AI Technical Summary
In tight gas reservoirs, the differences in fluids, reservoir properties and production systems of multiple stacks and different production layers have increased the difficulty of determining targets of directional wells. The existing methods cannot consider controlling the reserves and gas discharge radius at the same time, making it difficult to effectively develop the clusters. Well group.
A method for calculating the coordinate set of targets of directional wells is proposed. Through the gas seepage principle and linear fitting relationship, the control reserves and gas discharge radius formula of the production layer are derived, and the design starting point production layer is determined, and the coordinate relationship of the design radius and the vertical well target target is determined. Calculate the coordinate set of targets of directional wells.
This method considers the differences in the control reserves and gas discharge radius of different production layers, provides theoretical guidance, provides an effective development plan for the adjustment and optimization of the well network of tight gas reservoirs, and improves development efficiency.
Smart Images

Figure QLYQS_1 
Figure QLYQS_2 
Figure QLYQS_4
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of oil and gas field development, and in particular to a method for calculating a directional well target point coordinate set. Background Art
[0002] Tight gas reservoirs generally show characteristics such as multi-layer superposition, low single well production, and complex surface environment. In order to improve development efficiency, cluster well groups are often used for development. Cluster well groups usually consist of one vertical well and multiple directional wells. The vertical well is used as a skeleton well, and the directional well target is determined by the vertical well target. Methods for determining directional well targets include the production capacity equation method, the economic limit method, and the empirical analogy method, but different methods have certain limitations and cannot be fully applied to tight gas reservoirs.
[0003] In multi-layered tight gas reservoirs, the differences in fluids, reservoir properties, and production systems lead to different gas leakage radii and controlled reserves in different producing layers, making it more difficult to determine the directional well targets in different producing layers. Therefore, establishing a directional well target calculation method that simultaneously considers controlled reserves and gas leakage radius can provide theoretical guidance for well network adjustment and optimization of tight gas reservoirs. Summary of the invention
[0004] The present invention aims to solve the above problems and propose a method for calculating a set of target point coordinates of a directional well.
[0005] The technical solution of the present invention is:
[0006] A method for calculating a set of target coordinates of a directional well. When a vertical well in an n-layer combined production gas reservoir is produced at a fixed production rate, the method for calculating the set of target coordinates of the directional well is as follows:
[0007] Step 1: Obtain the controlled reserves of any production layer j;
[0008] The specific process is:
[0009] According to the gas seepage principle, when a vertical well in a combined production gas reservoir with n layers is producing at a fixed rate, the seepage equation of any production layer j is:
[0010]
[0011] Where: wfj (t) is the simulated bottom hole flowing pressure of the production layer j at time t, MPa 2 / (mPa·s);
[0012] ψ ij is the pseudo original formation pressure of production layer j, MPa 2 / (mPa·s);
[0013] p sc is standard pressure, MPa;
[0014] T j is the gas reservoir temperature of the production layer j, K;
[0015] is the production splitting coefficient of production layer j, dimensionless;
[0016] q sc is the gas production at the wellhead, m 3 / d;
[0017] T sc is standard temperature, K;
[0018] K j is the permeability of production layer j, 10 -3 μm 2 ;
[0019] h j is the thickness of the production layer j, m;
[0020] r ej is the gas release radius of production layer j, m;
[0021] r w is the wellbore radius, m;
[0022] S gij is the original gas saturation of production layer j, dimensionless;
[0023] p ij is the original formation pressure of production layer j, MPa;
[0024] Z ij is the original deviation coefficient of production layer j, dimensionless;
[0025] G j is the controlled reserves of production layer j, j = 1,…,n,m 3 ;
[0026] t is the production time, d;
[0027] μ j is the gas viscosity of production layer j, mPa·s;
[0028] C gj is the gas compressibility coefficient of production layer j, MPa -1 ;
[0029] Formula (1) takes adjacent production times t and t+1, and uses the high-pressure physical property parameters under the original conditions to replace the high-pressure physical property parameters at times t and t+1, and derives:
[0030]
[0031] Where: pwfj (t) is the bottom hole flowing pressure of the production layer j at time t, MPa;
[0032] p wfj (t+1) is the bottom hole flowing pressure of the production layer j at t+1, MPa;
[0033] C gij is the original gas compressibility coefficient of production layer j, MPa -1 ;
[0034] The p wfj (t) and q sc The linear relationship between the fitted wfj (t) = a j q sc +b j Substituting into formula (2), we can get the controlled reserves of production layer j:
[0035]
[0036] Where: a j is the slope of the linear fitting relationship of production layer j, a j <0.
