An automatic point-to-point system for substations based on digital twin technology

The digital twin technology is used to simulate the point-to-point process of the substation in the offline environment, which solves the problems of long power outage time and potential safety hazards during the point-to-point process of the substation, improves debugging efficiency and safety, and reduces the power outage time and construction period.

CN115562068BActive Publication Date: 2024-10-22MAINTENANCE BRANCH COMPANY STATE GRID ZHEJIANG ELECTRIC POWER +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211191374.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-28
Publication Date
2024-10-22
Estimated Expiration
2042-09-28

AI Technical Summary

Technical Problem

The point-to-point process of the substation needs to be carried out during a power outage, resulting in a long power outage, affecting residents' lives, and there are safety hazards, high communication costs for multiple links to cooperate with each other, and a high risk of errors.

Method used

An automatic point-to-point system based on digital twin technology is used to simulate the actual substation in an offline environment through the mirror monitoring host and simulation measurement and control device to complete the point-to-point work, generate a point-to-point debugging report, adjust the monitoring host configuration, and reduce the risk of errors in on-site operations. and blackout times.

Benefits of technology

Complete point-to-point work in the virtual environment in advance, reduce the risk of on-site reconstruction operations, improve substation debugging efficiency, shorten power outage time, reduce construction period, and reduce communication costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115562068B_ABST
    Figure CN115562068B_ABST
Patent Text Reader

Abstract

The present application provides a substation automatic point-to-point system based on digital twin technology, which includes a mirror monitoring host, a debugging management machine and a simulation measurement and control device, wherein the mirror monitoring host is used to send a first file to the debugging management machine, the debugging management machine is used to determine multiple measurement point information according to the first file, and send a replacement command of the first measurement point information to the simulation measurement and control device; the simulation measurement and control device is used to replace the first measurement point information according to the replacement command to generate the second measurement point information, and send the second measurement point information to the mirror monitoring host; the mirror monitoring host is used to generate a replacement data recording file according to the second measurement point information, the debugging management machine is used to determine the point-to-point result of the first measurement point information according to the replacement command and the replacement data recording file, and is used to generate a point-to-point debugging report, and the point-to-point debugging report is used to adjust the configuration of the monitoring host in the actual substation operation environment. The system enables the substation to complete the point-to-point in advance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of substation automation technology, and in particular to an automatic point-to-point system for a substation based on digital twin technology. Background Art

[0002] Whether the monitoring host can correctly monitor the substation is the premise of safe and stable operation of the power grid, which requires the measurement point information in the monitoring host to be highly accurate. The substation point verification is to check the measurement point information in the monitoring host with the measurement point information collected by the measurement and control device to verify whether the two are consistent, so as to ensure that the monitoring host can correctly monitor the substation.

[0003] At present, the process of substation alignment is generally that the debugging management machine sends the replacement commands of multiple measuring point information to the measurement and control device one by one through the monitoring host. After receiving the replacement command, the measurement and control device can replace the corresponding measuring point according to the replacement command, so that the corresponding measuring point triggers new information (i.e., generates new measuring point information), and reports the new measuring point information to the debugging management machine through the monitoring host. The debugging management machine determines whether the corresponding measuring point is aligned successfully according to the replacement command and the measuring point information. In this process, since the signal at the measuring point changes, it will affect the normal monitoring work of the substation and have certain safety hazards. Therefore, the alignment process of the substation needs to be carried out under power outages. However, the alignment work of the substation requires the mutual cooperation of various links (such as laying cables and wiring of the measurement and control device, power-on single-unit debugging, establishing communication connections, etc.). If the alignment fails, it is also necessary to find the cause of the alignment failure, modify and adjust the configuration of the monitoring host in a targeted manner, and re-align. This will cause the power outage time of the substation to be longer, affecting the normal life of residents. Summary of the invention

[0004] The present application provides an automatic substation point-to-point system based on digital twin technology. The system can migrate on-site point-to-point work to an offline mirror environment, allowing the substation to complete the point-to-point process in advance, improve the debugging efficiency of the actual operating environment of the substation, and reduce the power outage time of the substation.

[0005] To solve the above problems, an embodiment of the present application provides an automatic point-to-point system for a substation based on digital twin technology, the automatic point-to-point system comprising a mirror monitoring host, a debugging management machine and a simulation measurement and control device, wherein the mirror monitoring host is a monitoring host in the mirrored actual substation operating environment, and the simulation measurement and control device is a simulated measurement and control device in the actual substation operating environment; the mirror monitoring host is used to send a first file to the debugging management machine, the first file is a database information file or a screen information file; the debugging management machine is used to determine multiple measurement point information according to the first file, and send a replacement command for the first measurement point information to the simulation measurement and control device, the first measurement point information is the multiple measurement point information any one of the information; the simulation measurement and control device is used to replace the first measuring point information according to the replacement command to generate the second measuring point information, and send the second measuring point information to the mirror monitoring host; the mirror monitoring host is also used to generate a replacement data recording file of the first measuring point information according to the second measuring point information, and send the replacement data recording file to the debugging management machine; the debugging management machine is used to determine the point-to-point result of the first measuring point information according to the replacement command and the replacement data recording file, and to generate a point-to-point debugging report including the point-to-point results of the multiple measuring point information, and the point-to-point debugging report is used to adjust the configuration of the monitoring host in the actual substation operation environment.

