A method for power quality warning, source tracing and responsibility quantification in substations
By constructing power quality indicators and weights, calculating comprehensive scores, and using the ShapeDTW algorithm for traceability analysis, the complex problem of distributed photovoltaic power quality assessment in the Taiwan area is solved, power quality alarms and responsibility quantification are realized, and power quality is ensured. Control and management.
Patent Information
- Application Number
- CN202211515193.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-29
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2042-11-29
AI Technical Summary
It is difficult for the existing system to effectively assess and trace the source of power quality problems in distributed photovoltaic grid-connected backend areas, resulting in complex assessment of power quality indicators, difficulty in identifying the causes of power quality deterioration and quantification of responsibilities, and a lack of responsibility positioning for photovoltaic users and systems.
By analyzing the power quality data in the Taiwan area, we construct typical power quality indicators, determine the weight of each indicator, calculate the comprehensive power quality score, output the alarm level, and use the ShapeDTW algorithm to complete and align the power quality time series data to conduct traceability and quantitative analysis of responsibility. Distinguish the responsibilities between users and the power grid.
It has realized the alarm, traceability and responsibility quantification of power quality in Taiwan, clarified the definition of responsibilities between users and the power grid, and achieved full-process control and precise management of distributed photovoltaic power quality indicators.
Smart Images

Figure CN115759860B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power quality analysis in a substation, and in particular to a method for power quality alarm, source tracing and responsibility quantification in a substation. Background Art
[0002] Under the background of "dual carbon", the status of distributed photovoltaic in the power energy supply is becoming increasingly prominent. With the vigorous promotion of distributed photovoltaic, a large number of distributed photovoltaic accesses have brought many challenges to the economic, safe and stable operation of traditional power grids, which are mainly reflected in the power quality problems such as harmonics, three-phase imbalance, voltage fluctuation and flicker after it is connected to the grid. The existing system only evaluates the power quality problems in the substation, and lacks research on the impact of distributed photovoltaic output on the power quality indicators of the substation, which makes the power quality problems of the existing distributed photovoltaic substations and the rights and responsibilities of photovoltaic users unclear, and it is difficult to implement the principle of "whoever pollutes, whoever governs". At present, the evaluation of the power quality indicators of distributed photovoltaic grid connection is relatively complicated and difficult to apply to the front line of the power grid. Moreover, when the widespread grid connection of distributed photovoltaic affects the power quality of the substation, it is impossible to trace the source of the excessive power quality, and it is difficult to identify the cause of the deteriorated power quality. There is a lack of quantification of the responsibility of photovoltaic users and the system for the power quality of the substation. Summary of the invention
[0003] In view of this, the purpose of the present invention is to provide a method for power quality alarm, tracing and responsibility quantification in a substation area, which can trace the excessive power quality indicators at the public connection point and the distributed photovoltaic users and quantify the responsibility, and clarify the power quality responsibilities of users and the power grid background.
[0004] To achieve the above-mentioned purpose, the present invention provides a method for power quality warning, source tracing and responsibility quantification in a substation area, the method comprising the following steps:
[0005] S101. Analyze the power quality data of the substation area and construct typical power quality indicators;
[0006] S102, determining the weight of each typical power quality indicator;
[0007] S103, obtaining corresponding power quality data of the distributed photovoltaic area according to the typical power quality index, calculating the comprehensive score of the power quality index, and outputting the alarm level according to the comprehensive score of the power quality index;
[0008] S104. When the alarm level reaches the preset level, the power quality indicators exceeding the standard in the substation are traced and the responsibility is quantified.
[0009] Furthermore, typical power quality indicators include harmonic voltage w1, three-phase unbalance w2, voltage flicker w3, interharmonic voltage w4 and voltage deviation w5.
[0010] Furthermore, the harmonic voltage also includes a secondary index, which includes the second harmonic voltage w 11 、3rd harmonic voltage w 12 , 5th harmonic voltage w 13 , 7th harmonic voltage w 14 , 9th harmonic voltage w 15 Total harmonic voltage distortion w 16 .
[0011] Furthermore, step S102 specifically includes the following steps:
[0012] S201. According to the scaling theory, construct a pairwise comparison judgment matrix A:
[0013] A=(a ij ) n×n (i,j=1,2,…,n).
