time slot #1) and the second scheduling information 20_2 (time slot #5) are configured to allocate HARQ processes for uplink data transmitted in time slots #7-10 of the channel 48. The HARQ response (not shown) will be provided in the PDCCH 30. At least some scheduling information (e.g., NDI, MCS, and HARQ-ID) is provided by the second scheduling information 20_2.
[0273] The base station 120 has time slots #11 to 16 for PUSCH and uplink scheduling.
[0274] In the example shown, for example, Figure 5 As shown, for a data downlink, the first scheduling information 20_1 may point to multiple occurrences of the second scheduling information 20_2. The first scheduling information 20_1 provides one or more pointers.
[0275] In the example shown, for example, Figure 6 As shown, for a data uplink, the first scheduling information 20_1 points to one occurrence of the second scheduling information 20_2. The first scheduling information 20_1 provides a single pointer.
[0276] The above process is scalable. As the subcarrier spacing increases (time slot size decreases), the time period increases (measured in time slots). The above process allows the use of the second scheduling information 20_2 (and the number of second time slots is adjusted using the second scheduling information 20_2 per time period), so that different subcarrier spacings and different time periods can be supported.
[0277] The size of the first scheduling information 20_1 can be kept relatively small (e.g., compared to the case where all scheduling information is contained in a single PDCCH slot). The size of the first scheduling information 20_1 can be kept relatively small because a portion of the scheduling information (common to both the first scheduling information and the second scheduling information) can be conveyed via only the first scheduling information 20_1.
[0278] By associating (eg, pointing) from the first scheduling information 20_1 to the second scheduling information 20_2, scheduling flexibility may be maintained.
[0279] Due to the association (e.g., pointer) from the first scheduling information 20_1 to the second scheduling information 20_2, there is a reasonable user equipment blind detection burden. For example, the UE may be able to perform N blind decodings per time slot (N is a parameter, such as 12). In the current method, the first scheduling information may follow a budget of N blind decodings / time slot. The second scheduling information may consume only one blind decoding (therefore, the total blind decoding budget for each first time period will be, for example, N+1 or N+2, rather than N*2 or N*3).
[0280] A reasonable number of HARQ processes (eg, up to 16 HARQ processes) supports reasonable user equipment and base station processing time.
[0281] Only minor changes may be required to the base station and user equipment physical layer design. No changes to the HARQ process may be required.
[0282] The following paragraphs provide some further details of the example.
[0283] In different examples, different aspects of the HARQ process may be controlled by different scheduling information in the first scheduling information 20_1 and the second scheduling information 20_2.
[0284] According to one option, the first scheduling information 20_1 may trigger a HARQ acknowledgement.The first scheduling information 20_1 may indicate the PUCCH timing via selecting a predefined pattern (from a plurality of patterns configured by RRC).
[0285] For example, the pattern could provide:
[0286] The K1 value for each scheduled PSDCH. The PUCCH timing is determined relative to each PDSCH; and
[0287] Individual PUCCH Resource Indicator (PRI) for each PUCCH transmission, or a single PRI for all PUCCH transmissions
[0288] and Figure 6 Examples of corresponding patterns are as follows:
[0289]
[0290] According to another option, the second scheduling information 20_2 can trigger a HARQ response. The HARQ feedback timing, codebook and PUCCH resource are determined by the K1 and PUCCH resource indicator values contained on the second scheduling information 20_2, and the K1 value is determined by the second scheduling information 20_2 relative to the last scheduled PDSCH. The K1 value is configured by RRC. The first scheduling information 20_1 and the second scheduling information 20_2 can share a common configuration of the K1 value, or the K1 value can be configured separately for the first scheduling information 21_1 and the first scheduling information 22_2.
[0291] exist Figure 5 In the example of , the first scheduling information 20_1 does not trigger HARQ feedback, except for the PDSCH time slot it directly schedules (if any). Figure 5 In the example, the first two PDSCH slots are reported in the PUCCH triggered by the first scheduling information 20_1. The other PDSCH slots are reported in additional (middle) PUCCH slots triggered by the corresponding second scheduling information 20_2.
[0292] In an alternative example, the first scheduling information 20_1 triggers normal HARQ feedback covering HARQ feedback of all scheduled PDSCHs (i.e., HARQ-ACK transmission is repeated for some PDSCHs). The HARQ feedback containing A / N of all scheduled PDSCHs triggered by the first scheduling information 20_1 is transmitted last. The additional triggered intermediate HARQ response in the PUCCH is transmitted earlier and provides early HARQ feedback.