[0006] In a possible design, the mirror monitoring host, the simulation measurement and control device and the debugging management machine are respectively arranged on different servers.

[0007] In a possible design, the mirror monitoring host is set on a virtual machine, and the simulation measurement and control device is set on the debugging management machine.

[0008] In a possible design, the mirror monitoring host, the debugging management machine and the simulation measurement and control device are established on the server based on digital twin technology.

[0009] In one possible design, the debugging management machine is also used to determine the alignment result of the first measuring point information based on the replacement command and the replacement data record file, including marking the alignment of the first measuring point information as successful if the replacement command and the replacement data record file are consistent; if the replacement command and the replacement data record file are inconsistent, marking the alignment of the first measuring point information as failed.

[0010] In a possible design, the debugging management machine is also used to receive the second measuring point information from the simulation measurement and control device to generate a replacement result file of the first measuring point information, and determine the point result of the first measuring point information based on the replacement command, the replacement result file and the replacement data record file.

[0011] In a possible design, the debugging management machine is further used to mark the first measuring point information as a point failure when the second measuring point information is not received within a preset time period after sending the replacement command.

[0012] In a possible design, the debugging management machine is also used to send a cancel replacement command to the simulation measurement and control device and receive a cancel replacement command result from the simulation measurement and control device.

[0013] In a possible design, after determining the point-to-point results of the multiple measurement point information, the debugging management machine sends a cancel replacement command to the simulation measurement and control device and restarts the simulation measurement and control device.

[0014] In one possible design, the first measuring point information is telemetry data or telesignaling data.

[0015] According to the substation automatic point-to-point system based on digital twin technology provided in the embodiment of the present application, by setting a mirror monitoring host and a simulation measurement and control device, it is possible to truly simulate the monitoring host and the measurement and control device in the actual substation operating environment, and mirror the point-to-point work of the actual substation to an offline environment. After the mirror monitoring host sends a first file (database information file or screen information file) to the debugging management machine, the debugging management machine can determine multiple measurement point information based on the first file, and send a replacement command for the first measurement point information to the simulation measurement and control device. After receiving the replacement command, the simulation measurement and control device can replace the first measurement point information according to the replacement command. After performing the replacement setting, the simulation measurement and control device obtains The second measuring point information is received, and the second measuring point information is sent to the mirror monitoring host. After receiving the second measuring point information, the mirror monitoring host can generate a replacement data record file of the corresponding measuring point (i.e., the first measuring point information) according to the second measuring point information, and send the replacement data record file to the debugging management machine. The debugging management machine can determine the point-to-point result of the corresponding measuring point according to the replacement data record file and the replacement command. After determining the point-to-point results (success or failure) of all measuring point information, the debugging management machine can also generate a point-to-point debugging report including the point-to-point results of the measuring point information, so that the staff can directly adjust the configuration of the monitoring host in the actual substation operation environment according to the point-to-point debugging report generated by the debugging management machine. Through the above settings, the point-to-point process in the actual substation can be migrated to the offline mirror environment. In the offline mirror environment, even if the simulation measurement and control device changes the signal at the corresponding measuring point according to the replacement command, it will not cause any impact on the work of the actual substation. The point-to-point work can be completed in the virtual environment in advance, and the configuration of the monitoring host can be adjusted according to the point-to-point debugging report. It can reduce the communication cost of multiple links in the actual substation point-to-point process, reduce the risk of errors in reconstruction (expansion) on-site operations, improve the efficiency of actual substation debugging operations, reduce the power outage time of the substation, and shorten the construction period. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0017] Figure 1 It is a schematic diagram of the architecture of a substation provided in an embodiment of the present application.

[0018] Figure 2 It is a structural diagram of the automatic point-to-point system of the substation based on the digital twin technology provided in an embodiment of the present application.

[0019] Figure 3 It is a schematic flow chart of the automatic point-to-point process of the automatic point-to-point system of the substation provided in an embodiment of the present application.

[0020] Figure 4 It is a schematic block diagram of a debugging management machine of an automatic point-to-point system of a substation provided in an embodiment of the present application.

[0021] Figure 5 It is a schematic block diagram of a mirror monitoring host of an automatic point-to-point system of a substation provided in an embodiment of the present application.

[0022] Figure 6 It is a schematic block diagram of a simulation measurement and control device for an automatic point-to-point system of a substation provided in an embodiment of the present application.

[0023] Figure 7 It is a structural block diagram of electronic equipment in the automatic point-to-point system of the substation provided in an embodiment of the present application. DETAILED DESCRIPTION

[0024] The technical solution in the present application will be described below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments.

[0025] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.

[0026] The term "include" herein indicates the presence of the described features, integral bodies, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, integral bodies, steps, operations, elements, components and / or their collections. The terms "include", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized.

[0027] The term "and / or" in this article is only a description of the association relationship of the associated objects, indicating that there can be three relationships. For example, A and / or B can mean: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0028] In the description of the present application, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present application, "at least one" means one or more, and "more than one" means two or more, unless otherwise clearly and specifically defined.