[0014] Among them, a ii =1,a ij =1 / a ji , where i and j are two different typical power quality indicators, and the scale of the matrix elements is determined according to the relative importance of i and j;
[0015] S202, according to Aw = λ max w finds the maximum characteristic root λ of the judgment matrix A max And the corresponding eigenvector w, the relative weight of each typical power quality indicator is obtained.
[0016] Furthermore, in step S103, the calculation formula of the harmonic voltage index score y1 is as follows:
[0017]
[0018] In formula (1), if the generated harmonic voltage meets the requirements of GB / T 14549 standard, then x=yes, otherwise x=no;
[0019] The calculation formula of the three-phase unbalance index score y2 is as follows:
[0020]
[0021] In formula (2), the value of x is the negative sequence voltage unbalance degree at the common connection point;
[0022] The calculation formula of voltage flicker index score y3 is as follows:
[0023]
[0024] In formula (3), when the voltage flicker meets the requirements of GB / T 12326 standard, x = yes, otherwise x = no;
[0025] The calculation formula of interharmonic voltage index score y4 is as follows:
[0026]
[0027] In formula (4), when the interharmonic voltage meets the requirements of GB / T 24337 standard, x = yes, otherwise x = no;
[0028] The calculation formula of the voltage deviation index score y5 is as follows:
[0029]
[0030] In formula (5), x is the relative value of the deviation of the actual operating voltage to the nominal voltage. The calculation formula for the comprehensive score of the power quality index is as follows:
[0031]
[0032] In formula (6), M represents the comprehensive score of power quality indicators, n is the number of indicators, and y k represents the score of the kth indicator, w k Represents the weight of the k-th indicator.
[0033] Furthermore, in step S103, an alarm level is output according to the comprehensive score of the power quality index. Specifically, the alarm level is divided into three levels. The alarm level corresponding to the comprehensive score of the power quality index between 90 and 100 points is the first level, the alarm level corresponding to the comprehensive score of the power quality index between 70 and 90 points is the second level, and the alarm level corresponding to the comprehensive score of the power quality index below 70 points is the third level. In step S104, when the alarm level is the second level or the third level, the power quality indicators that exceed the standard are traced and the responsibility is quantified.
[0034] Furthermore, in step S104, before tracing the source and conducting responsibility quantification analysis on the power quality indicators exceeding the standard in the substation, the ShapeDTW algorithm is used to complete and align the power quality time series monitoring data of the substation and the time series monitoring data of the output of photovoltaic users under the substation.
[0035] Furthermore, in step S104, before tracing the source and conducting responsibility quantification analysis on the power quality indicators exceeding the standard in the substation, the time series monitoring data of the power quality indicators exceeding the standard are recorded as X = {x1, x2, ..., x n ,...,x N}, the sum of the time-series output data of all distributed photovoltaics in the corresponding area is recorded as P = {p1, p2, ..., pm ,...,p M}, after the two time series are completed and aligned based on the ShapeDTW algorithm, the time series monitoring data of the power quality index is recorded as X'={x'1,x'2,...,x' t ,...,x' T}, the sum of the distributed photovoltaic power output data is recorded as P' = {p'1, p'2, ..., p' t ,...,p' T}, the Pearson correlation coefficient between these two time series is:
[0036]
[0037] In formula (7), p′ i and x′ i are the i-th elements of sequences P' and X' respectively, and are the means of sequences P' and X' respectively. If the Pearson correlation coefficient is not less than 0.6, the power quality is traced and the responsibility is quantified for all distributed users under the substation. T is the length of the two time series after completion and alignment using the ShapeDTW algorithm.
[0038] Furthermore, the power quality of all distributed users in the substation area is traced and the responsibility is quantified, which specifically includes the following steps:
[0039] S301. Calculate the background power quality responsibility of the substation area. The specific calculation method is as follows:
[0040] First, use X' to compare P1', P2', ..., P I 'Do regression and get:
[0041] X'=β0+β1P1'+β2P2'+...+β I P I ' (8)
[0042] In this way, we can obtain β0, β1, …, β I equal regression coefficients, and P1', P2', ..., P I 'Insert the obtained regression model again and get
[0043]
[0044] Recalculate The simple correlation coefficient between and X', after removing this correlation coefficient, the remainder is the background power quality responsibility D B :
[0045]
[0046] In the formula and x' t They are and the tth element in X'; and They are and the mean corresponding to X'.