[0293] The HARQ feedback codebook (CB) determination of the feedback triggered by the second scheduling information 20_2 may use the conventional CB determination. In order to reduce the size of the type 1 CB, a reduced K1 set may be configured for the second scheduling information 20_2 and used in the type 1 CB determination.
[0294] The time slot including both the HARQ feedback triggered by the first scheduling information 20_1 and the HARQ feedback triggered by the second scheduling information 20_2 may need to include both downlink symbols and uplink symbols. It may be necessary to use a sufficiently short PUCCH transmission.
[0295] A demodulation reference signal (DMRS) used to detect the second scheduling information 20_2 may be the same as or different from a DMRS used to detect the first scheduling information 20_1.
[0296] The PDCCH DMRS is always used when detecting the first scheduling information 20_1.
[0297] The PDCCH (second scheduling information 20_2) can be demodulated based on the PDSCH DMRS or the PDCCH DMRS.
[0298] When the PDCCH (second scheduling information 20_2) is demodulated based on the PDSCH DMRS, the CCE is consistent with the PDSCH data grid.
[0299] CCE is a control channel element. CCE is a group of resources used to send PDCCH. PDCCH is transmitted using resource elements (RE) belonging to the control resource set (CORESET). A single resource element group (REG) is 1 resource block (RB) in the frequency domain and 1 symbol in the time domain, i.e. 12 resource elements. The aggregation level maps RE / REG to CCE.
[0300] When the PDCCH (second scheduling information 20_2) is demodulated based on the PDCCH DMRS (independent of the PDSCH), a predefined subset of CCEs of the PDCCH CORESET of the first scheduling information 20_1 is used, or a CCE grid in a predefined position configured via RRC.
[0301] Therefore, one option is to demodulate the PDCCH (second scheduling information 20_2) based on the PDCCH DMRS using the defined CCE subset of the PDCCH CORESET of the first scheduling information 20_1. The subset can be defined by a pointer. This option can also work with PUSCH multi-transmission time interval (TTI) scheduling. The traditional PDCCH processing chain can be used for the second scheduling information 20_2 detection to significantly reduce the blind detection burden and reduce power consumption.
[0302] Some attributes of the second scheduling information 20_2 may be derived from the first scheduling information 20_1 and / or its associated CORESET. For example, such attributes may include:
[0303] i) Timing, i.e. the location of the CORESET and its starting symbol within the time slot,
[0304] ii) the CCEs carrying the second scheduling information 20_2 may be derived as a subset of the CCEs (of the CORESET) in which the first scheduling information 20_1 has been detected,
[0305] iii) RNTI, and / or
[0306] iv) Payload.
[0307] In some examples, the association / pointer to the first scheduling information 20_1 is explicitly indicated by the content included in the first scheduling information 20_1.
[0308] The location of the second scheduling information 20_2 may be indicated via including a predefined pattern (from a plurality of patterns configured by RRC) in the first scheduling information 20_1 or a bitmap covering the number / groups of time slots that may be scheduled by the second scheduling information 20_2.
[0309] The presence of the second scheduling information 20_2 in some time slots can be indicated by a special value of a field (or multiple fields) in the first scheduling information 20_1, for example, NDI (or NDI+RV combination), which indicates that the NDI signaling is postponed to the second scheduling information 20_2 of the corresponding time period.
[0310] One occurrence of the second scheduling information 20_2 may be associated with another or more occurrences of the second scheduling information 20_2 via the first scheduling information 20_1. For example, the first scheduling information 20_1 may fully schedule the first 4 PDSCH slots, and in the 5th PDSCH slot, there is second scheduling information 20_2 for PDSCH slots 5-8. Therefore, the second scheduling information 20_2 is associated with the 4 PDSCH slots scheduled by the first scheduling information 20_1.
[0311] A CORESET is a group of control resources and includes N CCEs. Consecutive CCEs (1, 2, 4, 8, or 16) form a PDCCH candidate that can hold a PDCCH.
[0312] The user equipment may determine the starting CCE of the PDCCH.