[0029] Figure 1 Schematic diagram of the substation architecture provided by the embodiment of the present application. Figure 1 As shown, the substation 100 is generally a "three-layer two-network" structure, where the three layers refer to the station control layer, the bay layer and the process layer, and the two networks refer to the station control layer network and the process layer network, which are physically independent of each other. Among them, the station control layer equipment includes a monitoring host 110, a telecontrol workstation, an operator workstation, a timing system, etc., to realize the monitoring, control, alarm and information interaction functions for the entire station equipment, and the bay layer equipment includes a protection device 130, a measurement and control device 140 and other intelligent devices 150 (such as a fault recorder, etc.). The function of the bay layer equipment is to collect signals from the primary equipment of the bay and to protect, control and monitor the primary equipment, and to send relevant information (such as current value, voltage value, switch position information, etc.) to the station control layer equipment. In addition, the bay layer equipment is also used to receive control instructions from the station control layer equipment and perform corresponding operations. The process layer equipment includes an intelligent terminal 160 and a merging unit 170 for collecting primary equipment such as transformers, circuit breakers, disconnectors, and electronic transformers. The intelligent terminal 160 and the merging unit 170 convert the AC sampling signal and the DC input and output signal into digital signals on site. The three-layer devices realize data exchange and information sharing through network communication. The network between the bay layer device and the station control layer device is called the station control layer network, and the network between the process layer device and the bay layer device is called the process layer network. The station control layer network realizes data transmission within the station control layer and between the station control layer and the bay layer; the process layer network realizes data transmission within the process layer and between the bay layer and the process layer.

[0030] The monitoring host 110 can perform four-remote communication with the measurement and control device 140 through the station control layer network to monitor the substation 100 equipment. Here, the four remote communications refer to telemetry, telesignaling, remote control and remote adjustment. Telemetry is that the measurement and control device 140 collects and reports to the monitoring host 110 the electrical quantity (such as voltage value, current value, power, frequency, temperature, etc.) at a certain node (measurement point) in the substation 100 equipment. For example, the measurement and control device 140 collects and reports to the monitoring host 110 the voltage value at the XX winding of the XX transformer in the XX interval of the XX substation. Telesignaling is that the measurement and control device 140 collects and reports to the monitoring host 110 the switch position signal, knife switch position signal, primary equipment alarm signal, protection trip signal, etc. at a certain measurement point in the substation 100 equipment. For example, the measurement and control device 140 collects and reports to the monitoring host 110 the position signal of the XX isolating switch in the XX interval of the XX substation. Remote control is remote control, for example, the monitoring host 110 sends to the measurement and control device 140 a command to close or open a switch or knife switch. Remote adjustment is remote adjustment, for example, the monitoring host 110 issues a transformer tap adjustment command to the measurement and control device 140.

[0031] During this process, due to abnormal communication links, errors in parsing measurement point information (electrical quantities or status signals at a certain node), errors in associated configuration, etc., there may be a situation where the measurement point information obtained by the monitoring host 110 is inconsistent with the measurement point information collected by the measurement and control device 140, affecting the safe and stable operation of the substation 100. The countermeasure of the substation 100 is to calibrate the measurement point information (such as telemetry data, telesignaling data) collected by the measurement and control device 140 and the measurement point information in the monitoring host 110 to verify whether the two are consistent, thereby ensuring that the monitoring host 110 can correctly monitor the substation 100.

[0032] The process of the substation 100 is generally that the debugging management machine 120 sends a replacement command of multiple measuring point information to the measurement and control device 140 one by one through the monitoring host 110. After receiving the replacement command, the measurement and control device 140 replaces the corresponding measuring point according to the replacement command, and reports the new information triggered by the measuring point (new measuring point information) to the debugging management machine 120. The debugging management machine 120 determines whether the corresponding measuring point is successfully aligned according to the replacement command and the measuring point information. In the process of alignment, since it is necessary to change the signal at the corresponding measuring point, for example, the position signal of the XX isolating switch of the XX interval of the XX substation is changed from open to closed, and for another example, the voltage value at the XX winding of the XX transformer of the XX interval of the XX substation is changed from 220kV to 110kV, it will affect the normal operation of the substation 100 and have certain safety hazards. Therefore, the alignment process of the substation 100 needs to be carried out under the condition of power outage, and the power outage of the substation will affect the normal life of residents.

[0033] Moreover, the substation's point-to-point work requires the cooperation of various links (such as laying cables and wiring for the measurement and control device, power-on single-unit debugging, establishing communication connections, etc.). If the point-to-point fails, it is necessary to find the cause of the point-to-point failure, modify and adjust the configuration of the monitoring host in a targeted manner, and re-point. This will cause the substation to be out of power for a long time, greatly affecting the normal life of residents. In addition, in scenarios such as renovation and expansion, there are problems such as complex operation and security measures, large debugging workload, multiple on-site construction areas, and cross-operation of construction personnel, resulting in a long debugging cycle and tight construction period.

