A method for generating flight plans for new airports in the terminal area based on the principle of transition

Through analysis and classification, transfer principles, transfer flights are determined and incremental processing are carried out to generate suitable new airport flight plans, solving the problem of lack of detailed interpretation and feasible operations in the existing technology, and achieving broader applicability and detailed flight plan references.

CN115691227BActive Publication Date: 2025-04-29AVIATION DATA COMM
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211236500.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-10-10
Publication Date
2025-04-29
Estimated Expiration
2042-10-10

AI Technical Summary

Technical Problem

The existing technology lacks a detailed interpretation of the transition principle and a feasible transition method, especially in the generation of a new airport flight plan in the terminal area based on the transition principle, and lacks a relatively complete method.

Method used

A suitable new airport flight plan is generated by determining the baseline flight plan, counting flight conditions, analyzing the transfer principles, determining the transfer flights and performing incremental processing. This method includes sorting out common transition principles and determining transition flights and incremental plans based on a comprehensive analysis.

Benefits of technology

This method can be effectively applied to different transition principles, provides a wider applicability, provides a detailed flight plan reference for simulation modeling, and solves the shortcomings of the lack of detailed interpretation and feasible operations in the prior art.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115691227B_ABST
    Figure CN115691227B_ABST
Patent Text Reader

Abstract

A method for generating a flight plan for a new airport in a terminal area based on the principle of transfer is proposed. The common transfer principles are classified and sorted out. Based on a comprehensive analysis of the transfer principles, the transfer flights are determined and incremented to provide a flight plan reference for simulation modeling. The method includes the following steps: (1) determining the baseline flight plan; (2) counting the flights in the baseline flight plan; (3) analyzing the transfer principle: determining the total number of transfer flights and the number of flights per day at each airport after the transfer, determining the transfer situation, determining the flight transfer ratio and the minimum / maximum number of flights; (4) determining the flights to be transferred based on the transfer principle; (5) incrementing the flights after the transfer to meet the daily landing and take-off requirements.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of civil aviation data processing, and in particular to a method for generating a flight plan for a new airport in a terminal area based on a transition principle. Background Art

[0002] With the rapid development of the civil aviation industry, more and more cities are beginning to expand or add new airports. The flight plan of a new airport is usually obtained by transferring and increasing the original airport. The flight plan refers to the flight information provided to the air traffic service unit about the aircraft completing a flight, which should include the flight number, registration number, aircraft model, departure airport, planned off-block time, destination airport, planned on-block time, flight route, flight route direction, cruising altitude, etc. The transfer principle is given by the Civil Aviation Administration. In airspace simulation, it is necessary to process the new flight plan of the original airport and the new airport according to the flight plan of the original airport and the transfer principle.

[0003] However, due to the small number of cities with two airports in China, most of the existing literature and journals describe the significance and impact of the transition at a macro level, such as "Interpretation of the Transition and Operation of Beijing Daxing International Airport". There is a lack of detailed interpretation of the transition principles and the feasibility of the transition methods. At the same time, there are few examples of generating flight plans for new airports in the terminal area based on the transition principles, and there is no relatively complete method so far. Summary of the invention

[0004] In order to overcome the defects of the prior art, the technical problem to be solved by the present invention is to provide a method for generating a flight plan for a new airport in the terminal area based on the transition principle. The method classifies and sorts out the common transition principles, and on the basis of a comprehensive analysis of the transition principles, determines the transition flights and increments them, so as to provide a flight plan reference for simulation modeling.

[0005] The technical solution of the present invention is: the method for generating a flight plan for a new airport in a terminal area based on the transition principle comprises the following steps:

[0006] (1) Determine the baseline flight plan;

[0007] (2) Statistical baseline flight plan flight status;

[0008] (3) Analyze the transfer principles: determine the total number of transfer flights and the number of flights per day at each airport after the transfer, determine the transfer situation, determine the flight transfer ratio and the minimum / maximum number of flights;

[0009] (4) Determine the transfer flights based on the transfer principle;

[0010] (5) Increase the number of flights after the transfer to meet the daily landing and take-off requirements.

