A large bolt joint plate installation and opening / closing device for steel structures
By designing a steel structure large bolt node plate installation opening and closing device with multiple structures, the problems of limitations, difficulty in use, single installation form and troublesome use are solved, and a more flexible and convenient installation process is achieved.
Patent Information
- Application Number
- CN202211499015.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-28
- Publication Date
- 2025-05-27
- Estimated Expiration
- 2042-11-28
AI Technical Summary
The installation and closing device of large-scale bolt node plates of steel structure has limitations, which increases the difficulty of use, and the installation form is single and troublesome.
A device including a vertical plate, a sliding groove, a mounting structure, a control structure, a fixed structure and an adjusting structure is designed. By rotating the vertical cylinder on the outer wall of the double-headed stud, the matching sleeve plate drives the connecting plate to slide up and down on the inner wall of the sliding groove to achieve alignment of the connecting plate and the steel structure connection port; by rotating the rotating plate on the inner wall of the concave plate, the node plate is driven to rotate angle, and the position of the node plate is fixed through the fitting of the bent plate and the insertion plate; by plugging the frame and the bracket, the cylinder steel structure is clamped with the second bolt; by cooperating with the screw and the grip, the overall length of the node plate is achieved.
Resolve connection conflicts, eliminate usage limitations, reduce usage difficulty, increase the diversity of installation forms, and make the device more convenient to use.
Smart Images

Figure CN115749321B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of installation and opening / closing of large steel structure bolt gusset plates, and specifically provides a device for installing and opening / closing large steel structure bolt gusset plates. Background Art
[0002] The device for installing and opening / closing large steel structure bolt gusset plates is a device for splicing and supporting steel structures in buildings.
[0003] For example, the device for installing and opening / closing large steel structure bolt gusset plates of the technical solution with the authorization announcement number "CN 108086485 A" can improve the installation safety factor of large bolt gusset plates, improve construction efficiency and save labor costs compared with the prior art. When the device for installing and opening / closing large steel structure bolt gusset plates is used, it needs to be installed with external steel structures. Since the connection ports of the device for installing and opening / closing large steel structure bolt gusset plates are set in advance, misalignment is likely to occur during installation with steel structures, resulting in inability to install, and thus the device for installing and opening / closing large steel structure bolt gusset plates has limitations in use. Moreover, the device for installing and opening / closing large steel structure bolt gusset plates will adjust the rotation angle according to the connected steel structure during use. After the angle is rotated, there is no positioning, and it is easy to rotate back during installation, requiring readjustment, which increases the difficulty of using the device for installing and opening / closing large steel structure bolt gusset plates. In addition, the device for installing and opening / closing large steel structure bolt gusset plates can only be installed on the plane of the steel structure. If there is a columnar steel structure, columnar connecting plates need to be welded, resulting in a single installation form of the device for installing and opening / closing large steel structure bolt gusset plates. At the same time, the length of the gusset plate is limited, and since the device for installing and opening / closing large steel structure bolt gusset plates is already fixed to the steel structure, it cannot meet the installation requirements. It is necessary to disassemble and replace the entire device for installing and opening / closing large steel structure bolt gusset plates, resulting in troublesome use of the device for installing and opening / closing large steel structure bolt gusset plates. Summary of the Invention
[0004] The purpose of the present invention is to solve the problems that lead to limitations in the use of the device for installing and opening / closing large steel structure bolt gusset plates, increase the difficulty of using the device for installing and opening / closing large steel structure bolt gusset plates, result in a single installation form of the device for installing and opening / closing large steel structure bolt gusset plates, and troublesome use of the device for installing and opening / closing large steel structure bolt gusset plates, and propose a device for installing and opening / closing large steel structure bolt gusset plates.