[0047] S302. Calculate the power quality responsibility of each photovoltaic user. The specific calculation method is as follows:
[0048] First, the correlation between the output data of the i-th distributed photovoltaic user and the time series monitoring data of the excessive power quality indicators is calculated:
[0049]
[0050] Then calculate the power quality responsibility D of the i-th distributed photovoltaic user i :
[0051]
[0052] Compared with the prior art, the present invention has the following beneficial effects:
[0053] The present invention provides a method for warning, tracing and quantifying the power quality of an area. Aiming at typical power quality problems of distributed photovoltaics, the method constructs power quality indicators of distributed photovoltaics, determines the weight of each indicator, calculates the comprehensive score of the power quality indicators, and outputs the corresponding alarm level according to the score. When the alarm level exceeds the limit, the power quality indicators that exceed the standard in the area are traced and analyzed for responsibility quantification, so as to clarify the power quality responsibility of the area, and realize the full-process control and precise management of the warning, tracing and responsibility quantification of the power quality indicators of the distributed photovoltaic area. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only preferred embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0055] Figure 1 It is a schematic diagram of the overall process of a method for power quality alarm, source tracing and responsibility quantification in an area provided by an embodiment of the present invention.
[0056] Figure 2 It is a schematic diagram of the power quality alarm model indicator system provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0057] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The enumerated embodiments are only used to explain the present invention and are not used to limit the scope of the present invention.
[0058] Reference Figure 1 This embodiment provides a method for power quality warning, source tracing and responsibility quantification in a substation area, and the method includes the following steps:
[0059] S101. Analyze the power quality data of the substation and construct typical power quality indicators.
[0060] S102: Determine the weight of each typical power quality indicator.
[0061] S103, obtaining corresponding power quality data of the distributed photovoltaic area according to the typical power quality index, calculating the comprehensive score of the power quality index, and outputting the alarm level according to the comprehensive score of the power quality index;
[0062] S104. When the alarm level reaches the preset level, the power quality indicators exceeding the standard in the substation are traced and the responsibility is quantified.
[0063] Reference Figure 2 In view of the typical power quality characteristics of distributed photovoltaic areas, this embodiment selects power quality indicators such as harmonic voltage, three-phase imbalance, voltage flicker, interharmonic voltage, and voltage deviation to build an alarm evaluation system. And select the 2nd, 3rd, 4th, 5th, 7th, and 9th harmonic voltages and the total harmonic distortion rate as secondary indicators of harmonic voltage.
[0064] In this embodiment, the determination of the weight of each typical power quality indicator includes the following steps:
[0065] S201. According to the scaling theory, construct a pairwise comparison judgment matrix A:
[0066] A=(a ij ) n×n (i,j=1,2,…,n).
[0067] Among them, a ii =1,a ij =1 / a ji , where i and j are two different typical power quality indicators, and the scale of the matrix elements is determined according to the relative importance of i and j, as shown in Table 1:
[0068] Table 1
[0069]
[0070] The relative importance of i and j can be assessed based on expert experience.
[0071] S202, according to Aw = λmax w finds the maximum characteristic root λ of the judgment matrix A max And the corresponding eigenvector w, the relative weight of each typical power quality indicator is obtained.
[0072] In step S103, the calculation formula of the harmonic voltage index score y1 is as follows:
[0073]
[0074] In formula (1), if the generated harmonic voltage meets the requirements of GB / T 14549 standard, then x=yes, otherwise x=no;
[0075] The calculation formula of the three-phase unbalance index score y2 is as follows:
[0076]
[0077] In formula (2), the value of x is the negative sequence voltage unbalance degree at the common connection point;
[0078] The calculation formula of voltage flicker index score y3 is as follows:
[0079]
[0080] In formula (3), when the voltage flicker meets the requirements of GB / T 12326 standard, x = yes, otherwise x = no;
[0081] The calculation formula of interharmonic voltage index score y4 is as follows:
[0082]
[0083] In formula (4), when the interharmonic voltage meets the requirements of GB / T 24337 standard, x = yes, otherwise x = no;
[0084] The calculation formula of the voltage deviation index score y5 is as follows:
[0085]
[0086] In formula (5), x is the relative value of the deviation of the actual operating voltage from the nominal voltage. The calculation formula for the comprehensive score of the power quality index is as follows:
[0087]
[0088] In formula (6), M represents the comprehensive score of power quality indicators, n is the number of indicators, and y k represents the score of the kth indicator, w k Represents the weight of the k-th indicator.