[0011] The present invention determines a baseline flight plan, counts the baseline flight plan flight situation, and analyzes the transfer principle: determines the total transfer flights and the daily landing and landing flights of each airport after the transfer, determines the transfer situation, determines the flight transfer ratio and the minimum / maximum flight, determines the flight of the transfer based on the transfer principle, and increments the flight after the transfer to meet the daily landing and landing requirements. Therefore, the present invention classifies and sorts out common transfer principles, determines the transfer flights and increments based on a comprehensive analysis of the transfer principles, and provides a flight plan reference for simulation modeling. This method can be applied to different transfer principles and has a wider applicability. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 Shown is a flow chart of step (1) of the method for generating a flight plan for a new airport in a terminal area based on the transition principle according to the present invention. DETAILED DESCRIPTION

[0013] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0014] In order to make the description of the present disclosure more detailed and complete, the following provides an illustrative description of the implementation and specific embodiments of the present invention; however, this is not the only form of implementing or using the specific embodiments of the present invention. The implementation covers the features of multiple specific embodiments and the method steps and sequences used to construct and operate these specific embodiments. However, other specific embodiments can also be used to achieve the same or equivalent functions and step sequences.

[0015] like Figure 1 As shown, the method for generating a flight plan for a new airport in a terminal area based on the transition principle includes the following steps:

[0016] (1) Determine the baseline flight plan;

[0017] (2) Statistical baseline flight plan flight status;

[0018] (3) Analyze the transfer principles: determine the total number of transfer flights and the number of flights per day at each airport after the transfer, determine the transfer situation, determine the flight transfer ratio and the minimum / maximum number of flights;

[0019] (4) Determine the transfer flights based on the transfer principle;

[0020] (5) Increase the number of flights after the transfer to meet the daily landing and take-off requirements.

[0021] The present invention determines a baseline flight plan, counts the baseline flight plan flight situation, and analyzes the transfer principle: determines the total transfer flights and the daily landing and landing flights of each airport after the transfer, determines the transfer situation, determines the flight transfer ratio and the minimum / maximum flight, determines the flight of the transfer based on the transfer principle, and increments the flight after the transfer to meet the daily landing and landing requirements. Therefore, the present invention classifies and sorts out common transfer principles, determines the transfer flights and increments based on a comprehensive analysis of the transfer principles, and provides a flight plan reference for simulation modeling. This method can be applied to different transfer principles and has a wider applicability.

[0022] Preferably, in step (1), the flight plan for the day with a daily traffic volume of 90% to 95% of the maximum daily traffic volume in the historical data is selected as the baseline flight plan, and there is no bad weather or military aviation activity on that day, and the flight delays are within an acceptable range; taking into account the change of flight seasons, historical data of the same flight season are selected.

[0023] Preferably, in step (2), the flight status of the baseline flight plan is counted, including the number of flights, flight number, airline, registration number, aircraft type, departure airport, landing airport, reference type, reference point, reference time, flight route, flight transit point, and cruising altitude; the number of flights of each airline is counted, including domestic flights and international flights, as well as the number of take-offs and landings to each airport.

[0024] Preferably, in step (3), determining the transition situation includes the following situations:

[0025] (1) Based on airline companies, there are three types of situations:

[0026] ① All transitions;

[0027] ② All are retained;

[0028] ③Partial transition;

[0029] (2) Based on domestic / international routes, there are three situations:

[0030] ① All transitions;

[0031] ② All are retained;

[0032] ③Partial transition;

[0033] (3) Based on city pairs, there are three situations:

[0034] ① All transitions;

[0035] ② All are retained;

[0036] ③Partial transition;

[0037] (4) Based on airline, domestic / international route, and city pair combination, it includes the following three situations:

[0038] ① All transitions;

[0039] ② All are retained;

[0040] ③Partial transition.