[0005] To achieve the above object, the present invention provides the following technical solutions:
[0006] Design a large bolt node plate installation and opening / closing device for steel structures, including a vertical plate and a chute. Concave plates are fixedly connected to the upper and lower parts on the right side of the vertical plate. An installation structure is connected to the inner side of the concave plate, a control structure is connected to the inner wall of the concave plate, the right side of the control structure is connected to a first node plate. Square plates are fixedly connected to the upper and lower sides of the first node plate respectively. An adjustment structure is connected to the inner wall of the first node plate. Fixed structures are connected to the upper and lower sides of the vertical plate. A plurality of notches are processed on the upper part of the outer wall of the concave plate.
[0007] Preferably, the installation structure includes a double-headed stud, a vertical cylinder, a sleeve plate and a connecting plate;
[0008] The upper and lower sides of the double-headed stud are respectively fixedly connected to the inner side of the concave plate. The outer wall of the double-headed stud is threadedly connected to the inner wall of the vertical cylinder. The outer wall of the vertical cylinder is rotationally connected to the inner wall of the sleeve plate. The left side of the outer wall of the sleeve plate is slidably clamped with the notch on the right side of the vertical plate. The left side of the sleeve plate is fixedly connected to the right side of the connecting plate.
[0009] Preferably, the outer wall of the connecting plate is slidably clamped with the inner wall of the chute, and internal threads are processed on the inner wall of the connecting plate.
[0010] Preferably, the control structure includes a rotating plate, a bent plate, a first bolt and a plug plate;
[0011] The left side of the outer wall of the rotating plate is rotationally connected to the inner wall of the concave plate. The upper part of the outer wall of the rotating plate is slidably clamped with the inner wall of the bent plate. The front surface of the bent plate is threadedly connected to the outer wall of the first bolt. The left side of the bent plate is fixedly connected to the right side of the plug plate.
[0012] Preferably, the rear side of the outer wall of the first bolt is threadedly connected to the front surface of the rotating plate, and the diameter of the plug plate matches the inner diameter of the notch on the upper part of the outer wall of the concave plate.
[0013] Preferably, the right sides of the two rotating plates are respectively fixedly connected to the upper and lower parts on the left side of the first node plate.
[0014] Preferably, the fixed structure includes a bracket, a frame and a second bolt;
[0015] The inner sides of the two brackets are respectively fixedly connected to the upper and lower sides of the vertical plate. The inner wall of the bracket is slidably clamped with the outer wall on the right side of the frame. The top of the bracket is threadedly connected to the outer wall of the second bolt. The inner side of the outer wall of the second bolt is threadedly connected to the outer wall of the frame.
[0016] Preferably, chutes are processed on the upper and lower parts of the front surface of the vertical plate.
[0017] Preferably, the adjustment structure includes a second node plate, a vertical plate, a screw rod and a handle;
[0018] The outer wall of the second gusset plate is slidably clamped with the inner wall of the first gusset plate. The right ends of the upper and lower sides of the second gusset plate are fixedly connected to the inner sides of the vertical plates respectively. The inner wall of the vertical plate is rotatably connected to the outer wall of the right side of the screw rod. The left end of the screw rod is fixedly connected to the right side of the grip. The outer wall of the screw rod is threadedly connected to the inner wall of the square plate.
[0019] Preferably, the diameter of the front circular opening of the second gusset plate is the same as that of the front circular opening of the first gusset plate. The inner sides of the outer walls of the two screw rods are adjacent to the upper and lower sides of the first gusset plate respectively.