[0037] Step 2: Obtain the gas release radius of any production layer j;
[0038] The specific process is:
[0039] Substituting formula (3) into the volumetric reserve calculation formula of natural gas, the calculation formula for the gas leakage radius of production layer j is obtained:
[0040]
[0041] Where: is the porosity of production layer j, dimensionless.
[0042] Step 3: Determine the design starting point production layer; take the production layer corresponding to the maximum controlled reserves as the design starting point production layer; obtain the controlled reserves and gas leakage radius of the design starting point production layer;
[0043] The specific process is:
[0044] The production layer corresponding to the maximum controlled reserves is taken as the design starting point production layer; the controlled reserves of the design starting point production layer s satisfy:
[0045]
[0046] Where: G s is the controlled reserves of the production layer at the design starting point, m 3 ;
[0047] s is the designed starting point production layer;
[0048] For the maximum controlled reserve, m 3 ;
[0049] Determine the production layer s at the design starting point, the controlled reserve G of the production layer s at the design starting point s and the drainage radius r es .
[0050] Step 4: Based on the principle that the design radius r of production layer j ej (D) ≤ the design radius r of production layer j + 1 e(j+1) (D) , starting from the production layer s at the design starting point, and using the drainage radius of the production layer s at the design starting point, sequentially determine the design radii of each production layer;
[0051] (1) When j = s
[0052] The production layer j is the production layer s at the design starting point, then the design radius r of the production layer j ej (D) = the drainage radius r of the production layer s at the design starting point es ; That is, it satisfies:
[0053] r ej (D) = r es (6)
[0054] In the formula: r ej (D) is the design radius of production layer j, m;
[0055] r es is the drainage radius of the production layer s at the design starting point, m;
[0056] (2) When j < s
[0057] If the drainage radius r of production layer j ej ≤ the drainage radius r of the production layer s at the design starting point es , then the design radius r of the production layer j ej (D) = the drainage radius r of the production layer j ej ; If the drainage radius r of the production layer j ej > the drainage radius r of the production layer s at the design starting point es , then the design radius r of the production layer j ej (D) = the drainage radius r of the production layer s at the design starting point es ; That is, it satisfies:
[0058]
[0059] (3) When j > s
[0060] If the gas leakage radius r of the production layer j ej ≤ gas leakage radius r of the designed starting point production layer s es , then the design radius r of the production layer j is ej (D) = gas leakage radius r of the designed starting point production layer s es ; If the gas leakage radius r of the production layer j ej >Design starting point production layer s gas leakage radius r es , then the design radius r of the production layer j is ej (D) = gas leakage radius r of production layer j ej ; that is, satisfy:
[0061]
[0062] Step 5: Based on the designed radius of each production layer and the relationship between the designed radius and the vertical well target coordinates, the target coordinate set D of the directional well is obtained. j ;
[0063] The specific process is:
[0064]
[0065] Where: D j is the target coordinate set of the directional well in the production layer j;
[0066] (x j (D) ,y j (D) ,z j (D) ) is the target coordinate of the directional well in the production layer j;
[0067] (x j ,y j ,z j ) is the target coordinate of the vertical well in the production layer j;
[0068] The target coordinate set D of the directional well in the production layer j j is (x j ,y j ,z j ) is the center of the circle, 2r ej (D) The circumference of a circle with radius .
