A method for adjusting and controlling the operation modes of multi-well group pumping units

By sequencing and adjusting the operating mode control of pumping units in multiple well groups, the problems of insufficient liquid supply and uncoordinated supply and discharge in cluster wells are solved, energy saving and consumption reduction of pumping units in multiple well groups are achieved, and ineffective continuous operation is avoided. Reduced grid capacity.

CN115596410BActive Publication Date: 2024-10-11DAQING OILFIELD CO LTD +1
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202110778344.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-07-09
Publication Date
2024-10-11
Estimated Expiration
2041-07-09

AI Technical Summary

Technical Problem

In the process of oil field development, there are problems of insufficient liquid supply and uncoordinated supply and discharge in cluster wells, resulting in low efficiency and high energy consumption of pumping units in multi-well groups, and the proportion of low-yield wells gradually increases, resulting in ineffective continuous operation of oil wells, increasing grid capacity.

Method used

This paper proposes a control method for operating mode sequencing and adjustment of pumping units in multiple well groups. By collecting the production parameters of each well, calculating the continuous operating time and non-continuous operating time, and setting the operating mode sequence, the mode switching between pumping unit wells is realized. , to avoid ineffective continuous operation, and feedback the reverse power generation of the down stroke to the non-continuous operation pumping unit.

Benefits of technology

Under the premise of ensuring that the output of oil wells does not decrease, the ineffective continuous operation of multi-well group pumping units can be avoided to the greatest extent and the capacity of the power grid can be reduced. It is suitable for energy saving and consumption reduction of multi-well group pumping units such as cluster wells.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115596410B_ABST
    Figure CN115596410B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of oilfield production engineering, and belongs to a method for adjusting the operation mode of a multi-well group pumping unit. The control method comprises: collecting the production parameters of the multi-well group pumping unit wells and the upper limit value of the transformer capacity in the previous period; calculating the continuous operation coefficient η of the i-th oil well i , determine the continuous operation time t of the i-th oil well in a single cycle t i (on) and discontinuous operation time t i (un); according to the continuous operation time of the oil well t i (on) Sort from large to small ξ1, ξ2, ..., ξ N , according to the operation mode ranking ξ, the startup sequence and the operation mode switching principle are determined; at t-0.5min, the continuously operating pumping well automatically switches to the discontinuous operation mode, and the above steps are repeated in the next stage period t. The combined switching mode of crank continuous operation and crank discontinuous operation of multi-well group pumping wells provided by the present invention avoids the problem of invalid continuous operation of multi-well group pumping wells, and is suitable for energy saving and consumption reduction optimization of multi-well group pumping wells such as cluster wells.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of oilfield production engineering, and belongs to an operation mode sequencing adjustment control method suitable for multi-well group pumping units. Background Art

[0002] Conventional beam pumping units have been the dominant position in mechanical oil production equipment since their invention. Due to the limitation of their own four-bar linkage mechanism, beam pumping units have the disadvantages of low efficiency and high energy consumption. With the continuous development of oil fields, in order to increase crude oil production and save land acquisition costs, a large number of cluster wells are deployed in various oil fields. Cluster well technology has become one of the main technologies for the economic development of onshore and offshore oil fields. However, with the continuous development of oil wells, the proportion of low-yield wells in cluster wells has gradually increased, and there are widespread problems of insufficient fluid supply and uncoordinated supply and drainage. Summary of the invention

[0003] The purpose of the present invention is to propose an operation mode sequencing adjustment control method suitable for multi-well group pumping units, thereby avoiding the problem of ineffective continuous operation of multi-well group pumping units, and feeding back the reverse power generation of the pumping unit downstroke to the non-continuously operating pumping units, which can effectively reduce the capacity of the power grid and achieve energy saving and consumption reduction of multi-well group pumping units such as cluster wells.

[0004] To achieve the above purpose, the technical solution adopted is:

[0005] A method for adjusting and controlling the operation mode sequencing of a multi-well group pumping unit comprises the following steps:

[0006] Step S1: Collect the production parameters and transformer capacity of the multi-well group of pumping well 1, pumping well 2, ..., pumping well N in the previous period. The production parameters of each single well include the pump diameter D pi , stroke i 、Strike times n i , average daily liquid production Q i , average peak power P maxi , and the upper limit value of transformer capacity P T ;

[0007] Step S2: Based on the parameters collected in step S1, calculate the continuous operation time T required for the i-th oil well within 24 hours i (on), non-continuous operation time T i (un), based on the continuous running time T within 24 hours i (on) Calculate the continuous operation coefficient η i , according to the continuous operation coefficient η i , calculate the continuous operation time t of the i-th oil well in a single cycle t i (on) and discontinuous operation time t i(un);