[0020] The beneficial effect of a large bolt gusset plate installation and opening / closing device for steel structures proposed by the present invention is as follows: Through the rotation of the vertical cylinder on the outer wall of the double-headed stud in the installation structure, and then the cooperation of the sleeve plate to drive the connecting plate to slide up and down on the inner wall of the chute, so that the position of the connecting plate is aligned with the connection opening on the steel structure, and then the connecting bolt passes through the connecting plate and is connected to the steel structure, solving the connection conflict and eliminating the use limitation of the large bolt gusset plate installation and opening / closing device for steel structures;
[0021] Through the rotation of the rotating plate on the inner wall of the concave plate in the control structure, and then driving the first gusset plate to rotate at an angle. After rotating the angle, the bent plate is pushed towards the concave plate on the outer wall of the rotating plate, so that the insertion plate is inserted into the corresponding slot on the outer wall of the concave plate. Then the first bolt is threadedly connected to the rotating plate through the bent plate to fix the position of the bent plate, reducing the use difficulty of the large bolt gusset plate installation and opening / closing device for steel structures;
[0022] Through the insertion of the inner wall of the frame into the outer wall of the steel structure in the fixing structure, then the right side of the frame is inserted into the inner wall of the bracket, and then the second bolt is threadedly connected to the outer wall of the frame through the bracket. The column steel structure is clamped by the frame and the vertical plate to complete the installation, solving the problem of single installation form of the large bolt gusset plate installation and opening / closing device for steel structures;
[0023] Through the adjustment structure, the grip drives the screw rod to rotate to the right. The rotating screw rod drives the vertical plate to gradually move the second gusset plate to the right on the inner wall of the first gusset plate, realizing the overall lengthening of the gusset plate to meet the installation requirements without overall replacement, making the large bolt gusset plate installation and opening / closing device for steel structures convenient to use. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic structural diagram of the present invention;
[0025] Figure 2 It is Figure 1 a schematic structural diagram of A in
[0026] Figure 3 It is Figure 1 a schematic structural diagram of the connection relationship among the vertical plate, the chute and the connecting plate in
[0027] Figure 4 is Figure 3 Schematic structural diagram of B in
[0028] Figure 5 is Figure 1 Schematic structural diagram of the connection relationship between the second gusset plate and the vertical plate in
[0029] Figure 6 is Figure 1 Schematic structural diagram of the connection relationship between the vertical plate, the screw rod and the handle in
[0030] In the figure: 1. Vertical plate, 2. Installation structure, 201. Stud, 202. Vertical cylinder, 203. Sleeve plate, 204. Connecting plate, 3. Control structure, 301. Rotating plate, 302. Bent plate, 303. First bolt, 304. Insert plate, 4. Fixing structure, 401. Bracket, 402. Frame, 403. Second bolt, 5. Adjustment structure, 501. Second gusset plate, 502. Vertical plate, 503. Screw rod, 504. Handle, 6. Concave plate, 7. Chute, 8. First gusset plate, 9. Square plate. Specific embodiments
[0031] The present invention will be further described below with reference to the accompanying drawings:
[0032] Please refer to Figures 1-6 : In this embodiment, a large bolt gusset plate installation and opening / closing device for a steel structure includes a vertical plate 1 and a chute 7. Concave plates 6 are fixedly connected to the upper and lower sides of the right side of the vertical plate 1 respectively. An installation structure 2 is connected to the inner side of the concave plate 6, a control structure 3 is connected to the inner wall of the concave plate 6, the control structure 3 is connected to the right side of the first gusset plate 8, threaded ports are equally spaced on the front surface of the first gusset plate 8, square plates 9 are fixedly connected to the upper and lower sides of the first gusset plate 8 respectively, an adjustment structure 5 is connected to the inner wall of the first gusset plate 8, fixing structures 4 are connected to both the upper and lower sides of the vertical plate 1, and a plurality of notches are processed on the outer wall above the concave plate 6.