[0041] Preferably, in step (3), determining the flight transfer ratio and the minimum / maximum number of flights includes the following situations:

[0042] (1) Based on the airline, there are four situations:

[0043] ① Transition ratio;

[0044] ② Minimum / maximum ratio of transition;

[0045] ③Transfer flights;

[0046] ④Minimum / maximum number of transfers;

[0047] (2) Based on domestic / international routes, there are four situations:

[0048] ① Transition ratio;

[0049] ② Minimum / maximum ratio of transition;

[0050] ③Transfer flights;

[0051] ④Minimum / maximum number of transfers;

[0052] (3) Based on city pairs, there are four types of situations:

[0053] ① Transition ratio;

[0054] ② Minimum / maximum ratio of transition;

[0055] ③Transfer flights;

[0056] ④Minimum / maximum number of transfers;

[0057] (4) Based on airline, domestic / international route, and city pair combination, it includes the following four situations:

[0058] ① Transition ratio;

[0059] ② Minimum / maximum ratio of transition;

[0060] ③Transfer flights;

[0061] ④Minimum / maximum number of transfers.

[0062] Preferably, the step (4) comprises the following sub-steps:

[0063] (4.1) For flights that require full relocation, all flights of the corresponding category will be relocated to the new airport;

[0064] (4.2) For all flights that require reservation, all flights of the corresponding category will be retained at the original airport;

[0065] (4.3) For partially transferred flights, the transfer shall be carried out to meet the minimum required flight volume;

[0066] (4.4) For flights with a determined transfer ratio, transfer flights are randomly selected according to the corresponding ratio when the transfer conditions are met, and the take-off and landing ratio before and after the transfer must remain unchanged;

[0067] (4.5) For a given minimum ratio of flights, transfer flights are randomly selected at the minimum ratio while meeting the transfer conditions. The take-off and landing ratio before and after the transfer must remain unchanged. If the number of flights does not reach the target after all transfers are completed, this ratio will be increased;

[0068] (4.6) For flights with a given maximum ratio, half of the maximum ratio will be randomly selected as transfer flights if the transfer conditions are met. The take-off and landing ratio before and after the transfer must remain unchanged. If the number of flights does not reach the target after all transfers are completed, this ratio will be increased first;

[0069] (4.7) For flights with a confirmed transfer schedule, transfer flights shall be randomly selected with the corresponding schedule if the transfer conditions are met, and the take-off and landing ratio before and after the transfer shall remain unchanged;

[0070] (4.8) For a given minimum number of flights, randomly select transfer flights with the minimum number of flights while meeting the transfer conditions. The take-off and landing ratio before and after the transfer must remain unchanged. If the number of flights does not reach the target number after all transfers are completed, increase this number of flights;

[0071] (4.9) For a given maximum number of flights, half of the maximum number of flights will be randomly selected as transfer flights if the transfer conditions are met. The take-off and landing ratio before and after the transfer must remain unchanged. If the number of flights does not reach the target number after all transfers are completed, this flight will be increased first;

[0072] (4.10) The transfer flight schedule is completely shifted.

[0073] Preferably, the step (5) comprises the following sub-steps:

[0074] (5.1) Determine the incremental ratio based on the number of flights before and after the incremental increase;

[0075] (5.2) Randomly select flights for increment according to the increment ratio, and increment the take-off airport, landing airport, aircraft type, reference type, reference point, flight route,

[0076] The flight transit points and cruising altitude are the same as those in the baseline flight plan. To avoid duplication of the flight number and registration number, suffixes such as _1 and _2 are added to the flight number and registration number of the original baseline flight plan. The reference time fluctuates randomly by 0 to 10 minutes based on the reference time of the original baseline flight plan.

[0077] The method of the present invention is described in more detail below:

[0078] 1. Determine the baseline flight plan:

[0079] Taking the transfer of Chengdu Shuangliu International Airport to Chengdu Tianfu International Airport as an example, the maximum single-day flow of the flight plan of Chengdu Shuangliu International Airport in the 2021 summer flight season was counted, and the flight plan on the corresponding day with a daily traffic volume of 90% to 95% of the maximum single-day flow was selected as the baseline flight plan.