[0313] For example, if the second scheduling information 20_2 is to be found in a predefined subset of the CCEs of the CORESET of the first scheduling information 20_1, the base station may indicate the starting logical CCE where the second scheduling information 20_2 is located in the CORESET for each UE respectively. However, this may require further increasing the primary PDCCH payload. Another solution is to implicitly determine the starting CCE of the second scheduling information 20_2.
[0314] In some but not necessarily all examples, the starting CCE is determined based on the starting resource block (RB) and / or starting symbol of the PDSCH / PUSCH.
[0315] For example, the starting CCE of the second scheduling information 20_2 of each UE is determined based on the starting physical resource block (PRB) of the PDSCH.
[0316] This is determined by the equation Given, where
[0317] · Is the starting RB of the associated PDSCH
[0318] · is the RB size of the active BWP of the associated PDSCH
[0319] CORESET size is the number of CCEs in the main CORESET
[0320] An alternative is to use a subset of CCEs of the CORESET of the first scheduling information 20_1 in which the first scheduling information 20_1 has been decoded. If the first scheduling information 20_1 does not conflict, using the subset will ensure that the second scheduling information 20_2 of the scheduled user equipment will not conflict. In addition, the second scheduling information 20_2 typically has a smaller payload than the first scheduling information 20_1, and therefore may require fewer CCEs than the first scheduling information 20_1 to provide the same amount of coverage reliability.
[0321] Figure 7 An example of a controller 400 is shown. An implementation of the controller 400 may be controller circuitry. The controller 400 may be implemented in hardware alone, with certain aspects of software including only firmware, or may be a combination of hardware and software (including firmware).
[0322] like Figure 7 As shown, the controller 400 may be implemented using instructions that enable hardware functionality, for example, by using executable instructions of a computer program 406 that may be stored on a computer-readable storage medium (disk, memory, etc.) in a general or special purpose processor 402 for execution by such processor 402 .
[0323] The processor 402 is configured to read from and write to the memory 404. The processor 402 may also include an output interface via which the processor 402 outputs data and / or commands, and an input interface via which data and / or commands are input to the processor 402.
[0324] The memory 404 stores a computer program 406, which includes computer program instructions (computer program code) that control the operation of the user equipment 110 or the base station 120 when loaded into the processor 402. The computer program instructions of the computer program 406 provide the apparatus with the ability to perform Figures 2 to 6 The processor 402 can load and execute the computer program 406 by reading the memory 404 .
[0325] The apparatus (eg, user equipment 110) may include:
[0326] at least one processor 402; and
[0327] At least one memory 404 including computer program code
[0328] The at least one memory 404 and the computer program code are configured to, together with the at least one processor 402, cause the apparatus to at least perform:
[0329] Receiving first scheduling information 20_1 of a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from the next first scheduling information 20_1 by a first period of at least one multi-slot;
[0330] receiving second scheduling information 20_2 for a data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of multiple time slots,
[0331] wherein the first scheduling information 20_1 in the first time slot points to at least the second scheduling information 20_2; and
[0332] The second scheduling information 20_2 is related to at least one hybrid automatic request (HARQ) process of the data channel.
[0333] The system (e.g., base station 120) may include:
[0334] at least one processor 402; and
[0335] At least one memory 404 including computer program code
[0336] The at least one memory 404 and the computer program code are configured to, together with the at least one processor 402, cause the system (base station 120) to at least execute:
[0337] Transmitting first scheduling information 20_1 of a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from the next first scheduling information 20_1 by a first period of at least one multi-slot; and
[0338] transmitting second scheduling information 20_2 for a data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of multiple time slots,
[0339] wherein the first scheduling information 20_1 in the first time slot points to at least the second scheduling information 20_2; and
[0340] The second scheduling information 20_2 is related to at least one hybrid automatic request (HARQ) process of the data channel.
[0341] like Figure 8 As shown, the computer program 406 may reach the user equipment 110 or the base station 120 via any suitable delivery mechanism 408. The delivery mechanism 408 may be, for example, a machine-readable medium, a computer-readable medium, a non-transitory computer-readable storage medium, a computer program product, a memory device, a recording medium (such as a compact disc read-only memory (CD-ROM) or a digital versatile disk (DVD) or a solid-state memory), an article of manufacture including or tangibly embodying the computer program 406. The delivery mechanism may be a signal configured to reliably transmit the computer program 406. The user equipment 110 or the base station 120 may propagate or transmit the computer program 406 as a computer data signal.