[0008] In the formula, the operation coefficient of the i-th oil well is The continuous operation time t of the i-th oil well in a single cycle t i (on) = t·η i , min, non-continuous operation time t i (un) = t·(1-η i ), min;

[0009] Step S3: Set the oil well operation mode sequence ξ, and calculate the oil well continuous operation time t in step S2 i (on) Sort from largest to smallestξ 1 , 2 ,...,ξ N , the operation mode of the multi-well group pumping well is switched between the crank continuous operation mode and the crank discontinuous operation mode, and the multi-well group pumping well determines the start-up sequence and the operation mode switching principle according to the operation mode ranking ξ;

[0010] Step S4: At t-0.5min, the continuously operating pumping well automatically switches to the discontinuous operation mode, and in the next stage period t, steps S1 to S3 are repeated.

[0011] Preferably, the step S3 comprises the following steps:

[0012] Step S31: artificially set the maximum number of continuously operating wells m, and before the start of the stage production period t, sort the oil wells in the well group from large to small according to the operation mode sorting ξ, and for oil wells with ξ≤m, adopt the continuous operation mode, and for oil wells with ξ>m, adopt the crank discontinuous operation mode, where 1≤ξ≤N;

[0013] Step S32: The startup sequence of the oil wells in the continuous operation mode is as follows: the first oil well is switched from the crank discontinuous operation to the continuous operation mode, and the other oil wells are all in the crank discontinuous operation mode. When the first oil well finishes its upstroke, the second oil well is switched from the discontinuous mode to the continuous operation mode, ..., when the ξ-1th oil well finishes its upstroke, the ξth oil well is switched from the discontinuous mode to the continuous mode, and the continuous mode starts from the bottom dead center, ξ≤m;

[0014] Step S33: Operation mode ranking ξ The continuous operation time of the mth oil well reaches After that, the mth oil well is controlled to switch to crank discontinuous operation, and then the oil well with operation mode ranking m+1 is switched from crank discontinuous operation mode to continuous operation mode, ... the continuous operation time of the mith well reaches After that, the mi-th well is controlled to switch to the crank discontinuous operation, and the operation mode sequence is m+1+i oil well is switched from the crank discontinuous operation mode to the continuous operation mode;

[0015] Where i≤m, m+1+i≤N;

[0016] Step S34: Determine whether the continuous operation time of the oil well with operation mode ranking ξ=1 satisfies t 1 <t 1 (on), if the result is yes, then keep the continuous operation mode, otherwise switch to the discontinuous operation mode; then determine whether the operation mode ranking ξ=2 oil wells meet t 2 <t 2 (on), if the result is yes, keep the continuous operation mode, otherwise switch to the crank discontinuous operation mode until ξ = N, and the number of continuous operation wells shall not exceed m;

[0017] Where, 1≤ξ≤N;

[0018] Step S35: Enter the next cycle t and repeat steps S31 to S34.

[0019] Preferably, the maximum number of continuously operating oil wells m is determined according to the following method:

[0020] Keep all oil wells within time t, and the continuous operation time reaches t i (on), the maximum number of continuously operating oil wells m is determined according to the following steps;

[0021] Step S311: Starting from ξ=h, determine whether t ξ +t ξ+1 ≤t, if satisfied, proceed to step S312, if not satisfied, proceed to step S313;

[0022] Step S312: Determine whether If it satisfies, then m=ξ, if it does not satisfy, The determination process is over;

[0023] Step S313, let ξ=h+1, continue steps S311 and S312 until ξ=N, if it does not satisfy Then m = N;

[0024] In the formula, To round up.

[0025] Preferably, the maximum number of wells in continuous operation is

[0026] The transformer capacity is set to an upper limit value P T =P t ×(1-α); the average power of the oil well

[0027] In the formula, To round down, P t is the maximum installed capacity of the transformer, α is the planned reduction of transformer capacity; P maxi is the average peak power of the i-th oil well.

[0028] Preferably, the continuous operation time required for the i-th pumping well within 24 hours is Non-continuous time T within 24h i (un) = 24-T i (on);

[0029] Where D pi is the pump diameter of the i-th well, m; s i is the stroke of the i-th well, m; n i is the pump stroke times of the i-th well, min -1 ; is the average pump efficiency of the ith well, %;

[0030] Preferably, the average pump efficiency of the i-th oil well is It is calculated by the following method:

[0031]

[0032] In the formula, Q ik (measured) is the kth production measurement value of the i-th oil well under normal operating conditions, m 3 / d; n is the total number of production tests under normal working conditions, n≥3, Q i (R) is the theoretical displacement of the i-th oil well,

[0033]

[0034] Preferably, the single cycle t has a value of: 30≤t≤120, min.