[0080] 2. Statistics of flights in the baseline flight plan:

[0081] The original airport has 1,144 flights taking off and landing per day. Among them, Air China has 241 domestic flights and 25 international flights; Sichuan Airlines has 180 domestic flights and 35 international flights; China Eastern Airlines has 130 domestic flights and 12 international flights. Chengdu Airlines has 66 flights, Xiangpeng Airlines has 25 flights, Xiamen Airlines has 19 flights, Spring Airlines has 10 flights, Juneyao Airlines has 13 flights, China Southern Airlines has 90 flights, Changlong Airlines has 9 flights, Shandong Airlines has 6 flights, Shanghai Airlines has 5 flights, Qingdao Airlines has 6 flights, foreign airlines have 63 flights, other airlines have 139 flights, Tibet Airlines has 39 flights, cargo airlines have 16 flights, and Hong Kong, Macao and Taiwan airlines have 15 flights.

[0082] 3. Analysis of transition principles:

[0083] After the transfer, the new airport has 1,138 flights per day, including 569 takeoffs and 569 landings. The original airport has 460 flights per day, including 230 takeoffs and 230 landings.

[0084] Air China will retain 167 flights. Sichuan Airlines will retain 132 flights. China Eastern Airlines will retain business routes such as Beijing, Shanghai, Kunming, and Hangzhou, with no more than 42 flights per day. Chengdu Airlines will retain 44 flights per day. Tibet Airlines will retain all flights. Cargo airlines will retain all flights. All flights to Hong Kong, Macau, and Taiwan will be retained. All other airlines will relocate.

[0085] 4. Confirm the transfer flight:

[0086] Air China transferred 103 flights. Sichuan Airlines transferred 88 flights. China Eastern Airlines transferred 98 flights. Chengdu Airlines transferred 22 flights. Xiangpeng Airlines transferred 25 flights, Xiamen Airlines transferred 19 flights, Spring Airlines transferred 10 flights, Juneyao Airlines transferred 13 flights, China Southern Airlines transferred 90 flights, Changlong Airlines transferred 9 flights, Shandong Airlines transferred 6 flights, Shanghai Airlines transferred 5 flights, Qingdao Airlines transferred 6 flights, foreign airlines transferred 63 flights, and other airlines transferred 139 flights. The transfer time was completely shifted.

[0087] 5. Increase flights:

[0088] The original airport retains 455 flights and transfers 689 flights. The original airport has 460 landings and takeoffs per day, and the new airport has 1,138 landings and takeoffs per day. The original airport has an incremental ratio of 1.1%, and the new airport has an incremental ratio of 65.2%. The flight plans of the two airports are incremented at this ratio. The take-off airport, landing airport, aircraft type, reference type, reference point, flight route, flight pass, and cruising altitude of the incremental flight plan are the same as the baseline flight plan. The flight number and registration number are added with suffixes such as _1 and _2 on the original flight number and registration number, and the reference time is randomly floating up and down by 0 to 10 minutes on the original reference time.

[0089] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any simple modification, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention are still within the protection scope of the technical solution of the present invention.