[0034] In view of this, the embodiment of the present application provides an automatic point-to-point system for substations based on digital twin technology. By setting a mirror monitoring host, a simulation measurement and control device, and a debugging management machine, the point-to-point work of the substation can be migrated to an offline mirror environment. The point-to-point debugging report generated after completing the point-to-point in the offline mirror environment can be directly applied to the actual substation operation environment, so that the staff can directly adjust the configuration of the monitoring host according to the point-to-point debugging report. When performing point-to-point work in an offline mirror environment, even if the simulation measurement and control device changes the signal at the corresponding measuring point according to the replacement command, it will not affect the normal operation of the actual substation, that is, the actual substation can complete the point-to-point in advance, reduce the risk of errors in the reconstruction (expansion) on-site operation, improve the actual substation operation efficiency, and reduce the power outage time of the substation.

[0035] Figure 2 Schematic diagram of the structure of the automatic point-to-point system of the substation based on the digital twin technology provided in the embodiment of the present application. Figure 2 As shown, the automatic point-to-point system provided in the embodiment of the present application includes a mirror monitoring host 210, a debugging management machine 220 and a simulation measurement and control device 230.

[0036] Among them, the mirror monitoring host 210 is deployed on a server, which is a monitoring host in the actual substation operating environment of the mirror. The server of the mirror monitoring host 210 is a general server. The operating system version, database version, and monitoring system software version in the mirror monitoring host 210 are consistent with the operating system version, database version, and monitoring system software version in the actual substation operating environment, and the functions that can be realized are also the same. The mirror monitoring host 210 is used to send a first file to the debugging management machine 220. The first file can be a database information file or a screen information file. Here, the first file generated by the mirror monitoring host 210 is the same as the first file generated by the monitoring host in the actual substation operating environment.

[0037] Specifically, the database information file is the basic information of the substation, which includes substation information, voltage level information, interval information, primary equipment information, transformer information, winding information, intelligent equipment information, telemetry data, and telesignaling data. Among them, the substation information includes the substation name and substation description, the voltage level information includes the voltage level name and voltage level description, the interval information includes the interval name and interval description, the primary equipment information includes the primary equipment name, the primary equipment description, and the name of the interval to which it belongs, the transformer information includes the transformer name, the transformer description, and the interval to which the transformer belongs, the winding information includes the winding name, the winding description, and the name of the transformer to which the winding belongs, and the intelligent equipment information includes the intelligent equipment name and the intelligent equipment description. The screen information file is the monitoring information such as the substation wiring diagram, alarm, and measurement presented on the display interface of the monitoring host.

[0038] The debugging management machine 220 is deployed on the server. The debugging management machine 220 can determine multiple measuring point information based on the database information file or the screen information file, and send a replacement command of the first measuring point information to the simulation measurement and control device 230. The first measuring point information is any one of the multiple measuring point information. The replacement command is used to replace the first measuring point information. After the debugging management machine 220 sends the replacement command to the simulation measurement and control device 230, the debugging management machine 220 is also used to receive a replacement data record file from the mirror monitoring host 210. The replacement data record file can indicate the information change result at the corresponding measuring point in the first measuring point information. According to the replacement data record file and the replacement command, the point-to-point result (success or failure) of the first measuring point information can be determined. After determining the point-to-point results of all measuring point information, the debugging management machine 220 will also generate a point-to-point debugging report containing the point-to-point results of all measuring point information, so that the staff can adjust the configuration of the monitoring host in the actual substation operation environment according to the point-to-point debugging report.

[0039] Specifically, the debugging management machine 220 can determine multiple measuring point information in the database information file or the screen information file according to the user's selection, and the measuring point information includes measuring point index, measuring point function constraint, measuring point description and other information. The measuring point index is used to indicate the signal of the substation name, the interval name, the intelligent device name and the primary device name to which the measuring point belongs. For example, the number 001 represents the position signal of the XX disconnector of the XX interval XX measurement and control device of the XX substation. The measuring point function constraint indicates the signal type (electrical quantity or state quantity). For example, MX represents that the signal is an electrical quantity (such as voltage value, current value, power), and ST represents that the signal is a state quantity (such as the position information of switches and knife switches).

[0040] The simulation measurement and control device 230 is deployed on the server, and is a physical measurement and control device in the simulated actual substation operation environment. It can truly simulate the four remote communications and manufacturing message specification (MMS) communication between the measurement and control device and the monitoring host in the actual substation operation environment. The simulation measurement and control device 230 is used to receive the replacement command of the first measurement point information from the debugging management machine 220, and replace the first measurement point information according to the replacement command to generate the second measurement point information. The simulation measurement and control device 230 is also used to send the second measurement point information to the mirror monitoring host 210. After receiving the second measurement point information, the mirror monitoring host 210 can generate a replacement data record file of the corresponding measurement point (i.e., the first measurement point information) according to the second measurement point information, and send the generated replacement data record file to the debugging management machine 220.