[0035] The operation mode sequencing adjustment control method for multi-well group pumping units provided by the present invention can avoid the problem of ineffective continuous operation of multi-well group pumping units to the greatest extent possible while ensuring that the oil well production does not decrease, and can feed back the reverse power generation of the pumping unit downstroke to the non-continuously operating pumping units, thereby effectively reducing the capacity of the power grid, and is particularly suitable for energy saving and consumption reduction of multi-well group pumping units such as cluster wells. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 The present invention is a schematic diagram of an operation mode sequencing and adjustment control method applicable to a multi-well group oil pumping unit according to an embodiment of the present invention. DETAILED DESCRIPTION

[0037] The technical solution of the embodiment of the present invention will be clearly and completely described below in conjunction with the accompanying drawings of the embodiment of the present invention.

[0038] like Figure 1 As shown, the present invention provides an operation mode sequencing adjustment control method applicable to a multi-well group pumping unit, comprising the following steps:

[0039] Step 1: Collect the production parameters and transformer capacity P of pumping well 1, pumping well 2, ..., pumping well N in the previous period t , single well production parameters include pump diameter D pi , stroke i 、Strike times n i , Actual average daily liquid production Q i , average peak power P maxi , and the upper limit value of transformer capacity P T The stage period is not less than one week, and can be one week, one month or several months, but the stage period should not be too long, because if the period is too long, the oil well production parameters may change significantly, which is not conducive to the implementation of the plan;

[0040] Step 2: Based on the parameters collected in step S1, calculate the continuous operation time T required for the i-th oil well within 24 hours i (on), non-continuous operation time T i (un), based on the continuous running time T within 24 hours i (on) Calculate the continuous operation coefficient η i , according to the continuous operation coefficient η i , calculate the continuous operation time t of the i-th oil well in a single cycle t i (on) and discontinuous operation time t i (un);

[0041] The i-th oil well operation coefficient The continuous operation time t of the i-th oil well in a single cycle t i (on) = t·η i , min, non-continuous operation time t i (un) = t·(1-η i ), min;

[0042] Set the oil well operation mode sequence ξ, and calculate the oil well continuous operation time t in step S2 i (on) Sort from largest to smallestξ 1 , 2 ,...,ξ N , the operation mode of the multi-well group pumping well is switched between the crank continuous operation mode and the crank discontinuous operation mode, and the multi-well group pumping well determines the start-up sequence and the operation mode switching principle according to the operation mode sorting ξ; preferably, the step S3 includes the following steps;

[0043] Step S31: artificially set the maximum number of continuously operating wells m, and before the start of the stage production period t, sort the oil wells in the well group from large to small according to the operation mode sorting ξ, and for oil wells with ξ≤m, adopt the continuous operation mode, and for oil wells with ξ>m, adopt the crank discontinuous operation mode, where 1≤ξ≤N;

[0044] Wherein, the maximum number of continuously operating oil wells m is determined according to the following method:

[0045] If the selection is based on production priority, the maximum number of continuously operating oil wells m is determined according to the following steps:

[0046] Step S311: Starting from ξ=h, determine whether t ξ +t ξ+1 ≤t, if satisfied, proceed to step S312, if not satisfied, proceed to step S313;

[0047] Step S312: Determine whether If it satisfies, then m=ξ, if it does not satisfy, The determination process is over;

[0048] Step S313, let ξ=h+1, continue steps S311 and S312 until ξ=N, if it does not satisfy Then m = N;

[0049] In the formula, To round up.

[0050] Or, from the perspective of energy saving, choose: Maximum number of wells in continuous operation

[0051] The transformer capacity is set to an upper limit value P T =P t ×(1-α); the average power of the oil well

[0052] In the formula, To round down, P t is the maximum installed capacity of the transformer, α is the planned reduction of transformer capacity; P maxi is the peak power of the i-th oil well.