[0089] In step S103, the alarm level is output according to the comprehensive score of the power quality index, specifically: the alarm level is divided into three levels, the alarm level corresponding to the comprehensive score of the power quality index between 90-100 points is the first level, the alarm level corresponding to the comprehensive score of the power quality index between 70-90 points is the second level, and the alarm level corresponding to the comprehensive score of the power quality index below 70 points is the third level. In step S104, when the alarm level is the second level or the third level, the power quality index that exceeds the standard is traced and the responsibility is quantitatively analyzed. When the alarm level is the first level, it means that the power quality index of the substation meets the standard, and the alarm model does not issue an alarm signal. When the alarm level is the second level, it means that the substation needs to strengthen the power quality control in principle, conduct power quality index governance, and guide the subsequent photovoltaic development of the substation in an orderly manner. When the alarm level is the third level, it is necessary to give a power quality index analysis report, order the substation to rectify, govern the power quality index, and give a rectification work order.
[0090] Since the time series monitoring data of the power quality of the substation and the time series monitoring data of the output of photovoltaic users under the substation often have different data lengths due to different sampling frequencies of the monitoring equipment, in order to solve this problem, before tracing and quantifying the responsibility of the power quality indicators that exceed the standard in the substation, this embodiment uses the ShapeDTW algorithm to complete and align the time series monitoring data of the power quality of the substation and the time series monitoring data of the output of photovoltaic users under the substation. The dynamic time wrapping algorithm (DTW) is often used to find the optimal twisted alignment method of two sequences that cannot be aligned in time. The solution is achieved by minimizing the cumulative distance of the two sequences, and the minimum cumulative distance is called the DTW distance of the two sequences.
[0091] Suppose there are two time series x={x1,x2,...,x n} and y={y1,y2,...,y n}. First, calculate the Euclidean distance between each point in the sequence x and y. Obtain an m×n order Euclidean distance matrix M, M i,j represents the Euclidean distance between the i-th point in sequence x and the j-th point in sequence y. Next, define M c is the cumulative distance matrix, and calculates M c According to the following formula, M c Initialize the first row and column of the matrix:
[0092]
[0093] For each i in 2≤i less than or equal to n, calculate the cumulative distance M of j from 2 to m c, i ,j, which is calculated as follows:
[0094]
[0095] In the above formula, 2≤i≤n and 2≤j≤m, i,j∈N. Finally, the DTW distance of sequences x and y is determined. Since the calculation process of the cumulative distance matrix is equivalent to the matching process of two time series, each step will produce the minimum cumulative distance with the adjacent path. Then, when we proceed to the last step, we can get the overall minimum cumulative distance of the two sets of data, that is, DTW(x,y)=M c, n , m.
[0096] The ShapeDTW algorithm avoids the occurrence of pathological matching based on DTW, while taking into account the optimal matching of the overall and local morphology. Its basic idea is to segment the two sequences, calculate the DTW optimal matching for each segment of data, and generate a new sequence based on the matching path to achieve the effect of completing the two sets of sequences. The ShapeDTW algorithm completes the sequence using the following formula:
[0097] (x″,y″)=ShapeDTW(x,y)
[0098] ShapeDTW data completion includes the following steps:
[0099] 1) Select the benchmark data, intercept the data and form a data matrix. Select the benchmark data, intercept the data and form a data matrix. Let the original data x = {x1, x2, ..., x n} and y={y1,y2,...,y n}, select data x as the benchmark data, take each element of the two sets of data as the center, and intercept the lengths of s x With s y sequence and generate the matrix With the matrix
[0100] 2) Find the best match. For each row of data x in x′ i ′, calculate DTW(x′ i ,y′1),DTW(x′ i ,y′2),…,DTW(x′ i ,y′ n ), let y′ j Get the minimum DTW(x′ i ,y′ j ), then it means that the i-th row of matrix x′ matches the j-th row of matrix y′, that is, it means that the i-th element of the original sequence x matches the j-th element of the source sequence y.