[0041] According to the automatic point-to-point system of the substation based on the digital twin technology provided in the embodiment of the present application, by setting the mirror monitoring host 210 and the simulation measurement and control device 230, it is possible to truly simulate the monitoring host and the measurement and control device in the actual substation operation environment, and migrate the point-to-point work of the actual substation to an offline environment. After the mirror monitoring host 210 sends the first file (database information file or screen information file) to the debugging management machine 220, the debugging management machine 220 can determine multiple measurement point information according to the first file, and send a replacement command for the first measurement point information to the simulation measurement and control device 230. After receiving the replacement command, the simulation measurement and control device 230 can replace the first measurement point information according to the replacement command. After the replacement setting is performed, the simulation measurement and control device 230 can The second measuring point information at the corresponding measuring point can be obtained, and the second measuring point information is sent to the mirror monitoring host 210. After receiving the second measuring point information, the mirror monitoring host 210 can generate a replacement data record file of the corresponding measuring point (i.e., the first measuring point information) according to the second measuring point information, and send the replacement data record file to the debugging management machine 220. The debugging management machine 220 can determine the point-to-point result of the corresponding measuring point according to the replacement data record file and the replacement command. After determining the point-to-point results (success or failure) of all measuring point information, the debugging management machine 220 can also generate a point-to-point debugging report including the point-to-point results of the measuring point information. The staff can directly adjust the configuration of the monitoring host in the actual substation operation environment according to the point-to-point debugging report generated by the debugging management machine 220. Through the above settings, the point-to-point process in the actual substation can be migrated to the offline mirror environment. In the offline mirror environment, even if the simulation measurement and control device 230 changes the signal at the corresponding measuring point according to the replacement command, it will not cause any impact on the work of the actual substation. The point-to-point work can be completed in the virtual environment in advance, and the configuration of the monitoring host can be adjusted according to the point-to-point debugging report. The communication cost of multiple links in the actual substation point-to-point process can be reduced, the risk of errors in the reconstruction (expansion) on-site operations can be reduced, the actual substation debugging efficiency can be improved, the power outage time of the substation can be reduced, and the construction period can be shortened.

[0042] Here, the mirror monitoring host 210 can also send the replacement data record file including all measuring point information to the debugging management machine 220 after generating the replacement data record file of all measuring point information. The debugging management machine 220 determines the point-to-point results of the corresponding measuring points according to the replacement data record file and the replacement command at the corresponding measuring point to generate a point-to-point debugging report including the point-to-point results of all measuring point information.

[0043] Specifically, in the embodiment of the present application, in order to better simulate the operating environment of the actual substation, a simulation measurement and control device 230 and a mirror monitoring host 210 are established on the server based on the digital twin technology. Digital twins are also called digital mapping and digital mirroring, which can virtually build a digital model of the equipment and perform simulation testing and verification on it.

[0044] like Figure 2 As shown, the debugging management machine 220, the simulation measurement and control device 230 and the mirror monitoring host 210 can be respectively set on different servers to more realistically simulate the operating environment of the actual substation. Of course, the debugging management machine 220, the simulation measurement and control device 230 and the mirror monitoring host 210 can also be set on the same server, and this application does not make any limitation.

[0045] Specifically, in an embodiment of the present application, the mirror monitoring host 210 can also be set on a virtual machine, and the simulation measurement and control device 230 can be set on the debugging management machine 220, so that the staff can build an offline mirror environment more quickly. Moreover, setting the mirror monitoring host 210 on a virtual machine can facilitate the deployment of multiple independent monitoring system software on the mirror monitoring host 210.

[0046] Furthermore, the debugging management machine 220 is also used to receive the second measuring point information from the simulation measurement and control device 230, and can generate a replacement result file based on the first measuring point information and the second measuring point information. According to the replacement command, replacement result and replacement data record file, the point-to-point result of the first measuring point information can be determined more accurately to ensure the reliability of the point-to-point result, and it is also convenient for staff to investigate the reasons for the failure of the measuring point to point, thereby improving the efficiency of debugging the actual substation operating environment.

[0047] Figure 3 1 is a schematic flow chart of the automatic point-to-point process of the automatic point-to-point system of the substation provided by the embodiment of the present application. Figure 3 The automatic point-to-point process of the automatic point-to-point system of the substation provided by the embodiment of the present application is described. When the automatic point-to-point system is in point-to-point, it includes the following steps:

[0048] Step 301: The debugging management machine sends a first file request message to the mirror monitoring host.

[0049] Step 302: The mirror monitoring host sends a first file to the debugging management machine.

[0050] Among them, the first file is a database information file or a screen information file. The mirror monitoring host can generate a database information file and a screen information file, and the database information file and the screen information file are the same as the database information file and the screen information file generated in the monitoring host. The first file request message is used to request the mirror monitoring host to send the first file to the debugging management machine. After receiving the file request message, the mirror monitoring host sends the first file to the debugging management machine through the IEC61850 file service.

[0051] Step 303: The debugging management machine determines information of multiple measuring points according to the first file.

[0052] Specifically, multiple measuring point information is determined according to the telemetry data or telesignaling data selected by the user in the first file through the human-computer interaction interface.

[0053] Step 304: the debugging management machine sends a command to replace the first measuring point information to the simulation measurement and control device.