[0033] The installation structure 2 includes a stud 201, a vertical cylinder 202, a sleeve plate 203 and a connecting plate 204. The upper and lower sides of the stud 201 are fixedly connected to the inner side of the concave plate 6 respectively. The outer wall of the stud 201 is threadedly connected to the inner wall of the vertical cylinder 202. The vertical cylinder 202 rotates up and down through the thread on the outer wall of the stud 201. The outer wall of the vertical cylinder 202 is rotatably connected to the inner wall of the sleeve plate 203. The vertical cylinder 202 can rotate in the bearing on the inner wall of the sleeve plate 203. The left side of the outer wall of the sleeve plate 203 is slidably clamped in the notch on the right side of the vertical plate 1. The sleeve plate 203 can move up and down on the inner wall of the notch on the right side of the vertical plate 1 under force. The left side of the sleeve plate 203 is fixedly connected to the right side of the connecting plate 204. The outer wall of the connecting plate 204 is slidably clamped in the inner wall of the chute 7. The connecting plate 204 slides up and down through the inner wall of the chute 7 under force. The inner wall of the connecting plate 204 is processed with internal threads;
[0034] By rotating the vertical cylinder 202 in the installation structure 2 on the outer wall of the double-headed stud 201, and then driving the connecting plate 204 to slide up and down on the inner wall of the chute 7 through the sleeve plate 203, the position of the connecting plate 204 is aligned with the connection port on the steel structure. Then, the connecting bolt passes through the connecting plate 204 and is connected to the steel structure, solving the connection conflict and eliminating the use limitation of the opening and closing device for the large bolt gusset plate of the steel structure.
[0035] The control structure 3 includes a rotating plate 301, a bent plate 302, a first bolt 303, and an insertion plate 304. The left side of the outer wall of the rotating plate 301 is rotatably connected to the inner wall of the concave plate 6. The rotating plate 301 rotates through the pin shaft on the inner wall of the concave plate 6 under force. The upper part of the outer wall of the rotating plate 301 is slidably clamped with the inner wall of the bent plate 302. The bent plate 302 slides left and right above the outer wall of the rotating plate 301 under force. The front of the bent plate 302 is threadedly connected to the outer wall of the first bolt 303. The left side of the bent plate 302 is fixedly connected to the right side of the insertion plate 304. The rear of the outer wall of the first bolt 303 is threadedly connected to the front of the rotating plate 301. The bolt 303 fixes the position of the bent plate 302. The diameter of the insertion plate 304 is consistent with the inner diameter of the notch on the upper part of the outer wall of the concave plate 6. The right sides of the two rotating plates 301 are respectively fixedly connected to the upper and lower parts of the left side of the first gusset plate 8.
[0036] By rotating the rotating plate 301 in the control structure 3 on the inner wall of the concave plate 6, and then driving the first gusset plate 8 to rotate at an angle. After rotating the angle, the bent plate 301 is pushed towards the concave plate 6 on the outer wall of the rotating plate 301, so that the insertion plate 304 is inserted into the corresponding notch on the outer wall of the concave plate 6. Then, the first bolt 303 is threadedly connected to the rotating plate 301 through the bent plate 302 to fix the position of the bent plate 302, reducing the use difficulty of the opening and closing device for the large bolt gusset plate of the steel structure.
[0037] The fixing structure 4 includes a bracket 401, a frame 402, and a second bolt 403. The inner sides of the two brackets 401 are respectively fixedly connected to the upper and lower sides of the vertical plate 1. The inner wall of the bracket 401 is slidably clamped with the outer wall of the frame 402. The frame 402 slides left and right through the inner wall of the bracket 401 under force. The top of the bracket 401 is threadedly connected to the outer wall of the second bolt 403. The inner side of the outer wall of the second bolt 403 is threadedly connected to the outer wall of the frame 402.
[0038] By inserting the inner wall of the frame 402 in the fixing structure 4 into the outer wall of the steel structure, then inserting the right side of the frame 402 into the inner wall of the bracket 401, and then threading the second bolt 403 through the bracket 401 and the outer wall of the frame 402, the column steel structure is clamped by the frame 402 and the vertical plate 1 to complete the installation, solving the problem of single installation form of the opening and closing device for the large bolt gusset plate of the steel structure.
