Base station, terminal and method in communication system

By generating and mapping pseudo noise sequences for PBCH resource management in 3GPP-NR system, the problem of radio resource acquisition and management under different usage conditions is solved, and efficient, unified and seamless resource management is achieved, suitable for enhancing mobile broadband , ultra-reliable low latency and large-scale machine type communication scenarios.

CN115567180BActive Publication Date: 2024-12-03SAMSUNG ELECTRONICS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211006754.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2018-03-06
Filing Date
2018-03-09
Publication Date
2024-12-03
Estimated Expiration
2038-03-09

AI Technical Summary

Technical Problem

Next-generation cellular systems (such as 3GPP-NR) are difficult to achieve efficient and unified radio resource acquisition and management under different usage conditions (enhanced mobile broadband, ultra-reliable low latency and large-scale machine type communication), especially in different frequency bands and coverage requirements. Next, it is difficult for the prior art to achieve seamless and low latency radio resource management.

Method used

Demodulation reference signal (DMRS) for physical broadcast channel (PBCH) based on physical cell identification (ID) and timing information by generating and mapping pseudo noise (PN) sequences in user equipment (UE) and base station (BS). Generate PN sequences and map them to PBCH resources to achieve the determination and use of PBCH resources.

Benefits of technology

It realizes efficient radio resource management in different usage situations and frequency bands, provides a seamless and low-latency resource acquisition mechanism, is suitable for various cellular systems, and improves the flexibility and efficiency of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115567180B_ABST
    Figure CN115567180B_ABST
Patent Text Reader

Abstract

A method for controlling a reference signal in a wireless communication system by a user equipment (UE) is provided. The method includes receiving a demodulation reference signal (DMRS) of a physical broadcast channel (PBCH) from a base station (BS) through a downlink channel, and determining resources of the DMRS to be used for the PBCH. A pseudo noise (PN) sequence mapped to the resources of the DMRS to be used for the PBCH is generated by the base station (BS). The PN sequence is generated based on initial conditions including a physical cell identification (ID) and timing information, the timing information including at least one of an index of a half frame within a frame based on a carrier frequency range or a synchronization signal block (SSB) index. The index of the SSB includes at least one of a partial or full index of the SSB.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] This application is a divisional application of the invention patent application with application date of March 9, 2018, application number 201880017248.5, and invention name “Method and device for NR-DMRS sequence design”. Technical Field

[0002] The present disclosure relates generally to wireless communication systems, and more particularly, to DMRS sequence design in advanced wireless communication systems. Background Art

[0003] In order to meet the demand for increased wireless data traffic since the deployment of 4G communication systems, efforts have been made to develop improved 5G or pre-5G communication systems. Therefore, 5G or pre-5G communication systems are also referred to as "super 4G networks" or "post-LTE systems". 5G communication systems are considered to be implemented in higher frequency (millimeter wave) bands, such as 60GHz bands, in order to achieve higher data rates. In order to reduce the propagation loss of radio waves and increase the transmission distance, beamforming, massive multiple-input multiple-output (MIMO), full-dimensional MIMO (FD-MIMO), array antennas, analog beamforming, and massive antenna technology are discussed in 5G communication systems. In addition, in the 5G communication system, the development of system network improvements based on advanced small cells, cloud radio access networks (RAN), ultra-dense networks, device-to-device (D2D) communication, wireless backhaul, mobile networks, cooperative communication, coordinated multi-point (Comp), receiving end interference elimination, etc. is underway. In the 5G system, hybrid FSK and QAM modulation (FQAM) and sliding window superposition coding (SWSC) as advanced coding modulation (ACM) have been developed, and filter bank multi carrier (FBMC), non-orthogonal multiple access (NOMA) and sparse code multiple access (SCMA) as advanced access technologies have been developed.

[0004] The Internet is now evolving into the Internet of Things (IoT), which is a human-centered connected network in which humans generate and consume information, and in which distributed entities such as things exchange and process information without human intervention. The Internet of Everything (IoE) has emerged, which is the product of the combination of IoT technology and big data processing technology through connection with cloud servers. As the IoT implementation requires technical elements such as "sensing technology", "wired / wireless communication and network infrastructure", "service interface technology" and "security technology", sensor networks, machine-to-machine (M2M) communication, machine type communication (MTC), etc. have been studied recently. This IoT environment can provide intelligent Internet technology services that create new value for human life by collecting and analyzing data generated between connected things. Through the integration and combination of existing information technology (IT) and various industrial applications, IoT can be applied to various fields, including smart homes, smart buildings, smart cities, smart cars or connected cars, smart grids, healthcare, smart appliances, and advanced medical services.

[0005] In line with this, various attempts have been made to apply 5G communication systems to IoT networks. For example, technologies such as sensor networks, machine type communications (MTC), and machine-to-machine (M2M) communications can be implemented through beamforming, MIMO, and array antennas. Cloud radio access networks (RANs) as an application of the above-mentioned big data processing technologies can also be considered as an example of the fusion between 5G technologies and IoT technologies.

[0006] In wireless communication networks, network access and radio resource management (RRM) are enabled by physical layer synchronization signals and higher layer (MAC layer) procedures. Specifically, the UE attempts to detect the presence of synchronization signals and at least one cell identity (ID) for initial access. Once the UE is in the network and associated with a serving cell, the UE monitors several neighboring cells by attempting to detect their synchronization signals and / or measuring associated cell-specific reference signals (RS). Summary of the invention

[0007] Technical issues

[0008] For the next generation cellular systems, such as the Third Generation Partnership-New Radio Access Or Interface (3GPP-NR), an efficient and unified radio resource acquisition or tracking mechanism is desired, which is applicable to various use cases, such as Enhanced Mobile Broadband (Embb), Ultra Reliable Low Latency (URLLC), Massive Machine Type Communication (mMTC), each corresponding to different coverage requirements and frequency bands with different propagation losses. It is also desired to adopt different network and radio resource paradigms, the most likely design of seamless and low-latency RRM.

[0009] Solution to the problem

[0010] In one embodiment, a user equipment (UE) for controlling a reference signal in a wireless communication system comprises: a transceiver configured to receive a demodulation reference signal (DMRS) of a physical broadcast channel (PBCH) from a base station (BS) through a downlink channel; and a processor operably connected to the transceiver, the processor configured to determine resources of the DMRS to be used for the PBCH, wherein a pseudo-noise (PN) sequence mapped to the resources of the DMRS to be used for the PBCH is generated by the base station (BS), and wherein the PN sequence is generated based on an initial condition including a physical cell identification (ID) and timing information, the timing information including at least one of an index of a half frame within a frame based on a carrier frequency range or a synchronization signal block (SSB) index, wherein the index of the SSB includes at least one of a partial or full index of the SSB.

[0011] In another embodiment, a BS for controlling a reference signal in a wireless communication system is provided. The BS includes a processor configured to: determine resources for a DMRS to be used for a PBCH; generate a PN sequence based on an initial condition including a physical cell ID and timing information, the timing information including at least one of an index of a half frame within a frame based on a carrier frequency range or an index of an SSB, wherein the index of the SSB includes at least one of a partial or full index of the SSB; and map the PN sequence to resources for a DMRS to be used for a PBCH. The BS also includes a transceiver operably connected to the processor, the transceiver configured to send the DMRS of the PBCH to the UE via a downlink channel.

[0012] In another embodiment, a method of controlling a reference signal in a wireless communication system of a UE is provided. The method includes: receiving a DMRS of a PBCH from a BS through a downlink channel; and determining resources of the DMRS to be used for the PBCH, wherein a PN sequence mapped to the resources of the DMRS to be used for the PBCH is generated by the BS, and wherein the PN sequence is generated based on an initial condition including a physical cell ID and timing information, the timing information including at least one of an index of a half frame within a frame based on a carrier frequency range or an index of an SSB, wherein the index of the SSB includes at least one of a partial or full index of the SSB.

[0013] In another embodiment, a method is provided in a communication system and performed by a base station (102), the method comprising: determining a demodulation reference signal (DMRS) sequence associated with a pseudo noise (PN) sequence, wherein based on to define the initial value c_B of the PN sequence, wherein I_ID is a physical cell identifier ID, and I_t is timing information, wherein, when the number of synchronization signal block SSB indexes is 4, the timing information is defined based on two bits of the SSB index, wherein, when the number of SSB indexes is 8 or 64, the timing information is defined based on three bits of the SSB index; and wherein the DMRS sequence is used for a physical broadcast channel PBCH; determining resources for sending the DMRS sequence; and sending the DMRS sequence to the terminal on the resources.

[0014] In another embodiment, a method performed by a terminal in a communication system is provided, the method comprising: determining a resource for receiving a demodulation reference signal DMRS sequence associated with a pseudo noise PN sequence, wherein the DMRS sequence is used for a physical broadcast channel PBCH, and receiving a DMRS sequence mapped to the resource from a base station, wherein based on To define the initial value c_B of the PN sequence, and wherein I_ID is a physical cell identification ID, and I_t is timing information, wherein, when the number of synchronization signal block SSB indexes is 4, the timing information is defined based on two bits of the SSB index, wherein, when the number of SSB indexes is 8 or 64, the timing information is defined based on three bits of the SSB index.

[0015] In another embodiment, a base station in a communication system is provided, the base station comprising: a transceiver; and a controller coupled to the transceiver, configured to: determine a demodulation reference signal DMRS sequence associated with a pseudo noise PN sequence, wherein based on to define the initial value c_B of the PN sequence, wherein I_ID is a physical cell identifier ID, and I_t is timing information, wherein, when the number of synchronization signal block SSB indexes is 4, the timing information is defined based on two bits of the SSB index, wherein, when the number of SSB indexes is 8 or 64, the timing information is defined based on three bits of the SSB index; and wherein the DMRS sequence is used for a physical broadcast channel PBCH; determining resources for sending the DMRS sequence; and sending the DMRS sequence to the terminal on the resources.

[0016] In another embodiment, a terminal in a communication system is provided, the terminal comprising: a transceiver; and a controller coupled to the transceiver, configured to: determine a resource for receiving a demodulation reference signal DMRS sequence associated with a pseudo noise PN sequence, wherein the DMRS sequence is used for a physical broadcast channel PBCH, and receive the DMRS sequence mapped to the resource from a base station, wherein based on To define the initial value c_B of the PN sequence, wherein I_ID is a physical cell identifier ID, and I_t is timing information, wherein, when the number of synchronization signal block SSB indexes is 4, the timing information is defined based on two bits of the SSB index, wherein, when the number of SSB indexes is 8 or 64, the timing information is defined based on three bits of the SSB index.

[0017] Other technical features may be apparent to those skilled in the art from the following drawings, descriptions and claims.

[0018] Before proceeding to the following detailed description, it may be advantageous to set forth the definitions of certain words and phrases used throughout this patent document: The term "couple" and its derivatives refer to any direct or indirect communication between two or more elements, whether or not these elements are in physical contact with each other. The terms "send," "receive," and "communicate" and their derivatives encompass direct and indirect communication. The terms "include" and "comprises" and their derivatives mean including but not limited to. The term "or" is inclusive, meaning and / or. The phrase "associated with..." and its derivatives mean including, included, interconnected with..., containing, contained within, connected to or connected with..., coupled to or coupled with..., communicating with..., collaborating with..., interlaced, juxtaposed, close to, contacting or contacting with..., having, having the nature of..., having a relationship with..., etc. The term "controller" means any device, system, or part thereof that controls at least one operation. Such a controller can be implemented with hardware or a combination of hardware and software and / or firmware. The functions associated with any particular controller can be centralized or distributed, whether locally or remotely. When used with a list of items, the phrase "at least one of" means that different combinations of one or more of the listed items can be used, and only one of the items in the list may be required. For example, "at least one of A, B, and C" includes any of the following combinations: A, B, C, A and B, A and C, B and C, and A and B and C.

[0019] In addition, the various functions described below can be implemented or supported by one or more computer programs, each of which is formed by a computer-readable program code and embodied in a computer-readable medium. The terms "application" and "program" refer to one or more computer programs, software components, instruction sets, processes, functions, objects, classes, instances, related data or parts thereof suitable for implementation in a suitable computer-readable program code. The phrase "computer-readable program code" includes any type of computer code, including source code, object code and executable code. The phrase "computer-readable medium" includes any type of medium that can be accessed by a computer, such as a read-only memory (ROM), a random access memory (RAM), a hard drive, a compact disc (CD), a digital video disc (DVD) or any other type of memory. "Non-transitory" computer-readable media does not include wired, wireless, optical or other communication links that transmit temporary electrical signals or other signals. Non-transitory computer-readable media include media in which data can be permanently stored and media in which data can be stored and subsequently rewritten, such as rewritable optical discs or erasable storage devices.

[0020] Definitions for other specific words and phrases are provided throughout this patent document. Those of ordinary skill in the art should understand that in many, if not most instances, such definitions apply to prior and future uses of such defined words and phrases.

[0021] Advantageous Effects of the Invention

[0022] Embodiments of the present disclosure provide a NR-SS pulse set design in an advanced wireless communication system. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] For a more complete understanding of the present disclosure and its advantages, reference is now made to the following description taken in conjunction with the accompanying drawings, wherein like reference numerals represent like parts:

[0024] Figure 1 An example wireless network according to an embodiment of the present disclosure is shown;

[0025] Figure 2 An example eNB according to an embodiment of the present disclosure is shown;

[0026] Figure 3 An example UE according to an embodiment of the present disclosure is shown;

[0027] Figure 4A A high-level diagram of an orthogonal frequency division multiple access transmission path according to an embodiment of the present disclosure is shown;

[0028] Figure 4B A high-level diagram of an orthogonal frequency division multiple access receive path according to an embodiment of the present disclosure is shown;

[0029] Figure 5 A transmitter block diagram for a PDSCH in a subframe according to an embodiment of the present disclosure is shown;

[0030] Figure 6 A receiver block diagram for PDSCH in a subframe according to an embodiment of the present disclosure is shown;

[0031] Figure 7 A transmitter block diagram for a PUSCH in a subframe according to an embodiment of the present disclosure is shown;

[0032] Figure 8 A receiver block diagram for PUSCH in a subframe according to an embodiment of the present disclosure is shown;

[0033] Fig. 9 shows an example multiplexing of two slices according to an embodiment of the present disclosure;

[0034] Fig.10 An example antenna block according to an embodiment of the present disclosure is shown;

[0035] Fig.11 An example UE mobility scenario according to an embodiment of the present disclosure is shown;

[0036] Fig.12 illustrates an example beam scanning operation according to an embodiment of the present disclosure;

[0037] Fig.13 A flowchart showing a method for designing a DMRS sequence according to an embodiment of the present disclosure; and

[0038] Fig.14 Another flow chart of a method for designing a DMRS sequence according to an embodiment of the present disclosure is shown. DETAILED DESCRIPTION

[0039] Discussed below Figures 1 to 14 The various embodiments used to describe the principles of the present disclosure in this patent document are merely examples and should not be interpreted in any way to limit the scope of the present disclosure. Those skilled in the art will understand that the principles of the present disclosure can be implemented in any appropriately arranged system or device.

[0040] The following documents and standard descriptions are incorporated by reference into the present disclosure as if fully set forth herein: 3GPP TS 36.211 v13.2.0, "E-UTRA, Physical channels and modulation;" 3GPP TS 36.212 v13.2.0, "E-UTRA, Multiplexing and Channel coding;" 3GPP TS 36.213 v13.2.0, "E-UTRA, Physical Layer ProceduRE;" 3GPP TS 36.321 v13.2.0, "E-UTRA, Medium Access Control (MAC) protocol specification;" and 3GPP TS 36.331 v13.2.0, "E-UTRA, Radio Frequency Control (RRC) protocol specification.".

[0041] In order to meet the demand for increased wireless data traffic since the deployment of 4G communication systems, efforts have been made to develop improved 5G or pre-5G communication systems. Therefore, 5G or pre-5G communication systems are also called "beyond 4G networks" or "post-LTE systems."

[0042] 5G communication systems are considered to be implemented in higher frequency (millimeter wave) bands, such as 60 GHz bands, in order to achieve higher data rates. In order to reduce the propagation loss of radio waves and increase the transmission coverage, beamforming, massive multiple-input multiple-output (MIMO), full-size MIMO, array antennas, analog beamforming, massive antenna technology, etc. are discussed in 5G communication systems.

[0043] In addition, in 5G communication systems, development of system network improvements based on advanced small cells, cloud radio access networks (RAN), ultra-dense networks, device-to-device (D2D) communication, wireless backhaul communication, mobile networks, collaborative communications, coordinated multi-point (CoMP) transmission and reception, interference mitigation and elimination, etc. is underway.

[0044] In 5G systems, hybrid frequency shift keying and quadrature amplitude modulation (FQAM) and sliding window superposition coding (SWSC) as adaptive modulation and coding (ACM) technologies, and filter bank multi-carrier (FBMC), non-orthogonal multiple access (NOMA) and sparse code multiple access (SCMA) as advanced access technologies have been developed.

[0045] The following Figure 1-4B Various embodiments are described that are implemented in a wireless communication system and using Orthogonal Frequency Division Multiplexing (OFDM) or Orthogonal Frequency Division Multiple Access (OFDMA) communication technology. Figure 1-Figure 3 The description is not meant to imply physical or architectural limitations to the manner in which different embodiments may be implemented. Different embodiments of the present disclosure may be implemented in any suitably arranged communications system.

[0046] Figure 1 An example wireless network according to an embodiment of the present disclosure is shown. Figure 1 The embodiment of the wireless network shown is for illustration only. Other embodiments of the wireless network 100 may be used without departing from the scope of the present disclosure.

[0047] like Figure 1 As shown, the wireless network includes eNB 101, eNB 102, and eNB 103. eNB 101 communicates with eNB 102 and eNB 103. eNB 101 also communicates with at least one network 130, such as the Internet, a proprietary Internet Protocol (IP) network, or other data network.

[0048] eNB 102 provides wireless broadband access to network 130 for a first plurality of user equipments (UEs) within coverage area 120 of eNB 102. The first plurality of UEs include UE 111, UE 112, UE 113, UE 114, UE 115, and UE 116, UE 111 may be located in a small business (SB); UE 112 may be located in an enterprise (E); UE 113 may be located in a wireless hotspot (HS); UE 114 may be located in a first residence (R); UE 115 may be located in a second residence (R); UE 116 may be a mobile device (M), such as a cellular phone, a wireless laptop, a wireless PDA, etc. eNB 103 provides wireless broadband access to network 130 for a second plurality of UEs within coverage area 125 of eNB 103. The second plurality of UEs include UE 115 and UE 116. In some embodiments, one or more of eNBs 101-103 may communicate with each other and with UEs 111-116 using 5G, LTE, LTE-A, WiMAX, WiFi, or other wireless communication technologies.

[0049] Depending on the type of network, the term "base station" or "BS" may refer to any component (or set of components) configured to provide wireless access to a network, such as a Transmit Point (TP), a Transmit-Receive Point (TRP), an enhanced base station (eNodeB or eNB), a 5G base station (gNB), a macro cell, a femto cell, a WiFi access point (AP), or other wirelessly enabled devices. The base station may provide wireless access according to one or more wireless communication protocols, such as 5G 3GPP New Radio Interface / Access (NR), Long Term Evolution (LTE), LTE Advanced (LTE-A), High Speed ​​Packet Access (HSPA), Wi-Fi 802.11a / b / g / n / ac, etc. For convenience, the terms "BS" and "TRP" are used interchangeably in this patent document to refer to network infrastructure components that provide wireless access to remote terminals. Also, depending on the network type, the term "user equipment" or "UE" may refer to any component such as a "mobile station," "subscriber station," "remote terminal," "wireless terminal," "reception point," or "user device." For convenience, the terms "user equipment" and "UE" are used in this patent document to refer to a remote wireless device that wirelessly accesses a BS, and the UE is a mobile device (such as a mobile phone or a smart phone) or is generally considered to be a fixed device (such as a desktop computer or a vending machine).

[0050] Dashed lines illustrate the approximate extents of coverage areas 120 and 125, which are shown as approximately circular for purposes of illustration and explanation only. It should be clearly understood that coverage areas associated with eNBs, such as coverage areas 120 and 125, may have other shapes, including irregular shapes, depending on the configuration of the eNB and variations in the radio environment associated with natural and man-made obstacles.

[0051] As described in more detail below, one or more of UEs 111-116 include circuitry, programming, or a combination thereof for performing effective NR-DMRS sequence design in an advanced wireless communication system. In certain embodiments, one or more of eNBs 101-103 include circuitry, programming, or a combination thereof for receiving effective NR-DMRS sequence design in an advanced wireless communication system.

[0052] although Figure 1 An example of a wireless network is shown, but Figure 1 Various changes may be made. For example, the wireless network may include any number of eNBs and any number of UEs in any suitable arrangement. Furthermore, eNB 101 may communicate directly with any number of UEs and provide these UEs with wireless broadband access to network 130. Similarly, each eNB 102-103 may communicate directly with network 130 and provide UEs with direct wireless broadband access to network 130. In addition, eNBs 101, 102, and / or 103 may provide access to other or additional external networks, such as an external telephone network or other type of data network.

[0053] Figure 2 An example eNB 102 is shown according to an embodiment of the present disclosure. Figure 2 The embodiment of the eNB 102 shown is for illustration only. Figure 1 The eNBs 101 and 103 may have the same or similar configurations. However, eNBs have various configurations, and Figure 2 The scope of the present disclosure is not limited to any particular implementation of the eNB.

[0054] like Figure 2 As shown, the eNB 102 includes multiple antennas 205a-205n, multiple RF transceivers 210a-210n, transmit (TX) processing circuitry 215, and receive (RX) processing circuitry 220. The eNB 102 also includes a controller / processor 225, memory 230, and a backhaul or network interface 235.

[0055] The RF transceivers 210a-210n receive incoming RF signals from the antennas 205a-205n, such as signals transmitted by UEs in the network 100. The RF transceivers 210a-210n downconvert the incoming RF signals to generate IF or baseband signals. The IF or baseband signals are sent to the RX processing circuit 220, which generates processed baseband signals by filtering, decoding and / or digitizing the baseband or IF signals. The RX processing circuit 220 sends the processed baseband signals to the controller / processor 225 for further processing.

[0056] The TX processing circuit 215 receives analog or digital data (such as voice data, network data, email, or interactive video game data) from the controller / processor 225. The TX processing circuit 215 encodes, multiplexes, and / or digitizes the outgoing baseband data to generate a processed baseband or IF signal. The RF transceivers 210a-210n receive the processed baseband or IF signals from the TX processing circuit 215 and up-convert the baseband or IF signals to RF signals that are transmitted via the antennas 205a-205n.

[0057] The controller / processor 225 may include one or more processors or other processing devices that control the overall operation of the eNB 102. For example, the controller / processor 225 may control the reception of forward channel signals and the transmission of reverse channel signals by the RF transceivers 210a-210n, the RX processing circuit 220, and the TX processing circuit 215 according to well-known principles. The controller / processor 225 may also support additional functions, such as more advanced wireless communication functions. For example, the controller / processor 225 may support beamforming or directional routing operations, in which the signals transmitted from the multiple antennas 205a-205n are weighted differently to effectively direct the transmitted signals in the desired direction. The controller / processor 225 may support any one or more of a variety of other functions in the eNB 102.

[0058] Controller / processor 225 is also capable of running programs and other processes, such as an OS, that reside in memory 230. Controller / processor 225 may move data into or out of memory 230 as required by the running processes.

[0059] The controller / processor 225 is also coupled to a backhaul or network interface 235. The backhaul or network interface 235 allows the eNB 102 to communicate with other devices or systems via a backhaul connection or via a network. The interface 235 can support communication via any suitable wired or wireless connection. For example, when the eNB 102 is implemented as part of a cellular communication system (such as a system supporting 5G, LTE, or LTE-A), the interface 235 can allow the eNB 102 to communicate with other eNBs via a wired or wireless backhaul connection. When the eNB 102 is implemented as an access point, the interface 235 can allow the eNB 102 to communicate with a larger network (such as the Internet) via a wired or wireless local area network or via a wired or wireless connection. The interface 235 includes any suitable structure that supports communication via a wired or wireless connection, such as an Ethernet or RF transceiver.