[0054] Among them, the debugging management machine connects to the simulation measurement and control device where the corresponding measurement point in the first measurement point information is located, and after the simulation measurement and control device is connected, a replacement command of the first measurement point information is sent to the simulation measurement and control device. The first measurement point information is any one of a plurality of measurement point information, and the debugging management machine sends a plurality of replacement commands corresponding to the plurality of measurement point information to the corresponding simulation measurement and control device one by one. Specifically, the debugging management machine can send the replacement commands corresponding to the measurement point information point by point according to the order of the plurality of measurement point information.

[0055] Step 305: The simulation measurement and control device sends a replacement command confirmation message to the debugging management machine.

[0056] Specifically, after receiving the replacement command of the first measuring point information, the simulation measurement and control device will send a replacement command confirmation message to the debugging management machine, indicating to the debugging management machine that the replacement command of the first measuring point information has been received.

[0057] Step 306: The simulation measurement and control device determines a second measurement point message according to the first measurement point information and the replacement command.

[0058] Step 307: The simulation measurement and control device sends a second measurement point message to the mirror monitoring host.

[0059] Specifically, the replacement command is used to replace the first measurement point information. After receiving the replacement command from the debugging management machine, the simulation measurement and control device responds to the replacement operation, replaces the first measurement point message, generates a second measurement point message, and reports the second measurement point information to the mirror monitoring host.

[0060] Step 308: The mirror monitoring host generates a replacement data record file of the first measuring point information according to the second measuring point information.

[0061] Step 309: the mirror monitoring host sends the replacement data record file to the debugging management machine.

[0062] Step 310: The debugging management machine determines the alignment result of the first measuring point information according to the replacement command and the replacement data record file.

[0063] Specifically, the mirror monitoring host generates a replacement data record file of the corresponding measuring point (i.e., the first measuring point information) according to the second measuring point information. The replacement data record file can indicate the replacement result of the corresponding measuring point. After generating the replacement data record file, the mirror monitoring host sends the replacement data record file to the debugging management machine. The debugging management machine determines the point-to-point result of the first measuring point information by comparing the replacement command and the replacement data record file. If the replacement command and the replacement data record file are consistent, the first measuring point information is marked as successfully matched. If the replacement command and the replacement data record file are inconsistent, the first measuring point information is marked as failed to match. Here, if the debugging management machine does not receive the second measuring point message sent by the simulation measurement and control device within the preset time length after receiving the replacement command confirmation message from the simulation measurement and control device, the first measuring point information is marked as failed to match.

[0064] Furthermore, the debugging management machine can also obtain the second measuring point information from the simulation measurement and control device, and generate a replacement result file of the corresponding measuring point based on the first measuring point information and the second measuring point information, wherein the replacement result file and the replacement data record file can both be understood as the information change result file at the corresponding measuring point in the first measuring point information, except that one is directly generated by the debugging management machine, and the other is obtained by the debugging management machine from the mirror monitoring host. The debugging management machine can more accurately determine the point-to-point result of the first measuring point information by comparing the replacement command, the replacement result file, and the replacement data record file, which is also convenient for the staff to investigate the cause of the point-to-point failure and improve the debugging efficiency. For example, the replacement command and the replacement data record file are inconsistent, but the replacement result file and the replacement data record file are consistent, which at least indicates that there is no abnormality in the communication.

[0065] Among them, the point-to-point process of each measuring point information in the multiple measuring point information is similar to the point-to-point process of the first measuring point information. After the debugging management machine determines the point-to-point result of each measuring point information in the multiple measuring point information, the debugging management machine can generate a point-to-point debugging report containing the point-to-point results of all measuring point information, so that the staff can adjust the configuration of the monitoring host in the actual substation environment according to the point-to-point debugging report.

[0066] Step 311: the debugging management machine sends a cancel replacement command to the simulation measurement and control device.

[0067] Step 312: The simulation measurement and control device sends a cancellation and replacement result (success or failure) to the debugging management machine.

[0068] Specifically, after the debugging management machine sends the replacement command of all measurement point information to the simulation measurement and control device, it sends a cancel replacement command to the simulation measurement and control device. If it receives a successful cancellation replacement operation message from the simulation measurement and control device, it ends the point matching. If it receives a failed cancellation replacement operation message from the simulation measurement and control device, it sends the cancel replacement command again and restarts the simulation measurement and control device to ensure that the cancellation replacement operation is successful.

[0069] Exemplarily, the mirror monitoring host generates a database information file, which includes telemetry data (measurement point information) or telesignaling data (measurement point information) of the substation equipment at each node reported by the measurement and control device. After the debugging management machine obtains the database information file from the mirror monitoring host, it can determine multiple measurement point information according to the telemetry data or telesignaling data selected by the user in the database information file, and after establishing a connection with the simulation measurement and control device corresponding to the first measurement point information (any one of the multiple measurement point information), send a replacement command for the first measurement point information to the corresponding simulation measurement and control device. After receiving the replacement command, the simulation measurement and control device can replace the original information (telemetry value or telesignaling value) at the corresponding measurement point with the information in the replacement command, triggering the information change at the corresponding measurement point to generate the first measurement point information. The mirror monitoring host can generate a replacement data record file of the corresponding measuring point (i.e., the first measuring point information) according to the second measuring point information, and send the replacement data record file to the debugging management machine. After receiving the replacement data record file, the debugging management machine can determine the alignment result of the first measuring point information by comparing the replacement command and the replacement data record file. If the replacement command is consistent with the replacement data record file, it means that the first measuring point information in the monitoring host is consistent with the first measuring point information collected by the measurement and control device, and the first measuring point information alignment is marked as successful. If the replacement command is inconsistent with the replacement data record file, it means that the first measuring point information in the monitoring host is inconsistent with the first measuring point information collected by the measurement and control device, and the first measuring point information alignment is marked as failed. After determining the alignment results of all measuring point information, the debugging management machine generates a point-to-point debugging report containing the alignment results of the measuring point information.