[0039] Chute grooves 7 are machined on the upper and lower sides of the front surface of the vertical plate 1. The adjustment structure 5 includes a second node plate 501, a vertical plate 502, a screw rod 503, and a grip 504. The outer wall of the second node plate 501 is slidably clamped with the inner wall of the first node plate 8. The second node plate 501 slides left and right through the inner wall of the first node plate 8 under force. The right ends of the upper and lower sides of the second node plate 501 are fixedly connected to the inner sides of the vertical plates 502 respectively. The inner wall of the vertical plate 502 is rotatably connected to the outer wall of the right side of the screw rod 503. The screw rod 503 rotates through the bearing on the inner wall of the vertical plate 502 under force. The left end of the screw rod 503 is fixedly connected to the right side of the grip 504. The grip 504 facilitates driving the screw rod 503 to rotate. The outer wall of the screw rod 503 is threadedly connected to the inner wall of the square plate 9. The diameter of the circular opening on the front surface of the second node plate 501 is the same as that of the circular opening on the front surface of the first node plate 8. The inner sides of the outer walls of the two screw rods 503 are adjacent to the upper and lower sides of the first node plate 8 respectively;
[0040] By driving the screw rod 503 to rotate to the right through the grip 504 in the adjustment structure 5, the rotating screw rod 503 drives the vertical plate 502 to gradually move the second node plate 501 to the right inside the inner wall of the first node plate 8, realizing the overall lengthening of the node plate to meet the installation requirements without the need for overall replacement, making the installation and opening / closing device of the large bolt node plate of the steel structure convenient to use.
[0041] When using the installation and opening / closing device of the large bolt node plate of the steel structure, first make the rear end surface of the vertical plate 1 fit with the surface of the steel structure. Then, the vertical cylinder 202 rotates on the outer wall of the double-headed stud 201, and further cooperates with the sleeve plate 203 to drive the connecting plate 204 to slide up and down inside the chute groove 7, aligning the position of the connecting plate 204 with the connection port on the steel structure. Then, the connecting bolt passes through the connecting plate 204 and is connected to the steel structure. Then, the rotating plate 301 rotates inside the concave plate 6, and further drives the first node plate 8 to rotate at an angle. After rotating the angle, push the bent plate 301 towards the concave plate 6 on the outer wall of the rotating plate 301, so that the insertion plate 304 is inserted into the corresponding notch on the outer wall of the concave plate 6. Then, the first bolt 303 is threadedly connected to the rotating plate 301 through the bent plate 302 to fix the position of the bent plate 302. The rotated first node plate 8 is in contact with the surface of the steel structure on the other side. Then, the connecting bolt passes through the first node plate 8 and is connected to the steel structure. When the length of the first node plate 8 is insufficient, cooperate with the two grips 504 to drive the screw rod 503 to rotate to the right. The rotating screw rod 503 drives the vertical plate 502 to gradually move the second node plate 501 to the right inside the inner wall of the first node plate 8, realizing the overall lengthening of the node plate to meet the installation requirements. When installing the installation and opening / closing device of the large bolt node plate of the steel structure with the column steel structure, make the left side of the vertical plate 1 fit with the steel structure. Then, the inner wall of the frame 402 is inserted into the outer wall of the steel structure. Then, the right side of the frame 402 is inserted into the inner wall of the support 401. Then, the second bolt 403 is threadedly connected to the outer wall of the frame 402 through the support 401, and the column steel structure is clamped by the frame 402 and the vertical plate 1 to complete the installation.
[0042] Although the present invention has been illustrated and described with reference to preferred embodiments, those of ordinary skill in the art should understand that various changes in form and detail may be made within the scope of the claims.