[0060] Memory 230 is coupled to controller / processor 225. A portion of memory 230 may include RAM and another portion of memory 230 may include flash memory or other ROM.

[0061] although Figure 2 An example of an eNB 102 is shown, but the Figure 2 For example, eNB 102 may include any number of Figure 2 As a specific example, the access point may include multiple interfaces 235, and the controller / processor 225 may support routing functions for routing data between different network addresses. As another specific example, although shown as including a single instance of the TX processing circuit 215 and a single instance of the RX processing circuit 220, the eNB 102 may include multiple instances of each instance (such as one for each RF transceiver). And, Figure 2 The various components in may be combined, further subdivided, or omitted, and additional components may be added according to specific needs.

[0062] Figure 3 An example UE 116 is shown in accordance with an embodiment of the present disclosure. Figure 3 The embodiment of UE 116 shown is for illustration only. Figure 1 UE 111-UE 115 may have the same or similar configuration. However, UEs have various configurations, and Figure 3 The scope of the present disclosure is not limited to any particular implementation of the UE.

[0063] like Figure 3As shown, UE 116 includes an antenna 305, a radio frequency (RF) transceiver 310, a TX processing circuit 315, a microphone 320, and a receive (RX) processing circuit 325. UE 116 also includes a speaker 330, a processor 340, an input / output (I / O) interface 345, a touch screen 350, a display 355, and a memory 360. The memory 360 includes an operating system (OS) 361 and one or more applications 362.

[0064] RF transceiver 310 receives incoming RF signals sent by eNBs of network 100 from antenna 305. RF transceiver 310 downconverts the incoming RF signals to generate IF or baseband signals. The IF or baseband signals are sent to RX processing circuitry 325, which generates processed baseband signals by filtering, decoding, and / or digitizing the baseband or IF signals. RX processing circuitry 325 sends the processed baseband signals to speaker 330 (such as voice data) or processor 340 for further processing (such as web browsing data).

[0065] The TX processing circuit 315 receives analog or digital voice data from the microphone 320, or receives other outgoing baseband data (such as network data, email, or interactive video game data) from the processor 340. The TX processing circuit 315 encodes, multiplexes, and / or digitizes the outgoing baseband data to generate a processed baseband or IF signal. The RF transceiver 310 receives the processed baseband or IF signal from the TX processing circuit 315 and up-converts the baseband or IF signal to an RF signal that is transmitted via the antenna 305.

[0066] The processor 340 may include one or more processors or other processing devices and runs an OS 361 stored in the memory 360 to control the overall operation of the UE 116. For example, the processor 340 may control the reception of forward channel signals and the transmission of reverse channel signals by the RF transceiver 310, the RX processing circuit 325, and the TX processing circuit 315 according to well-known principles. In some embodiments, the processor 340 includes at least one microprocessor or microcontroller.

[0067] The processor 340 is also capable of running other processes and programs resident in the memory 360, such as a process for reporting CSI on the PUCCH. The processor 340 can move data into or out of the memory 360 as required by the running process. In some embodiments, the processor 340 is configured to run applications 362 based on the OS 361 or in response to signals received from the eNB or operator. The processor 340 is also coupled to the I / O interface 345, which provides the UE 116 with the ability to connect to other devices such as laptops and handheld computers. The I / O interface 345 is the communication path between these accessories and the processor 340.

[0068] Processor 340 is also coupled to touch screen 350 and display 355. An operator of UE 116 may input data into UE 116 using touch screen 350. Display 355 may be a liquid crystal display, light emitting diode display, or other display capable of presenting text (such as from a website) and / or at least limited graphics.

[0069] Memory 360 is coupled to processor 340. A portion of memory 360 may include random access memory (RAM) and another portion of memory 360 may include flash memory or other read-only memory (ROM).

[0070] although Figure 3 An example of UE 116 is shown, but the Figure 3 Make various changes. For example, Figure 3 The various components in the embodiment may be combined, further subdivided, or omitted, and additional components may be added according to specific needs. As a specific example, processor 340 may be divided into multiple processors, such as one or more central processing units (CPUs) and one or more graphics processing units (GPUs). Figure 3 The UE 116 is shown configured as a mobile phone or smartphone, but the UE may be configured to operate as other types of mobile or stationary devices.

[0071] Figure 4A is a high-level diagram of a transmit path circuit. For example, the transmit path circuit may be used for orthogonal frequency division multiple access (OFDMA) communications. Figure 4B is a high-level diagram of a receive path circuit. For example, the receive path circuit can be used for orthogonal frequency division multiple access (OFDMA) communications. Figure 4A and Figure 4B For downlink communications, the transmit path circuit may be implemented in a base station (eNB) 102 or a relay station, and the receive path circuit may be implemented in a user equipment (e.g., Figure 1 In other examples, for uplink communications, the receive path circuit 450 may be implemented in a base station (e.g., Figure 1 The transmission path circuit may be implemented in a user equipment (e.g., Figure 1 The method is implemented in user equipment 116).

[0072] The transmit path circuit includes a channel coding and modulation block 405, a serial-to-parallel (S-to-P) block 410, an inverse fast Fourier transform (IFFT) block of size N 415, a parallel-to-serial (P-to-S) block 420, a cyclic prefix addition block 425, and an up-converter (UC) 430. The receive path circuit 450 includes a down-converter (DC) 455, a cyclic prefix removal block 460, a serial-to-parallel (S-to-P) block 465, a fast Fourier transform (FFT) block of size N 470, a parallel-to-serial (P-to-S) block 475, and a channel decoding and demodulation block 480.

[0073] Figure 4A At least some components in 400 and 4B 450 may be implemented in software, while other components may be implemented in configurable hardware or a mixture of software and configurable hardware. Specifically, it is noted that the FFT block and IFFT block described in this disclosure document may be implemented as configurable software algorithms, where the value of size N may be modified according to the implementation.

[0074] In addition, although the present disclosure is directed to embodiments implementing fast Fourier transform and inverse fast Fourier transform, this is merely exemplary and cannot be interpreted as limiting the scope of the present disclosure. It is understood that in alternative embodiments of the present disclosure, the fast Fourier transform function and the inverse fast Fourier transform function can be easily replaced by discrete Fourier transform (DFT) function and inverse discrete Fourier transform (IDFT) function, respectively. It is understood that for DFT and IDFT functions, the value of the N variable can be any integer (i.e., 1, 4, 3, 4, etc.), and for FFT and IFFT functions, the value of the N variable can be any integer of a power of 2 (i.e., 1, 2, 4, 8, 16, etc.).

[0075] In the transmit path circuit 400, the channel coding and modulation block 405 receives a set of information bits, applies coding (e.g., LDPC coding) and modulates (e.g., Quadrature Phase Shift Keying (QPSK) or Quadrature Amplitude Modulation (QAM)) the input bits to produce a frequency domain modulation symbol sequence. The serial-to-parallel block 410 converts (i.e., demultiplexes) the serial modulation symbols into parallel data to produce N parallel symbol streams, where N is the IFFT / FFT size used in the BS 102 and the UE 116. The size-N IFFT block 415 then performs an IFFT operation on the N parallel symbol streams to produce a time domain output signal. The parallel-to-serial block 420 converts (i.e., multiplexes) the parallel time domain output symbols from the size-N IFFT block 415 to produce a serial time domain signal. The add cyclic prefix block 425 then inserts a cyclic prefix into the time domain signal. Finally, upconverter 430 modulates (ie, upconverts) the output of add cyclic prefix block 425 to RF frequency for transmission via a wireless channel. The signal may also be filtered at baseband before conversion to RF frequency.

[0076] The transmitted RF signal arrives at UE 116 after passing through the wireless channel, and the opposite operation of eNB 102 is performed at UE 116. Downconverter 455 downconverts the received signal to baseband frequency, and removes the cyclic prefix block 460 to remove the cyclic prefix to produce a serial time-domain baseband signal. Serial-to-parallel module 465 converts the time-domain baseband signal into parallel time-domain signals. FFT block 470 of size N then performs an FFT algorithm to produce N parallel frequency-domain signals. Parallel-to-serial block 475 converts the parallel frequency-domain signals into a sequence of modulated data symbols. Channel decoding and demodulation block 480 demodulates and then decodes the modulation symbols to recover the original input data stream.

[0077] Each of eNBs 101-eNB 103 may implement a transmit path similar to that for transmitting in the downlink to user equipments 111-116, and may implement a receive path similar to that for receiving in the uplink from user equipments 111-116. Similarly, each of user equipments 111-116 may implement a transmit path corresponding to the architecture for transmitting in the uplink to eNBs 101-eNB 103, and may implement a receive path corresponding to the architecture for receiving in the downlink from eNBs 101-eNB 103.

[0078] 5G communication system use cases have been identified and described. These use cases can be roughly divided into three different groups. In one example, Enhanced Mobile Broadband (eMBB) is determined to meet high bit / second requirements, but the latency and reliability requirements are not too strict. In another example, Ultra Reliable And Low Latency (URLL) is determined, but the bit / second requirements are not too strict. In yet another example, massive machine type communication (mMTC) is determined to have up to 100,000 to 1 million devices per square kilometer, but the reliability / throughput / latency requirements may be less strict. This scenario may also involve power efficiency requirements, as battery consumption should be minimized as much as possible.

[0079] A communication system includes a downlink (DL) that transmits signals from a transmission point such as a base station (BS) or NodeB to a user equipment (UE) and an uplink (UL) that transmits signals from a UE to a reception point such as a NodeB. A UE, also commonly referred to as a terminal or mobile station, can be fixed or mobile and can be a cellular phone, a personal computer device, or an automation device. An eNodeB, typically a fixed station, may also be referred to as an access point or other equivalent terms. For an LTE system, a NodeB is typically referred to as an eNodeB.

[0080] In a communication system such as an LTE system, a DL signal may include a data signal that transmits information content, a control signal that transmits DL control information (DCI), and a reference signal (RS) also known as a pilot signal. The eNodeB sends data information through a physical DL shared channel (PDSCH). The eNodeB sends DCI through a physical DL control channel (PDCCH) or an enhanced PDCCH (EPDCCH).

[0081] The eNodeB sends confirmation information in the physical hybrid ARQ indicator channel (PHICH) in response to a data transmission block (TB) from the UE. The eNodeB sends one or more types of RS, including UE common RS, channel state information RS (CSI-RS) or demodulation RS (DMRS). CRS is sent over the DL system bandwidth (BW), which the UE can use to obtain channel estimates to demodulate data or control information or perform measurements. In order to reduce CRS overhead, the eNodeB may send a CRS-RS whose time domain and / or frequency domain density is smaller than that of the CRS. DMRS can only be sent in the BW of the corresponding PDSCH or EPDCCH, and the UE can use DMRS to demodulate the data or control information in the PDSCH or EPDCCH, respectively. The transmission time interval of a DL channel is called a subframe and may have a duration of, for example, 1ms.

[0082] The DL signal also includes the transmission of a logical channel that carries system control information. When the DL signal transmits a Master Information Block (MIB), the BCCH is mapped to a transport channel called a Broadcast Channel (BCH), or when the DL signal transmits a System Information Block (SIB), the BCCH is mapped to a DL Shared Channel (DL-SCH). Most system information is included in different SIBs, which are sent using the DL-SCH. The presence of system information on the DL-SCH in a subframe can be indicated by the transmission of the corresponding pdcch, which transmits a codeword (Cyclic Redundancy Check, CRC) with a cyclic redundancy check scrambled with a specific System Information RNTI (Si-RNTI). Alternatively, the scheduling information sent by the SIB can be provided in an earlier SIB, and the scheduling information of the first SIB (first SIB, SIB-1) can be provided by the MIB.

[0083] DL resource allocation is performed in units of subframes and physical resource blocks (PRBs). The transmission BW consists of frequency resource units called resource blocks (RBs). Each RB consists of subcarriers or resource elements (REs), such as 12 REs. A unit of an RB in a subframe is called a PRB. For PDSCH transmission BW, a total of M of RE PDSCH RBs.

[0084] UL signals may include data signals for transmitting data information, control signals for transmitting UL control information (UL Control Information, UCI), and UL RS. UL RS includes DMRS and sounding RS (SRS). The UE sends DMRS only in the BW of the corresponding PUSCH or PUCCH. The eNodeB can use DMRS to demodulate the data signal or UCI signal. The UE sends SRS to provide UL CSI to the eNodeB. The UE sends data information or UCI through its respective physical UL shared channel (UL Shared Channel, PUSCH) or physical UL control channel (Physical UL Control Channel, PUCCH). If the UE needs to send data information and UCI in the same UL subframe, it can multiplex both in the PUSCH. UCI includes Hybrid Automatic Repeat Request Acknowledgement (HARQ-ACK) information, Scheduling Request (SR), Rank Indicator (RI) and Channel State Information (CSI). HARQ-ACK indicates correct (ACK) or incorrect (NACK) detection of data TB in PDSCH, or no PDCCH detection (DTX); SR indicates whether there is data in the UE's buffer; CSI enables the eNodeB to perform link adaptation of PDSCH transmission to the UE. HARQ-ACK information is also sent by the UE in response to detecting the PDCCH / EPDCCH indicating the release of the semi-persistently scheduled PDSCH.

[0085] The UL subframe includes two time slots. Each time slot includes a time slot for transmitting data information, UCI, DMRS or SRS. symbols. The frequency resource unit of the UL system BW is RB. For the transmission BW, a total of N of REs RB RBs. For PUCCH, N RB= 1. The last subframe symbol can be used to multiplex SRS transmissions from one or more UEs. The number of subframe symbols that can be used for data / UCI / DMRS transmission is If the last subframe symbol is used to send SRS, then N SRS =1; otherwise N SRS =0.

[0086] Figure 5 A transmitter block diagram 500 for PDSCH in a subframe according to an embodiment of the present disclosure is shown. Figure 5 The illustrated embodiment of transmitter block diagram 500 is for illustration only. Figure 5 The scope of the present disclosure is not limited to any particular implementation of transmitter block diagram 500 .

[0087] like Figure 5 As shown, information bits 510 are encoded by an encoder 520 (such as a turbo encoder) and modulated by a modulator 530, such as using quadrature phase shift keying (QPSK) modulation. A serial-to-parallel (S / P) converter 540 generates M modulation symbols, which are then provided to a mapper 550 to map to REs selected by a transmission BW selection unit 555 for the assigned PDSCH transmission BW, a unit 560 applies an inverse fast Fourier transform (IFFT), and the output is then serialized by a parallel-to-serial (P / S) converter 570 to create a time domain signal, filtering is applied by a filter 580, and a signal 590 is transmitted. Additional functions, such as data scrambling, cyclic prefix insertion, time windowing, interleaving, etc., are well known in the art and are not shown for the sake of brevity.

[0088] Figure 6 A receiver block diagram 600 for PDSCH in a subframe according to an embodiment of the present disclosure is shown. Figure 6 The embodiment of diagram 600 shown is for illustration only. Figure 6 The scope of the present disclosure is not limited to any particular implementation of diagram 600 .

[0089] like Figure 6 As shown, received signal 610 is filtered by filter 620, RE 630 for the assigned receive BW is selected by BW selector 635, fast Fourier transform (FFT) is applied by unit 640, and the output is serialized by parallel-to-serial converter 650. Subsequently, demodulator 660 coherently demodulates the data symbols by applying a channel estimate obtained from a DMRS or CRS (not shown), and decoder 670, such as a turbo decoder, decodes the demodulated data to provide an estimate of information data bits 680. For the sake of brevity, additional functions such as time windowing, cyclic prefix removal, descrambling, channel estimation, and deinterleaving are not shown.

[0090] Figure 7 A transmitter block diagram 700 for PUSCH in a subframe according to an embodiment of the present disclosure is shown. Figure 7 The illustrated embodiment of block diagram 700 is for illustration only. Figure 7 The scope of the present disclosure is not limited to any particular implementation of block diagram 700 .

[0091] like Figure 7 As shown, information data bits 710 are encoded by an encoder 720 (such as a turbo encoder) and modulated by a modulator 730. A discrete Fourier transform (DFT) unit 740 applies DFT to the modulated data bits, a transmission BW selection unit 755 selects REs 750 corresponding to the assigned PUSCH transmission BW, a unit 760 applies IFFT, and after cyclic prefix insertion (not shown), filtering is applied by a filter 770, and a signal 780 is transmitted.

[0092] Figure 8 A receiver block diagram 800 for PUSCH in a subframe according to an embodiment of the present disclosure is shown. Figure 8 The illustrated embodiment of block diagram 800 is for illustration only. Figure 8 The scope of the present disclosure is not limited to any particular implementation of block diagram 800 .

[0093] like Figure 8 As shown, received signal 810 is filtered by filter 820. Subsequently, after removing the cyclic prefix (not shown), unit 830 applies FFT, REs 840 corresponding to the assigned PUSCH receive BW are selected by receive BW selector 845, unit 850 applies inverse discrete Fourier transform (IDFT), demodulator 860 coherently demodulates the data symbols by applying a channel estimate obtained from a DMRS (not shown), and decoder 870, such as a turbo decoder, decodes the demodulated data to provide estimates of information data bits 880.

[0094] In the next generation of cellular systems, various use cases are envisioned that exceed the capabilities of LTE systems. One of the requirements for systems referred to as 5G or fifth generation cellular systems is the ability to operate both below 6 GHz and above 6 GHz (e.g., in the mmWave regime). In 3GPP TR 22.891,74, 5G use cases have been identified and described; these use cases can be broadly divided into three different groups. The first group, referred to as "enhanced mobile broadband" (eMBB), targets high data rate services with less stringent latency and reliability requirements. The second group, referred to as "ultra-reliable and low latency (URLL)", targets applications with less stringent data rate requirements but lower latency tolerance. The third group, referred to as "massive MTC (mMTC)", targets a large number of low-power device connections, such as 1 million per square kilometer, with less stringent reliability, data rate and latency requirements.

[0095] In order to enable 5G networks to support these different services with different Quality of Service (QoS), a method called network slicing has been identified in the LTE specification. In order to efficiently utilize PHY resources and multiplex various slices (with different resource allocation schemes, parameter sets and scheduling strategies) in DL-SCH, a flexible and independent frame or subframe design is utilized.

[0096] Fig. 9 An example multiplexing of two slices 900 is shown according to an embodiment of the present disclosure. Fig. 9 The illustrated embodiment of multiplexing of two slices 900 is for illustration only. Fig. 9 The scope of the present disclosure is not limited to any particular implementation of the multiplexing of two slices 900 .

[0097] Fig. 9 Two exemplary embodiments of multiplexing two slices within a common subframe or frame are depicted. In these exemplary embodiments, a slice may consist of one or two transmission instances, wherein one transmission instance includes a control (CTRL) component (e.g., 920a, 960a, 960b, 920b, or 960c) and a data component (e.g., 930a, 970a, 970b, 930b, or 970c). In embodiment 910, the two slices are multiplexed in the frequency domain, while in embodiment 950, the two slices are multiplexed in the time domain. The two slices may be sent with different parameter sets.

[0098] The LTE specification supports up to 32 CSI-RS antenna ports, enabling the eNB to be equipped with a large number of antenna elements (such as 64 or 128). In this case, multiple antenna elements are mapped to one CSI-RS port. For next-generation cellular systems such as 5G, the maximum number of CSI-RS ports can remain the same or increase.

[0099] Fig.10 An example antenna block 1000 is shown according to an embodiment of the present disclosure. Fig.10 The illustrated embodiment of antenna block 1000 is for illustration only. Fig.10 The scope of the present disclosure is not limited to any particular implementation of antenna block 1000 .

[0100] For the millimeter wave frequency band, such as Fig.10 As shown, although the number of antenna elements can be larger for a given form factor, the number of CSI-RS ports (which can correspond to the number of digital precoding ports) is often limited by hardware limitations (such as the feasibility of installing a large number of ADCs / DACs at mmWave frequencies). In this case, one CSI-RS port is mapped to a large number of antenna elements, which can be controlled by a set of analog phase shifters. One CSI-RS port can then correspond to a subarray that produces a narrow analog beam through analog beamforming. The analog beam can be configured to scan a wider range of angles by changing the phase shifter set between symbols or subframes. The number of subarrays (equal to the number of RF chains) is proportional to the number of CSI-RS ports N. CSI-PORT The number of digital beamforming units is the same as N CSI-PORT A linear combination is performed on the analog beams to further increase the precoding gain. While the analog beams are wideband (and therefore not frequency selective), the digital precoding can vary across frequency subbands or resource blocks.

[0101] In the 3GPP LTE communication system, network access and radio resource management (RRM) are enabled by physical layer synchronization signals and higher layer (MAC) processes. Specifically, the UE attempts to detect the presence of synchronization signals and at least one cell ID for initial access. Once the UE is in the network and associated with the serving cell, the UE monitors several neighboring cells by attempting to detect their synchronization signals and / or measuring the associated cell-specific RS (e.g., by measuring their RSRP). For next-generation cellular systems, such as 3GPP NR (new radio access or interface), an efficient and unified radio resource acquisition or tracking mechanism is expected that is applicable to various use cases (such as eMBB, URLLC, mMTC, each corresponding to different coverage requirements) and frequency bands (with different propagation losses). The most likely design is to adopt different network and radio resource paradigms, and seamless and low-latency RRM is also expected. These goals will at least bring the following problems when designing access, radio resource and mobility management frameworks.

[0102] First, since NR may support more diverse network topologies, the concept of a cell may be redefined or replaced with another radio resource entity. For example, for a synchronous network, a cell may be associated with multiple TRPs (transmit-receive points), similar to the COMP (coordinated multi-point transmission) scenario in the LTE specification. In this case, seamless mobility is a desired feature.

[0103] Second, when utilizing large antenna arrays and beamforming, defining radio resources in terms of beams (although one may say it differently) may be a natural approach. Given that many beamforming architectures may be utilized, an access, radio resource, and mobility management framework that is adaptable to various beamforming architectures (or, alternatively, agnostic to the beamforming architecture) is desirable.

[0104] Fig.11 An example UE mobility scenario 1100 according to an embodiment of the present disclosure is shown. Fig.11 The illustrated embodiment of the UE mobility scenario 1100 is for illustration only. Fig.11 The scope of the present disclosure is not limited to any particular implementation of the UE mobility scenario 1100 .

[0105] For example, the framework may be applicable or agnostic to forming a beam for one CSI-RS port (e.g., multiple analog ports connected to one digital port and utilizing multiple widely separated digital ports) or forming a beam from multiple CSI-RS ports. In addition, whether beam scanning is used (e.g., Fig.11 This framework is applicable.

[0106] Third, different frequency bands and use cases impose different coverage limitations. For example, the millimeter wave bands cause significant propagation losses. Therefore, some form of coverage enhancement scheme is needed. Several candidates include beam scanning (such as Fig.10 As shown), repetition, diversity and / or multi-TRP transmission. For mMTC with small transmission bandwidth, time domain repetition is required to ensure adequate coverage.

[0107] Fig.11 UE-centric access is described in , which utilizes two levels of radio resource entities. The two levels may be referred to as "cell" and "beam". These two terms are exemplary and used for the purpose of illustration. Other terms may also be used, such as Radio Resource (RR) 1 and 2. In addition, the term "beam" as a unit of radio resources will be used in conjunction with, for example, Fig.10 The simulated beams used for beam scanning are different.

[0108] like Fig.11As shown, the first RR level (referred to as "cell") applies when a UE enters the network and thus participates in an initial access procedure. In 1110, after performing an initial access procedure including detecting the presence of synchronization signals, UE 1111 connects to cell 1112. Synchronization signals can be used for coarse timing and frequency acquisition, as well as detecting a cell identity (cell ID) associated with a serving cell. At the first level, the UE observes cell boundaries, as different cells may be associated with different cell IDs. Fig.11 In the MAC layer, a cell is associated with a TRP (usually, a cell can be associated with multiple TRPs). Since the cell ID is a MAC layer entity, the initial access involves not only physical layer procedures (such as cell search via synchronization signal acquisition) but also MAC layer procedures.