[0069] The technical effects of the present invention are:
[0070] The present invention establishes a method for calculating the target point coordinate set of a directional well, taking into account the differences in the controlled reserves and drainage radii of different pay zones, proposing the idea of using the pay zone with the largest controlled reserves as the starting pay zone for design, enriching the design theory of hybrid well patterns, and having guiding significance for the effective development of tight gas reservoirs. Detailed implementation mode
[0071] A method for calculating the target point coordinate set of a directional well is as follows:
[0072] Step 1: Calculate the controlled reserve G of each pay zone through formula (3) j ;
[0073]
[0074] Step 2: Calculate the drainage radius r of each pay zone through formula (4) ej ;
[0075]
[0076] Step 3: Determine the starting pay zone s for design, the controlled reserve G of the starting pay zone s s and the drainage radius r es ;
[0077]
[0078] Step 4: Calculate the design radius of each pay zone respectively;
[0079] (1) When j = s, the pay zone j is the starting pay zone s for design, then the design radius r of the pay zone j ej (D) = the drainage radius r of the starting pay zone s es ; that is, it satisfies:
[0080] r ej (D) = r es (6)
[0081] (4) When j < s
[0082] If the drainage radius r of the pay zone j ej ≤ the drainage radius r of the starting pay zone s es , then the design radius r of the pay zone j ej (D) = the drainage radius r of the pay zone j ej ; if the drainage radius r of the pay zone j ej > the drainage radius r of the starting pay zone s es , then the design radius r of the pay zone j ej (D) = the drainage radius r of the starting pay zone ses ; that is, satisfy:
[0083]
[0084] (5) When j>s
[0085] If the gas leakage radius r of the production layer j ej ≤ gas leakage radius r of the designed starting point production layer s es , then the design radius r of the production layer j is ej (D) = gas leakage radius r of the designed starting point production layer s es ; If the gas leakage radius r of the production layer j ej >Design starting point production layer s gas leakage radius r es , then the design radius r of the production layer j is ej (D) = gas leakage radius r of production layer j ej ; that is, satisfy:
[0086]
[0087] Step 5: Use formula (9) to obtain the target coordinate set D of the directional well in all production layers j ;
[0088]
[0089] Specific experimental example: take a five-layer superimposed gas reservoir and a vertical well with fixed production as an example.
[0090] The parameters of each production layer are as follows:
[0091] When j=1: initial gas saturation S gij The output split coefficient is 0.65. j The original gas compression coefficient C is 9.10%. gij is 0.05119, the slope a of the linear fitting relationship j =-0.00000011, gas reservoir temperature T j is 366.57, the original deviation coefficient Z ij The porosity is 0.9468. is 0.06, thickness h j =5, the original formation pressure p ij is 20, the target coordinates of the vertical well in the production layer j (x j ,y j ,z j ) is (19412069.80,3971464.41,-1770.11);
[0092] When j = 2: initial gas saturation S gijThe yield splitting coefficient is 0.7. The original gas compression coefficient C is 6.56%. gij is 0.048162, and the slope a of the linear fitting relationship j is -0.00000009, gas reservoir temperature T j is 367.23, the original deviation coefficient Z ij The porosity is 0.949. is 0.05, thickness h j =4, the original formation pressure p ij 20.3, the target coordinates of the vertical well in the production layer j (x j ,y j ,z j ) is (19412069.80,3971464.41,-1817.16);
[0093] When j=3: initial gas saturation S gij The yield splitting coefficient is 0.8. The original gas compression coefficient C is 54.00%. gij is 0.044879, and the slope a of the linear fitting relationship j =-0.00000023, gas reservoir temperature T j is 368.42, the original deviation coefficient Z ij The porosity is 0.952. is 0.08, thickness h j = 10, the original formation pressure p ij is 20.5, the target coordinates of the vertical well in the production layer j (x j ,y j ,z j ) is (19412069.80,3971464.41,-1902.69);
[0094] When j=4: initial gas saturation S gij 0.7, production split coefficient◇ j The original gas compression coefficient C is 19.49%. gij is 0.04236, and the slope a of the linear fitting relationship j =-0.00000019, gas reservoir temperature T j is 369.39, the original deviation coefficient Z ij The porosity is 0.9553. is 0.07, thickness h j 6. The original formation pressure p ij 21, the target coordinates of the vertical well in the production layer j (x j ,y j ,zj ) is (19412069.80,3971464.41,-1971.56);
[0095] When j=5: initial gas saturation S gij 0.75, production split coefficient◇ j The original gas compression coefficient C is 10.86%. gij is 0.039689, and the slope a of the linear fitting relationship j =-0.00000021, gas reservoir temperature T j is 369.77, the original deviation coefficient Z ij The porosity is 0.9593. is 0.06, thickness h j 3. The original formation pressure p ij is 21.5, the target coordinates of the vertical well in the production layer j (x j ,y j ,z j ) is (19412069.80,3971464.41,-1998.65).
[0096] Step 1: Calculate the controlled reserves G of each production layer using formula (3) j ;
[0097] Calculation shows that: when j = 1, G j =10504139.21m 3 ; When j = 2, G j =10589749.18m 3 ; When j = 3, G j =41851354.90m 3 ; When j = 4, G j =16947822.86m 3 ; When j = 5, G j =9769873.71m 3 .