[0070] The staff can directly adjust the configuration of the monitoring host according to the point-to-point debugging report. For example, if the first measuring point information fails to be aligned, the staff will find the cause of the point-to-point failure according to the point-to-point debugging report. If there is a problem with the modeling of the database information file, the error information in the database information file will be modified, and the monitoring host will regenerate the database information file. If the corresponding measuring point does not support replacement (such as an alarm signal), the measuring point will be ignored and no processing is required. If the communication is abnormal, the communication abnormality will be repaired. After checking the information of all measuring points that failed to be aligned, the automatic point-to-point system provided in the embodiment of the present application is used to re-perform automatic point-to-point.

[0071] Specifically, the replacement value in the replacement command is set according to a preset rule. For example, the telesignaling is opened and closed point by point, and the telemetering value is increased or decreased point by point. That is, if the telesignaling value of the XX disconnector is 0 (indicating that the XX disconnector is currently in the open position), then the replacement value in the replacement command can be set to 1 (indicating that the XX disconnector is in the closed position); if the telesignaling value of the XX disconnector in the monitoring host is 1, then the replacement value in the replacement command can be set to 0; if the replacement value in the replacement command corresponding to the current measuring point is 35kV, then the replacement value in the replacement command corresponding to the next measuring point can be 40kV, and the replacement value in the replacement command corresponding to the next measuring point can be 45kV.

[0072] Figure 4 Schematic block diagram of the debugging management machine of the substation automatic point-to-point system provided in the embodiment of the present application. Figure 4 As shown, the debugging management machine 400 includes a determination module 410 , a sending module 420 and a receiving module 430 .

[0073] Among them, the determination module 410 is used to determine multiple measuring point information according to the database information file or the screen information file, the sending module 420 is used to send a replacement command of the first measuring point information to the simulation measurement and control device, the first measuring point information is any one of the multiple measuring point information, the receiving module 430 is used to receive the replacement data record file, the determination module 410 is also used to determine the point-to-point result of the first measuring point information according to the replacement data record file and the replacement command, and to generate a point-to-point debugging report including the point-to-point results of multiple measuring point information, and the point-to-point debugging report is used to adjust the configuration of the monitoring host in the actual substation operation environment.

[0074] Optionally, the determination module 410 is further specifically configured to mark the first measurement point information alignment as successful if the replacement command and the replacement data record file are consistent; and mark the first measurement point information alignment as failed if the replacement command and the replacement data record file are inconsistent.

[0075] Optionally, the receiving module 430 is also used to receive second measuring point information from the simulation measurement and control device to generate a replacement result file of the first measuring point information, and the determining module 410 is also used to determine the point result of the first measuring point information according to the replacement command, the replacement result file and the replacement data record file.

[0076] Optionally, when the second measuring point information is not received within a preset time period after the replacement command is sent, the determination module 410 is used to mark the first measuring point information as a point matching failure.

[0077] Optionally, the sending module 420 is further used to send a cancel replacement command to the simulation measurement and control device, and the receiving module 430 is further used to receive a cancel replacement command result from the simulation measurement and control device.

[0078] Optionally, the first measuring point information is telemetry data or telesignaling data.

[0079] Figure 5 Schematic block diagram of the mirror monitoring host of the substation automatic point-to-point system provided in the embodiment of the present application. Figure 5 As shown, the mirror monitoring host 500 includes a receiving module 510 and a sending module 520 .

[0080] Among them, the receiving module 510 is used to receive a first file request message from the debugging management machine, the first file request message is used to request the mirror monitoring host 500 to send a first file, the first file is a database information file or a screen information file, the sending module 520 is used to send the first file to the debugging management machine, the receiving module 510 is also used to receive the second measuring point information, and can generate a replacement data recording file of the first measuring point information according to the second measuring point information, and the sending module 520 is also used to send the replacement data recording file to the debugging management machine.

[0081] Figure 6 Schematic block diagram of the simulation measurement and control device of the substation automatic point-to-point system provided in the embodiment of the present application. Figure 6 As shown, the simulation measurement and control device 600 includes a receiving module 610 , a determining module 620 and a sending module 630 .

[0082] The receiving module 610 is used to receive a replacement command of the first measuring point information from the debugging management machine, the determining module 620 is used to determine the second measuring point information according to the first measuring point information and the replacement command, and the sending module 630 is used to send the second measuring point information to the mirror monitoring host.

[0083] Optionally, the sending module 630 is further configured to send the second measuring point information to the debugging management machine.