Claims
1. A large bolt node plate installation opening and closing device for steel structures, including a vertical plate (1) and a chute (7). Characterized in that: On the upper and lower sides of the right side of the vertical plate (1), concave plates (6) are respectively fixedly connected. An installation structure (2) is connected to the inner side of the concave plate (6), a control structure (3) is connected to the inner wall of the concave plate (6), the right side of the control structure (3) is connected to a first node plate (8), square plates (9) are respectively fixedly connected to the upper and lower sides of the first node plate (8), an adjustment structure (5) is connected to the inner wall of the first node plate (8), fixing structures (4) are connected to both the upper and lower sides of the vertical plate (1), a plurality of notches are processed on the upper part of the outer wall of the concave plate (6), and the installation structure (2) includes a stud (201), a vertical cylinder (202), a sleeve plate (203), and a connecting plate (204). The upper and lower sides of the stud (201) are respectively fixedly connected to the inner side of the concave plate (6). The outer wall of the stud (201) is threadedly connected to the inner wall of the vertical cylinder (202). The outer wall of the vertical cylinder (202) is rotatably connected to the inner wall of the sleeve plate (203). The left side of the outer wall of the sleeve plate (203) is slidably clamped with the notch on the right side of the vertical plate (1). The left side of the sleeve plate (203) is fixedly connected to the right side of the connecting plate (204). The control structure (3) includes a rotating plate (301), a bent plate (302), a first bolt (303), and an inserting plate (304). The left side of the outer wall of the rotating plate (301) is rotatably connected to the inner wall of the concave plate (6). The upper part of the outer wall of the rotating plate (301) is slidably clamped with the inner wall of the bent plate (302). The front surface of the bent plate (302) is threadedly connected to the outer wall of the first bolt (303). The left side of the bent plate (302) is fixedly connected to the right side of the inserting plate (304). The outer wall of the connecting plate (204) is slidably clamped with the inner wall of the chute (7). The inner wall of the connecting plate (204) is processed with internal threads.
2. A large bolt node plate installation opening and closing device for steel structures according to claim 1, Characterized in that: The rear of the outer wall of the first bolt (303) is threadedly connected to the front surface of the rotating plate (301). The diameter of the inserting plate (304) is consistent with the inner diameter of the notch on the upper part of the outer wall of the concave plate (6).
3. A large bolt node plate installation opening and closing device for steel structures according to claim 2, Characterized in that: The right sides of the two rotating plates (301) are respectively fixedly connected to the upper and lower left sides of the first node plate (8).
4. A large bolt node plate installation opening and closing device for steel structures according to claim 3, Characterized in that: The fixing structure (4) includes a bracket (401), a frame (402), and a second bolt (403). The inner sides of the two brackets (401) are respectively fixedly connected to the upper and lower sides of the vertical plate (1). The inner wall of the bracket (401) is slidably clamped with the outer wall of the right side of the frame (402). The top of the bracket (401) is threadedly connected to the outer wall of the second bolt (403). The inner side of the outer wall of the second bolt (403) is threadedly connected to the outer wall of the frame (402).
5. A large bolt node plate installation opening and closing device for steel structures according to claim 4, characterized in that: Chutes (7) are respectively machined on the upper and lower sides of the front surface of the vertical plate (1).
6. A large bolt node plate installation opening and closing device for steel structures according to claim 5, characterized in that: The adjustment structure (5) includes a second node plate (501), a vertical plate (502), a screw rod (503) and a grip (504); The outer wall of the second node plate (501) is slidably clamped with the inner wall of the first node plate (8), the right ends of the upper and lower sides of the second node plate (501) are respectively fixedly connected with the inner sides of the vertical plates (502), the inner wall of the vertical plate (502) is rotatably connected with the outer wall of the right side of the screw rod (503), the left end of the screw rod (503) is fixedly connected with the right side of the grip (504), and the outer wall of the screw rod (503) is threadedly connected with the inner wall of the square plate (9).
7. A large bolt node plate installation opening and closing device for steel structures according to claim 6, characterized in that: The diameter of the circular opening on the front surface of the second node plate (501) is the same as the diameter of the circular opening on the front surface of the first node plate (8), and the inner sides of the outer walls of the two screw rods (503) are adjacent to the upper and lower sides of the first node plate (8) respectively.
Citation Information
Patent Citations
Installation switching device for large-scale bolt gusset plate of steel structure and installation method of device
CN108086485A
Steel structure column butt joint positioning device
CN209556408U
Modular wiring device
CN214590289U