[0109] When the UE is already connected to a cell and therefore to the network, the second RR level (called "beam") applies. In this second level, as shown in embodiment 1150, UE 1111 can move within the network without observing cell boundaries. That is, UE mobility is handled at the beam level rather than the cell level, where one cell can be associated with N beams (N can be 1 or greater than 1). However, unlike a cell, a beam is a physical layer entity. Therefore, UE mobility management is only handled at the physical layer. Fig.11 An example of a UE mobility scenario based on the second level RR is given in Embodiment 1150 of the present invention.

[0110] After UE 1111 is associated with serving cell 1112, UE 1111 is further associated with beam 1151. This is achieved by acquiring a beam or radio resource (RR) acquisition signal from which the UE can acquire a beam identification or identity. An example of a beam or RR acquisition signal is a measurement reference signal (RS). When acquiring a beam (or RR) acquisition signal, UE 1111 can report the status to the network or an associated TRP. Examples of such reports include measured beam power (or measured RS power) or a set of at least one recommended "beam identification (ID)" or "RR-ID". Based on the report, the network or associated TRP can assign a beam (as a radio resource) to UE 1111 for data and control transmission. When UE 1111 moves to another cell, the boundary between the previous cell and the next cell is neither observable nor visible to UE 1111. Instead of cell switching, UE 1111 switches from beam 1151 to beam 1152. Reporting from UE 711 to the network or associated TRP facilitates this seamless mobility - particularly when UE 1111 reports a set of M>1 preferred beam identifiers by acquiring and measuring M beam (or RR) acquisition signals.

[0111] Fig.12An example beam scanning operation 1200 is shown in accordance with an embodiment of the present disclosure. Fig.12 The illustrated embodiment of the beam scanning operation 1200 is for illustration only. Fig.12 The scope of the present disclosure is not limited to any particular implementation of beam scanning operation 1200 .

[0112] like Fig.12 As shown, the aforementioned initial access procedure 1210 and the aforementioned mobility or radio resource management 1220 are described from the perspective of the UE. The initial access procedure 1210 includes obtaining a cell ID from a DL synchronization signal 1211, and retrieving broadcast information (together with system information required for the UE to establish DL and UL connections), followed by UL synchronization (which may include a random access procedure). Once the UE completes 1211 and 1212, the UE is connected to the network and associated with the cell. After the initial access procedure is completed, the UE, which may be mobile, is in the RRM state described in 1220. This state first includes an acquisition phase 1221, in which the UE may periodically (repeatedly) attempt to acquire a "beam" or RR ID from a "beam" or RR acquisition signal (such as measuring RS).

[0113] The UE may be configured with a list of beams / RR IDs to monitor. The TRP / network may update or reconfigure the "beam" / RR ID list. The configuration may be signaled via higher layer (such as RRC) signaling or a dedicated L1 or L2 control channel. Based on the list, the UE may monitor and measure signals associated with each of these beams / RR IDs. The signal may correspond to a measurement RS resource, such as a measurement RS resource similar to a CSI-RS resource in an LTE system. In this case, the UE may be configured with a set of K>1 CSI-RS resources for monitoring. There may be multiple options for measurement report 1222. First, the UE may measure each of the K CSI-RS resources, calculate the corresponding RS power (similar to RSRP or RSRQ in an LTE system), and report the RS power to the TRP (or network). Second, the UE may measure each of the K CSI-RS resources, calculate the associated CSI (which may include CQI and possible other CSI parameters, such as RI and PMI), and report the CSI to the TRP (or network). Based on the reports from the UE, the UE is assigned M≥1 "beams" or RRs via higher layer (RRC) signaling or L1 / L2 control signaling 1223. The UE is thus connected to these M "beams" / RRs.

[0114] For some scenarios, such as asynchronous networks, the UE may fall back to cell-ID based or cell-level mobility management similar to 3GPP LTE systems. Therefore, only one of the two levels of radio resource entities (cells) is applicable. When utilizing two levels ("cell" and "beam") of radio resource entities or management, the synchronization signal may be designed primarily for initial access to the network. For analog beam scanning (e.g. Fig.12 In millimeter wave systems where common signals (such as synchronization signals and broadcast channels) may be enhanced by multiplying the beam ID by a factor of 20 (as shown), the synchronization signal may be repeated across time (such as across OFDM symbols or time slots or subframes). However, this repetition factor is not necessarily related to the number of "beams" (defined as radio resource units, as distinct from the analog beams used in beam scanning) supported per cell or per TRP. Therefore, the beam identification (ID) cannot be acquired or detected from the synchronization signal. Instead, the beam ID is carried by a beam (RR) acquisition signal, such as a measurement RS. Similarly, the beam (RR) acquisition signal does not carry the cell ID (and therefore, the cell ID is not detected from the beam or RR acquisition signal).

[0115] Therefore, considering the above new challenges in the initial access procedure and RRM for new radio access technology (NR), there is a need to design synchronization signals (and their associated UE procedures) and a primary broadcast channel carrying broadcast information (e.g., a master information block or MIB).

[0116] In some embodiments of Part I for NR-DMRS design aspects, the following design aspects may be considered for NR-DMRS sequences. Note that the present disclosure also covers combinations of design aspects.

[0117] In one embodiment of aspect I, for the functionality of NR-DMRS, NR-DMRS is used only for demodulating NR-PBCH. In another embodiment, NR-DMRS is used only for carrying timing assumptions, such as SS block index (full or partial), and / or SS pulse index (full or partial), and / or LBS of SFN (e.g., one or two bits). In yet another embodiment, NR-DMRS is used for both demodulating NR-PBCH and carrying timing assumptions, such as SS block index (full or partial), and / or SS pulse index (full or partial), and / or LBS of SFN (e.g., one or two or three bits), and / or half-frame timing position in a radio frame (i.e., the first or second 5ms within a 10ms radio frame).

[0118] In one embodiment of aspect II for cell-specific or UE-specific, the NR-DMRS is cell-specific and its sequence is generated using at least the cell ID or part of the cell ID information. In another embodiment, the NR-DMRS is UE-specific and its sequence is generated using the cell ID (or part of the cell ID) and the UE ID information.

[0119] In one embodiment of aspect III for a parameter set for NR-DMRS, the parameter set for NR-DMRS is the same as the parameter set for NR-SS and NR-PBCH.

[0120] In one embodiment of aspect IV for NR-DMRS ports, NR-DMRS is sent on the same port as NR-SS and NR-PBCH ports (one port is designed for all). In another embodiment, NR-DMRS is sent on two ports, which are the same as NR-PBCH (which may be different from NR-SS). In yet another embodiment, NR-DMRS is sent on two ports, one of which is the same as NR-SS and the remaining one is the same as one of the ports used for NR-PBCH transmission.

[0121] In one embodiment of aspect V for carrier frequency dependence or independence. The sequence of NR-DMRS is independent / common for all carrier frequency ranges. Although different numbers of timing assumptions are carried in SS blocks for different carrier frequencies (e.g., SS block index (whole or part), and / or SS pulse index (whole or part), and / or LSB of SFN (e.g., one or two or three bits), and / or half-frame timing position in a radio frame (e.g., the first or second 5ms within a 10ms radio frame)), NR-DMRS carries the same number of timing assumptions so that the sequence design is common for all carrier frequency ranges.

[0122] In one example, for a given cell, if there are 4 timing assumptions for frequency range A (e.g., [0, 3] GHz), 8 timing assumptions for frequency range B (e.g., [3, 6] GHz), and 64 assumptions for frequency range C (e.g., [6, 52.6] GHz), the common design of the DMRS can carry 4 timing assumptions for all carrier frequency ranges (e.g., the 4 timing assumptions can refer to SS block indices within an SS pulse, or SS block pulse indices within an SS block pulse set, or SS block indices within an SS pulse set, or LBS of an SFN, or a 5 ms indication within a radio subframe, or a combination of the above timing information and / or a portion of the above timing information), and the remaining assumptions for carrier frequency ranges B and C are carried by other signals / channels in the SS block.

[0123] In another example, for a given cell, if there are 8 timing assumptions for frequency range A (e.g., [0, 3] GHz), 16 timing assumptions for frequency range B (e.g., [3, 6] GHz), and 128 assumptions for frequency range C (e.g., [6, 52.6] GHz), then a common design of the DMRS may carry 8 timing assumptions for all carrier frequency ranges (e.g., the 8 timing assumptions may refer to a 3-bit SS block index within a SS pulse, or a 3-bit SS block pulse index within a SS block pulse set, or 3 LSBs of an SS block index within a SS pulse set, or 3 MSBs of an SS block index within a SS pulse set, or 3 LSBs of an SFN, or a combination of 2 bits from the above timing information and a 5 ms indication within a radio subframe, and the 3-bit timing information may be different for different carrier frequency ranges), and the remaining assumptions for carrier frequency ranges B and C are carried by other signals / channels in the SS block (e.g., NR-PBCH payload or NR-PBCH scrambling or a combination).

[0124] In another example, for a given cell, if there are 16 timing assumptions for frequency range A (e.g., [0, 3] GHz), 32 timing assumptions for frequency range B (e.g., [3, 6] GHz), and 256 assumptions for frequency range C (e.g., [6, 52.6] GHz), the common design of the DMRS can carry 16 timing assumptions for all carrier frequency ranges (e.g., the 16 timing assumptions can refer to SS block indices within an SS pulse, or SS block pulse indices within an SS block pulse set, or SS block indices within an SS pulse set, or LBS of an SFN, or a 5 ms indication within a radio subframe, or a combination of the above timing information and / or a portion of the above timing information), and the remaining assumptions for carrier frequency ranges B and C are carried by other signals / channels in the SS block.

[0125] In another example, for a given cell, if there are 32 timing assumptions for frequency range A (e.g., [0, 3] GHz), 64 timing assumptions for frequency range B (e.g., [3, 6] GHz), and 512 assumptions for frequency range C (e.g., [6, 52.6] GHz), the common design of the DMRS can carry 32 timing assumptions for all carrier frequency ranges (e.g., the 32 timing assumptions can refer to SS block indices within an SS pulse, or SS block pulse indices within an SS block pulse set, or SS block indices within an SS pulse set, or LBS of an SFN, or a 5 ms indication within a radio subframe, or a combination of the above timing information and / or a portion of the above timing information), and the remaining assumptions for carrier frequency ranges B and C are carried by other signals / channels in the SS block.

[0126] In another example, for a given cell, if there are 64 timing assumptions for frequency range A (e.g., [0, 3] GHz), 128 timing assumptions for frequency range B (e.g., [3, 6] GHz), and 1024 assumptions for frequency range C (e.g., [6, 52.6] GHz), the common design of the DMRS can carry 64 timing assumptions for all carrier frequency ranges (e.g., the 64 timing assumptions can refer to SS block indices within an SS pulse, or SS block pulse indices within an SS block pulse set, or SS block indices within an SS pulse set, or LBS of an SFN, or a 5 ms indication within a radio subframe, or a combination of the above timing information and / or a portion of the above timing information), and the remaining assumptions for carrier frequency ranges B and C are carried by other signals / channels in the SS block.

[0127] In one embodiment, the sequence of NR-DMRS depends on the carrier frequency range. For example, if NR-DMRS is used to indicate timing information, such as SS block index (full or partial), and / or SS pulse index (full or partial), and / or LBS of SFN (e.g., one or two or three bits), and / or half-frame timing position in a radio frame (i.e., the first or second 5ms within a 10ms radio frame), the number of assumptions of timing information may be different for different carrier frequency ranges (e.g., a smaller number for a carrier frequency range from 0 to 6 GHz and a larger number for a carrier frequency range from 6 to 60 GHz).

[0128] In one example, for a given cell, if 4 timing assumptions are considered for frequency range A (e.g., [0, 3] GHz), 8 timing assumptions are considered for frequency range B (e.g., [3, 6] GHz), and 64 assumptions are considered for frequency range C (e.g., [6, 52.6] GHz), the DMRS may carry 4 (or 2 or 1) timing assumptions for carrier frequency range A, 8 (or 4 or 2) timing assumptions for carrier frequency range B, and 64 (or 32 or 16) timing assumptions for carrier frequency range C (note that the timing assumptions of different ranges are fixed on the radio, and the timing assumption may refer to an SS block index within an SS block pulse, or an SS block pulse index within an SS block pulse set, or an SS block index within an SS pulse set, or an LBS of an SFN, or a 5 ms indication within a radio subframe, or a combination of the above timing information and / or part of the above timing information).

[0129] To support different numbers of hypotheses for different carrier frequencies, the DMRS sequence for carrier frequency range A may be a subset of the sequence for carrier frequency range B (e.g., initial conditions are selected as a subset, or cyclic shifts are selected as a subset, or sequence generator / roots are selected as a subset, or both cyclic shifts and sequence generator / roots are selected as a subset), or the sequence for carrier frequency range B may be the product of the sequence for carrier frequency range A and an additional sequence; and the DMRS sequence for carrier frequency range B may be a subset of the sequence for carrier frequency range C (e.g., initial conditions are selected as a subset, or cyclic shifts are selected as a subset, or sequence generator / roots are selected as a subset, or both cyclic shifts and sequence generator / roots are selected as a subset), or the sequence for carrier frequency range C may be the product of the sequence for carrier frequency range B and an additional sequence. If the number of hypotheses in brackets is taken (i.e., the complete timing information is not taken), the remaining timing hypotheses are carried by other signals / channels in the SS block (e.g., NR-SSS and / or PBCH), and the design is common to all carrier frequencies.

[0130] In one example, for a given cell, if 8 timing assumptions are considered for frequency range A (e.g., [0, 3] GHz), 16 timing assumptions are considered for frequency range B (e.g., [3, 6] GHz), and 128 assumptions are considered for frequency range C (e.g., [6, 52.6] GHz), the DMRS may carry 8 (or 4 or 2 or 1) timing assumptions for carrier frequency range A, 16 (or 8 or 4 or 2) timing assumptions for carrier frequency range B, and 128 (or 64 or 32 or 16) timing assumptions for carrier frequency range C (note that the timing assumptions of different ranges are fixed to the radio, and the timing assumption may refer to an SS block index within an SS pulse, or an SS block pulse index within an SS block pulse set, or an SS block index within an SS pulse set, or an LBS of an SFN, or a 5 ms indication within a radio subframe, or a combination of the above timing information and / or part of the above timing information).

[0131] To support different numbers of hypotheses for different carrier frequencies, the DMRS sequence for carrier frequency range A may be a subset of the sequence for carrier frequency range B (e.g., initial conditions are selected as a subset, or cyclic shifts are selected as a subset, or sequence generator / roots are selected as a subset, or both cyclic shifts and sequence generator / roots are selected as a subset), or the sequence for carrier frequency range B may be the product of the sequence for carrier frequency range A and an additional sequence; and the DMRS sequence for carrier frequency range B may be a subset of the sequence for carrier frequency range C (e.g., initial conditions are selected as a subset, or cyclic shifts are selected as a subset, or sequence generator / roots are selected as a subset, or both cyclic shifts and sequence generator / roots are selected as a subset), or the sequence for carrier frequency range C may be the product of the sequence for carrier frequency range B and an additional sequence. If the number of hypotheses in brackets is taken (i.e., the complete timing information is not taken), the remaining timing hypotheses are carried by other signals / channels in the SS block (e.g., NR-SSS and / or PBCH), and the design is common to all carrier frequencies.

[0132] In another example, for a given cell, if 16 timing assumptions are considered for frequency range A (e.g., [0, 3] GHz), 32 timing assumptions are considered for frequency range B (e.g., [3, 6] GHz), and 256 assumptions are considered for frequency range C (e.g., [6, 52.6] GHz), the DMRS may carry 16 (or 8 or 4 or 2 or 1) timing assumptions for carrier frequency range A, 32 (or 16 or 8 or 4 or 2) timing assumptions for carrier frequency range B, and 256 (or 128 or 64 or 32 or 16) timing assumptions for carrier frequency range C (note that the radio of the timing assumptions of different ranges is fixed, and the timing assumption may refer to the SS block index within the SS pulse, or the SS block pulse index within the SS block pulse set, or the SS block index within the SS pulse set, or the LBS of the SFN, or the 5 ms indication within the radio subframe, or a combination of the above timing information and / or part of the above timing information).

[0133] To support different numbers of hypotheses for different carrier frequencies, the DMRS sequence for carrier frequency range A may be a subset of the sequence for carrier frequency range B (e.g., cyclic shift is selected as a subset, or sequence generator / root is selected as a subset, or both cyclic shift and sequence generator / root are selected as a subset), or the sequence for carrier frequency range B may be the product of the sequence for carrier frequency range A and an additional sequence; and the DMRS sequence for carrier frequency range B may be a subset of the sequence for carrier frequency range C (e.g., cyclic shift is selected as a subset, or sequence generator / root is selected as a subset, or both cyclic shift and sequence generator / root are selected as a subset), or the sequence for carrier frequency range C may be the product of the sequence for carrier frequency range B and an additional sequence. If the number of hypotheses in brackets is taken (i.e., the complete timing information is not taken), the remaining timing hypotheses are carried by other signals / channels in the SS block (e.g., NR-SSS and / or PBCH), and the design is common to all carrier frequencies.

[0134] In another example, for a given cell, if 32 timing hypotheses are considered for frequency range A (e.g., [0, 3] GHz), 64 timing hypotheses are considered for frequency range B (e.g., [3, 6] GHz), and 512 hypotheses are considered for frequency range C (e.g., [6, 52.6] GHz), then the DMRS may carry 32 (or 16 or 8 or 4 or 2 or 1) timing hypotheses for carrier frequency range A and 64 (or 32 or 16 or 8) timing hypotheses for carrier frequency range B. or 4 or 2) timing assumptions, carrying 512 (or 256 or 128 or 64 or 32 or 16) timing assumptions for carrier frequency range C (note that the radio of timing assumptions in different ranges is fixed, and the timing assumption may refer to an SS block index within an SS pulse, or an SS block pulse index within an SS block pulse set, or an SS block index within an SS pulse set, or an LBS of an SFN, or a 5ms indication within a radio subframe, or a combination of the above timing information and / or part of the above timing information).

[0135] To support different numbers of hypotheses for different carrier frequencies, the DMRS sequence for carrier frequency range A may be a subset of the sequence for carrier frequency range B (e.g., cyclic shift is selected as a subset, or sequence generator / root is selected as a subset, or both cyclic shift and sequence generator / root are selected as a subset), or the sequence for carrier frequency range B may be the product of the sequence for carrier frequency range A and an additional sequence; and the DMRS sequence for carrier frequency range B may be a subset of the sequence for carrier frequency range C (e.g., cyclic shift is selected as a subset, or sequence generator / root is selected as a subset, or both cyclic shift and sequence generator / root are selected as a subset), or the sequence for carrier frequency range C may be the product of the sequence for carrier frequency range B and an additional sequence. If the number of hypotheses in brackets is taken (i.e., the complete timing information is not taken), the remaining timing hypotheses are carried by other signals / channels in the SS block (e.g., NR-SSS and / or PBCH), and the design is common to all carrier frequencies.

[0136] In another example, for a given cell, if 64 timing hypotheses are considered for frequency range A (e.g., [0, 3] GHz), 128 timing hypotheses are considered for frequency range B (e.g., [3, 6] GHz), and 1024 hypotheses are considered for frequency range C (e.g., [6, 52.6] GHz), then the DMRS may carry 64 (or 32 or 16 or 8 or 4 or 2 or 1) timing hypotheses for carrier frequency range A and 126 (or 64 or 32 or 16) timing hypotheses for carrier frequency range B. or 8 or 4 or 2) timing assumptions, carrying 1024 (or 512 or 256 or 128 or 64 or 32 or 16) timing assumptions for carrier frequency range C (note that the radio of different ranges of timing assumptions is fixed, and the timing assumption may refer to an SS block index within an SS pulse, or an SS block pulse index within an SS block pulse set, or an SS block index within an SS pulse set, or an LBS of an SFN, or a 5ms indication within a radio subframe, or a combination of the above timing information and / or part of the above timing information).

[0137] To support different numbers of hypotheses for different carrier frequencies, the DMRS sequence for carrier frequency range A may be a subset of the sequence for carrier frequency range B (e.g., cyclic shift is selected as a subset, or sequence generator / root is selected as a subset, or both cyclic shift and sequence generator / root are selected as a subset), or the sequence for carrier frequency range B may be the product of the sequence for carrier frequency range A and an additional sequence; and the DMRS sequence for carrier frequency range B may be a subset of the sequence for carrier frequency range C (e.g., cyclic shift is selected as a subset, or sequence generator / root is selected as a subset, or both cyclic shift and sequence generator / root are selected as a subset), or the sequence for carrier frequency range C may be the product of the sequence for carrier frequency range B and an additional sequence. If the number of hypotheses in brackets is taken (i.e., the complete timing information is not taken), the remaining timing hypotheses are carried by other signals / channels in the SS block (e.g., NR-SSS and / or PBCH), and the design is common to all carrier frequencies.

[0138] In yet another embodiment, a combination of the above two embodiments is used for different carrier frequency ranges. In one example, for a given cell, if 4 timing hypotheses are considered for frequency range A (e.g., [0, 3] GHz), 8 timing hypotheses are considered for frequency range B (e.g., [3, 6] GHz), and 64 hypotheses are considered for frequency range C (e.g., [6, 52.6] GHz), then the DMRS can carry 8 timing hypotheses for carrier frequency ranges B and C (e.g., the 8 timing hypotheses can refer to a 3-bit SS block index within an SS pulse, or a 3-bit SS block pulse index within an SS block pulse set, or 3 LSBs of an SS block index within an SS pulse set, or 3 MSBs of an SS block index within an SS pulse set, or 3 LSBs of an SFN, or 2 bits from the above timing information and a 5 ms indication within a radio subframe). combination of), and the remaining assumptions for carrier frequency range C are carried by other signals / channels in the SS block (for example, NR-PBCH payload or NR-PBCH scrambling or a combination thereof), and the DMRS can carry 4 timing assumptions for carrier frequency range A, where the DMRS sequence for carrier frequency range A can be a subset of the sequences of carrier frequency ranges B and C, where the sequences of ranges B and C are the same (for example, to construct the subset sequence, selecting the initial condition as a subset, or selecting the cyclic shift as a subset, or selecting the cyclic shift as a subset, or selecting the sequence generator / root as a subset, or selecting both the cyclic shift and the sequence generator / root as a subset) can be performed, or the sequence for carrier frequency ranges B and C can be the product of the sequence of carrier frequency range A and the additional sequence.

[0139] In yet another example, for a given cell, if 8 timing hypotheses are considered for frequency range A (e.g., [0, 3] GHz), 16 timing hypotheses are considered for frequency range B (e.g., [3, 6] GHz), and 128 hypotheses are considered for frequency range C (e.g., [6, 52.6] GHz), then the DMRS may carry 16 timing hypotheses for carrier frequency ranges B and C (e.g., the 16 timing hypotheses may refer to a 4-bit SS block index within an SS pulse, or a 4-bit SS block pulse index within an SS block pulse set, or 4 LSBs of the SS block index within an SS pulse set, or 4 MSBs of the SS block index within an SS pulse set, or 4 LSBs of the SFN, or a combination of 3 LSBs of the SS block index within an SS pulse set and a 5 ms indication within a radio subframe, or 4 MSBs of the SS block index within an SS pulse set); A combination of 3 MSBs and a 5 ms indication within a radio subframe, or a combination of 3 LSBs of SFN and a 5 ms indication within a radio subframe), and the remaining assumptions for carrier frequency range C are carried by other signals / channels in the SS block (e.g., NR-PBCH payload or NR-PBCH scrambling or a combination thereof), and the DMRS can carry 8 timing assumptions for carrier frequency range A, where the DMRS sequence for carrier frequency range A can be a subset of the sequences for carrier frequency ranges B and C, where the sequences for ranges B and C are the same (e.g., to construct the subset sequence, selecting the initial condition as a subset, selecting the cyclic shift as a subset, or selecting the sequence generator / root as a subset, or selecting both the cyclic shift and the sequence generator / root as a subset can be performed), or the sequence for carrier frequency ranges B and C can be the product of the sequence for carrier frequency range A and the additional sequence.