[0342] When executed on a computer included in a user device, the computer program 406 may enable the user device to:
[0343] Receiving first scheduling information 20_1 of a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from the next first scheduling information 20_1 by a first period of at least one multi-slot;
[0344] receiving second scheduling information 20_2 for a data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of multiple time slots,
[0345] wherein the first scheduling information 20_1 in the first time slot points to at least the second scheduling information 20_2; and
[0346] The second scheduling information 20_2 is related to at least one hybrid automatic request (HARQ) process of the data channel.
[0347] When executed on a computer included in the base station 120, the various computer programs 406 may cause the base station 120 to be able to:
[0348] Transmitting first scheduling information 20_1 of a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from the next first scheduling information 20_1 by a first period of at least one multi-slot; and
[0349] transmitting second scheduling information 20_2 for a data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of multiple time slots,
[0350] wherein the first scheduling information 20_1 in the first time slot points to at least the second scheduling information 20_2; and
[0351] The second scheduling information 20_2 is related to at least one hybrid automatic request (HARQ) process of the data channel.
[0352] The computer program instructions may be included in a computer program, a non-transitory computer readable medium, a computer program product, a machine readable medium. In some but not necessarily all examples, the computer program instructions may be distributed over more than one computer program.
[0353] Although memory 404 is shown as a single component / circuitry, it may be implemented as one or more separate components / circuitry, some or all of which may be integrated / removable and / or may provide permanent / semi-permanent / dynamic / cached storage.
[0354] Although processor 402 is shown as a single component / circuitry, it may be implemented as one or more separate components / circuitry, some or all of which may be integrated / removable.Processor 402 may be a single-core or multi-core processor.
[0355] References to "computer-readable storage medium," "computer program product," "tangibly embodied computer program," etc. or "controller," "computer," "processor," etc. should be understood to include not only computers having different architectures (such as single / multi-processor architectures and sequential (von Neumann) / parallel architectures), but also special-purpose circuits such as field-programmable gate arrays (FPGAs), application-specific circuits (ASICs), signal processing devices, and other processing circuit systems. References to computer programs, instructions, code, etc. should be understood to cover software for programmable processors or firmware, such as the programmable content of hardware devices, whether instructions for a processor or configuration settings for a fixed-function device, gate array, or programmable logic device, etc.
[0356] As used in this application, the term "circuitry" may refer to one or more or all of the following:
[0357] (a) a pure hardware circuitry implementation (such as an implementation solely in analog and / or digital circuitry), and
[0358] (b) a combination of hardware circuitry and software such as (where applicable):
[0359] (i) a combination of analog and / or digital hardware circuits and software / firmware, and
[0360] (ii) any portion of hardware processor(s) (including digital signal processor(s)), software and memory with software that work together to cause a device (such as a mobile phone or server) to perform various functions, and
[0361] (c) Hardware circuit(s) and / or processor(s), such as microprocessor(s) or portion(s) of microprocessor(s), that require software (e.g., firmware) to operate, but which may not be present when not required for operation.
[0362] This definition of circuitry applies to all uses of the term in this application, including in any claims. As another example, as used in this application, the term circuitry also covers an implementation of hardware-only circuits or processors and their (or their) accompanying software and / or firmware. For example, the term circuitry also covers a baseband integrated circuit for a mobile device or a similar integrated circuit in a server, cellular network device, or other computing or network device, if applicable to the particular claim element.
[0363] Figures 2 to 6 The blocks shown may represent steps in a method and / or code segments in a computer program 406. The description of a particular order of blocks does not necessarily mean that there is a required or preferred order for the blocks, and the order and arrangement of the blocks may be changed. In addition, some blocks may be omitted.
[0364] Where a structural feature has been described, it may be replaced by a component for performing one or more of the functions of the structural feature, whether that function or those functions are explicitly or implicitly described.
[0365] The examples above consider an application as a component that:
[0366] Automotive systems; telecommunications systems; electronic systems, including consumer electronics; distributed computing systems; media systems for generating or rendering media content, including audio, video and audiovisual content and mixed, mediated, virtual and / or augmented reality; personal systems, including personal health systems or personal fitness systems; navigation systems; user interfaces, also known as human-machine interfaces; networks, including cellular, non-cellular and optical networks; ad hoc networks; the Internet; the Internet of Things; virtualized networks; and related software and services.