[0084] Optionally, the receiving module 610 is further used to receive a cancel replacement command from the debugging management machine, and the sending module 630 is further used to send a cancel replacement command result to the debugging management machine.

[0085] Figure 7 It is a structural block diagram of an electronic device in the substation automatic point-to-point system provided in an embodiment of the present application. The electronic device can be the aforementioned debugging management machine, the aforementioned mirror monitoring host, or the aforementioned simulation measurement and control device. The electronic device includes: a processor 710, a memory 720, and a communication interface 730. Among them, the memory 720 stores instructions, the processor 710 is used to execute the instructions in the memory 720, and the processor 710 is also used to control the communication interface 730 to communicate with the outside world.

[0086] The electronic device may be a smart device such as a desktop computer, a notebook, or a palmtop computer. Figure 7 This is merely an example of an electronic device and does not constitute a limitation on the electronic device. The electronic device may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, it may also include input and output devices, network access devices, etc.

[0087] It should be understood that in the embodiments of the present application, the processor may be a central processing unit (CPU), and the processor may also be other general-purpose processors, digital signal processors (DSP), application specific integrated circuits (ASIC), field programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or the processor may also be any conventional processor, etc.

[0088] It should also be understood that the memory in the embodiments of the present application may be a volatile memory or a non-volatile memory, or may include both volatile and non-volatile memories. Among them, the non-volatile memory may be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), or a flash memory. The volatile memory may be a random access memory (RAM), which is used as an external cache. By way of example and not limitation, many forms of random access memory (RAM) are available, such as static RAM (SRAM), dynamic random access memory (DRAM), synchronous DRAM (SDRAM), double data rate synchronous dynamic random access memory (DDR SDRAM), enhanced synchronous dynamic random access memory (ESDRAM), synchronous link dynamic random access memory (SLDRAM), and direct rambus RAM (DR RAM).

[0089] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0090] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0091] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0092] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0093] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.

[0094] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.

[0095] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. An automatic point-to-point system for substations based on digital twin technology, characterized in that: include: A mirror monitoring host, a debugging management machine and a simulation measurement and control device, wherein the mirror monitoring host is a monitoring host in the mirrored actual substation operating environment, and the simulation measurement and control device is a simulation of the measurement and control device in the actual substation operating environment; The mirror monitoring host is used to send a first file to the debugging management machine, where the first file is a database information file or a screen information file; The debugging management machine is used to determine a plurality of measuring point information according to the first file, and send a replacement command of the first measuring point information to the simulation measurement and control device, wherein the first measuring point information is any one of the plurality of measuring point information; The simulation measurement and control device is used to replace the first measurement point information according to the replacement command to generate second measurement point information, and send the second measurement point information to the mirror monitoring host; The mirror monitoring host is further used to generate a replacement data recording file of the first measuring point information according to the second measuring point information, and send the replacement data recording file to the debugging management machine; The debugging management machine is used to determine the point-to-point result of the first measuring point information according to the replacement command and the replacement data record file, and to generate a point-to-point debugging report including the point-to-point results of the multiple measuring point information, and the point-to-point debugging report is used to adjust the configuration of the monitoring host in the actual substation operating environment.

2. The automatic point-to-point system according to claim 1, characterized in that: The mirror monitoring host, the simulation measurement and control device and the debugging management machine are respectively arranged on different servers.

3. The automatic point-to-point system according to claim 1, characterized in that: The mirror monitoring host is arranged on a virtual machine, and the simulation measurement and control device is arranged on the debugging management machine.

4. The automatic point-to-point system according to any one of claims 1 to 3, characterized in that: The mirror monitoring host and the simulation measurement and control device are established on the server based on the digital twin technology.

5. The automatic point-to-point system according to any one of claims 1 to 3, characterized in that: The debugging management machine is used to determine the point result of the first measuring point information according to the replacement command and the replacement data record file, including: If the replacement command and the replacement data record file are consistent, then the first measurement point information is marked as successfully matched; If the replacement command and the replacement data record file are inconsistent, the first measurement point information is marked as failed.

6. The automatic point-to-point system according to any one of claims 1 to 3, characterized in that: The debugging management machine is also used to receive the second measuring point information from the simulation measurement and control device to generate a replacement result file of the first measuring point information, and determine the point result of the first measuring point information according to the replacement command, the replacement result file and the replacement data record file.

7. The automatic point-to-point system according to any one of claims 1 to 3, characterized in that: The debugging management machine is further used to mark the first measuring point information as failed when the second measuring point information is not received within a preset time period after sending the replacement command.

8. The automatic point-to-point system according to any one of claims 1 to 3, characterized in that: The debugging management machine is also used to send a cancel replacement command to the simulation measurement and control device and receive a cancel replacement command result from the simulation measurement and control device.

9. The automatic point-to-point system according to any one of claims 1 to 3, characterized in that: After determining the point matching results of the plurality of measuring point information, the debugging management machine sends a cancel replacement command to the simulation measurement and control device, and restarts the simulation measurement and control device.

10. The automatic point-to-point system according to any one of claims 1 to 3, characterized in that: The first measuring point information is telemetry data or telesignaling data.