[0140] In another example, for a given cell, if 16 timing hypotheses are for frequency range A (e.g., [0, 3] GHz), 32 timing hypotheses are for frequency range B (e.g., [3, 6] GHz), and 256 hypotheses are for frequency range C (e.g., [6, 52.6] GHz), then the DMRS can carry 32 timing hypotheses for carrier frequency ranges B and C (e.g., the 32 timing hypotheses can refer to an SS block index within an SS pulse, or an SS block pulse index within an SS block pulse set, or an SS block index within an SS pulse set, or an LBS of an SFN, or a 5 ms indication within a radio subframe, or The above timing information and / or a combination of part of the above timing information), and the remaining assumptions for carrier frequency range C are carried by other signals / channels in the SS block (e.g., PBCH payload), and the DMRS can carry 16 timing assumptions for carrier frequency range A, wherein the DMRS sequence for carrier frequency range A can be a subset of the sequences of carrier frequency ranges B and C (e.g., selecting cyclic shift as a subset, or selecting sequence generator / root as a subset, or selecting both cyclic shift and sequence generator / root as a subset), or the sequence for carrier frequency ranges B and C can be the product of the sequence of carrier frequency range A and an additional sequence.

[0141] In yet another example, for a given cell, if 32 timing hypotheses are for frequency range A (e.g., [0, 3] GHz), 64 timing hypotheses are for frequency range B (e.g., [3, 6] GHz), and 512 hypotheses are for frequency range C (e.g., [6, 52.6] GHz), then the DMRS may carry 64 timing hypotheses for carrier frequency ranges B and C (e.g., the 64 timing hypotheses may refer to an SS block index within an SS pulse, or an SS block pulse index within an SS block pulse set, or an SS block index within an SS pulse set, or an LBS of an SFN, or a 5 m within a radio subframe). s indication, or a combination of the above timing information and / or part of the above timing information), and the remaining assumptions for carrier frequency range C are carried by other signals / channels in the SS block, and the DMRS can carry 32 timing assumptions for carrier frequency range A, where the DMRS sequence of carrier frequency range A can be a subset of the sequences of carrier frequency ranges B and C (for example, selecting cyclic shift as a subset, or selecting sequence generator / root as a subset, or selecting both cyclic shift and sequence generator / root as a subset), or the sequence of carrier frequency ranges B and C can be the product of the sequence of carrier frequency range A and an additional sequence.

[0142] In yet another example, for a given cell, if 64 timing hypotheses are for frequency range A (e.g., [0, 3] GHz), 128 timing hypotheses are for frequency range B (e.g., [3, 6] GHz), and 1024 hypotheses are for frequency range C (e.g., [6, 52.6] GHz), then the DMRS may carry 128 timing hypotheses for carrier frequency ranges B and C (e.g., the 128 timing hypotheses may refer to an SS block index within an SS pulse, or an SS block pulse index within an SS block pulse set, or an SS block index within an SS pulse set, or an LBS of an SFN, or a radio subframe within a radio subframe). 5ms indication, or a combination of the above timing information and / or part of the above timing information), and the remaining assumptions for carrier frequency range C are carried by other signals / channels in the SS block, and the DMRS can carry 64 timing assumptions for carrier frequency range A, where the DMRS sequence of carrier frequency range A can be a subset of the sequences of carrier frequency ranges B and C (for example, selecting the cyclic shift as a subset, or selecting the sequence generator / root as a subset, or selecting both the cyclic shift and the sequence generator / root as a subset), or the sequence of carrier frequency ranges B and C can be the product of the sequence of carrier frequency range A and the additional sequence.

[0143] In some embodiments of aspect VI, the sequence type of NR-DMRS used to indicate the timing hypothesis (e.g., SS block index (full or partial), and / or SS pulse index (full or partial), and / or LSB of SFN (e.g., one or two bits), and / or half-frame timing position in the radio frame (i.e., the first or second 5ms within a 10ms radio frame) is considered. Note that the sequence here can be combined with other sequences (e.g., multiplied or XORed or interleaved) to generate the final sequence of NR-DMRS.

[0144] In one example, one or more ZC sequences with one or more cyclic shifts may be used to indicate a timing assumption in NR-DMRS. In another example, one or more M sequences with one or more cyclic shifts may be used to indicate a timing assumption in NR-DMRS. In yet another example, two interleaved M sequences may be used to indicate a timing assumption in NR-DMRS. In yet another example, a BPSK or QPSK modulated Gold sequence (exclusive OR of two M sequences) with cyclic shifts and / or initial conditions may be used to indicate a timing assumption in NR-DMRS.

[0145] In some embodiments of aspect VII, the sequence length of NR-DMRS is considered. In general, the sequence length is determined by the number of REs available within a symbol, the number of symbols to be multiplexed with NR-PBCH and NR-DMRS, the overhead ratio of NR-DMRS, and the actual sequence type used to generate NR-DMRS (see aspect VI) (for example, there are some restrictions on the sequence length for a specific type of sequence). At the same time, if the NR-DMRS is located in multiple symbols within a subframe (which can be continuous or non-continuous symbols), the following embodiments can be considered to determine the sequence length.

[0146] In one example, the NR-DMRS sequence within each symbol may be the same between different symbols, then the sequence (and the associated sequence length) used to generate the NR-DMRS refers to the sequence within each symbol. In another example, there is only one NR-DMRS sequence across all symbols (which may be continuous or non-contiguous), then the sequence (and the associated sequence length) used to generate the NR-DMRS refers to the sequence within all symbols.

[0147] Based on the above considerations, the number of REs N used to generate the NR-DMRS sequence DMRS and the actual sequence length N of NR-DMRS DMRS It can be determined according to Table 1 (for the construction method based on product and BPSK modulation in Part II) and Table 2 (for the construction method based on QPSK modulation in Part II), where N is determined by the payload of the NR-DMRS in the symbol. DMRS , and also consider the specific sequence type to determine L DMRS To generate NR-DMRS. DMRS and N DMRS The relationship between and can be determined as follows.

[0148] In one example, truncation (including no truncation) may be used to generate NR-DMRS. DMRS The value of is after "or" in Table 1A and Table 1B, Table 2A and Table 2B correspond to this embodiment, where L DMRS ≥N DMRS Note that in this embodiment, L DMRS The value of refers to the minimum sequence length to be truncated from the DMRS and to generate the DMRS, and the actual sequence length can be greater than L DMRS .

[0149] In another example, repetition of all or part of the sequence (including non-repetition), and / or multiplexing with a zero sequence (including non-multiplexing), and / or concatenation with multiple sequences (including non-concatenation) can be used to generate NR-DMRS. DMRSThe value of is before the "or" in Table 1A and Table 1B, and Table 2A and Table 2B correspond to this embodiment, where L DMRS ≤N DMRS .

[0150] In yet another example, a combination of the above two embodiments may be used to generate NR-DMRS.

[0151] In yet another example, the sequence length for generating DMRS is fixed, regardless of the DMRS overhead and RE mapping mode. In this case, the DMRS sequence is always truncated from a much longer PN sequence. For example, it can reuse the sequence generator of the LTE CRS sequence, or the LTE DMRS sequence for PDSCH, or the NR DMRS sequence for NR PDSCH. For another example, it can reuse the sequence generator type of the LTE CRS sequence (whose length is 2^31-1), or the LTE DMRS sequence for PDSCH (whose length is 2^31-1), or the NR DMRS sequence for NR PDSCH (e.g., also having a length of 2^31-1).

[0152] Table 1A. NR-DMRS sequence design

[0153]

[0154]

[0155]

[0156]

[0157] Table 1B. NR-DMRS design

[0158]

[0159]

[0160]

[0161]

[0162] Table 2A. NR-DMRS design

[0163]

[0164]

[0165]

[0166]

[0167] Table 2B. NR-DMRS design

[0168]

[0169]

[0170]

[0171]

[0172] If the DMRS REs are not uniformly distributed, there may be multiple NR-DMRS sequences mapped to the REs for DMRS transmission (the lengths of the NR-DMRS sequences may be the same or different). For each of them, the number of REs is denoted as N DMRS , then the same principle as above can be used to calculate the actual sequence length of the sequence generating the DMRS sequence. For example, the following sequence lengths in Tables 3A and 3B (for the construction method based on product and BPSK modulation in Part II) and Tables 4A and 4B (for the construction method based on QPSK modulation in Part II) are considered for uneven RE mapping of NR-DMRS sequences.

[0173] Table 3A. NR-DMRS design

[0174]

[0175]

[0176] Table 3B. NR-DMRS design

[0177]

[0178]

[0179] Table 4A. NR-DMRS design

[0180]

[0181]

[0182] Table 4B. NR-DMRS design

[0183]

[0184]

[0185] In some embodiments of aspect VIII for mapping NR-DMRS, the NR-DMRS may be mapped to contiguous REs with the same symbol as the NR-PBCH within the resource grid (frequency division multiplexing (FDM) with the NR-PBCH). For example, they may be mapped at the center of the NR-SS transmission bandwidth. In another embodiment, the NR-DMRS may be mapped to separate symbols within the resource grid (time division multiplexing (TDM) with the PBCH). In yet another embodiment, the NR-DMRS may be mapped to non-contiguous REs with the same symbol as the NR-PBCH within the resource grid (interleaved frequency division multiplexing (IFDM) with the NR-PBCH). For example, they may be uniformly mapped and interleaved with the NR-PBCH REs.

[0186] In one sub-embodiment, the NR-DMRS sequence may be identically mapped to multiple symbols in the time domain. In another sub-embodiment, the NR-DMRS sequence may be identically mapped to multiple groups of PRBs in the frequency domain. For example, if the DMRS REs are uniformly distributed, one copy of the NR-DMRS sequence is mapped to the central portion of the bandwidth (e.g., the central 12 PRBs), and another copy of the NR-DMRS sequence is mapped to the remaining portion of the bandwidth (e.g., the remaining 12 PRBs). For another example, if the DMRS REs are not uniformly distributed (e.g., the density within the central 12 PRBs is 1 / X of the density in the remaining 12 PRBs), one copy of the NR-DMRS sequence is mapped to the central portion of the bandwidth (e.g., the central 12 PRBs), and X copies are mapped to the remaining portion of the bandwidth (e.g., the remaining 12 PRBs, and a specific example is to map two copies to the upper and lower 6 PRBs accordingly when X=2).

[0187] In another sub-embodiment, the NR-DMRS sequence can be mapped to multiple groups of PRBs in the frequency domain in the same manner, but with different phase rotations. For example, if the DMRS REs are uniformly distributed, one copy of the NR-DMRS sequence is mapped to the central portion of the bandwidth (e.g., the central 12 PRBs), and another copy of the NR-DMRS sequence with a phase rotation of π (equivalent to the opposite value of the original sequence) is mapped to the remaining portion of the bandwidth (e.g., the remaining 12 PRBs). For another example, if the DMRS REs are not uniformly distributed (e.g., the density within the central 12 PRBs is 1 / X of the density in the remaining 12 PRBs), one copy of the NR-DMRS sequence is mapped to the central portion of the bandwidth (e.g., the central 12 PRBs), and X copies with phase rotation are mapped to the remaining portion of the bandwidth (e.g., the remaining 12 PRBs, and a specific example is to map two copies to the upper and lower 6 PRBs accordingly when X=2).

[0188] In yet another sub-embodiment, one NR-DMRS sequence may be mapped to a portion of the NR-PBCH bandwidth (e.g., the central 12 PRBs), and another NR-DMRS sequence carrying only cell ID information is mapped to the remainder of the bandwidth (note that the present disclosure covers both NR-DMRS sequence designs).

[0189] In yet another sub-embodiment, one NR-DMRS sequence may be mapped to a portion of the NR-PBCH bandwidth (e.g., the central 12 PRBs) and another NR-DMRS sequence is mapped to the remainder of the bandwidth (note that the two NR-DMRS sequences may be the same or different and the present disclosure covers both NR-DMRS sequence designs).

[0190] In yet another sub-embodiment, if the DMRS REs are not uniformly distributed (e.g., the density within the central 12 PRBs is 1 / X of the density within the remaining 12 PRBs), one NR-DMRS sequence may be mapped to a portion of the NR-PBCH bandwidth (e.g., the central 12 PRBs), and the other X copies of the NR-DMRS sequence carrying only cell ID information may be mapped to the remaining bandwidth (a specific example is to map two copies to the upper and lower 6 PRBs, respectively, when X=2. Note that the present disclosure covers these two NR-DMRS sequence designs). In yet another sub-embodiment, multiple NR-DMRS sequences may be mapped to multiple symbols in the time domain, where the multiple sequences are constructed in a similar pattern and the only difference is the timing information carried (e.g., symbol index information).

[0191] In this case, the same DMRS overhead ratio (e.g. 1 / r DMRS ), we can have K = r DMRS ·r DMRS possible mapping patterns, so that it can indicate up to K hypotheses. Combining the hypotheses indicated by the NR-DMRS sequence itself, we can have the following sub-design (symbol L 1 and L 2 Corresponds to L in Part II.A and Part II.B 1 = |U| and L 2 =|V|). Note that k (the number of hypotheses carried by the IFDM multiplexing pattern, and k≤K) can be 1 in all the following sub-embodiments, which means that no hypothesis is indicated by the IFDM multiplexing pattern. And note that L 1 and L 2The SS block timing indication method is detailed in Part II.A and Part II.B, and the number of timing assumptions in the remainder of the present disclosure means the remaining number of timing assumptions other than the timing assumptions already carried by the IFDM multiplexing mode (which is purely carried by the NR-DMRS sequence itself).

[0192] In one sub-embodiment, the IFDM multiplexing pattern can be used to indicate some timing assumptions, such as, for example, an SS block index within an SS pulse, or an SS block pulse index within an SS block pulse set, or an SS block index within an SS pulse set, or an LBS of an SFN, or a 5ms indication within a radio subframe, or a combination of the above timing information and / or a portion of the above timing information.

[0193] In one sub-embodiment, the IFDM multiplexing pattern may be used to indicate k cell ID hypotheses (or a portion of cell ID hypotheses), and the NR-DMRS sequence may be used to indicate up to L cell ID hypotheses. 1 ·L 2 A cell-specific SS block timing assumption corresponds to a cell ID carried by the IFDM multiplexing pattern.

[0194] In another sub-embodiment, (k, L 1 , L 2 ) are used together to indicate the SS block timing assumption, where k is used to indicate the SS pulse index, (L 1 , L 2 ) is used to indicate the SS block index within the SS pulse (note that the designs in Part II.A and Part II.B can still be used for different carrier frequencies, for example, carrier frequency range A is 0 to 6 GHz and carrier frequency range B is 6 to 60 GHz).

[0195] In yet another sub-embodiment, (k, L 1 , L 2 ) are used together to indicate the SS block timing assumption, where L 1 Used to indicate SS pulse index, (k, L 2 ) is used to indicate the SS block index within the SS pulse (note that the designs in Part II.A and Part II.B can still be used for different carrier frequencies, for example, carrier frequency range A is 0 to 6 GHz and carrier frequency range B is 6 to 60 GHz).

[0196] In yet another sub-embodiment, (k, L 1 , L 2 ) are used together to indicate the SS block timing assumption, where L 2 Used to indicate SS pulse index, (k, L 1) is used to indicate the SS block index within the SS pulse (note that the designs in Part II.A and Part II.B can still be used for different carrier frequencies, for example, carrier frequency range A is 0 to 6 GHz and carrier frequency range B is 6 to 60 GHz).

[0197] In yet another sub-embodiment, (k, L 1 , L 2 ) are used together to indicate the SS block timing hypothesis, where k is used to indicate the number of SS block timing index hypotheses in the carrier frequency range A (e.g., 0 to 6 GHz), (k, L 1 , L 2 ) is used to indicate the number of SS block timing index assumptions for the carrier frequency range B (e.g., 6 to 60 GHz).

[0198] In yet another sub-embodiment, (k, L 1 , L 2 ) are used together to indicate the SS block timing assumption, where (k, L 1 ) is used to indicate the number of SS block timing index hypotheses in the carrier frequency range A (e.g., 0 to 6 GHz), (k, L 1 , L 2 ) is used to indicate the number of SS block timing index hypotheses in the carrier frequency range B (e.g., 6 to 60 GHz). In another sub-embodiment, (k, L 1 , L 2 ) are used together to indicate the SS block timing assumption, where (k, L 2 ) is used to indicate the number of SS block timing index hypotheses in the carrier frequency range A (e.g., 0 to 6 GHz), (k, L 1 , L 2 ) is used to indicate the number of SS block timing index assumptions for the carrier frequency range B (e.g., 6 to 60 GHz).

[0199] In some embodiments of Part II for NR-DMRS sequence design, for example, a product-based construction method is used to generate a sequence s for NR-DMRS. DMRS (m) s can be defined by the product of two subsequences DMRS (m) = s 1 (m)·s 2 (m) m = 0, 1, ..., L DMRS -1. In another embodiment (based on the construction method of BPSK modulation), the sequence s used to generate NR-DMRS is DMRS (m) can be modulated by PBSK signal c(n)(0≤m≤L DMRS -1) Definition, s DMRS (m) = 1-2·c(m), c(m) = (s 1 (m)+s2 (m))mod 2 m=0,1,...,L DMRS -1.

[0200] In another embodiment (a construction method based on QPSK modulation), the sequence s used to generate the NR-DMRS is DMRS (n) can be defined by the QPSK modulated signal c(m) by truncating the last element or truncating the central element, c(m)=(s 1 (m)+s 2 (m))mod2m=0,1,...,L DMRS -1. For all the above examples, s 1 (m) and s 2 The function of (m) is as follows.

[0201] In one sub-embodiment, s 1 (m) carries a timing assumption, such as an SS block index (full or partial), and / or an SS pulse index (full or partial), and / or an LBS of the SFN (e.g. one, two, or three bits), and / or the timing position of the SS block in the radio frame (i.e., the first or second 5 ms within a 10 ms radio frame if the period is 5 ms), s 2 (m) carries cell ID (or part thereof) and / or UE ID and / or time slot index and / or symbol index information.

[0202] In another sub-embodiment, s 1 (m) carries part of the timing assumption, such as the SS block index (full or partial), and / or the SS pulse index (full or partial), and / or the LBS of the SFN (e.g. one or two or three bits), and / or the timing position of the SS block in the radio frame (i.e., the first or second 5 ms within a 10 ms radio frame if the period is 5 ms), s 2 (m) carries the remainder of the timing hypothesis and / or cell ID (or part thereof) and / or UE ID and / or slot index and / or symbol index information (e.g., the cell ID information is in an initial condition and the timing hypothesis is in a cyclic shift of the sequence).

[0203] In yet another sub-embodiment, s 1 (m) carries the part of the cell ID information, s 2(m) carries the remainder of the cell ID information and the timing assumption, such as the SS block index (full or partial), and / or the SS pulse index (full or partial), and / or the LBS of the SFN (e.g., one or two or three bits), and / or the timing position of the SS block in the radio frame (i.e., the first or second 5 ms within a 10 ms radio frame if the periodicity is 5 ms) (e.g., the cell ID information and the timing assumption are carried in the initial condition of the sequence).

[0204] In yet another sub-embodiment, s 1 (m) and s 2 (m) Both carry timing assumptions, such as SS block index (full or partial), and / or SS pulse index (full or partial), and / or LBS of SFN (e.g., one or two or three bits), and / or timing position of SS block in radio frame (i.e., first or second 5ms within 10ms radio frame if periodicity is 5ms) and cell ID information (or part thereof). For example, cell ID information is in initial condition and timing assumption is in cyclic shift of sequence. For another example, combination of cell ID information and timing assumption is in initial condition of sequence.

[0205] In yet another sub-embodiment, s 1 (m) is a constant sequence (e.g., 1 for product-based embodiments and 0 for BPSK and QPSK modulation-based embodiments), s 2 (m) is a scrambled sequence carrying the timing assumption (if applicable) (e.g., SS block index (all or part), and / or SS pulse index (all or part), and / or LBS of SFN (e.g., one or two or three bits), and / or the timing position of the SS block in the radio frame (i.e., if the periodicity is 5 ms, the first or second 5 ms within a 10 ms radio frame) and cell ID (or part thereof) information.

[0206] In yet another sub-embodiment, s 2 (m) is a constant sequence (e.g., 1 for product-based embodiments and 0 for BPSK and QPSK modulation-based embodiments), s 1 (m) Carries timing assumptions (if applicable), e.g., SS block index (full or partial), and / or SS pulse index (full or partial), and / or LBS of SFN (e.g., one or two or three bits), and / or timing position of SS block in radio frame (i.e., first or second 5ms within 10ms radio frame if periodicity is 5ms). Cell ID information is carried by common scrambling sequence of NR-DMRS and NR-PBCH.

[0207] sequence s 1 (m) and s2 The specific design of (m) is as follows (note that support s 1 (m) and s 2 (m) Combination of different design options).

[0208] In use 1 In some embodiments of part II.A of the sequence design of (m), the sequence s 1 (m) does not carry any timing information (equivalent to DMRS consisting only of s 2 (m) construction), then s 1 (m) = 1m = 0, 1, ..., L DMRS -1. In another embodiment, the sequence s 1 (m) carries a timing assumption, e.g., SS block index (full or partial), and / or SS pulse index (full or partial), and / or LBS of SFN (e.g., one or two or three bits), and / or the timing position of the SS block in the radio frame (i.e., the first or second 5 ms within a 10 ms radio frame if the period is 5 ms), and then s can be defined using one of the following options: 1 (m) (See also Design Aspect VI in Section I).

[0209] In one example of Option 1 using ZC sequences with possible cyclic shifts, the sequence s 1 (m) By Definition, where

[0210] L DMRS As determined in Table 1A, Table 1B, Table 2A, Table 2B, Table 3A, Table 3B, Table 4A and Table 4B (corresponding columns), u is the root index of the ZC sequence, u∈U (1≤u≤L DMRS -1), v is the cyclic shift index, v∈V(0≤v≤L DMRS -1). |V|·|U| is equal to or greater than the number of timing hypotheses carried by the NR-DMRS.

[0211] Note that the number of timing assumptions carried by the NR-DMRS may be different for different carrier frequency ranges (see also Design Aspect V in Section I). For example, if the number of timing assumptions carried by the NR-DMRS for carrier frequency range A is less than the number of timing assumptions carried for carrier frequency range B (e.g., carrier frequency range A is 0 to 6 GHz and carrier frequency range B is 6 to 60 GHz), in this scenario, a corresponding design sub-option may be considered (replacing V A and V B For the corresponding root index set, U A and U Bfor the corresponding set of cyclic shift indices). Note that the design suboptions can be generalized to more than two frequency ranges.

[0212] In one example of sub-option 1, V A =V B and This means using the same sequence, but using different cyclic shifts for different frequency ranges. A specific example of this sub-option could be |U A |=1,|U B | is the multiple difference between the assumed quantities, which means that in the absence of a circular shift (equivalent to a default shift), |V A | sequences are used for carrier frequency range A, and in order to carry a larger number of hypotheses for carrier frequency range B, the |V A | sequence of cyclic shifts. At the same time, a special case of this example is |V A |=|V B |=1, which means no cyclic shift.

[0213] In an example of sub-option 2, and U A =U B , which means that the same cyclic shift is utilized, and different base sequences are used for different frequency ranges. A specific example of this sub-option could be |V A |=1,|V B | is the multiple difference between the number of hypotheses, which means that carrier frequency range A utilizes only one sequence, and in order to carry a larger number of hypotheses for carrier frequency range B, multiple sequences (with the same cyclic shift) are utilized. Meanwhile, a special case of this example is |U A |=|U B |=1, which means that only one ZC sequence is used. Another special case of this example is |U A |=|U B |=2, which means that two ZC sequences are utilized and they can utilize conjugate roots.