[0367] The term "comprise" as used in this document is inclusive rather than exclusive. That is, any reference to X including Y means that X may include only one Y or may include multiple Ys. If the exclusive meaning of "comprise" is intended, it will be clearly stated in the context by referring to "comprising only one" or using "consisting".
[0368] In this specification, reference is made to various examples. The description of features or functions associated with an example indicates that these features or functions are present in the example. The use of the term "example" or "for example" or "may" or "can" in the text indicates (whether explicitly stated or not) that such features or functions are present in at least the described example, whether described as an example or not, and they may but not necessarily be present in some or all other examples. Therefore, "example" or "for example" or "may" or "can" refers to a specific instance in a class of examples. The attributes of an instance may be attributes of only that instance or attributes of a class or attributes of a subclass of a class including some but not all instances in the class. Therefore, it is implicitly disclosed that features described with reference to one example rather than with reference to another example may be used as part of a working combination in the other example where possible, but do not necessarily have to be used in the other example.
[0369] Although the examples have been described in the preceding paragraphs with reference to various examples, it should be appreciated that modifications to the examples given can be made without departing from the scope of the claims.
[0370] Features described in the preceding description may be used in other combinations than the combinations explicitly described above.
[0371] Although functions have been described with reference to certain features, those functions may be performable by other features whether described or not.
[0372] Although features have been described with reference to certain examples, those features may also be present in other examples whether described or not.
[0373] The terms "a" or "the" as used in this document are inclusive and not exclusive. That is, any reference to X that includes an a / the Y indicates that X may include only one Y or may include multiple Ys, unless the context clearly indicates otherwise. If the exclusive meaning of "a" or "the" is intended, it will be clearly stated in the context. In some cases, "at least one" or "one or more" may be used to emphasize the inclusive meaning, but the absence of these terms should not be regarded as inferring any exclusive meaning.
[0374] The presence of a feature (or combination of features) in a claim is a reference to the feature or (combination of features) itself, as well as to features that achieve substantially the same technical effect (equivalent features). Equivalent features include, for example, features that are variants and achieve substantially the same result in substantially the same way. Equivalent features include, for example, features that perform substantially the same function in substantially the same way to achieve substantially the same result.
[0375] In this specification, reference is made to various examples, using adjectives or adjective phrases to describe features of the examples. Such description of a characteristic associated with an example indicates that the characteristic exists in some examples exactly as described and in other examples substantially as described.
[0376] While in the foregoing description efforts have been made to draw attention to those features regarded as essential, it should be understood that the applicant may seek protection by way of claims for any patentable feature or combination of features mentioned above and / or shown in the accompanying drawings, whether emphasized or not.
Claims
1. An apparatus for communication, comprising means for: Receiving first scheduling information for a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from next first scheduling information by a first period of at least one multi-slot; and receiving second scheduling information for the data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of the multi-time slot, wherein the first scheduling information in the first time slot points to at least the second scheduling information; and The second scheduling information is associated with at least one hybrid automatic request (HARQ) process of the data channel.
2. The apparatus according to claim 1, wherein at least one of the first scheduling information and the second scheduling information is configured to enable at least two HARQ processes of the data channel, wherein the two HARQ processes do not overlap in the time domain.
3. The apparatus according to claim 1 or 2, wherein the first scheduling information and the second scheduling information are combined to enable: receiving first data in a time slot of the data channel during the at least one first time period; receiving second data in a different time slot of the data channel during the at least one first time period; and A HARQ acknowledgement for the first data is transmitted separately from a HARQ acknowledgement for the second data.
4. The apparatus according to claim 1 or 2, wherein the first scheduling information and the second scheduling information are combined to enable: During the at least one first time period, transmitting first data in a time slot of the data channel; and During the at least one first time period, second data is transmitted in a different time slot of the data channel.
5. An apparatus according to claim 1 or 2, wherein the first scheduling information is configured to allocate one or more early HARQ processes before receiving the second scheduling information, and wherein the second scheduling information is configured to assist in the allocation of one or more late HARQ processes at or after receiving the second scheduling information.
6. The apparatus of claim 1 or 2, wherein the reception in the PDCCH uses a subcarrier spacing of 480 kHz, 960 kHz, 1920 kHz, or greater.