[0098] Step 2: Calculate the gas leakage radius r of each production layer using formula (4) ej ;
[0099] Calculation shows that: when j = 1, r ej =331.70m; when j=2, r ej =390.95m; when j=3, r ej =362.89m; when j=4, r ej =337.66m; when j=5, r ej =374.88m.
[0100] Step 3: Determine the designed starting point production layer s and the controlled reserves G of the designed starting point production layer s by formula (5) s And the deflation radius r es ;
[0101] When j = 3, G j =41851354.90m 3 Satisfy formula (5);
[0102] That is, the starting production layer s is designed to be production layer 3; its G s =41851354.90m 3 , r es =362.89m.
[0103] Step 4: Calculate the design radius of each production layer respectively; where j ranges from 1 to 5;
[0104] (1) When j = s = 3, it can be seen from formula (6) that the design radius r of the production layer j is ej (D) = gas leakage radius r of the designed starting point production layer s es =362.89m;
[0105] (2) When j = 1 and 2, j < 3, it can be seen from formula (7):
[0106] When j = 1, the gas leakage radius r of the production layer 1 e1 =331.70m<the gas leakage radius r of the designed starting point production layer s es =362.89, so the design radius r of production layer 1 e1 (D) = gas leakage radius r of production layer 1 e1 =331.70m;
[0107] When j = 2, the gas leakage radius r of the production layer 2 e2 =390.95m> Design starting point production layer s gas leakage radius r es =362.89, so the design radius r of production layer 2 e2 (D) = gas leakage radius r of the designed starting point production layer s es =362.89m;
[0108] (3) When j = 4 and 5, j>3, it can be seen from formula (8);
[0109] When j = 4, the gas leakage radius r of the production layer 4 e4 =337.66m<the gas leakage radius r of the designed starting point production layer s es =362.89, so the design radius r of production layer 4 e4 (D)= gas leakage radius r of the designed starting point production layer s es =362.89m;
[0110] When j=5, the gas leakage radius r of the production layer 5 e5 =374.88m> gas leakage radius r of the designed starting point production layer s es =362.89, so the design radius r of production layer 5 e5 (D) = gas leakage radius r of production layer 5 e1 =374.88m.
[0111] Step 5: Calculate the target coordinate set of the directional well. Use formula (9) to obtain the target coordinate set D of the directional well in all production layers. j :
[0112] When j=1,
[0113]
[0114] When j = 2,
[0115]
[0116] When j=3,
[0117]
[0118] When j=4,
[0119]
[0120] When j=5,
[0121]
Claims
1. A method for calculating a set of target coordinates of a directional well, characterized in that: When a vertical well produces at a fixed production rate in an n-layer combined gas reservoir, the calculation method of the target point coordinate set of the directional well is as follows: Step 1: Obtain the controlled reserves of any production layer j; Step 2: Obtain the drainage radius of any production layer j; Step 3: Determine the starting production layer of the design; Take the production layer corresponding to the maximum controlled reserves as the starting production layer of the design; Obtain the controlled reserves and drainage radius of this starting production layer of the design; Step 4: Based on the principle that the design radius of production layer j ≤ the design radius of production layer j + 1, starting from the starting production layer of the design, use the drainage radius of the starting production layer of the design to sequentially determine the design radii of each production layer; (1) When production layer j = the starting production layer of the design, then the design radius of production layer j = the drainage radius of the starting production layer of the design; (2) When production layer j < design starting point production layer, if the gas leakage radius of production layer j j ≤ the gas leakage radius of the production layer at the design starting point, then the design radius of production layer j = the gas leakage radius of production layer j; If the drainage radius of production layer j > the drainage radius of the starting production layer of the design, then the design radius of production layer j = the drainage radius of the starting production layer of the design; (3) When production layer j > the starting production layer of the design, if the drainage radius of production layer j ≤ the drainage radius of the starting production layer of the design, then the design radius of production layer j = the drainage radius of the starting production layer of the design; If the drainage radius of production layer j > the drainage radius of the starting production layer of the design, then the design radius of production layer j = the drainage radius of production layer j; Step 5: According to the design radius of each production layer and the relationship between the design radius and the vertical well target coordinates, the target coordinate set of the directional well is obtained, which is the design radius r of the production layer j with the target coordinate of the directional well in the production layer j as the center. ej (D) The circumference of a circle is twice the radius.