[0214] In an example of sub-option 3, and This means that for different frequency ranges both the cyclic shift and the base sequence may be different.

[0215] In another embodiment, the number of timing assumptions carried by the NR-DMRS can be the same for different carrier frequency ranges (see also Design Aspect V in Section I), even though the number of timing assumptions carried by the SS block is different. For example, if the number of timing assumptions carried by the SS block for carrier frequency range A is less than the number of timing assumptions carried for carrier frequency range B (e.g., carrier frequency range A is 0 to 6 GHz and carrier frequency range B is 6 to 60 GHz), then the DMRS sequence can be common for both carrier frequencies and the remaining timing assumptions are implicitly or explicitly carried by other signals / channels (e.g., NR-SSS or NR-PBCH). For example, if there are 8 timing assumptions for frequency range A and 64 timing assumptions for frequency range B, then a common DMRS sequence design carrying 2 / 4 / 8 timing assumptions can be used for both carrier frequencies.

[0216] In yet another embodiment, the number of timing assumptions carried by the NR-DMRS may be the same for different carrier frequency ranges (see also Design Aspect V in Section I), even though the number of timing assumptions carried by the SS block is different. For example, if the number of timing assumptions carried by the SS block for carrier frequency range A is less than the number of timing assumptions carried for carrier frequency range B (e.g., carrier frequency range A is 0 to 6 GHz and carrier frequency range B is 6 to 60 GHz), then the DMRS sequence may reflect the difference in the number of assumptions and, if common, carry the remaining timing assumptions via other signals / channels (e.g., implicitly or explicitly via NR-SSS or NR-PBCH). For example, if there are 8 timing assumptions for frequency range A and 64 timing assumptions for frequency range B, then the DMRS carries 8 / 4 / 2 / 1 assumptions in frequency range A and 64 / 32 / 16 / 8 assumptions in frequency range B (note that the respective ratios of the number of assumptions are fixed), and the remaining 1 / 2 / 4 / 8 assumptions are carried by other signals / channels.

[0217] Note that the above embodiments can be combined when the number of assumptions carried by the DMRS is different for more than 2 carrier frequency ranges. For example, if the DMRS carries 4 timing assumptions for carrier frequency range A (0 to 3 GHz), 8 timing assumptions for carrier frequency range B (3 to 6 GHz), and 64 timing assumptions for carrier frequency range C (6 to 60 GHz), the following designs of the DMRS can be considered: a common DMRS sequence design carries 4 assumptions, and the remaining assumptions for ranges B and C are carried by other signals / channels; a common DMRS sequence design carries 2 assumptions, and the remaining assumptions for ranges A, B, and C are carried by other signals / channels; a common DMRS sequence design carries 8 assumptions for ranges B and C, and a DMRS sequence design carries 4 assumptions for range A (a subset of the sequences for ranges B and C compared to ranges B and C); an independent DMRS design for each carrier frequency, and the sequences for range A are a subset of the sequences for range B, and the sequences for range B are a subset of the sequences for range C.

[0218] In one example of Option 2 using M sequences with possible cyclic shifts, the sequence s 1 (m) is defined by an M sequence with cyclic shifts (note that for the product-based construction method, s 1 (m) is defined by the M sequence of BPSK modulation with cyclic shift) Where L DMRS As determined in Table 1A, Table 1B, Table 2A, Table 2B, Table 3A, Table 3B, Table 4A and Table 4B (corresponding columns), u is a sequence of length L DMRS The numeric index of the M sequence, u∈U, v is the cyclic shift index v∈V (0≤v≤L DMRS -1). |V|·|U| is equal to or greater than the number of timing hypotheses carried by the NR-DMRS. The length is L DMRS The M sequence can be obtained from L DMRS Select accordingly from Tables 5, 6, 7, 8 and 9 for 255, 127, 63, 31 and 15. The initial condition is and where p DMRS =log(L DMRS +1). V and U are determined by the sequence length (i.e., L DMRS ) and the number of hypotheses carried by the DMRS (i.e., N hyp ) is determined. For example, V = {0, ..., L DMRS -1}, For another example, only one M sequence generator is utilized, e.g., |U|=1, and different cyclic shifts are used to represent the timing hypothesis, e.g., {0, ..., Nhyp -1}. In this example, it can be DMRS =31U={2}or{3}, for L DMRS =63, U = {2} or {4}, for L DMRS =127, U={2}or{3}or{4}or{6}.

[0219] Table 5. Recursive construction method

[0220]

[0221]

[0222]

[0223]

[0224] Table 6. Recursive construction method

[0225]

[0226]

[0227]

[0228]

[0229] Table 7. Recursive construction method

[0230]

[0231] Table 8. Recursive construction method

[0232]

[0233] Table 9. Recursive construction methods

[0234]

[0235] In one embodiment, note that the number of timing assumptions carried by the NR-DMRS may be different for different carrier frequency ranges (see also Design Aspect V in Section I). For example, if the number of timing assumptions carried by the NR-DMRS for carrier frequency range A is less than the number of timing assumptions carried for carrier frequency range B (e.g., carrier frequency range A is 0 to 6 GHz and carrier frequency range B is 6 to 60 GHz), in this scenario, a corresponding design sub-option may be considered (replacing V A and V B For the corresponding root index set, U A and U Bfor the corresponding set of cyclic shift indices). Note that the design suboptions can be generalized to more than two frequency ranges.

[0236] In one example of sub-option 1, V A =V B and This means using the same sequence, but using different cyclic shifts for different frequency ranges. A specific example of this sub-option could be |U A |=1,|U B | is the multiple difference between the assumed quantities, which means that in the absence of a circular shift (equivalent to a default shift), |V A | sequences are used for carrier frequency range A, and in order to carry a larger number of hypotheses for carrier frequency range B, the |V A | sequence of cyclic shifts. At the same time, a special case of this example is |V A |=|V B |=1, which means no cyclic shift. For example, if there are 8 timing hypotheses for frequency range A and 64 timing hypotheses for frequency range B, then for carrier frequency range A, 8 non-offset M sequences are used, and for carrier frequency range B, 8 M sequences with 8 offsets each are used (same as range A).

[0237] In an example of sub-option 2, and U A =U B , which means that the same cyclic shift is utilized, and different base sequences are used for different frequency ranges. A specific example of this sub-option could be |V A |,|V B | is the multiple difference between the number of hypotheses, which means that carrier frequency range A utilizes only one sequence, and in order to carry a larger number of hypotheses for carrier frequency range B, multiple sequences (with the same cyclic shift) are utilized. Meanwhile, a special case of this example is |U A |=|U B |=1, which means that only one M-sequence is used. For example, if there are 8 timing hypotheses for frequency range A and 64 timing hypotheses for frequency range B, then for carrier frequency range A, 1 M-sequence with 8 offsets is used, and for carrier frequency range B, 8 M-sequences with 8 offsets each are used (same as range A).

[0238] In an example of sub-option 3, This means that for different frequency ranges both the cyclic shift and the base sequence may be different.

[0239] In another embodiment, the number of timing assumptions carried by the NR-DMRS can be the same for different carrier frequency ranges (see also Design Aspect V in Section I), even though the number of timing assumptions carried by the SS block is different. For example, if the number of timing assumptions carried by the SS block for carrier frequency range A is less than the number of timing assumptions carried for carrier frequency range B (e.g., carrier frequency range A is 0 to 6 GHz and carrier frequency range B is 6 to 60 GHz), the DMRS sequence can be common for both carrier frequencies and the remaining timing assumptions are implicitly or explicitly carried by other signals / channels (e.g., NR-SSS or NR-PBCH). For example, if frequency range A has 8 timing assumptions and frequency range B has 64 timing assumptions, a common DMRS sequence design carrying 2 / 4 / 8 timing assumptions (e.g., 1 M sequence with 2 / 4 / 8 shifts or 2 / 4 / 8 M sequences with 1 shift) can be used for both carrier frequencies.

[0240] In yet another embodiment, the number of timing assumptions carried by the NR-DMRS may be the same for different carrier frequency ranges (see also Design Aspect V in Section I), even though the number of timing assumptions carried by the SS block is different. For example, if the number of timing assumptions carried by the SS block for carrier frequency range A is less than the number of timing assumptions carried for carrier frequency range B (e.g., carrier frequency range A is 0 to 6 GHz and carrier frequency range B is 6 to 60 GHz), then the DMRS sequence may reflect the difference in the number of assumptions and, if common, carry the remaining timing assumptions via other signals / channels (e.g., implicitly or explicitly via NR-SSS or NR-PBCH). For example, if there are 8 timing assumptions for frequency range A and 64 timing assumptions for frequency range B, then the DMRS carries 8 / 4 / 2 / 1 assumptions in frequency range A and 64 / 32 / 16 / 8 assumptions in frequency range B (note that the respective ratios of the number of assumptions are fixed), and the remaining 1 / 2 / 4 / 8 assumptions are carried by other signals / channels.

[0241] Note that the above embodiments may be combined when the number of assumptions carried by the DMRS is different for more than 2 carrier frequency ranges. For example, if the DMRS carries 4 timing assumptions for carrier frequency range A (0 to 3 GHz), 8 timing assumptions for carrier frequency range B (3 to 6 GHz), and 64 timing assumptions for carrier frequency range C (6 to 60 GHz), the following designs of the DMRS may be considered: a common DMRS sequence design carries 4 assumptions (4 M sequences with 1 shift, or 2 M sequences with 2 shifts, or 1 M sequence with 4 shifts), and the remaining assumptions for ranges B and C are carried by other signals / channels; a common DMRS sequence design carries 2 assumptions (2 M sequences with 1 shift, or 1 M sequence with 2 shifts), and the remaining assumptions for ranges A, B, and C are carried by other signals / channels; a common DMRS sequence design carries 2 assumptions (2 M sequences with 1 shift, or 1 M sequence with 2 shifts), and the remaining assumptions for ranges A, B, and C are carried by other signals / channels; The MRS sequence design carries 8 hypotheses for ranges B and C (8 M sequences with 1 shift, or 2 M sequences with 4 shifts, or 4 M sequences with 2 shifts, or 1 M sequence with 8 shifts), and the DMRS sequence design carries 4 hypotheses for range A (the M sequence generator is selected or shifted from the design of ranges B and C, that is, compared with ranges B and C, it is a subset of the sequences of ranges B and C); an independent DMRS design is provided for each carrier frequency, and the sequence of range A is a subset of the sequence of range B, and the sequence of range B is a subset of the sequence of range C (for example, the same M sequence generator is used for the three ranges, and the cyclic shift of range A is a subset of the cyclic shift of range B, and the cyclic shift of range B is a subset of the cyclic shift of range C).

[0242] In one example of Option 3 using interleaved M sequences, the sequence s 1 (m) is defined by two M sequences (note that for the product-based construction method, s 1 (m) is defined by two BPSK modulated M sequences) and Where L DMRS As determined in Table 1A, Table 1B, Table 2A, Table 2B, Table 3A, Table 3B, Table 4A and Table 4B (corresponding columns), u 1 and u 2 The sequence length is L DMRS The numerical index of the M sequence, v is the cyclic shift index v∈V(0≤v≤L DMRS -1).|V| 2 Equal to or greater than the number of timing hypotheses carried by NR-DMRS. and The length is L DMRS u 1 and u 2 M sequences, which can be obtained from LDMRS is selected accordingly from Table 5, Table 6, Table 7, Table 8, Table 9 and Table 10 for 255, 127, 63, 31, 15, 7, and the initial condition is and where p DMRS =log(L DMRS +1).

[0243] Table 10. Recursive construction method

[0244]

[0245] Note that the number of timing assumptions carried by the NR-DMRS may be different for different carrier frequency ranges (see also Design Aspect V in Section I). For example, if the number of timing assumptions carried by the NR-DMRS for carrier frequency range A is less than the number of timing assumptions carried for carrier frequency range B (e.g., carrier frequency range A is 0 to 6 GHz and carrier frequency range B is 6 to 60 GHz). In this scenario, one embodiment is to set Where V A and V B are the corresponding sets of root indices for frequency ranges A and B).

[0246] In another embodiment, the number of timing assumptions carried by the NR-DMRS can be the same for different carrier frequency ranges (see also Design Aspect V in Section I), even though the number of timing assumptions carried by the SS block is different. For example, if the number of timing assumptions carried by the SS block for carrier frequency range A is less than the number of timing assumptions carried for carrier frequency range B (e.g., carrier frequency range A is 0 to 6 GHz and carrier frequency range B is 6 to 60 GHz), then the DMRS sequence can be common for both carrier frequencies and the remaining timing assumptions are implicitly or explicitly carried by other signals / channels (e.g., NR-SSS or NR-PBCH). For example, if there are 8 timing assumptions for frequency range A and 64 timing assumptions for frequency range B, then a common DMRS sequence design carrying 2 / 4 / 8 timing assumptions can be used for both carrier frequencies.

[0247] In yet another embodiment, the number of timing assumptions carried by the NR-DMRS may be the same for different carrier frequency ranges (see also Design Aspect V in Section I), even though the number of timing assumptions carried by the SS block is different. For example, if the number of timing assumptions carried by the SS block for carrier frequency range A is less than the number of timing assumptions carried for carrier frequency range B (e.g., carrier frequency range A is 0 to 6 GHz and carrier frequency range B is 6 to 60 GHz), then the DMRS sequence may reflect the difference in the number of assumptions and, if common, carry the remaining timing assumptions via other signals / channels (e.g., implicitly or explicitly via NR-SSS or NR-PBCH). For example, if there are 8 timing assumptions for frequency range A and 64 timing assumptions for frequency range B, then the DMRS carries 8 / 4 / 2 / 1 assumptions in frequency range A and 64 / 32 / 16 / 8 assumptions in frequency range B (note that the respective ratios of the number of assumptions are fixed), and the remaining 1 / 2 / 4 / 8 assumptions are carried by other signals / channels.

[0248] Note that the above embodiments can be combined when the number of assumptions carried by the DMRS is different for more than 2 carrier frequency ranges. For example, if the DMRS carries 4 timing assumptions for carrier frequency range A (0 to 3 GHz), 8 timing assumptions for carrier frequency range B (3 to 6 GHz), and 64 timing assumptions for carrier frequency range C (6 to 60 GHz), the following designs of the DMRS can be considered: a common DMRS sequence design carries 4 assumptions, and the remaining assumptions for ranges B and C are carried by other signals / channels; a common DMRS sequence design carries 2 assumptions, and the remaining assumptions for ranges A, B, and C are carried by other signals / channels ; A common DMRS sequence design carries 8 hypotheses for ranges B and C, and a DMRS sequence design carries 4 hypotheses for range A (which is a subset of the sequences of ranges B and C compared to ranges B and C); An independent DMRS design is provided for each carrier frequency, and the sequence of range A is a subset of the sequence of range B, and the sequence of range B is a subset of the sequence of range C (for example, the same M sequence generator is used for the three ranges, and the cyclic shift of range A is a subset of the cyclic shift of range B, and the cyclic shift of range B is a subset of the cyclic shift of range C).

[0249] In one example of Option 4 using a Gold sequence with a shift (the product of two BPSK modulated M sequences each with a cyclic shift), the sequence s 1 (m) is defined by the product of two BPSK-modulated M sequences with cyclic shifts Where L DMRSAs determined in Table 1A, Table 1B, Table 2A, Table 2B, Table 3A, Table 3B, Table 4A and Table 4B (corresponding columns), u1 and u2 are sequences of length L. DMRS The numerical index of the M sequence (u1≠u2), v1, v2 are cyclic shift indices, v1∈V1 and v2∈V2, where V1 and V2 are {0, ..., L DMRS -1}, |V1|·|V2| is equal to or greater than the number of timing hypotheses carried by NR-DMRS. The length is L DMRS The sequence can be obtained from L DMRS Select accordingly from Tables 5, 6, 7, 8, 9 and 10 for 255, 127, 63, 31, 15 and 7. The initial condition is and where p DMRS =log(L DMRS +1), V1 and V2 are determined by the sequence length (i.e., L DMRS ) and the number of hypotheses carried by the DMRS (i.e., N hyp ) is determined. For example, V1={0,...,L DMRS -1} and

[0250] In one embodiment, the same M-sequence generator (ie, u1, u2) is used to generate Gold sequences for different carrier frequency ranges.

[0251] In another embodiment, if the number of timing assumptions carried by the NR-DMRS can be different for different carrier frequency ranges (see also Design Aspect V in Section I). For example, if the number of timing assumptions carried by the NR-DMRS for carrier frequency range A is less than the number of timing assumptions carried for carrier frequency range B (e.g., carrier frequency range A is 0 to 6 GHz and carrier frequency range B is 6 to 60 GHz). In this scenario, the corresponding design sub-option (changing V1 to V2) can be considered. A and V1 B and U1 A and U2 B for the corresponding set of cyclic shift indices). Note that the design suboptions can be generalized to more than two frequency ranges.

[0252] In an example of sub-option 1, V1 A =V1 B as well as or V2 A =V2 B as well as This means that one of the cyclic shift sets is a subset of another carrier frequency range. In one example of sub-option 2, as well as This means that both cyclic shift sets are subsets of the other carrier frequency range.

[0253] In another embodiment, the number of timing assumptions carried by the NR-DMRS can be the same for different carrier frequency ranges (see also Design Aspect V in Section I), even though the number of timing assumptions carried by the SS block is different. For example, if the number of timing assumptions carried by the SS block for carrier frequency range A is less than the number of timing assumptions carried for carrier frequency range B (e.g., carrier frequency range A is 0 to 6 GHz and carrier frequency range B is 6 to 60 GHz), then the DMRS sequence can be common for both carrier frequencies and the remaining timing assumptions are implicitly or explicitly carried by other signals / channels (e.g., NR-SSS or NR-PBCH). For example, if there are 8 timing assumptions for frequency range A and 64 timing assumptions for frequency range B, then a common DMRS sequence design carrying 2 / 4 / 8 timing assumptions can be used for both carrier frequencies.

[0254] In yet another embodiment, the number of timing assumptions carried by the NR-DMRS may be the same for different carrier frequency ranges (see also Design Aspect V in Section I), even though the number of timing assumptions carried by the SS block is different. For example, if the number of timing assumptions carried by the SS block for carrier frequency range A is less than the number of timing assumptions carried for carrier frequency range B (e.g., carrier frequency range A is 0 to 6 GHz and carrier frequency range B is 6 to 60 GHz), then the DMRS sequence may reflect the difference in the number of assumptions and, if common, carry the remaining timing assumptions via other signals / channels (e.g., implicitly or explicitly via NR-SSS or NR-PBCH). For example, if there are 8 timing assumptions for frequency range A and 64 timing assumptions for frequency range B, then the DMRS carries 8 / 4 / 2 / 1 assumptions in frequency range A and 64 / 32 / 16 / 8 assumptions in frequency range B (note that the respective ratios of the number of assumptions are fixed), and the remaining 1 / 2 / 4 / 8 assumptions are carried by other signals / channels.

[0255] Note that the above embodiments can be combined when the number of assumptions carried by the DMRS is different for more than 2 carrier frequency ranges. For example, if the DMRS carries 4 timing assumptions for carrier frequency range A (0 to 3 GHz), 8 timing assumptions for carrier frequency range B (3 to 6 GHz), and 64 timing assumptions for carrier frequency range C (6 to 60 GHz), the following designs of the DMRS can be considered: a common DMRS sequence design carries 4 assumptions, and the remaining assumptions for ranges B and C are carried by other signals / channels; a common DMRS sequence design carries 2 assumptions, and the remaining assumptions for ranges A, B, and C are carried by other signals / channels; a common DMRS sequence design carries 4 assumptions for ranges B and C. With 8 hypotheses, the DMRS sequence design carries 4 hypotheses for range A (compared to range B and C, which are a subset of the sequences of range B and C); independent DMRS design is provided for each carrier frequency, and the sequence of range A is a subset of the sequence of range B, and the sequence of range B is a subset of the sequence of range C (e.g., for three ranges, the same M-sequence generator and cyclic shift are used as one of the M-sequences in the Gold sequence construction, and the cyclic shift of the other M-sequences of range A is a subset of the cyclic shift of range B, and the cyclic shift of the other M-sequences of range B is a subset of the cyclic shift of range C).

[0256] In one example of using M sequences with different initial conditions to represent timing hypothesis option 5, the sequence s 1 (m) is defined by a sequence of M with different initial conditions (note that for the product-based construction method, s 1 (m) is defined by the M sequence of BPSK modulation with different initial conditions) Where L DMRS As determined in Table 1A, Table 1B, Table 2A, Table 2B, Table 3A, Table 3B, Table 4A and Table 4B (corresponding columns), The length is L DMRS The u-th M sequence can be obtained from L DMRS The initial conditions are 255, 127, 63, 31, 15 in Table 5, Table 6, Table 7, Table 8 and Table 9 respectively. By s 1 (m) and if s 2 (m) does not carry all possible cell ID information, then the initial condition By 1 (m) and possible cell ID information. DMRS =31, u = 2 or 3, for L DMRS =63, u = 2 or 4, for L DMRS=127, u=2 or 3 or 4 or 6.

[0257] In one embodiment, note that the number of timing assumptions carried by the NR-DMRS may be different for different carrier frequency ranges (see also Design Aspect V in Section I). For example, if the number of timing assumptions carried by the NR-DMRS for carrier frequency range A is less than the number of timing assumptions carried for carrier frequency range B (e.g., carrier frequency range A is 0 to 6 GHz and carrier frequency range B is 6 to 60 GHz), then the initial condition set for range A may be a subset of the initial condition set for range B.

[0258] In another embodiment, the number of timing assumptions carried by the NR-DMRS can be the same for different carrier frequency ranges (see also Design Aspect V in Section I), even though the number of timing assumptions carried by the SS block is different. For example, if the number of timing assumptions carried by the SS block for carrier frequency range A is less than the number of timing assumptions carried for carrier frequency range B (e.g., carrier frequency range A is 0 to 6 GHz and carrier frequency range B is 6 to 60 GHz), then the DMRS sequence can be common for both carrier frequencies and the remaining timing assumptions are implicitly or explicitly carried by other signals / channels (e.g., NR-SSS or NR-PBCH). For example, if frequency range A has 8 timing assumptions and frequency range B has 64 timing assumptions, then a common DMRS sequence design carrying 2 / 4 / 8 timing assumptions (e.g., 1 M sequence with 2 / 4 / 8 shifts or 2 / 4 / 8 M sequences with 1 shift) can be used for both carrier frequencies.

[0259] In yet another embodiment, the number of timing assumptions carried by the NR-DMRS may be the same for different carrier frequency ranges (see also Design Aspect V in Section I), even though the number of timing assumptions carried by the SS block is different. For example, if the number of timing assumptions carried by the SS block for carrier frequency range A is less than the number of timing assumptions carried for carrier frequency range B (e.g., carrier frequency range A is 0 to 6 GHz and carrier frequency range B is 6 to 60 GHz), then the DMRS sequence may reflect the difference in the number of assumptions and, if common, carry the remaining timing assumptions via other signals / channels (e.g., implicitly or explicitly via NR-SSS or NR-PBCH). For example, if there are 8 timing assumptions for frequency range A and 64 timing assumptions for frequency range B, then the DMRS carries 8 / 4 / 2 / 1 assumptions in frequency range A and 64 / 32 / 16 / 8 assumptions in frequency range B (note that the respective ratios of the number of assumptions are fixed), and the remaining 1 / 2 / 4 / 8 assumptions are carried by other signals / channels.