7. The apparatus of claim 1 or 2, configured to enable remote control of one or more of the following in response to the received control signaling: duration of the at least one first period; content of the first scheduling information; a pointer to at least said second scheduling information in frequency and / or time; a timing of said first time slot comprising first scheduling information; the number of second time slots including second scheduling information in the first time period; content of the second scheduling information; a timing of a second time slot including second scheduling information; Timing of HARQ responses; An early HARQ process is enabled prior to reception of the second scheduling information.
8. The apparatus according to claim 1 or 2, configured as a user equipment or a mobile device of a radio access network.
9. A computer program product which, when executed on a computer included in a user device, enables the user device to perform: Receiving first scheduling information for a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from a next first scheduling information by at least one first period of multiple time slots; receiving second scheduling information for the data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of the multi-time slot, wherein the first scheduling information in the first time slot points to at least the second scheduling information; and The second scheduling information is associated with at least one hybrid automatic request (HARQ) process of the data channel.
10. A method for communication, comprising: Transmitting first scheduling information for a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from a next first scheduling information by a first period of at least one multi-slot; as well as transmitting second scheduling information of the data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of the multi-time slot, wherein the first scheduling information in the first time slot points to at least the second scheduling information; and The second scheduling information is associated with at least one hybrid automatic request (HARQ) process of the data channel.
11. A system for communication, comprising means for: transmitting first scheduling information of a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from next first scheduling information by a first period of at least one multi-slot; and transmitting second scheduling information of the data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of the multi-time slot, wherein the first scheduling information in the first time slot points to at least the second scheduling information; and The second scheduling information is associated with at least one hybrid automatic request (HARQ) process of the data channel.
12. The system of claim 11, configured to control one or more of the following: duration of the at least one first period; content of the first scheduling information; a pointer to at least said second scheduling information in frequency and / or time; a timing of said first time slot comprising first scheduling information; the number of second time slots including second scheduling information in the first time period; content of the second scheduling information; a timing of a second time slot including second scheduling information; Timing of HARQ responses; An early HARQ process is enabled prior to reception of the second scheduling information.
13. The system of claim 11 or 12, wherein the second scheduling information is based on information that is not available when the first scheduling information is transmitted.
14. The system according to claim 11 or 12, configured as a base station of a radio access network.
15. A computer program product which, when executed on a computer included in a base station, enables the base station to perform: transmitting first scheduling information of a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from next first scheduling information by a first period of at least one multi-slot; and transmitting second scheduling information of the data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of the multi-time slot, wherein the first scheduling information in the first time slot points to at least the second scheduling information; and The second scheduling information is associated with at least one hybrid automatic request (HARQ) process of the data channel.
16. An apparatus for communication, comprising: at least one processor; as well as at least one memory including computer program code, The at least one memory and the computer program code are configured to, together with the at least one processor, cause the apparatus to at least perform: Receiving first scheduling information for a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from a next first scheduling information by at least one first period of multiple time slots; as well as receiving second scheduling information for the data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of the multi-time slot, wherein the first scheduling information in the first time slot points to at least the second scheduling information; and The second scheduling information is associated with at least one hybrid automatic request (HARQ) process of the data channel. 17 . The apparatus according to claim 16 , wherein at least one of the first scheduling information and the second scheduling information is configured to enable at least two HARQ processes of the data channel, wherein the two HARQ processes do not overlap in the time domain.
18. The apparatus of claim 16, wherein the first scheduling information and the second scheduling information in combination enable: receiving first data in a time slot of the data channel during the at least one first time period; receiving second data in a different time slot of the data channel during the at least one first time period; and A HARQ acknowledgement for the first data is transmitted separately from a HARQ acknowledgement for the second data.
19. The apparatus of claim 16, wherein the first scheduling information and the second scheduling information in combination enable: During the at least one first time period, transmitting first data in a time slot of the data channel; and During the at least one first time period, second data is transmitted in a different time slot of the data channel.
20. The apparatus of claim 16, wherein the first scheduling information is configured to allocate one or more early HARQ processes prior to receipt of second scheduling information, and wherein the second scheduling information is configured to assist in allocation of one or more late HARQ processes upon or after receipt of the second scheduling information.
21. The apparatus of claim 16, wherein the reception in the PDCCH uses a subcarrier spacing of 480 kHz, 960 kHz, 1920 kHz, or greater.