Claims

1. A method for generating a flight plan for a new airport in a terminal area based on the principle of transition, characterized in that: It includes the following steps: (1) Determine the baseline flight plan; (2) Statistical baseline flight plan flight status; (3) Analyze the transfer principles: determine the total number of transfer flights and the number of flights per day at each airport after the transfer, determine the transfer situation, determine the flight transfer ratio and the minimum / maximum number of flights; (4) Determine the transfer flights based on the transfer principle; (5) Increase the number of flights after the transfer to meet the daily landing and take-off requirements; In the step (1), the flight plan of the corresponding day with a daily traffic volume of 90% to 95% of the maximum daily traffic volume in the historical data is selected as the baseline flight plan, and there is no bad weather, no military aviation activities, and the flight delay is within an acceptable range on that day; considering the flight season change, the historical data of the same flight season is selected; In the step (2), the flight status of the baseline flight plan is counted, including the number of flights, flight number, airline, registration number, aircraft type, departure airport, landing airport, reference type, reference point, reference time, flight route, flight passing point, and cruising altitude; the number of flights of each airline is counted, including domestic flights and international flights, and the number of take-offs and landings to each airport; In the step (3), the transition situation is determined, including the following situations: (1) Based on airline companies, there are three types of situations: ① All transitions; ② All are retained; ③Partial transition; (2) Based on domestic / international routes, there are three situations: ① All transitions; ② All are retained; ③Partial transition; (3) Based on city pairs, there are three situations: ① All transitions; ② All are retained; ③Partial transition; (4) Based on airline, domestic / international route, and city pair combination, it includes the following three situations: ① All transitions; ② All are retained; ③Partial transition; In step (3), the flight transfer ratio and the minimum / maximum number of flights are determined, including the following situations: (1) Based on the airline, there are four situations: ① Transition ratio; ② Minimum / maximum ratio of transition; ③Transfer flights; ④Minimum / maximum number of transfers; (2) Based on domestic / international routes, there are four situations: ① Transition ratio; ② Minimum / maximum ratio of transition; ③Transfer flights; ④Minimum / maximum number of transfers; (3) Based on city pairs, there are four types of situations: ① Transition ratio; ② Minimum / maximum ratio of transition; ③Transfer flights; ④Minimum / maximum number of transfers; (4) Based on airline, domestic / international route, and city pair combination, it includes the following four situations: ① Transition ratio; ② Minimum / maximum ratio of transition; ③Transfer flights; ④Minimum / maximum number of transfers; The step (4) comprises the following sub-steps: (4.1) For flights that require full relocation, all flights of the corresponding category will be relocated to the new airport; (4.2) For all flights that require reservation, all flights of the corresponding category will be retained at the original airport; (4.3) For partially transferred flights, the transfer shall be carried out to meet the minimum required flight volume; (4.4) For flights with a determined transfer ratio, transfer flights are randomly selected according to the corresponding ratio when the transfer conditions are met, and the take-off and landing ratio before and after the transfer must remain unchanged; (4.5) For a given minimum ratio of flights, transfer flights are randomly selected at the minimum ratio while meeting the transfer conditions. The take-off and landing ratio before and after the transfer must remain unchanged. If the number of flights does not reach the target after all transfers are completed, this ratio will be increased; (4.6) For a given maximum ratio of flights, half of the maximum ratio of transfer flights are randomly selected under the transfer conditions, and the take-off and landing ratio before and after the transfer must remain unchanged. If the number of flights does not reach the target after all transfers are completed, this ratio will be increased first; (4.7) For flights with a confirmed transfer schedule, transfer flights shall be randomly selected with the corresponding schedule if the transfer conditions are met, and the take-off and landing ratio before and after the transfer shall remain unchanged; (4.8) For a given minimum number of flights, randomly select transfer flights with the minimum number of flights while meeting the transfer conditions. The take-off and landing ratio before and after the transfer must remain unchanged. If the number of flights does not reach the target number after all transfers are completed, increase this number of flights; (4.9) For a given maximum number of flights, half of the maximum number of flights will be randomly selected as transfer flights if the transfer conditions are met. The take-off and landing ratio before and after the transfer must remain unchanged. If the number of flights does not reach the target number after all transfers are completed, this flight will be increased first; (4.10) The transfer flight schedule is completely shifted.

2. The method for generating a flight plan for a new airport in a terminal area based on the transition principle according to claim 1 is characterized in that: The step (5) comprises the following sub-steps: (5.1) Determine the incremental ratio based on the number of flights before and after the incremental increase; (5.2) Flights are randomly selected for increment according to the incremental ratio. The take-off airport, landing airport, aircraft type, reference type, reference point, flight route, flight transit point, and cruising altitude of the incremental flight plan are the same as those of the baseline flight plan. To avoid duplication of flight number and registration number, suffixes _1 and _2 are added to the flight number and registration number of the original baseline flight plan. The reference time is randomly increased or decreased by 0 to 10 minutes based on the reference time of the original baseline flight plan.

Citation Information

Patent Citations

  • Method for predicting take-off and landing amount of large busy airport terminal area containing planned airport

    CN110059893A

  • Automated survey process to determine average passenger weight and average checked-bag weight used in determining aircraft weight

    WO2022020825A1