[0260] Note that the above embodiments can be combined when the number of assumptions carried by the DMRS is different for more than 2 carrier frequency ranges. For example, if the DMRS carries 4 timing assumptions for carrier frequency range A (0 to 3 GHz), 8 timing assumptions for carrier frequency range B (3 to 6 GHz), and 64 timing assumptions for carrier frequency range C (6 to 60 GHz), the following designs of the DMRS can be considered: a common DMRS sequence design carries 4 assumptions (4 different initial conditions), and the remaining assumptions for ranges B and C are carried by other signals / channels; a common DMRS sequence design carries 2 assumptions (2 different initial conditions), and the remaining assumptions for ranges A, B, and C are carried by other signals / channels; a common DMRS sequence design carries 8 assumptions (8 different initial conditions) for ranges B and C, and a DMRS sequence design carries 4 assumptions for range A (down to 4 initial conditions); an independent DMRS design for each carrier frequency, and the sequence for range A is a subset of the sequence for range B, and the sequence for range B is a subset of the sequence for range C.

[0261] In use 2 In some embodiments of part II.B of the sequence design of (m), the NR-DMRS sequence contains only timing information, and the cell ID information is carried separately (e.g., via an IDFM multiplexing mode), and s 2 (m) = 1m = 0, 1, ..., L DMRS -1.

[0262] In another embodiment, the sequence s 2 (m) carries at least a cell ID (or part thereof), and / or a UE ID and / or a time slot index and / or a symbol index information, and Where c(n) is a pseudo-random sequence constructed from the gold sequence, where c(n) = (x 1 (n)+x 2 (n))mod 2 and x 1 (n), and x 1 (n), x 2 (n) are the initial conditions c 1,int and c 2,int The M sequence.

[0263] In one sub-embodiment, c 1,int It is only the cell ID (or part of the cell ID, such as the cell ID module DMRS ) function, and c 2,int is fixed. In another sub-embodiment, c 1,int and c 2,intBoth are cell IDs (or parts of cell IDs, such as cell ID modules). DMRS ) function.

[0264] In another embodiment, the sequence s 2 (m) carries the cell ID (or part of it) and the timing assumption, and Where c(n) is a pseudo-random sequence constructed from the gold sequence, where c(n) = (x 1 (n)+x 2 (n))mod 2 and x 1 (n), x 2 (n) are the initial conditions c 1,int and c 2,int The M sequence.

[0265] In one sub-embodiment, c 1,int It is only the cell ID (or part of the cell ID, such as the cell ID module DMRS ) function, and c 2,int is a function of the timing assumption. In another sub-embodiment, c 1,int is the cell ID (or part of the cell ID, such as the cell ID module DMRS ) and the timing assumptions, and c 2,int is fixed. In yet another sub-embodiment, c 1,int and c 2,int Both are cell IDs (or parts of cell IDs, such as cell ID modules). DMRS ) and timing assumptions.

[0266] In yet another embodiment, the sequence s 2 (m) carries cell ID information (or part thereof), and s 2 (m) is defined by an M sequence with cyclic shift Where L DMRS As determined in Table 1A, Table 1B, Table 2A, Table 2B, Table 3A, Table 3B, Table 4A, and Table 4B (corresponding columns), u is a sequence of length L DMRS The numeric index of the M sequence, u∈U, v is the cyclic shift index v∈V (0≤v≤L DMRS -1). |V|·|U| is equal to or greater than the number of cell IDs carried by the scrambling sequence (note that it may not contain all cell IDs but only partial information, such as the LSB or HLS of the cell ID). The length is L DMRS The M sequence can be obtained from L DMRS Select accordingly from Tables 5, 6, 7, 8 and 9 for 255, 127, 63, 31 and 15. The initial condition is and where p DMRS =log(L DMRS +1). For example, V = {0, ..., L DMRS -1} and in is the number of cell IDs contained in the scrambling sequence (e.g. after the actual cell IDs are truncated or wrapped). For another example, only one M-sequence generator is utilized, e.g. |U|=1, and different cyclic shifts are used to represent the timing hypothesis, e.g. In this example, for L DMRS =31, U = {2} or {3}, for L DMRS =63, U = {2} or {4}, for L DMRS =127, U={2}or{3}or{4}or{6}.

[0267] In one sub-embodiment, if s 1 (m) is also constructed using the M sequence, then s 2 The generator of (m) can be a paired generator to make s 1 (m)·s 2 (m) Gold sequence (ie, the DMRS-sequence is based on a Gold sequence with potential cyclic shifts and truncation within each M sequence). For example, if generator 2 is used for s 1 (m), L DMRS =31, then generator 3 can be used for s 2 (m) (or exchange); if generator 2 is used for s 1 (m), L DMRS =63, then generator 4 can be used for s 2 (m) (or exchange); if generator 2 is used for s 1 (m), L DMRS =127, then generator 3 can be used for s 2 (m) (or exchange); if generator 4 is used for s 1 (m), L DMRS =127, then generator 6 can be used for s 2 (m) (or exchange).

[0268] In yet another embodiment, sequence s2(m) carries cell ID information (or a portion thereof), and s 2 (m) is defined by a sequence of M with different initial conditions (note that for the product-based construction method, s 2 (m) is defined by the M sequence of BPSK modulation with different initial conditions) Where L DMRSAs determined in Table 1A, Table 1B, Table 2A, Table 2B, Table 3A, Table 3B, Table 4A and Table 4B (corresponding columns), The length is L DMRS The u-th M sequence can be obtained from L DMRS The initial conditions are 255, 127, 63, 31, 15 in Table 5, Table 6, Table 7, Table 8 and Table 9 respectively. By s 2 (m) is determined by the cell ID information carried, and if s 1 (m) does not carry possible timing assumptions, so the initial condition By s 2 (m) and possible timing assumptions. DMRS =31, u = 2 or 3, for L DMRS =63, u = 2 or 4, for L DMRS =127, u=2 or 3 or 4 or 6.

[0269] In one sub-embodiment, if s 1 (m) is also constructed using the M sequence, then s 2 The generator of (m) can be a paired generator to make s 1 (m)·s 2 (m) Gold sequence (ie, the DMRS-sequence is based on a Gold sequence with potential cyclic shifts and truncation within each M sequence). For example, if generator 2 is used for s 1 (m), L DMRS =31, then generator 3 can be used for s 2 (m) (or exchange); if generator 2 is used for s 1 (m), L DMRS =63, then generator 4 can be used for s 2 (m) (or exchange); if generator 2 is used for s 1 (m), L DMRS =127, then generator 3 can be used for s 2 (m) (or exchange); if generator 4 is used for s 1 (m), L DMRS =127, then generator 6 can be used for s 2 (m) (or exchange).

[0270] In yet another embodiment, the sequence s2(m) carries both the cell ID information (or part thereof) and a part of the timing assumption, then the sequence design of s2(m) can use the same options as in Part II.A, where the assumptions in Part II.A refer to both the cell ID information (or part thereof) and a part of the timing assumption carried by s2(m). Note that s2(m) 2 (m) design options can be combined with s 1 (m) The same or different.

[0271] In one sub-embodiment, if s 1 If both s(m) and s2(m) use options based on M sequences, their generators can be paired generators to produce s 1 (m)·s 2 (m) Gold sequence (i.e., the DMRS sequence is based on the Gold sequence with potential cyclic shift and truncation within each M sequence). For example, if generator 2 is used for s1(m), L DMRS =31, then generator 3 can be used for s2(m) (or exchange); if generator 2 is used for s1(m), L DMRS =63, then generator 4 can be used for s2(m) (or exchange); if generator 2 is used for s1(m), L DMRS =127, then generator 3 can be used for s2(m) (or exchange); if generator 4 is used for s1(m), L DMRS =127, then generator No. 6 can be used for s2(m) (or exchange).

[0272] In some embodiments of Part III for NR-DMRS sequence design examples, 288 REs for NR-PBCH and NR-DMRS in each OFDM symbol are considered, and two symbols are used for NR-PBCH and NR-DMRS mapping.

[0273] The following designs of NR-DMRS sequences are supported. In one example of sequence option 1, a BPSK-modulated Gold sequence is constructed from an M sequence of length L with A cyclic shifts and another M sequence of length L with B cyclic shifts, and then truncated to length N, the corresponding number of REs used for NR-DMRS. In such an example, A=8 for the carrier frequency range [3 60] GHz, A=4 for the carrier frequency range [0 3] GHz; B=L, where 1000 cell IDs are mapped to L hypotheses (e.g., modulo L). In such an example, A=16 for the carrier frequency range [6 60] GHz, A=8 for the carrier frequency range [3 6] GHz, A=4 for the carrier frequency range [0 3] GHz; B=L, where 1000 cell IDs are mapped to L hypotheses (e.g., modulo L). In such an example, for the carrier frequency range [3 60] GHz, A=64, for the carrier frequency range [0 3] GHz, A=32; B=L. 1000 cell IDs are mapped to the hypotheses in the two M sequences. In such an example, for the carrier frequency range [6 60] GHz, A=L, for the carrier frequency range [3 6] GHz, A=64, for the carrier frequency range [0 3] GHz, A=32; B=L. 1000 cell IDs are mapped to the hypotheses in the two M sequences.

[0274] In another example of sequence option 2, a BPSK modulated Gold sequence is constructed from an M sequence of length L with A cyclic shifts and another M sequence of length L with B initial conditions, and then truncated to length N, the corresponding number of REs used for NR-DMRS. In such an example, A=8 for the carrier frequency range [3 60] GHz, A=4 for the carrier frequency range [0 3] GHz; B=1000, where 1000 cell IDs are mapped to 1000 hypotheses. In such an example, A=16 for the carrier frequency range [6 60] GHz, A=8 for the carrier frequency range [3 6] GHz, A=4 for the carrier frequency range [0 3] GHz; B=1000, where 1000 cell IDs are mapped to 1000 hypotheses. In such an example, A=1 for all carrier frequency ranges, B=16000 for the carrier frequency range [6 60] GHz, B=8000 for the carrier frequency range [3 6] GHz, and B=4000 for the carrier frequency range [0 3] GHz. The combination of timing hypothesis and cell ID is mapped to different cyclic shifts. In such an example, A=1 for all carrier frequency ranges, B=8000 for the carrier frequency range [3 60] GHz, and B=4000 for the carrier frequency range [0 3] GHz. The combination of timing hypothesis and cell ID is mapped to different cyclic shifts.

[0275] In yet another example of sequence option 3, a BPSK modulated Gold sequence is constructed from an M sequence of length L with A initial conditions and another M sequence of length L with B initial conditions, and then truncated to length N, the corresponding number of REs used for NR-DMRS. In such an example, A=8 for the carrier frequency range [3 60] GHz, A=4 for the carrier frequency range [0 3] GHz; B=1000, where 1000 cell IDs are mapped to 1000 hypotheses. In such an example, A=16 for the carrier frequency range [6 60] GHz, A=8 for the carrier frequency range [3 6] GHz, A=4 for the carrier frequency range [0 3] GHz; B=1000, where 1000 cell IDs are mapped to 1000 hypotheses. In such an example, A=1 for all carrier frequency ranges, B=16000 for the carrier frequency range [6 60] GHz, B=8000 for the carrier frequency range [3 6] GHz, and B=4000 for the carrier frequency range [0 3] GHz. The combination of timing hypothesis and cell ID is mapped to different cyclic shifts. In such an example, A=1 for all carrier frequency ranges, B=8000 for the carrier frequency range [3 60] GHz, and B=4000 for the carrier frequency range [0 3] GHz. The combination of timing hypothesis and cell ID is mapped to different cyclic shifts.

[0276] In yet another example of sequence option 4, a BPSK modulated Gold sequence is constructed from an M sequence of length L without cyclic shift and another M sequence of length L with B cyclic shifts or initial conditions, and then truncated to a length of N, the corresponding number of REs used for NR-DMRS. In such an example, when cyclic shifts are used, B=L, and when initial conditions are used, B=1000.

[0277] In yet another example of sequence option 5, a QPSK modulated Gold sequence is constructed from an M sequence of length L with A cyclic shifts and another M sequence of length L with B cyclic shifts, and then truncated to length N, the corresponding number of REs used for NR-DMRS. In such an example, A=8 for the carrier frequency range [3 60] GHz, A=4 for the carrier frequency range [0 3] GHz; B=L, where 1000 cell IDs are mapped to L hypotheses (e.g., modulo L). In such an example, A=16 for the carrier frequency range [6 60] GHz, A=8 for the carrier frequency range [3 6] GHz, A=4 for the carrier frequency range [0 3] GHz; B=L, where 1000 cell IDs are mapped to L hypotheses (e.g., modulo L). In such an example, A=64 for the carrier frequency range [3 60] GHz, A=32 for the carrier frequency range [0 3] GHz; B=L. 1000 cell IDs are mapped to hypotheses in two M sequences. In such an example, A=L for the carrier frequency range [6 60] GHz, A=64 for the carrier frequency range [3 6] GHz, and A=32 for the carrier frequency range [0 3] GHz; B=L. 1000 cell IDs are mapped to hypotheses in two M sequences.

[0278] In yet another example of sequence option 6, a QPSK modulated Gold sequence is constructed from an M sequence of length L with A cyclic shifts and another M sequence of length L with B initial conditions, and then truncated to length N, the corresponding number of REs used for NR-DMRS. In such an example, A=8 for the carrier frequency range [3 60] GHz, A=4 for the carrier frequency range [0 3] GHz; B=1000, where 1000 cell IDs are mapped to 1000 hypotheses. In such an example, A=16 for the carrier frequency range [6 60] GHz, A=8 for the carrier frequency range [3 6] GHz, A=4 for the carrier frequency range [0 3] GHz; B=1000, where 1000 cell IDs are mapped to 1000 hypotheses. In such an example, A=1 for all carrier frequency ranges, B=16000 for the carrier frequency range [6 60] GHz, B=8000 for the carrier frequency range [3 6] GHz, and B=4000 for the carrier frequency range [0 3] GHz. The combination of timing hypothesis and cell ID is mapped to different cyclic shifts. In such an example, A=1 for all carrier frequency ranges, B=8000 for the carrier frequency range [3 60] GHz, and B=4000 for the carrier frequency range [0 3] GHz. The combination of timing hypothesis and cell ID is mapped to different cyclic shifts.

[0279] In yet another example of sequence option 7, a QPSK modulated Gold sequence is constructed from an M sequence of length L with A initial conditions and another M sequence of length L with B initial conditions, and then truncated to length N, the corresponding number of REs used for NR-DMRS. In such an example, A=8 for the carrier frequency range [3 60] GHz, A=4 for the carrier frequency range [0 3] GHz; B=1000, where 1000 cell IDs are mapped to 1000 hypotheses. In such an example, A=16 for the carrier frequency range [6 60] GHz, A=8 for the carrier frequency range [3 6] GHz, A=4 for the carrier frequency range [0 3] GHz; B=1000, where 1000 cell IDs are mapped to 1000 hypotheses. In such an example, A=1 for all carrier frequency ranges, B=16000 for the carrier frequency range [6 60] GHz, B=8000 for the carrier frequency range [3 6] GHz, and B=4000 for the carrier frequency range [0 3] GHz. The combination of timing hypothesis and cell ID is mapped to different cyclic shifts. In such an example, A=1 for all carrier frequency ranges, B=8000 for the carrier frequency range [3 60] GHz, and B=4000 for the carrier frequency range [0 3] GHz. The combination of timing hypothesis and cell ID is mapped to different cyclic shifts.

[0280] In yet another example of sequence option 8, a QPSK modulated Gold sequence is constructed from an M sequence of length L without cyclic shift and another M sequence of length L with B cyclic shifts or initial conditions, and then truncated to a length of N, the corresponding number of REs used for NR-DMRS. In such an example, when cyclic shifts are used, B=L, and when initial conditions are used, B=1000.

[0281] Note that in all the above sequence options, the number of cell IDs is assumed to be 1000. If the number of cell IDs is another number (for example, the cell ID is about 1000 but is determined by the NR-PSS and NR-SSS design), the values ​​of 1000, 2000, 4000, 8000, and 16000 may be replaced by cell ID, 2*N_ID, 4*N_ID, 8*N_ID, 16*N_ID.

[0282] In some embodiments, the following RE mapping designs are supported (which can be combined with one or more of the above sequence options). In one example of mapping option 1, 1 / 3 NR-DMRS overhead is evenly distributed in the frequency domain, and the NR-DMRS sequence is repeated in two OFDM symbols. In this mapping option, the following sequences can be used to map to each repeated NR-DMRS sequence: NR-DMRS sequence option 1 or 2 or 3 or 4, L = 127 and N = 96; and NR-DMRS sequence option 5 or 6 or 7 or 8, L = 255 and N = 96.

[0283] In one example of mapping option 2, 1 / 4 NR-DMRS overhead is evenly distributed in the frequency domain, and the NR-DMRS sequence is repeated in two OFDM symbols. In this mapping option, the following sequences can be used to map to each repeated NR-DMRS sequence: NR-DMRS sequence option 1 or 2 or 3 or 4, L = 127 and N = 72; and NR-DMRS sequence option 5 or 6 or 7 or 8, L = 255 and N = 72.

[0284] In one example of mapping option 3, 1 / 3 NR-DMRS overhead is evenly distributed in the frequency domain, and the NR-DMRS sequence is repeated in the frequency domain (e.g., one copy is mapped to the central 12 PRBs and the other copy is mapped to the remaining 12 PRBs). In this mapping option, the following sequences can be used to map to each repeated NR-DMRS sequence: NR-DMRS sequence option 1 or 2 or 3 or 4, L = 127 and N = 96; and NR-DMRS sequence option 5 or 6 or 7 or 8, L = 255 and N = 96.

[0285] In one example of mapping option 4, 1 / 4 NR-DMRS overhead is evenly distributed in the frequency domain, and the NR-DMRS sequence is repeated in the frequency domain (e.g., one copy is mapped to the central 12 PRBs and the other copy is mapped to the remaining 12 PRBs). In this mapping option, the following sequences can be used to map to each repeated NR-DMRS sequence: NR-DMRS sequence option 1 or 2 or 3 or 4, L = 127 and N = 72; and NR-DMRS sequence option 5 or 6 or 7 or 8, L = 255 and N = 72.

[0286] In one example of mapping option 5, 1 / 3 NR-DMRS overhead is evenly distributed in the frequency domain, and the NR-DMRS sequence is repeated in both the frequency domain and the time domain (e.g., one copy is mapped to the central 12 PRBs of the first symbol, one copy is mapped to the central 12 PRBs of the second symbol, one copy is mapped to the remaining 12 PRBs of the first symbol, and one copy is mapped to the remaining 12 PRBs of the second symbol). In this mapping option, the following sequences can be used to map to each repeated NR-DMRS sequence: NR-DMRS sequence option 1 or 2 or 3 or 4, L = 63 and N = 48; and NR-DMRS sequence option 5 or 6 or 7 or 8, L = 127 and N = 48.

[0287] In one example of mapping option 6, 1 / 4 NR-DMRS overhead is evenly distributed in the frequency domain, and the NR-DMRS sequence is repeated in both the frequency domain and the time domain (e.g., one copy is mapped to the central 12 PRBs of the first symbol, one copy is mapped to the central 12 PRBs of the second symbol, one copy is mapped to the remaining 12 PRBs of the first symbol, and one copy is mapped to the remaining 12 PRBs of the second symbol). In this mapping option, the following sequences can be used to map to each repeated NR-DMRS sequence: NR-DMRS sequence option 1 or 2 or 3 or 4, L = 63 and N = 36; and NR-DMRS sequence option 5 or 6 or 7 or 8, L = 127 and N = 36.

[0288] In one example of mapping option 7, 1 / 3 NR-DMRS overhead is evenly distributed in the frequency domain, and the NR-DMRS sequence is repeated in two OFDM symbols in an interleaved pattern (staggered pattern) (e.g., one copy is mapped to an even RE position in the first symbol and an odd RE position in the second symbol, and the other copy is mapped to an odd RE position in the first symbol and an even RE position in the second symbol). In this mapping option, the following sequences can be used to map to each repeated NR-DMRS sequence: NR-DMRS sequence option 1 or 2 or 3 or 4, L = 127 and N = 96; and NR-DMRS sequence option 5 or 6 or 7 or 8, L = 255 and N = 96.

[0289] In one example of mapping option 8, 1 / 4 NR-DMRS overhead is evenly distributed in the frequency domain, and the NR-DMRS sequence is repeated in two OFDM symbols in an interleaved pattern (staggered pattern) (e.g., one copy is mapped to an even RE position in the first symbol and an odd RE position in the second symbol, and the other copy is mapped to an odd RE position in the first symbol and an even RE position in the second symbol). In this mapping option, the following sequences can be used to map to each repeated NR-DMRS sequence: NR-DMRS sequence option 1 or 2 or 3 or 4, L = 127 and N = 72; and NR-DMRS sequence option 5 or 6 or 7 or 8, L = 255 and N = 72.

[0290] In one example of mapping option 9, 1 / 3 NR-DMRS overhead is evenly distributed in the frequency domain, and one of the NR-DMRS sequences carrying the timing assumption is mapped to the central part of the bandwidth (e.g., the central 12 PRBs), and the other NR-DMRS sequence that does not carry the timing assumption is mapped to the remaining part of the bandwidth (e.g., the remaining 12 PRBs). In this mapping option, the following sequences can be used: the first NR-DMRS sequence uses option 1 or 2 or 3, L = 127 and N = 96, or option 5 or 6 or 7, L = 255 and N = 96; the second NR-DMRS sequence uses option 4, L = 127 and N = 96, or option 8, L = 255 and N = 96.

[0291] In one example of mapping option 10, 1 / 4 NR-DMRS overhead is evenly distributed in the frequency domain, and one of the NR-DMRS sequences carrying the timing assumption is mapped to the central part of the bandwidth (e.g., the central 12 PRBs), and the other NR-DMRS sequence that does not carry the timing assumption is mapped to the remaining part of the bandwidth (e.g., the remaining 12 PRBs). In this mapping option, the following sequences can be used: the first NR-DMRS sequence uses option 1 or 2 or 3, L = 127 and N = 72, or option 5 or 6 or 7, L = 255 and N = 72; the second NR-DMRS sequence uses option 4, L = 127 and N = 72, or option 8, L = 255 and N = 72.

[0292] In one example of mapping option 11, 1 / 3 NR-DMRS overhead is evenly distributed in the frequency domain, and one of the NR-DMRS sequences carrying the timing assumption is mapped to the central part of the bandwidth (e.g., the same central 127 subcarriers as NR-PSS and NR-SSS), and the other NR-DMRS sequence that does not carry the timing assumption is mapped to the remaining part of the bandwidth. In this mapping option, the following sequences can be used: the first NR-DMRS sequence uses option 1 or 2 or 3, L = 127 and N = 84 or 85, or option 5 or 6 or 7, L = 255 and N = 84 or 85; the second NR-DMRS sequence uses option 4, L = 127 and N = 84 or 85, or option 8, L = 255 and N = 84 or 85.

[0293] In one example of mapping option 12, 1 / 4 NR-DMRS overhead is evenly distributed in the frequency domain, and one of the NR-DMRS sequences carrying the timing assumption is mapped to the central part of the bandwidth (e.g., the same central 127 subcarriers as NR-PSS and NR-SSS), and the other NR-DMRS sequence that does not carry the timing assumption is mapped to the remaining part of the bandwidth. In this mapping option, the following sequences can be used: the first NR-DMRS sequence uses option 1 or 2 or 3, L = 31 and N = 31 or L = 63 and N = 32, or option 5 or 6 or 7, L = 63 and N = 31 or L = 127 and N = 32; the second NR-DMRS sequence uses option 4, L = 31 and N = 31 or L = 63 and N = 32, or option 8, L = 63 and N = 31 or L = 127 and N = 32.

[0294] In one example of mapping option 13, 1 / 3 NR-DMRS overhead is evenly distributed in the frequency domain, and a single NR-DMRS sequence is mapped in two OFDM symbols. In this mapping option, the following sequences can be used: NR-DMRS sequence option 1 or 2 or 3 or 4, L = 255 and N = 192; and NR-DMRS sequence option 5 or 6 or 7 or 8, L = 511 and N = 192.