[0101] 3) Form the padded sequences x″ and y″. Keep the reference sequence unchanged, that is, x″=x, the i-th element y″ of the sequence y″ i The value of x i Matching y j , that is, y″ i =y′1. According to this rule, the sequence y is reconstructed to form a new sequence.
[0102] In step S104, before tracing the source and conducting responsibility quantification analysis on the power quality indicators exceeding the standard in the substation, the time series monitoring data of the power quality indicators exceeding the standard are recorded as X = {x1, x2, ..., x n ,...,x N}, the sum of the time-series output data of all distributed photovoltaics in the corresponding area is recorded as P = {p1, p2, ..., p m ,...,p M}, after the two time series are completed and aligned based on the ShapeDTW algorithm, the time series monitoring data of the power quality index is recorded as X'={x'1,x'2,...,x' t ,...,x' T}, the sum of the distributed photovoltaic power output data is recorded as P' = {p'1, p'2, ..., p' t ,...,p' T}, the Pearson correlation coefficient between these two time series is:
[0103]
[0104] In formula (7), p′ i and x′ i are the i-th elements of sequences P' and X' respectively, and are the means of the sequences P' and X', respectively. T is the length of the two time series after the ShapeDTW algorithm is used to complete and align them. If the Pearson correlation coefficient is less than 0.6, it means that the excessive power quality in the area is mainly affected by the power quality of the power grid system; otherwise, it means that the excessive power quality index is caused by the distributed photovoltaic under the area. Therefore, if the Pearson correlation coefficient is not less than 0.6, the power quality of all distributed users under the area is traced and the responsibility is quantified.
[0105] The power quality of all distributed users in the substation is traced and the responsibility is quantified, which includes the following steps:
[0106] S301. Calculate the background power quality responsibility of the substation (the contribution of power quality phenomena caused by other interfering users other than distributed photovoltaics). The specific calculation method is as follows:
[0107] First, use X' to compare P1', P2', ..., P I 'Do regression and get:
[0108] X'=β0+β1P1'+β2P2'+...+β I P I ' (8)
[0109] In this way, we can obtain β0, β1, …, β I equal regression coefficients, and P1', P2', ..., P I 'Insert the obtained regression model again and get
[0110]
[0111] Recalculate The simple correlation coefficient between and X', after removing this correlation coefficient, the remainder is the background power quality responsibility D B :
[0112]
[0113] In the formula and x' t They are and the tth element in X'; and They are and the mean corresponding to X'.
[0114] S302. Calculate the power quality responsibility of each photovoltaic user. The specific calculation method is as follows:
[0115] First, the correlation between the output data of the i-th distributed photovoltaic user and the time series monitoring data of the excessive power quality indicators is calculated:
[0116]
[0117] Then calculate the power quality responsibility D of the i-th distributed photovoltaic user i :
[0118]
[0119] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for power quality warning, source tracing and responsibility quantification in a substation, characterized in that: The method comprises the following steps: S101. Analyze the power quality data of the substation area and construct typical power quality indicators; S102, determining the weight of each typical power quality indicator; S103, obtaining corresponding power quality data of the distributed photovoltaic area according to the typical power quality index, calculating the comprehensive score of the power quality index, and outputting the alarm level according to the comprehensive score of the power quality index; S104. When the alarm level reaches the preset level, the power quality indicators exceeding the standard in the substation area are traced and the responsibility is quantitatively analyzed; In step S104, before tracing the source and quantifying the responsibility of the power quality indicators that exceed the standard in the substation, the ShapeDTW algorithm is used to complete and align the power quality time series monitoring data of the substation and the time series monitoring data of the output of photovoltaic users under the substation; In step S104, before tracing the source and quantifying the responsibility of the power quality indicators that exceed the standard in the substation area, the time series monitoring data of the power quality indicators that exceed the standard are recorded as , the sum of the time series output data of all distributed photovoltaics in the corresponding area is recorded as After the two time series are completed and aligned based on the ShapeDTW algorithm, the time series monitoring data of the power quality indicators is recorded as , the sum of the time series output data of distributed photovoltaic is recorded as , find the Pearson