2. The method for calculating the coordinate set of target points of a directional well according to claim 1, characterized in that: The specific calculation process of the controlled reserves of any production layer j in the above Step 1 is: Where: G j is the controlled reserves of production layer j, j = 1,…,n,m 3 ; S gij is the original gas saturation of production layer j, dimensionless; C gij is the original gas compressibility coefficient of production layer j, MPa -1 ; ◇ j is the production splitting coefficient of production layer j, 0≤◇ j ≤1, dimensionless; a j is the slope of the linear fitting relationship of production layer j, a j <0.
3. The method for calculating the coordinate set of target points of a directional well according to claim 2, characterized in that: The specific calculation process of the drainage radius of any production layer j in the above Step 2 is: Where: r ej is the gas release radius of production layer j, m; p sc is standard pressure, MPa; T j is the gas reservoir temperature of the production layer j, K; Z ij is the original deviation coefficient of production layer j, dimensionless; T sc is standard temperature, K; is the porosity of production layer j, dimensionless; h j is the thickness of the production layer j, m; p ij is the original formation pressure of production layer j, MPa.
4. The method for calculating the coordinate set of target points of a directional well according to claim 3, characterized in that: The specific process of the above Step 3 is: Take the production layer corresponding to the maximum controlled reserves as the starting production layer of the design; the controlled reserves of the starting production layer s of the design satisfy: Where: G s is the controlled reserves of the production layer at the design starting point, m 3 ; s is the starting production layer of the design; is the maximum controlled reserve, m 3 ; Determine the designed starting point production layer s and the controlled reserves G of the designed starting point production layer s by formula (5): s and the gas leakage radius r of the designed starting point production layer s es .
5. The method for calculating the coordinate set of target points of a directional well according to claim 4, characterized in that: The specific process of the above Step 4 is: The design radius r of the production layer j ej (D) ≤ Design radius r of production layer j+1 e(j+1) (D) As a principle, starting from the design starting point production layer s, the design radius of each production layer is determined in turn by using the gas release radius of the design starting point production layer s; (1) When j = s The production layer j is the design starting point production layer s, then the design radius r of production layer j ej (D) = gas leakage radius r of the designed starting point production layer s es ; that is, satisfy: r ej (D) =r es (6) Where: r ej (D) is the design radius of production layer j, m; r es is the gas release radius of the designed starting point production layer s, m; (2) When j < s If the gas leakage radius r of the production layer j ej ≤ gas leakage radius r of the designed starting point production layer s es , then the design radius r of the production layer j is ej (D) = gas leakage radius r of production layer j ej ; If the gas leakage radius r of the production layer j ej >Design starting point production layer s gas leakage radius r es , then the design radius r of the production layer j is ej (D) = gas leakage radius r of the designed starting point production layer s es ; that is, satisfy: (3) When j > s If the gas leakage radius r of the production layer j ej ≤ gas leakage radius r of the designed starting point production layer s es , then the design radius r of the production layer j is ej (D) = gas leakage radius r of the designed starting point production layer s es ; If the gas leakage radius r of the production layer j ej >Design starting point production layer s gas leakage radius r es , then the design radius r of the production layer j is ej (D) = gas leakage radius r of production layer j ej ; that is, satisfy:
6. The method for calculating the coordinate set of target points of a directional well according to claim 5, characterized in that: The specific process of the above Step 5 is: According to the design radius of each production layer and the relationship between the design radius and the vertical well target coordinates, the target coordinate set D of the directional well is obtained. j : Where: D j is the target coordinate set of the directional well in the production layer j; (x j (D) ,y j (D) ,z j (D) ) is the target coordinate of the directional well in the production layer j; (x j ,y j ,z j ) is the target coordinate of the vertical well in the production layer j; The target coordinate set D of the directional well in the production layer j j is (x j ,y j ,z j ) is the center of the circle, 2r ej (D) The circumference of a circle with radius .
Citation Information
Patent Citations
Productivity prediction model and productivity sensitivity analysis method for multi-section fractured horizontal well in low-permeability tight gas reservoir
CN111236908A
Method for calculating gas release radius of fixed-production gas well based on high-pressure physical property parameters
CN114611430A