[0295] In one example of mapping option 14, 1 / 4 NR-DMRS overhead is evenly distributed in the frequency domain, and a single NR-DMRS sequence is mapped in two OFDM symbols. In this mapping option, the following sequences can be used: NR-DMRS sequence option 1 or 2 or 3 or 4, L = 255 and N = 144; and NR-DMRS sequence option 5 or 6 or 7 or 8, L = 511 and N = 144.

[0296] In one example of mapping option 15, 1 / 3 NR-DMRS overhead is evenly distributed in the frequency domain, and two NR-DMRS sequences are mapped in an interleaved mode (interleaved mode) in two OFDM symbols (for example, one copy is mapped to an even RE position in the first symbol and an odd RE position in the second symbol, and the other copy is mapped to an odd RE position in the first symbol and an even RE position in the second symbol). The first NR-DMRS sequence carries a timing assumption, while the second NR-DMRS sequence does not carry a timing assumption. In this mapping option, the following sequences can be used: the first NR-DMRS sequence uses option 1 or 2 or 3, L = 127 and N = 96, or option 5 or 6 or 7, L = 255 and N = 96; the second NR-DMRS sequence uses option 4, L = 127 and N = 96, or option 8, L = 255 and N = 96.

[0297] In one example of mapping option 16, 1 / 4 NR-DMRS overhead is evenly distributed in the frequency domain, and two NR-DMRS sequences are mapped in an interleaved mode (interleaved mode) in two OFDM symbols (for example, one copy is mapped to an even RE position in the first symbol and an odd RE position in the second symbol, and the other copy is mapped to an odd RE position in the first symbol and an even RE position in the second symbol). The first NR-DMRS sequence carries a timing assumption, while the second NR-DMRS sequence does not carry a timing assumption. In this mapping option, the following sequences can be used: the first NR-DMRS sequence uses option 1 or 2 or 3, L = 127 and N = 72, or option 5 or 6 or 7, L = 255 and N = 72; the second NR-DMRS sequence uses option 4, L = 127 and N = 72, or option 8, L = 255 and N = 72.

[0298] In one example of mapping option 17, the 1 / 3 NR-DMRS overhead is evenly distributed in the frequency domain, but occupies only the remaining 12 PRBs (or 161 REs) except the central 12 PRBs (or 127 REs in which NR-PSS and NR-SSS are transmitted). NR-DMRS is repeated in two OFDM symbols. In this mapping option, the following sequences can be used: NR-DMRS sequence option 1 or 2 or 3 or 4, L = 63 and N = 48 (or 53); and NR-DMRS sequence option 5 or 6 or 7 or 8, L = 127 and N = 48 (or 53).

[0299] In one example of mapping option 18, the 1 / 4 NR-DMRS overhead is evenly distributed in the frequency domain, but only occupies the remaining 12 PRBs (or 161 REs) except the central 12 PRBs (or 127 REs in which NR-PSS and NR-SSS are transmitted). NR-DMRS is repeated in two OFDM symbols. In this mapping option, the following sequences can be used: NR-DMRS sequence option 1 or 2 or 3 or 4, L = 63 and N = 36 (or 40); and NR-DMRS sequence option 5 or 6 or 7 or 8, L = 127 and N = 36 (or 40).

[0300] In one example of mapping option 19, 1 / 4 NR-DMRS overhead is evenly distributed in the central 12 PRBs (or 127 REs where NR-PSS and NR-SSS are transmitted), and 1 / 3 NR-DMRS overhead is evenly distributed in the remaining 12 PRBs (or 161 REs). The DMRS sequence is repeated in two OFDM symbols. In this mapping option, the following sequences can be used: NR-DMRS sequence option 1 or 2 or 3 or 4, L = 127 and N = 84 (or 82); and NR-DMRS sequence option 5 or 6 or 7 or 8, L = 255 and N = 84 (or 82).

[0301] In one example of mapping option 20, 1 / 6 NR-DMRS overhead is evenly distributed in the central 12 PRBs (or 127 REs where NR-PSS and NR-SSS are sent), and 1 / 3 NR-DMRS overhead is evenly distributed in the remaining 12 PRBs (or 161 REs). The DMRS sequence is repeated in two OFDM symbols. In this mapping option, the following sequences can be used: NR-DMRS sequence option 1 or 2 or 3 or 4, L = 127 and N = 72 (or 68); and NR-DMRS sequence option 5 or 6 or 7 or 8, L = 255 and N = 72 (or 68).

[0302] In one example of mapping option 21, 1 / 4 NR-DMRS overhead is evenly distributed in the central 12 PRBs (or 127 REs in which NR-PSS and NR-SSS are transmitted), and 1 / 3 NR-DMRS overhead is evenly distributed in the remaining 12 PRBs (or 161 REs). One DMRS sequence is mapped to the central 12 PRBs (or 127 REs), spanning two symbols, and the other is mapped to the remaining 12 PRBs (or 161 REs). In this mapping option, the following sequences can be used: the first sequence can use NR-DMRS sequence option 1 or 2 or 3 or 4, L = 127 and N = 72 (or 80), or option 5 or 6 or 7 or 8, L = 255 and N = 72 (or 80); the second sequence can use NR-DMRS sequence option 1 or 2 or 3 or 4, L = 127 and N = 96 (or 84), or option 5 or 6 or 7 or 8, L = 255 and N = 96 (or 84).

[0303] In one example of mapping option 22, 1 / 6 NR-DMRS overhead is evenly distributed in the central 12 PRBs (or 127 REs in which NR-PSS and NR-SSS are transmitted), and 1 / 3 NR-DMRS overhead is evenly distributed in the remaining 12 PRBs (or 161 REs). One DMRS sequence is mapped to the central 12 PRBs (or 127 REs), spanning two symbols, and the other is mapped to the remaining 12 PRBs (or 161 REs). In this mapping option, the following sequences can be used: the first sequence can use NR-DMRS sequence option 1 or 2 or 3 or 4, L = 63 and N = 48 (or 52), or option 5 or 6 or 7 or 8, L = 127 and N = 48 (or 52); the second sequence can use NR-DMRS sequence option 1 or 2 or 3 or 4, L = 127 and N = 96 (or 84), or option 5 or 6 or 7 or 8, L = 255 and N = 96 (or 84).

[0304] In one example of mapping option 23, 1 / 6 NR-DMRS overhead is evenly distributed in the central 12 PRBs, and 1 / 3 NR-DMRS overhead is evenly distributed in the remaining 12 PRBs. One DMRS sequence is mapped to the central 12 PRBs, spanning two symbols, and its other two copies are mapped to the remaining 6 PRBs above and the remaining 6 PRBs below, respectively. In this mapping option, the following sequences can be used: NR-DMRS sequence option 1 or 2 or 3 or 4, L = 63 and N = 48; and NR-DMRS sequence option 5 or 6 or 7 or 8, L = 127 and N = 48.

[0305] In one example of mapping option 24, 1 / 6 NR-DMRS overhead is evenly distributed in the central 12 PRBs, and 1 / 3 NR-DMRS overhead is evenly distributed in the remaining 12 PRBs. One DMRS sequence carrying a timing assumption is mapped to the central 12 PRBs, spanning two symbols, and two copies of another DMRS sequence that does not carry a timing assumption are mapped to the remaining 6 PRBs above and the remaining 6 PRBs below, respectively. In this mapping option, the following sequences can be used: the first sequence can use NR-DMRS sequence option 1 or 2 or 3, L = 63 and N = 48, or NR-DMRS sequence option 5 or 6 or 7, L = 127 and N = 48; the second sequence can use NR-DMRS sequence option 4, L = 63 and N = 48, or NR-DMRS sequence option 8, L = 127 and N = 48.

[0306] Note that in all the above mapping options, the value of L is determined by assuming that the NR-DMRS sequence for PBCH is truncated from the nearest Gold sequence length. If a common PN sequence (e.g., Gold sequence) length is utilized (as specified in Aspect VII of Part I), regardless of the DMRS overhead and RE mapping pattern, for example, as in LTE-CRS, or LTE-DMRS, or NR-DMRS for NR-PDSCH, a specific length of the PN sequence may be used instead of L.

[0307] In a sub-embodiment, for all the above mapping options, if L = 127, the M sequence generator of the DMRS can reuse the M sequence generator of the NR-SSS sequence to save construction complexity. For example, the M sequence generator is f(x) = x 7 +x 4 +1 and g(x)=x 7 +x+1.

[0308] In some embodiments of Part IV, for more NR-DMRS sequence design examples, within a SS block, two symbols are used for NR-PBCH and its DMRS, where each symbol has N_RE REs for NR-PBCH and its DMRS mapping. The overhead of DMRS is 1 / 4 (i.e., N_RE / 4 REs are used for DMRS mapping within each symbol), and the subcarriers used for DMRS are evenly distributed in the frequency domain. For another example, consider another scenario: within a SS block, three, four, or five symbols are used for NR-PBCH and its DMRS, where each symbol has N_RE REs for NR-PBCH and its DMRS mapping. The overhead of DMRS is k (i.e., k*N_RE REs are used for DMRS mapping within each symbol), and the subcarriers used for DMRS are evenly distributed in the frequency domain.

[0309] For another example, consider another scenario: within the SS block, three or four or five symbols are used for NR-PBCH and its DMRS, where each symbol can have a different or the same number of REs for NR-PBCH mapping, and the total number of REs for NR-PBCH within the SS block is N_DMRS. For all the above scenarios, assume that for all carrier frequency ranges supported in NR, the DMRS sequence carries N_t timing assumptions and N_ID cell IDs (e.g., N_ID=1008) (note that if the actual number of timing assumptions for a particular carrier frequency range is less than N_t, the number of timing assumptions carried by the DMRS can be equal to the actual number of timing assumptions for the carrier frequency range. For example, if the DMRS carries 8 timing assumptions (i.e., 8 DMRS sequences), and the frequency range 0 to 3 GHz only requires a maximum number of 4 timing assumptions, a subset of 4 DMRS sequences can be selected from all 8 DMRS sequences and used for the frequency range 0 to 3 GHz).

[0310] In one embodiment, the value of N_RE may be 288, where all subcarriers in 24 RBs are used for NR-PBCH and its DMRS mapping. In another embodiment, the value of N_RE may be 254, where not all subcarriers in 24 RBs are used for NR-PBCH and its DMRS mapping (e.g., the remaining subcarriers are left as guard bands). In yet another embodiment, the value of N_RE may be 12*N_PRB, where all subcarriers in N_PRB RBs are used for NR-PBCH and its DMRS mapping.

[0311] In one embodiment, the subcarrier index I_DMRS to be used for DMRS mapping within each symbol may be determined by (I_DMRS modulo 4) = 0. In another embodiment, the subcarrier index I_DMRS to be used for DMRS mapping within each symbol may be determined by (I_DMRS modulo 4) = 1. In yet another embodiment, the subcarrier index I_DMRS to be used for DMRS mapping within each symbol may be determined by (I_DMRS modulo 4) = 2. In yet another embodiment, the subcarrier index I_DMRS to be used for DMRS mapping within each symbol may be determined by (I_DMRS modulo 4) = 3.

[0312] In one embodiment, the number of timing hypotheses may be N_t=8 (e.g., 3 LSBs of the SS block timing index within the SS pulse set, or 3 bits within the SFN, or 2 LSBs of the SS block timing index within the SS pulse set and 1 bit for half radio frame indication). In another embodiment, the number of timing hypotheses may be N_t=4 (e.g., 2 bits of the SS block timing index within the SS pulse set, or 2 bits within the SFN). In yet another embodiment, the number of timing hypotheses may be N_t=16 (e.g., 3 LSBs of the SS block timing index within the SS pulse set and 1 bit for half radio frame indication).

[0313] If N_t=16, the timing index used in this embodiment means I_t=8*I_HF+I_SSB, or I_t=2*I_SSB+I_HF, where I_HF is a 1-bit indicator of a half radio frame and I_SSB is a 3-bit indicator of the 3 LSBs of the SS block index within 5ms. If N_t=8, the timing index utilized in this embodiment may mean that for the carrier frequency range [3, 52.6] GHz, I_t=I_SSB, where I_SSB is a 3-bit indicator of the 3 LSBs of the SS block index within 5 ms; for the carrier frequency range [0, 3] GHz, I_t=4*I_HF+I_SSB, where I_SSB is a 2-bit indicator of the 2 LSBs of the SS block index within 5 ms, and I_HF is a 1-bit indicator of a half radio frame; or may mean that for the entire carrier frequency range [0, 52.6] GHz, I_t=I_SSB, where I_SSB is a 3-bit indicator of the 3 LSBs of the SS block index within 5 ms. If N_t=4, the timing index utilized in this embodiment means that I_t=I_SSB, where I_SSB is a 2-bit indicator of the 2 LSBs of the SS block index within 5 ms.

[0314] In another embodiment, two types of DMRS sequences may be supported, one type of DMRS sequence carrying N_t timing assumptions (e.g., N_t=16 or N_t=8 or N_t=4), and the other type of DMRS sequence carrying no timing assumptions (e.g., N_t=0). For the DMRS sequence type that does not carry any timing assumptions, in the following sequence design options and sub-options, I_t=0.

[0315] For the above-considered scenarios, the combination of the above-considered designs in Part I and Part II supports the following NR-PBCH DMRS sequence design. In one embodiment of sequence option 1, the BPSK-modulated Gold sequence is constructed by the XOR of two M sequences of length L, where one M sequence s A (n) Using generator g A(x) and initial condition c A Generate, another M sequence s B (n) Using generator g B (x) and initial condition c B There are possible output offsets Nc (note that if the offset does not exist, then Nc = 0), so that the BPSK modulated Gold sequence s(n) = 1-2*(s A (N+Nc)+s B (N+Nc))mod2) and s(n) is truncated to the desired DMRS sequence length N_DMRS.

[0316] In one example of sequence sub-option 1a, the length L of the Gold sequence is the same as that of the LTE-CRS (e.g., 2^31-1) or the NR-DMRS for PDSCH (e.g., 2^31-1 or larger), and an M sequence s A (n) by g A (x) = x 31 +x 3 +1 gives, initial condition c A Fixed (e.g. c A =1), another M sequence s B (n) by g B (x) = x 31 +x 3 +x 2 +x+1, the initial condition c B Carrying both N_ID cell IDs and N_t timing assumptions, for example, c B =c1*N_ID*I_t+c2*I_ID+c3, where I_t is the corresponding timing index carried by the DMRS sequence (0≤I_t≤N_t-1), I_ID is the cell ID index of the DMRS sequence (0≤I_ID≤N_ID-1), c1 and c2 are two integer constants (e.g., c1=1, c2=1, c3=0, or c1=1, c2=1, c3=1, or c1=c2=8, c3=0). There is an output offset Nc (e.g., Nc=1600 in LTE).

[0317] In one example of sequence sub-option 1b, the length L of the Gold sequence is the same as that of the LTE-CRS (e.g., 2^31-1) or the NR-DMRS for PDSCH (e.g., 2^31-1 or larger), and an M sequence s A (n) by g A (x) = x 31 +x 3 +1 gives, initial condition c A Carry N_t timing assumptions, for example c A=c1*I_t+c2, where I_t is the corresponding timing index carried by the DMRS sequence (0≤I_t≤N_t), c1 and c2 are two integer constants (e.g., c1=1, c2=0, or c1=N_ID, c2=0), and another M sequence s B (n) by g B (x) = x 31 +x 3 +x 2 +x+1, the initial condition c B Carry N_ID cell IDs, for example, c B = c3*I_ID+c4, where I_ID is the cell ID index of the DMRS sequence (0≤I_ID≤N_ID-1), c3 and c4 are two integer constants (e.g. c3=1, c4=0, or c3=N_t, c4=0). There is an output offset Nc (e.g., Nc=1600 in LTE).

[0318] In one example of sequence sub-option 1c, the length L of the Gold sequence is 1023, and one of the M sequences s A (n) by g A (x) = x 10 +x 3 +1 gives, initial condition c A Carry N_t timing assumptions, for example, c A =c1*I_t+c2, where I_t is the corresponding timing index carried by the DMRS sequence (0≤I_t≤N_t-1), c1 and c2 are two integer constants (e.g., c1=1, c2=0, or c1=N_ID, c2=0), and another M sequence s B (n) by g B (x) = x 10 +x 7 +1 gives, initial condition c B Carry N_ID cell IDs, for example, c B =c3*I_ID+c4, where I_ID is the cell ID index of the DMRS sequence (0≤I_ID≤N_ID-1), c3 and c4 are two integer constants (eg, c3=1, c4=0, or c3=N_t, c4=0). No output offset Nc (eg, Nc=0).

[0319] In an example of sequence sub-option 1d, the length L of the Gold sequence is 127, and an M sequence s A (n) is given by gA(x), as an example in Table 6 (e.g., g A A specific example of (x) is the same as a generator of NR-SSS, namely g A (x) = x7 +x 4 +1), another M sequence s B (n) by g B (x) is given as another example in Table 6 but with g A (x) different (e.g., g B A specific example of (x) is the same as the other generators of NR-SSS, i.e., g B (x) = x 7 +x+1). Initial condition c A and c B The combination of is used to represent N_ID cell IDs and N_t timing assumptions. There is no output offset Nc (e.g., Nc=0). In the following examples, I_t is the corresponding timing index carried by the DMRS sequence (0≤I_t≤N_t-1), I_ID is the cell ID index of the DMRS sequence (0≤I_ID≤N_ID-1), and c1, c2, c3 are integer constants.

[0320] In one example, And c B =(c1*N_ID*I_t+c2*I_ID+c3)mod 127. For example, c1=c2=1 and c3=0. For example, c1=c2=2 and c3=0. In another example, if N_t=8, And c B =I_ID_1mod 112, where I_ID=3*I_ID_1+I_ID_2, and 0≤I_ID_1≤335, 0≤I_ID_2≤2. For example, c1=8, c2=1. In another example, if N_t=4, And c B =I_ID_1mod 112, where I_ID=3*I_ID_1+I_ID_2, and 0≤I_ID_1≤335, 0≤I_ID_2≤2. For example, c1=5, c2=1. For example, c1=4, c2=1. For example, c1=8, c2=1. In another example, if N_t=8, And c B =(c1*N_ID*I_t+c2*I_ID+c3)mod 90. For example, c1=c2=1 and c3=0. In another example, if N_t=4, And c B =(c1*N_ID*I_t+c2*I_ID+c3)mod 64. For example, c1=c2=1 and c3=0.

[0321] In an example of sequence sub-option 1e, the length L of the Gold sequence is 255, and an M sequence s A(n) by g A (x) is given as an example in Table 5 (e.g., g A (x) = x 8 +x 7 +x 6 +x+1), and another M sequence s B (n) by g B (x) is given as another example in Table 5 but with g A (x) different (e.g., g B (x) = x 8 +x 7 +x 2 +x+1). Initial condition c A and c B The combination of is used to represent N_ID cell IDs and N_t timing assumptions. There is no output offset Nc (e.g., Nc=0). In the following examples, I_t is the corresponding timing index carried by the DMRS sequence (0≤I_t≤N_t-1), I_ID is the cell ID index of the DMRS sequence (0≤I_ID≤N_ID-1), and c1, c2, c3, c4 are integer constants.

[0322] In one example, And c B =(c1*N_ID*I_t+c2*I_ID+c3)mod 255. For example, c1=c2=1 and c3=0. For example, c1=c2=2 and c3=0. In another example, if N_t=8, And c B =c4*((c1*N_ID*I_t+c2*I_ID+c3)mod90). For example, c1=c2=1 and c3=0, c4=2. For example, c1=c2=1 and c3=0, c4=1. In another example, if N_t=4, And c B =c4*((c1*N_ID*I_t+c2*I_ID+c3)mod 64). For example, c1=c2=1 and c3=0, c4=3. For example, c1=c2=1 and c3=0, c4=1.

[0323] In one embodiment of sequence option 2, the Gold sequence for QPSK modulation is constructed by the exclusive OR of two M sequences of length L, where one M sequence s A (n) Using generator g A (x) and initial condition c A Generate, another M sequence s B (n) Using generator g B (x) and initial condition c BThere are possible output offsets Nc (note that if the offset does not exist, then Nc = 0) such that the QPSK modulated Gold sequence s(n) = (1-2*((s A (2n+Nc)+s B (2n+Nc))mod2)) / √2+j*(1-2*((s A (2n+Nc+1)+s B (2n+Nc+1))mod2)) / √2 and s(n) is truncated to the desired DMRS sequence length N_DMRS.

[0324] In one example of sequence sub-option 2a, the length L of the Gold sequence is the same as that of the LTE-CRS (e.g., 2^31-1) or the NR-DMRS for PDSCH (e.g., 2^31-1 or larger), and an M sequence s A (n) by g A (x) = x 31 +x 3 +1 gives, initial condition c A Fixed (e.g. c A =1), another M sequence s B (n) by g B (x) = x 31 +x 3 +x 2 +x+1, the initial condition c B Both N_ID cell IDs and N_t timing assumptions are carried.

[0325] In one example, c B =c1*N_ID*I_t+c2*I_ID+c3, where I_t is the corresponding timing index carried by the DMRS sequence (0≤I_t≤N_t-1), I_ID is the cell ID index of the DMRS sequence (0≤I_ID≤N_ID-1), c1 and c2 are two integer constants (e.g., c1=1, c2=1, c3=0, or c1=1, c2=1, c3=1, or c1=c2=8, c3=0). There is an output offset Nc (e.g., Nc=1600 in LTE, or other values).

[0326] In another example, c B=c1*I_t+c2*I_ID+c3, where I_t is the corresponding timing index carried by the DMRS sequence (0≤I_t≤N_t-1), I_ID is the cell ID index of the DMRS sequence (0≤I_ID≤N_ID-1), c1 and c2 are two integer constants (e.g., c1=2^10, c2=1, c3=0, or c1=2^12, c2=1, c3=0). There is an output offset Nc (e.g., Nc=1600 in LTE, or other values).

[0327] In yet another example, c B =c1*I_t+c2*[I_ID / 4]+c3, where I_t is the corresponding timing index carried by the DMRS sequence (0≤I_t≤N_t-1), I_ID is the cell ID index of the DMRS sequence (0≤I_ID≤N_ID-1), c1 and c2 are two integer constants (e.g., c1=2^10, c2=1, c3=0, or c1=2^12, c2=4, c3=0). There is an output offset Nc (e.g., Nc=1600 in LTE, or other values).

[0328] In yet another example, c B =c0*I_t*I_ID+c1*I_t+c2*I_ID+c3, where I_t is the corresponding timing index carried by the DMRS sequence (0≤I_t≤N_t-1), I_ID is the cell ID index of the DMRS sequence (0≤I_ID≤N_ID-1), and c0, c1, c2, c3 are constants. There is an output offset Nc (for example, Nc=1600 in LTE, or Nc can be other integer values). Note that the c0*I_t*I_ID term in the initial condition is to avoid coherent combining of inter-cell interference.

[0329] In yet another example, c B =c0*(I_t+1)*(I_ID+1)+c1*(I_t+1)+c2*(I_ID+1)+c3, where I_t is the corresponding timing index carried by the DMRS sequence (0≤I_t≤N_t-1), I_ID is the cell ID index of the DMRS sequence (0≤I_ID≤N_ID-1), and c0, c1, c2, c3 are constants. There is an output offset Nc (for example, Nc=1600 in LTE, or Nc can be other integer values). Note that the c0*(I_t+1)*(I_ID+1) term in the initial condition is to avoid coherent combining of inter-cell interference. For example, c0=2^8, c1=2^2, c2=0, c3=0; c0=2^10, c1=2^4, c2=0, c3=0; c0=2^11, c1=2^5, c2=0, c3=0.

[0330] In yet another example, c B =c0*(I_t+1)*(2*I_ID+1)+c1*(I_t+1)+c2*(I_ID+1)+c3, where I_t is the corresponding timing index carried by the DMRS sequence (0≤I_t≤N_t-1), I_ID is the cell ID index of the DMRS sequence (0≤I_ID≤N_ID-1), and c0, c1, c2, c3 are constants. There is an output offset Nc (for example, Nc=1600 in LTE, or Nc can be other integer values). Note that the c0*(I_t+1)*(I_ID+1) term in the initial condition is to avoid coherent combining of inter-cell interference. For example, c0=2^8, c1=2^2, c2=0, c3=0; c0=2^10, c1=2^4, c2=0, c3=0; c0=2^11, c1=2^5, c2=0, c3=0; c0=2^12, c1=2^4, c2=0, c3=0.