[0053] Step S32: The startup sequence of the oil wells in the continuous operation mode is as follows: the first oil well is switched from the crank discontinuous operation to the continuous operation mode, and the other oil wells are all in the crank discontinuous operation mode. When the first oil well finishes its upstroke, the second oil well is switched from the discontinuous mode to the continuous operation mode, ..., when the ξ-1th oil well finishes its upstroke, the ξth oil well is switched from the discontinuous mode to the continuous mode, and the continuous mode starts from the bottom dead center, ξ≤m;

[0054] Step S33: Operation mode ranking ξ The continuous operation time of the mth oil well reaches After that, the mth oil well is controlled to switch to the crank discontinuous mode, and then the oil well with the operation mode ranking of m+1 is switched from the crank discontinuous operation mode to the continuous operation mode, ... the continuous operation time of the mith well reaches After that, the mi-th well is controlled to switch to the crank discontinuous mode, and the operation mode sequence is m+1+i oil well switches from the crank discontinuous operation mode to the continuous operation mode;

[0055] Where i≤m, m+1+i≤N;

[0056] Step S34: Determine whether the continuous operation time of the oil well with operation mode ranking ξ=1 satisfies t 1 <t 1 (on), if the result is yes, then keep the continuous operation mode, otherwise switch to the discontinuous operation mode; then determine whether the oil wells with the operation mode ranking ξ=2 meet t 2 <t 2 (on), if the result is yes, keep the continuous operation mode, otherwise switch to the crank discontinuous operation mode until ξ = N, and the number of continuous operation wells shall not exceed m;

[0057] Where, 1≤ξ≤N;

[0058] Step S35: Enter the next cycle t and repeat steps S31 to S34.

[0059] Step S4: At t-0.5min, the continuously operating pumping well automatically switches to the discontinuous operation mode, and in the next stage period t, steps S1 to S3 are repeated.

[0060] Preferably, the continuous operation time required for the i-th pumping well within 24 hours is Non-continuous time T within 24h i (un) = 24-T i (on);

[0061] Where D pi is the pump diameter of the i-th well, m; s i is the stroke of the i-th well, m; n iis the pump stroke times of the i-th well, min -1 ; is the average pump efficiency value given for the ith well, %;

[0062] Among them, given pump efficiency The specific average pump efficiency of the i-th oil well is calculated and determined by the reasonable pump efficiency value of the i-th oil well. It is calculated by the following method:

[0063]

[0064] In the formula, Q ik (measured) is the kth production measurement value of the i-th oil well under normal operating conditions, m 3 / d; n is the total number of production tests under normal working conditions, n≥3, Q i (R) is the theoretical displacement of the i-th oil well, Among them, the normal operating conditions of oil wells refer to special operating conditions such as no rod break, severe leakage, insufficient fluid supply, etc. If the average pump efficiency value cannot be determined by the above method You can also refer to the reasonable pump efficiency experience values ​​within the same block.

[0065] In this embodiment, the single cycle t is determined by the formation fluid supply recovery situation and the allowable liquid level fluctuation range. Specifically, the single cycle t is set to: 30≤t≤120, min. The specific value of t can be determined according to actual production conditions.

[0066] Finally, it should be pointed out that the embodiments described above are only some embodiments of the present invention, not all embodiments. Any modification and replacement of the technical solutions or technical features described in the present invention, and all other embodiments obtained by ordinary technicians in this field without creative work, are within the spirit and scope of protection of the present invention.