correlation coefficient between these two time series: (7) In formula (7), and Sequence P' and X' The i-th element of and Sequence P' and X' If the Pearson correlation coefficient is not less than 0.6, the power quality traceability and responsibility quantification are performed for all distributed users in the substation area. T is the length of the two time series after the ShapeDTW algorithm is used to complete and align them. The power quality of all distributed users in the substation is traced and the responsibility is quantified, which includes the following steps: S301. Calculate the background power quality responsibility of the substation area. The specific calculation method is as follows: First use X' right Regression yields: (8) This gives the regression coefficient , and Substitute the obtained regression model again and get : (9) Recalculate and X' The simple correlation coefficient between them, after removing this correlation coefficient, the remainder is the background power quality responsibility : (10) In the formula and They are and X' The t elements; and They are and X' The corresponding mean; S302. Calculate the power quality responsibility of each photovoltaic user. The specific calculation method is as follows: First, the correlation between the output data of the i-th distributed photovoltaic user and the time series monitoring data of the excessive power quality indicators is calculated: (11) Then calculate the power quality responsibility of the i-th distributed photovoltaic user : (12)。 2. A method for power quality warning, source tracing and responsibility quantification in an area according to claim 1, characterized in that: Typical power quality indicators include harmonic voltage w1, three-phase unbalance w2, voltage flicker w3, interharmonic voltage w4 and voltage deviation w5.
3. A method for power quality warning, source tracing and responsibility quantification in an area according to claim 2, characterized in that: The harmonic voltage also includes secondary indicators, which include the 2nd harmonic voltage w 11 、3rd harmonic voltage w 12 、5th harmonic voltage w 13 、7th harmonic voltage w 14 , 9th harmonic voltage w 15 Total harmonic voltage distortion w 16 .
4. A method for power quality warning, source tracing and responsibility quantification in an area according to claim 2, characterized in that: Step S102 specifically includes the following steps: S201. According to the scaling theory, construct a pairwise comparison judgment matrix A: in, , , where i and j are two different typical power quality indicators, and the scale of the matrix elements is determined according to the relative importance of i and j; S202, according to Find the maximum eigenvalue of the judgment matrix A and the corresponding eigenvector , and obtain the relative weights of each typical power quality indicator.
5. A method for power quality warning, source tracing and responsibility quantification in an area according to claim 2, characterized in that: In step S103, the harmonic voltage index is scored The calculation formula is as follows: (1) In formula (1), if the generated harmonic voltage meets the requirements of GB / T 14549 standard, then x=yes, otherwise x=no; Three-phase unbalance index score The calculation formula is as follows: (2) In formula (2), the value of x is the negative sequence voltage unbalance degree at the common connection point; Voltage flicker index score The calculation formula is as follows: (3) In formula (3), when the voltage flicker meets the requirements of GB / T 12326 standard, x=yes, otherwise x=no; Interharmonic voltage index score The calculation formula is as follows: (4) In formula (4), when the interharmonic voltage meets the requirements of GB / T 24337 standard, x=yes, otherwise x=no; Voltage deviation index score The calculation formula is as follows: (5) In formula (5), x is the relative value of the deviation of the actual operating voltage to the nominal voltage. The calculation formula for the comprehensive score of the power quality index is as follows: (6) In formula (6), M represents the comprehensive score of power quality indicators, n is the number of indicators, represents the score of the kth indicator, Represents the weight of the k-th indicator.
6. A method for power quality warning, source tracing and responsibility quantification in an area according to claim 5, characterized in that: In step S103, the alarm level is output according to the comprehensive score of the power quality index. Specifically, the alarm level is divided into three levels. The alarm level corresponding to the comprehensive score of the power quality index between 90-100 points is the first level, the alarm level corresponding to the comprehensive score of the power quality index between 70-90 points is the second level, and the alarm level corresponding to the comprehensive score of the power quality index below 70 points is the third level. In step S104, when the alarm level is the second level or the third level, the excessive power quality indicators are traced and the responsibility is quantified.