22. The apparatus of claim 16, wherein the at least one memory and the computer program code are configured to, with the at least one processor, cause the apparatus to at least: enable remote control of one or more of the following in response to the received control signaling: duration of the at least one first period; content of the first scheduling information; a pointer to at least said second scheduling information in frequency and / or time; a timing of said first time slot comprising first scheduling information; the number of second time slots including second scheduling information in the first time period; content of the second scheduling information; a timing of a second time slot including second scheduling information; The timing of the HARQ acknowledgement; or An early HARQ process is enabled prior to reception of the second scheduling information.
23. The apparatus of claim 16, wherein the at least one memory and the computer program code are configured to, with the at least one processor, cause the apparatus to be configured as a user equipment or a mobile device of a radio access network.
24. A system for communication, comprising: at least one processor; as well as at least one memory including computer program code, The at least one memory and the computer program code are configured to, with the at least one processor, cause the system to at least perform: Transmitting first scheduling information for a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from a next first scheduling information by a first period of at least one multi-slot; as well as transmitting second scheduling information of the data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of the multi-time slot, wherein the first scheduling information in the first time slot points to at least the second scheduling information; and The second scheduling information is associated with at least one hybrid automatic request (HARQ) process of the data channel.
25. The system of claim 24, wherein the at least one memory and the computer program code are configured to, with the at least one processor, cause the system to at least control one or more of: duration of the at least one first period; content of the first scheduling information; a pointer to at least said second scheduling information in frequency and / or time; a timing of said first time slot comprising first scheduling information; the number of second time slots including second scheduling information in the first time period; content of the second scheduling information; a timing of a second time slot including second scheduling information; The timing of the HARQ acknowledgement; or An early HARQ process is enabled prior to reception of the second scheduling information.
26. The system of claim 24, wherein the second scheduling information is based on information that is not available when the first scheduling information is transmitted.
27. The system of claim 24, wherein the at least one memory and the computer program code are configured to, with the at least one processor, cause the system to be configured as: a base station of a radio access network.
28. A method for communication, comprising: At the device, receiving first scheduling information for a data channel in a physical downlink control channel (PDCCH) in a first time slot, wherein the first time slot is separated from a next first scheduling information by at least a first period of multiple time slots; as well as receiving, at the device, second scheduling information for the data channel in the PDCCH in at least one second time slot, wherein the at least one second time slot is delayed by one or more time slots relative to the first time slot and is received after the first time slot within a first period of the multi-time slot, wherein the first scheduling information in the first time slot points to at least the second scheduling information; and The second scheduling information is associated with at least one hybrid automatic request (HARQ) process of the data channel.
29. The method according to claim 28, wherein at least one of the first scheduling information and the second scheduling information is configured to enable at least two HARQ processes of the data channel, wherein the two HARQ processes do not overlap in the time domain.
30. The method of claim 28, wherein the first scheduling information and the second scheduling information combine to enable: receiving first data in a time slot of the data channel during the at least one first time period; receiving second data in a different time slot of the data channel during the at least one first time period; and A HARQ acknowledgement for the first data is transmitted separately from a HARQ acknowledgement for the second data.
31. The method of claim 28, wherein the first scheduling information and the second scheduling information combine to enable: During the at least one first time period, transmitting first data in a time slot of the data channel; and During the at least one first time period, second data is transmitted in a different time slot of the data channel.
32. A method according to claim 28, wherein the first scheduling information is configured to allocate one or more early HARQ processes before receiving the second scheduling information, and wherein the second scheduling information is configured to assist in the allocation of one or more late HARQ processes at or after receiving the second scheduling information.
33. The method of claim 28, wherein the reception in the PDCCH uses a subcarrier spacing of 480 kHz, 960 kHz, 1920 kHz, or greater.
34. The method of claim 28, enabling remote control of one or more of the following in response to the received control signaling: duration of the at least one first period; content of the first scheduling information; a pointer to at least said second scheduling information in frequency and / or time; a timing of said first time slot comprising first scheduling information; the number of second time slots including second scheduling information in the first time period; content of the second scheduling information; a timing of a second time slot including second scheduling information; The timing of the HARQ acknowledgement; or An early HARQ process is enabled prior to reception of the second scheduling information.
35. The method of claim 28, wherein the apparatus is a user equipment or a mobile device of a radio access network.