Claims

1. A method for adjusting and controlling the operation modes of multi-well group pumping units. It is characterized in that The following steps are involved: Step S1: Collect the production parameters and transformer capacity of the multi-well group of pumping well 1, pumping well 2, ..., pumping well N in the previous period. The production parameters of each single well of the pumping well include the pump diameter D pi , stroke i 、Strike times n i , average daily liquid production Q i , average peak power P maxi , and the upper limit value of transformer capacity P T ; Step S2: Based on the parameters collected in step S1, calculate the continuous operation time T required for the i-th pumping well within 24 hours i (on), non-continuous operation time T i (un), based on the continuous running time T within 24 hours i (on) Calculate the continuous operation coefficient η i , according to the continuous operation coefficient η i , calculate the continuous operation time t of the i-th pumping well in a single cycle t i (on) and discontinuous operation time t i (un); The operation coefficient of the i-th pumping well The continuous operation time t of the i-th pumping well in a single cycle t i (on) = t·η i , min, non-continuous operation time t i (un) = t·(1-η i ), min; Step S3: Set the operation mode ranking of the pumping well ξ, and calculate the continuous operation time t of the pumping well according to step S2 i (on) Sort from largest to smallestξ 1 , 2 ,...,ξ N The operation mode of the multi-well group pumping well is switched between the crank continuous operation mode and the crank discontinuous operation mode. The multi-well group pumping well determines the start-up sequence and the operation mode switching principle according to the operation mode ranking ξ; Wherein, the step S3 specifically includes: Step S31: artificially set the maximum number of continuously operating oil wells m, and before the start of the stage production period t, sort the pumping wells in the well group from large to small according to the operation mode sorting ξ, and for the pumping wells with ξ≤m, adopt the continuous operation mode, and for the pumping wells with ξ>m, adopt the crank discontinuous operation mode, where 1≤ξ≤N; Step S32: The startup sequence of the oil wells in the continuous operation mode is as follows: the first pumping well is switched from the crank discontinuous operation to the continuous operation mode, and the other oil wells are all in the crank discontinuous operation mode. When the first pumping well ends its upstroke, the second pumping well is switched from the discontinuous mode to the continuous operation mode, ..., when the ξ-1th pumping well ends its upstroke, the ξth pumping well is switched from the discontinuous mode to the continuous mode, and the continuous mode starts from the bottom dead center, ξ≤m; Step S33: Operation mode ranking ξ The continuous operation time of the mth pumping well reaches After that, the mth pumping well is controlled to switch to crank discontinuous operation, and then the pumping well with operation mode ranked as m+1 is switched from crank discontinuous operation mode to continuous operation mode, ... the continuous operation time of the mith pumping well reaches After that, the mi-th pumping well is controlled to switch to the crank discontinuous operation, and the operation mode sequence is m+1+i pumping well is switched from the crank discontinuous operation mode to the continuous operation mode; Where, i≤m, m+1+i≤N; Step S34: Determine whether the continuous operation time of the pumping well with the operation mode ranking ξ=1 satisfies t 1 <t 1 (on), if the result is yes, then keep the continuous operation mode, otherwise switch to the discontinuous operation mode; then determine whether the pumping well with the operation mode ranking ξ=2 satisfies t 2 <t 2 (on), if the result is yes, keep the continuous operation mode, otherwise switch to the crank discontinuous operation mode until ξ = N, and the number of continuous operation wells shall not exceed m; Where, 1≤ξ≤N; Step S35: Enter the next cycle t and repeat steps S31 to S34; Step S4: At t-0.5min, the continuously operating pumping well automatically switches to the discontinuous operation mode, and in the next stage period t, steps S1 to S3 are repeated.

2. The operation mode sequencing adjustment control method applicable to a multi-well group pumping unit as claimed in claim 1, It is characterized in that The maximum number of continuously operating oil wells m is determined according to the following method: Keep all pumping wells within time t, and the continuous operation time reaches t i (on), the maximum number of continuously operating oil wells m is determined according to the following steps; Step S311: Starting from ξ=h, determine whether t ξ +t ξ+1 ≤t, if satisfied, proceed to step S312, if not satisfied, proceed to step S313; Step S312: Determine whether If it satisfies, then m=ξ, if it does not satisfy, The determination process is over; Step S313, let ξ=h+1, continue steps S311 and S312 until ξ=N, if it does not satisfy Then m = N; In the formula, To round up.

3. The operation mode sequencing adjustment control method applicable to a multi-well group pumping unit as claimed in claim 1, It is characterized in that Maximum number of continuously operating oil wells The transformer capacity is set to an upper limit value P T =P t ×(1-α); Average power of pumping well In the formula, To round down, P t is the maximum installed capacity of the transformer, α is the planned reduction of transformer capacity; P maxi is the peak power of the i-th pumping well.

4. The operation mode sequencing adjustment control method applicable to a multi-well group pumping unit as claimed in claim 1, It is characterized in that The continuous operation time required for the i-th pumping well within 24 hours Non-continuous time T within 24h i (un) = 24-T i (on); Where D pi is the pump diameter of the i-th pumping well, m; s i is the stroke of the i-th pumping well, m; n i is the pump stroke times of the i-th pumping well, min -1 ; η i The pump efficiency of the i-th pumping well is given in %.

5. The operation mode sequencing adjustment control method applicable to multi-well group pumping units as claimed in claim 4, It is characterized in that The average pump efficiency of the i-th pumping well It is calculated by the following method: In the formula, Q ik (measured) is the kth production measurement value of the i-th pumping well under normal working conditions, m 3 / d; n is the total number of production tests under normal working conditions, n≥3, Q i (R) is the theoretical displacement of the i-th pumping well, 6. The operation mode sequencing adjustment control method applicable to a multi-well group pumping unit according to claim 1, It is characterized in that The value of the single cycle t is: 30≤t≤120, min.

Citation Information

Patent Citations

  • Method and system for the optimised planning of complex production sequences in the industrial operation of installations

    CN101790746A

  • Diagnostic method for measuring annular working fluid level and working conditions of rod-pumped well by electric parameters

    CN104373113A

  • Daily fluid output measuring method of rod-pumped well based on loading force

    CN104389580A

  • Combined working system type swabbing operation method for beam-pumping unit

    CN106089156A

  • A method for optimizing peak shaving sequence of heating furnace peak shaving well

    CN109508898A