[0331] In yet another example, if there is a cell-specific offset in the RE position of the DMRS, Where I_t is the corresponding timing index carried by the DMRS sequence (0≤I_t≤N_t-1), I_ID is the cell ID index of the DMRS sequence (0≤I_ID≤N_ID-1), and c0, c1, c2, c3 are integers. There is an output offset Nc (for example, Nc=1600 in LTE, or Nc can be other integer values). Note that the initial condition The term is to avoid coherent combining of inter-cell interference.

[0332] One possible variation of this example is c3=mod(I_ID, 4). For this particular example, the parameters c0, c1, c2 can be chosen such that the real part of the normalized cross-correlation is minimized.

[0333] Example# c0 c1 c2 1 2^10 2^2 2^10 2 2^11 2^5 2^11 3 2^11 2^6 2^11 4 2^12 2^6 2^12

[0334] In yet another example, if there is a cell-specific offset in the RE position of the DMRS, Where I_t is the corresponding timing index carried by the DMRS sequence (0≤I_t≤N_t-1), I_ID is the cell ID index of the DMRS sequence (0≤I_ID≤N_ID-1), and c0, c1, c2, c3 are integers. There is an output offset Nc (for example, Nc=1600 in LTE, or Nc can be other integer values). Note that the initial condition The term is to avoid coherent combination of inter-cell interference, and It means that cells are grouped (because there is a cell-specific offset in RE position and the period of the offset is 4) and helps to further reduce the maximum cross-correlation between sequences. For example, c0=2^12, c1=2^6, c2=0, c3=0; c0=2^10, c1=2^2, c2=0, c3=0; c0=2^11, c1=2^6, c2=0, c3=0; c0=2^11, c1=2^6, c2=0, c3=0; c0=2^12, c1=2^7, c2=0, c3=0; c0=2^12, c1=0, c2=2, c3=0.

[0335] A possible variation of the previous example is c3 = mod(I_ID, 4), so that the sequence is still cell-specific, rather than group-cell-specific. For this particular example, the parameters c0, c1, c2 may be chosen such that the real part of the (maximum and / or average) normalized cross-correlation is minimized (for both inter-cell and intra-cell scenarios). For example

[0336] Example# c0 c1 c2 1 2^10 2^2 0 2 2^11 2^6 0 3 2^12 2^6 0

[0337] In yet another example, if there is a cell-specific offset in the RE position of the DMRS, Where I_t is the corresponding timing index carried by the DMRS sequence (0≤I_t≤N_t-1), I_ID is the cell ID index of the DMRS sequence (0≤I_ID≤N_ID-1), and c0, c1, c2, c3 are integers. There is an output offset Nc (for example, Nc=1600 in LTE, or Nc can be other integer values). Note that the initial condition The term is to avoid the coherent combination of inter-cell interference. For example, c0 = 2^12, c1 = 2^6, c2 = 0, c3 = 0; c0 = 2^10, c1 = 2^2, c2 = 0, c3 = 0; c0 = 2^11, c1 = 2^6, c2 = 0, c3 = 0; c0 = 2^11, c1 = 2^6, c2 = 0, c3 = 0; c0 = 2^12, c1 = 2^7, c2 = 0, c3 = 0; c0 = 2^12, c1 = 0, c2 = 2, c3 = 0.

[0338] One possible variation of the previous example is c3 = mod(I_ID, 4). For this particular example, the parameters c0, c1, c2 may be chosen such that the real part of the normalized cross-correlation is minimized.

[0339] In one example of sequence sub-option 2b, the length L of the Gold sequence is the same as that of the LTE-CRS (e.g., 2^31-1) or the NR-DMRS for PDSCH (e.g., 2^31-1 or larger), and an M sequence sA(n) is given by gA(x)=x 31 +x3 +1 gives, initial condition c A Carry N_t timing assumptions, for example, cA = c1*I_t+c2, where I_t is the corresponding timing index carried by the DMRS sequence (0≤I_t≤N_t), c1 and c2 are two integer constants (for example, c1=1, c2=0, or c1=N_ID, c2=0), and another M sequence sB(n) is composed of g B (x) = x 31 +x 3 +x 2 +x+1, the initial condition c B Carry N_ID cell IDs, for example cB=c3*I_ID+c4, where I_ID is the cell ID index of the DMRS sequence (0≤I_ID≤N_ID-1), c3 and c4 are two integer constants (for example c3=1, c4=0, or c3=N_t, c4=0). There is an output offset Nc (for example, Nc=1600 in LTE).

[0340] In one example of sequence sub-option 2c, the length L of the Gold sequence is 1023, and one of the M sequences sA(n) consists of g A (x) = x 10 +x 3 +1, the initial condition cA carries N_t timing hypotheses, for example, cA = c1*I_t+c2, where I_t is the corresponding timing index carried by the DMRS sequence (0≤I_t≤N_t-1), c1 and c2 are two integer constants (for example, c1=1, c2=0, or c1=N_ID, c2=0), and another M sequence sB(n) is given by g B (x) = x 10 +x 7 +1, the initial condition cB carries N_ID cell IDs, for example, cB=c3*I_ID+c4, where I_ID is the cell ID index of the DMRS sequence (0≤I_ID≤N_ID-1), c3 and c4 are two integer constants (for example, c3=1, c4=0, or c3=N_t, c4=0). There is no output offset Nc (for example, Nc=0).

[0341] In an example of sequence sub-option 2d, the length L of the Gold sequence is 127, and an M sequence s A (n) is given by gA(x), as an example in Table 6 (e.g., g A A specific example of (x) is the same as a generator of NR-SSS, namely g A (x) = x 7 +x 4 +1), another M sequence s B(n) by g B (x) is given as another example in Table 6 but with g A (x) different (e.g., g B A specific example of (x) is the same as the other generators of NR-SSS, i.e., g B (x) = x 7 +x+1). Initial condition c A and c B The combination of is used to represent N_ID cell IDs and N_t timing hypotheses. No offset Nc is output (eg, Nc=0).

[0342] In the following examples, I_t is the corresponding timing index carried by the DMRS sequence (0≤I_t≤N_t-1), I_ID is the cell ID index of the DMRS sequence (0≤I_ID≤N_ID-1), and c1, c2, and c3 are integer constants. In one example, And c B =(c1*N_ID*I_t+c2*I_ID+c3)mod 127. For example, c1=c2=1 and c3=0. For example, c1=c2=2 and c3=0. In another example, if N_t=8, And c B =I_ID_1mod 112, where I_ID=3*I_ID_1+I_ID_2, and 0≤I_ID_1≤335, 0≤I_ID_2≤2. For example, c1=8, c2=1. In another example, if N_t=4, And c B =I_ID_1mod 112, where I_ID=3*I_ID_1+I_ID_2, and 0≤I_ID_1≤335, 0≤I_ID_2≤2. For example, c1=5, c2=1. For example, c1=4, c2=1. For example, c1=8, c2=1. In another example, if N_t=8, And c B =(c1*N_ID*I_t+c2*I_ID+c3)mod 90. For example, c1=c2=1 and c3=0. In another example, if N_t=4, And c B =(c1*N_ID*I_t+c2*I_ID+c3)mod 64. For example, c1=c2=1 and c3=0.

[0343] In an example of sequence sub-option 2e, the length L of the Gold sequence is 255, and an M sequence s A (n) by g A (x) is given as an example in Table 5 (e.g., gA (x) = x 8 +x 7 +x 6 +x+1), and another M sequence s B (n) by g B (x) is given as another example in Table 5 but with g A (x) different (e.g., g B (x) = x 8 +x 7 +x2+x+1). Initial condition c A and c B The combination of is used to represent N_ID cell IDs and N_t timing assumptions. There is no output offset Nc (e.g., Nc=0). In the following examples, I_t is the corresponding timing index carried by the DMRS sequence (0≤I_t≤N_t-1), I_ID is the cell ID index of the DMRS sequence (0≤I_ID≤N_ID-1), and c1, c2, c3, c4 are integer constants.

[0344] In one example, And c B =(c1*N_ID*I_t+c2*I_ID+c3)mod 255. For example, c1=c2=1 and c3=0. For example, c1=c2=2 and c3=0. In another example, if N_t=8, And c B =c4*((c1*N_ID*I_t+c2*I_ID+c3)mod90). For example, c1=c2=1 and c3=0, c4=2. For example, c1=c2=1 and c3=0, c4=1. In another example, if N_t=4, And c B =c4*((c1*N_ID*I_t+c2*I_ID+c3)mod 64). For example, c1=c2=1 and c3=0, c4=3. For example, c1=c2=1 and c3=0, c4=1.

[0345] In an example of sequence sub-option 2f, the length L of the Gold sequence is 511, and an M sequence s A (n) by g A (x)(e.g. g A (x) = x 9 +x 5 +1) gives, another M sequence s B (n) and g A (x) is different (e.g. x 9 +x 4 +1). Initial condition c A and cB The combination of is used to represent N_ID cell IDs and N_t timing assumptions. There is no output offset Nc (e.g., Nc=0). In the following examples, I_t is the corresponding timing index carried by the DMRS sequence (0≤I_t≤N_t-1), I_ID is the cell ID index of the DMRS sequence (0≤I_ID≤N_ID-1), and c1, c2, c3, c4 are integer constants.

[0346] In one example, And c B =(c1*N_ID*I_t+c2*I_ID+c3)mod 511. For example, c1=c2=1 and c3=0. For example, c1=c2=2 and c3=0. In another example, if N_t=8, And c B =c4*((c1*N_ID*I_t+c2*I_ID+c3)mod90). For example, c1=c2=1 and c3=0, c4=4. For example, c1=c2=1 and c3=0, c4=1. In another example, if N_t=4, And c B =c4*((c1*N_ID*I_t+c2*I_ID+c3)mod 64). For example, c1=c2=1 and c3=0, c4=7. For example, c1=c2=1 and c3=0, c4=1.

[0347] The present disclosure supports the following RE mapping designs and can be combined with one or more of the above sequence options / sub-options.

[0348] In one embodiment of mapping option 1, the NR-DMRS sequence is repeated in two OFDM symbols in the time domain. In this mapping option, all the above sequence options / sub-options can be used to map to each repeated NR-DMRS sequence, where the number of timing assumptions carried by the two sequences is N_t (e.g., N_t=16 or N_t=8 or N_t=4), and for N_RE=288, the desired DMRS sequence length is N_DMRS=72, for N_RE=254, N_DMRS=63.

[0349] In one embodiment of mapping option 2, the NR-DMRS sequence is repeated across OFDM symbols in the frequency domain (e.g., one copy is mapped to the central 12 PRBs of two symbols and the other copy is mapped to the remaining 12 PRBs of two symbols). In this mapping option, all of the above sequence options / sub-options can be used to map to each repeated NR-DMRS sequence, where the number of timing assumptions carried by the two sequences is N_t (e.g., N_t=16 or N_t=8 or N_t=4), and for N_RE=288, the desired DMRS sequence length is N_DMRS=72, and for N_RE=254, N_DMRS=63.

[0350] In one embodiment of mapping option 3, two types of DMRS sequences, where a first type of NR-DMRS sequence carrying N_t (e.g., N_t=16 or N_t=8 or N_t=4) timing assumptions is mapped to the central part of the bandwidth (e.g., the central 12 PRBs of two symbols), and a second type of NR-DMRS sequence that does not carry a timing assumption is mapped to the remaining part of the bandwidth (e.g., the remaining 12 PRBs of two symbols). In this mapping option, all of the above sequence options / sub-options can be used, where for the first type of DMRS sequence, N_t>0 (e.g., N_t=16 or N_t=8 or N_t=4), and for the second type of DMRS sequence, N_t=0, and for N_RE=288, the desired DMRS sequence length is N_DMRS=72, and for N_RE=254, N_DMRS=63.

[0351] In one embodiment of mapping option 4, a single NR-DMRS sequence is mapped to all OFDM symbols in a frequency first and timing second order. In this mapping option, all the above sequence options / sub-options can be used, where the number of timing assumptions carried by the sequence for a given cell is N_t (e.g., N_t=16 or N_t=8 or N_t=4), and for two PBCH symbols within an SS block with 1 / 4 density, the expected DMRS sequence length is typically N_DMRS=144, or N_DMRS=126, or N_DMRS=N_RE / 2, where N_RE can be calculated based on the number of PRBs of NR-4, or for N_symbol PBCH symbols within an SS block with k density, typically N_DMRS=N_RE*k*N_symbol, where N_RE can be calculated based on the number of PRBs of NR-PBCH (e.g., N_RE=12*N_PRB), or for N_PRB PRBs for NR-PBCH and its DMRS mapping within an SS block with k density, typically N_DMRS=N_PRB*k.

[0352] Fig.13 A flowchart of a method 1300 for designing a DMRS sequence according to an embodiment of the present disclosure is shown, and the method may be performed by a UE. Fig.13 The illustrated embodiment of method 1300 is for illustration only. Fig.13 The scope of the present disclosure is not limited to any particular implementation of beam scanning operation 1300 .

[0353] like Fig.13 As shown, method 1300 starts at step 1305. In step 1305, the UE receives a demodulation reference signal (DMRS) of a physical broadcast channel (PBCH) through a downlink channel. In some embodiments, in step 1305, the UE receives a PBCH and a DMRS of a BPCH from a base station (BS) through a downlink channel.

[0354] In step 1310, the UE determines resources for a DMRS to be used for a PBCH. In step 1310, a pseudo noise (PN) sequence is mapped to resources for a DMRS to be used for a PBCH. The PN sequence in step 1310 is generated based on an initial condition, the initial condition including a physical cell ID and timing information, the timing information including at least one of an index of a half frame within a frame based on a carrier frequency range or an index of an SSB. In step 1310, the index of the SSB includes at least one of a partial or full index of the SSB. In some embodiments, the UE determines a DMRS sequence from eight candidate DMRS sequences of a cell in step 1310 based on one of the carrier frequency ranges including carrier frequency range A, carrier frequency range B, and / or carrier frequency range C. In such an embodiment, carrier frequency range A is 0 to 3 gigahertz (GHz), carrier frequency range B is 3 to 6 GHz, and carrier frequency range C is 6 to 52.6 GHz.

[0355] In some embodiments, eight candidate DMRS sequences are generated in step 1310 based on three bits of timing information, including a two-bit index of an SSB and a one-bit index of a half frame within a frame for carrier frequency range A, a three-bit index of an SSB for carrier frequency range B, and a portion of an index of the three least significant bits (LSBs) of an SSB for carrier frequency range C. In some embodiments, in step 1310, the remaining timing information for carrier frequency range B and carrier frequency range C is transmitted separately as part of a payload of the PBCH. In some embodiments, the initial condition in step 1310 includes at least a term constructed by multiplying the timing information included in the DMRS sequence and a grouping cell ID with a grouping size of 4. In such an embodiment, the initial condition is composed of Given as , where I_ID is the cell ID and I_t is the timing information included in the DMRS sequence.

[0356] Fig.14 A flowchart of a method 1400 for designing a DMRS sequence according to an embodiment of the present disclosure is shown, and the method may be performed by a BS. Fig.14 The illustrated embodiment of method 1400 is for illustration only. Fig.14 The scope of the present disclosure is not limited to any particular implementation of beam scanning operation 1400 .

[0357] like Fig.14 As shown, the method 1400 starts at step 1405. In step 1405, the BS determines resources to be used for a demodulation reference signal (DMRS) of a physical broadcast channel (PBCH).

[0358] In some embodiments, the BS determines a DMRS sequence from eight candidate DMRS sequences of the cell according to one of the carrier frequency ranges including carrier frequency range A, carrier frequency range B, and carrier frequency range C in step 1405, wherein the carrier frequency range A is 0 to 3 gigahertz (GHz), the carrier frequency range B is 3 to 6 GHz, and the carrier frequency range C is 6 to 52.6 GHz. In such an embodiment, the eight candidate DMRS sequences are generated based on three bits of timing information, including two bits of SSB index and one bit of half-frame index within a frame of carrier frequency range A, three bits of SSB index of carrier frequency range B, and part of the index of the SSB of the three least significant bits (LSBs) of carrier frequency range C.

[0359] Next, in step 1410, the BS generates a pseudo-noise (PN) sequence based on an initial condition, which includes a physical cell ID and timing information, the timing information including at least one of an index of a half frame within a frame based on a carrier frequency range or an index of an SSB, wherein the index of the SSB includes at least one of a partial or full index of the SSB.

[0360] In some embodiments, the initial condition in step 1410 includes at least a term constructed by the product of the timing information included in the DMRS sequence and the grouping cell ID with a grouping size of 4. In such an embodiment, the initial condition is composed of Given as , where I_ID is the cell ID and I_t is the timing information included in the DMRS sequence.

[0361] In some embodiments, for carrier frequency range A, the initial condition includes I_t=4*I_HF+I_SSB, and I_t=I_SSB for carrier frequency range B and carrier frequency range C. In such an embodiment, I_HF is the index of the half frame within the frame, I_SSB is the index of the SSB of carrier frequency range A and carrier frequency range B, and is part of the index of the SSB of the three least significant bits (LSBs) of carrier frequency range C.

[0362] Then, in step 1415, the BS maps the PN sequence to resources of a DMRS to be used for the PBCH.

[0363] Finally, the BS transmits the DMRS of the PBCH through the downlink channel in step 1420. In some embodiments, the BS transmits the remaining timing information of the carrier frequency range B and the carrier frequency range C respectively transmitted as part of the payload of the PBCH in step 1420.

[0364] In some embodiments, the BS transmits the PBCH and the DMRS of the BPCH to the user equipment (UE) through a downlink channel in step 1420 .

[0365] Although the present disclosure has been described with exemplary embodiments, various changes and modifications may be suggested to those skilled in the art. The present disclosure is intended to encompass changes and modifications that fall within the scope of the appended claims.

[0366] Nothing in this application should be construed as implying that any particular element, step, or function is essential to be included in the claims. The scope of the patented subject matter is limited solely by the claims. Furthermore, no claim is intended to invoke 35 USC § 112(f) unless the word "means" is followed by a participle.

Claims

1. A method performed by a base station (102) in a communication system, the method include: determining a demodulation reference signal DMRS sequence associated with a pseudo noise PN sequence, Among them, based on To define the initial value c_B of the PN sequence, Where I_ID is the physical cell identification ID, and I_t is the timing information, Wherein, when the number of synchronization signal block SSB indexes is 4, the timing information is defined based on two bits of the SSB index, Wherein, when the number of SSB indexes is 8 or 64, the timing information is defined based on three bits of the SSB index; and Wherein, the DMRS sequence is used for a physical broadcast channel PBCH; determining resources for sending the DMRS sequence; and The DMRS sequence is sent to the terminal on the resource.

2. The method according to claim 1, in, The DMRS sequence is determined among a plurality of candidate DMRS sequences based on the number of SSB indexes.

3. The method according to claim 1, in, In the case where the number of SSB indexes is 8 or 64, I_t=I_SSB, and Among them, when the number of SSB indexes is 8, I_SSB is the three LSBs of the SSB index, and when the number of SSB indexes is 64, I_SSB is the three LSBs of the SSB index.

4. The method according to claim 1, in, In the case where the number of SSB indexes is 4, I_t=4*I_HF+I_SSB, and Here, I_HF is a half-frame index, and when the number of SSB indexes is 4, I_SSB is two LSBs of the SSB index.

5. The method according to claim 1, in, The timing information includes two bits of the SSB index and one bit of the half-frame index.

6. A method performed by a terminal in a communication system, the method include: determining a resource for receiving a demodulation reference signal DMRS sequence associated with a pseudo noise PN sequence, wherein the DMRS sequence is used for a physical broadcast channel PBCH, and receiving a DMRS sequence mapped to the resource from a base station, Among them, based on To define the initial value c_B of the PN sequence, and Where I_ID is the physical cell identification ID, and I_t is the timing information, Wherein, when the number of synchronization signal block SSB indexes is 4, the timing information is defined based on two bits of the SSB index, In which, when the number of SSB indexes is 8 or 64, the timing information is defined based on three bits of the SSB index.

7. The method according to claim 6, in, The DMRS sequence is determined among a plurality of candidate DMRS sequences based on the number of SSB indexes.

8. The method according to claim 6, in, In the case where the number of SSB indexes is 8 or 64, I_t=I_SSB, and Among them, when the number of SSB indexes is 8, I_SSB is the three LSBs of the SSB index, and when the number of SSB indexes is 64, I_SSB is the three LSBs of the SSB index.

9. The method according to claim 6, in, In the case where the number of SSB indexes is 4, I_t=4*I_HF+I_SSB, and Here, I_HF is a half-frame index, and when the number of SSB indexes is 4, I_SSB is two LSBs of the SSB indexes.

10. The method according to claim 6, in, The timing information includes two bits of the SSB index and one bit of the half-frame index.

11. A base station in a communication system, the base station include: Transceiver; as well as A controller coupled to the transceiver is configured to: determining a demodulation reference signal DMRS sequence associated with a pseudo noise PN sequence, Among them, based on To define the initial value c_B of the PN sequence, Where I_ID is the physical cell identification ID, and I_t is the timing information, Wherein, when the number of synchronization signal block SSB indexes is 4, the timing information is defined based on two bits of the SSB index, Wherein, when the number of SSB indexes is 8 or 64, the timing information is defined based on three bits of the SSB index; and Among them, the DMRS sequence is used for the physical broadcast channel PBCH; determining resources for transmitting a DMRS sequence; and The DMRS sequence is sent to the terminal on the resource.

12. The base station according to claim 11, in, The DMRS sequence is determined among a plurality of candidate DMRS sequences based on the number of SSB indexes.

13. The base station according to claim 11, in, In the case where the number of SSB indexes is 8 or 64, I_t=I_SSB, and Among them, when the number of SSB indexes is 8, I_SSB is the three LSBs of the SSB index, and when the number of SSB indexes is 64, I_SSB is the three LSBs of the SSB index.

14. The base station according to claim 11, in, In the case where the number of SSB indexes is 4, I_t=4*I_HF+I_SSB, and Here, I_HF is a half-frame index, and when the number of SSB indexes is 4, I_SSB is two LSBs of the SSB index.

15. The base station according to claim 11, in, The timing information includes two bits of the SSB index and one bit of the half-frame index.

16. A terminal in a communication system, the terminal include: Transceiver; as well as A controller coupled to the transceiver is configured to: determining a resource for receiving a demodulation reference signal DMRS sequence associated with a pseudo noise PN sequence, wherein the DMRS sequence is used for a physical broadcast channel PBCH, and receiving the DMRS sequence mapped to the resource from a base station, Among them, based on To define the initial value c_B of the PN sequence, Where I_ID is the physical cell identification ID, and I_t is the timing information, Wherein, when the number of synchronization signal block SSB indexes is 4, the timing information is defined based on two bits of the SSB index, In which, when the number of SSB indexes is 8 or 64, the timing information is defined based on three bits of the SSB index.

17. The terminal according to claim 16, in, The DMRS sequence is determined among a plurality of candidate DMRS sequences based on the number of SSB indexes.

18. The terminal according to claim 16, in, In the case where the number of SSB indexes is 8 or 64, I_t=I_SSB, and Among them, when the number of SSB indexes is 8, I_SSB is the three LSBs of the SSB index, and when the number of SSB indexes is 64, I_SSB is the three LSBs of the SSB index.

19. The terminal according to claim 16, in, In the case where the number of SSB indexes is 4, I_t=4*I_HF+I_SSB, and Here, I_HF is a half-frame index, and when the number of SSB indexes is 4, I_SSB is two LSBs of the SSB indexes.

20. The terminal according to claim 16, in, The timing information includes two bits of the SSB index and one bit of the half-frame index.